JP3896537B2 - Hanging tool for construction, construction jig and construction method thereof - Google Patents
Hanging tool for construction, construction jig and construction method thereof Download PDFInfo
- Publication number
- JP3896537B2 JP3896537B2 JP2001402071A JP2001402071A JP3896537B2 JP 3896537 B2 JP3896537 B2 JP 3896537B2 JP 2001402071 A JP2001402071 A JP 2001402071A JP 2001402071 A JP2001402071 A JP 2001402071A JP 3896537 B2 JP3896537 B2 JP 3896537B2
- Authority
- JP
- Japan
- Prior art keywords
- construction
- hanging
- metal
- jig
- marking line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、建築用吊下げ金具及びその施工治具並びにその施工方法に係り、さらに詳しく説明すると、建築構造物におけるH形鋼などを介して金属製折板材からなる屋根材や壁材が極めて簡易に構築できる建築用吊下げ金具と、この金属製折板材が正確に且つ強固に構築でき、使用法も簡便である施工治具と、さらに、金属製折板材からなる屋根材や壁材の施工が簡易に行える施工方法とに関するものである。
【0002】
【従来の技術】
従来、建築構造物において、例えば、そのH形鋼を介して金属製折板材からなる屋根を構築するには、例えば、図11に示す構築工法が採用されている。この工法は、図示するように建築構造物におけるH形鋼100のフランジ部101に略U形状の金具体110を挟持固定させて、その下部板111に垂下状に設けたネジ杆112に山座金120とフェルトパッキン121を介在させて金属製折板材125の頂面126に設けたネジ穴127を通した後、さらに、平座金122を介在させて前記ネジ杆112の下端部にナット123を締着させ、順次隣の頂面126a・・・を同様に締着させることで、H形鋼100に複数の金属製折板材125からなる屋根を設置している(実用新案登録第3013802号公報参照)。なお、金具体110の素材は、ある程度の弾性材で構成されており、その開口部113は、若干開口するように構成されている。
【0003】
また、同じ権利者による上記実用新案と同様な技術思想に基づく略U形状の金具体を基本とする金具が意匠登録として開示されている(意匠登録第734823号公報、同734823号の類似1、同第739866号公報参照)。
【発明が解決しようとする課題】
【0004】
上記実用新案登録の場合、屋根材の山ピッチに位置決めのための墨出しを行う必要があり、手間がかかる課題があった。また、H形鋼のフランジ部に金具体を取付けるには、その開口部を挟持させるため、フランジ部の厚みにより開口部が開かずに金具体を挟持させることができないので、その略U形状の開口部の寸法が異なる複数の金具体を準備する必要があった。
【0005】
さらに、屋根材の取付けは、H形鋼の下面を基準にするため、歪みやうねりなどが位置決めの際、直接影響を及ぼしており、屋根材を取付ける際には、微調整を行う必要があるなどの課題があった。また、梁をまたぐ場合には、この金具体は使用できないし、ケバラを使用する場合には、梁を延出させる必要があった。
【0006】
一方、意匠登録の場合も上記と同様な課題があり、これら課題を解決する必要が依然として残っていった。
【0007】
【発明が解決しようとする課題】
本発明は、上記課題を解決するためになされたものであり、その目的は、建築構造物におけるH形鋼を介して金属製折板材からなる屋根材や壁材が極めて簡易に構築できる構成の建築用吊下げ金具と、この建築用吊下げ金具を取付けて屋根材や壁材を構築する際に使用する施工治具として、金属製折板材が正確、且つ強固に構築でき、その使用法も簡便である治具と、さらに、金属製折板材からなる屋根材や壁材の構築が簡易に行える施工方法とを提供することにある。
【0008】
【課題を解決するための手段】
本発明に係る請求項1記載の発明は、左右の鍔部と垂下部及び平らな底部から構成する長尺な金属材からなる皿状体であって、前記底部の長手方向に沿って等間隔に先端を尖鋭部とした複数個の剣先ボルトが下方に向けて垂下状に形成さ
れ、前記底部に等間隔に複数個の位置決め兼用水抜き穴が設けられていることを特徴とする。
【0009】
本発明に係る請求項2記載の発明は、少なくとも一方の鍔部の下面に、皿状体の長手方向の長さ寸法の1/2を示す刻印が施されていることを特徴とする。
【0010】
本発明に係る請求項3記載の発明は、平面から見て左右両端と中央部とに幅広部を備える帯状体であって、前記各幅広部の上面に複数個の小突起が形成されると共に、前記左右両端の幅広部に続く幅狭部に等間隔の位置決め用突起及びボルト逃げ穴とがそれぞれ形成され、且つ、前記帯状体の下面にハンドルが設けられていることを特徴とする。
【0011】
本発明に係る請求項4記載の発明は、金属製折板材を構築するH形鋼などの取付け面に、長手方向中心部に沿う横方向の墨出し線とスタート位置を示す墨出し線と長手方向に沿う横方向の墨出し線とを描く工程と、前記2つの墨出し線に沿って1本目の建築用吊下げ金具を配して前記取付け面に溶着させる工程と、続く2本目の建築用吊下げ金具を1本目の右端側に前記長手方向の墨出し線に沿わせて配する工程と、隣接し合う1本目及び2本目との建築用吊下げ金具の端部間の基準点と施工治具の上面の略中心部とを当接させる工程と、前記施工治具の各位置決め用突起を1本目及び2本目の各位置決め兼用水抜き穴と、前記施工治具の各ボルト逃げ穴を1本目及び2本目の左右の各剣先ボルトにそれぞれ挿通させる工程と、前記2本目が前記長手方向中心部の墨出し線に沿っていることを確認した上、2本目の建築用吊下げ金具を仮止め溶着させる工程と、前記施工治具を取外して2本目の建築用吊下げ金具を前記取付け面に溶着させる工程と、各建築用吊下げ金具の剣先ボルトに山座金やパッキン、平座金、ナットなどを介して金属製折板材が構築させる工程とからなることを特徴とする。
【0012】
本発明に係る請求項5記載の発明は、金属製折板材を構築するH形鋼などの取付け面に、長手方向中心部に沿う横方向の墨出し線とスタート位置を示す墨出し線とを描く工程であって、2本目以降の建築用吊下げ金具に用いる長手方向中心部に沿う横方向の墨出し線は、描かずに不要であることを特徴とする。
【0013】
【作用】
本発明に係る建築用吊下げ金具によれば、建築用吊下げ金具に等間隔に形成させた剣先ボルトを介して金属製折板材の頂面に等間隔に設けられたネジ穴に山座金などで締着できるため、建築構造物におけるH形鋼などの取付け面に金属製折板材からなる屋根材や壁材の構築が簡易に行える。また、皿状体構成の建築用吊下げ金具内に雨水が浸入しても、その底部に複数個の位置決め兼用水抜き穴が設けられているため、雨水が溜まることがなくなり、建築用吊下げ金具の腐敗が防げる。
【0014】
本発明に係る建築用施工治具によれば、この施工治具には、等間隔に位置決め用突起とボルト逃げ穴とが形成されていること共に、少なくとも2本目用の墨出し線が取付け面の長手方向中心部に描いてあるため、2本目の建築用吊下げ金具は勿論のこと、3本目以降も施工治具を使用することにより取付け面に対して正確に行える。また、施工治具の小突起により建築用吊下げ金具の横方向のズレが防げるし、この施工治具に幅狭部を設けたことにより、施工治具の軽量化と施工時の建築用吊下げ金具に対する仮止め溶接が簡易に行えること及び幅狭部による建築用吊下げ金具の取付け位置が正確に真直ぐに延出しているかを作業者が目視でき、従って正確な金属製折板材の構築ができる。
【0015】
本発明に係る建築用施工方法によれば、1本目の建築用吊下げ金具は、長手方向中心部に沿う墨出し線とスタート位置を示す墨出し線とを描く工程で、取付け面に正確に固着できる。2本目は長手方向中心部に沿う墨出し線と隣接し合う1本目と2本目とに、その位置決め用突起と位置決め兼用水抜き穴及びボルト逃げ穴と剣先ボルトとを挿通させると工程などで、建築用吊下げ金具は同様に取付け面に正確に固着できる。また、3本目以降は長手方向中心部に沿う墨出し線が、存在しなくても施工治具を使用ことで同様に取付け面に建築用吊下げ金具が正確に固着できる。
【0016】
【発明の実施の形態】
以下、本発明の実施形態を図面を参照して説明する。図1は、本発明に係る建築用吊下げ金具の第1例を示す斜視図、図2は、同第1例の裏面を示す斜視図、図3は同第1例の使用状態を示す斜視図、図4は、建築用吊下げ金具の第2例を示す斜視図、図5は、同第2例の使用状態を示す要部断面図、図6は、本発明に係る施工治具の第1例を示す斜視図、図7(イ)から(ホ)は、同第1例の使用状態を順次示す説明図、図8は、図7(ニ)の状態を示す一部断面説明図、図9は、同施工治具の第2例を順次示す斜視図、図10(イ)から(ホ)は、同第2例の使用状態を順次示す説明図である。
【0017】
最初に、建築用吊下げ金具1について説明する。この建築用吊下げ金具1は、図1〜図3に図示するように所定の長さを備える長尺な金属材からなる皿状体2で形成されている。つまり、この皿状体2は、左右の鍔部20,20と垂下部21,21及び平らな底部22を備える断面形状が皿状体2に形成され、底部22に先端を尖鋭部23としたボルト24(以下、剣先ボルトと云う)が3個等間隔に、尖鋭部23を下方に向けて垂下状に設けられている。さらに、底部22の両端から等間隔に4個の位置決め兼用水抜き穴25,26が設けられ、この内、両端の水抜き穴26は、小形状に形成されているが、同じ形状の大きさでもよいこと勿論である。
【0018】
この皿状体2の材質は、金属材であればよく、例えば、亜鉛メッキ鋼板や高耐性圧延鋼材、着色亜鉛鉄板、溶融アルミニウムメッキ鋼板及び塗装ステンレス鋼板などの金属材が好ましい。
【0019】
上記水抜き穴25,26は、4個形成されており、図示のように等間隔に設けることが好ましいが、特に、両端の小形状の水抜き穴26の穴は、必ずしも円形状の穴に限定されるものではない。また、皿状体2の中央部を示す目印として、鍔部20の下面201に刻印27が刻んであるが、必ずしも鍔部20の下面201に限定されるものでもなく、図示省略するが、鍔部20の下面201から上面200に連続状に続けて刻印27してもよい。
【0020】
上記建築用吊下げ金具1の使用方法を説明する。図3に示すようにH形鋼3の下方のフランジ部30の下面31に、H形鋼3に構築する屋根の大きさに応じて複数個の建築用吊下げ金具1をその上面200とフランジ部30の下面31とを当接させ、この鍔部20の上面200とフランジ部30の下面31との所定個所に複数個の溶接32,32,…を施して建築用吊下げ金具1をフランジ部30に固着させることにより、金属製折板材5が取付けられる。
【0021】
詳しくは、建築用吊下げ金具1の剣先ボルト24に図示する山座金53とフェルトパッキン54とを介在させて金属製折板材5の頂面50に設けたネジ穴55(図示省略)を通した後、平座金56を介在させて前記剣先ボルト24の下端部にナット56を締着させ、順次隣の頂面50,50,・・・に同様に剣先ボルト24を締着させることで、H形鋼3のフランジ部30の下面31に固着させた複数個の建築用吊下げ金具1を介して金属製折板材5が構築されている。この頂面50のネジ穴55(図示省略)は、予め事前に金属製折板材5の各頂面50にそれぞれ形成されており、定められた取付けピッチで穴55が開けられている。
【0022】
この建築用吊下げ金具1は、通称88タイプと称する三つ山からなる金属製折板構成の屋根材5に対応させるものであり、図示のように屋根材は、頂面50と底面51及び傾斜面52とで形成されている。
【0023】
図4及び図5に示す建築用吊下げ金具10は、上記建築用吊下げ金具1とは剣先ボルト24の数が異なっており、この例では、皿状体2に2個の剣先ボルト24が等間隔に設けてある。また、3個の位置決め兼用水抜き穴25が形成されており、この水抜き穴25は、等間隔に設けてあることが好ましい。
【0024】
さらに、この皿状体2の中央部を示す目印として、上記と同様に鍔部20の下面201に刻印27(図示省略)が刻んであるが、この刻印26の位置は、鍔部20の下面201に限定されるものでもなく、鍔部20の下面201から上面200に連続状に続けて刻印27してもよい。
【0025】
この建築用吊下げ金具10は、通称150タイプと称する二つ山からなる折板構成の金属製折板材5aに使用される屋根材である。図5に示すように、剣先ボルト24に山座金53とフェルトパッキン54とを介在させて金属製折板材5aの頂面50に設けたネジ穴55を通した後、平座金56を介在させて剣先ボルト24の下端部にナット57を締着させて、H形鋼3のフランジ部30の下面31に建築用吊下げ金具10が固着されている。
【0026】
次に、施工治具4について説明する。図6に示す施工治具4は、上記する88タイプの金属製折板構成の屋根材5に適用できるものである。つまり、平面から見て左右両端部と中央部とが幅広部41,42を備える所定厚みの帯状体43からなり、左右及び中央部の幅広部41,42の上面に複数個の小突起44,44…が設けてあり、左右の幅広部41,41の近傍に位置する幅狭部45の上面に位置決め用の突起46,46がそれぞれ設けてある。また、この左右の幅狭部45,45の近傍に建築用吊下げ金具1の剣先ボルト24が挿通するボルト逃げ穴47,47がそれぞれ設けられている。48は、下面の中央部に設けられたハンドルであり、このハンドル48の両端部のネジ部には、それぞれナット480が締着させ、このナット480が小穴49に挿通させてハンドル48が設けられている。
【0027】
さらに、この施工治具4を使用した施工方法を図7及び図8により説明する。目的とする屋根材を構築する、例えば、H形鋼3のフランジ部30の下面31には、その建築用吊下げ金具1の長手方向中心部に沿う横方向に延びる墨出し線300(図7のイ)と、建築用吊下げ金具1のスタート位置を示す縦方向の墨出し線301(図7のロ)とが描かれている工程が示されている。なお、この墨出し線300及び301を描く順序は、前記と逆でもよい。なお、このスタート位置には、建築用吊下げ金具1の端部若しくはこの建築用吊下げ金具1の刻印27を縦方向の墨出し線301に合致させればよい。
【0028】
そして、この墨出し線300及び301をスタート位置として、この墨出し線300及び301に沿わせて建築用吊下げ金具1を、その左端部と中心部とを墨出し線300及び301に揃えて鍔部20,20の上面200をフランジ部30の下面31に密に当接させ、この当接部の複数個所に溶接32,32,…を施して建築用吊下げ金具1を固着させる(図7のハ)工程がある。
【0029】
続いて、この固着された建築用吊下げ金具1の右隣りに、左端部を配するように次の建築用吊下げ金具1aを作業者が把持して、鍔部20,20の上面200とフランジ部30の下面31とを当接させる。そして、この左右の建築用吊下げ金具1,1aの隣り合う隣接部28と、作業者が把持している施工治具4の略中央部とを合致させて、施工治具4の上面を建築用吊下げ金具1,1aに重ね合わせ、両位置決め突起体46,46の先端部を建築用吊下げ金具1,1aのそれぞれ左右の位置決め兼用水抜き穴25,25に挿通させる。これとと共に、建築用吊下げ金具1,1aの両剣先ボルト24,24を左右のボルト逃げ穴47,47に挿通させて、2本目の建築用吊下げ金具1aの取付け位置が墨出し線301に沿って正確に位置決めされているかを作業者が目視する工程を行う。
【0030】
次に、作業者が正確な位置決めであることを確認できたら、この施工治具4から露出している鍔部20の部分に仮止めの溶接32a,32a(図7のニ)を行う工程がある。その後、施工金具4を建築用吊下げ金具1,1aから外した後、2本目の建築用吊下げ金具1aに残る部位に正確な複数個の溶接32,32を施す(図7のホ)工程を経て、以下同様な作業を繰り返すことにより、目的の建築用吊下げ金具1,1a,…をH形鋼3のフランジ部30に固着させることができる。なお、墨出し線301は、1本目及び2本目の建築用吊下げ金具1,1a用としては必ず必要であるが、3本目以降には必ずしも必要なものではなく、その使用は任意である。
【0031】
このように目的の建築用吊下げ金具1,1a,…を複数個、H形鋼3のフランジ部30などの取付け面に正確に固着させた後、この建築用吊下げ金具1,1a…に突設されている剣先ボルト24,24,…を金属製折板材5の各頂面50に形成されているネジ穴55にそれぞれ通した上、山座金53及びフェルトパッキン54,平座金56,ナット57などを介在させて金属製折板材5が構築させられる。
【0032】
図9に示す施工治具40は、図6に示す施工治具4と基本的に同じ構成であるため、同じ構成は図6に示す符号と同じ符号を付し、これと異なる構成を説明する。この施工治具40は、上記のように通称150タイプと称する二つ山からなる折板構成の金属製折板材5aに適用されるものである。つまり、中央部の幅広部42の両端近傍に位置する左右の幅狭部45,45に位置決め用突起460,460がそれぞれ設けてあり、上記施工治具4と異なって、左右の幅広部41の近傍には、ボルト逃げ穴47,47がそれぞれ設けられている。
【0033】
次に、上記施工治具40の使用した施工方法を説明する。この方法は、上記施工治具4と基本的に同じ構成であるため、同様に同じ構成は同一符号を付して構成を説明する。所定の金属製折板材5aを構築するために、例えば、H形鋼3のフランジ部30の下面31には、複数個の建築用吊下げ金具10のスタート位置を示す縦方向の墨出し線300(図10のイ)と、中央長手方向に沿う横方向に延びる墨出し線301(図10のロ)とが描かれている工程を備えている。
【0034】
この墨出し線300及び301に沿わせて建築用吊下げ金具10の左端部と中心部とを揃えて、鍔部20,20の上面200がフランジ部30の下面31に密に当接され、この当接部の複数個所に溶接32,32,…を施した建築用吊下げ金具10が固着されている工程(図10のハ)を備えている。
【0035】
この固着された建築用吊下げ金具10の右隣りに、次の建築用吊下げ金具10aの左端部が配するように、鍔部20,20の上面200とフランジ部30の下面31とを当接させる。この左右の建築用吊下げ金具10,10aが隣り合う隣接部と、施工治具40の略中央部とを合致させ、施工治具40の上面と隣接する建築用吊下げ金具10,10aとを重ね合わせ、その位置決め突起46,46の先端部を建築用吊下げ金具10,10aの左右の位置決め兼用水抜き穴25,25にそれぞれ挿通させる。これと共に、建築用吊下げ金具10,10aの両剣先ボルト24,24に左右のボルト逃げ穴47,47をそれぞれ挿通させて、次の2本目の建築用吊下げ金具10の取付け位置が墨出し線301に沿って正確に位置決めされていることを確認した後、この施工治具40から露出している次の建築用吊下げ金具10aの鍔部20,20の部分に仮止めの溶接32a,32a(図10のニ)を行う工程を備えている。
【0036】
その後、施工治具40を建築用吊下げ金具10,10aから外し、次の2本目の建築用吊下げ金具10aの残る部位に正確な複数個の溶接32,32(図10のホ)を施す工程を経て、以下同様な作業を繰り返すことにより、建築用吊下げ金具10,10a,…がH形鋼3のフランジ部30に固着させ、上記建築用吊下げ金具1,1aと同様に金属製折板材5aが構築される工程を備えている。
【0037】
このように施工治具4,40を使用することにより、金属製折板材からなる屋根材や壁材の施工が極めて簡易に構築できる施工方法である。
【0038】
【発明の効果】
本発明は、上記構成であるから、次のような効果がある。
本発明に係る建築用吊下げ金具によると、その建築用吊下げ金具に等間隔に形成させた剣先ボルトで、金属製折板材の屋根材や壁材の頂面に設けられたネジ穴を介して山座金やパッキン材などで気密性を保って締着できるため、建築構造物におけるH形鋼などの取付け面に屋根材や壁材の構築が簡易に行える。
【0039】
本発明に係る建築用吊下げ金具の底部には、複数個の位置決め兼用水抜き穴が設けられているから、雨水が浸入しても溜まることがなくなり、建築用吊下げ金具の腐敗を防ぐことができる。
【0040】
本発明に係る建築用施工治具によると、その施工治具には、等間隔に位置決め用突起とボルト逃げ穴とが形成され、さらに、少なくとも2本目用の墨出し線が取付け面の長手方向に描いてあるから2本目の建築用吊下げ金具は勿論のこと、3本目以降も施工治具を使用することで、取付け面に対して建築用吊下げ金具の取付けが正確に行える。
【0041】
しかも、施工治具の小突起により建築用吊下げ金具の横方向のズレが防げるから、その施工治具に幅狭部を設けたことで、施工治具の軽量化や施工時の建築用吊下げ金具に対する仮止め溶接が簡易に行えるし、幅狭部による建築用吊下げ金具の取付け位置が正確に真直ぐに延出しているかを作業者が目視できるから正確な金属製折板材の構築ができる。
【0042】
本発明に係る建築用施工方法によると、1本目の建築用吊下げ金具は、長手方向中心部に沿う墨出し線とスタート位置を示す墨出し線とを描く工程を備えているから取付け面に正確に建築用吊下げ金具が固着できる。
【0043】
また、2本目は長手方向中心部に沿う墨出し線と隣接し合う1本目と2本目とに、その位置決め用突起と位置決め兼用水抜き穴及びボルト逃げ穴と剣先ボルトとを挿通させると工程などで、建築用吊下げ金具は同様に取付け面に正確に固着できる。さらに、3本目以降は長手方向中心部に沿う墨出し線が、存在しなくても施工治具を使用する工程とで同様に取付け面に正確に建築用吊下げ金具が固着できる。
【図面の簡単な説明】
【図1】 本発明に係る建築用吊下げ金具の第1例を示す斜視図である。
【図2】 同第1例の裏面を示す斜視図である。
【図3】 同第1例の使用状態を示す斜視図である。
【図4】 建築用吊下げ金具の第2例を示す斜視図である。
【図5】 同第2例の使用状態を示す要部断面図である。
【図6】 本発明に係る施工治具の第1例を示す斜視図である。
【図7】 (イ)から(ホ)は、同第1例の使用状態を順次示す説明図である。
【図8】 図7(ニ)の状態を示す一部断面説明図である。
【図9】 同施工治具の第2例を順次示す斜視図である。
【図10】(イ)から(ホ)は、同第2例の使用状態を順次示す説明図である。
【図11】従来の構築工法を示す斜視図である。
【符号の説明】
1 建築用吊下げ金具
4 施工治具
20 鍔部
21 垂下部
22 底部
23 尖鋭部
24 剣先ボルト
25,26 位置決め兼用水抜き穴[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a hanging bracket for construction, a construction jig for the construction, and a construction method thereof. More specifically, a roof material or a wall material made of a metal folded plate material through an H-shaped steel or the like in a building structure is extremely used. Easy-to-construct suspension brackets for construction, construction jigs that can be constructed accurately and firmly with this metal folded plate material, and easy to use, and roof and wall materials made of metal folded plate material The present invention relates to a construction method that allows simple construction.
[0002]
[Prior art]
Conventionally, in a building structure, for example, in order to build a roof made of a metal folded plate material through its H-shaped steel, for example, a construction method shown in FIG. 11 is employed. In this construction method, as shown in the figure, a substantially U-shaped
[0003]
In addition, a metal fitting based on a substantially U-shaped gold concrete based on the same technical idea as the utility model by the same right holder is disclosed as design registration (design registration No. 734823,
[Problems to be solved by the invention]
[0004]
In the case of registration of the above-mentioned utility model, it is necessary to perform marking for positioning on the mountain pitch of the roofing material, which has been a troublesome task. Further, in order to attach the gold concrete to the flange portion of the H-shaped steel, the opening portion is sandwiched, and therefore the gold concrete cannot be sandwiched without opening the opening portion due to the thickness of the flange portion. It was necessary to prepare a plurality of gold concretes having different opening dimensions.
[0005]
Furthermore, since the mounting of the roofing material is based on the lower surface of the H-shaped steel, distortion and waviness directly affect the positioning, and it is necessary to make fine adjustments when attaching the roofing material. There were issues such as. Also, this gold concrete cannot be used when straddling a beam, and it was necessary to extend the beam when using a rose.
[0006]
On the other hand, in the case of design registration, there are the same problems as described above, and the need to solve these problems still remains.
[0007]
[Problems to be solved by the invention]
The present invention has been made in order to solve the above-mentioned problems, and the object of the present invention is to construct a roof material or wall material made of a metal folded plate material very easily through an H-shaped steel in a building structure. As a construction jig to be used when constructing roofing materials and wall materials by attaching architectural suspension brackets and building suspension brackets, metal folded plate materials can be constructed accurately and firmly, and their usage is also Another object of the present invention is to provide a simple jig and a construction method capable of easily constructing a roof material or a wall material made of a metal folded plate material.
[0008]
[Means for Solving the Problems]
The invention described in
[0009]
The invention described in
[0010]
The invention described in
[0011]
The invention according to
[0012]
In the invention according to
[0013]
[Action]
According to the architectural hanging bracket according to the present invention, a mountain washer or the like in a screw hole provided at equal intervals on the top surface of the metal folded plate material via a sword tip bolt formed at equal intervals on the architectural hanging bracket. Therefore, it is possible to easily construct a roof material or a wall material made of a metal folded plate material on a mounting surface such as an H-shaped steel in a building structure. In addition, even if rainwater enters the architecturally-suspended metal fittings with a plate-like body, a plurality of positioning and drainage holes are provided at the bottom, so that rainwater will not accumulate, Prevents metal corruption.
[0014]
According to the construction jig according to the present invention, the construction jig has positioning projections and bolt relief holes formed at equal intervals, and at least the second marking line is attached to the mounting surface. Since it is drawn at the center in the longitudinal direction, the second and subsequent construction metal fittings can be accurately applied to the mounting surface by using the construction jig. Also, the small protrusions on the construction jig can prevent the horizontal displacement of the construction hanging metal fittings, and the construction jig is provided with a narrow portion, which reduces the weight of the construction jig and the construction suspension during construction. An operator can visually check whether temporary fixing welding to the lowering bracket can be performed easily and whether the mounting position of the hanging bracket for construction by the narrow part extends accurately and straight, so that an accurate metal folded plate material can be constructed. it can.
[0015]
According to the construction method for building according to the present invention, the first hanging bracket for building is accurately drawn on the mounting surface in the process of drawing the inking line along the longitudinal center and the inking line indicating the start position. Can stick. The second is a process such as inserting the positioning protrusion, the positioning drainage hole, the bolt escape hole, and the sword tip bolt into the first and second adjacent to the inking line along the longitudinal center. Architectural suspension fittings can likewise be accurately secured to the mounting surface. In addition, even if the third and subsequent lines do not have a marking line along the central portion in the longitudinal direction, the construction hanging bracket can be accurately fixed to the mounting surface in the same manner by using the construction jig.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a perspective view showing a first example of a hanging bracket for building according to the present invention, FIG. 2 is a perspective view showing a back surface of the first example, and FIG. 3 is a perspective view showing a use state of the first example. 4 is a perspective view showing a second example of a hanging metal fitting for construction, FIG. 5 is a cross-sectional view of an essential part showing a use state of the second example, and FIG. 6 is a construction jig according to the present invention. 7 is a perspective view showing the first example, FIGS. 7A to 7E are explanatory views sequentially showing the use state of the first example, and FIG. 8 is a partial cross-sectional explanatory view showing the state of FIG. FIG. 9 is a perspective view sequentially illustrating a second example of the construction jig, and FIGS. 10A to 10E are explanatory diagrams sequentially illustrating the usage state of the second example.
[0017]
First, the
[0018]
The material of the dish-
[0019]
Four drain holes 25, 26 are formed and are preferably provided at equal intervals as shown in the drawing. In particular, the holes of the small drain holes 26 at both ends are not necessarily circular holes. It is not limited. In addition, as a mark indicating the central portion of the dish-
[0020]
The usage method of the said construction | assembly
[0021]
In detail, the screw hole 55 (illustration omitted) provided in the
[0022]
This construction hanging
[0023]
4 and 5 is different from the above-described architectural suspension fitting 1 in the number of
[0024]
Further, as a mark indicating the central portion of the dish-
[0025]
This architectural hanging metal fitting 10 is a roof material used for a metal folded plate material 5a having a folded plate structure consisting of two ridges commonly called 150 type. As shown in FIG. 5, after a
[0026]
Next, the
[0027]
Furthermore, the construction method using this
[0028]
Then, with the
[0029]
Subsequently, an operator holds the next architectural hanging metal fitting 1a so that the left end portion is arranged on the right side of the fixed architectural hanging
[0030]
Next, when the operator can confirm that the positioning is accurate, the step of performing
[0031]
In this way, after a plurality of target
[0032]
Since the
[0033]
Next, the construction method used by the
[0034]
The
[0035]
The
[0036]
Thereafter, the
[0037]
By using the construction jigs 4 and 40 in this way, it is a construction method in which the construction of roof materials and wall materials made of metal folded plate materials can be constructed extremely easily.
[0038]
【The invention's effect】
Since this invention is the said structure, there exist the following effects.
According to the architectural hanging bracket according to the present invention, the sword tip bolts formed at equal intervals on the architectural hanging bracket, through the screw holes provided on the top surface of the roofing material or wall material of the metal folded plate material. Since it can be fastened with a mountain washer or packing material while maintaining airtightness, it is easy to construct a roof material or wall material on the mounting surface of an H-shaped steel in a building structure.
[0039]
Since the bottom of the architectural hanging metal fitting according to the present invention is provided with a plurality of positioning and drainage holes, it will not accumulate even if rainwater enters, and prevent the architectural hanging metal fitting from decaying. Can do.
[0040]
According to the construction jig according to the present invention, positioning jigs and bolt relief holes are formed at equal intervals on the construction jig, and at least the second marking line is in the longitudinal direction of the mounting surface. The construction suspension fitting can be accurately attached to the attachment surface by using the construction jig for the third and subsequent constructions as well as the second construction suspension fitting.
[0041]
In addition, the small protrusions on the construction jig can prevent the horizontal displacement of the hanging metal fittings for construction, so by providing a narrow section on the construction jig, the construction jig can be reduced in weight and suspended during construction. Temporary fastening welding can be easily performed to the lowering metal fittings, and the operator can visually check whether the mounting position of the hanging metal fittings for construction by the narrow part is extending straight straight, so that an accurate metal folded plate material can be constructed. .
[0042]
According to the construction method for building according to the present invention, the first construction hanging metal fitting is provided with a process of drawing a marking line along the longitudinal center and a marking line indicating the start position. The hanging bracket for building can be fixed accurately.
[0043]
In addition, the second is a process in which the positioning protrusion, the positioning drainage hole, the bolt relief hole, and the sword tip bolt are inserted into the first and second adjacent to the inking line along the central portion in the longitudinal direction. Thus, the architectural hanging bracket can be accurately fixed to the mounting surface as well. Further, in the third and subsequent lines, the hanging bracket for construction can be accurately fixed to the mounting surface in the same manner as in the process of using the construction jig even if there is no marking line along the central portion in the longitudinal direction.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a first example of an architectural hanging metal fitting according to the present invention.
FIG. 2 is a perspective view showing a back surface of the first example.
FIG. 3 is a perspective view showing a usage state of the first example.
FIG. 4 is a perspective view showing a second example of a building hanging metal fitting.
FIG. 5 is a cross-sectional view of a main part showing a usage state of the second example.
FIG. 6 is a perspective view showing a first example of a construction jig according to the present invention.
FIGS. 7A to 7E are explanatory diagrams sequentially showing usage states of the first example. FIGS.
8 is a partial cross-sectional explanatory view showing the state of FIG.
FIG. 9 is a perspective view sequentially illustrating a second example of the construction jig.
FIGS. 10A to 10E are explanatory diagrams sequentially showing usage states of the second example. FIGS.
FIG. 11 is a perspective view showing a conventional construction method.
[Explanation of symbols]
DESCRIPTION OF
Claims (5)
前記底部の長手方向に沿って等間隔に先端を尖鋭部とした複数個の剣先ボルトが下方に向けて垂下状に形成され、
前記底部に等間隔に複数個の位置決め兼用水抜き穴が設けられていることを特徴とする建築用吊下げ金具。A dish-like body made of a long metal material composed of left and right buttocks and hanging parts and a flat bottom part,
A plurality of sword bolts with sharp tips at equal intervals along the longitudinal direction of the bottom are formed in a hanging shape downward.
A suspension metal fitting for building, wherein a plurality of positioning and drainage holes are provided at equal intervals on the bottom.
皿状体の長手方向の長さ寸法の1/2を示す刻印が施されていることを特徴とする請求項1記載の建築用吊下げ金具。On the bottom surface of at least one heel
The hanging bracket for construction according to claim 1, wherein a mark indicating 1/2 of the length in the longitudinal direction of the dish-like body is provided.
前記各幅広部の上面に複数個の小突起が形成されると共に、前記左右両端の幅広部に続く幅狭部に等間隔に位置決め用突起及びボルト逃げ穴とがそれぞれ形成され、
且つ、前記帯状体の下面にハンドルが設けられていることを特徴とする建築用施工治具。A band-shaped body provided with wide portions at both the left and right ends and the central portion when viewed from the plane,
A plurality of small protrusions are formed on the upper surface of each wide part, and positioning protrusions and bolt escape holes are formed at equal intervals in the narrow part following the wide part on both the left and right ends,
And the construction jig characterized by the handle being provided in the lower surface of the said strip | belt-shaped body.
前記2つの墨出し線に沿って、請求項1又は2に記載された1本目の建築用吊下げ金具を配して前記取付け面に溶着させる工程と、
続く2本目の前記建築用吊下げ金具を1本目の右端側に前記長手方向の墨出し線に沿わせて配する工程と、
隣接し合う1本目及び2本目との前記建築用吊下げ金具の端部間の基準点と、請求項3に記載された建築用施工治具の上面の略中心部とを当接させる工程と、
前記建築用施工治具の各位置決め用突起を1本目及び2本目の各位置決め兼用水抜き穴と、前記建築用施工治具の各ボルト逃げ穴を1本目及び2本目の左右の各剣先ボルトにそれぞれ挿通させる工程と、
前記2本目が前記長手方向中心部の墨出し線に沿っていることを確認した上、2本目の前記建築用吊下げ金具を仮止め溶着させる工程と、
前記建築用施工治具を取外して2本目の前記建築用吊下げ金具を前記取付け面に溶着させる工程と、
前記各建築用吊下げ金具の剣先ボルトに山座金やパッキン、平座金、ナットなどを介して金属製折板材が構築させる工程とからなることを特徴とする建築用施工方法。Drawing a horizontal marking line along the longitudinal center and a marking line indicating the start position on the mounting surface of the H-shaped steel or the like that constructs the metal folded plate material;
A step of arranging the first architectural hanging metal fitting according to claim 1 or 2 and welding it to the mounting surface along the two marking lines;
A step of disposing in and along the lower bracket hanging for the construction of the two eyes following the longitudinal direction of the marking line on the right end of the first run,
A reference point between the ends of the building hanging bracket and one first and two second adjacent, the step of abutting the substantially central portion of the upper surface of the the building construction jig according to claim 3 ,
And the positioning combined water drain hole of the first run and two eyes each positioning projection of the building construction jig, the bolts escape hole of the building construction jig 1 -th and two eyes of the left and right of each point of a sword bolts A process of inserting each,
On the two eyes and it was confirmed that along the marking lines of the longitudinal center portion, and a lower bracket hanging for the construction of the two first step of tacking welding,
A step of welding the lower bracket hanging for the construction of the two eyes to remove the building construction jig to the mounting surface,
A construction method comprising the steps of: constructing a metal folded plate material on a sword tip bolt of each of the above-described suspension metal fittings via a mountain washer, packing, plain washer, nut, or the like.
2本目以降の前記建築用吊下げ金具に用いる長手方向中心部に沿う横方向の墨出し線は、描かずに不要であることを特徴とする請求項4記載の建築用施工方法。A process of drawing a horizontal marking line along the longitudinal center and a marking line indicating the start position on the mounting surface of the H-shaped steel that constructs the metal folded plate material,
5. The construction method according to claim 4, wherein a horizontal marking line along a longitudinal center portion used for the second and subsequent architectural hanging metal fittings is unnecessary without being drawn.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001402071A JP3896537B2 (en) | 2001-12-28 | 2001-12-28 | Hanging tool for construction, construction jig and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001402071A JP3896537B2 (en) | 2001-12-28 | 2001-12-28 | Hanging tool for construction, construction jig and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003201763A JP2003201763A (en) | 2003-07-18 |
JP3896537B2 true JP3896537B2 (en) | 2007-03-22 |
Family
ID=27640430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001402071A Expired - Fee Related JP3896537B2 (en) | 2001-12-28 | 2001-12-28 | Hanging tool for construction, construction jig and construction method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3896537B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6505433B2 (en) * | 2014-12-16 | 2019-04-24 | 東日本旅客鉄道株式会社 | Fireproof roof |
-
2001
- 2001-12-28 JP JP2001402071A patent/JP3896537B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2003201763A (en) | 2003-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110747744B (en) | Positioning method of corrugated steel web and bidirectional adjusting and positioning device adopted by same | |
JP3896537B2 (en) | Hanging tool for construction, construction jig and construction method thereof | |
US2737267A (en) | Building construction | |
JP3068799B2 (en) | Scaffolding connection structure | |
US6360509B1 (en) | Metal building truss and method of construction | |
JP2011058294A (en) | Reinforcement assembling fitting | |
CN220133487U (en) | Scaffold locking and fixing device | |
JP3028476B2 (en) | Method of repairing tunnel interior plate mounting portion and repair member | |
JPH01244056A (en) | Fitting of clip to fixture | |
JPS6137244Y2 (en) | ||
CN217924802U (en) | Can dismantle setpoint fixing device on shaped steel cantilever beam | |
JPS5844780Y2 (en) | New window frame mounting device | |
JPH094141A (en) | Fixture for folded plate and hanging method thereof | |
JP4782305B2 (en) | Makeup tile rod mounting bracket and makeup tile rod mounting structure | |
JPH0718793A (en) | Fitting device for folding plate roof | |
JPS6012052Y2 (en) | Fens middle frame mounting mechanism | |
JPH0741592Y2 (en) | Nut positioning holder | |
US20060096230A1 (en) | Truss and method for making same | |
JPH052728Y2 (en) | ||
JP3008370U (en) | Slab, wall rebar assembly bracket | |
JPH0813515A (en) | Reinforcing bar fixture | |
JP3195945B2 (en) | Tent base bracket | |
JP2000274016A (en) | Repair metal fittings for slate structural body and repair structure thereof | |
JP3869126B2 (en) | Exterior plate material mounting structure | |
JP3023908U (en) | Reinforced concrete perforated beam sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041227 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060623 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060704 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060829 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061107 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061207 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |