JP3867743B2 - Reinforcement method of rock bolt - Google Patents

Reinforcement method of rock bolt Download PDF

Info

Publication number
JP3867743B2
JP3867743B2 JP19551697A JP19551697A JP3867743B2 JP 3867743 B2 JP3867743 B2 JP 3867743B2 JP 19551697 A JP19551697 A JP 19551697A JP 19551697 A JP19551697 A JP 19551697A JP 3867743 B2 JP3867743 B2 JP 3867743B2
Authority
JP
Japan
Prior art keywords
reinforcing
lock bolt
bolt
lock
reinforcing pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP19551697A
Other languages
Japanese (ja)
Other versions
JPH1136298A (en
Inventor
和夫 木内
信博 荒木
武人 大柴
隆 大河内
Original Assignee
岡部株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 岡部株式会社 filed Critical 岡部株式会社
Priority to JP19551697A priority Critical patent/JP3867743B2/en
Publication of JPH1136298A publication Critical patent/JPH1136298A/en
Application granted granted Critical
Publication of JP3867743B2 publication Critical patent/JP3867743B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、例えば法面安定工法等に用いられるロックボル卜の補強方法に関する。
【0002】
【従来の技術】
従来、例えば法面安定工法等のロックボルト工において、強度を増すためには、▲1▼ロックボルトの本数を増やす、▲2▼太径のロックボルトを使用する、▲3▼高強度のロックボルトを使用するなどの方法がある。
【0003】
【発明が解決使用とする課題】
ところで、 これらの方法ではコスト、施工性に問題がある。特に、ロックネットに使用するアンカーボルトは、地山を削孔してロックボルトを挿入しグラウト材を充填した後、ロックネットを固定するワイヤーを取り付けるものであるが、ワイヤーに荷重がかかったときに、引き抜き強度は十分であるが、曲げ引張若しくは剪断力が加わるような、応力が生じた場合には、強度が不足し、ロックボルトが曲げや剪断力により変形や破断する場合があり、地盤の崩壊につながることがある。また、太径のロックボルトを使用した場合は変形や破断を抑えることはできるが、重量が重いため施工性に問題がある。
【0004】
この発明は、かかる点に鑑みてなされたもので、前記問題点を克服し、かつ経済的で簡易的にロックボルトを補強することができるロックボル卜の補強方法を提供することを目的とする。
【0005】
【課題を解決するための手段】
前記課題を解決し、かつ目的を達成するために、請求項1記載の発明は、『地山に削孔した孔に挿入されたロックボル卜と前記孔との間にグラウト材が充填され、
前記ロックボル卜に補強パイプを外挿して前記孔内の所定位置まで設け、
前記グラウト材が硬化したら前記地山から突出する前記補強パイプの先端部に引っ張り部材取付具を取り付け、
前記ロックボル卜の前記地山から突出する先端部から前記補強パイプの先端部に、前記引っ張り部材取付具の抜けを規制する押え治具を挿入し、
前記ロックボル卜の先端部にナットを螺着し前記押え治具を介して前記引っ張り部材取付具を押さえ付けて固定した、
ことを特徴とするロックボル卜の補強方法。』であり、ロックボル卜に孔内の所定位置まで補強パイプを挿入したので、剪断力が向上し、ロックボルトの曲げや剪断力により変形や破断することを防止することができる。また、引っ張り部材取付具により確実に引っ張り部材を取り付けることができ、しかも押え治具により引っ張り部材取付具の浮き上がりを防止できる。さらに、従来のロックボル卜を使用して簡易的にロックボルトを補強することができるので経済的である。
【0006】
【発明の実施の形態】
以下、この発明のロックボル卜の補強方法の実施の形態を図面に基づいて説明する。まず、ロックボル卜の補強方法の第1の実施の形態を図1乃至図3に示し、図1はロックボル卜の補強方法を示す図、図2は補強パイプを示す図、図3は押え治具を示す図である。
【0007】
地山1に削孔した孔2にグラウト材3を注入して充填し、ロックボル卜4を挿入する。グラウト材3の注入時期は、ロックボル卜4の挿入後でもよい。
【0008】
グラウト材3が硬化する前に角座金5を介して補強部材である補強パイプ6をロックボル卜4に孔2内の所定位置まで挿入する。補強パイプ6には、図1及び図2に示すようにストッパー部6aが設けられており、補強パイプ6を押し込みストッパー部6aが角座金5に当接することで挿入位置が決定される。ストッパー部6aは補強パイプ6を押し込んだとき、角座金5にひっかかるようになっていれば形状等特に限定されない。
【0009】
これにより、補強パイプ6とロックボル卜4の隙間にグラウト材3が充填される。グラウト材3が十分に硬化したら地山1から突出する補強パイプ6の先端部に引っ張り部材取付具7を取り付ける。そして、補強パイプ6の先端部に押え治具8を挿入し引っ張り部材取付具7の抜け止めを行い、ロックボル卜4の先端部にナット9を螺着し固定する。
【0010】
このようにして、引っ張り部材取付具7は、ロックボル卜4に挿入された補強パイプ6の先端部に取り付けられる。押え治具8は、一方に引っ張り部材取付具7が抜け出さないようにするストッパー部8aを有し、他方にナット9の締付荷重を受ける座金部8bを有し、引っ張り部材取付具7の移動と抜け出しを防ぐものである。押え治具8の高さHは、図1に示すようにナット9を螺着した時に、座金部8bが補強パイプ6の先端に当接しない高さである。これにより、押え治具8は、確実に引っ張り部材取付具7を押さえつけることができる。
【0011】
なお、押え治具8は、図3に示すものに限定されず、引っ張り部材取付具7を押圧できれば所定厚さの平板等でもよい。また、使用するロックボル卜4は、全ねじタイプまたはボルト端部がネジになってナット9が螺着可能なものならばよい。さらに、自穿孔タイプのロックボル卜でもよい。また、この実施の形態では、補強パイプ6にストッパー部6aを一体に設けているが、平板等を溶接してもよい。
【0012】
また、補強パイプ6を角座金5より先に挿入してもよく、この場合ストッパー部6aが地山1に当接して位置決めされ、その後に角座金5を挿入して引っ張り部材取付具7を取り付ける。
【0013】
このように、ロックボル卜4に孔2内の所定位置まで補強パイプ6を挿入したので、 剪断力が向上し、引っ張り部材取付具7からの引っ張りによるロックボルト4の曲げや剪断力により変形や破断することを防止することができる。また、引っ張り部材取付具7により確実に引っ張り部材を取り付けることができ、しかも押え治具8により引っ張り部材取付具7の浮き上がりを防止できる。
【0014】
また、ロックボル卜4に補強パイプ6を取り付けるだけで簡単に補強ができるので施工性がよい。さらに、補強パイプ6を使用することで最小限の削孔径でロックボル卜4の補強ができ、従来のロックボル卜4を使用して簡易的にロックボルト4を補強することができるので経済的である。
【0015】
また、補強パイプ6の埋め込み深さを変えることにより様々な地山に対応できる。
【0016】
次に、ロックボル卜の補強方法の第2の実施の形態を図4に示す。このロックボル卜の補強方法は、図1と同様に構成されるが、補強部材の変形例を示すもので、ロックボル卜4にストッパー部16aを有するスリーブ16を圧着したものである。この場合、ロックボル卜4とスリーブ16の隙間がないので補強パイプ6に比べ細径にでき、また削孔した孔2に挿入するだけなので施工性がよい。また、この実施例では、ロックボル卜4にスリーブ16が圧着されているから、ストッパー部16aはなくてもよい。
【0017】
次に、ロックボル卜の補強方法が用いられる法面安定工法について説明する。図5はロックカバーネットを支持する状態を示す図、図6は引っ張り部材取付具を示す図、図7は図6のVII−VII線に沿う断面図、図8はUボルトの平面図である。
【0018】
法面安定工法に用いられるロックカバーネット60は、落石等を防止するものであり、このロックカバーネット60にはワイヤーロープ61,62が縦横に所定間隔で針金等で取り付けられている。それぞれのワイヤーロープ61,62は、両端部が引っ張り部材取付具7を介してロックボル卜4に固定されている。引っ張り部材取付具7は、図6乃至図8に示すように緩衝金具70とUボルト71を有し、緩衝金具70は、一対の金具72,73でワイヤーロープ61,62を挟み、ボルト74とナット75で締付固定して構成される。Uボルト71は、その両端部71aを一対の金具72,73のボス部72a,73aに挿通し、ボス部72a,73aから突出するネジ部71bにナット76を螺着して緩衝金具70に取り付けられる。このようにして、緩衝金具70に取り付けられたUボルト71の屈曲部71cをロックボルト4の補強部材に取り付け、ナット76を回動してワイヤーロープ61,62を引っ張り、ロックカバーネット60を張り落石の発生自身を防止する。
【0019】
図9はロックカバーネットを支持する他の実施の形態を示す図である。この実施の形態では、引っ張り部材取付具7は図6乃至図8に示す実施の形態と同様に構成されるが、ロックカバーネット60に1本のワイヤーロープ80を縦方向の上下に所定間隔でターンさせて針金等で取り付け、同様にロックカバーネット60に1本のワイヤーロープ81を横方向の上下に所定間隔でターンさせて針金等で取り付け、それぞれのワイヤーロープ80,81のターン部を引っ張り部材取付具7により支持してロックカバーネット60を張り落石の発生自身を防止する。
【0020】
【発明効果】
前記したように、この発明によれば、ロックボル卜に孔内の所定位置まで補強パイプを設けたので、 剪断力が向上し、ロックボルトの曲げや剪断力により変形や破断することを防止することができる。また、引っ張り部材取付具により確実に引っ張り部材を取り付けることができ、しかも押え治具により引っ張り部材取付具の浮き上がりを防止できる。また、ロックボル卜に補強部材を取り付けるだけで簡単に補強ができるので施工性がよい。さらに、補強部材を使用することで最小限の削孔径でロックボル卜の補強ができるので、従来のロックボル卜を使用して簡易的にロックボルトを補強することができるので経済的である。
【図面の簡単な説明】
【図1】ロックボル卜の補強方法を示す図である。
【図2】補強パイプを示す図である。
【図3】押え治具を示す図である。
【図4】ロックボル卜の補強方法の第2の実施の形態を示す図である。
【図5】ロックカバーネットを支持する状態を示す図である。
【図6】引っ張り部材取付具を示す図である。
【図7】図6のVII−VII線に沿う断面図である。
【図8】Uボルトの平面図である。
【図9】ロックカバーネットを支持する他の実施の形態を示す図である。
【符号の説明】
1 地山
2 孔
3 グラウト材
4 ロックボル卜
7 引っ張り部材取付具
8 押え治具
9 ナット
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for reinforcing a rock bolt used for, for example, a slope stabilization method.
[0002]
[Prior art]
Conventionally, in order to increase the strength in the lock bolt method such as the slope stabilization method, for example, (1) increase the number of lock bolts, (2) use a large diameter lock bolt, (3) high strength lock There are methods such as using bolts.
[0003]
[Problems to be Solved by the Invention]
By the way, these methods have problems in cost and workability. In particular, the anchor bolts used for the lock net are those that drill holes in the ground, insert the lock bolts, fill the grout material, and then attach the wire that fixes the lock net, but when a load is applied to the wire In addition, the pull-out strength is sufficient, but when stress is applied, such as bending tension or shearing force, the strength is insufficient, and the lock bolt may be deformed or broken by bending or shearing force. May lead to the collapse of. In addition, when a large-diameter lock bolt is used, deformation and breakage can be suppressed, but there is a problem in workability due to its heavy weight.
[0004]
The present invention has been made in view of this point, and an object of the present invention is to provide a method for reinforcing a rock bolt that can overcome the above-described problems and can reinforce a lock bolt easily and economically.
[0005]
[Means for Solving the Problems]
In order to solve the above-mentioned problems and achieve the object, the invention according to claim 1 is as follows: `` The grout material is filled between the rock bolt and the hole inserted into the hole drilled in the natural ground,
Set to a predetermined position of the Rokkuboru Bok in the reinforcing pipe extrapolated hole,
When the grout material is hardened, attach a pulling member fixture to the tip of the reinforcing pipe protruding from the ground,
The distal end portion of the reinforcing pipe from the tip portion protruding from the natural ground of the Rokkuboru Bok, insert the presser jig for restricting the exit of the tension member attachment,
A nut was screwed onto the tip of the lock bolt and the tension member fixture was pressed and fixed via the presser jig .
A method of reinforcing a rockbol cage characterized by the above. Since the reinforcing pipe is inserted into the lock bolt to a predetermined position in the hole, the shearing force is improved, and it is possible to prevent the lock bolt from being deformed or broken by the bending or shearing force of the lock bolt. In addition, the tension member can be securely attached by the tension member mounting tool, and the lifting of the tension member mounting tool can be prevented by the holding jig. Furthermore, since the lock bolt can be easily reinforced using a conventional lock bolt, it is economical.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of a method for reinforcing a rock bolt according to the present invention will be described below with reference to the drawings. First, FIG. 1 to FIG. 3 show a first embodiment of a method for reinforcing a lock bolt, FIG. 1 is a diagram showing a method for reinforcing a lock bolt, FIG. 2 is a diagram showing a reinforcing pipe, and FIG. 3 is a holding jig. FIG.
[0007]
The grout material 3 is injected and filled into the hole 2 drilled in the ground 1 and the rock bolt 4 is inserted. The injection time of the grout material 3 may be after the rock bolt 4 is inserted.
[0008]
Before the grout material 3 is cured, the reinforcing pipe 6 as a reinforcing member is inserted into the lock bolt 4 through the square washer 5 to a predetermined position in the hole 2. As shown in FIGS. 1 and 2, the reinforcing pipe 6 is provided with a stopper portion 6 a, and the insertion position is determined by pushing the reinforcing pipe 6 and the stopper portion 6 a abutting against the square washer 5. The shape of the stopper portion 6a is not particularly limited as long as the stopper 6a is caught on the square washer 5 when the reinforcing pipe 6 is pushed.
[0009]
As a result, the grout material 3 is filled in the gap between the reinforcing pipe 6 and the lock bolt 4. When the grout material 3 is sufficiently cured, the tension member attaching tool 7 is attached to the tip of the reinforcing pipe 6 protruding from the natural ground 1. Then, a holding jig 8 is inserted into the distal end portion of the reinforcing pipe 6 to prevent the pulling member attachment 7 from coming off, and a nut 9 is screwed and fixed to the distal end portion of the lock bolt 4.
[0010]
In this way, the tension member attaching tool 7 is attached to the distal end portion of the reinforcing pipe 6 inserted into the lock bolt 4. The holding jig 8 has a stopper portion 8 a that prevents the pulling member attachment 7 from coming out on one side and a washer portion 8 b that receives the tightening load of the nut 9 on the other side. And prevent it from coming out. The height H of the holding jig 8 is a height at which the washer portion 8b does not contact the tip of the reinforcing pipe 6 when the nut 9 is screwed as shown in FIG. Thereby, the holding jig 8 can hold down the pulling member attachment 7 reliably.
[0011]
Note that the holding jig 8 is not limited to the one shown in FIG. 3, and may be a flat plate having a predetermined thickness as long as it can press the pulling member attachment 7. Further, the lock bolt 4 to be used may be an all-screw type or a bolt that can be screwed onto the nut 9 by screwing the bolt end. Furthermore, a self-drilling type rockbol can be used. Further, in this embodiment, the stopper portion 6a is provided integrally with the reinforcing pipe 6, but a flat plate or the like may be welded.
[0012]
Further, the reinforcing pipe 6 may be inserted before the square washer 5. In this case, the stopper portion 6 a is positioned in contact with the ground 1, and then the square washer 5 is inserted to attach the pulling member fixture 7. .
[0013]
As described above, since the reinforcing pipe 6 is inserted into the lock bolt 4 to a predetermined position in the hole 2, the shearing force is improved, and the lock bolt 4 is deformed or broken by the bending or shearing force due to the pulling from the pulling member attachment 7. Can be prevented. Further, the tension member can be securely attached by the tension member attaching tool 7, and the lifting member 8 can be prevented from being lifted by the presser jig 8.
[0014]
Further, since the reinforcement can be easily performed by simply attaching the reinforcement pipe 6 to the rockbolt 4, the workability is good. Further, the use of the reinforcing pipe 6 makes it possible to reinforce the lock bolt 4 with a minimum hole diameter, and it is economical because the lock bolt 4 can be easily reinforced using the conventional lock bolt 4. .
[0015]
Moreover, it can respond to various natural grounds by changing the embedding depth of the reinforcement pipe 6.
[0016]
Next, FIG. 4 shows a second embodiment of the method for reinforcing the rock bolt. The method of reinforcing the lock bolt is configured in the same manner as in FIG. 1, but shows a modification of the reinforcing member, in which a sleeve 16 having a stopper portion 16 a is pressure-bonded to the lock bolt 4. In this case, since there is no gap between the lock bolt 4 and the sleeve 16, the diameter can be made smaller than that of the reinforcing pipe 6, and the workability is good because it is only inserted into the drilled hole 2. In this embodiment, since the sleeve 16 is pressure-bonded to the lock bolt 4, the stopper portion 16a is not necessary.
[0017]
Next, a description will be given of a slope stabilizing method in which the method for reinforcing the rock bolt is used. 5 is a view showing a state in which the lock cover net is supported, FIG. 6 is a view showing a tension member mounting tool, FIG. 7 is a cross-sectional view taken along the line VII-VII in FIG. 6, and FIG. .
[0018]
The lock cover net 60 used in the slope stabilization method is to prevent falling rocks and the like, and wire ropes 61 and 62 are attached to the lock cover net 60 with wires or the like at predetermined intervals in the vertical and horizontal directions. Each wire rope 61, 62 is fixed to the lock bolt 4 via the tension member attachment 7 at both ends. As shown in FIGS. 6 to 8, the tension member fitting 7 has a shock-absorbing metal fitting 70 and a U-bolt 71. The shock-absorbing metal fitting 70 sandwiches the wire ropes 61 and 62 between a pair of metal fittings 72 and 73, The nut 75 is fastened and fixed. The U-bolt 71 is attached to the shock-absorbing metal fitting 70 by inserting both ends 71a thereof into the boss parts 72a and 73a of the pair of metal fittings 72 and 73 and screwing nuts 76 to screw parts 71b protruding from the boss parts 72a and 73a. It is done. In this way, the bent portion 71c of the U bolt 71 attached to the buffer metal fitting 70 is attached to the reinforcing member of the lock bolt 4, the nut 76 is rotated to pull the wire ropes 61 and 62, and the lock cover net 60 is stretched. Prevents rockfalls from occurring.
[0019]
FIG. 9 is a view showing another embodiment for supporting the lock cover net. In this embodiment, the tension member mounting tool 7 is configured in the same manner as the embodiment shown in FIGS. 6 to 8, but one wire rope 80 is vertically attached to the lock cover net 60 in the vertical direction at a predetermined interval. Turn and attach with wire etc. Similarly, turn one wire rope 81 on the lock cover net 60 at a predetermined interval in the horizontal direction and attach with wire etc. Pull the turn part of each wire rope 80, 81 The lock cover net 60 is supported by the member fixture 7 and the occurrence of falling rocks is prevented.
[0020]
[Effect of the invention]
As described above, according to the present invention, since the reinforcement pipe is provided to the predetermined position in the hole in the lock bolt, the shearing force is improved, and the lock bolt is prevented from being deformed or broken by the bending or shearing force of the lock bolt. Can do. In addition, the tension member can be securely attached by the tension member mounting tool, and the lifting of the tension member mounting tool can be prevented by the holding jig. In addition, the workability is good because it can be easily reinforced simply by attaching a reinforcing member to the rockbolt. Further, since the lock bolt can be reinforced with the minimum hole diameter by using the reinforcing member, the lock bolt can be easily reinforced using the conventional lock bolt, which is economical.
[Brief description of the drawings]
FIG. 1 is a view showing a method for reinforcing a rock bolt.
FIG. 2 is a view showing a reinforcing pipe.
FIG. 3 is a view showing a holding jig.
FIG. 4 is a diagram showing a second embodiment of a method for reinforcing a rock bolt.
FIG. 5 is a diagram showing a state in which a lock cover net is supported.
FIG. 6 is a view showing a tension member mounting tool.
7 is a cross-sectional view taken along line VII-VII in FIG.
FIG. 8 is a plan view of a U-bolt.
FIG. 9 is a view showing another embodiment for supporting the lock cover net.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Ground 2 Hole 3 Grout material 4 Rockbolt 7 Tensile member fixture 8 Pressing jig 9 Nut

Claims (1)

地山に削孔した孔に挿入されたロックボル卜と前記孔との間にグラウト材が充填され、
前記ロックボル卜に補強パイプを外挿して前記孔内の所定位置まで設け、
前記グラウト材が硬化したら前記地山から突出する前記補強パイプの先端部に引っ張り部材取付具を取り付け、
前記ロックボル卜の前記地山から突出する先端部から前記補強パイプの先端部に、前記引っ張り部材取付具の抜けを規制する押え治具を挿入し、
前記ロックボル卜の先端部にナットを螺着し前記押え治具を介して前記引っ張り部材取付具を押さえ付けて固定した、
ことを特徴とするロックボル卜の補強方法。
The grout material is filled between the rock bolt and the hole inserted in the hole drilled in the ground,
Set to a predetermined position of the Rokkuboru Bok in the reinforcing pipe extrapolated hole,
When the grout material is hardened, attach a pulling member fixture to the tip of the reinforcing pipe protruding from the ground,
The distal end portion of the reinforcing pipe from the tip portion protruding from the natural ground of the Rokkuboru Bok, insert the presser jig for restricting the exit of the tension member attachment,
A nut was screwed onto the tip of the lock bolt and the tension member fixture was pressed and fixed via the presser jig .
A method of reinforcing a rockbol cage characterized by the above.
JP19551697A 1997-07-22 1997-07-22 Reinforcement method of rock bolt Expired - Lifetime JP3867743B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19551697A JP3867743B2 (en) 1997-07-22 1997-07-22 Reinforcement method of rock bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19551697A JP3867743B2 (en) 1997-07-22 1997-07-22 Reinforcement method of rock bolt

Publications (2)

Publication Number Publication Date
JPH1136298A JPH1136298A (en) 1999-02-09
JP3867743B2 true JP3867743B2 (en) 2007-01-10

Family

ID=16342391

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19551697A Expired - Lifetime JP3867743B2 (en) 1997-07-22 1997-07-22 Reinforcement method of rock bolt

Country Status (1)

Country Link
JP (1) JP3867743B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105180787A (en) * 2015-05-05 2015-12-23 中国电建集团中南勘测设计研究院有限公司 High-pressure grouting lifting deformation monitor and installation method thereof

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5628506B2 (en) * 2009-10-14 2014-11-19 坂本 雄三 Method for maintaining tension of wire rope in rock fall protection work
JP5542405B2 (en) * 2009-10-14 2014-07-09 雄三 坂本 Wire rope tension retainer in rock fall protection work
JP5781413B2 (en) * 2011-09-30 2015-09-24 神鋼建材工業株式会社 Anchor bolt installation structure, its maintenance method and construction method
JP5981742B2 (en) * 2012-03-19 2016-08-31 岡部株式会社 Protective sheath for slope stabilization method and construction method of slope stabilization method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105180787A (en) * 2015-05-05 2015-12-23 中国电建集团中南勘测设计研究院有限公司 High-pressure grouting lifting deformation monitor and installation method thereof
CN105180787B (en) * 2015-05-05 2018-07-13 中国电建集团中南勘测设计研究院有限公司 A kind of high-pressure grouting lifts deformation monitoring device and its installation method

Also Published As

Publication number Publication date
JPH1136298A (en) 1999-02-09

Similar Documents

Publication Publication Date Title
JP3867743B2 (en) Reinforcement method of rock bolt
US5678374A (en) Method of reinforcing concrete made construction and fixture used therefor
KR102019396B1 (en) Apparatus of prevention against falling stone
KR20100081704A (en) Structure and method for pressure reinforcement of slope site
KR200387409Y1 (en) Fixing apparatus of wire rope
KR20100115070A (en) Anchor bolt for fixing wire
JP4081602B2 (en) Joint structure of steel-concrete composite structure and reinforced concrete structure
JP3699022B2 (en) Anchor reinforcing device, anchor for slope and method for installing anchor on slope
KR101017183B1 (en) Ground anchor using steel strand and ground reinforcement method using the same
CA2466283C (en) Rock bolt
JP3330107B2 (en) Structure of anchoring part of PC steel and method of injecting buffer material in anchoring part of PC steel
KR102110806B1 (en) Construction method for reinforced helical pile
US7162843B2 (en) Bolts with connected anchor
KR100568041B1 (en) Permanent Anchor
KR101423292B1 (en) Apparatus for fixing rock bolt with leaf springs
JP4229253B2 (en) Lock bolt reinforcement method
JP6674843B2 (en) anchor
JP3943411B2 (en) Underground anchor
AU2002351425A1 (en) Rock bolt
JP5756659B2 (en) Anchor bolt advance yield type attracting metal and method for seismic reinforcement of large-scale wooden buildings using the attracted metal
JPH0341691B2 (en)
US10138613B2 (en) Ground anchor and method of using a ground anchor
KR102588552B1 (en) Apparatus for fixing steel reinforcements
KR101284182B1 (en) Reinforced rock bolt nail using prestressed and its manufacture methode and its construction method
JP3938385B2 (en) Construction side lining block unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040520

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060502

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060512

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061003

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061003

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101020

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111020

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121020

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131020

Year of fee payment: 7

EXPY Cancellation because of completion of term