JP3846458B2 - Power distribution method - Google Patents
Power distribution method Download PDFInfo
- Publication number
- JP3846458B2 JP3846458B2 JP2003186082A JP2003186082A JP3846458B2 JP 3846458 B2 JP3846458 B2 JP 3846458B2 JP 2003186082 A JP2003186082 A JP 2003186082A JP 2003186082 A JP2003186082 A JP 2003186082A JP 3846458 B2 JP3846458 B2 JP 3846458B2
- Authority
- JP
- Japan
- Prior art keywords
- region
- power supply
- power
- switch
- feeder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、配電系統における盗電による電力損失を少なくし、電気料金の回収率を向上させるのに好適な給配電方法その記録媒体に関する。
【0002】
【従来の技術】
従来の技術としては、【特許文献1】に記載のように、電力量計本体,カバー,ベースで電力量計量素子を収納する筐体を形成し、電力量計量素子で計量される電力量を視認できるように数値表示する電力量計において、電力量計の封印が破壊されてあるいは偽装再封印されて盗電などの不正行為を防止するために、封印ネジの頭部の位置変化を検知する電力量計がある。
【0003】
又、【特許文献2】に記載のように、電力需給計器の一部にバイパス線検出回路を設け、このバイパス線検出回路は、電流変圧器,テスト電流作動増幅調整回路,テスト電流調整回路,テスト電流増幅回路からの信号によって、電流検出線を流れるテスト電流を検出し、被注入テスト電流と被測定テスト電流とに僅かでも差異があれば、信号がメインコントローラに送られ、バイパス線が存在することを示すようにした改良型電力需給計器及び方法がある。又、【特許文献3】に記載のように、電力を供給する電力線と、電力線の外側を覆っている被覆部材と、被覆部材の所定の位置に電力線とは別に設けられた信号線の一端又は両端に接続され、信号線に所定電圧の電源を供給する電源供給部と、電源供給部によって信号線に供給された電源の変動を検知する電圧変動検知部と、電圧変動検知部によって所定値以上の電圧の変動を検知した場合に異常発生情報を管理センタへ送信するようにした盗電防止装置がある。
【0004】
【特許文献1】
特開2002−257862号公報
【特許文献2】
特開2000−249730号公報
【特許文献3】
特開2003−021649号公報
【0005】
【発明が解決しようとする課題】
【特許文献1】に記載の従来の技術は、電力量計の封印を破壊するあるいは偽装再封印による盗電等の不正行為を防止するものであり、電力量計とは別の場所を導体によりバイパスして行う盗電(以下、バイパス盗電という)を防止することができないものであった。
【0006】
又、【特許文献2】に記載の従来技術は、電力量計に内蔵した電源からのテスト電流を内蔵の電流変圧器で検出してバイパス線の有無を判定するので、測定しようとする電力需要家を停電させた状態でないと検出できないものであった。又、【特許文献3】に記載の盗電防止装置も【特許文献2】に記載の装置と同様な問題がある。
【0007】
すなわち、上記従来の技術は、電力量計の不正使用行為を防止する、一時的に停電させて盗電行為を検知することはできるが、バイパス盗電等を防止するものではない。そのため、バイパス盗電が頻繁に行われると、電気料金の回収率が低下し、電力損失(コマーシャルロスともいう)が大きくなるという問題があった。
【0008】
本発明の第1の目的は、バイパス盗電を低減して電力損失を減少させる給配電方法を提供することを目的とする。
【0009】
本発明の第2の目的は、バイパス盗電を低減するのに好適な給配電方法を実現できる給配電方法を提供することにある。
【0010】
本発明の第3の目的は、電力の配分に優先順位をつけて電気料金の回収率が高い地域の電力供給信頼度を向上させた給配電方法を提供することにある。
【0011】
【課題を解決するための手段】
上記目的を達成するために、本発明は、顧客データベース及び制御系データベースから計算される地域別の支払状況データと電力供給データから地域別の電気料金回収率を計算し、該電気料金回収率に基づいて地域別の電力供給信頼度を求め、求められた電力供給信頼度となるようにシミュレーションにより供給フィーダ,開閉器の開閉状態を設定するものである。これにより、電気料金回収率の高い地域を優先的に停電事故の復旧行うことができ、電力の融通に余力のあるフィーダで、距離も短い電力の供給経路を優先的に割当てることができるようになる。
【0012】
【発明の実施の形態】
以下、本発明の一実施例を図1から図3により説明する。図1に示すように、配電系統の監視,制御,料金課金,徴収などを行っている営業所1には、顧客データベース3を有する料金課金,徴収のための管理計算機2と、制御系データベース6を有する系統監視装置5と、管理計算機2及び系統監視装置5に接続された電気料金回収率の管理計算機8と、管理計算機8に接続された給配電系統計画用の計算機9と、計算機9に接続された遠方制御装置10が設置されている。
【0013】
管理計算機2は、顧客データベース3に蓄積している顧客の課金情報,支払履歴情報,住所などから地域別の支払状況データ4を計算する。系統監視装置5は、制御系データベース6に蓄積している配電系統の運用情報から、地域別の電力供給データ7を計算する。管理計算機8は、管理計算機2で計算された地域別の支払状況データ4と、地域別の電力供給データ7を基に地域別の電気料金回収率を計算する。
【0014】
計算機9は、管理計算機8で計算された地域別の電気料金回収率データを基に、地域別の電力供給信頼度の目標値を計算する。又、配電系統にある開閉器の開路,閉路状態の組合せを変更した状態をシミュレーションして、地域別の電力供給信頼度の目標値となるように各開閉器の開路,閉路状態を算出する。
【0015】
遠方制御装置10は、上述の各開閉器14〜21と信号線で接続されており、各開閉器の開路,閉路状態に基づき配電系統11上の開閉器14〜21の開路,閉路状態を変更する制御を遠方の営業所1から行う。または、各開閉器の状態は、手動変更される。
【0016】
変電所,開閉器,フィーダなどから構成される配電系統11には、図1に示す例では、変電所12と変電所13が設置されている。変電所12には負荷経路31,32が接続され、負荷経路31には開閉器14,15が設けられており、フィーダ22を介して需要家に接続されている。開閉器14,15,フィーダ22が設置されている地域は地域1として定義される。負荷経路32には開閉器16が設けられており、フィーダ23を介して需要家に接続されている。変電所13には負荷経路33,34が設けられている。負荷経路33には開閉器18,19が設けられており、フィーダ24を介して需要家に接続されている。負荷経路34には開閉器20,21が設けられ需要家に接続されている。開閉器17,19、フィーダ23,24が設置されている地域は地域2として定義されている。又、開閉器18,20が設置されている地域は地域3として定義されている。負荷経路32と負荷経路33との間は、開閉器17が設けられた負荷経路35で接続されている。開閉器17は、変電所12に接続されるフィーダ23と変電所13に接続されるフィーダ24との間の開閉切換えを行い、変電所とフィーダとの接続切換えを行う。
【0017】
これら開閉器14〜開閉器21の開路,閉路状態を変えることで、変電所から各電力需要家に電力を供給する経路を変えることができる。この経路の選択は、後述するように、それぞれの変電所が供給できる負荷の量,各フィーダの許容電流,線路抵抗値,各開閉器の許容電流が異なるため、どの変電所からどの経路を通じて電力を供給するかで、電力供給の信頼度が異なり、各開閉器の開路,閉路状態を変えて、各地域の電力供給の信頼度を変えることができる。
【0018】
図2は、電力料金回収率を向上するための方法を示す処理の流れ図である。ステップ50で、ルーチンがスタートすると、ステップ51で、地域別の電気料金回収率を計算する。図3に示すように、ステップ60で電気料金回収率の計算を行うため、顧客データベース3に蓄積している電力需要家データ63を取込む。電力需要家データ63には、各電力需要家の課金情報,支払履歴情報及び住所が記録されている。また、配電制御系データベース6に蓄積している地域別の電力供給データ64を取込む。
【0019】
地域Aの電気料金回収率CA は、数1により求めることができる。
【0020】
【数1】
【0021】
ここで、Uは地域Aの設定された期間(以下設定期間という)における課金者数(契約電力需要家数ともいう)、CPn は、設定期間内において、地域A内のn番目の電力需要家が支払った料金に対応する電力量、すなわちn番目の電力需要家が支払った分の電力量、TPA は設定期間内に地域Aに給電した電力量の合計である。
【0022】
ステップ52で、対象とする全ての地域の電気料金回収率の計算が完了したか否かを判定する。対象とする全ての地域の電気料金回収率の計算が完了していない場合は、ステップ51に戻り、対象とする全ての地域の電気料金回収率の計算が完了するまで計算を繰り返す。
【0023】
対象とする全ての地域の電気料金回収率の計算が完了すると、ステップ53で、地域別の電力供給信頼度の目標値を設定する。この電力供給信頼度の目標値の計算では、計算された地域別の電力料金の回収率を基にして、電気料金回収率の高い地域から順に高い電力供給信頼度を割り振っていく。電力供給信頼度の目標値の設定には、予め電力料金回収率と電力供給信頼度の関係を表にして記憶したテーブルを使用して行うことができる。
【0024】
ここで、電力供給信頼度とは、起こりうる停電事故を想定し、想定した停電事故のうち、配電系統の開閉器の開路,閉路状態を変更することにより、隣接したフィーダからの電力融通により停電を復旧させることができる割合である。例えば、隣接するフィーダの負荷容量に余裕がないか、隣接するフィーダと接続するための開閉器が存在しないなどの理由で、停電を全く復旧できない場合は、電力供給信頼度は0%となる。又、隣接するフィーダからの電力融通により想定される停電事故を復旧できる時は、電力供給信頼度は100%となる。
【0025】
ステップ54では、対象とする全ての地域での電力供給信頼度の目標値が求められた否かを判別する。対象とする全ての地域で電力供給信頼度の目標値が求められていない場合は、ステップ53に戻り、対象とする全ての地域で電力供給信頼度の目標値が求められるまで計算を繰り返す。
【0026】
対象とする全ての地域で電力供給信頼度の目標値が求められると、地域別の電力供給度信頼度の目標値を出力し、この目標値に合うように、ステップ55で配電系統の変更を行うシミュレーションを行う。シミュレーションでは、電力供給度信頼度の目標値に合うように設定するため、停電事故が生じても切換えないようにする開閉器の定義を行う。
【0027】
配電系統の変更を行うために、配電系統の多数の開閉器の開路,閉路状態をシミュレーションして開閉器の開路,閉路状態を決定する。
【0028】
負荷融通対象の配電系統を開閉器で区分される複数の配電区間に区分する。この区分された配電区間又は配電区間群を1つのノードとして取り扱う。ノードのうち他の配電系統の充電部分に開閉器を介して接続されたノードを識別して、他の配電系統をフィーダとして識別する。識別された各フィーダの予備量,各ノードの負荷量,各ノード相互間の連係可能性などをデータとして記録しておく。例えば、図4に示す例では、フィーダF1〜F4が存在し、フィーダF1は容量が50で、負荷量が9,9及び8の3つのノードが接続されているので予備量が24、同様にフィーダF2は容量が60で予備量が17、フィーダF3は容量が70で予備量が8、フィーダF4には供給経路がないことを示している。又、ノードは#1から#9が存在し、それぞれ丸印内に示す負荷量となっていることを示している。
【0029】
着目する地域に対応するノードを選定し、このノードについてフィーダから直接又は他の中継ノードを介して電力の融通を受ける供給経路を求める。図4に示す例では、例えばノード#5が着目する地域である場合、ノード#5は、フィーダF1からノード#9,#8を介して、あるいはノード#3,#2を介して電力の融通を受けることができる。又、フィーダF2からはノード#8を介して、あるいはノード#9,#6かノード#9,#8のいずれかを介して電力の融通を受けることができる。フィーダF3からノード#2を介して電力の融通を受けることができる。このように、ノード#5は、いずれかのフィーダから電力の融通を受けることができる。これらの供給経路のうちフィーダF1とフィーダF2は他のフィーダが停止していてもノード#5に電力を融通することが可能であるが、フィーダF3は他のフィーダが停止している場合は、ノード#5に電力を融通することができない。
【0030】
このような状況を定量的に表すために、求められた供給経路のうちフィーダに至るまでの中継ノードと着目ノードの総負荷量が最小となる経路を最短負荷経路として各フィーダについて設定する。着目ノードの最短負荷経路の隣接ノードを他の隣接ノードに代えた供給経路がある場合は、その供給経路うちの最短負荷経路を次最短負荷経路として設定する。
【0031】
次に、フィーダの予備量をそのフィーダに係る最短負荷経路の全ノードの総負荷量で除した値を供給密集度として定義し、着目ノードについて、各フィーダについて最短負荷経路にある全ノードの総負荷量とフィーダの予備量の比である供給密集度を求める。又、各着目ノードについて最短負荷経路にかかるフィーダの予備量を、予備量から中継ノードの総負荷量を引いた値で除した値である供給距離を求める。ここで、供給密集度が大きいことは、予備量に余裕があり、安定に電力を融通できることを意味し、供給距離が大きいことは、中継ノードの負荷量が小さいか中継ノードの距離が短く、安定に電力を融通できることを意味する。すなわち、電力の融通に余力のあるフィーダで、距離も短い電力の供給経路を優先的に割当てることにより、電力料金の回収率の高い地域に優先的にサービスを行うことができる。
【0032】
この供給密集度と供給距離に基づいて各フィーダから着目ノードに電力を融通する供給妥当性について評価し、着目ノードについて評価ポイントの高い順にフィーダを供給フィーダの候補して決定する。決定された供給フィーダ,開閉器の開閉状態は、電力供給信頼性の目標値が高い地域順に割り振っていく。このようにして、地域別の電力供給信頼度の目標値に合わせて供給フィーダ,開閉器の開閉状態を設定する。
【0033】
以上では、管理計算機2,管理計算機8,計算機9と別の計算機で計算する場合を説明したが、1つの計算機で行っても良い。
【0034】
以上説明した給配電方法の手順を、CD−ROM等の記録媒体に記録しておき、計算機にインストールして、顧客データベース及び配電制御データベースにアクセスすることにより、供給フィーダ,開閉器の開閉状態に設定することができる。
【0035】
本実施例によれば、電気料金の回収率が高い地域の電力供給信頼度を、電気料金の回収率が低い地域の電力供給信頼度よりも高く設定することにより、電気料金の回収率が高い地域に優先的に電力を供給できるようにし、優遇措置をとることにより電気料金の回収率を上げることができる。
【0036】
又、電気料金の回収率が高い地域は、停電事故からの復旧を電気料金の回収率が低い地域より早くするとができ、電気料金の回収率に応じた利益を受けられる。又、電気料金回収率の低い地域と、電気料金の回収率が高い地域があり、地域によって電気料金回収率の差が明確な場合に、電力料金の回収率の高い地域に優先的に予備量の大きい電力を供給するサービスを行うことができる。
【0037】
【発明の効果】
本発明によれば、盗電が多数行われ電気料金の回収率が低い地域は電力供給信頼度が低く、電気料金の回収率が高い地域は電力供給信頼度を上げることができる。その結果、限られた電力を電気料金回収率の高い地域に優先的に給電することができ、全体として電気料金の回収率が向上する。
【図面の簡単な説明】
【図1】本発明の一実施例である電力システムの構成図である。
【図2】本実施例の制御流れ図である。
【図3】電力料金回収率向上のための制御流れ図である。
【図4】電力供給の信頼度を求める流れ図である。
【符号の説明】
1…営業所、2,8…管理計算機、3…顧客データベース、4…支払状況データ、5…系統監視装置、6…制御系データベース、7…電力供給データ、9…計算機、10…遠方制御装置、11…配電系統、12,13…変電所、14〜21…開閉器、22〜25…フィーダ、31〜35…負荷経路。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a power supply / distribution method and a recording medium suitable for reducing power loss due to power theft in a power distribution system and improving an electricity bill collection rate.
[0002]
[Prior art]
As a conventional technique, as described in [Patent Document 1], a casing for storing an electric energy metering element is formed by an watt hour meter body, a cover, and a base, and the electric energy measured by the electric energy metering element is determined. In a watt-hour meter that displays numerical values so that it can be visually recognized, the power that detects the position change of the head of the sealing screw in order to prevent fraudulent acts such as theft due to the watt-hour meter's seal being destroyed or camouflaged and resealed There is a meter.
[0003]
Further, as described in [Patent Document 2], a bypass line detection circuit is provided in a part of the power supply and demand meter, and this bypass line detection circuit includes a current transformer, a test current operation amplification adjustment circuit, a test current adjustment circuit, The test current flowing through the current detection line is detected by the signal from the test current amplifier circuit. If there is a slight difference between the test current to be injected and the test current to be measured, the signal is sent to the main controller and there is a bypass line. There are improved power supply and demand meters and methods designed to show that. Further, as described in [Patent Document 3], a power line for supplying power, a covering member covering the outside of the power line, and one end of a signal line provided separately from the power line at a predetermined position of the covering member or A power supply unit that is connected to both ends and supplies power of a predetermined voltage to the signal line, a voltage fluctuation detection unit that detects fluctuations in the power supplied to the signal line by the power supply unit, and a voltage fluctuation detection unit that exceeds a predetermined value There is an anti-theft device that transmits abnormality occurrence information to a management center when a change in voltage is detected.
[0004]
[Patent Document 1]
JP 2002-257862 A [Patent Document 2]
JP 2000-249730 A [Patent Document 3]
Japanese Patent Laid-Open No. 2003-021649
[Problems to be solved by the invention]
The prior art described in
[0006]
In addition, the conventional technology described in [Patent Document 2] detects the test current from the power source built in the watt hour meter with the built-in current transformer and determines the presence or absence of the bypass line. It could not be detected unless the house was powered down. The anti-theft device described in [Patent Document 3] has the same problem as the device described in [Patent Document 2].
[0007]
In other words, the conventional technology described above can prevent illegal use of the watt-hour meter, and can detect a power theft by temporarily interrupting power, but does not prevent bypass theft. For this reason, if bypass theft is frequently performed, there is a problem that the recovery rate of the electricity charge is reduced and the power loss (also referred to as commercial loss) is increased.
[0008]
A first object of the present invention is to provide a power distribution method that reduces power loss by reducing bypass theft.
[0009]
A second object of the present invention is to provide a power supply / distribution method capable of realizing a power supply / distribution method suitable for reducing bypass theft.
[0010]
A third object of the present invention is to provide a power supply / distribution method in which priority is given to the distribution of electric power to improve the power supply reliability in a region where the recovery rate of the electric bill is high.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, the present invention calculates an electricity rate collection rate for each region from the payment status data and the power supply data for each region calculated from the customer database and the control system database. Based on this, the power supply reliability for each region is obtained, and the open / close state of the supply feeder and the switch is set by simulation so as to obtain the obtained power supply reliability. As a result, power failure accidents can be preferentially restored in areas with a high electricity bill collection rate, and feeders with sufficient power capacity can be preferentially assigned power supply routes with short distances. Become.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described below with reference to FIGS. As shown in FIG. 1, a
[0013]
The
[0014]
The
[0015]
The
[0016]
In the example shown in FIG. 1, a
[0017]
By changing the open and closed states of these switches 14 to 21, it is possible to change the path for supplying power from the substation to each power consumer. As will be described later, this route is selected because the amount of load that can be supplied by each substation, the allowable current of each feeder, the line resistance value, and the allowable current of each switch are different. The reliability of power supply differs depending on whether the power supply is supplied, and the reliability of power supply in each region can be changed by changing the open / close state of each switch.
[0018]
FIG. 2 is a process flow diagram illustrating a method for improving the power rate recovery rate. When the routine starts in
[0019]
Electrical collection ratio C A local A can be determined by the
[0020]
[Expression 1]
[0021]
Here, U is the number of billers (also referred to as the number of contracted power consumers) in the set period of region A (hereinafter referred to as the set period), and CP n is the nth power demand in area A within the set period. amount of power corresponding to the home paid fee, namely n-th minute amount of power electric power consumer has paid, TP a is the sum of the amount of power to power the region a within a set period.
[0022]
In
[0023]
When the calculation of the electricity rate collection rate of all the target areas is completed, in step 53, the target value of the power supply reliability for each area is set. In the calculation of the target value of the power supply reliability, high power supply reliability is assigned in order from the region with the highest electricity charge recovery rate based on the calculated electricity charge recovery rate for each region. The target value of the power supply reliability can be set using a table stored in advance as a table of the relationship between the power charge recovery rate and the power supply reliability.
[0024]
Here, the power supply reliability is assumed to be a possible power outage accident. Among the assumed power outage accidents, the open / close state of the switch in the distribution system is changed, and power outage is caused by power interchange from adjacent feeders. It is the ratio that can be restored. For example, when the power failure cannot be recovered at all because the load capacity of the adjacent feeder is not sufficient or there is no switch for connecting to the adjacent feeder, the power supply reliability is 0%. Moreover, when the power failure accident assumed by the power interchange from the adjacent feeder can be recovered, the power supply reliability is 100%.
[0025]
In
[0026]
When the target value of power supply reliability is obtained in all target regions, the target value of power supply reliability for each region is output, and the distribution system is changed in step 55 so as to match this target value. Perform the simulation to be performed. In the simulation, a switch is defined so as not to switch even if a power outage accident occurs in order to set it to meet the target value of power supply reliability.
[0027]
In order to change the distribution system, the open / close states of a number of switches in the distribution system are simulated to determine the open / close states of the switches.
[0028]
The distribution system for load accommodation is divided into a plurality of distribution sections divided by switches. This divided distribution section or distribution section group is handled as one node. The node connected to the charging part of the other distribution system among the nodes via the switch is identified, and the other distribution system is identified as a feeder. The spare amount of each identified feeder, the load amount of each node, the possibility of linkage between nodes, etc. are recorded as data. For example, in the example shown in FIG. 4, feeders F1 to F4 exist, the feeder F1 has a capacity of 50, and three nodes with load amounts 9, 9, and 8 are connected, so the reserve amount is 24, and similarly The feeder F2 has a capacity of 60 and a reserve amount of 17, the feeder F3 has a capacity of 70 and a reserve amount of 8, and the feeder F4 has no supply path. In addition,
[0029]
A node corresponding to the region of interest is selected, and a supply path for receiving power interchange directly from the feeder or via another relay node is obtained for this node. In the example shown in FIG. 4, for example, when
[0030]
In order to quantitatively represent such a situation, a route in which the total load amount of the relay node and the node of interest up to the feeder is minimized among the obtained supply routes is set for each feeder as the shortest load route. When there is a supply route in which the adjacent node of the shortest load route of the target node is replaced with another adjacent node, the shortest load route of the supply routes is set as the next shortest load route.
[0031]
Next, a value obtained by dividing the spare amount of the feeder by the total load amount of all the nodes in the shortest load path related to the feeder is defined as the supply congestion, and for the target node, the total of all the nodes in the shortest load path for each feeder is defined. The supply density, which is the ratio of the load amount to the feeder reserve amount, is obtained. In addition, a supply distance that is a value obtained by dividing the reserve amount of the feeder on the shortest load path for each node of interest by the value obtained by subtracting the total load amount of the relay node from the reserve amount is obtained. Here, a large supply congestion means that there is a margin in the reserve amount and power can be stably accommodated, and a large supply distance means that the load amount of the relay node is small or the distance of the relay node is short, It means that power can be interchanged stably. That is, it is possible to provide services preferentially to regions where the recovery rate of power charges is high by preferentially allocating power supply paths that are short in distance with feeders that have power reserves.
[0032]
Based on the supply density and the supply distance, the validity of the supply of power from each feeder to the target node is evaluated, and the feeder is determined as a candidate for the supply feeder in descending order of the evaluation points for the target node. The open / close states of the determined supply feeders and switches are assigned in order of regions with the highest power supply reliability target values. In this manner, the open / close state of the supply feeder and the switch is set in accordance with the target value of the power supply reliability for each region.
[0033]
In the above, the case where the calculation is performed by a computer other than the
[0034]
The procedure of the power supply / distribution method described above is recorded on a recording medium such as a CD-ROM, installed in a computer, and accessed to the customer database and the power distribution control database, so that the supply feeder and the switch are opened and closed. Can be set.
[0035]
According to the present embodiment, by setting the power supply reliability in a region with a high electricity bill collection rate higher than the power supply reliability in a region with a low electricity bill collection rate, the electricity bill collection rate is high. By making it possible to supply power preferentially to the region and taking preferential treatment, the collection rate of electricity charges can be increased.
[0036]
In addition, in regions where the electricity bill collection rate is high, recovery from a power outage accident can be made faster than regions where the electricity bill collection rate is low, and a profit corresponding to the electricity bill collection rate can be obtained. In addition, when there is a region with a low electricity bill collection rate and a region with a high electricity bill collection rate, and there is a clear difference in the electricity bill collection rate depending on the region, a reserve amount is given priority to a region with a high electricity bill collection rate. A service that supplies a large amount of power can be performed.
[0037]
【The invention's effect】
According to the present invention, the power supply reliability is low in areas where a large number of thefts are performed and the recovery rate of electricity charges is low, and the power supply reliability can be increased in areas where the recovery rate of electricity charges is high. As a result, limited power can be preferentially supplied to areas with a high electricity bill collection rate, and the electricity bill collection rate improves as a whole.
[Brief description of the drawings]
FIG. 1 is a configuration diagram of a power system according to an embodiment of the present invention.
FIG. 2 is a control flowchart of this embodiment.
FIG. 3 is a control flowchart for improving a power rate recovery rate.
FIG. 4 is a flowchart for obtaining reliability of power supply.
[Explanation of symbols]
DESCRIPTION OF
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003186082A JP3846458B2 (en) | 2003-06-30 | 2003-06-30 | Power distribution method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003186082A JP3846458B2 (en) | 2003-06-30 | 2003-06-30 | Power distribution method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005020966A JP2005020966A (en) | 2005-01-20 |
JP3846458B2 true JP3846458B2 (en) | 2006-11-15 |
Family
ID=34185307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003186082A Expired - Fee Related JP3846458B2 (en) | 2003-06-30 | 2003-06-30 | Power distribution method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3846458B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5178344B2 (en) * | 2008-06-24 | 2013-04-10 | 中国電力株式会社 | Electricity rate calculation system, electricity rate calculation method |
JP6194316B2 (en) * | 2011-10-10 | 2017-09-06 | ダスギプ・インフォメーション・アンド・プロセス・テクノロジー・ゲゼルシャフト・ミット・ベシュレンクテル・ハフツングDasgip Information And Process Technology Gmbh | Biotechnology apparatus and method for performing controlled operation of a bioreactor system |
US8768795B2 (en) * | 2012-09-12 | 2014-07-01 | General Electric Company | Methods and systems for estimating recoverable utility revenue |
CN112398126B (en) * | 2020-11-26 | 2022-09-09 | 国网河南省电力公司内乡县供电公司 | Power distribution grid loss reduction and anti-theft operation and maintenance management method |
-
2003
- 2003-06-30 JP JP2003186082A patent/JP3846458B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2005020966A (en) | 2005-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102187540B (en) | Short-term load forecasting based capacity check for automated power restoration of electric distribution networks | |
US20160193932A1 (en) | Electrical vehicle charging devices, systems, and methods | |
US7551984B1 (en) | Method of tracking power outages | |
JP2007014066A (en) | System and method for leveling power load | |
Ashton et al. | Novel application of detrended fluctuation analysis for state estimation using synchrophasor measurements | |
JP2004340767A (en) | Electric power transaction method and electric power transaction system prevented in stealing electricity | |
JP2015529926A (en) | Method and system for estimating recoverable utility revenues | |
JP2004226223A (en) | Power supply service method and system, watthour meter and its program | |
JP6432816B2 (en) | Power management system, control device | |
JP2007020314A (en) | Power demand prediction system | |
JP3812431B2 (en) | Distribution efficiency improvement service providing method and distribution efficiency improvement system | |
CN105547331A (en) | Intelligent electric meter electric quantity reminding method based on wireless communication | |
US20040008023A1 (en) | Real-time charging electronic watthour meter | |
JP2015042071A (en) | Power distribution system facility evaluation device and power distribution system facility evaluation method | |
JP3846458B2 (en) | Power distribution method | |
CN101329788A (en) | Authorization type power management method and system | |
KR101659862B1 (en) | Smart energy management system and smart energy management method using the system | |
CN113655272A (en) | Electric quantity value correction method and device, storage medium and electronic equipment | |
Karabiber | Detecting and pricing nontechnical losses by using utility power meters in electricity distribution grids | |
Wang | Reliability cost/worth considerations in distribution system evaluation. | |
Sathyapriya et al. | Hardware implementation of IOT based energy management theft detection and disconnection using smart meter | |
Buevich et al. | Short paper: Microgrid losses: When the whole is greater than the sum of its parts | |
US6839696B1 (en) | Guarantee charge processing method and apparatus | |
WO2021215058A1 (en) | Distributed power supply optimum arrangement system and arrangement method | |
Numair et al. | On the UK smart metering system and value of data for distribution system operators |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041209 |
|
RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20060420 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060726 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060801 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060814 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 3846458 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090901 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100901 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110901 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120901 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130901 Year of fee payment: 7 |
|
LAPS | Cancellation because of no payment of annual fees |