JP3824931B2 - Installation work for air conditioning equipment in underground space - Google Patents

Installation work for air conditioning equipment in underground space Download PDF

Info

Publication number
JP3824931B2
JP3824931B2 JP2001394702A JP2001394702A JP3824931B2 JP 3824931 B2 JP3824931 B2 JP 3824931B2 JP 2001394702 A JP2001394702 A JP 2001394702A JP 2001394702 A JP2001394702 A JP 2001394702A JP 3824931 B2 JP3824931 B2 JP 3824931B2
Authority
JP
Japan
Prior art keywords
packer
height
anchor bolt
base
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001394702A
Other languages
Japanese (ja)
Other versions
JP2003193490A (en
Inventor
清之 大和田
Original Assignee
松下環境空調エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 松下環境空調エンジニアリング株式会社 filed Critical 松下環境空調エンジニアリング株式会社
Priority to JP2001394702A priority Critical patent/JP3824931B2/en
Publication of JP2003193490A publication Critical patent/JP2003193490A/en
Application granted granted Critical
Publication of JP3824931B2 publication Critical patent/JP3824931B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、とくに、地下鉄等の地下空間における空調設備機器等の据−付け工事方法に関するものである。
【0002】
【従来の技術】
一般に、この種の地下鉄等の地下空間における空調設備機器の据付け工事にあっては、該空調設備機器等の据付けすべき部位に対し、アンカーボルトが立設される所定の深さの複数個のアンカーボルト設定孔を設けた基礎コンクリートを打設し、この作業が終了後、該基礎コンクリート上においてアンカーボルトの両側に配置される仮パッカーを、一体型の型枠内にコンクリートを充填してこれを突き固めながら形成し、この仮パッカー上に据付けすべき空調機器等の機台ベースを上載し、その後、前記アンカーボルト設定孔に打設されたアンカーボルト固設用のコンクリート上面と前記空調機器等の機台ベースとの間に本パッカーを打設して、該本パッカーと機台ベースとの間にスぺーサを介在し、該スぺーサにより機台ベースの高さ及び水平度を調整して空調設備機器の据付けを行なうようにしていた。
【0003】
【発明が解決しようとする課題】
しかしながら、上記した従来の方法にあっては、本パッカーを打設する際は既に仮パッカー上に設置する空調設備機器を構成する例えば、送風機の機台ベースが上載されており、基礎コンクリート上面と機台ベースの間隙に型枠を入れ、無収縮セメントを突き固める本パッカーの設定は極めて困難であった。従って、型枠を廃し無収縮セメント(パッドタイプ)を巻いた上に錠台を置き、側面からのみ、空き固める等の方法がとられたが強度的に不完全で錠台上面のレベル出しが難しい上に非常な労苦を必要とし、工期を大幅に長くする要因となっていた。
【0004】
そこで、本発明は上記の問題点に鑑みてなされたもので、その目的とするところは、空調機器等の設置レベルの調整をきわめて簡易に行ない、その作業効率並びに設置精度の良化向上を図るとともに、その作業に必要な労力と時間を極力省き、作業全体の工期を可及的に短縮し得る地下空間における空調設備機器等の据付け工事方法を提供するものである。
【0005】
【課題を解決するための手段】
この課題を解決するために、請求項1に記載の発明は、空調設備機器等の据付けすべき部位に対し、ほぼ中心部にアンカーボルトが立設される所定の深さの複数個のアンカーボルト設定孔を設けた基礎コンクリートを打設し、該基礎コンクリート上において配置される仮パッカーを形成し、該仮パッカー上に錠台及び高さ調整部材を介して据付けすべき空調機器等の機台ベースを上載するとともに、該機台ベースの高さ及び水平度を調整し、前記アンカーボルト設定孔にアンカーボルト固設用に打設されるアンカーボルト固設用のコンクリート上において該コンクリート上面と前記空調機器等の機台ベースとの間に本パッカーを打設形成して地下空間における空調設備機器等の据付け工事において、
前記機台ベースの高さ及び水平度を調整するに際し、前記本パッカー打設部位付近に、螺旋回転動作機構付きの面高低微調整器具を所定の複数箇所に配置し、該螺旋回転動作機構付きの面高低微調整器具によりその高さ及び水平度のレベルを調整設定し、その後、前記本パッカーを形成することを要旨とする。
【0006】
上記した構成によれば、機台ベースの高さ及び水平度を調整するに際し、基礎コンクリート上において、本パッカー打設部位付近の所定の複数箇所に配置された螺旋回転動作機構付きの面高低微調整器具により該機台ベースの高さ及び水平度のレベルを調整設定し、その後、前記本パッカーを形成することにより、空調機器等の設置レベルの調整をきわめて簡易に行ない、その作業効率並びに設置精度の良化向上を図るとともに、その作業に必要な労力と時間を極力省き、作業全体の工期を可及的に短縮し得るものである。
【0007】
【発明の実施の形態】
以下、地下空間における空調設備機器等の据付け工事方法における本発明の実施形態について図1〜図9を参照して説明する。
以下記載する本実施の形態にあっては、地下空間に据付けられる空調設備機器等において、該空調設備機器等を構成する送風機の据付けの場合について説明する。
【0008】
まず、送風機1の据付け状態にあっては、図1及び図2に示すように、地下空間Sにおいて、据付けすべき送風機1の形態に対応して所定の形状にコンクリート打設された基礎コンクリート2に対し、送風機1の据付けすべき部位にアンカーボルト3を納める金属製の造形装置を構成する金属製有底型枠4〜4が該基礎コンクリート2と一体でコンクリート打設され、該基礎コンクリート部2上に仮パッカー5〜5を介在して送風機1の機台ベース6を載置するとともに、金属製型枠4〜4内に打設充填されたアンカーボルト3固設用のコンクリート9上面と機台ベース6下面との間に本パッカー7を形成し、そのアンカーボルト3を介してナット等の締着手段により前記機台ベース6を固定することにより、空調設備機器等を構成する送風機1を地下空間における基礎コンクリート2上に据付けられるものである。
【0009】
以下、その据付け工事方法を具体的に説明する。
まず、基礎コンクリート2は、送風機1の据付けすべき部位に対応して設定された送風機基礎の配筋用アンカーボルトを床面スラブに打設し、基礎鉄筋を配筋して配筋枠組8を形成する。この配筋枠組8の中に後述する金属製有底型枠(アンカースリーブともいう。)4を組み込み、円周の鉄筋に接続固定する。この後送風機基礎全体の型枠(木製)を形成し、基礎コンクリート2を打設する。(基礎形成工程という。)。すなわち、基礎コンクリート2用の方形状等に枠組みされた配筋枠組8とともに、後述するアンカーボルト固設のためのコンクリート9用の金属製有底型枠4を配設した後、送風機基礎全体の型枠(図示しない)を施工し基礎コンクリート2の打設を行う。
【0010】
なお、前記金属製有底型枠4の内径部位がアンカーボルト設定孔とされるものであり、このアンカーボルト設定孔のほぼ中央部には下端をU字状に曲折されたアンカーボルト3を立設するものである。
【0011】
この場合、図5に示すように、金属製有底型枠4は、例えば、亜鉛鉄板等の金属製の有底円筒形状に形成されており、これにより、基礎コンクリート2用の配筋枠組8をそのまま金属製有底型枠4内に挿通しかつ該配筋枠組8における円周の鉄筋て該金属製有底型枠4を配置することができ、また、アンカーボルト3を該金属製有底型枠4に挿通された配筋枠組8における鉄筋に対して引掛け金具(図示しない)を介して引掛けて立設することができ、それぞれの結束作業の作業性を良くするものである。さらに、金属製有底型枠4と基礎コンクリート2の打設コンクリートとの密着性を良化して基礎コンクリート部2の打設精度を高めるものである。
【0012】
ついで、上記基礎コンクリート2における型枠解体後、該基礎コンクリート2上にスミ出しを行い、その基礎コンクリート2上において、仮パッカー5〜5を据付けすべき送風機1に対応する所定の複数個所(図3では3箇所を示す。)打設形成して配置する。(仮パッカー形成工程という。)
【0013】
すなわち、図6に示すように、各仮パッカー5は、鋼製の横方向に2分割した方形状の所定の高さの型枠10(仮枠ともいう)を組み、該型枠10内に無収縮性モルタル(パッドタイプ)を目分量により数回(約5回が好ましい。)に分けて投入してバイブレータ手段により振動を付与しながら打ち固めることにより打設形成される。この場合、無収縮性モルタル(パッドタイプ)を目分量により数回(約5回が好ましい。)に分けて投入することにより、無収縮性モルタル(パッドタイプ)を型枠10の上部まで早く固めることができるものである。
【0014】
そして、上記無収縮性モルタル(パッドタイプ)からなる仮パッカー5上に錠台(平行ライナー)11をバイブレータ手段により振動を付与しながら該仮パッカー5内に1/3程度まで突きながら埋め込む(図6参照)。この場合、錠台(平行ライナー)11の上面の平行度を調整しながら行ない、高い部分はゴム製のハンマー等により微調整を行なうものである。
【0015】
ついで、上記仮パッカー5上の錠台(平行ライナー)11に対して、相対向する摺動テーパー面を備えた一対の高さ調整部材12(テーパーライナー)を載置し、この高さ調整部材12(テーパーライナー)を介して据付けすべき空調機器等である送風機1の機台ベース6を上載するとともに、該機台ベース6の高さレベル及び水平度を別設される後述の螺旋回転動作機構付きの面高低微調整器具13の操作で調整し設定する(機台ベース設置仮芯調整工程という)。
【0016】
そして、この螺旋回転動作機構付きの面高低微調整器具13は、図9に示すように、例えば、レベリングブロックのような互いに対向して摺接する摺動テーパー面14、15を有する一対の固定側及び可動側の調整台16、17と、該固定側の調整台16に対し可動側の調整台17をその上面が平行状態で上下動するように両者をねじ連繋したねじ手段18とから構成され、このねじ手段18の螺進及び螺退回転することにより可動側の調整台17をその摺動テーパー面を利用して上下動してその高さの高低を調整する。なお、固定側と可動側の調整台16、17のねじ連繋(ねじ手段18)における螺合組付け状態の遊びは、1/1000〜5/1000の精度に設定したものが使用されるものである。
【0017】
上記機台ベース設置仮芯調整工程において、機台ベース6の高さ及び水平度の調整設定にあっては、基礎コンクリート2上面と前記送風機1の機台ベース6との間における所定部位(後述する本パッカー7の形成部位の近傍)の複数箇所に対して前記螺旋回転動作機構付きの面高低微調整器具13を設置し、該螺旋回転動作機構付きの面高低微調整器具13により機台ベース6の水平度並びに予め決められた高さレベルを微調整して設定する。
【0018】
この各螺旋回転動作機構付きの面高低微調整器具13の個々の操作によって、機台ベース6の水平度並びに高さレベルの調整作業を簡単かつ素早く行なうことができるものである。
【0019】
この状態において、螺旋回転動作機構付きの面高低微調整器具13にて設定した高さレベルに合せて前記仮パッカー5上における高さ調整部材12(テーパーライナー)を調整し、該高さ調整部材12(テーパーライナー)の上面を機台ベース6の下面に当接する。
【0020】
なお、上記のように機台ベース6を水平度並びに予め決められた高さレベルに調整設定した後においては、前記螺旋回転動作機構付きの面高低微調整器具13を外して仮芯検査を受け、その検査合格後、金属製有底型枠4内、すなわち、アンカーボルト設定孔にアンカーボルト固設用としてのコンクリート9を充填、打設して、該充填、打設されたコンクリート9によりアンカーボルト3を垂直状態に固定する。
【0021】
そして、前記アンカーボルト固設用としての各コンクリート9上においてアンカーボルト3を挟んだ位置における該コンクリート9上面と前記送風機1の機台ベース6との間に本パッカー7を、無収縮セメントを金属製分割型枠に流し込むようにして打設しかつ該無収縮セメント上に前述の仮パッカー5と同様に錠台11aを載置することにより形成する(本パッカー打設工程という)。
【0022】
本パッカー7の錠台レベルの調整は,既に仮パッカー5上に載置され仮芯出しが完了している機台ベース6の下面と錠台11aとの間に一対の高さ調整部材12a(テーパーライナー)を入れてこの高さ調整部材12a(テーパーライナー)を摺動させることで該錠台11aを本パッカー7内に押し込む方法によって行なうものである。
【0023】
すなわち、上記錠台(平行ライナー)11a上に対し、前記仮パッカー5に使用された高さ調整部材12と同様に構成した対向する摺動テーパー面を備えた高さ調整部材12a(テーパーライナー)を載置し、該高さ調整部材12a(テーパーライナー)を摺動させることによって、錠台11aを本パッカー7内に押し込みながら、この高さ調整部材12a(テーパーライナー)の上面を機台ベース6の下面に当接する(図6及び図7参照)。
【0024】
この場合、本パッカー7が硬化するまでの間は、錠台(平行ライナー)11aの上面レベルが据付ける送風機1の機台ベース6の下面と平行でかつ高さ調整部材12aに「がた」が生じないように点検するものである。このとき、アンカーボルト3の垂直度についても該垂直となるように設定する。
【0025】
ついで、前記本パッカー7が硬化した後、本パッカー7の錠台上の高さ調整材12により本芯出し調整を行うとともに、アンカーボルト3に螺合するナット等により締着する。すなわち、この本芯出し調整は、前述のように、アンカーボルトに螺合するナット等をトルクレンチで締めながら高さ調整部材12を摺動させる精密調整作業として行なわれるものである。
【0026】
そして、これ等の調整作業が終了し、最終検査を合格した後に、本パッカー7の金属製分割型枠を解体抜出するとともに、前記各仮パッカー5における錠台11及び高さ調整部材12とを全数溶接固定する。
【0027】
その後、基礎コンクリート2に対し据付けした機台ベース6上面までシンダーコンクリート19を打設しコテ仕上げを行い、ここに、地下空間において、空調設備機器等を構成する送風機1を基礎コンクリート2上に据付けるものである。
【0028】
なお、上記した実施の形態において、機台ベース6の据付けにあたっての仮パッカー5及び本パッカー7の設置位置並びにその個数は、図示のものに限定するものではなく、また、螺旋回転動作機構付きの面高低微調整器具13にあっても図示のものに限定するものではない。
【0029】
【発明の効果】
請求項1の発明にあっては、機台ベースの高さ及び水平度を調整するに際し、基礎コンクリート上において、本パッカー打設部位付近の所定の複数箇所に螺旋回転動作機構付きの面高低微調整器具を配置し、該個々の螺旋回転動作機構付きの面高低微調整器具により該機台ベースの高さ及び水平度のレベルを調整設定することにより、空調機器等の設置レベルの調整をきわめて簡易に行ない、その作業効率並びに設置精度の良化向上を図るとともに、その作業に必要な労力と時間を極力省き、作業全体の工期を可及的に短縮し得る。
【0030】
また機台ベースの高さ及び水平度を調整するに際し、ジャッキ等の方法では、本芯出し調整の基準となる錠台のレベル1/100〜2/100というシビアな調整が難しく、耐荷重計算した台数分の螺旋回転動作機構付きの面高低微調整器具を配置し、該個々の螺旋回転動作機構付きの面高低微調整器具を使用することにより、シビアな調整が容易に確保することができる。
【図面の簡単な説明】
【図1】本実施の形態に係る送風機1の据付け状態を示す説明図である。
【図2】同じく、本実施の形態に係る送風機1の据付け状態を示す説明図である。
【図3】本実施の形態に係る送風機1の据付け工事方法のパッカー配置を略示する平面説明図である。
【図4】本実施の形態に係る送風機1の据付け工事方法を略示する側面説明図である。
【図5】アンカーボルト用の金属製有底型枠の説明図である。
【図6】仮パッカー形成工程の説明図である。
【図7】同じく、仮パッカー形成工程の説明図である。
【図8】機台ベース設置調整工程及び本パッカー打設工程の説明図である。
【図9】本実施の形態に係る螺旋回転動作機構付きの面高低微調整器の一例を示す斜視図である。
【符号の説明】
1 送風機
2 基礎コンクリート
3 アンカーボルト
4 金属製有底型枠
5 仮パッカー
6 機台ベース
7 本パッカー
8 配筋枠組
9 アンカーボルト固設用のコンクリート
11 錠台
12 高さ調整部材
13 螺旋回転動作機構付きの面高低微調整器具
[0001]
BACKGROUND OF THE INVENTION
In particular, the present invention relates to a method for installing air conditioning equipment in an underground space such as a subway.
[0002]
[Prior art]
In general, in the installation work of air conditioning equipment in an underground space of this kind such as a subway, a plurality of anchor bolts are erected at a predetermined depth with respect to a site to be installed such as the air conditioning equipment. After the foundation concrete with anchor bolt setting holes is placed and this work is finished, temporary packers placed on both sides of the anchor bolt on the foundation concrete are filled into the integrated formwork with concrete. The concrete base for anchor bolt fixing and the air conditioner mounted on the anchor bolt setting hole are mounted on the temporary packer, and the machine base such as the air conditioner to be installed on the temporary packer is mounted on the temporary base. The machine packer is placed between the machine base and the spacer, and a spacer is interposed between the machine packer and the machine base. Pingdu adjust to the had to perform the installation of air conditioning equipment.
[0003]
[Problems to be solved by the invention]
However, in the above-described conventional method, when placing the present packer, for example, a base base of a blower that constitutes the air conditioning equipment installed on the temporary packer is mounted on the upper surface of the basic concrete. It was extremely difficult to set up this packer that puts a formwork in the gap between the machine base and hardens the non-shrinkage cement. Therefore, the method of removing the formwork and placing the lock table on the non-shrinkable cement (pad type) and then solidifying the space only from the side was taken, but the strength was incomplete and the level of the upper surface of the lock table was raised. It was difficult and required a lot of labor, and it was a factor that greatly lengthened the construction period.
[0004]
Accordingly, the present invention has been made in view of the above-described problems, and the object of the present invention is to extremely easily adjust the installation level of an air conditioner or the like to improve the work efficiency and the installation accuracy. At the same time, it is intended to provide a method for installing air-conditioning equipment and the like in an underground space that can save the labor and time required for the work as much as possible and shorten the work period of the whole work as much as possible.
[0005]
[Means for Solving the Problems]
In order to solve this problem, the invention according to claim 1 is a plurality of anchor bolts having a predetermined depth in which an anchor bolt is erected substantially at the center of a portion to be installed such as an air conditioner equipment. A base for air conditioners or the like to be installed on the temporary packer via a lock base and a height adjusting member, by placing the basic concrete provided with a setting hole to form a temporary packer arranged on the basic concrete A base is mounted, and the height and level of the base of the machine base are adjusted, and the concrete upper surface and the concrete upper surface on the anchor bolt fixing concrete placed in the anchor bolt setting hole for anchor bolt fixing In the installation work of air conditioning equipment etc. in the underground space by placing this packer between the base of air conditioning equipment etc.
When adjusting the height and level of the base of the machine base, the surface height fine adjustment tool with a spiral rotation operation mechanism is arranged in a predetermined plurality of locations near the site where the present packer is placed, and the spiral rotation operation mechanism is provided. The gist is to adjust and set the level of the height and the level of the level with the surface height adjustment tool, and then form the packer.
[0006]
According to the above-described configuration, when adjusting the height and level of the machine base, the height of the surface with the spiral rotation operation mechanism disposed at a plurality of predetermined positions near the site where the packer is placed on the foundation concrete. By adjusting and setting the height and level of the base of the machine base with an adjusting device, and then forming the main packer, the installation level of the air conditioner etc. can be adjusted very easily, its work efficiency and installation In addition to improving accuracy and reducing the labor and time required for the work as much as possible, the work period of the whole work can be shortened as much as possible.
[0007]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention in an installation method for air conditioning equipment in an underground space will be described with reference to FIGS.
In the present embodiment described below, a description will be given of the case of installing an air blower constituting the air conditioning equipment in the air conditioning equipment installed in the underground space.
[0008]
First, in the installed state of the blower 1, as shown in FIG.1 and FIG.2, in the underground space S, the concrete foundation 2 in which concrete was cast in a predetermined shape corresponding to the form of the blower 1 to be installed. On the other hand, the bottomed metal frames 4 to 4 constituting the metal forming apparatus for housing the anchor bolt 3 in the portion to be installed in the blower 1 are concretely cast integrally with the foundation concrete 2, and the foundation concrete portion The base unit 6 of the blower 1 is placed on the upper surface 2 with the temporary packers 5 to 5, and the upper surface of the concrete 9 for fixing the anchor bolts 3 placed in the metal molds 4 to 4 is fixed. This packer 7 is formed between the lower surface of the machine base 6 and the machine base 6 is fixed by fastening means such as nuts via the anchor bolts 3 so as to constitute air conditioning equipment and the like. 1 is intended to be mounted on the foundation concrete 2 in the underground space.
[0009]
Hereinafter, the installation method will be specifically described.
First, the foundation concrete 2 is constructed by placing anchor reinforcement bolts for the blower foundation set on the floor slab corresponding to the part to be installed on the blower 1, and arranging the reinforcing bar 8 by placing the foundation rebar. Form. A metal bottomed formwork (also referred to as an anchor sleeve) 4 to be described later is incorporated in the reinforcing bar frame 8 and connected and fixed to a circumferential reinforcing bar. After this, the formwork (wooden) of the entire blower foundation is formed, and the foundation concrete 2 is placed. (Referred to as the basic formation process). That is, after arranging the bottomed metal frame 4 for the concrete 9 for anchor bolt fixing, which will be described later, together with the reinforcing bar frame 8 framed in a rectangular shape or the like for the foundation concrete 2, A formwork (not shown) is constructed and the foundation concrete 2 is placed.
[0010]
In addition, an inner diameter portion of the metal bottomed mold 4 is an anchor bolt setting hole, and an anchor bolt 3 whose lower end is bent in a U-shape is set up substantially at the center of the anchor bolt setting hole. It is to be established.
[0011]
In this case, as shown in FIG. 5, the metal bottomed mold 4 is formed in a metal bottomed cylindrical shape such as a galvanized iron plate, for example, so that the reinforcing bar frame 8 for the foundation concrete 2 is formed. Can be inserted into the metal bottomed mold 4 as it is, and the metal bottomed mold 4 can be arranged as a circumferential reinforcing bar in the reinforcing bar frame assembly 8, and the anchor bolt 3 can be The reinforcing bars in the reinforcing bar frame 8 inserted through the bottom mold 4 can be hooked up via hooks (not shown) to improve the workability of each bundling operation. . Furthermore, the adhesiveness between the metal bottomed formwork 4 and the foundation concrete 2 is improved to improve the accuracy of placing the foundation concrete portion 2.
[0012]
Next, after dismantling the formwork in the foundation concrete 2, smearing is performed on the foundation concrete 2, and a plurality of predetermined locations corresponding to the blower 1 on which the temporary packers 5 to 5 are to be installed (see FIG. 3 shows three places.) It is formed and placed. (This is called a temporary packer forming step.)
[0013]
That is, as shown in FIG. 6, each temporary packer 5 assembles a square-shaped mold frame 10 (also referred to as a temporary frame) having a predetermined height divided into two in the horizontal direction. A non-shrinkable mortar (pad type) is thrown in several times (preferably about 5 times) according to the target amount, and is placed and formed by squeezing it while applying vibration by means of a vibrator. In this case, the non-shrinkable mortar (pad type) is quickly solidified to the upper part of the mold 10 by adding the non-shrinkable mortar (pad type) several times (preferably about 5 times) according to the amount of the division. It is something that can be done.
[0014]
Then, a lock base (parallel liner) 11 is embedded on the temporary packer 5 made of the non-shrinkable mortar (pad type) while applying vibration to the temporary packer 5 to about 1/3 while applying vibration by means of a vibrator (see FIG. 6). In this case, the adjustment is performed while adjusting the parallelism of the upper surface of the lock table (parallel liner) 11, and the high portion is finely adjusted with a rubber hammer or the like.
[0015]
Next, a pair of height adjusting members 12 (taper liners) having sliding taper surfaces facing each other are placed on the lock table (parallel liner) 11 on the temporary packer 5, and this height adjusting member is placed. 12 (the taper liner) is mounted on the machine base 6 of the blower 1 that is an air conditioner to be installed, and the height and level of the machine base 6 are separately provided. It adjusts and sets by operation of the surface height fine adjustment tool 13 with a mechanism (it is called a machine base installation temporary core adjustment process).
[0016]
Then, as shown in FIG. 9, the surface height fine adjustment device 13 with the spiral rotation operation mechanism includes a pair of fixed sides having sliding taper surfaces 14 and 15 that are in sliding contact with each other such as a leveling block. And the movable adjustment bases 16 and 17, and the screw means 18 in which the movable adjustment base 17 is connected to the fixed adjustment base 16 so that the upper surface thereof moves up and down in a parallel state. The screw means 18 is screwed up and screwed down so that the movable adjustment base 17 is moved up and down using the sliding taper surface to adjust the height. The play in the threaded assembly state in the screw connection (screw means 18) of the adjustment bases 16 and 17 on the fixed side and the movable side is set to an accuracy of 1/1000 to 5/1000. is there.
[0017]
In the machine base installation temporary core adjustment process, in the adjustment setting of the height and horizontality of the machine base 6, a predetermined portion (described later) between the upper surface of the foundation concrete 2 and the machine base 6 of the blower 1. The surface height fine adjustment device 13 with the helical rotation operation mechanism is installed at a plurality of locations (in the vicinity of the formation site of the present packer 7), and the base height is adjusted by the surface height fine adjustment device 13 with the helical rotation operation mechanism. The level of 6 and the predetermined height level are finely adjusted and set.
[0018]
By the individual operation of the surface height fine adjustment tool 13 with each spiral rotation operation mechanism, the adjustment work of the level and height level of the machine base 6 can be easily and quickly performed.
[0019]
In this state, the height adjustment member 12 (taper liner) on the temporary packer 5 is adjusted according to the height level set by the surface height fine adjustment device 13 with the spiral rotation operation mechanism, and the height adjustment member The upper surface of 12 (taper liner) is brought into contact with the lower surface of the machine base 6.
[0020]
In addition, after the machine base 6 is adjusted and set to a level and a predetermined height as described above, the surface height fine adjustment device 13 with the spiral rotation operation mechanism is removed and a temporary core inspection is performed. After passing the inspection, the concrete 9 for fixing the anchor bolt is filled in the metal bottomed mold 4, that is, in the anchor bolt setting hole, and the anchor 9 is anchored by the filled and cast concrete 9. The bolt 3 is fixed in a vertical state.
[0021]
Then, the packer 7 is placed between the top surface of the concrete 9 and the machine base 6 of the blower 1 at a position where the anchor bolt 3 is sandwiched on the concrete 9 for fixing the anchor bolt. It is formed by pouring into a divided mold form and placing the lock table 11a on the non-shrinkable cement in the same manner as the temporary packer 5 described above (referred to as the present packer placing step).
[0022]
The lock table level of the packer 7 is adjusted by a pair of height adjustment members 12a (between the lower surface of the machine base 6 already placed on the temporary packer 5 and the temporary centering completed and the lock table 11a. A taper liner) is inserted and the height adjusting member 12a (taper liner) is slid to push the lock 11a into the main packer 7.
[0023]
That is, a height adjusting member 12a (taper liner) having an opposing sliding taper surface configured in the same manner as the height adjusting member 12 used for the temporary packer 5 on the lock table (parallel liner) 11a. , And slide the height adjusting member 12a (taper liner) to push the lock table 11a into the packer 7, while the upper surface of the height adjusting member 12a (taper liner) is 6 (see FIGS. 6 and 7).
[0024]
In this case, until the present packer 7 is cured, the upper surface level of the lock table (parallel liner) 11a is parallel to the lower surface of the machine base 6 of the blower 1 to be installed, and the height adjustment member 12a is “back”. It is inspected so as not to occur. At this time, the perpendicularity of the anchor bolt 3 is also set to be perpendicular.
[0025]
Next, after the main packer 7 is hardened, the centering adjustment is performed by the height adjusting member 12 on the lock base of the main packer 7 and the nut is screwed into the anchor bolt 3. That is, this centering adjustment is performed as a precision adjustment operation in which the height adjusting member 12 is slid while tightening a nut or the like screwed to the anchor bolt with a torque wrench as described above.
[0026]
And after these adjustment work is complete | finished and the final inspection is passed, while disassembling and extracting the metal division | segmentation formwork of this packer 7, the lock base 11 in each said temporary packer 5, and the height adjustment member 12 and All are fixed by welding.
[0027]
After that, cinder concrete 19 is placed to the upper surface of the machine base 6 installed on the foundation concrete 2 and troweled, and the blower 1 constituting the air conditioning equipment is installed on the foundation concrete 2 in the underground space. It is what you attach.
[0028]
In the above-described embodiment, the installation positions and the number of temporary packers 5 and main packers 7 for installing the machine base 6 are not limited to those shown in the drawings, and a spiral rotation operation mechanism is provided. Even if it exists in the surface height fine adjustment tool 13, it does not limit to the thing of illustration.
[0029]
【The invention's effect】
According to the first aspect of the present invention, when adjusting the height and level of the machine base, the surface height of the base concrete provided with the spiral rotation operation mechanism at a plurality of predetermined positions near the site where the packer is placed is determined. Adjusting the installation level of the air conditioner etc. by adjusting and setting the height and level of level of the machine base by adjusting the height and level of the machine base with the surface height adjustment tool with the individual spiral rotation mechanism This simplifies the operation and improves the work efficiency and installation accuracy, and saves the labor and time required for the work as much as possible, thereby shortening the work period of the entire work as much as possible.
[0030]
In addition, when adjusting the height and level of the machine base, it is difficult to adjust the lock base level 1/100 to 2/100, which is the standard for the centering adjustment, with the method of jacking, etc. Severe adjustment can be easily ensured by arranging the surface height fine adjustment tools with the spiral rotation operation mechanism for the number, and using the surface height fine adjustment devices with the individual spiral rotation operation mechanisms. .
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing an installed state of a blower 1 according to the present embodiment.
FIG. 2 is also an explanatory diagram showing an installation state of the blower 1 according to the present embodiment.
FIG. 3 is an explanatory plan view schematically showing a packer arrangement in the method of installing the blower 1 according to the present embodiment.
FIG. 4 is an explanatory side view schematically showing a method for installing the blower 1 according to the present embodiment.
FIG. 5 is an explanatory diagram of a metal bottomed mold for an anchor bolt.
FIG. 6 is an explanatory diagram of a temporary packer forming process.
FIG. 7 is also an explanatory diagram of a temporary packer forming step.
FIG. 8 is an explanatory diagram of a machine base installation adjustment process and a main packer placement process.
FIG. 9 is a perspective view showing an example of a surface height fine adjuster with a helical rotation operation mechanism according to the present embodiment.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Blower 2 Basic concrete 3 Anchor bolt 4 Metal bottom formwork 5 Temporary packer 6 Machine base 7 Main packer 8 Reinforcement frame 9 Concrete for anchor bolt fixation 11 Lock base 12 Height adjustment member 13 Spiral rotation operation mechanism Surface height adjustment tool with

Claims (1)

空調設備機器等の据付けすべき部位に対し、ほぼ中心部にアンカーボルトが立設される所定の深さの複数個のアンカーボルト設定孔を設けた基礎コンクリートを打設し、該基礎コンクリート上において配置される仮パッカーを形成し、該仮パッカー上に錠台及び高さ調整部材を介して据付けすべき空調機器等の機台ベースを上載するとともに、該機台ベースの高さ及び水平度を調整し、前記アンカーボルト設定孔にアンカーボルト固設用に打設されるアンカーボルト固設用のコンクリート上において該コンクリート上面と前記空調機器等の機台ベースとの間に本パッカーを打設形成して地下空間における空調設備機器等の据付け工事において、
前記機台ベースの高さ及び水平度を調整するに際し、前記本パッカー打設部位付近に、螺旋回転動作機構付きの面高低微調整器具を所定の複数箇所に配置し、該螺旋回転動作機構付きの面高低微調整器具によりその高さ及び水平度のレベルを調整設定し、その後、前記本パッカーを形成することを特徴とする地下空間における空調設備機器等の据付け工事方法。
A foundation concrete having a plurality of anchor bolt setting holes with a predetermined depth at which an anchor bolt is erected substantially at the center is placed on a site to be installed such as an air conditioner equipment. A temporary packer to be arranged is formed, and a machine base such as an air conditioner to be installed on the temporary packer via a lock table and a height adjusting member is mounted, and the height and horizontality of the machine base are set. Adjust and form this packer between the concrete upper surface and the base of the air conditioner etc. on the anchor bolt fixing concrete to be anchored in the anchor bolt setting hole. In the installation work of air conditioning equipment etc. in the underground space,
When adjusting the height and level of the base of the machine base, the surface height fine adjustment tool with a spiral rotation operation mechanism is arranged in a predetermined plurality of locations near the site where the present packer is placed, and the spiral rotation operation mechanism is provided. A method for installing air conditioning equipment in an underground space, wherein the height and level of the level are adjusted and set by means of a surface height adjustment tool, and then the packer is formed.
JP2001394702A 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space Expired - Fee Related JP3824931B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001394702A JP3824931B2 (en) 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001394702A JP3824931B2 (en) 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space

Publications (2)

Publication Number Publication Date
JP2003193490A JP2003193490A (en) 2003-07-09
JP3824931B2 true JP3824931B2 (en) 2006-09-20

Family

ID=27601353

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001394702A Expired - Fee Related JP3824931B2 (en) 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space

Country Status (1)

Country Link
JP (1) JP3824931B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7330082B2 (en) 2019-12-06 2023-08-21 株式会社長谷工コーポレーション Construction method of equipment foundation

Also Published As

Publication number Publication date
JP2003193490A (en) 2003-07-09

Similar Documents

Publication Publication Date Title
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
US8720160B1 (en) Process for forming concrete walls and other vertically positioned shapes
JP3269808B2 (en) Method for placing ready-mixed concrete and formwork apparatus used in the method
CZ285120B6 (en) Process for producing gravel-free superstructure for at least one track
JP2002061198A (en) Construction method for steel pipe column, and pile head processing construction method to cast-in-place pile for same method
JP3824932B2 (en) Installation work for air conditioning equipment in underground space
KR102273901B1 (en) Method for repairing sleeper on concrete bed
JP3824931B2 (en) Installation work for air conditioning equipment in underground space
JP3763575B2 (en) Underground beam construction frame and underground beam construction method using the same
JPH0813608A (en) Construction method of thin-walled precast concrete post and guide form
JP2006322154A (en) Foundation construction method of building
JP2004017645A (en) Form device for pre-cast concrete foundation block, pre-cast concrete foundation block, and foundation technique using pre-cast concrete foundation block
JP7396763B1 (en) 3-point anchor integrated liner, long anchor integrated liner, equipment installation method
KR102441003B1 (en) Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie
JP3740232B2 (en) Anchor bolt mounting bracket
JP3072102U (en) Reinforcing bar jig for pier construction
JPH063878Y2 (en) Anchor frame level adjustment structure
JP7288390B2 (en) Foundation construction method and foundation
CN115045502B (en) Construction method for replacing templates by using matched blocks on close side of constructional column
CN215395869U (en) Novel precast concrete superimposed sheet's preparation mould
JP2002097818A (en) Method of installing base isolating foundation frame for building
JPH07286332A (en) Execution method of precast concrete foundation and installation spacer used therefor
JP2001032523A (en) Fitting for supporting form
JPH0732755Y2 (en) Foundation bolt installation frame that also serves as a concrete formwork
JPH07180359A (en) Device and method for adjusting level of steel-framed column

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041021

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060403

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060530

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060628

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090707

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090707

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120707

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120707

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130707

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees