JP3810164B2 - Landfill method using pre-mixed soil - Google Patents
Landfill method using pre-mixed soil Download PDFInfo
- Publication number
- JP3810164B2 JP3810164B2 JP33899596A JP33899596A JP3810164B2 JP 3810164 B2 JP3810164 B2 JP 3810164B2 JP 33899596 A JP33899596 A JP 33899596A JP 33899596 A JP33899596 A JP 33899596A JP 3810164 B2 JP3810164 B2 JP 3810164B2
- Authority
- JP
- Japan
- Prior art keywords
- conveyor
- soil
- landfill
- land
- mixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Description
【0001】
【発明の属する技術分野】
この発明は、事前混合処理土を用いた水域の埋立方法に関するものである。
【0002】
【従来の技術】
近年、沖合の海域を埋め立てた人工島や沿岸浅海域の埋立地に構造物を構築する場合、事前混合処理土による埋立が行われている。
当該埋立方法では、陸上部で混合調製した埋立材を土運船(バージ)などで対象海域まで運搬しようとしても、積載容量が大きく積み込み作業に時間を要するとともに、運搬時間の経過により埋立材が固化するため、従来は、通常、海域にプラント船と打設船等からなる船団を構成し、この混合プラント船団により埋立を行っていた。
【0003】
しかしながら、海上プラント船は気象および海象条件によりプラントの稼働率が低下するという欠点があることから、この稼働率の低下分を事前に見込んで大型設備を当該海域に設置しておく必要があった。また、大型設備搭載船は、操船、位置決めに時間を要する他、海域における施工スペースの関係から多数セットによる同時投入は困難であった。
【0004】
【発明が解決しようとする課題】
本発明は、大型設備搭載船を誂えることなく、埋立作業を効率的に行うことにより経済性に優れた事前混合処理土による埋立方法を提供することを目的とするものである。
【0005】
【課題を解決するための手段】
本発明に係る事前混合処理土による埋立方法は、陸上部より埋立予定水域までフローティングコンベアを連設するとともに、該コンベアの乗継ぎ部に混合手段を設けることにより、土砂および固化材を陸上部より運搬すると同時に混合調製して事前混合処理土となし、これを水域に投入することを特徴とするものである。
【0006】
【発明の実施の形態】
以下、図面を参照しながら本発明の好適な実施形態を説明するが、先ず、事前混合処理盛土工法について説明する。
【0007】
事前混合処理盛土工法とは、周知のように、埋立て、裏埋め、中詰め土砂等に、固化材と分離防止剤や粘土等を事前に添加、混合し、新材料に処理した後、所定の場所に運搬、投入してそのまま安定した地盤を造成する工法である。
事前混合処理盛土工法は、▲1▼埋立て造成後の地盤改良が不要になる、▲2▼大規模施工、大水深施工が可能である、等の利点を有している。
【0008】
事前混合処理盛土工法には大別して、スラリー状盛土工法とドライ状盛土工法があり、スラリー状盛土工法は、土質材料、固化材、混和材料、水を混合して製造したスラリー状またはモルタル状材料をコンクリートポンプ、打設管により底部から打ち上げる工法であり、他方、ドライ状盛土工法は、土質材料、固化材、混和材料、水を混合して製造した非流動状の粉粒体材料を水中に投入、降下、着底、堆積させる工法である。
【0009】
上記固化材としては、通常、セメントが用いられる。また、分離防止剤は土砂とセメントの水中分離を防止するために用いられるものであり、強アニオン性ポリアクリルアミドの水溶液などが使用される。セメントや分離防止剤の添加率は、土砂の種類、その他の施工条件を考慮して、最適な配合量となるように選定する。例えば、目標強度を2kg/cm2 とした場合、事前混合処理土1m3 当たりの配合は、土砂1300kg、セメント120kg、分離防止剤1kgとなる。
【0010】
ドライ状盛土工法では、通常、土質材料の運搬、固化材の混合、分離防止剤の添加、処理土運搬、投入・埋立ての順に行われるが、本発明は、土質材料と固化材の運搬、およびその混合方法に特徴がある。そこで、ドライ状盛土工法により海域を埋め立てる場合について詳述する。
【0011】
図1において、陸上部10には、陸上コンベア14を設置し、接続コンベア16を介して、埋立予定海域30までフローティングコンベア20、20、20を連設する。フローティングコンベア20は台船22上にベルトコンベアを搭載した形式のコンベアである。フローティングコンベア20の終点部には、台船22上に搭載したトリッパコンベア24およびスプレッドコンベア26が接続され、海中投入用の打設シュート32から埋立予定海域30に投入されるようになっている。
【0012】
各コンベアの乗継ぎ部には、土砂と固化材の混合手段34を設けることにより、運搬過程で土砂と固化材を混合し、事前混合処理土に調製する。ベルトコンベアによる輸送時間は船舶による運搬と比べて格段に短いから、土砂と固化材が運搬過程で固化するようなことはない。混合手段34としては、格別の制限はなく、公知のダンパシュートや連続ミキサー等を採用することができる。
【0013】
陸上部10では、計量された土砂と固化材がホッパー12に受入れられ、ホッパー12から陸上コンベア14に供給される。なお、この実施形態では、陸上コンベア14から接続コンベア16を介して土砂等をフローティングコンベア20に運搬したが、本発明はこの方法に限らず、陸上部10から直接、フローティングコンベア20に供給してもよい。
【0014】
なお、投入すべき事前混合処理土に分離防止剤を添加する場合には、打設シュート32の近傍で添加することが好ましい。
【0015】
【発明の効果】
本発明に係る埋立方法によれば、作業効率はコンベアシステムのみに依存し、気象条件等の影響を受けにくい。従って、海上プラント船で埋立材としての事前混合処理土を製造する場合に比べて、稼働率の大幅な改善が見込める。また、事前混合処理土の混合調製をフローティングコンベア部分で行うので、陸上プラント設備や作業エリアも小規模にすることができるという効果を有している。
【0016】
更に、限られた埋立施工海域内に、複数系列のフローティングコンベアを設置することにより、処理能力を増大させることが可能となり、海上プラント船による方法よりも、一層作業効率を促進することができる。
【図面の簡単な説明】
【図1】本発明の好適な実施形態であるドライ状盛土工法により海域を埋め立てる場合の説明図である。
【符号の説明】
10 陸上部
14 陸上コンベア
20 フローティングコンベア
22 台船
30 埋立予定海域
32 打設シュート
34 混合手段[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for landfilling a water area using premixed treated soil.
[0002]
[Prior art]
In recent years, when constructing a structure on an artificial island that reclaims offshore waters or a landfill in shallow coastal waters, landfill with premixed soil has been performed.
In the landfill method, even if the landfill material mixed and prepared on land is transported to the target sea area by means of an earth ship (barge) or the like, the loading capacity is large and time is required for loading work. In order to solidify, conventionally, a fleet composed of a plant ship and a driving ship is usually formed in the sea area, and landfill is performed by this mixed plant fleet.
[0003]
However, offshore plant ships have the disadvantage that the operating rate of the plant decreases due to weather and sea conditions, so it was necessary to install large facilities in the sea area in anticipation of this reduced operating rate in advance. . In addition, ships with large facilities require time for maneuvering and positioning, and due to the construction space in the sea area, it was difficult to simultaneously load multiple sets.
[0004]
[Problems to be solved by the invention]
An object of the present invention is to provide a landfill method using premixed soil that is excellent in economic efficiency by efficiently performing landfill work without preparing a large-equipped ship.
[0005]
[Means for Solving the Problems]
The landfill method using the pre-mixed treated soil according to the present invention includes a floating conveyor continuously connected from the land portion to the planned landfill area, and a mixing means is provided in the connecting portion of the conveyor, so that the earth and sand and the solidified material are removed from the land portion. It is characterized in that it is mixed and prepared at the same time as being transported to form a pre-mixed treated soil, which is thrown into the water area.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a preferred embodiment of the present invention will be described with reference to the drawings. First, a premixed processing embankment method will be described.
[0007]
As is well known, the pre-mixing embankment method is to add a premixed material, anti-separation agent, clay, etc. in advance to landfill, backfilling, filling sand, etc. It is a construction method that creates a stable ground by transporting and feeding it to the site.
The pre-mixing embankment method has advantages such as (1) no need for ground improvement after landfill construction, (2) large-scale construction and deep water construction.
[0008]
The premixing embankment method is roughly divided into a slurry embankment method and a dry embankment method. The slurry embankment method is a slurry or mortar material produced by mixing soil material, solidification material, admixture, and water. The dry embankment method is a non-fluid granular material produced by mixing soil material, solidification material, admixture material, and water in water. It is a method of throwing in, descending, landing, and depositing.
[0009]
As the solidifying material, cement is usually used. Further, the separation preventing agent is used for preventing separation of earth and sand from cement in water, and an aqueous solution of strong anionic polyacrylamide or the like is used. The addition rate of cement and anti-separation agent should be selected so as to obtain the optimum blending amount in consideration of the type of earth and sand and other construction conditions. For example, when the target strength is 2 kg / cm 2 , the composition per 1 m 3 of the premixed soil is 1300 kg of earth and sand, 120 kg of cement, and 1 kg of the separation inhibitor.
[0010]
The dry embankment method is usually carried out in the order of transporting soil material, mixing solidification material, adding antiseparation agent, transporting treated soil, charging and landfilling, but the present invention transports soil material and solidification material, And its mixing method. Therefore, the case where the sea area is reclaimed by the dry embankment method will be described in detail.
[0011]
In FIG. 1, a
[0012]
At the connecting portion of each conveyor, earth and sand and solidifying material mixing means 34 are provided, so that the earth and sand and the solidifying material are mixed during the transportation process to prepare premixed soil. Since the transportation time by the belt conveyor is much shorter than that by ship, the earth and sand and the solidified material are not solidified during the transportation process. The mixing means 34 is not particularly limited, and a known damper chute, continuous mixer or the like can be employed.
[0013]
In the
[0014]
In addition, when adding an anti-separation agent to the pre-mixed treated soil to be added, it is preferable to add it near the
[0015]
【The invention's effect】
According to the landfill method according to the present invention, the work efficiency depends only on the conveyor system and is not easily affected by weather conditions or the like. Therefore, a significant improvement in the operation rate can be expected as compared with the case where premixed soil as landfill material is manufactured on an offshore plant ship. Moreover, since the premixed soil is mixed and prepared in the floating conveyor portion, there is an effect that the land plant equipment and the work area can be reduced in size.
[0016]
Furthermore, it is possible to increase the processing capacity by installing a plurality of series of floating conveyors in a limited landfill construction area, and work efficiency can be further promoted compared with the method using a marine plant ship.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram when a sea area is reclaimed by a dry embankment method which is a preferred embodiment of the present invention.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33899596A JP3810164B2 (en) | 1996-12-04 | 1996-12-04 | Landfill method using pre-mixed soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33899596A JP3810164B2 (en) | 1996-12-04 | 1996-12-04 | Landfill method using pre-mixed soil |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10159057A JPH10159057A (en) | 1998-06-16 |
JP3810164B2 true JP3810164B2 (en) | 2006-08-16 |
Family
ID=18323280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP33899596A Expired - Fee Related JP3810164B2 (en) | 1996-12-04 | 1996-12-04 | Landfill method using pre-mixed soil |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3810164B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111393092A (en) * | 2020-03-25 | 2020-07-10 | 江苏坤泽科技股份有限公司 | Low-gel-material high-impermeability sea sand solidified soil for hydraulic reclamation and preparation method thereof |
-
1996
- 1996-12-04 JP JP33899596A patent/JP3810164B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111393092A (en) * | 2020-03-25 | 2020-07-10 | 江苏坤泽科技股份有限公司 | Low-gel-material high-impermeability sea sand solidified soil for hydraulic reclamation and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
JPH10159057A (en) | 1998-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO1998051760A2 (en) | Solidification and stabilization of dredged materials | |
CN105731758A (en) | Sea dredged silt dewatering and solidifying treatment integrated device and method | |
JP2004504518A5 (en) | ||
JP3810164B2 (en) | Landfill method using pre-mixed soil | |
JPH1018345A (en) | Reclamation construction method by soft earth and dredging reclamation-through execution work system | |
JP3211875B2 (en) | Effective use of rising soil by improving the ground over water | |
CN204238282U (en) | For construction work embankment dredged mud filling Mixing Machine | |
JP2019093558A (en) | Production method for erosion control soil cement | |
CN207130685U (en) | Island environment protection device is built in a kind of dredging markets solidification | |
JP3053179B2 (en) | Solidification and transfer processing method for earth and sand such as dredging | |
JP2895595B2 (en) | Landfill work boat | |
JP3276617B2 (en) | Marine landfill method using sea sand | |
JP2005330731A (en) | Artificial tideland material using dredged cohesive soil, manufacturing device for the same, and artificial tideland construction method | |
JP7185484B2 (en) | Drop mixing method and system for cohesive soil and steel slag | |
KR100971002B1 (en) | Method for constructing revetment using mixed composition of flowable recliamed coal ash | |
JPH01239293A (en) | Shield construction and slurry material therefor | |
JP3965675B2 (en) | Landfill method and landfill device | |
CN213620162U (en) | Underwater concrete pouring operation platform ship | |
JP3480699B2 (en) | Land transfer method for sediment transfer such as dredging | |
JPH02307583A (en) | Method and apparatus for solidification of soft mud | |
JP4268837B2 (en) | Recycling method of excavated sediment in shield method | |
CN214301748U (en) | Construction equipment for protecting submarine pipeline by using self-compacting cement soil | |
CN206529783U (en) | A kind of mud mold bag curing system | |
JP3896556B2 (en) | Landfill method using dredged soil | |
US5205646A (en) | Method for conveyance of cement under water to form concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060117 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060314 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060516 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060523 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090602 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100602 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100602 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110602 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110602 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120602 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |