JP3774886B2 - Anchor construction method - Google Patents

Anchor construction method Download PDF

Info

Publication number
JP3774886B2
JP3774886B2 JP2000319516A JP2000319516A JP3774886B2 JP 3774886 B2 JP3774886 B2 JP 3774886B2 JP 2000319516 A JP2000319516 A JP 2000319516A JP 2000319516 A JP2000319516 A JP 2000319516A JP 3774886 B2 JP3774886 B2 JP 3774886B2
Authority
JP
Japan
Prior art keywords
grout
hose
anchor
casing
uncurtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000319516A
Other languages
Japanese (ja)
Other versions
JP2002129555A (en
Inventor
田 太 一 稲
Original Assignee
株式会社ジオフロント
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ジオフロント filed Critical 株式会社ジオフロント
Priority to JP2000319516A priority Critical patent/JP3774886B2/en
Publication of JP2002129555A publication Critical patent/JP2002129555A/en
Application granted granted Critical
Publication of JP3774886B2 publication Critical patent/JP3774886B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、高被圧水が流出するような地下水の移動の激しい地盤にアンカーを造成するのに適したアンカー施工方法に関する。
【0002】
【従来の技術】
従来のアンカーは、アンボンドPC鋼より線等を緊張材として組み込んだアンカーテンドンをアンカー孔に挿入し、グラウト材の注入・固化のもとで固定させて緊張材を緊張、定着させるのが通常である。
【0003】
従来のアンカー施工方法の一例を図8及び図9において説明する。図8はアンカーの従来例を示す断面図、図9は図8の部分拡大斜視図である。
地盤に掘削したアンカー孔6には、セメントミルク等のグラウト材を注入して固化させたアンカー体7が形成され、このアンカー体7内には、複数(本例では3個)の耐荷体2a、2b、2cが深さ位置を違えて配設され、その各耐荷体2a、2b、2cには、それぞれ独立のアンボンドPC鋼より線等の緊張材3がUターンさせて巻き掛けられたアンカーテンドン1が設けられ、その緊張材3の端部がアンカー孔6の開口外で緊張、定着されている。
【0004】
アンカー孔6は、削孔機を用いて削孔され、このアンカー孔6にグラウト材の1次注入を行い、ここにテンドン1加工をした復数の緊張材3が挿入され、次にケーシングを引き抜きながらグラウト材の2次注入を行い、グラウト材の固化後、複数の緊張材3を緊張して定着する。前記ケーシングには削孔機の掘削ロッドをそのまま用いる。
【0005】
耐荷体2a、2b、2cは、図9に示すように先端に、緊張材3を挿入して折り返す(Uターンさせる)溝9がU字状に形成されており、緊張材3は、各耐荷体2a、2b、2cの先端で溝9に挿入されて折り曲げられUターンされ、耐荷体2a、2b、2cに金属バンド10で固定される。
【0006】
耐荷体2a、2b、2cは、定着部に深さ位置を違えて、等間隔又は不等間隔で配置される。このため浅い位置側の耐荷体2b、2cの側部は、深い位置側の耐荷体2aから折り返された緊張材3が通過することとなるため、これらの緊張材3も全て耐荷体2b、2cに金属バンド10で固定される。すなわち、耐荷体2bには耐荷体2aから折り返された緊張材3も固定されるし、耐荷体2cには、耐荷体2aおよび2bから折り返された緊張材3も固定される(図9参照)。前記定着部の長さは、設計荷重に対応して削孔径や地盤土質の性状等により決定される。
【0007】
前記のように配設された複数の緊張材3は、アンカー孔6の開口外において緊張して定着される。図8においては、台座11、支圧プレート12及びアンカーヘッド13等の定着具で定着されている。なお、符号14は山留壁、15は腹起し材を示す。
【0008】
【発明が解決しようとする課題】
しかしながら、前記のような従来のアンカー施工方法においては、地盤が高被圧水を流出するような地下水の移動の激しい地盤であると、アンカー孔6にグラウト材を注入しても、地下水及び高被圧水でグラウト材が硬化するまでに洗われたり,グラウト材が希釈され、アンカー造成ができなかったり、アンカー体7と地盤との付着に悪影響を与え、所定のアンカー耐力が得られない、等の課題がある。
【0009】
この発明は、このような従来技術の課題を解決せんと提案されたものであり、その目的は、高被圧水が流出するような地下水の移動の激しい地盤にアンカーを造成するのに最適なアンカー施工方法の提供にある。
【0010】
【課題を解決するための手段】
前記課題を解決するため、この発明のアンカー施工方法は、下記工程よりなることを特徴とする。
(1)先端に捨てビットを具備する掘削パイプを使用し、所定の角度で所定の深度までアンカー孔を削孔する工程、
(2)予めアンカーテンドンの定着部に織布製の袋体を被せ、その中にグラウト注入用のホースとグラウト充填確認用のホースを差し込んだアンカーテンドンを、前記掘削パイプをケーシングとしてその内に挿入する工程、
(3)前記挿入したアンカーテンドンで前記ケーシング先端の捨てビットを叩いてケーシングから外す工程、
(4)前記挿入したアンカーテンドンを傷つけないように前記ケーシングを引き抜く工程、
(5)前記袋体内にグラウト注入用のホースによってグラウト材を注入する工程、
(6)グラウト充填確認用のホースで前記グラウト材の充填状態を確認し、所定の充填状態になったらグラウト充填確認用のホースを閉じる工程、
(7)さらに前記グラウト注入用のホースからグラウト材を加圧注入し、袋体の外周面をアンカー孔の孔壁に加圧密着させ、地盤とアンカー定着体の密着性をよくし、十分に加圧注入後グラウト注入用のホースを閉じ、グラウト材を固化させる工程、
(8)前記アンカー孔の口元を口元パッカーで止水する工程、
(9)アンカーテンドンの緊張材を、緊張、定着させる工程。
【0011】
【発明の実施の形態】
以下、この発明の実施の形態について図面を参照して詳細に説明する。図1乃至図5はこの発明の実施の形態を施工順に示す概略断面図、図6はこの発明の実施の形態を示す部分斜視図、図7はこの発明のアンカー施工方法に使用する耐荷体の斜視図であり、前記図8及び図9に示す従来例と同一構成要素には同一符号を付して説明する。
【0012】
この発明のアンカー施工方法は、アンカーテンドン1の定着部に相当する範囲に織布製の袋体8を被せ、この袋体8内にグラウト注入用ホースとしてグラウト注入管16を差し込み、袋体8の開口を封止17し、この袋体8が被せられたグラウト注入管16を含むアンカーテンドン1をアンカー孔6内に挿入した後、前記グラウト注入管16よりグラウト材を加圧注入し、袋体8の外周面がアンカー孔6の孔壁に加圧密着されるまで加圧充填する。
【0013】
前記アンカーテンドン1は、図6に示すように同一軸線上に複数の耐荷体2、2を配置し、各耐荷体2、2に独立したPC鋼より線等の緊張材3を各々ターンさせて構成され、グラウト注入管16も前記耐荷体2、2に固定して配設し、アンカーテンドン1の一部となるように組み込まれており、このグラウト注入管16を含むアンカーテンドン1の定着部に相当する範囲に織布製の袋体8を被せ、その開口を封止17し、これをアンカー孔6内に挿入した後、前記グラウト注入管16よりグラウト材を加圧注入し、袋体8の外周面がアンカー孔6の孔壁に加圧密着するまで加圧充填する。
【0014】
図1乃至図5に基づいて更に具体的に説明すると、まず、図1に示すように掘削機(図示省略)を用いて先端に捨てビット21を具備する掘削パイプ(これは単管パイプ)20で、アンカー孔6を削孔する。これは所定の角度で所定の深度まで行う。所定の深度まで削孔したら削孔を停止し、掘削機を掘削パイプ20から取り外し、この掘削パイプ20をケーシングとして用いる。
【0015】
一方、予めアンカーテンドン1の定着部に相当する範囲に織布製の袋体8を被せ、その中にグラウト注入用のホース22(グラウト注入管16)とグラウト充填確認用のホース(以下、リターンホースと称す)23を差し込んだアンカーテンドン1を用意しておき、このアンカーテンドン1を図2に示すように前記掘削パイプ20をケーシングとしてその中に挿入する。符号17は、袋体8の開口の封止部を示す。
【0016】
好ましくは、図6に示すように同一軸線上に複数の耐荷体2、2を配置し、各耐荷体2、2に独立した緊張材3を各々ターンさせて構成され、グラウト注入管16も前記耐荷体2、2に固定して配設して組み込み、このグラウト注入管16を含む定着部に相当する範囲に織布製の袋体8を被せ、その開口を封止したアンカーテンドン1とする。耐荷体2は、図7に示すように緊張材3を挿入してUターンさせる凹溝9と、グラウト注入管16を挿通する凹溝19とが設けられて構成され、緊張材3は凹溝9に挿入されてUターンされ、グラウト注入管16は凹溝19に挿通されて配管され、いずれも金属バンド10で締結固定される。このように構成したアンカーテンドン1を、前記ケーシング20中に挿入する。本例においては、グラウト注入管16が、前記グラウト注入用のホース22となる。
【0017】
次に、図2に示すようにケーシング20内に挿入したアンカーテンドン1で、ケーシング20先端の捨てビット21を叩いてケーシング20から取り外す(分離する)。ここで、ケーシング20から捨てビット21を取り外すのは、次の工程でアンカーテンドン1をアンカー孔6内に残してケーシング20を引き抜くためである。捨てビット21があると障害となりアンカーテンドン1をアンカー孔6内に残して引き抜くことができないからである。捨てビット21は、アンカーテンドン1で叩けば取り外すことができる構造であり、従来公知の手段が採用される。
【0018】
次に、図3に示すように前記挿入したアンカーテンドン1を傷つけないように前記ケーシング20を引き抜く。するとアンカーテンドン1がアンカー孔6内に設置された状態になると共に、捨てビット21はアンカー孔6の孔底に残される。
【0019】
次に、図4に示すように前記袋体8内にグラウト注入用のホース22またはグラウト注入管16からセメントミルク等のグラウト材を加圧注入する。このグラウト材の加圧注入による充填状態の確認は、グラウト充填確認用のリターンホース23で確認する。リターンホース23から流出するグラウト材が、グラウト注入用のホース22またはグラウト注入管16から注入するグラウト材と同等の濃さになれば所定の充填状態と判断する。リターンホース23で所定の充填状態と確認したら、このリターンホース23は閉口する。このとき袋体8の中はグラウト材で充填された状態となる。
【0020】
次に、リターンホース23を閉口したら、さらにグラウト注入用のホース22またはグラウト注入管16からグラウト材を加圧注入し、袋体8の外周面をアンカー孔6の孔壁に加圧密着させ、地盤とアンカー体(アンカー定着体)7の密着性をよくし、十分に加圧注入後グラウト注入用のホース23またはグラウト注入管16を閉口し、グラウト材を固化させる。袋体8を織布製としたのは、この時グラウト材が袋体8の外周面からしみ出てアンカー孔6の孔壁(地盤)との付着力を向上させ一体化し、耐力が増加するからである。
【0021】
次に、図5に示すようにアンカー孔6の口元を口元パッカー24で止水する。この口元パッカー24はアンカーテンドン1を通して止水壁部18の口元にセットし、ホース25から口元パッカー24内にセメントミルク等のグラウト材を注入充填し、流水が止まるのを確認して充填を止める。さらにホース26を利用して口元パッカー24より内側のアンカー孔6の空洞部にグラウト材を注入する。
【0022】
そして、最後にアンカーテンドン1の緊張材3を、緊張、定着させる。この緊張、定着手段は、従来公知の手段が採用される。
【0023】
しかして、アンカーテンドン1は、定着部に相当する部分に袋体8が被せられてアンカー孔6内に挿入され、この袋体8内にグラウト材が加圧注入されてアンカーが施工されるため、地盤が高被圧水を流出するような地下水の移動の激しい地盤であっても、グラウト材が固化するまでに洗われたり、希釈されることがない。
なお、前記実施の形態は、この発明を説明するためのものであって、この発明を限定するものではなく、この発明の技術的範囲内において変形、改造等も許されるものである。
【0024】
【発明の効果】
以上詳細に説明した通り、この発明のアンカー施工方法は、アンカーテンドンの定着部に相当する範囲に織布製の袋体を被せ、この袋体内にグラウト注入用ホース(グラウト注入管)を差し込み、袋体の開口を封止し、この袋体が被せられたグラウト注入用ホース(グラウト注入管)を含むアンカーテンドンをアンカー孔内に挿入した後、前記グラウト注入用ホース(グラウト注入管)よりグラウト材を加圧注入し、袋体の外周面がアンカー孔の孔壁に加圧密着するまで加圧充填するので、地盤が高被圧水を流出するような地下水の移動の激しい地盤であっても、充填したグラウト材が固化するまでに洗われたり、希釈されることがなく、アンカー造成ができなかったり、アンカー体と地盤との付着に悪影響を与え、所定のアンカー耐力が得られない、といった課題は全て解決される。
【0025】
この発明のアンカー施工方法によれば、地盤が高被圧水を流出するような地下水の移動の激しい地盤であっても、所定のアンカー耐力の有するアンカーの施工が可能となるばかりでなく、そのアンカーも容易に施工できるものである。
【図面の簡単な説明】
【図1】 この発明の実施の形態の施工順に示す概略断面図である。
【図2】 この発明の実施の形態の次の施工順を示す概略説明図である。
【図3】 この発明の実施の形態のまた次の施工順を示す概略説明図である。
【図4】 この発明の実施の形態のさらに次の施工順を示す概略説明図である。
【図5】 この発明の実施の形態のまたさらに次の施工順を示す概略説明図である。
【図6】 この発明の実施の形態に係るアンカーテンドンの部分斜視図である。
【図7】 この発明の実施の形態に係る耐荷体の斜視図である。
【図8】 従来のアンカー施工方法を示す断面図である。
【図9】 従来のアンカー施工方法に係るアンカーテンドンの部分斜視図である。
【符号の説明】
1 アンカーテンドン
2 耐荷体
3 緊張材
6 アンカー孔
7 アンカー体
8 袋体
16 グラウト注入管
17 袋体の開口の封止部
20 掘削パイプ(ケーシング)
21 捨てビット
22 グラウト注入用のホース
23 グラウト充填確認用のホース(リターンホース)
24 口元パッカー
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an anchor construction method suitable for constructing an anchor on a ground where groundwater moves vigorously such that highly pressurized water flows out.
[0002]
[Prior art]
In conventional anchors, unbonded PC steel wires and other materials are used as a tension material, and an curtain rod is inserted into the anchor hole and fixed under the injection and solidification of the grout material. is there.
[0003]
An example of a conventional anchor construction method will be described with reference to FIGS. 8 is a sectional view showing a conventional example of an anchor, and FIG. 9 is a partially enlarged perspective view of FIG.
An anchor body 7 is formed in the anchor hole 6 excavated in the ground and solidified by injecting a grout material such as cement milk. In the anchor body 7, a plurality (three in this example) of load bearing bodies 2a are formed. 2b and 2c are arranged at different depth positions, and the load bearing members 2a, 2b and 2c are anchors in which tension materials 3 such as independent unbonded PC steel wires are wound in a U-turn. The tendon 1 is provided, and the end of the tension member 3 is tensioned and fixed outside the opening of the anchor hole 6.
[0004]
The anchor hole 6 is drilled by using a drilling machine, the grout material is primarily injected into the anchor hole 6, and the rebound tension material 3 processed with tendon 1 is inserted therein, and then the casing is mounted. The secondary injection of the grout material is performed while being pulled out, and after the grout material is solidified, the plurality of tension materials 3 are tensioned and fixed. A drilling rod of a drilling machine is used as it is for the casing.
[0005]
As shown in FIG. 9, the load bearing bodies 2a, 2b, and 2c are formed with U-shaped grooves 9 that are inserted and folded back (U-turned) by inserting the tension material 3 into the tip. The ends of the bodies 2a, 2b and 2c are inserted into the grooves 9 and bent, and are U-turned, and fixed to the load-resistant bodies 2a, 2b and 2c with the metal band 10.
[0006]
The load-bearing bodies 2a, 2b, and 2c are arranged at equal intervals or unequal intervals in the fixing unit at different depth positions. For this reason, since the tension material 3 turned back from the load resistance body 2a on the deep position side passes through the side portions of the load resistance bodies 2b and 2c on the shallow position side, all of these tension materials 3 are also the load resistance bodies 2b and 2c. It is fixed with a metal band 10. That is, the tension member 3 folded back from the load bearing member 2a is also fixed to the load bearing member 2b, and the tension member 3 folded from the load bearing members 2a and 2b is also fixed to the load bearing member 2c (see FIG. 9). . The length of the fixing portion is determined by the diameter of the drilling hole, the nature of the ground soil, or the like corresponding to the design load.
[0007]
The plurality of tension members 3 arranged as described above are tensioned and fixed outside the opening of the anchor hole 6. In FIG. 8, fixing is performed by fixing tools such as a pedestal 11, a support plate 12, and an anchor head 13. Reference numeral 14 denotes a mountain retaining wall, and 15 denotes an erection material.
[0008]
[Problems to be solved by the invention]
However, in the conventional anchor construction method as described above, if the ground is a ground where the groundwater is flowing so that the highly pressurized water flows out, even if the grout material is injected into the anchor hole 6, The grout material is washed by the pressurized water until it hardens, the grout material is diluted, the anchor cannot be formed, the adhesion between the anchor body 7 and the ground is adversely affected, and the predetermined anchor strength cannot be obtained. There are issues such as.
[0009]
The present invention has been proposed to solve such problems of the prior art, and its purpose is optimal for constructing anchors on ground where groundwater moves vigorously such that highly pressurized water flows out. The provision of anchor construction methods.
[0010]
[Means for Solving the Problems]
In order to solve the above problems, the anchor construction method of the present invention is characterized by the following steps.
(1) A step of drilling an anchor hole to a predetermined depth at a predetermined angle using a drilling pipe having a discarded bit at the tip;
(2) Cover the fixing part of the uncurtain dong in advance with a woven cloth bag, and insert the grouting injection hose and the grouting filling hose into the uncured dong. Inserting step,
(3) A step of tapping a discarded bit at the tip of the casing with the inserted an curtain curtain to remove it from the casing;
(4) a step of pulling out the casing so as not to damage the inserted an curtain curtain;
(5) A step of injecting a grout material into the bag by a grout injecting hose,
(6) Checking the filling state of the grout material with a grout filling confirmation hose, and closing the grout filling confirmation hose when a predetermined filling state is reached,
(7) Further, the grout material is pressurized and injected from the hose for injecting the grout, and the outer peripheral surface of the bag body is press-contacted to the hole wall of the anchor hole to improve the adhesion between the ground and the anchor fixing body. Closing the grout injection hose after pressure injection and solidifying the grout material,
(8) A step of stopping the mouth of the anchor hole with a mouth packer,
(9) A step of tensioning and fixing the tension material of the uncurtain don.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. 1 to 5 are schematic sectional views showing the embodiment of the present invention in the order of construction, FIG. 6 is a partial perspective view showing the embodiment of the present invention, and FIG. 7 is a diagram of a load bearing body used in the anchor construction method of the present invention. It is a perspective view, and the same components as those in the conventional example shown in FIGS.
[0012]
In the anchor construction method of the present invention, a woven cloth bag body 8 is covered in a range corresponding to the fixing portion of the an curtain curtain 1, and a grout injection pipe 16 is inserted into the bag body 8 as a grout injection hose. After sealing the opening 17 and inserting the uncurtain don 1 including the grout injection pipe 16 covered with the bag body 8 into the anchor hole 6, the grout material is pressurized and injected through the grout injection pipe 16. Pressure filling is performed until the outer peripheral surface of the body 8 is pressed and adhered to the hole wall of the anchor hole 6.
[0013]
As shown in FIG. 6, the uncurtain dong 1 has a plurality of load-bearing bodies 2 and 2 arranged on the same axis, and each load-bearing body 2 and 2 is made to turn a tension material 3 such as a PC stranded wire independently. The grout injection pipe 16 is also fixedly disposed on the load-bearing bodies 2 and 2 and is incorporated so as to be a part of the uncurtain don 1, and the fixing portion of the uncurtain don 1 including the grout injection pipe 16 A woven cloth bag body 8 is covered in a range corresponding to the above, and the opening is sealed 17 and inserted into the anchor hole 6, and then the grout material is pressurized and injected through the grout injection pipe 16. Pressure filling is performed until the outer peripheral surface of 8 is in pressure contact with the hole wall of the anchor hole 6.
[0014]
More specifically, referring to FIG. 1 to FIG. 5, first, as shown in FIG. 1, a drilling pipe (this is a single-pipe pipe) 20 having a discarded bit 21 at its tip using an excavator (not shown). Then, the anchor hole 6 is drilled. This is done at a predetermined angle to a predetermined depth. After drilling to a predetermined depth, the drilling is stopped, the excavator is removed from the excavation pipe 20, and the excavation pipe 20 is used as a casing.
[0015]
On the other hand, a woven cloth bag 8 is covered in advance in a range corresponding to the fixing portion of the uncurtain don 1, and a grout injection hose 22 (grouting pipe 16) and a grout filling confirmation hose (hereinafter referred to as return). An uncurtain dong 1 into which a hose) 23 is inserted is prepared, and the uncurtain dong 1 is inserted into the excavation pipe 20 as a casing as shown in FIG. Reference numeral 17 denotes a sealing portion of the opening of the bag body 8.
[0016]
Preferably, as shown in FIG. 6, a plurality of load bearing bodies 2, 2 are arranged on the same axis, and each of the load bearing bodies 2, 2 is configured to turn independent tension members 3, and the grout injection pipe 16 is also configured as described above. The uncurtain dong 1 is fixed and arranged on the load-bearing bodies 2 and 2 and covered with a bag 8 made of woven cloth in a range corresponding to the fixing portion including the grout injection pipe 16 and the opening thereof is sealed. . As shown in FIG. 7, the load-bearing body 2 includes a groove 9 for inserting the tension material 3 to make a U-turn and a groove 19 for inserting the grout injection pipe 16. The tension material 3 is a groove. The grout injection pipe 16 is inserted into the concave groove 19 and piped, and both are fastened and fixed by the metal band 10. The uncurtain dong 1 configured as described above is inserted into the casing 20. In this example, the grouting pipe 16 serves as the grouting hose 22.
[0017]
Next, as shown in FIG. 2, with the uncurtain don 1 inserted into the casing 20, the discard bit 21 at the tip of the casing 20 is tapped and removed (separated) from the casing 20. Here, the reason why the discard bit 21 is removed from the casing 20 is to pull out the casing 20 while leaving the uncurtain dong 1 in the anchor hole 6 in the next step. This is because the presence of the discard bit 21 is an obstacle, and the uncurtain don 1 cannot be pulled out while remaining in the anchor hole 6. The discard bit 21 has a structure that can be removed by tapping with the uncurtain dong 1, and conventionally known means are employed.
[0018]
Next, as shown in FIG. 3, the casing 20 is pulled out so as not to damage the inserted uncurtain dong 1. Then, the uncurtain dong 1 is placed in the anchor hole 6 and the discard bit 21 is left at the bottom of the anchor hole 6.
[0019]
Next, as shown in FIG. 4, a grout material such as cement milk is pressurized and injected into the bag body 8 from the grout injection hose 22 or the grout injection pipe 16. Confirmation of the filling state by pressure injection of the grout material is confirmed by a return hose 23 for grout filling confirmation. When the grout material flowing out from the return hose 23 has the same density as the grout material injected from the grout injection hose 22 or the grout injection pipe 16, it is determined as a predetermined filling state. When the return hose 23 confirms the predetermined filling state, the return hose 23 is closed. At this time, the inside of the bag body 8 is filled with the grout material.
[0020]
Next, when the return hose 23 is closed, the grout material is further pressurized and injected from the grout injection hose 22 or the grout injection pipe 16, and the outer peripheral surface of the bag body 8 is pressed and adhered to the hole wall of the anchor hole 6. The adhesiveness between the ground and the anchor body (anchor fixing body) 7 is improved, and after sufficiently pressurized injection, the grout injection hose 23 or the grout injection pipe 16 is closed to solidify the grout material. The bag body 8 is made of woven fabric. At this time, the grout material oozes out from the outer peripheral surface of the bag body 8 to improve the adhesion with the hole wall (ground) of the anchor hole 6 and integrate it, thereby increasing the proof stress. Because.
[0021]
Next, as shown in FIG. 5, the mouth of the anchor hole 6 is stopped by the mouth packer 24. The mouth packer 24 is set at the mouth of the water blocking wall portion 18 through the uncurtain don 1, and a grout material such as cement milk is injected and filled into the mouth packer 24 from the hose 25, and the filling is stopped after confirming that the flowing water stops. . Further, a grout material is injected into the cavity of the anchor hole 6 inside the mouth packer 24 using the hose 26.
[0022]
Finally, the tension material 3 of the uncurtain don 1 is tensioned and fixed. Conventionally known means are employed as the tension and fixing means.
[0023]
The uncurtain dong 1 is inserted into the anchor hole 6 with the bag body 8 covering the portion corresponding to the fixing portion, and the grout material is injected into the bag body 8 under pressure to construct the anchor. Even if the ground is a ground where the groundwater is intensively flowing out of high pressure water, it is not washed or diluted before the grout material is solidified.
The above embodiment is for explaining the present invention, and is not intended to limit the present invention. Modifications, modifications, etc. are allowed within the technical scope of the present invention.
[0024]
【The invention's effect】
As explained in detail above, the anchor construction method of the present invention covers a woven cloth bag in a range corresponding to the fixing portion of the uncurtain don, and inserts a grout injection hose (grouting pipe) into the bag, After sealing the opening of the bag body and inserting an uncurtain don including a grout injection hose (grouting pipe) covered with the bag body into the anchor hole, the grout from the grout injecting hose (grouting pipe) Since the material is pressurized and filled until the outer peripheral surface of the bag body is in pressure contact with the hole wall of the anchor hole, the ground is a ground where the groundwater moves rapidly so that highly pressurized water flows out. However, the filled grout material is not washed or diluted before solidifying, the anchor cannot be formed, the adhesion between the anchor body and the ground is adversely affected, and the predetermined anchor strength is obtained. Non, such problem is solved all.
[0025]
According to the anchor construction method of the present invention, not only can the construction of an anchor having a predetermined anchor strength be possible, even in the ground where the ground is moving rapidly such that the ground flows out of highly pressurized water, Anchors can also be easily constructed.
[Brief description of the drawings]
FIG. 1 is a schematic cross-sectional view shown in the order of construction according to an embodiment of the present invention.
FIG. 2 is a schematic explanatory diagram showing the next construction order of the embodiment of the present invention.
FIG. 3 is a schematic explanatory view showing the next construction order of the embodiment of the present invention.
FIG. 4 is a schematic explanatory view showing the next construction order of the embodiment of the present invention.
FIG. 5 is a schematic explanatory diagram showing still another construction order according to the embodiment of the present invention.
FIG. 6 is a partial perspective view of the uncurtain don according to the embodiment of the present invention.
FIG. 7 is a perspective view of the load-bearing body according to the embodiment of the present invention.
FIG. 8 is a cross-sectional view showing a conventional anchor construction method.
FIG. 9 is a partial perspective view of an uncurtain dong according to a conventional anchor construction method.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Uncurtain Don 2 Load-bearing body 3 Tensile material 6 Anchor hole 7 Anchor body 8 Bag body 16 Grout injection pipe 17 Sealing part 20 of bag body Opening pipe (casing)
21 Discard bit 22 Hose for grout injection 23 Hose for confirmation of grout filling (return hose)
24 Mouth Packer

Claims (1)

下記工程よりなることを特徴とするアンカー施工方法。
(1)先端に捨てビットを具備する掘削パイプを使用し、所定の角度で所定の深度までアンカー孔を削孔する工程、
(2)予めアンカーテンドンの定着部に織布製の袋体を被せ、その中にグラウト注入用のホースとグラウト充填確認用のホースを差し込んだアンカーテンドンを、前記掘削パイプをケーシングとしてその内に挿入する工程、
(3)前記挿入したアンカーテンドンで前記ケーシング先端の捨てビットを叩いてケーシングから外す工程、
(4)前記挿入したアンカーテンドンを傷つけないように前記ケーシングを引き抜く工程、
(5)前記袋体内にグラウト注入用のホースによってグラウト材を注入する工程、
(6)グラウト充填確認用のホースで前記グラウト材の充填状態を確認し、所定の充填状態になったらグラウト充填確認用のホースを閉じる工程、
(7)さらに前記グラウト注入用のホースからグラウト材を加圧注入し、袋体の外周面をアンカー孔の孔壁に加圧密着させ、地盤とアンカー定着体の密着性をよくし、十分に加圧注入後グラウト注入用のホースを閉じ、グラウト材を固化させる工程、
(8)前記アンカー孔の口元を口元パッカーで止水する工程、
(9)アンカーテンドンの緊張材を、緊張、定着させる工程。
An anchor construction method comprising the following steps.
(1) A step of drilling an anchor hole to a predetermined depth at a predetermined angle using a drilling pipe having a discarded bit at the tip;
(2) Cover the fixing part of the uncurtain dong in advance with a woven cloth bag body, and insert the grout injection hose and the grout filling confirmation hose into the uncurtain dong, using the excavation pipe as a casing. Inserting step,
(3) A step of hitting a discarded bit at the tip of the casing with the inserted an curtainless detachment from the casing,
(4) a step of pulling out the casing so as not to damage the inserted an curtain curtain;
(5) A step of injecting a grout material into the bag by a grout injecting hose,
(6) a step of confirming a filling state of the grout material with a grout filling confirmation hose and closing the grout filling confirmation hose when a predetermined filling state is reached;
(7) Further, the grout material is pressurized and injected from the hose for injecting the grout, and the outer peripheral surface of the bag body is press-contacted to the hole wall of the anchor hole to improve the adhesion between the ground and the anchor fixing body. Closing the grout injection hose after pressure injection and solidifying the grout material,
(8) A step of stopping the mouth of the anchor hole with a mouth packer,
(9) A step of tensioning and fixing the tension material of the uncurtain don.
JP2000319516A 2000-10-19 2000-10-19 Anchor construction method Expired - Fee Related JP3774886B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000319516A JP3774886B2 (en) 2000-10-19 2000-10-19 Anchor construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000319516A JP3774886B2 (en) 2000-10-19 2000-10-19 Anchor construction method

Publications (2)

Publication Number Publication Date
JP2002129555A JP2002129555A (en) 2002-05-09
JP3774886B2 true JP3774886B2 (en) 2006-05-17

Family

ID=18797965

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000319516A Expired - Fee Related JP3774886B2 (en) 2000-10-19 2000-10-19 Anchor construction method

Country Status (1)

Country Link
JP (1) JP3774886B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561992A (en) * 2012-01-29 2012-07-11 山东大学 Deformation water stopper and grouting plugging process adopting same

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766450B1 (en) 2006-08-10 2007-10-17 (주)신화소일테크 The anchor construction method in soft ground of gaving used the foundation fixing anchor and this shich consisted of fixing supporter
JP5392555B2 (en) * 2009-07-28 2014-01-22 独立行政法人土木研究所 Anchor structure, bearing support restraint, anchor construction method
KR101105477B1 (en) 2011-03-23 2012-01-13 보림이엔씨 주식회사 Ground anchor
CN103397630B (en) * 2013-07-29 2015-07-22 上海强劲地基工程股份有限公司 Stiffening pile with grouting bags
JP6077706B1 (en) * 2016-07-12 2017-02-08 黒沢建設株式会社 U-turn compound resistance mechanism type ground anchor
CN114658042A (en) * 2022-04-08 2022-06-24 中冶建筑研究总院(深圳)有限公司 High confined water head stratum double-pipe grouting bagged anti-floating anchor rod and construction method thereof
CN114837053B (en) * 2022-05-23 2023-05-05 四川公路桥梁建设集团有限公司 Inverted arch pavement reinforcing structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561992A (en) * 2012-01-29 2012-07-11 山东大学 Deformation water stopper and grouting plugging process adopting same
CN102561992B (en) * 2012-01-29 2013-11-06 山东大学 Grouting plugging process adopting deformation water stopper

Also Published As

Publication number Publication date
JP2002129555A (en) 2002-05-09

Similar Documents

Publication Publication Date Title
JP3774886B2 (en) Anchor construction method
KR102017848B1 (en) balloon type intensively expandable anchor apparatus
KR20020009300A (en) apparatus and method for earth anchor using expansible packer
JP4237173B2 (en) Hole closing jig and hole closing method using the hole closing jig
KR19990000560A (en) Earth anchor and construction method using the same
JP2007262811A (en) Pile structure and pile member driving method
JP2979115B2 (en) Construction method of cast-in-place concrete pile
CN211571665U (en) Fixing structure of concrete surface soil pressure cell
JPS6245399B2 (en)
JPS622083B2 (en)
JP3850765B2 (en) Steel pipe pile burial method and steel pipe pile body
JPH07127058A (en) Construction method for upward anchor and its anchor
JP4351194B2 (en) Ground anchor method and ground anchor structure
JP5463043B2 (en) Method for reinforcing concrete structures
JP4127837B2 (en) Ground anchor method and ground anchor structure
JP3513905B2 (en) Permanent anchor method
JPH0647967Y2 (en) Bearing plate with water-stop sheath
KR200325653Y1 (en) Earth anchor including a duplex grouting pipe
KR20020012451A (en) apparatus and method for removal anchor using double uneven pipe
JP3729028B2 (en) Water stop method for joints in steel pipe sheet piles
JP2984728B2 (en) Construction method of cast-in-place concrete pile
KR101791903B1 (en) Anchor construction method using pack anchor
KR101182372B1 (en) Structure for preventing damage of expansion pack with earth anchor
KR20020018528A (en) apparatus and method for precast anchor
JP3594054B2 (en) Ground anchor and its construction method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050802

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050822

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051017

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060210

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100303

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110303

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130303

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140303

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees