JP3755472B2 JP2002063169A JP2002063169A JP3755472B2 JP 3755472 B2 JP3755472 B2 JP 3755472B2 JP 2002063169 A JP2002063169 A JP 2002063169A JP 2002063169 A JP2002063169 A JP 2002063169A JP 3755472 B2 JP3755472 B2 JP 3755472B2
Authority
JP
Japan
Prior art keywords
ground
flexible
injection
boring
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002063169A
Other languages
Japanese (ja)
Other versions
JP2003261934A (en
Inventor
俊介 島田
仁 三浦
忠雄 小山
英雄 北川
イエネン ディトマー
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toa Corp
Original Assignee
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toa Corp filed Critical Toa Corp
Priority to JP2002063169A priority Critical patent/JP3755472B2/en
Publication of JP2003261934A publication Critical patent/JP2003261934A/en
Application granted granted Critical
Publication of JP3755472B2 publication Critical patent/JP3755472B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は軟弱地盤、漏水地盤等、液状化の恐れのある地盤、汚染地盤などの地盤の改良方法に係り、特に、地盤改良を施し難い既設構造物下方の支持地盤、廃棄物処理場の底盤あるいは溜め池や貯水池下方等を改良する方法に係り、詳細には、地盤改良を施し難い既設構造物下方の支持地盤を効率良く、かつ経済的に地盤改良し、地盤沈下や、地震時における地盤の液状化を未然に防止し得、さらに廃棄物処理場からの有害物質の溶出を防止し得、さらには溜め池や貯水池からの漏水を防止し得る地盤改良方法に関する。
【0002】
【従来の技術】
軟弱地盤等、地震による地盤沈下や、液状化の恐れのある地盤では、その対策として、構造物、廃棄物処理場、溜め池や貯水池等の不動物体の構築の際に、セメント系固化材や薬材を地盤に注入する等、各種の地盤改良が行なわれている。このような地盤改良は不動物体を新たに構築する際にはもちろんのこと、既設不動物体に対してもその支持地盤に地盤改良を施す必要がある。
【0003】
この種の薬液注入として従来、例えば、図15に示すように、不動物体としての構造物106の近傍地盤100に垂直削孔101または斜め削孔102を穿孔した後、削孔101、102中に注入管105を埋設し、この注入管105を通して薬液を地盤100中に注入する手段が採用されていた。
【0004】
【発明が解決すべき課題】
しかし、これでは構造物106が広大な場合、あるいは廃棄物処理場、溜め池、浄水地等の場合、垂直削孔101ではもちろんのこと、斜め削孔102を行って注入しても改良不能領域103が大幅に残ってしまい、固結領域104が少なく、このため充分な改良効果が期待されないのみならず、削孔本数が大量となり、不経済であった。
【0005】
ところで、我が国は世界でも有数の火山地帯と言われており、数々の災害に襲われている。このため、耐震仕様のライフライン整備改良が急務とされ、災害に強いライフラインが要求されるようになってきた。したがって、各種幹線整備事業にあたっては、自然環境への配慮、道路や交通規制への対応、工事に伴う振動、騒音への対応策等、さまざまな課題や問題を解決する必要がある。
【0006】
例えば、石油タンクや各種工場等、重要構造物は地震時の液状化防止対策として薬液注入による地盤改良が要求されている。さらに、溜め池や、貯水池、廃棄物処理場等では、建設後永年を経たものが多く、近年では老巧化が進み、薬液注入による漏水防止等の補修工事が必要とされている。
【0007】
そこで、本発明の目的はビル等の既設構造物、廃棄物処理場、溜め池や貯水池等、下方の地盤改良の施し難い支持地盤を地盤改良するに際し、効率よく、かつ経済的に、しかも立地条件に制約されることなく実施し得、上述の公知技術に存する欠点を排除した地盤改良方法を提供することにある。
【0008】
【課題を解決するための手段】
上述の目的を達成するため、本発明によれば、改良すべき地盤の近傍地表面からボーリングし、得られたボーリング孔中に可撓性注入細管を挿入し、この注入細管を通して地盤中に注入材を注入して該地盤を改良する地盤改良方法において、前記ボーリング孔は地盤の近傍地表面から該地盤中に屈曲して、または屈曲と直線を任意に組み合わせてボーリングすることにより得られ、かつ、前記可撓性注入細管は可撓性結束注入細管であって、複数本の可撓性注入細管を、これらの吐出口が軸方向の異なる個所に位置するように結束して構成されてなり、これら各吐出口を通して注入材を改良すべき地盤に注入することを特徴とする。
【0009】
さらに上述の目的を達成するため、本発明によれば、改良すべき地盤の近傍地表面から地盤中に屈曲して、または屈曲と直線を任意に組み合わせて反対側の近傍地表面までボーリングし、その後、ボーリング孔に可撓性芯材の抱き込まれた可撓性結束細管を、その芯材部分をボーリングロッドのヘッドに引っかけて、かつシール材を填充しながら、さらに、ボーリングロッドを引き抜きながら引き込んで改良すべき地盤の所定位置に挿入し、可撓性結束細管の吐出口から注入材を前記シール材によるシールを破って注入することを特徴とする。
【0010】
さらになお、上述の目的を達成するため、本発明によれば、改良すべき地盤の近傍地表面から地盤中に屈曲して、または屈曲と直線を任意に組み合わせて反対側の近傍地表面までボーリングし、次いで内部に可撓性結束細管の収納された可撓性さや管をボーリングヘッドに連結してボーリング孔中に引き込んだ後、ボーリング孔中にシール材を導入しながらさや管のみを引き抜いて可撓性結束注入細管を改良すべき所定の位置に配置し、可撓性結束注入細管の吐出口から注入材を前記シール材によるシールを破って注入することを特徴とする。
【0011】
また、さらに上述の目的を達成するため、本発明によれば、改良すべき地盤の近傍地表面から地盤中に屈曲して、または屈曲と直線を任意に組み合わせて反対側の近傍地表面までボーリングし、次いで、周壁に複数の吐出口を有する可撓性さや管をボーリングヘッドに連結し、該さや管とボーリング孔との間にシール材を導入しながらさや管をボーリング孔中に埋設の後、該さや管内に、吐出口が複数の袋パッカで覆われた可撓性結束細管を、さや管の吐出口が可撓性結束細管の互いに隣接する袋パッカ間に位置するように挿入し、該袋パッカを膨脹させてパッカを形成した後に可撓性結束注入細管の吐出口を通して注入材を注入することを特徴とする。
【0012】
【発明の実施の態様】
以下、本発明を添付図面を用いて詳述する。
【0013】
図1は本発明方法の原理を説明するための一具体例の模式図である。図2は本発明方法の原理を説明するための他の具体例の模式図である。図3は本発明に用いられる可撓性結束注入細管の一具体例の部分平面図である。図4は本発明に用いられるドリルロッドの一具体例の平面図であって、(a)は回転しながら直進推進の状態を示し、(b)は曲線状推進の状態を示す。図5は本発明にかかる現場での具体的ボーリングの説明図であって、(a)はボーリングヘッドによるボーリング、(b)はケーシングの挿入、(c)は可撓性結束注入細管の注入、(d)はパッカの形成、(e)は注入材の注入を表す。図6は現場でボーリング孔を削孔する際の削孔軌道を削孔する一例の説明図である。図7は現場で削孔軌道を形成の後、拡孔してボーリング孔を形成する一例の説明図である。図8は拡孔してボーリング孔を形成する際に使用する拡孔装置の一具体例の斜視図である。図9は本発明方法を説明するための一具体例の断面図である。図10は本発明方法の一注入態様を表した部分断面図である。図11はパッカを用いた本発明方法の一注入態様を表した部分断面図である。図12は本発明に用いられる可撓性さや管の使用状態を表した部分断面図である。図13はパッカの装着された可撓性結束注入細管およびさや管を用いたときの注入態様を表した部分断面図である。図14はパッカの装着された可撓性結束注入細管およびパッカの装着されたさや管を用いたときの注入態様を表した部分断面図である。図15は構造物直下の支持地盤の公知の地盤改良を表した模式図である。
【0014】
図1は本発明方法の基本模式図であって、ビル、廃棄物処理場、溜め池、貯水池等、移動不可能な不動物体1の直下の改良すべき地盤2の近傍地表面3から地盤4中に屈曲して、または屈曲と直線を組み合わせて、例えば、図1では最初に斜めに屈曲して、続いて不動物体1の直下の改良すべき地盤2に直線状に、さらに続いて、斜めに屈曲して、対向側の近傍地表面3まで削孔し、ボーリング孔5を形成する。
【0015】
次いで、図1のボーリング孔5中に可撓性結束注入細管6を挿入し、これら吐出口から注入材を吐出し、地盤4中に注入して不動物体1直下の改良すべき地盤2に固結領域7を形成する。
【0016】
図2もまた、本発明にかかる他の基本模式図であって、従来の垂直削孔101ならびに斜め直線状の斜め削孔102と、曲線状(屈曲)ボーリング孔5とを併用した例である。この方法では、従来の技術にさらに本発明のボーリング孔5を併用するので、改良すべき地盤2は一層確実かつ迅速に固結され、固結領域7を形成する。
【0017】
図3は本発明に用いられる可撓性結束注入細管6の一具体例の平面図であって、複数本の可撓性注入細管8、8・・8を、これらの吐出口9、9・・9が軸方向の異なる個所に位置するように、バンド16で結束して構成される。また、図3に示すように可撓性結束注入細管6は複数本の可撓性注入細管8、8・・8とともに、可撓性芯材10を抱き合わせて結束することもでき、さらに、複数の吐出口9、9・・9のうち、任意のいずれかに袋パッカ11を被覆してもよい。袋パッカ11を膨脹させてパッカとした状態は後述する。また、可撓性結束注入細管6には、図示しないが、ボーリング孔5の孔壁との間に任意の間隔を保つためにスペーサを備えることもできる。
【0018】
この種の可撓性芯材10としては、可撓性結束注入細管6をボーリング孔5内に引き込み、引っ張って切れないだけの強度と、可撓性があればよく、具体的にはひも状なしいはワイヤ状であって、材質としては合成樹脂製、金属製等、いかなる材質のものでもよい。なお、可撓性芯材10は複数の可撓性注入細管8のうちの一本ないしは複数本が芯材の代わりとなるほどの引張強度があれば必ずしも必要としない。
【0019】
本発明では、改良すべき地盤2の下方に、後述する誘導式水平ボーリング工法を用いてほぼ水平にボーリングする。すなわち、まず、図1および図2における、不動物体1下方の改良すべき地盤2の近傍地表面3から後述の図4(a)に示されるドリルヘッド17を有するボーリングロッドを回転しながら押し込み、ロッドの回転と押し込みにより斜め直線状に削孔する。
【0020】
次いで、ドリルヘッド17先端のビット傾斜面、すなわち、先端テーパ刃18を曲げる方向に調整し、ジエッテイングと押し込みにより曲線部を削孔する。続いて、ボーリングロッドの回転と押し込みにより水平部を削孔し、さらに必要に応じて、不動物体1の反対側の近傍地表面3まで斜め直線状に削孔する。
【0021】
上述図4のドリルヘッド17を使用した実際の現場における削孔について、図5を用いて説明する。まず、図5(a)に示されるように、近傍地表面3に発進坑35を形成するとともに、ボーリングマシン28を設置する。次いで、近傍地表面3のボーリングマシン28から発進坑35を経て、先端に図4(a)に示されるドリルヘッド17を備えたボーリングロッド37を、ドリルヘッド17を回転しながら改良すべき地盤2中に押し込み、削孔する。削孔を曲げる場合には、図4(b)に示されるように、先端テーパ刃18を曲げる方向に調整して削孔する。この削孔は反対側の近傍地表面3に到達するまで行ってもよいが、図5に示されるように、改良すべき地盤2の末端まで行うだけでも充分である。
【0022】
続いて、削孔中にベントナイト泥水や、セメントベントナイト液のような硬化性泥水を噴出しながら、ボーリングロッド37を引き抜いた後、図5(b)に示されるようにケーシング36を用いて再ボーリングする。このとき、削孔はケーシング36によって保護される。
【0023】
さらに続いて、図5(c)に示されるように、ケーシング36の中に可撓性結束注入細管6を挿入する。この注入細管6は先端、すなわち改良すべき地盤2の奥に位置する吐出口9、および手前に位置する吐出口9にそれぞれ袋パッカ11、11を覆わせる。これら袋パッカ11、11を膨脹させると、図5(d)に示されるようにパッカ24、24となり、ケーシング36を引き抜いて図5(e)に示されるように、パッカ24、24間に注入材を吐出口9、9・・9から注入し、改良すべき地盤2を効率よく改良する。
【0024】
さらに他の現場における地盤のボーリングを説明すると、まず、図6に示されるように、掘削流体をジエット噴出するボーリングヘッド26を近傍地表面3より接続坑31を経て、誘導アンテナ27により、検知しながらボーリングマシン28で誘導し、到達坑29まで掘進して削孔軌道30を形成する。ボーリングマシン28は図示しない油圧ユニットで操作される。
【0025】
ボーリングヘッド26の誘導システムはボーリングヘッド26に搭載した発振コイルと、到達点に配置されたアンテナ内の二つの受信コイルの磁気的結合によりヘッド位置を推進するように誘導する。上下、前後の位置センシングはボーリングヘッドに搭載した上下角センサ出力の積分処理により推進する。前後方向の一定間隔ごとに現在位置を演算してリアルタイムで画面に表示される。この画面を見ながらオペレータは操作ボックスを操作し、ボーリングヘッドがあらかじめ設定した目標経過に沿って進むように操作すればよい。
【0026】
次いで、図7に示されるように、削孔軌道30が到達坑29に到達した後、ボーリングヘッド26に拡孔装置であるバックリーマー32(図8)を連結し、このリーマー32にスイベル33を介し、エキスパンダーチャック34で近傍地表面3の可撓性結束注入細管6をはさんで連結する。このとき、可撓性結束注入細管6は図13に示されるようにさや管20に挿入されたものでもよく、この場合、細管6とさや管20がエキスパンダーチャック34にはさまれる。続いて、バックリーマー32を回転させ、削孔軌道を拡張してボーリング孔5とした後、このボーリング孔5に掘削流体をジエット噴出させながら可撓性注入細管6を所定の個所に引き込み、埋設する。ここで使用する掘削流体はベントナイト泥水、水、あるいはセメントベントナイト泥水のような硬化性シール材等であるが、通常は、削孔時にはベントナイト泥水や水が用いられ、細管6の引き込み時には硬化性シール材が用いられる。
【0027】
図9は本発明にかかる地盤改良方法の一具体例を表した説明図である。図8はビル、共同住宅、廃棄物処理場、溜め池や貯水池等、動かすことのできない不動物体1の下方等、地盤改良の施し難い支持地盤、すなわち改良すべき地盤2の地盤改良にかかわるものであり、まず、地盤4の改良すべき地盤2を上述のようにしてボーリングし、ボーリング孔5を形成する。
【0028】
削孔中、計画削孔軌跡上に障害物がある場合には、ボーリングロッド先端部のセンサが信号を発信し、この信号を地上の受信機で受け、障害物を避ける方向に削孔を誘導する。あるいは、ボーリングロッド先端部のセンサから発信された位置信号を信号ケーブルにより地上のパソコンで処理し、障害物を避けるように削孔径路を管理する。
【0029】
次に、上述のようにして削孔されたボーリング孔5に、斜孔部5aまたは反対側の斜孔部5aを経て水平孔部5bを通し、ボーリング孔5中にベントナイト泥水とともに可撓性結束注入細管6を挿入する。この挿入に当たって、可撓性結束注入細管6は図4(a)のドリルヘッド17に可撓性芯材10を連結して挿入する。ベントナイト泥水はシール材としての働きのほかに滑材としても効果を発揮する。さらに、このベントナイト泥水をセメントベントナイトのシール12に置き換えて硬化させ、すなわち、注入管6とボーリング孔5の孔壁13とのすき間にシール12を形成し、次いで、可撓性結束注入細管6の吐出口9を通して改良すべき地盤2中に注入機14から注入材を注入し、改良すべき地盤2を地盤改良する。なお、ベントナイト泥水の代わりにセメントベントナイトのような削孔保護材や硬化材を用いることもできる。図9中、15は可撓性結束注入細管6の巻取機である。
【0030】
上述に用いられる可撓性結束注入細管6はゴム、プラスチック等の可撓性材料からなり、結束に当たって例えば、図10に示されるように、複数本のゴム製可撓性注入細管8、8・・8を、これらの吐出口9、9・・9がそれぞれ軸方向の異なる個所に位置するように可撓性芯材10と抱き合わせてバンド16で結束し、構成される。そして、注入に際してはこれら細管8、8・・8の吐出口9、9・・9を通じて注入材を、シール12を破って改良すべき地盤2中に注入し、改良すべき地盤2を改良する。
【0031】
本発明に用いられる誘導式水平ボーリング工法は上述のように発進坑より掘削流体(ベントナイト泥水等)をジエット噴出するボーリングロッドを地上から誘導アンテナで検知しながら誘導し、到達坑までドリルロッドを堀進させる。
【0032】
この工法に用いられるドリルヘッドは既述の図4に示すものである。これを詳述すると、図示しない削孔装置に図4のドリルヘッド17を連結し、これを図4(a)に示すように、地盤中に回転しながら推進して削進する。この場合、図6および図7に示すように、オペレータは操作ボックスによりドリルヘッドが目標経過に沿って進むように操作する。ドリルヘッド17の方向修正は図4に示されるように、ドリルヘッド17の先端テーパ刃18を回転させて行う。直線部はテーパ刃を反転させ(図4(a))、曲線時には曲げる方向にテーパを固定して圧入する(図4(b))。
【0033】
さらに、本発明にかかる他の地盤改良方法を図9を用いて詳述する。まず、改良すべき地盤2の近傍地表面3から地盤4中に屈曲して、または屈曲と直線を任意に組み合わせ、斜孔部5a、直線ないしは水平状のボーリング孔5b、反対側の斜孔部5aを経て、反対側の近傍地表面3までボーリングし、ボーリング孔5を形成する。次いで、得られたボーリング孔5に図3の可撓性芯材10を抱き込んだ可撓性結束細管6を、その芯材10部材を図示しないボーリング管のヘッドに引っかけ、図10に示されるように、ボーリング孔壁13と可撓性結束細管6とのすき間に上述と同様のシール材、例えば掘削流体、固化性流体等を填充してボーリング孔中にシール12を形成しながら、さらにボーリング管を引き抜きながら改良すべき地盤2の所定位置に挿入する。その後、図10に示すように、可撓性結束細管6の吐出口9から注入材を前記シール材によるシール12を破って注入する。このとき、可撓性結束注入細管6の末端部は既述のとおり、改良すべき地盤2の端部まで挿入すれば充分であるが、反対側の近傍地表面3まで引き込んでもかまわない。
【0034】
可撓性結束細管6は図3に示されるように、複数の吐出口9、9・・9のうち、いずれかに袋パッカ11を被覆したものであってもよく、この場合、可撓性結束細管6を改良すべき地盤2の所定位置に挿入の後、図11に示すように、袋パッカ11に固結材を注入してパッカ19を形成し、その後、可撓性結束注入細管6の吐出口9から注入材を隣接するパッカ19、19間の吐出口9から注入材を浸透、注入する。
【0035】
さらにまた、本発明にかかる他の地盤改良方法を以下に説明する。まず、上述と同様にして図9に示されるボーリング孔5を地盤4の改良すべき地盤2に形成する。次いで、図示しないが、内部に可撓性結束細管の挿入された可撓性さや管をボーリングヘッドに連結して該さや管をボーリング孔5中に引き込んだ後、ボーリング孔5中に上述と同様なシール材を導入しながらさや管のみを引き抜く。さや管を引き抜いたときに、図9ないしは図10の状態になるので、以下、これら図9および図10を用いて説明すると、可撓性結束注入細管6は改良すべき所定の位置に配置され、可撓性結束注入細管6の吐出口9、9・・9から注入材がシール材によるシール12を破って注入される。
【0036】
さらにまた、本発明にかかる他の地盤改良方法を以下に説明する。まず、上述と同様にして図9に示されるボーリング孔5を地盤4の改良すべき地盤2に形成する。次いで、図12に示すように、周壁21に複数の吐出口22、22・・22を有する可撓性さや管20を図示しないボーリングヘッドに連結し、さや管20とボーリング孔5の孔壁13との間に上述と同様なシール材を導入しながらさや管20をシール材によるシール12中に埋設する。
【0037】
その後、埋設されたさや管20内に、図3に示すように、複数の吐出口9、9・・9のうちの任意のいくつかが袋パッカ11、11・・11で覆われた可撓性結束注入細管6を、図13に示すように、さや管20の吐出口22が可撓性結束細管6の互いに隣接する図3の袋パッカ11、11間に位置するように挿入し、袋パッカ11、11を膨脹させてパッカ19、19を形成した後に、可撓性結束注入細管6の吐出口9、9・・9を通し、さらにさや管20の吐出口22を通して、注入材をシール材によって形成されたシール12を破って注入する。図13において、さや管20はボーリング孔5に導入する前に、すでに可撓性結束注入細管6を内蔵させたものを用い、これをボーリング孔5中に埋設してもかまわない。
【0038】
さらに、図14に示すように、さや管20の複数の吐出口22、22・・22のうちのいくつかの吐出口22、22・・22を袋パッカで覆い、注入材を地盤に注入するに当たり、あらかじめ袋パッカを膨脹させてパッカ24、24・・24を形成の後、これらの隣接するパッカ24、24間に形成される空間25を通して、さや管20の吐出口22から注入材を地盤に注入することもできる。
【0039】
【発明の効果】
上述の本発明によれば、ビル等の既設構造物、廃棄物処理場、溜め池や貯水池等、移動することのできない不動物体の下方の改良すべき地盤を地盤改良するに際し、改良すべき地盤(支持地盤)の近傍地表面から該地盤の下方に向けて斜めにボーリングし、次いで不動物体の下方をほぼ水平にボーリングし、得られたボーリング孔に可撓性注入管を挿入し、この注入管吐出口を通して地盤を改良することにより、地盤改良を施し難い既設構造物等、不動物体の下方の支持地盤を立地条件に制限されずに、効率良く、かつ経済的に地盤改良することができ、地盤沈下や地震時における地盤の液状化を未然に防止し得る。
【図面の簡単な説明】
【図1】本発明方法の原理を説明するための一具体例の模式図である。
【図2】本発明方法の原理を説明するための他の具体例の模式図である。
【図3】本発明に用いられる可撓性結束注入細管の一具体例の部分平面図である。
【図4】本発明に用いられるドリルロッドの一具体例の平面図であって、(a)は回転しながら直進推進の状態を示し、(b)は曲線状推進の状態を示す。
【図5】本発明にかかる現場での具体的ボーリングの説明図であって、(a)はボーリングヘッドによるボーリング、(b)はケーシングの挿入、(c)は可撓性結束注入細管の注入、(d)はパッカの形成、(e)は注入材の注入を表す。
【図6】現場でボーリング孔を削孔する際の削孔軌道を削孔する一例の説明図である。
【図7】現場で削孔軌道を形成の後、拡孔してボーリング孔を形成する一例の説明図である。
【図8】拡孔してボーリング孔を形成する際に使用する拡孔装置の一具体例の斜視図である。
【図9】本発明方法を説明するための一具体例の断面図である。
【図10】本発明方法の一注入態様を表した部分断面図である。
【図11】パッカを用いた本発明方法の一注入態様を表した部分断面図である。
【図12】本発明に用いられる可撓性さや管の使用状態を表した部分断面図である。
【図13】パッカの装着された可撓性結束注入細管およびさや管を用いたときの注入態様を表した部分断面図である。
【図14】パッカの装着された可撓性結束注入細管およびパッカの装着されたさや管を用いたときの注入態様を表した部分断面図である。
【図15】構造物直下の支持地盤の公知の地盤改良を表した模式図である。
【符号の説明】
1 不動物体
2 改良すべき地盤
3 近傍地表面
4 地盤
5 ボーリング孔
5a 斜孔部
5b 水平孔部
6 可撓性結束注入細管
7 固結領域
8 可撓性注入細管
9 吐出口
10 可撓性芯材
11 袋パッカ
12 シール
13 孔壁
14 注入機
15 巻取機
16 バンド
17 ドリルヘッド
18 先端テーパ刃
19 パッカ
20 可撓性さや管
21 周壁
22 吐出口
23 ゴムスリーブ
24 パッカ
25 空間
26 ボーリングヘッド
27 誘導アンテナ
28 ボーリングマシン
29 到達坑
30 削孔軌道
31 接続坑
32 バックリーマー
33 スイベル
34 エキスパンダーチャック
35 発進坑
36 ケーシング
37 ボーリングロッド
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a ground improvement method such as a soft ground, a leaky ground, a ground that may be liquefied, and a contaminated ground, and more particularly, a supporting ground below an existing structure that is difficult to improve the ground, and a bottom of a waste disposal site. Or, it relates to a method for improving the reservoir basin or reservoir reservoir, etc., and more specifically, the supporting ground below the existing structure, which is difficult to improve the ground, can be improved efficiently and economically. The present invention relates to a ground improvement method that can prevent liquefaction of wastewater, prevent elution of harmful substances from a waste disposal site, and further prevent leakage from a reservoir or reservoir.
[0002]
[Prior art]
For soft ground, such as ground subsidence due to earthquakes or ground that may be liquefied, as a countermeasure, cement-based solidification materials and other materials such as structures, waste disposal sites, reservoirs and reservoirs should be constructed. Various ground improvements such as injection of chemicals into the ground have been made. Such ground improvement is necessary not only when constructing a new inanimate object, but also for the existing inanimate object, it is necessary to improve the ground on the supporting ground.
[0003]
Conventionally, for example, as shown in FIG. 15, a vertical hole 101 or an oblique hole 102 is drilled in the ground 100 near the structure 106 as an inanimate body, and then into the holes 101, 102. A means for embedding an injection pipe 105 and injecting a chemical solution into the ground 100 through the injection pipe 105 was adopted.
[0004]
[Problems to be Solved by the Invention]
However, in this case, when the structure 106 is very large, or in the case of a waste treatment plant, a reservoir, a water purification plant, etc., not only the vertical drilling hole 101 but also the region that cannot be improved even if the oblique hole 102 is injected. As a result, a large amount of 103 remains, and there are few consolidated regions 104. Therefore, not only a sufficient improvement effect is not expected, but also the number of drilling holes becomes large, which is uneconomical.
[0005]
By the way, Japan is said to be one of the world's leading volcanic areas and has been hit by numerous disasters. For this reason, it has been urgently required to improve and improve earthquake-resistant lifelines, and lifelines that are resistant to disasters have been demanded. Therefore, in various mainline maintenance projects, it is necessary to solve various problems and problems such as consideration for the natural environment, response to roads and traffic regulations, vibrations associated with construction, and countermeasures against noise.
[0006]
For example, important structures such as oil tanks and various factories are required to improve the ground by injecting chemicals to prevent liquefaction during an earthquake. In addition, many reservoirs, reservoirs, waste disposal sites, etc. have passed many years after construction, and in recent years, aging has progressed and repair work such as prevention of water leakage due to chemical injection is required.
[0007]
Therefore, the object of the present invention is to improve the efficiency of an existing structure such as a building, a waste disposal site, a reservoir, a reservoir, etc., which is difficult and difficult to improve the ground, efficiently and economically. An object of the present invention is to provide a ground improvement method which can be carried out without being restricted by the conditions and which eliminates the disadvantages existing in the above-mentioned known technology.
[0008]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, according to the present invention, boring is performed from the ground surface near the ground to be improved, and a flexible injection capillary is inserted into the obtained drilling hole and injected into the ground through the injection capillary. In the ground improvement method for improving the ground by injecting material, the boring hole is obtained by bending into the ground from the ground surface near the ground or by arbitrarily combining bending and straight lines, and The flexible injection tubule is a flexible bundling injection tubule, and is formed by bundling a plurality of flexible injection tubules so that their discharge ports are located at different locations in the axial direction. The injection material is injected into the ground to be improved through these discharge ports.
[0009]
Furthermore, in order to achieve the above-mentioned object, according to the present invention, it is bent into the ground from the near ground surface of the ground to be improved, or by boring to the near ground surface on the opposite side by arbitrarily combining the bending and the straight line, After that, while holding the flexible bundling tubule with the flexible core material held in the boring hole, hooking the core material part to the head of the boring rod and filling the sealing material, while pulling out the boring rod The injection material is inserted into a predetermined position of the ground to be pulled in and improved, and the injection material is injected from the discharge port of the flexible bundling capillary tube while breaking the seal by the seal material.
[0010]
Still further, in order to achieve the above-mentioned object, according to the present invention, the boring to the near ground surface on the opposite side is performed by bending the ground surface near the ground to be improved into the ground or by arbitrarily combining bending and straight lines. Next, after connecting the flexible sheath or tube containing the flexible bundling capillaries to the boring head and drawing it into the boring hole, pull out only the sheath tube while introducing the sealing material into the boring hole. The flexible bundling injection tubule is arranged at a predetermined position to be improved, and the injection material is injected from the discharge port of the flexible bundling injection tubule by breaking the seal by the sealing material.
[0011]
Further, in order to achieve the above-described object, according to the present invention, the ground surface to be improved is bent into the ground surface, or any combination of bending and straight lines is drilled to the near ground surface on the opposite side. Then, after connecting the flexible sheath having a plurality of discharge ports on the peripheral wall to the boring head and introducing the sealing material between the sheath tube and the bore hole, the sheath tube is embedded in the bore hole. In the sheath tube, the flexible bundling tubule whose discharge port is covered with a plurality of bag packers is inserted so that the discharge port of the sheath tube is located between adjacent bag packers of the flexible bundling tube, After the bag packer is expanded to form a packer, the injection material is injected through the discharge port of the flexible bundling injection capillary tube.
[0012]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
[0013]
FIG. 1 is a schematic diagram of a specific example for explaining the principle of the method of the present invention. FIG. 2 is a schematic view of another specific example for explaining the principle of the method of the present invention. FIG. 3 is a partial plan view of a specific example of the flexible bundling injection tubule used in the present invention. 4A and 4B are plan views of a specific example of the drill rod used in the present invention, in which FIG. 4A shows a state of straight propulsion while rotating, and FIG. 4B shows a state of curvilinear propulsion. FIG. 5 is an explanatory view of concrete boring in the field according to the present invention, where (a) is boring by a boring head, (b) is insertion of a casing, (c) is injection of a flexible bundling injection capillary, (D) shows formation of a packer, and (e) shows injection of an injection material. FIG. 6 is an explanatory diagram of an example of drilling a drilling track when drilling a boring hole on site. FIG. 7 is an explanatory diagram of an example in which a drilling track is formed on site and then expanded to form a borehole. FIG. 8 is a perspective view of a specific example of a hole expanding device used for expanding a hole to form a boring hole. FIG. 9 is a cross-sectional view of one specific example for explaining the method of the present invention. FIG. 10 is a partial sectional view showing one injection mode of the method of the present invention. FIG. 11 is a partial sectional view showing an injection mode of the method of the present invention using a packer. FIG. 12 is a partial cross-sectional view showing the flexibility and the state of use of the tube used in the present invention. FIG. 13 is a partial cross-sectional view showing an injection mode when using a flexible bundling injection capillary tube and a sheath tube to which a packer is attached. FIG. 14 is a partial cross-sectional view showing an injection mode when a flexible bundle injection capillary tube with a packer and a sheath tube with a packer are used. FIG. 15 is a schematic diagram showing a known ground improvement of the support ground directly under the structure.
[0014]
FIG. 1 is a basic schematic diagram of the method of the present invention. From a ground surface 3 to a ground 4 near a ground 2 to be improved directly under a non-movable inanimate body 1, such as a building, a waste disposal site, a reservoir, a reservoir, etc. Bending in or a combination of bending and straight lines, for example, in FIG. 1, first bent diagonally first, then straight to the ground 2 to be improved directly below the inanimate body 1, and then further diagonally And boring to the near ground surface 3 on the opposite side to form a boring hole 5.
[0015]
Next, flexible bundling injection capillaries 6 are inserted into the boring holes 5 in FIG. 1, the injection material is discharged from these discharge ports, injected into the ground 4, and fixed to the ground 2 to be improved immediately below the inanimate body 1. A tie region 7 is formed.
[0016]
FIG. 2 is another basic schematic view according to the present invention, which is an example in which the conventional vertical drilling hole 101 and the oblique straight-lined diagonal hole 102 and the curved (bent) boring hole 5 are used in combination. . In this method, since the boring hole 5 of the present invention is used in combination with the conventional technique, the ground 2 to be improved is consolidated more reliably and quickly, and the consolidated region 7 is formed.
[0017]
FIG. 3 is a plan view of a specific example of the flexible bundling injection tubule 6 used in the present invention, and a plurality of flexible injection tubules 8, 8,. -It is configured by binding with a band 16 so that 9 is located at different locations in the axial direction. In addition, as shown in FIG. 3, the flexible bundling injection capillary 6 can be combined with a plurality of flexible injection capillaries 8, 8,. The bag packer 11 may be covered on any one of the discharge ports 9, 9. The state in which the bag packer 11 is expanded to form a packer will be described later. In addition, although not shown, the flexible bundling injection thin tube 6 may be provided with a spacer in order to maintain an arbitrary interval with the hole wall of the boring hole 5.
[0018]
As this type of flexible core material 10, it is sufficient that the flexible bundling injection capillary 6 is pulled into the boring hole 5 and has sufficient strength and flexibility not to be pulled. Alternatively, it is wire-shaped, and any material such as synthetic resin or metal may be used. The flexible core material 10 is not necessarily required if one or more of the plurality of flexible injection capillaries 8 have a tensile strength sufficient to replace the core material.
[0019]
In the present invention, boring is performed substantially horizontally below the ground 2 to be improved using a guided horizontal boring method described later. That is, first, in FIG. 1 and FIG. 2, a boring rod having a drill head 17 shown in FIG. 4 (a) described later is pushed in from the ground surface 3 near the ground 2 to be improved below the inanimate body 1 while rotating. Drilling in a slanting straight line by rotating and pushing the rod.
[0020]
Next, the bit inclined surface at the tip of the drill head 17, that is, the tip taper blade 18 is adjusted in the bending direction, and the curved portion is drilled by jetting and pushing. Subsequently, the horizontal portion is drilled by rotating and pushing the boring rod, and if necessary, the drilling is performed in a slanting straight line to the ground surface 3 on the opposite side of the inanimate body 1.
[0021]
The actual drilling using the drill head 17 of FIG. 4 will be described with reference to FIG. First, as shown in FIG. 5 (a), a start pit 35 is formed on the nearby ground surface 3, and a boring machine 28 is installed. Next, the ground 2 to be improved while rotating the drill head 17 from the boring machine 28 on the nearby ground surface 3 through the starting pit 35 and rotating the drill head 17 with the drill head 17 shown in FIG. Push in and drill. When the hole is bent, as shown in FIG. 4B, the hole is adjusted by adjusting the tip tapered blade 18 in the bending direction. This drilling may be performed until reaching the near ground surface 3 on the opposite side, but as shown in FIG. 5, it is sufficient to perform only to the end of the ground 2 to be improved.
[0022]
Subsequently, the boring rod 37 is pulled out while ejecting curable mud such as bentonite mud or cement bentonite into the drilling hole, and then rebored using the casing 36 as shown in FIG. To do. At this time, the hole drilling is protected by the casing 36.
[0023]
Subsequently, as shown in FIG. 5 (c), the flexible binding injection capillary 6 is inserted into the casing 36. The injection capillaries 6 cover the bag packers 11 and 11 at the tip, that is, the discharge port 9 located in the back of the ground 2 to be improved and the discharge port 9 located in front. When these bag packers 11 and 11 are expanded, they become packers 24 and 24 as shown in FIG. 5 (d), and the casing 36 is pulled out and injected between the packers 24 and 24 as shown in FIG. 5 (e). The material is injected from the discharge ports 9, 9... 9 to efficiently improve the ground 2 to be improved.
[0024]
Next, ground boring at another site will be described. First, as shown in FIG. 6, a boring head 26 for jetting a drilling fluid is detected from a nearby ground surface 3 through a connection pit 31 and detected by an induction antenna 27. However, it guides with the boring machine 28, digs up to the arrival pit 29, and forms the drilling track 30. The boring machine 28 is operated by a hydraulic unit (not shown).
[0025]
The induction system of the boring head 26 induces the head position to be propelled by magnetic coupling of an oscillation coil mounted on the boring head 26 and two receiving coils in the antenna arranged at the arrival point. Vertical / front / rear position sensing is promoted by integrating the output of the vertical angle sensor mounted on the boring head. The current position is calculated at predetermined intervals in the front-rear direction and displayed on the screen in real time. The operator may operate the operation box while looking at this screen so that the boring head advances along the preset target course.
[0026]
Next, as shown in FIG. 7, after the drilling track 30 reaches the access hole 29, a back reamer 32 (FIG. 8) as a hole expanding device is connected to the boring head 26, and a swivel 33 is connected to the reamer 32. Then, the expander chuck 34 is connected with the flexible bundling injection tubule 6 on the ground surface 3 in between. At this time, the flexible binding injection capillary 6 may be inserted into the sheath tube 20 as shown in FIG. 13, and in this case, the capillary 6 and the sheath tube 20 are sandwiched between the expander chucks 34. Subsequently, the back reamer 32 is rotated to expand the drilling trajectory to form the borehole 5, and then the flexible injection capillary 6 is drawn into a predetermined location while jetting the drilling fluid into the borehole 5 and buried. To do. The drilling fluid used here is bentonite mud, water, or a curable sealant such as cement bentonite mud, but usually bentonite mud or water is used when drilling, and a curable seal is used when the narrow tube 6 is retracted. A material is used.
[0027]
FIG. 9 is an explanatory view showing a specific example of the ground improvement method according to the present invention. Fig. 8 is related to the ground improvement of the ground 2 to be improved, such as buildings, apartment houses, waste disposal sites, reservoirs, reservoirs, etc. First, the ground 2 to be improved of the ground 4 is bored as described above to form the bore hole 5.
[0028]
When there is an obstacle on the planned drilling locus during drilling, the sensor at the tip of the boring rod transmits a signal, and this signal is received by the ground receiver to guide the drilling in a direction to avoid the obstacle. To do. Alternatively, the position signal transmitted from the sensor at the tip of the boring rod is processed by a personal computer on the ground using a signal cable, and the drilling path is managed so as to avoid obstacles.
[0029]
Next, the horizontal hole portion 5b is passed through the bore hole 5 drilled as described above through the oblique hole portion 5a or the opposite oblique hole portion 5a, and the flexible binding together with bentonite mud water in the bore hole 5. The injection capillary 6 is inserted. In this insertion, the flexible bundling injection tubule 6 is inserted by connecting the flexible core member 10 to the drill head 17 shown in FIG. Bentonite mud is effective as a lubricant as well as a sealant. Further, this bentonite mud is replaced with a cement bentonite seal 12 and hardened, that is, a seal 12 is formed between the injection pipe 6 and the hole wall 13 of the boring hole 5. An injection material is injected from the injector 14 into the ground 2 to be improved through the discharge port 9, and the ground 2 to be improved is improved. A hole protecting material such as cement bentonite or a hardener can be used instead of bentonite mud. In FIG. 9, reference numeral 15 denotes a winder for the flexible bundling injection thin tube 6.
[0030]
The flexible bundling injection tubule 6 used in the above is made of a flexible material such as rubber and plastic. For example, as shown in FIG. 10, a plurality of rubber flexible injection tubules 8, 8. 8 is formed by tying the flexible core material 10 together with a band 16 so that the discharge ports 9, 9... 9 are located at different positions in the axial direction. In injection, the injection material is injected into the ground 2 to be improved by breaking the seal 12 through the discharge ports 9, 9,... 9 of these thin tubes 8, 8,. .
[0031]
As described above, the guided horizontal boring method used in the present invention guides a boring rod that jets drilling fluid (bentonite mud etc.) from the starting pit while detecting it from the ground with an induction antenna, and drills the drill rod up to the reaching mine. Advance.
[0032]
The drill head used in this construction method is as shown in FIG. More specifically, the drill head 17 of FIG. 4 is connected to a drilling device (not shown), and as shown in FIG. In this case, as shown in FIGS. 6 and 7, the operator operates the operation box so that the drill head advances along the target course. The direction of the drill head 17 is corrected by rotating the tip tapered blade 18 of the drill head 17 as shown in FIG. The straight line portion reverses the taper blade (FIG. 4 (a)), and press-fits with the taper fixed in the bending direction when curved (FIG. 4 (b)).
[0033]
Furthermore, the other ground improvement method concerning this invention is explained in full detail using FIG. First, it is bent from the ground surface 3 near the ground 2 to be improved into the ground 4 or an arbitrary combination of bending and straight lines, and an inclined hole portion 5a, a straight or horizontal boring hole 5b, an opposite inclined hole portion. A boring hole 5 is formed by boring to the near ground surface 3 on the opposite side through 5a. Next, the flexible bundling tubule 6 in which the flexible core material 10 of FIG. 3 is held in the obtained boring hole 5 is hooked on the head of the boring tube (not shown) and the core material 10 member is shown in FIG. As described above, a sealing material similar to the above, for example, a drilling fluid, a solidifying fluid, or the like is filled in the gap between the boring hole wall 13 and the flexible bundling capillary 6 to form the seal 12 in the boring hole. While pulling out the tube, it is inserted into a predetermined position of the ground 2 to be improved. Thereafter, as shown in FIG. 10, the injection material is injected from the discharge port 9 of the flexible bundling capillary 6 by breaking the seal 12 by the sealing material. At this time, as described above, it is sufficient to insert the end portion of the flexible bundling injection capillary 6 to the end portion of the ground 2 to be improved, but it may be drawn to the near ground surface 3 on the opposite side.
[0034]
As shown in FIG. 3, the flexible bundling tubule 6 may be one in which one of a plurality of discharge ports 9, 9... 9 is covered with a bag packer 11. After the binding capillary 6 is inserted into a predetermined position of the ground 2 to be improved, as shown in FIG. 11, a packing material is injected into the bag packer 11 to form a packer 19, and then the flexible binding injection capillary 6 The injection material is permeated and injected from the discharge port 9 between the adjacent packers 19, 19 from the discharge port 9.
[0035]
Furthermore, another ground improvement method according to the present invention will be described below. First, the boring hole 5 shown in FIG. 9 is formed in the ground 2 to be improved of the ground 4 in the same manner as described above. Next, although not shown in the drawing, after the flexible sheath or tube into which the flexible bundling tubule is inserted is connected to the boring head and the sheath tube is drawn into the boring hole 5, the same as described above in the boring hole 5. Pull out only the sheath and pipe while introducing a suitable sealing material. Since the state shown in FIGS. 9 and 10 is obtained when the sheath tube is pulled out, the flexible bundling injection thin tube 6 is arranged at a predetermined position to be improved. The injection material is injected from the discharge ports 9, 9,... 9 of the flexible bundle injection thin tube 6 by breaking the seal 12 by the seal material.
[0036]
Furthermore, another ground improvement method according to the present invention will be described below. First, the boring hole 5 shown in FIG. 9 is formed in the ground 2 to be improved of the ground 4 in the same manner as described above. Next, as shown in FIG. 12, a flexible sheath 20 having a plurality of discharge ports 22, 22... 22 in the peripheral wall 21 is connected to a boring head (not shown), and the hole wall 13 of the sheath 20 and the bore hole 5 is connected. The sheath tube 20 is embedded in the seal 12 with the sealant while introducing the same sealant as described above.
[0037]
Thereafter, as shown in FIG. 3, a flexible sheath in which any of the plurality of discharge ports 9, 9,... 9 are covered with bag packers 11, 11,. 13 is inserted so that the discharge port 22 of the sheath tube 20 is located between the bag packers 11 and 11 of FIG. 3 adjacent to each other in the flexible binding capillary 6 as shown in FIG. After the packers 11 and 11 are inflated to form the packers 19 and 19, the injection material is sealed through the discharge ports 9, 9, 9 of the flexible bundling injection thin tube 6 and further through the discharge port 22 of the sheath tube 20. The seal 12 formed by the material is broken and injected. In FIG. 13, a sheath tube 20 having a flexible bundling injection thin tube 6 already incorporated therein before being introduced into the boring hole 5 may be embedded in the boring hole 5.
[0038]
Further, as shown in FIG. 14, some of the plurality of discharge ports 22, 22... 22 of the sheath tube 20 are covered with a bag packer, and the injection material is injected into the ground. In the process, after the bag packer is expanded in advance to form packers 24, 24, 24, the injection material is grounded from the discharge port 22 of the sheath tube 20 through the space 25 formed between these adjacent packers 24, 24. Can also be injected.
[0039]
【The invention's effect】
According to the above-mentioned present invention, when improving the ground below an inanimate object that cannot be moved, such as an existing structure such as a building, a waste disposal site, a reservoir, or a reservoir, the ground to be improved Boring diagonally from the ground surface near the (supporting ground) toward the lower part of the ground, then drilling the lower part of the inanimate body almost horizontally, and inserting a flexible injection tube into the obtained bore hole, this injection By improving the ground through the pipe discharge port, it is possible to improve the ground efficiently and economically without being limited by the location conditions of the supporting ground below the inanimate body, such as existing structures that are difficult to improve. In addition, ground subsidence and liquefaction of the ground during an earthquake can be prevented in advance.
[Brief description of the drawings]
FIG. 1 is a schematic diagram of a specific example for explaining the principle of the method of the present invention.
FIG. 2 is a schematic view of another specific example for explaining the principle of the method of the present invention.
FIG. 3 is a partial plan view of a specific example of a flexible bundling injection capillary used in the present invention.
FIGS. 4A and 4B are plan views of a specific example of a drill rod used in the present invention, wherein FIG. 4A shows a state of straight propulsion while rotating, and FIG. 4B shows a state of curvilinear propulsion.
FIGS. 5A and 5B are explanatory diagrams of concrete boring in the field according to the present invention, where FIG. 5A is boring by a boring head, FIG. 5B is insertion of a casing, and FIG. , (D) shows formation of a packer, and (e) shows injection of an injection material.
FIG. 6 is an explanatory diagram of an example of drilling a drilling track when drilling a boring hole on site.
FIG. 7 is an explanatory diagram of an example of forming a drilling track after forming a drilling track on site to form a boring hole.
FIG. 8 is a perspective view of a specific example of a hole expanding device used when a hole is formed to form a boring hole.
FIG. 9 is a cross-sectional view of a specific example for explaining the method of the present invention.
FIG. 10 is a partial sectional view showing an injection mode of the method of the present invention.
FIG. 11 is a partial cross-sectional view showing an injection mode of the method of the present invention using a packer.
FIG. 12 is a partial cross-sectional view showing flexibility and a use state of a tube used in the present invention.
FIG. 13 is a partial cross-sectional view showing an injection mode when using a flexible bundling injection capillary tube and a sheath tube to which a packer is attached.
FIG. 14 is a partial cross-sectional view showing an injection mode when using a flexible bundle injection capillary tube with a packer attached and a sheath tube with a packer attached thereto.
FIG. 15 is a schematic diagram showing a known ground improvement of a supporting ground directly under a structure.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Inanimate body 2 Ground 3 to improve Near ground surface 4 Ground 5 Boring hole 5a Oblique hole part 5b Horizontal hole part 6 Flexible binding injection | pouring thin tube 7 Consolidation area | region 8 Flexible injection | pouring thin tube 9 Discharge port
10 Flexible core
11 Bag packer
12 Seal
13 hole wall
14 Injection machine
15 Winder
16 bands
17 Drill head
18 Tapered tip
19 Packer
20 Flexible sheath
21 wall
22 Discharge port
23 Rubber sleeve
24 Packer
25 space
26 Boring head
27 induction antenna
28 Boring machine
29 Reach pit
30 Drilling track
31 Connection mine
32 Buck reamer
33 Swivel
34 Expander chuck
35 Start pit
36 Casing
37 Boring rod

Claims (12)

改良すべき地盤の近傍地表面からボーリングし、得られたボーリング孔中に可撓性注入細管を挿入し、この注入細管を通して地盤中に注入材を注入して該地盤を改良する地盤改良方法において、前記ボーリング孔は地盤の近傍地表面から該地盤中に屈曲して、または屈曲と直線を任意に組み合わせてボーリングすることにより得られ、、前記可撓性注入細管は可撓性結束注入細管であって、複数本の可撓性注入細管を、これらの吐出口が軸方向の異なる個所に位置するように結束して構成され、これら各吐出口を通して注入材を改良すべき地盤に注入することを特徴とする地盤改良方法。In the ground improvement method of boring from the ground surface near the ground to be improved, inserting a flexible injection capillary into the obtained borehole, and injecting an injection material into the ground through the injection capillary to improve the ground. The boring hole is obtained by boring into the ground from the ground surface near the ground or by arbitrarily combining bending and straight lines, and the flexible injection capillary is a flexible binding injection capillary. A plurality of flexible injection capillaries are configured so that these discharge ports are located at different locations in the axial direction, and the injection material is injected into the ground to be improved through these discharge ports. The ground improvement method characterized by this. 請求項1において、前記可撓性結束注入細管は複数本の可撓性注入細管に可撓性芯材を抱き合わせて結束する請求項1に記載の地盤改良方法。The ground improvement method according to claim 1, wherein the flexible bundling injection capillaries are bundled by tying a flexible core material to a plurality of flexible injection capillaries. 請求項1において、前記可撓性結束注入細管の複数の吐出口のうち、いずれかに袋パッカを被覆するようにした請求項1に記載の地盤改良方法。2. The ground improvement method according to claim 1, wherein a bag packer is covered on any one of the plurality of discharge ports of the flexible binding injection capillary tube. 請求項1において、前記可撓性結束注入細管とボーリング孔壁との隙間にシールを形成し、前記各吐出口を通して注入材を前記シールを破って地盤中に注入する請求項1に記載の地盤改良方法。2. The ground according to claim 1, wherein a seal is formed in a gap between the flexible bundling injection capillary and the borehole wall, and the injection material is injected into the ground through the discharge ports by breaking the seal. Improvement method. 請求項1において、前記ボーリングは誘導システムにより地盤中のボーリングヘッドを地上部から所定方向に誘導して行われる請求項1に記載の地盤改良方法。The ground improvement method according to claim 1, wherein the boring is performed by guiding a boring head in the ground from a ground portion in a predetermined direction by a guidance system. 改良すべき地盤の近傍地表面から地盤中に屈曲して、または屈曲と直線を任意に組み合わせて反対側の近傍地表面までボーリングし、その後、ボーリング孔に可撓性芯材の抱き込まれた可撓性結束注入細管を、その芯材部分をボーリング管のヘッドに引っかけて、かつボーリング孔中にシール材を填充しながら、さらに、ボーリング管を引き抜きながら引き込んで改良すべき地盤の所定位置に挿入し、可撓性結束細管の吐出口から注入材を前記シール材によるシールを破って注入することを特徴とする地盤改良方法。Bending from the ground surface near the ground to be improved into the ground, or boring to the ground surface on the opposite side by any combination of bending and straight lines, and then the flexible core material was held in the borehole Place the flexible bundling injection tubule on the head of the boring tube, fill the boring hole with a sealing material, and pull out the boring tube while pulling it out to a predetermined position on the ground to be improved. A ground improvement method comprising inserting and injecting an injection material from a discharge port of a flexible bundling tubule by breaking the seal by the sealing material. 請求項6において、シール材が掘削流体または固化性流体である請求項6に記載の地盤改良方法。The ground improvement method according to claim 6, wherein the sealing material is a drilling fluid or a solidifying fluid. 請求項6において、前記可撓性結束細管が複数の吐出口のうち、いずれかに袋パッカを被覆して構成され、該可撓性結束細管を改良すべき地盤の所定位置に挿入の後、該袋パッカに固結材を注入してパッカを形成し、その後、可撓性結束注入細管の吐出口から注入材を注入する請求項6に記載の地盤改良方法。In Claim 6, the flexible binding tubule is configured by covering a bag packer on any of the plurality of discharge ports, and after inserting the flexible binding tubule into a predetermined position of the ground to be improved, The ground improvement method according to claim 6, wherein a packing material is injected into the bag packer to form a packer, and then the injection material is injected from the discharge port of the flexible binding injection capillary tube. 改良すべき地盤の近傍地表面から地盤中に屈曲して、または屈曲と直線を任意に組み合わせて反対側の近傍地表面までボーリングし、次いで内部に可撓性結束細管の挿入された可撓性さや管をボーリングヘッドに連結して該さや管をボーリング孔中に引き込んだ後、ボーリング孔中にシール材を導入しながらさや管のみを引き抜いて可撓性結束注入細管を改良すべき所定の位置に配置し、可撓性結束注入細管の吐出口から注入材を前記シール材によるシールを破って注入することを特徴とする地盤改良方法。Bending from the ground surface near the ground to be improved into the ground, or any combination of bending and straight lines, boring to the near ground surface on the opposite side, and then flexible with flexible tubules inserted inside After the sheath tube is connected to the boring head and the sheath tube is drawn into the borehole, the sheath is introduced into the borehole and only the sheath tube is pulled out to improve the flexible binding injection tube. The ground improvement method characterized by arrange | positioning and inject | pouring an injection material from the discharge port of a flexible binding injection | pouring thin tube, breaking the seal | sticker by the said sealing material. 改良すべき地盤の近傍地表面から地盤中に屈曲して、または屈曲と直線を任意に組み合わせて反対側の近傍地表面までボーリングし、次いで、周壁に複数の吐出口を有する可撓性さや管をボーリングヘッドに連結し、該さや管とボーリング孔との間にシール材を導入しながらさや管をボーリング孔中に埋設の後、該さや管内に、複数の吐出口のうちの任意のいくつかが袋パッカで覆われた可撓性結束注入細管を、さや管の吐出口が可撓性結束細管の互いに隣接する袋パッカ間に位置するように挿入し、該袋パッカを膨脹させてパッカを形成した後に可撓性結束注入細管の吐出口を通して注入材を注入することを特徴とする地盤改良方法。A flexible sheath that has a plurality of outlets on the peripheral wall, bent from the ground surface near the ground to be improved, bent into the ground, or any combination of bending and straight lines to the opposite ground surface. The sheath tube is embedded in the borehole while introducing a sealant between the sheath tube and the borehole, and then, in the sheath tube, any of a plurality of discharge ports Insert the flexible binding injection tubule covered with the bag packer so that the outlet of the sheath tube is located between the adjacent bag packers of the flexible binding tubule, and expand the bag packer to remove the packer. A ground improvement method comprising injecting an injection material through a discharge port of a flexible bundle injection capillary after forming. 請求項10において、前記可撓性結束注入細管がすでに内蔵されている可撓性さや管をボーリングヘッドに連結してボーリング孔中に埋設するようにした請求項10に記載の地盤改良方法。The ground improvement method according to claim 10, wherein the flexible sheath or tube in which the flexible bundling injection tubule is already built is connected to a boring head and embedded in the boring hole. 請求項10において、さや管の複数の吐出口のうちのいくつかの吐出口を袋パッカで覆い、注入材を地盤に注入するに当たって、あらかじめ該袋パッカを膨脹させてパッカを形成させた後、これらの隣接するパッカ間に形成される空間を通してさや管の吐出口から注入材を地盤に注入する請求項10に記載の地盤改良方法。In claim 10, after covering some discharge ports of the plurality of discharge ports of the sheath tube with a bag packer and injecting the injection material into the ground, the bag packer is expanded in advance to form a packer. The ground improvement method of Claim 10 which inject | pours an injection material into a ground from the discharge port of a sheath pipe | tube through the space formed between these adjacent packers.
JP2002063169A 2002-03-08 2002-03-08 Ground improvement method Expired - Lifetime JP3755472B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002063169A JP3755472B2 (en) 2002-03-08 2002-03-08 Ground improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002063169A JP3755472B2 (en) 2002-03-08 2002-03-08 Ground improvement method

Publications (2)

Publication Number Publication Date
JP2003261934A JP2003261934A (en) 2003-09-19
JP3755472B2 true JP3755472B2 (en) 2006-03-15

Family

ID=29196576

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002063169A Expired - Lifetime JP3755472B2 (en) 2002-03-08 2002-03-08 Ground improvement method

Country Status (1)

Country Link
JP (1) JP3755472B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005248632A (en) * 2004-03-05 2005-09-15 Kanpai Co Ltd Liquid injection method, recharge method and chemical grouting method
JP4632905B2 (en) * 2005-08-31 2011-02-16 根本企画工業株式会社 Geothermal air conditioning system
JP5124334B2 (en) * 2008-04-01 2013-01-23 株式会社大林組 Ground reinforcement method, ground reinforcement structure

Also Published As

Publication number Publication date
JP2003261934A (en) 2003-09-19

Similar Documents

Publication Publication Date Title
RU2693805C2 (en) System (versions) and method for near-surface laying of underground cables or underground lines in ground
JP3755472B2 (en) Ground improvement method
JP3834571B2 (en) Construction method for underground structures
JP2005029964A (en) Work execution method for long face bolt
US20230220646A1 (en) Method and system of underground deployment of materials and equipment
JP3889750B2 (en) Face stabilization method in underground structure construction method
JP2005083002A (en) Ground grouting method and method of anchoring injection pipe to ground
JP7032242B2 (en) Inserting member for filling grout material used in micropile method and micropile method
JP4113305B2 (en) Ground obstruction removal method
JP4623482B2 (en) Solidification method using sleeve tube
JP2001182496A (en) Water leakage measure of tunnel
JP2006226058A (en) Grouting construction method and injection pipe device
CN115306300B (en) Horizontal long-distance obstacle removing device and omnibearing high-pressure injection grouting method
CN100491693C (en) Construction method for underground structure
JP3515046B2 (en) Ground reinforcement method
JP4414844B2 (en) Reinforcement method of natural ground
KR100668121B1 (en) Appratus and method for drive a earth-rod into the ground
JP3320669B2 (en) Non-cutting restoration method of service pipe at renewal of underground sewer
JP3923482B2 (en) Underground conduit construction method
JP3717228B2 (en) Protective method
JP2006200126A (en) Device for repairing connecting part of manhole peripheral wall and pipe and repairing construction method using the repairing device
JP2004183444A (en) Slope reinforcing method
JP4448405B2 (en) RC segment, check boring method and core boring method using this RC segment
JP5301316B2 (en) Water pipe pipe disposal method
KR101569870B1 (en) Apparatus for reinforcing and waterproof grouting of cip, and method for waterproof-reinforce grouting ground

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050714

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050726

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050913

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051115

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051212

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3755472

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100106

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313118

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130106

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140106

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term