JP3748615B2 - Construction method of cylindrical underground structure - Google Patents
Construction method of cylindrical underground structure Download PDFInfo
- Publication number
- JP3748615B2 JP3748615B2 JP07054196A JP7054196A JP3748615B2 JP 3748615 B2 JP3748615 B2 JP 3748615B2 JP 07054196 A JP07054196 A JP 07054196A JP 7054196 A JP7054196 A JP 7054196A JP 3748615 B2 JP3748615 B2 JP 3748615B2
- Authority
- JP
- Japan
- Prior art keywords
- cylindrical
- submerged
- underground structure
- box
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、円筒状地中構造物の構築方法に関し、特に、大規模かつ大深度の地中構造物を構築するための円筒状地中構造物の構築方法に関する。
【0002】
【従来の技術】
地下空間を有効利用するために、液化天然ガスや液化石油ガス等の貯蔵タンクや、深夜の余剰電力を圧縮空気として貯蔵するための圧気貯蔵タンク、あるいは下水処理施設、原子力施設等を地中に設けることを目的として、大規模空間を有する構造物を地中の深い位置に構築する工法が種々開発されている。
【0003】
そして、かかる大規模の地中構造物を構築するための工法として、例えば、地表面から地中の深部に至る地中連続壁を構築し、これを山留壁として内部を掘削した後に、この掘削形成された作業空間内において、地中構造物の本体部分を構築する方法が考えられる。また、かかる地中連続壁は、これを円筒状に構築することが、外周の地盤からの土圧を支持する上で有効な構造であることから、特に大深度の地中構造物を構築する際の地中連続壁としては、円筒状のものを構築するのが一般的である。
【0004】
一方、このような円筒状の地中連続壁を構築するには、短冊状あるいは円形の掘削断面形状を有する縦溝掘削機を用い、多数の縦溝を、円筒状の地中連続壁の周方向に沿ってリング状に連接させて掘削形成するとともに、各縦溝の内部に順次コンクリートを打設して連続一体化することによって円筒状の地中連続壁を形成する方法が一般的に採用されている。
【0005】
そして、このような縦溝を周方向にリング状に連接させて形成する工法では、隣接する各縦溝に打設されるコンクリート間の、鉛直方向の継目部分を精度良く施工する必要がある。
【0006】
【発明が解決しようとする課題】
しかしながら、特に大規模かつ大深度の地中連続壁を構築する場合には、縦溝掘削機による掘削延長が長くなるため、隣接する縦溝間の鉛直継目を精度良く施工することが困難で、継ぎ目部分に隙間が生じやすく、またかかる鉛直継目には、打設したコンクリートが硬化する際の水平方向の収縮によりクラックが発生しやすいという問題がある。
【0007】
したがって、構築された地中連続壁は、内部の掘削施工時に止水処理等を施す必要を生じるとともに、本体構造物とするには、気密性、水密性についての信頼性に欠けるため、地下タンク等の貯蔵空間として用いる場合には、別途内側に二次覆工等の構造物を構築する必要があった。
【0008】
また、内部に圧縮空気などの加圧物質を貯蔵する場合には、これらの高い内圧により円筒状の構造物に周方向の引張り荷重が負荷され、これによって継ぎ目部分が開いて貯蔵した加圧物質が外部に漏出することになるという課題があった。
【0009】
そこで、この発明は、これらの課題に着目してなされたもので、気密性、水密性に富んだ円筒状の地中構造物を、大深度の地中にも容易に構築設置することのできる円筒状地中構造物の構築方法を提供することを目的とするものである。
【0010】
また、この発明は、内部に加圧物質が貯蔵される場合でも、かかる圧力に抗して安定した状態で加圧物質を貯蔵することのできる構造物を得るための円筒状地中構造物の構築方法を提供することを目的とするものである。
【0011】
【課題を解決するための手段】
この発明は、上記の目的を達成するためになされたものであり、その要旨は、構築すべき大規模かつ大深度の円筒状地中構造物を収容し得る断面形状の水没立坑を所定の深度まで掘削形成する工程と、前記水没立坑の開口部に、円筒状の外型枠を上下方向にスライド可能、かつ吊り下げた状態に設置するとともに、該外型枠の下端部に底板を設置して、該底板の上部にコンクリートを打設することにより、底面が閉塞された円筒状の函体の底版コンクリートを形成する工程と、該底版コンクリートの上部に、前記外型枠の内周面に対向させて円筒状の内型枠を上下方向にスライド可能、かつ吊り下げた状態に設置するとともに、前記外型枠の内周面に沿って外側型膜を配置し、前記内型枠の外周面に沿って内側型膜を設置し、前記外型枠と前記内型枠との間にコンクリートを打設することにより、内外周部に前記内側型膜及び前記外側型膜が配置された函体の側壁部分を形成する工程と、前記外型枠及び前記内型枠を上下方向にスライドさせ、前記内側型膜及び前記外側型膜を継ぎ足しながら、前記外型枠と前記内型枠との間にコンクリートを打設し、前記函体の側壁部分を上方に順次継ぎ足して行く工程と、前記函体の内部に順次注水して、該函体を水没立坑内に徐々に沈設させてゆく工程とからなり、前記函体の側壁部分を順次継ぎ足す工程と、前記函体の内部に順次注水して該函体を水没立坑内に順次沈設させてゆく工程とを繰り返すことにより、前記水没立坑内に、内外周部に内側型膜及び外側型膜が配置された円筒状地中構造物を構築することを特徴とする円筒状地中構造物の構築方法にある。
【0012】
すなわち、水没立坑の開口部に設置した外型枠と内型枠とを上下方向にスライドさせながら、内側型膜及び外側型膜を順次上方に継ぎ足し、外型枠と内型枠との間にコンクリート順次打設し、函体の側壁部分を順次上方に継ぎ足す工程と、函体の内部に順次注水して、函体を水没立坑内に順次沈設させていく工程とを繰り返すことにより、水没立坑内に、内外周部に内側型膜及び外側型膜が配置された円筒状地中構造物を構築することができることになる。
【0014】
そして、この発明の円筒状地中構造物の構築方法によれば、水没立坑の底部に着底させた円筒状地中構造物と水没立坑の内壁面との間の水没外溝には重泥水を充填することが好ましい。
【0015】
また、前記水没外溝の下部には、前記重泥水の下方に介装するようにしてベントナイト層を設けることもできる。
【0016】
さらに、前記水没外溝の底部には、前記重泥水あるいはベントナイト層の下方に介装するようにして、コンクリートを圧入固化することによりコンクリート栓を形成することもできる。
【0017】
さらにまた、水没立坑の底部に着底させた円筒状地中構造物の底版部分に排水孔を設け、円筒状地中構造物の内部への地下水の流入を可能にすることもできる。
【0018】
また、この発明の円筒状地中構造物の構築方法は、前記構築すべき円筒状地中構造物を収容し得る断面形状の水没立坑を所定の深度まで掘削形成する工程の終了後に、形成された水没立坑に、これの内周面を覆う円筒状のケーシング膜を沈設設置する工程を含めることができる。
【0019】
そして、この発明の円筒状地中構造物の構築方法によれば、この円筒状地中構造物を構成する円筒状コンクリート函は、これの内部に注水しながら、リング状に連続一体化したドーナツ状のコンクリート構造物としての函壁を、順次上方に積み重ねるようにして打設形成してゆくことにより構築されるので、水没立坑の底部に着底した円筒状地中構造物には、鉛直方向の継目が介在しないことになる。
【0020】
なお、函壁を形成すべく、リング状に連続一体化した状態で、コンクリートを積み重ねるようにして上方に打設して行く際に生じる、水平方向の継目は、各継目毎に上端面のレイタンス等を除去しながらコンクリートを打設して行くことにより、あるいは、これのさらに上方に打設形成される函壁の重量で押圧されることにより、容易に密着性が保持されて、気密性、水密性を備えることになる。
【0021】
また、水没立坑の底部に着底させた円筒状地中構造物と水没立坑の内壁面との間の水没外溝に重泥水を充填することにより、重泥水による大きな重泥水圧によって円筒状地中構造物が内方に押圧され、構造物の周方向には圧縮力、すなわちプレストレスが付加されることになるので、これによって円筒状地中構造物は、内部に貯留した加圧物質の内圧にも耐え得る強固な構造となる。
【0022】
さらに、前記水没外溝の下部には、前記重泥水の下方に介装するようにしてベントナイト層を設けて、ベントナイトパッカーを形成すれば、これのゲル強度の発揮により、円筒状地中構造物の下部における側圧力を静水圧相当のものに維持することができる。
【0023】
一方、このようにして水没立坑内に沈設設置された円筒状地中構造物は、貯留物を貯留すべく内部に注水された水を排出すると、浮力によって浮き上がろうとすることになるが、前記水没外溝の底部に、重泥水やベントナイト層の下方に介装するようにして、コンクリートを圧入固化してコンクリート栓を形成しておくことにより、着底させた円筒状地中構造物の下方に水没立坑内の水や重泥水等が廻り込むのを防止して、円筒状地中構造物が浮力により浮上するのを容易に防止することができる。
【0024】
また、水没立坑の底部に着底させた円筒状地中構造物の底版部分に排水孔を設けて、この排水孔を介して円筒状地中構造物の内部に地下水の流入を可能にすることにより、地下水圧の逃げ道を確保することができるので、円筒状地中構造物が浮力により浮上するのを防止することができる。
【0025】
なお、前記構築すべき円筒状地中構造物を収容し得る断面形状の水没立坑を所定の深度まで掘削形成する工程の終了後に、形成された水没立坑には、これの内周面を覆う円筒状のケーシング膜を沈設設置しておけば、崩壊しやすい地盤に水没立坑を設ける場合や、水没立坑の周囲の地盤の地質が均一ではなく、崩壊し易い地盤を含む場合であっても、水没立坑の壁面を防護しつつかつ水没立坑内の泥水を周囲の地盤に散逸させることなく、容易に円筒状地中構造物の構築作業を行なうことができる。
【0026】
【発明の実施の形態】
次に、この発明の好ましい実施の形態すなわち一実施例を添付図面を参照しつつ詳細に説明する。図1〜図8に示すこの実施例にかかる円筒状地中構造物の構築方法は、例えば地中約200mから360m程度の深度に、夜間の余剰電力等を圧縮空気として貯蔵するための貯蔵空間51を有するとともに、上部に下水処理のための汚泥消化槽52を備えた、直径約11m程度の大きさの、いわゆる下水処理施設共用型のCAES(Compressed Air Energy Storage )タンク50を地中に形成するために採用されたものである(図10参照)。
【0027】
そして、この実施例の円筒状地中構造物の構築方法によれば、まず、図1に示すように、構築すべき直径約11m程度の大きさの円筒状の地中構造物20を収容し得る断面形状、すなわち直径約12m程度の円形断面で、地中約370m程度に至る深さまで、泥水等の充填水で満たされた水没立坑10を掘削形成する。なお、かかる掘削作業に先立って、水没立坑10の周囲の地盤には、これの開口部分の外側にこれの周囲を囲んで深さ50m程度の地中連続壁11を構築しておく。
【0028】
この掘削作業は、例えば図1に示す立坑掘削装置40を用いて行うことができ、これのグリッパ41を押しつけて水没立坑10の内壁面から掘削反力を取りながら、かつ水没立坑10に充填水を満たして壁面の崩壊を防止しながら、先端のカッタ装置42により底面の地盤を切削してゆくことにより、鉛直方向下方に向かって立坑10を容易に掘削形成して行くことができる。
【0029】
なお、かかる掘削作業は上記立坑掘削装置40の他、公知の種々の掘削機械を用いて行なうことができる他、水没立坑10の開口部分はその内壁面が地中連続壁11により覆われて防護されていることにより、開口部分の地盤の崩落を招くことなく、迅速に掘削作業その他の作業を行なうことができる。
【0030】
そして、水没立坑10の掘削作業が終了したら、次に、図2に示すように、例えば薄い鋼板や補強した合成樹脂幕等からなる、直径が約12mよりやや小さい円筒状のケーシング幕13を、水没立坑10の内壁面を覆って沈設設置するとともに、これの外側の水没立坑10の内壁面との隙間には、グラウトモルタル等の裏込材43を注入充填する作業を行なう。
【0031】
すなわち、このケーシング幕13は、後述するような、コンクリートを打設しつつ円筒状地中構造物20を構成する円筒状コンクリート函21を沈設する作業を行う際などにおいて、水没立坑10の内壁面を崩落させないように長期間にわたってこれを防護するとともに、水没立坑10内の充填水や、水没立坑10の底面に着底させた円筒状地中構造物20の外側の水没外溝30に重泥水33を充填する際に、これらの充填水や重泥水33が周囲の地盤中に散逸しないようにするものである。また、沈設設置したケーシング幕13の周囲への裏込材43の注入充填作業は、例えばケーシング幕13の沈設時にこれの外周に取り付けて沈降させたトレミ管等を介して容易に行なうことができる。
【0032】
なお、このケーシング幕13は、水没立坑10を設ける地盤が安定した地盤である場合や、充填水や重泥水33の散逸が生じないような地盤である場合には必ずしも設置する必要はない。
【0033】
このようにして、水没立坑10を掘削形成し、必要に応じてケーシング幕13を設置する作業が終了したら、次に、図3示すように、この水没立坑10の開口部に、円筒状地中構造物20の底版部分を構成する、底面が閉塞する円筒状の函体22を設置する作業を行う。そして、かかる函体22の製作作業は、例えば図4に示すような、以下の工程に従って行われる。
【0034】
すなわち、まず、ケーシング幕13の設置された水没立坑10の開口部内周面に沿って、上下方向にスライド可能なスライドフォームからなる二重構造の円筒状の外型枠15を、例えば地上に設けたクレーン等により支持させて設置するとともに、函体22を構築するための底面部分の型枠となる、例えば鋼板からなる床板16を、この外型枠15の内部を経て外型枠15の下端部に位置するように吊り下げ支持する作業を行なう((a)参照)。
【0035】
次に、設置した床板16の上方に、地上から水中コンクリートを投入打設して、函体22の床版コンクリート23を形成する作業を行う((b)参照)。
【0036】
床版コンクリート23を打設形成したら、当該床版コンクリート23をこれの天端面が外型枠15の下端部に位置するまで吊下げ下降するとともに、床版コンクリート23の上方に、函体22の側壁部分24を打継ぎ打設するための、外側型膜18や内側型膜19及び内型枠17の取付け作業を行なう((c)参照)。
【0037】
ここで、外側型膜18や内側型膜19は、例えばたわみ易くかつ所望の引張強度を有する炭素繊維からなる幕部材や、合成樹脂幕、薄い鋼鉄箔、形状記憶合金箔等によって円筒状に作成されるもので、床版コンクリート23に予め埋設設置した種々の取付部材を介して床版コンクリート23と一体となってこれの上方に延長設置され、順次上方に継ぎ足されるものである。なお、外側型膜18や内側型膜19は、床版コンクリート23を打設する際に、その下端部をコンクリート中に埋め込むことにより、床版コンクリート23と一体化することもできる。
【0038】
また、外側型膜18は、外型枠15の内周面に沿って配設されるとともに、内側型膜19は、内型枠17の外周面に沿って配設されることにより、外側型膜18と内側型膜19との間には、外型枠15と内型枠17とによって形成される所定の幅のリング状のコンクリートの打設空間が保持されることになる。
【0039】
さらに、内型枠17は、外型枠15と同様に、上下方向にスライド可能な二重構造のスライドフォームからなるもので、外型枠15との間に函体22の側壁部分24の肉厚分の間隔をおいて、当該外型枠15と同心状に、かつ例えば地上に設けたクレーン等により支持させた状態で設置されことになる。
【0040】
そして、外側型膜18や内側型膜19及び内型枠17の取付け作業が終了したら、外側型膜18や内側型膜19の間に形成されたリング状のコンクリート打設空間に、コンクリートを、鉛直継目を設けることなく周方向に一体となった状態で打設固化しながら((d)参照)、函体22の側壁部分24を上方に打ち継いで順次構築して行くとともに、床版コンクリート23を徐々に下降させて、例えば床版コンクリート23と側壁部分24とからなる函体22が浮遊する状態になるまで、側壁部分24を立ち上げる(図3参照)。
【0041】
なお、外型枠15と内型枠17が二重構造のスライドフォームとして構成されていることにより、図3に示すように、かかる側壁部分24の構築作業に際し、これらの型枠15、17を下方にスライドして打設した下段すなわち第1ロッドのコンクリートの養生を行ないつつ、型枠15、17の上部に上段すなわち第2ロッドの側壁部分24のコンクリートを打継ぐ作業を行なってゆくことができる。
【0042】
そして、このようにして、水没立坑10の開口部に、円筒状の函体22を、吊り下げた状態あるいは浮遊さた状態で設置したら、図5及び図6に示すように、外側型膜18及び内側型膜19を上方に順次継ぎ足し延長しつつ、外型枠15及び内型枠17の内部において、函体22の側壁部分24の上方に函壁コンクリート25を打設し養生しながら上方に打継いでゆく。また、かかる打継ぎ作業と併行して、構築された円筒状コンクリート函21を水没立坑10内に沈設してゆく作業を繰り返して行き、図7に示すように、最終的に、円筒状コンクリート函21を水没立坑10の底面に着底させる。なお、円筒状コンクリート函21を順次速やかに沈降させるためには、コンクリート函21にかかる浮力に抗すべく、コンクリート函21の内部に注水する。
【0043】
また、上記上方への打継ぎ作業において、円筒状コンクリート函21の函壁コンクリート25は、外型枠15と内型枠17の高さ等に応じて設定される所定のロッド長で、輪切り状に一体となって、鉛直継目を生じることなく順次上方に打継構築されるとともに、各ロッドを上方に打継ぐための水平継目は、各ロッドの上端面のレイタンス等を除去し、打継部分に差し筋を適宜施すこと等により、確実かつ精度良く施工することができる。
【0044】
なお、打継ぎ構築される函壁コンクリート25の内方に、内部構造としての例えばスラブコンクリート26等を構築形成する場合には、例えば外型枠15及び内型枠17の直下において、例えば函壁コンクリート25に打ち込んだアンカー等を介して型枠を設け、水没立坑10の開口部近傍において、その取り付けた型枠内に水中コンクリートを投入打設することにより、容易に構築することができる。
【0045】
また、上記外側型膜18及び内側型膜19は、気密性や耐腐食性あるいは耐微生物付着性等の処理をしたものを用いることが好ましい。
【0046】
円筒状の円筒状コンクリート函21を水没立坑10の底面に着底させて円筒状地中構造物20としたら、図8に示すように、円筒状コンクリート函21の外周面と水没立坑10の内壁面すなわちケーシング幕13との間に形成された水没外溝30内の充填水を重泥水33と置き換える作業を行なう。
【0047】
この作業を行なうには、まず水没外溝30に圧入管を挿入して水中コンクリートを圧入固化することにより、水没外溝30の底部にコンクリート栓31を形成する。
【0048】
また、コンクリート栓31の上方には、ベントナイト水を給送してベントナイト層を設けることにより、水没外溝30の下部にベントナイトパッカー32を形成する。
【0049】
そして、ベントナイトパッカー32の上方に重泥水33を給送して、水没外溝30の充填水を重泥水33を置き換える。
【0050】
ここで、重泥水33は、周辺地山の単位体積重量にほぼ等しいか、これより小さい比重を有する液体と定義され、常温あるいはタンク50内の貯蔵物質の温度領域で、流体としてのパスカルの原理に基づく物性を有するもので、好ましくは長期にわたり沈降しにくく腐敗しない安定した成分によって構成され、具体的には、例えば水、ベントナイト、合成した分散剤、重晶石微粉末等を配合して用いることができる。
【0051】
そして、この実施例では、より具体的には、表1に示す配合からなる、比重2.00のものを使用し、かかる重泥水33によって、円筒状地中構造物20にプレストレスを導入して当該円筒状地中構造物20を内部からの圧力に耐える強固な構造とする。
【0052】
【表1】
また、水没外溝30の底部に形成されたコンクリート栓31は、着底させた円筒状コンクリート函21の下方に水没立坑10内の充填水や重泥水33が廻り込むのを防止して、内部の注水を排出する際に、円筒状地中構造物20が浮力により浮上するのを防止する。
【0053】
さらに、ベントナイトを注入して水没外溝30の下部に形成されたベントナイトパッカー32は、これのゲル強度の発揮により、図9に示すように、連続地中壁の下部における側圧力を静水圧相当のものに維持する(図9(a)はベントナイトパッカーを形成しない場合、(b)はベントナイトパッカーを形成した場合のゲル圧の鉛直方向の変化状況を示すものである。)。
【0054】
さらにまた、水没立坑10の底部に着底させた、円筒状地中構造物20を構成する円筒状コンクリート函21の床版コンクリート23には、排水孔28を設け、円筒状コンクリート函21内への地下水の流入を可能にすることによっても、地下水圧の逃げ道を確保して円筒状地中構造物20が浮力により浮上するのを容易に防止することができる。
【0055】
なお、かかる排水孔28は、例えば、床版コンクリート23を打設形成する際に、開閉可能な水抜きパイプ等を埋め込んでおけば、円筒状コンクリート函21の着底後にこれを解放することによって容易に設けることができる。
【0056】
そして、水没外溝30を重泥水33で充填したら、円筒状地中構造物20の内部に投入した注水を送水管35を介して適宜排出するとともに、円筒状地中構造物20の上端外周に耐震用の支承版36を取り付ける作業等、その他の付属作業を行って、円筒状地中構造物20によって構成される、図10に示すような気密性に富んだCAESタンク50の構築作業が終了する。
【0057】
このようにして構築されたCAESタンク50は、夜間の余剰電力等を圧縮空気として貯蔵するための貯蔵空間51を有するとともに、上部に下水処理のための汚泥消化槽52を備え、夜間電力を有効利用しつつ下水の処理を行なう機能を備えるものである。
【0058】
なお、この実施例では、地中にCAESタンク50を構築する際にこの発明を適用する場合について記載したが、この発明は上記実施例の態様のものに限定されるものではなく、地下空間を設けるための種々の地中構造物を構築すべく採用することができる。
【0059】
【発明の効果】
以上詳細に説明したように、この発明の円筒状地中構造物の構築方法によれば、水没立坑の開口部に底面が閉塞された円筒状の函体を形成し、この函体の側壁部分を、外型枠と内型枠とを上下方向にスライドさせながら、内側型膜及び外側型膜を順次上方に継ぎ足し、外型枠と内型枠との間に順次コンクリートを打設することにより、上方に継ぎ足していく工程と、函体の内部に順次注水しながら、函体を水没立坑内に徐々に沈設させてゆく工程とを繰り返すことにより、水没立坑内に大規模、大深度の円筒状地中構造物を構築することができる。
従って、鉛直方向に継目が介するようなことがない気密性、水密性に優れた円筒状地中構造物を構築することができる。さらに、円筒状地中構造物の側壁部分の内周部及び外周部には全体に亘って内側型膜及び外側型膜が配置されることになるので、側壁部分の強度を高めることができる。
【0060】
また、水没立坑の底部に着底させた円筒状地中構造物と水没立坑の内壁面との間の水没外溝に重泥水を充填することにより、重泥水による大きな重泥水圧によって円筒状地中構造物が内方に押圧され、円筒状地中構造物の周方向に圧縮力、すなわちプレストレスを付加することができるので、円筒状地中構造物を、内部に貯留した加圧物質の内圧にも耐え得る強固な構造とすることができる。
【図面の簡単な説明】
【図1】水没立坑を、所定の深度まで掘削形成する工程を示す説明図である。
【図2】水没立坑内にケーシング幕を設置する状況を示す説明図である。
【図3】水没立坑の開口部に、筒状地中構造物の底版部分を構成する、底面が閉塞する円筒状の函体を設置する状況を示す説明図である。
【図4】(a)〜(d)は、水没立坑の開口部に函体を設置するための作業工程の一例を示す説明図である。
【図5】函体の側壁部分の上方に函壁を継ぎ足しながら、円筒状コンクリート函を水没立坑内に沈設してゆく工程を示す説明図である。
【図6】函体の側壁部分の上方に函壁を継ぎ足しながら、円筒状コンクリート函を水没立坑内に沈設してゆく工程を示す説明図である。
【図7】円筒状コンクリート函を水没立坑の底面に着底させた状況を示す説明図である。
【図8】着底させた円筒状コンクリート函と水没立坑の内壁面との間の水没外溝に重泥水が充填する状況を示す説明図である。
【図9】(a)及び(b)は、ベントナイトパッカーを形成しない場合と形成した場合のゲル圧の鉛直方向の変化状況を示すチャートである。
【図10】この発明の一実施例にかかる円筒状地中構造物の構築方法により形成されたCAESタンクの構成を示す説明図である。
【符号の説明】
10 水没立坑
11 地中連続壁
13 ケーシング幕
15 外型枠
16 床板
17 内型枠
18 外側型幕
19 内側型幕
20 円筒状地中構造物
21 円筒状コンクリート函
22 函体
23 床版コンクリート
24 側壁部分
25 函壁コンクリート
28 排水孔
30 水没外溝
31 コンクリート栓
32 ベントナイトパッカー
33 重泥水
40 立坑掘削装置
50 CAESタンク[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a cylindrical underground structure, and more particularly, to a method for constructing a cylindrical underground structure for constructing a large-scale and deep underground structure.
[0002]
[Prior art]
In order to make effective use of underground space, storage tanks for liquefied natural gas and liquefied petroleum gas, etc., pressurized air storage tanks for storing midnight surplus power as compressed air, sewage treatment facilities, nuclear facilities, etc. For the purpose of providing, various construction methods for constructing a structure having a large-scale space in a deep position in the ground have been developed.
[0003]
And as a construction method for constructing such a large underground structure, for example, after constructing an underground continuous wall from the ground surface to the deep part of the ground, and excavating the interior as a mountain wall, A method for constructing the main body portion of the underground structure in the excavated work space can be considered. In addition, since this underground continuous wall is a structure that is effective in supporting the earth pressure from the outer ground, it is particularly effective to construct a cylindrical structure of this structure. It is common to construct a cylindrical wall as the underground continuous wall.
[0004]
On the other hand, in order to construct such a cylindrical underground continuous wall, a longitudinal groove excavator having a strip-like or circular excavation cross-sectional shape is used, and a large number of vertical grooves are arranged around the cylindrical underground continuous wall. In general, a method of forming a cylindrical underground continuous wall by continuously connecting and consolidating concrete inside each longitudinal groove while continuously excavating and forming in a ring shape along the direction Has been.
[0005]
And in the construction method in which such vertical grooves are connected in a ring shape in the circumferential direction, it is necessary to construct a vertical seam portion between concrete cast in adjacent vertical grooves with high accuracy.
[0006]
[Problems to be solved by the invention]
However, especially when building a large and deep underground continuous wall, the length of excavation by the longitudinal groove excavator becomes long, so it is difficult to construct a vertical seam between adjacent longitudinal grooves with high accuracy. There is a problem that a gap is likely to occur at the joint portion, and such a vertical joint has a problem that cracks are likely to occur due to horizontal contraction when the placed concrete hardens.
[0007]
Therefore, the built underground continuous wall needs to be water-stopped at the time of excavation inside, and since it is not reliable for airtightness and watertightness in order to make the main body structure, underground tank In the case of using as a storage space, etc., it was necessary to construct a structure such as a secondary lining separately inside.
[0008]
In addition, when storing pressurized substances such as compressed air inside, the high tensile pressure causes a circumferential tensile load to be applied to the cylindrical structure, thereby opening the seam and storing the pressurized substance. There was a problem that would be leaked to the outside.
[0009]
Therefore, the present invention has been made paying attention to these problems, and it is possible to easily construct and install a cylindrical underground structure rich in airtightness and watertightness even in deep underground. It aims at providing the construction method of a cylindrical underground structure.
[0010]
Further, the present invention provides a cylindrical underground structure for obtaining a structure capable of storing a pressurized material in a stable state against such pressure even when the pressurized material is stored therein. The purpose is to provide a construction method.
[0011]
[Means for Solving the Problems]
The present invention has been made in order to achieve the above object, and the gist thereof is that a submerged shaft having a cross-sectional shape capable of accommodating a large-scale and deep cylindrical underground structure to be constructed has a predetermined depth. A cylindrical outer formwork is slidable in the vertical direction at the opening of the submerged shaft and installed in a suspended state, and a bottom plate is installed at the lower end of the outer formwork Then, by placing concrete on the top of the bottom plate, a step of forming the bottom slab concrete of the cylindrical box with the bottom closed, and on the inner peripheral surface of the outer mold frame on the top of the bottom slab concrete The cylindrical inner mold is opposed to be slidable in the vertical direction, and is installed in a suspended state, and an outer mold film is disposed along the inner circumferential surface of the outer mold, and the outer circumference of the inner mold is Install the inner mold membrane along the surface, By pouring concrete between the inner mold, a step of forming a side wall of the inner membrane and a box body, wherein the outer membrane is disposed on the inner peripheral portion, the outer frame and in the Slide the mold up and down, and while adding the inner mold film and the outer mold film, put concrete between the outer mold frame and the inner mold frame, the side wall portion of the box upward A step of sequentially adding water , a step of sequentially pouring water into the box, and gradually sinking the box into a submerged shaft, a step of sequentially adding side walls of the box, The inner mold film and the outer mold film are arranged on the inner and outer peripheral portions in the submerged shaft by repeating the process of sequentially injecting water into the box and sequentially depositing the box in the submerged shaft. cylindrical underground structure, characterized in that to construct a cylindrical underground structure A strategy for a thing.
[0012]
That is, while sliding the outer mold frame and the inner mold frame installed in the opening of the submerged shaft in the vertical direction, the inner mold film and the outer mold film are sequentially added upward, and between the outer mold frame and the inner mold frame. Submerged by repeating the steps of placing concrete sequentially, adding the side walls of the box sequentially upward, and sequentially pouring water into the box and then sinking the box into the submerged shaft. A cylindrical underground structure in which the inner die membrane and the outer die membrane are disposed on the inner and outer peripheral portions can be constructed in the shaft .
[0014]
According to the construction method of the cylindrical underground structure of the present invention, heavy mud water is placed in the submerged outer groove between the cylindrical underground structure grounded at the bottom of the submerged shaft and the inner wall surface of the submerged shaft. Is preferably filled.
[0015]
Further, a bentonite layer can be provided below the submerged outer groove so as to be interposed below the heavy mud water.
[0016]
Further, a concrete plug can be formed at the bottom of the submerged outer groove by pressing and solidifying the concrete so as to be interposed below the heavy mud water or the bentonite layer.
[0017]
Furthermore, it is also possible to allow the inflow of groundwater into the interior of the bottom plate portion provided drainage holes, cylindrical underground structure of the cylindrical underground structure was bottom landing to the bottom of the submerged pit.
[0018]
Also, the construction method of the cylindrical underground structure of the present invention is formed after the end of the step of excavating and forming the water submerged shaft having a cross-sectional shape capable of accommodating the cylindrical underground structure to be constructed to a predetermined depth. The submerged shaft can include a step of installing a cylindrical casing film covering the inner peripheral surface thereof.
[0019]
And according to the construction method of the cylindrical underground structure of the present invention, the cylindrical concrete box constituting the cylindrical underground structure is a donut that is continuously integrated into a ring shape while pouring water into the inside thereof. As the concrete walls are constructed by laying up and forming the walls as if they were stacked one after the other, the cylindrical underground structure landing on the bottom of the submerged shaft is No joints will be present.
[0020]
In order to form a box wall, the horizontal seam generated when the concrete is piled upward in a state of continuous integration in a ring shape is the latency of the upper end surface for each seam. Adhesion is easily maintained by placing the concrete while removing etc., or by being pressed by the weight of the box that is formed further above this, airtightness, It will be watertight.
[0021]
In addition, by filling heavy submersible water in the outer submerged groove between the cylindrical underground structure landing on the bottom of the submerged shaft and the inner wall surface of the submerged shaft, the cylindrical ground is generated by the heavy heavy mud pressure from the heavy mud. The intermediate structure is pressed inward, and a compressive force, that is, prestress, is applied in the circumferential direction of the structure, so that the cylindrical underground structure is made of the pressurized material stored inside. It has a strong structure that can withstand internal pressure.
[0022]
Furthermore, if a bentonite layer is provided at the lower part of the submerged outer groove so as to intervene below the heavy mud water, and a bentonite packer is formed, the gel underground structure exhibits a cylindrical structure. The side pressure at the lower part of can be maintained at a level equivalent to hydrostatic pressure.
[0023]
On the other hand, the cylindrical underground structure installed and submerged in the submerged shaft in this way, when draining the water injected inside to store the stored matter, it will try to float by buoyancy, The bottom of the submerged outer groove is interposed below heavy mud water or bentonite layer, and concrete is pressed and solidified to form a concrete plug, thereby forming a bottomed cylindrical underground structure. It is possible to prevent water in the submerged vertical shaft, heavy mud water, and the like from moving downward, and to easily prevent the cylindrical underground structure from rising due to buoyancy.
[0024]
In addition, a drainage hole should be provided in the bottom slab part of the cylindrical underground structure that is attached to the bottom of the submerged shaft, and groundwater can flow into the cylindrical underground structure through this drainage hole. Thus, a groundwater pressure escape path can be ensured, so that the cylindrical underground structure can be prevented from rising due to buoyancy.
[0025]
In addition, after completion | finish of the process which excavates and forms the water-immersed shaft of the cross-sectional shape which can accommodate the said cylindrical underground structure which should be constructed | assembled to the predetermined depth, the formed water-immersed shaft has a cylinder covering the inner peripheral surface thereof. If a submerged casing membrane is installed, the submerged shaft will be submerged even if a submerged shaft is provided on the ground that is prone to collapse, or even if the geology of the ground around the submerged shaft is not uniform and includes a ground that tends to collapse. The construction work of the cylindrical underground structure can be easily performed while protecting the wall surface of the shaft and without dissipating the muddy water in the submerged shaft to the surrounding ground.
[0026]
DETAILED DESCRIPTION OF THE INVENTION
Next, a preferred embodiment of the present invention, that is, an example, will be described in detail with reference to the accompanying drawings. The construction method of the cylindrical underground structure according to this embodiment shown in FIGS. 1 to 8 is a storage space for storing, for example, surplus power at night as compressed air at a depth of about 200 m to 360 m in the ground. 51 and a
[0027]
And according to the construction method of the cylindrical underground structure of this embodiment, first, as shown in FIG. 1, a cylindrical
[0028]
This excavation work can be performed using, for example, the
[0029]
Such excavation work can be performed by using various well-known excavating machines in addition to the above-mentioned
[0030]
Then, when the excavation work of the submerged
[0031]
That is, the
[0032]
The
[0033]
When the operation of excavating and forming the submerged
[0034]
That is, first, a double-structured cylindrical
[0035]
Next, the work of forming the
[0036]
When the
[0037]
Here, the
[0038]
The
[0039]
Further, like the
[0040]
When the
[0041]
In addition, since the
[0042]
Then, when the
[0043]
Further, in the above-described upward joining operation, the
[0044]
In addition, when, for example,
[0045]
Moreover, it is preferable to use the
[0046]
If the cylindrical cylindrical
[0047]
In order to perform this operation, first, a
[0048]
Also,
[0049]
Then, the
[0050]
Here, the
[0051]
In this embodiment, more specifically, a material having a specific gravity of 2.00 having the composition shown in Table 1 is used, and prestress is introduced into the cylindrical
[0052]
[Table 1]
Moreover, the
[0053]
Further, the
[0054]
Furthermore, a
[0055]
For example, when the
[0056]
When the submerged
[0057]
The
[0058]
In this embodiment, the case where the present invention is applied when the
[0059]
【The invention's effect】
As described in detail above, according to the method for constructing a cylindrical underground structure of the present invention, a cylindrical box having a bottom closed at the opening of a submerged shaft is formed, and a side wall portion of the box is formed. By sliding the outer mold frame and the inner mold frame in the vertical direction, the inner mold film and the outer mold film are sequentially added upward, and concrete is sequentially placed between the outer mold frame and the inner mold frame. A large-scale, deep cylinder inside the submerged shaft is repeated by repeating the process of adding upward and the step of gradually sinking the box into the submerged shaft while sequentially pouring water into the box. The underground structure can be constructed.
Therefore, it is possible to construct a cylindrical underground structure having excellent airtightness and watertightness that does not involve a seam in the vertical direction. Furthermore, since the inner mold membrane and the outer mold membrane are disposed over the entire inner circumference and outer circumference of the side wall portion of the cylindrical underground structure, the strength of the side wall portion can be increased.
[0060]
In addition, by filling heavy submersible water in the outer submerged groove between the cylindrical underground structure landing on the bottom of the submerged shaft and the inner wall surface of the submerged shaft, the cylindrical ground is generated by the heavy heavy mud pressure from the heavy mud. medium structure is pressed inward, compressive force in the circumferential direction of the cylindrical underground structure, i.e. as it can be added to prestress, cylindrical underground structure, and stored inside the pressurized substance it can be a rigid structure that can withstand the internal pressure.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing a process of excavating and forming a submerged vertical shaft to a predetermined depth.
FIG. 2 is an explanatory view showing a situation in which a casing curtain is installed in a submerged vertical shaft.
FIG. 3 is an explanatory diagram showing a situation in which a cylindrical box having a closed bottom surface, which constitutes a bottom plate portion of a cylindrical underground structure, is installed at an opening of a water submerged shaft.
FIGS. 4A to 4D are explanatory views showing an example of a work process for installing a box at the opening of a submerged shaft. FIG.
FIG. 5 is an explanatory view showing a process of sinking a cylindrical concrete box in a submerged shaft while adding the box wall above the side wall portion of the box.
FIG. 6 is an explanatory view showing a process of sinking a cylindrical concrete box in a submerged shaft while adding the box wall above the side wall portion of the box.
FIG. 7 is an explanatory view showing a situation in which a cylindrical concrete box is attached to the bottom surface of a submerged shaft.
FIG. 8 is an explanatory view showing a situation in which heavy muddy water is filled in a submerged outer groove between a bottomed cylindrical concrete box and an inner wall surface of a submerged vertical shaft.
FIGS. 9A and 9B are charts showing changes in the gel pressure in the vertical direction when the bentonite packer is not formed and when the bentonite packer is formed. FIGS.
FIG. 10 is an explanatory diagram showing a configuration of a CAES tank formed by a cylindrical underground structure building method according to an embodiment of the present invention.
[Explanation of symbols]
DESCRIPTION OF
Claims (6)
前記水没立坑の開口部に、円筒状の外型枠を上下方向にスライド可能、かつ吊り下げた状態に設置するとともに、該外型枠の下端部に底板を設置して、該底板の上部にコンクリートを打設することにより、底面が閉塞された円筒状の函体の底版コンクリートを形成する工程と、
該底版コンクリートの上部に、前記外型枠の内周面に対向させて円筒状の内型枠を上下方向にスライド可能、かつ吊り下げた状態に設置するとともに、前記外型枠の内周面に沿って外側型膜を配置し、前記内型枠の外周面に沿って内側型膜を設置し、前記外型枠と前記内型枠との間にコンクリートを打設することにより、内外周部に前記内側型膜及び前記外側型膜が配置された函体の側壁部分を形成する工程と、
前記外型枠及び前記内型枠を上下方向にスライドさせ、前記内側型膜及び前記外側型膜を継ぎ足しながら、前記外型枠と前記内型枠との間にコンクリートを打設し、前記函体の側壁部分を上方に順次継ぎ足して行く工程と、
前記函体の内部に順次注水して、該函体を水没立坑内に徐々に沈設させてゆく工程とからなり、
前記函体の側壁部分を順次継ぎ足す工程と、前記函体の内部に順次注水して該函体を水没立坑内に順次沈設させてゆく工程とを繰り返すことにより、
前記水没立坑内に、内外周部に内側型膜及び外側型膜が配置された円筒状地中構造物を構築することを特徴とする円筒状地中構造物の構築方法。A step of excavating and forming a submersible shaft having a cross-sectional shape capable of accommodating a large-scale and deep cylindrical underground structure to be constructed;
At the opening of the submerged shaft, a cylindrical outer mold is slidable in the vertical direction and installed in a suspended state, and a bottom plate is installed at the lower end of the outer mold, A step of forming a bottom slab concrete of a cylindrical box with a closed bottom by placing concrete ;
At the top of the bottom slab concrete, the cylindrical inner mold frame is slidable in the vertical direction so as to face the inner peripheral surface of the outer mold frame, and is installed in a suspended state, and the inner peripheral surface of the outer mold frame The outer mold membrane is arranged along the outer mold surface, the inner mold membrane is installed along the outer circumferential surface of the inner mold frame, and the concrete is placed between the outer mold frame and the inner mold frame, whereby the inner and outer circumferences are arranged. Forming a side wall portion of the box in which the inner mold film and the outer mold film are arranged in a part ;
The outer mold frame and the inner mold frame are slid vertically, and concrete is placed between the outer mold frame and the inner mold frame while adding the inner mold film and the outer mold film, and the box A process of sequentially adding the side wall portion of the body upward ,
Water is sequentially poured into the box, and the box is gradually submerged in a submerged shaft .
By repeating the step of sequentially adding the side wall portion of the box, and the step of sequentially pouring water into the box and sequentially sinking the box in a submerged shaft ,
A method for constructing a cylindrical underground structure, comprising constructing a cylindrical underground structure in which an inner mold membrane and an outer mold membrane are arranged on the inner and outer peripheries in the submerged shaft .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07054196A JP3748615B2 (en) | 1996-03-26 | 1996-03-26 | Construction method of cylindrical underground structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07054196A JP3748615B2 (en) | 1996-03-26 | 1996-03-26 | Construction method of cylindrical underground structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH09256399A JPH09256399A (en) | 1997-09-30 |
JP3748615B2 true JP3748615B2 (en) | 2006-02-22 |
Family
ID=13434491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP07054196A Expired - Fee Related JP3748615B2 (en) | 1996-03-26 | 1996-03-26 | Construction method of cylindrical underground structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3748615B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853622A (en) * | 2019-02-28 | 2019-06-07 | 吉林建筑大学 | A kind of assembly concrete dry type rural toilet and its method of construction |
CN113882862B (en) * | 2021-11-15 | 2024-04-16 | 中煤第一建设有限公司 | High strength tunnel ventilation shaft pit shaft structure |
-
1996
- 1996-03-26 JP JP07054196A patent/JP3748615B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH09256399A (en) | 1997-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912045B (en) | Pier constitution water bottom is fixed to use hollow cylinder pier and its construction method of installation | |
JPS6122698B2 (en) | ||
CN104762942B (en) | Fixed platform soft soil foundation seabed, aquatic building ocean fixed installation construction method | |
WO2016109962A1 (en) | Construction method for fixing offshore marine platform to a seabed having layers of a soil/clay nature | |
JP3748615B2 (en) | Construction method of cylindrical underground structure | |
JP3107458B2 (en) | Confirmation and increase method of bearing capacity of cast-in-place pile | |
JP4311676B2 (en) | Construction method using casing | |
JP4868365B2 (en) | Ground vibration propagation suppression structure | |
JP4449532B2 (en) | Rapid construction method of shaft by convex joint of deep bottom shaft | |
JP2726611B2 (en) | How to set up an open caisson | |
JP4066340B2 (en) | Ground improvement method | |
JP3881961B2 (en) | Pile embedding method and excavator used for the method | |
JP2740842B2 (en) | Method of storing high pressure gas in rock and rock tank for storing high pressure gas | |
JP2576945B2 (en) | Construction method of manhole combined sinking pit and cutting edge to promote sinking | |
JP2004238993A (en) | Impervious structure of revetment, and construction method for revetment | |
JP2005009235A (en) | Method for constructing underwater tunnel | |
CN216973476U (en) | Gravity type fan foundation that caisson and steel-pipe pile combine | |
JPH0323689B2 (en) | ||
JP4778460B2 (en) | Steel plate cell installation method and structure | |
JP2581602B2 (en) | Waste treatment method | |
JPS6352193B2 (en) | ||
JP2006183276A (en) | Vertical shaft structure and its construction method | |
JP3595906B6 (en) | Buoyancy adjustment device and method of using the same | |
JPH07252854A (en) | Construction method for underground structure | |
JP2612669B2 (en) | Underground tank construction method and underground tank constructed thereby |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050530 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050607 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050808 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20050901 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20050901 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051101 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051129 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081209 Year of fee payment: 3 |
|
R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081209 Year of fee payment: 3 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081209 Year of fee payment: 3 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091209 Year of fee payment: 4 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091209 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101209 Year of fee payment: 5 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101209 Year of fee payment: 5 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111209 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |