JP3731119B2 - Facility device management system schedule display method and facility device management system - Google Patents

Facility device management system schedule display method and facility device management system Download PDF

Info

Publication number
JP3731119B2
JP3731119B2 JP2002105303A JP2002105303A JP3731119B2 JP 3731119 B2 JP3731119 B2 JP 3731119B2 JP 2002105303 A JP2002105303 A JP 2002105303A JP 2002105303 A JP2002105303 A JP 2002105303A JP 3731119 B2 JP3731119 B2 JP 3731119B2
Authority
JP
Japan
Prior art keywords
schedule
equipment
user
setting
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002105303A
Other languages
Japanese (ja)
Other versions
JP2003303012A (en
Inventor
雅也 小西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2002105303A priority Critical patent/JP3731119B2/en
Publication of JP2003303012A publication Critical patent/JP2003303012A/en
Application granted granted Critical
Publication of JP3731119B2 publication Critical patent/JP3731119B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、スケジュール表示方法、特に複数の設備機器の管理を行う設備機器管理システムにおけるスケジュール表示方法に関する。
【0002】
【従来の技術】
複数の設備機器の管理を行う設備機器管理システムにおいて、設備機器の動作スケジュールを設定して管理を行うことができるシステムがある。動作スケジュールは、一般に、設備機器の名称と、動作の時刻と、動作の内容とを含んでいる。このような動作スケジュールを設定して管理を行うことができる設備機器管理システムでは、設定された動作スケジュールを表示画面を介して表示させている。スケジュール表示方法としては、設定された動作スケジュールの時刻に対応する表示画面の一部に対して、動作スケジュールの動作の内容に対して決められている色を表示する事により、動作スケジュールを表示する方法がある。
【0003】
【発明が解決しようとする課題】
この従来のスケジュール表示方法では、同じ時間帯に2以上の設備機器の動作スケジュールが重なっている場合、動作スケジュールが重なっていることを示す色がその時間帯を示す表示画面の一部に表示される。このため、同じ時間帯に2以上の動作スケジュールが設定されている場合には、ユーザは、表示画面を一見しただけではその動作スケジュールの動作の内容を全く知ることができない。例えば、同じ時間帯に同じ動作の内容で2以上の設備機器の動作スケジュールが重なっていても、動作スケジュールが重なっていることを示す色が表示される。その結果、ユーザは、動作スケジュールの設定作業等において、動作スケジュールに設定されている動作の内容を確認するためには、その動作スケジュールに関しての詳細な設定等を参照する必要がある。このため、ユーザの負担が大きくなっている。
【0004】
そこで、本発明においては、設備機器管理システムにおいて設定された動作スケジュールの確認に際して、ユーザの負担を軽減するスケジュール表示方法および設備機器管理システムを提供することを課題とする。
【0005】
【課題を解決するための手段】
請求項1にかかるスケジュール表示方法は、複数の設備機器の管理を行う設備機器管理システムにおいて、表示画面を介して複数の設備機器の動作スケジュールを同時表示させるスケジュール表示方法であって、第1ステップと、第2ステップと、第3ステップとを備えている。第1ステップは、同じ時間に2以上の設備機器の動作スケジュールが重なっていない場合に、その時間に対応する表示画面の一部に対して、動作対応標示によって動作スケジュールを表示させる。動作対応標示とは、例えば、動作スケジュールの動作の内容に対して決められている色、文字あるいは記号などである。第2ステップは、同じ時間に2以上の設備機器の動作スケジュールが重なっている場合に、それぞれの動作スケジュールの動作の内容が異なる種類のものであるときに、その時間に対応する表示画面の一部に対して、異種類動作重複標示によって動作スケジュールを表示させる。異種類動作重複標示とは、例えば、異なる種類の動作の内容を持つ2以上の動作スケジュールが重なっていることを識別するための色、文字あるいは記号などである。第3ステップは、同じ時間に2以上の設備機器の動作スケジュールが重なっている場合に、それぞれの動作スケジュールの動作の内容が同じ種類のものであるときに、その時間に対応する表示画面の一部に対して、動作対応標示によって動作スケジュールを表示させる。
【0006】
このスケジュール表示方法を用いる事で、同じ動作の内容を持つ複数の動作スケジュールが同じ時間帯に設定されている場合、ユーザは、表示画面を一見して、設定されている動作スケジュールの動作の内容を知る事ができる。これにより、ユーザは、設定されている動作スケジュールの動作の内容を知るために動作スケジュールの詳細な設定等を参照する必要がなくなる。その結果、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止することにもつながる。
【0007】
請求項2に記載のスケジュール表示方法は、請求項1に記載のスケジュール表示方法であって、さらに第4ステップを備えている。第4ステップは、曜日あるいは所定の単位に分けて管理された複数の設備機器の動作スケジュールを、その曜日あるいはその所定の単位に対応する表示画面の一部に対して表示させる。
このスケジュール表示方法を用いる事で、例えば、曜日等に分けて設定された動作スケジュールを、一覧として表示する事ができる。そのため、ユーザは、他の日に設定されている動作スケジュールと比較しながら、動作スケジュールの確認をする事ができる。これにより、数日にわたり同じ時間帯に同じ動作の内容を持つ動作スケジュールを設定するような場合に、ユーザが動作の内容を誤って設定していたとしても、表示画面を一見して誤りに気づくことができる。これにより、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止することにもつながる。
【0008】
請求項3に記載の設備機器管理システムは、情報端末と、制御装置とを備えている。情報端末は、請求項1又は2に記載のスケジュール表示方法により複数の設備機器の動作スケジュールを表示画面に表示させるコンピュータプログラムを有している。制御装置は、情報端末において設定された動作スケジュールにしたがって複数の設備機器の動作制御を行う。
【0009】
この設備機器管理システムにより、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止する効果にもつながり、安定的な設備管理を実現する事ができる。
【0010】
【発明の実施の形態】
〈システムの構成〉
本発明の一実施形態にかかる設備機器管理システムを、図1に示す。この設備機器管理システムは、ビル等に設置される複数の設備機器3の監視・制御をするシステムであり、それぞれの設備機器3の状態監視、発停制御、動作設定等をシステムのユーザからの要求によりあるいは動作スケジュール等により実行するシステムである。システムは、情報端末1と、情報端末1に接続されるステーション2と、ステーション2に接続される複数の設備機器3とから構成される。
【0011】
情報端末1は、本発明のスケジュール表示ルーチン12により設備機器3の動作スケジュールを表示させる画面表示プログラム11を有している。情報端末1は、ステーション2に対して設備機器3の制御の要求をしたり、ステーション2の有する監視制御プログラム21を設定したりする。また、画面表示プログラム11により、情報端末1は、ステーション2から得た設備機器3の監視・制御の結果の表示やステーション2の有する監視制御プログラム21の設定状態の表示をする。ここで、情報端末1とは、例えばコンピュータ、携帯コンピュータ、パネルコンピュータ等である。
【0012】
ステーション2は、複数の設備機器3を監視・制御する監視制御プログラム21を有しており、それぞれの設備機器3の状態監視、発停制御、動作設定等を情報端末1からの要求によりあるいは動作スケジュール等にしたがって自動的に実行する。また、その監視・制御の結果を情報端末1に通知する。
設備機器3は、例えば、空調設備、電気設備、照明設備、あるいは防災・防犯設備などに備えられる機器である。具体的には、例えば、空気調和機の室内機、空気調和機の室外機、換気装置、電気機器、照明機器あるいは電気・ガス・水道などの使用量測定装置などである。
【0013】
〈動作スケジュールの設定〉
ユーザは、情報端末1からこの設備機器管理システムに接続される設備機器3の一例である空気調和機の室内機31等に対して動作スケジュールを設定し、所望の時刻に所望の動作の内容で室内機31等を動作させることができる。図2、図3および図4は、室内機31等の動作スケジュールの設定時に情報端末1に表示される画面である。
【0014】
〈メイン画面5の構成〉
図2は、動作スケジュールの設定のメイン画面5である。メイン画面5は、スケジュールプログラム一覧51と、編集ボタン一覧52と、有効無効選択ボタン53とから構成されている。スケジュールプログラム一覧51は、この設備機器管理システムに登録されているスケジュールプログラムを表示している。スケジュールプログラムとは、カレンダーデータと曜日等に分けて設定された室内機31等の動作スケジュールとを関連づけているプログラムである。この設備機器管理システムでは、複数のスケジュールプログラムを有することができる。編集ボタン一覧52は、スケジュールプログラムの作成や削除等の編集動作を行うボタンである。有効無効選択ボタン53は、登録したスケジュールプログラムを有効にしておくか無効にしておくかを選択するボタンである。スケジュールプログラムの編集の際には、スケジュールプログラムを無効にしてから編集する。
【0015】
スケジュールプログラム一覧51より編集するプログラムを選択し、編集ボタン一覧52から編集項目を選択すると、図3に示すスケジュール表示画面6が開かれる。
〈スケジュール表示画面6の構成〉
スケジュール表示画面6は、週間スケジュール表示部61と、カレンダー表示部62と、画面遷移ボタン63とから構成されている。週間スケジュール表示部61は、平日、休日および特日に分けて設定された室内機31等の動作スケジュールを表示している。ここで、平日とは、休日および特日として設定された日以外の日であり、7曜に分かれている(図3参照)。休日とは、例えば、国民の祝日等といった日である。また、特日とは、ユーザが特別に設定する日等である。週間スケジュール表示部では、1日を15分毎の時間帯に区分し、それぞれの時間帯に設定された動作スケジュールがあれば、その時間帯に対応する部分に、設定された動作の内容を示す色を表示して、動作スケジュールを表示する。動作の内容と色との対照表61aは、週間スケジュール表示部61において表示されている。カレンダー表示部62では、ユーザは平日、休日および特日をカレンダー上に設定できる。この設定により、スケジュールプログラムは、平日、休日および特日の別を判断して、その日に動作させるべき動作スケジュールを判断する。画面遷移ボタン63は、OKボタンとキャンセルボタンとを有する。OKボタンが押下されると、スケジュール表示画面6で行われた設定変更を保持してメイン画面5に遷移する。キャンセルボタンが押下されると、スケジュール表示画面6で行われた設定変更を破棄してメイン画面5に遷移する。
【0016】
平日、休日あるいは特日の動作スケジュールを設定あるいは変更する際には、ユーザは、週間スケジュール表示部61にて動作スケジュールを設定あるいは変更する日を選択し、図4に示すスケジュール設定画面7を表示させる。ユーザは、そのスケジュール設定画面7上にて動作スケジュールの設定あるいは変更を行う。
【0017】
〈スケジュール設定画面7の構成〉
スケジュール設定画面7は、設備機器選択部71と、動作スケジュール一覧72と、時刻設定部73と、アクション設定部74と、画面遷移ボタン75とから構成される。設備機器選択部71は、設備機器管理システムに接続されている設備機器3の室内機31等のリストや数台の室内機31等からなるグループのリストを表示している。動作スケジュール一覧72は、このスケジュールプログラムに設定されている動作スケジュールを表示している。一つの動作スケジュールは、時刻と、室内機31等の名称と、動作の内容とを含んでいる。時刻設定部73は、動作スケジュール設定の際に、動作スケジュールの時刻を設定させる部分である。動作スケジュール一覧72で動作スケジュールが選択されると、その動作スケジュールに設定されている時刻が時刻設定部73に表示される。ユーザは、その表示された時刻を時刻設定部73の上下ボタンにて変更することができる。アクション設定部74は、動作スケジュール設定の際に、動作スケジュールの動作の内容を設定させる部分である。動作スケジュール一覧72で動作スケジュールが選択されると、その動作スケジュールに設定されている動作の内容がアクション設定部74に表示される。ユーザは、その表示された動作の内容をアクション設定部74のチェックボタンにて変更することができる。ユーザが設定できる室内機31等の動作の内容には、例えば、室内機31等の運転・停止等の発停動作の設定、送風・冷房・暖房等の運転モードの設定、運転温度の設定等がある。さらに、電圧等の値を指定して動作を制御できる室内機31等に対しては、そのアナログ値を設定できる。また、リモコンを備える室内機31等に対しては、そのリモコンからの操作の許可・禁止を設定することができる。画面遷移ボタン75は、OKボタンとキャンセルボタンとを有する。OKボタンが押下されると、スケジュール設定画面7で行われた設定変更を保持してスケジュール表示画面6に遷移する。キャンセルボタンが押下されると、スケジュール設定画面7で行われた設定変更を破棄してスケジュール表示画面6に遷移する。
【0018】
〈スケジュール表示ルーチン12の作用〉
本発明のスケジュール表示ルーチン12は、画面表示プログラム11のルーチンの一つであり、スケジュール設定画面7で設定された動作スケジュールを、スケジュール表示画面6の週間スケジュール表示部61に一覧表示させる。このスケジュール表示ルーチン12の作用について具体例を用いて説明する。
【0019】
図4に示すスケジュール設定画面7は、あるスケジュールプログラムの日曜日に設定された動作スケジュールを表示している(図4参照)。ここで、動作スケジュール一覧72は、7つの動作スケジュールが設定されていることを示している。
動作スケジュール一覧72において、時刻[06時00分]には、[停止]という動作の内容で、1つの動作スケジュールが設定されている。これに対して、スケジュール表示ルーチン12は、週間スケジュール表示部61の日曜日の[06時00分]に対応する部分に、[停止]を示す色を配置する(図3の位置100a参照)ことで、この動作スケジュールを表示する。
【0020】
動作スケジュール一覧72において、時刻[08時00分]には、[運転]という同一の動作の内容で、3つの動作スケジュールが設定されている。これに対して、スケジュール表示ルーチン12は、週間スケジュール表示部61の日曜日の[08時00分]に対応する部分に、[運転]を示す色を配置する(図3の位置100b参照)ことで、この動作スケジュールを表示する。
【0021】
動作スケジュール一覧72において、時刻[20時00分]には、[送風]という動作の内容で、1つの動作スケジュールが設定されている。さらに、[停止]という動作の内容で、2つの動作スケジュールが設定されている。これに対して、スケジュール表示ルーチン12は、週間スケジュール表示部61の日曜日の[20時00分]に対応する部分に、動作が重複していることを示す色を配置する(図3の位置100c参照)ことで、この動作スケジュールを表示する。動作が重複していることを示す色とは、週間スケジュール表示部61の動作の内容と色との対照表61aにおいて、[混合]として示されている色のことである。
【0022】
〈スケジュール表示ルーチン12の効果〉
画面表示プログラム11にスケジュール表示ルーチン12を組み込んでいることで、同じ動作の内容を持つ複数の動作スケジュールが同じ時間帯に設定されている場合、ユーザは、スケジュール表示画面6を一見して、設定されている動作スケジュールの動作の内容を知る事ができる。これにより、ユーザは、設定されている動作スケジュールの動作の内容を知るために、スケジュール設定画面7を開いて確認する必要がなくなる。その結果、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止することにもつながる。
【0023】
また、このスケジュール表示ルーチン12を用いることで、曜日等に分けて設定された動作スケジュールを一覧として表示する事ができる。そのため、ユーザは、他の日に設定されている動作スケジュールと比較しながら、動作スケジュールの確認をする事ができる。これにより、数日にわたり同じ時間帯に同じ動作の内容を持つ動作スケジュールを設定するような場合に、ユーザが動作の内容を誤って設定していたとしても、スケジュール表示画面6を一見して誤りに気づくことができる。これにより、ユーザは、設定されている動作スケジュールの動作の内容を知るために、スケジュール設定画面7を開いて確認する必要がなくなる。その結果、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止することにもつながる。
【0024】
さらに、情報端末1にスケジュール表示ルーチン12を含む画面表示プログラム11を組み込ませた図1の設備機器管理システムにおいては、ユーザの負担の軽減およびユーザのエンジニアリングミスの防止が実現されることにより、安定的な設備管理が実現される。
なお、本実施形態では、色による動作スケジュールの動作の内容の表示について説明したが、他の実施形態として、文字や記号により動作スケジュールの動作のを表示することも可能である。
【0025】
〈有効無効選択ボタン53〉
設定された動作スケジュールをスケジュール表示画面6で確認した後、画面遷移ボタン63のOKボタンを押下すると、メイン画面5に遷移する。このとき、メッセージが表示され、設定したスケジュールプログラムを動作させるにはスケジュールプログラムを有効にするよう促す。ユーザは、設定したスケジュールプログラムを有効にする場合は、メイン画面5の有効無効選択ボタン53を操作して、スケジュールプログラムを有効にする。
【0026】
このメッセージ表示により、有効にする必要のあるスケジュールプログラムを無効のままにしておくことを防止できる。
〈カレンダー表示部62〉
スケジュール表示画面6のカレンダー表示部62について説明を加える。カレンダー表示部62では、ユーザは、平日、休日および特日をカレンダー上に設定できる。この設定により、スケジュールプログラムは、平日、休日および特日の別を判断して、その日に動作させるべき動作スケジュールを判断する。この設備機器管理システムは、現在月を含む13ヶ月分のカレンダーを持つ。月替りの際に、新しく現在月となるカレンダーの設定を、1年後の同月の設定としてローテーションする。そのため、現在月についてカレンダーを編集した場合、その設定は、月替わりで破棄される。これにより、現在月に例年とは違ったカレンダーを急遽する設定することになった場合等に、そのカレンダーが誤って次の年に反映されることを防ぐことができる。
【0027】
また、カレンダー表示部62では、カレンダーコピーとカレンダー更新月の設定とをすることができる。
カレンダーコピーとは、スケジュールプログラムにカレンダーを設定する際に、ベースとなるカレンダーの中から目的に合ったものを選択し、そのカレンダーの設定をスケジュールプログラムに読み込む機能である。これにより、ユーザは、カレンダーを最初から設定する必要なく、ベースとなるカレンダーを読み込み、そのカレンダーをカスタマイズして使うことができる。これにより、カレンダーの設定作業が軽減される。このときベースとなるカレンダーの範囲とスケジュールプログラムのカレンダーの範囲とが異なると、それらの重なる範囲だけがコピーされる。また、コピーの際には、現在月にはベースカレンダーをコピーしない等、現在動作しているスケジュールを保護するようになっている。また、スケジュールプログラムに設定されているカレンダーをクリアすることもできる。
【0028】
カレンダー更新月の設定とは、スケジュールプログラムに設定されているカレンダーの設定の更新をする月を設定することである。このカレンダー更新月の設定をしておけば、カレンダー更新月になるとユーザへの警告が行われる。このカレンダーの更新月は、手動によりあるいは自動により設定される。手動により設定する際には、翌日以降の12ヶ月のなかから更新月を選択して設定する。自動により設定されるのは、例えば、カレンダーコピーが行われた場合等である。その場合には、そのコピーされたカレンダーの範囲の最終月が更新月として自動的に設定される。また、更新月を「無し」として設定し、ユーザへの警告を行わない設定とすることもできる。
【0029】
【発明の効果】
請求項1にかかる発明では、同じ動作の内容を持つ複数の動作スケジュールが同じ時間帯に設定されている場合、ユーザは、表示画面を一見して、設定されている動作スケジュールの動作の内容を知る事ができる。これにより、ユーザは、設定されている動作スケジュールの動作の内容を知るために動作スケジュールの詳細な設定等を参照する必要がなくなる。その結果、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止することにもつながる。
【0030】
請求項2にかかる発明では、曜日等に分けて設定された動作スケジュールを一覧として表示する事ができる。そのため、ユーザは、他の日に設定されている動作スケジュールと比較しながら、動作スケジュールの確認をする事ができる。これにより、数日にわたり同じ時間帯に同じ動作の内容を持つ動作スケジュールを設定するような場合に、ユーザが動作の内容を誤って設定していたとしても、表示画面を一見して誤りに気づくことができる。これにより、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減されることとなる。これはまた、ユーザのエンジニアリングミスを防止することにもつながる。
【0031】
請求項3にかかる発明では、設定されている動作スケジュールの確認に際してのユーザの負担は、軽減される。これはまた、ユーザのエンジニアリングミスを防止する効果にもつながり、安定的な設備管理を実現する事ができる。
【図面の簡単な説明】
【図1】本発明の一実施形態にかかるシステムの構成図。
【図2】動作スケジュール設定のメイン画面。
【図3】スケジュール表示画面。
【図4】スケジュール設定画面。
【符号の説明】
1 情報端末
2 ステーション
3 設備機器
6 スケジュール表示画面
11 画面表示プログラム
12 スケジュール表示ルーチン
61 週間スケジュール表示部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a schedule display method, and more particularly to a schedule display method in an equipment management system that manages a plurality of equipment.
[0002]
[Prior art]
2. Description of the Related Art In equipment equipment management systems that manage a plurality of equipment equipment, there is a system that can perform management by setting an equipment equipment operation schedule. The operation schedule generally includes the name of the equipment, the operation time, and the operation content. In the equipment management system capable of setting and managing such an operation schedule, the set operation schedule is displayed via a display screen. As a schedule display method, the operation schedule is displayed by displaying the color determined for the operation content of the operation schedule on a part of the display screen corresponding to the set operation schedule time. There is a way.
[0003]
[Problems to be solved by the invention]
In this conventional schedule display method, when operation schedules of two or more equipment devices overlap in the same time zone, a color indicating that the operation schedules overlap is displayed on a part of the display screen indicating the time zone. The For this reason, when two or more operation schedules are set in the same time zone, the user cannot know the details of the operations of the operation schedule at a glance. For example, even if the operation schedules of two or more equipment devices with the same operation content in the same time zone overlap, a color indicating that the operation schedules overlap is displayed. As a result, in order to confirm the content of the operation set in the operation schedule in the operation schedule setting work or the like, the user needs to refer to the detailed settings related to the operation schedule. This increases the burden on the user.
[0004]
Accordingly, an object of the present invention is to provide a schedule display method and a facility equipment management system that reduce the burden on the user when confirming the operation schedule set in the equipment management system.
[0005]
[Means for Solving the Problems]
A schedule display method according to claim 1 is a schedule display method for simultaneously displaying operation schedules of a plurality of facility devices via a display screen in a facility device management system for managing a plurality of facility devices, wherein the first step And a second step and a third step. In the first step, when the operation schedules of two or more equipment devices do not overlap at the same time, the operation schedule is displayed on the part of the display screen corresponding to the time by the operation corresponding indication. The action-corresponding sign is, for example, a color, a character, or a symbol determined for the contents of the action in the action schedule. In the second step, when the operation schedules of two or more equipment devices overlap at the same time, when the operation contents of each operation schedule are of different types, one of the display screens corresponding to the time is displayed. The operation schedule is displayed on the part by the different type operation overlap indication. The different type operation overlap indication is, for example, a color, a character, or a symbol for identifying that two or more operation schedules having different types of operation contents overlap. In the third step, when the operation schedules of two or more equipment devices overlap at the same time, when the operation contents of the respective operation schedules are of the same type, one of the display screens corresponding to the time is displayed. The operation schedule is displayed on the part by the operation corresponding indication.
[0006]
By using this schedule display method, when multiple operation schedules with the same operation content are set in the same time zone, the user can look at the display screen and view the operation content of the set operation schedule. Can know. This eliminates the need for the user to refer to the detailed setting of the operation schedule in order to know the operation content of the set operation schedule. As a result, the burden on the user when confirming the set operation schedule is reduced. This also leads to preventing user engineering errors.
[0007]
The schedule display method according to claim 2 is the schedule display method according to claim 1, further comprising a fourth step. In the fourth step, the operation schedules of the plurality of facility devices managed separately for the day of the week or the predetermined unit are displayed on a part of the display screen corresponding to the day of the week or the predetermined unit.
By using this schedule display method, it is possible to display, for example, an operation schedule set for each day of the week as a list. Therefore, the user can confirm the operation schedule while comparing with the operation schedule set on another day. As a result, when setting an operation schedule having the same operation content in the same time zone for several days, even if the user sets the operation content by mistake, the user notices the error at a glance. be able to. As a result, the burden on the user when confirming the set operation schedule is reduced. This also leads to preventing user engineering errors.
[0008]
A facility equipment management system according to a third aspect includes an information terminal and a control device. The information terminal has a computer program for displaying operation schedules of a plurality of equipment on a display screen by the schedule display method according to claim 1 or 2. The control device performs operation control of a plurality of equipment according to an operation schedule set in the information terminal.
[0009]
With this equipment management system, the burden on the user when confirming the set operation schedule is reduced. This also leads to an effect of preventing the user from making an engineering error, and stable equipment management can be realized.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
<System configuration>
FIG. 1 shows an equipment management system according to an embodiment of the present invention. This equipment management system is a system that monitors and controls a plurality of equipment 3 installed in a building, etc., and monitors the status, start / stop control, operation setting, etc. of each equipment 3 from a system user. It is a system that executes on demand or according to an operation schedule. The system includes an information terminal 1, a station 2 connected to the information terminal 1, and a plurality of facility devices 3 connected to the station 2.
[0011]
The information terminal 1 has a screen display program 11 for displaying the operation schedule of the equipment 3 by the schedule display routine 12 of the present invention. The information terminal 1 requests the station 2 to control the equipment 3 or sets the monitoring control program 21 of the station 2. Further, the information display terminal 1 displays the result of monitoring / control of the equipment 3 obtained from the station 2 and the setting state of the monitoring control program 21 of the station 2 by the screen display program 11. Here, the information terminal 1 is, for example, a computer, a portable computer, a panel computer, or the like.
[0012]
The station 2 has a monitoring control program 21 for monitoring and controlling a plurality of facility devices 3, and the status monitoring, start / stop control, operation setting, etc. of each facility device 3 is performed by a request from the information terminal 1 or Automatically executed according to a schedule. In addition, the information terminal 1 is notified of the monitoring / control result.
The equipment 3 is equipment provided in, for example, air conditioning equipment, electrical equipment, lighting equipment, disaster prevention / crime prevention equipment, or the like. Specifically, for example, an indoor unit of an air conditioner, an outdoor unit of an air conditioner, a ventilation device, an electric device, a lighting device, or a usage measurement device such as electricity / gas / water.
[0013]
<Operation schedule settings>
The user sets an operation schedule for the indoor unit 31 of the air conditioner that is an example of the facility device 3 connected to the facility device management system from the information terminal 1, and at a desired time with the content of the desired operation. The indoor unit 31 and the like can be operated. 2, 3 and 4 are screens displayed on the information terminal 1 when setting the operation schedule of the indoor unit 31 or the like.
[0014]
<Configuration of main screen 5>
FIG. 2 is a main screen 5 for setting an operation schedule. The main screen 5 includes a schedule program list 51, an edit button list 52, and a valid / invalid selection button 53. The schedule program list 51 displays schedule programs registered in the equipment management system. The schedule program is a program that associates calendar data with an operation schedule of the indoor unit 31 or the like set for each day of the week. This equipment management system can have a plurality of schedule programs. The edit button list 52 is a button for performing an edit operation such as creation or deletion of a schedule program. The valid / invalid selection button 53 is a button for selecting whether the registered schedule program is valid or invalid. When editing a schedule program, disable the schedule program before editing.
[0015]
When a program to be edited is selected from the schedule program list 51 and an edit item is selected from the edit button list 52, the schedule display screen 6 shown in FIG. 3 is opened.
<Configuration of schedule display screen 6>
The schedule display screen 6 includes a weekly schedule display unit 61, a calendar display unit 62, and a screen transition button 63. The weekly schedule display unit 61 displays the operation schedule of the indoor unit 31 and the like set separately for weekdays, holidays, and special days. Here, weekdays are days other than days set as holidays and special days, and are divided into seven days (see FIG. 3). A holiday is a day such as a national holiday, for example. Further, the special day is a day or the like that is specially set by the user. In the weekly schedule display section, one day is divided into time zones every 15 minutes, and if there is an operation schedule set for each time zone, the contents of the set operation are displayed in the part corresponding to that time zone Display the color and display the operation schedule. A comparison table 61 a of the content and color of the operation is displayed in the weekly schedule display unit 61. In the calendar display unit 62, the user can set weekdays, holidays, and special days on the calendar. With this setting, the schedule program determines whether it is a weekday, a holiday, and a special day, and determines an operation schedule to be operated on that day. The screen transition button 63 has an OK button and a cancel button. When the OK button is pressed, the setting change made on the schedule display screen 6 is held and the screen transitions to the main screen 5. When the cancel button is pressed, the setting change made on the schedule display screen 6 is discarded and the screen transitions to the main screen 5.
[0016]
When setting or changing the operation schedule on weekdays, holidays, or special days, the user selects the day on which the operation schedule is set or changed on the weekly schedule display unit 61 and displays the schedule setting screen 7 shown in FIG. Let The user sets or changes the operation schedule on the schedule setting screen 7.
[0017]
<Configuration of schedule setting screen 7>
The schedule setting screen 7 includes an equipment device selection unit 71, an operation schedule list 72, a time setting unit 73, an action setting unit 74, and a screen transition button 75. The facility device selection unit 71 displays a list of indoor units 31 and the like of the facility device 3 connected to the facility device management system and a list of groups composed of several indoor units 31 and the like. The operation schedule list 72 displays the operation schedule set in this schedule program. One operation schedule includes the time, the name of the indoor unit 31 and the like, and the content of the operation. The time setting unit 73 is a part for setting the time of the operation schedule when the operation schedule is set. When an operation schedule is selected in the operation schedule list 72, the time set in the operation schedule is displayed on the time setting unit 73. The user can change the displayed time with the up and down buttons of the time setting unit 73. The action setting unit 74 is a part for setting the operation content of the operation schedule when the operation schedule is set. When an operation schedule is selected in the operation schedule list 72, the content of the operation set in the operation schedule is displayed on the action setting unit 74. The user can change the content of the displayed operation with the check button of the action setting unit 74. The contents of the operation of the indoor unit 31 and the like that can be set by the user include, for example, setting of the start / stop operation such as operation / stop of the indoor unit 31, setting of the operation mode such as blowing / cooling / heating, setting of the operation temperature, etc. There is. Furthermore, the analog value can be set for the indoor unit 31 or the like whose operation can be controlled by specifying a value such as a voltage. In addition, for an indoor unit 31 or the like that includes a remote controller, permission / prohibition of operations from the remote controller can be set. The screen transition button 75 has an OK button and a cancel button. When the OK button is pressed, the setting change made on the schedule setting screen 7 is held and the schedule display screen 6 is displayed. When the cancel button is pressed, the setting change made on the schedule setting screen 7 is discarded and the schedule display screen 6 is displayed.
[0018]
<Operation of Schedule Display Routine 12>
The schedule display routine 12 of the present invention is one of the routines of the screen display program 11 and displays the operation schedule set on the schedule setting screen 7 on the weekly schedule display unit 61 of the schedule display screen 6 as a list. The operation of the schedule display routine 12 will be described using a specific example.
[0019]
The schedule setting screen 7 shown in FIG. 4 displays an operation schedule set on Sunday of a schedule program (see FIG. 4). Here, the operation schedule list 72 indicates that seven operation schedules are set.
In the operation schedule list 72, at the time [06:00], one operation schedule is set with the content of the operation of [Stop]. On the other hand, the schedule display routine 12 arranges a color indicating [stop] in a portion corresponding to [06:00] on Sunday of the weekly schedule display unit 61 (see a position 100a in FIG. 3). This operation schedule is displayed.
[0020]
In the operation schedule list 72, at the time [08:00], three operation schedules are set with the same operation content [operation]. On the other hand, the schedule display routine 12 arranges a color indicating [driving] in a portion corresponding to [08:00] on Sunday of the weekly schedule display unit 61 (see a position 100b in FIG. 3). This operation schedule is displayed.
[0021]
In the operation schedule list 72, at the time [20:00], one operation schedule is set with the content of the operation "Blower". Furthermore, two operation schedules are set with the content of the operation of “stop”. On the other hand, the schedule display routine 12 arranges a color indicating that the operation is duplicated in a portion corresponding to [20:00] on Sunday in the weekly schedule display unit 61 (position 100c in FIG. 3). This operation schedule is displayed. The color indicating that the operation is duplicated is a color indicated as [Mixed] in the comparison table 61a of the operation content and color of the weekly schedule display unit 61.
[0022]
<Effect of schedule display routine 12>
By incorporating the schedule display routine 12 in the screen display program 11, when a plurality of operation schedules having the same operation content are set in the same time zone, the user looks at the schedule display screen 6 and sets it. You can know the details of the operation schedule. This eliminates the need for the user to open and confirm the schedule setting screen 7 in order to know the operation content of the set operation schedule. As a result, the burden on the user when confirming the set operation schedule is reduced. This also leads to preventing user engineering errors.
[0023]
Further, by using this schedule display routine 12, it is possible to display a list of operation schedules set for each day of the week. Therefore, the user can confirm the operation schedule while comparing with the operation schedule set on another day. As a result, when setting an operation schedule having the same operation content in the same time zone for several days, even if the user has set the operation content by mistake, the error may appear at first glance on the schedule display screen 6 You can notice. This eliminates the need for the user to open and confirm the schedule setting screen 7 in order to know the operation content of the set operation schedule. As a result, the burden on the user when confirming the set operation schedule is reduced. This also leads to preventing user engineering errors.
[0024]
Further, in the facility equipment management system of FIG. 1 in which the screen display program 11 including the schedule display routine 12 is incorporated in the information terminal 1, the burden on the user is reduced and the engineering error of the user is prevented, so that the stable Equipment management is realized.
In this embodiment, the display of the contents of the operation schedule operation by color has been described. However, as another embodiment, the operation schedule operation can be displayed by characters and symbols.
[0025]
<Valid / invalid selection button 53>
After confirming the set operation schedule on the schedule display screen 6, when the OK button of the screen transition button 63 is pressed, the screen transitions to the main screen 5. At this time, a message is displayed to prompt the user to validate the schedule program in order to operate the set schedule program. In order to validate the set schedule program, the user operates the validity / invalidity selection button 53 on the main screen 5 to validate the schedule program.
[0026]
This message display can prevent the schedule program that needs to be enabled from being left invalid.
<Calendar display section 62>
The calendar display unit 62 of the schedule display screen 6 will be described. In the calendar display unit 62, the user can set weekdays, holidays, and special days on the calendar. With this setting, the schedule program determines whether it is a weekday, a holiday, and a special day, and determines an operation schedule to be operated on that day. This equipment management system has a calendar for 13 months including the current month. When the month changes, the calendar setting that becomes the current month is rotated as the same month setting one year later. Therefore, when the calendar is edited for the current month, the setting is discarded every month. As a result, when the current month is set to suddenly change a calendar different from the normal year, the calendar can be prevented from being reflected in the next year by mistake.
[0027]
In the calendar display unit 62, calendar copy and calendar update month can be set.
The calendar copy is a function for selecting a calendar suitable for a purpose from a base calendar and reading the calendar setting into the schedule program when setting the calendar in the schedule program. This allows the user to read the base calendar and customize the calendar without having to set the calendar from the beginning. This reduces the work of setting the calendar. At this time, if the base calendar range is different from the calendar range of the schedule program, only the overlapping range is copied. Also, when copying, the currently operating schedule is protected, such as not copying the base calendar in the current month. It is also possible to clear the calendar set in the schedule program.
[0028]
The setting of the calendar update month is to set a month for updating the calendar setting set in the schedule program. If the calendar update month is set, the user is warned when the calendar update month is reached. The calendar update month is set manually or automatically. When setting manually, an update month is selected and set from 12 months after the next day. The automatic setting is performed, for example, when a calendar copy is performed. In that case, the last month in the range of the copied calendar is automatically set as the update month. In addition, the update month can be set as “none”, and the user can be set not to be warned.
[0029]
【The invention's effect】
In the invention according to claim 1, when a plurality of operation schedules having the same operation content are set in the same time zone, the user glances at the display screen and displays the operation content of the set operation schedule. I can know. This eliminates the need for the user to refer to the detailed setting of the operation schedule in order to know the operation content of the set operation schedule. As a result, the burden on the user when confirming the set operation schedule is reduced. This also leads to preventing user engineering errors.
[0030]
In the invention according to claim 2, it is possible to display the operation schedule set for each day of the week as a list. Therefore, the user can confirm the operation schedule while comparing with the operation schedule set on another day. As a result, when setting an operation schedule having the same operation content in the same time zone for several days, even if the user sets the operation content by mistake, the user notices the error at a glance. be able to. As a result, the burden on the user when confirming the set operation schedule is reduced. This also leads to preventing user engineering errors.
[0031]
In the invention according to claim 3, the burden on the user when confirming the set operation schedule is reduced. This also leads to an effect of preventing the user from making an engineering error, and stable equipment management can be realized.
[Brief description of the drawings]
FIG. 1 is a configuration diagram of a system according to an embodiment of the present invention.
FIG. 2 is a main screen for setting an operation schedule.
FIG. 3 is a schedule display screen.
FIG. 4 is a schedule setting screen.
[Explanation of symbols]
1 Information terminal 2 Station 3 Equipment 6 Schedule display screen 11 Screen display program 12 Schedule display routine 61 Weekly schedule display section

Claims (3)

複数の設備機器(3)の管理を行う設備機器管理システムにおいて、表示画面(6)を介して前記複数の設備機器(3)の動作スケジュールを同時表示させるスケジュール表示方法(12)であって、
同じ時間に2以上の設備機器(3)の動作スケジュールが重なっていない場合に、その時間に対応する表示画面(6)の一部(61)に対して、動作スケジュールの動作の内容に対して決められている動作対応標示によって動作スケジュールを表示させる第1ステップと、
同じ時間に2以上の設備機器(3)の動作スケジュールが重なっている場合に、それぞれの動作スケジュールの動作の内容が異なる種類のものであるときに、その時間に対応する表示画面(6)の一部(61)に対して、異なる種類の動作の内容を持つ2以上の動作スケジュールが重なっていることを識別するための異種類動作重複標示によって動作スケジュールを表示させる第2ステップと、
同じ時間に2以上の設備機器(3)の動作スケジュールが重なっている場合に、それぞれの動作スケジュールの動作の内容が同じ種類のものであるときに、その時間に対応する表示画面(6)の一部(61)に対して、前記動作対応標示によって動作スケジュールを表示させる第3ステップと、
を備えた、
スケジュール表示方法(12)。
In a facility equipment management system for managing a plurality of equipment devices (3), a schedule display method (12) for simultaneously displaying operation schedules of the plurality of equipment devices (3) via a display screen (6),
When the operation schedules of two or more equipment devices (3) do not overlap at the same time, the content of the operation schedule operation is selected for a part (61) of the display screen (6) corresponding to that time. A first step of displaying an operation schedule according to a predetermined operation corresponding indication;
When the operation schedules of two or more equipment devices (3) overlap at the same time, when the operation contents of each operation schedule are of different types, the display screen (6) corresponding to that time A second step of displaying an operation schedule with a different type operation overlap indication for identifying that two or more operation schedules having contents of different types of operations overlap each other (61);
When the operation schedules of two or more equipment devices (3) overlap at the same time, when the operation contents of the respective operation schedules are of the same type, the display screen (6) corresponding to that time A third step of displaying an operation schedule by the operation corresponding indication for a part (61);
With
Schedule display method (12).
曜日あるいは所定の単位に分けて管理された前記複数の設備機器(3)の動作スケジュールを、その曜日あるいはその所定の単位に対応する表示画面(6)の一部(61)に対して表示させる第4ステップ、
をさらに備えた、
請求項1に記載のスケジュール表示方法(12)。
The operation schedule of the plurality of facility devices (3) managed by dividing the day of the week or a predetermined unit is displayed on a part (61) of the display screen (6) corresponding to the day of the week or the predetermined unit. 4th step,
Further equipped with,
The schedule display method (12) according to claim 1.
請求項1又は2に記載のスケジュール表示方法(12)により前記複数の設備機器(3)の動作スケジュールを前記表示画面(6)に表示させるコンピュータプログラム(11)を有する情報端末(1)と、
前記情報端末(1)において設定された前記動作スケジュールにしたがって前記複数の設備機器(3)の動作制御を行う制御装置(2)と、
を備えた、
設備機器管理システム。
An information terminal (1) having a computer program (11) for displaying an operation schedule of the plurality of equipment (3) on the display screen (6) by the schedule display method (12) according to claim 1 or 2,
A control device (2) for controlling the operation of the plurality of equipment (3) according to the operation schedule set in the information terminal (1);
With
Equipment management system.
JP2002105303A 2002-04-08 2002-04-08 Facility device management system schedule display method and facility device management system Expired - Fee Related JP3731119B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002105303A JP3731119B2 (en) 2002-04-08 2002-04-08 Facility device management system schedule display method and facility device management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002105303A JP3731119B2 (en) 2002-04-08 2002-04-08 Facility device management system schedule display method and facility device management system

Publications (2)

Publication Number Publication Date
JP2003303012A JP2003303012A (en) 2003-10-24
JP3731119B2 true JP3731119B2 (en) 2006-01-05

Family

ID=29390065

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002105303A Expired - Fee Related JP3731119B2 (en) 2002-04-08 2002-04-08 Facility device management system schedule display method and facility device management system

Country Status (1)

Country Link
JP (1) JP3731119B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101658091B1 (en) * 2014-04-11 2016-09-30 엘지전자 주식회사 Remote maintenance server, total maintenance system including the remote maintenance server and method thereof
JP6630065B2 (en) * 2015-06-05 2020-01-15 アズビル株式会社 Schedule management system and schedule management method
US11278176B2 (en) * 2018-09-06 2022-03-22 Irobot Corporation Scheduling system for autonomous robots

Also Published As

Publication number Publication date
JP2003303012A (en) 2003-10-24

Similar Documents

Publication Publication Date Title
US7274972B2 (en) Programmable controller with saving changes indication
US9056539B2 (en) Display apparatus and method having parameter display toggle capability for an environmental control system
US20100050108A1 (en) Display apparatus and method for entering a reminder in a control unit for an environmental control system
US7460933B2 (en) Thermostat display system providing adjustable backlight and indicators
US20070045441A1 (en) Thermostat configuration wizard
JP3495191B2 (en) Air conditioning management device
JP3731119B2 (en) Facility device management system schedule display method and facility device management system
JP2003303228A (en) Method of setting schedule for facility and equipment management system, and facility and equipment management system
CN112950142A (en) Method and device for setting equipment operation schedule, storage medium and terminal
JP4185257B2 (en) Disaster prevention system
CN107770237B (en) Schedule control device, facility management system, and schedule control method
JP3018306B2 (en) Facility management device
JP2002286280A (en) Air conditioning control system
JPH0621039Y2 (en) Load timer device
JPH03191392A (en) Screen display system
JPH07129873A (en) Monitor and control equipment of building managing system
JP2612778B2 (en) Facility management device
JP5120328B2 (en) Air conditioning system
JPH0756998A (en) Building managing device
OWNER ColorTouch™
JPH06251276A (en) Facility controller
KR20030038957A (en) Air-Conditioner System and Reservation Method for the Same
JP2000066713A (en) Supervisory and controlling system
JPH04116800A (en) Indicating lamp test system
JPH03214396A (en) Annunciator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040524

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050701

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050705

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050913

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050926

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081021

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091021

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091021

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101021

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111021

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111021

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121021

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121021

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131021

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees