JP3716952B2 - Safety device in mobile crane - Google Patents

Safety device in mobile crane Download PDF

Info

Publication number
JP3716952B2
JP3716952B2 JP30712396A JP30712396A JP3716952B2 JP 3716952 B2 JP3716952 B2 JP 3716952B2 JP 30712396 A JP30712396 A JP 30712396A JP 30712396 A JP30712396 A JP 30712396A JP 3716952 B2 JP3716952 B2 JP 3716952B2
Authority
JP
Japan
Prior art keywords
jib
boom
pin
bracket
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP30712396A
Other languages
Japanese (ja)
Other versions
JPH10139377A (en
Inventor
佐敏 澤藤
光雄 大矢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP30712396A priority Critical patent/JP3716952B2/en
Publication of JPH10139377A publication Critical patent/JPH10139377A/en
Application granted granted Critical
Publication of JP3716952B2 publication Critical patent/JP3716952B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は移動式クレーンにおける安全装置に関し、特に作業モードスイッチの選択操作ミス、および移動式クレーンの作業状態をチェックして、ジブの落下を防止するようにした移動式クレーンにおける安全装置に関する。
【0002】
【従来の技術】
移動式クレーンは、車体上に伸縮自在なブームを起伏自在に、かつ旋回自在に設けて、これらの伸縮、起伏及び旋回の各操作によって吊り荷作業が行われる。しかし、前記伸縮、起伏及び旋回の各操作による作業可能範囲を拡大する必要がある場合には、ブームの先端部にジブを装着して作業範囲を拡大できるようなジブ装着型の移動式クレーンが使用される。このようなジブ装着型の移動式クレーンの従来技術としては、例えば図24〜図33に示すように、第1の従来技術として「実開平5−44990号」公報、および第2の従来技術として「実開平6−76283号」公報がある。
【0003】
第1および第2の従来技術は、図24において前後左右に車輪を有する下部走行体1の略中央の上部に旋回自在に上部旋回体8を設け、上部旋回体8上には伸縮自在なブーム3を起伏自在に設けている。また、上部旋回体8上の前方側面側には走行操作や作業機操作が可能な運転室9が配設されている。ブーム3は多段伸縮ブームであって、基段ブーム4乃至トップブーム6からなっている。また移動式クレーンの走行時等にはブーム3の側面にジブ7が装着されている。このジブ7は、作業時に必要に応じて図29に示すロックピン(19a) 回りに回動して、ブーム3の側面からブーム先端部に張り出され、図31に示すようにブーム先端部に連結されるようになっている。
【0004】
このようなジブ装着型の移動式クレーンにおけるジブ7の張出、格納装置を図面を参照しながら詳細に説明する。
図25はジブ7の格納状態を表す平面図、図26は図25のトップブーム6とジブ7との連結部詳細平面図、図27は張出状態での連結部側面図を表している。基段ブーム4の側面後部にジブ7の固定用のラグ81が設けられ、ラグ81にジブ7の先端部に設けられたラグ82がピン83により連結されている。また、基段ブーム4の側面中央部にはラグ85が設けられ、ラグ85にジブ7の中央部に設けられたつの84が係止され、ピン80により連結されている。
【0005】
図26に示すように、トップブーム6の先端側面の左右にはラグ87a、87bが設けられ、ジブ7の基端部にはトップブーム6のラグ87a、87bとジブ7をそれぞれ連結するロックピン19a、19bが設けられている。ロックピン19a、19bは、それぞれを抜き差しするためのロックシリンダ17、18が取着されている。また、ジブ7の基端部上面にはジブ7の振出し(ピン80の回りにジブ7を回動すること)、張出及び格納用の回動シリンダ63がそのチューブ側をピン99によって回動自在に設けられている。回動シリンダ63のロッド側はリンク92及びリンク93の連結部にピン96で回動自在に接続されている。またリンク93の他端側はジブ7の上面にピン97により回動自在に取着され、リンク92の他端側は格納時にジブ7の上面にピン94により回動自在に取着されている。
【0006】
また、トップブーム6の上面にはスイッチボックス89が配設されている。このスイッチボックス89には、ロックシリンダ17、18及び回動シリンダ63を操作するためのスイッチ(図示せず)が収納されている。さらに、上記のジブ7を基段ブーム4に固定するピン83、ピン80、リンク92を固定するピン94、ピン98等は、トップブーム6の上面から容易に抜き差し可能なように位置している。
【0007】
第2の従来技術は、第1の従来技術において図32(A)に示すように、図25に示すような基段ブーム4の側面に設けられラグ85と、ジブ7に設けられたつの84とを連結するピン80を検出するリミットスイッチ86が基段ブーム4に設置されている。
また図32(B)に示すように、図25に示すような基段ブーム4の側面に設けられラグ81と、ジブ7に設けられたラグ82とを連結するピン83を検出するリミットスイッチ88が基段ブーム4に設置されている。
図33に示すように、トップブーム6用伸縮シリンダ141の駆動回路には、トップブーム6の伸長側となる方向切換弁143のパイロット回路を開閉するソレノイド弁147が介設されている。これらリミットスイッチ86,88は、常時開接点同志および常時閉接点同志をそれぞれ直列に接続したものを並列に接続した回路を、電源90とソレノイド弁147間に直列に接続した。
【0008】
第1の従来技術、および第2の従来技術は次のように作用する。
図26に示すようにジブ張出のときは、作業者はまずトップブーム6の上面に乗り、リンク92をジブ7に取着しているピン94を抜く。そして、スイッチボックス89のスイッチを操作して回動シリンダ63を作動してリンク92の先端部の孔をトップブーム6の上面側端部に設けられた孔95に一致させ、ピン98を孔95に挿入してリンク92とトップブーム6を連結する。次に、図25に示すジブ7の先端部を基段ブーム4に固定しているピン83を抜き、スイッチボックス89により回動シリンダ63を作動して、図28、図29に示すようにジブ7をピン80の回りに振出し、ジブ7の基端部のロックピン19aをトップブーム6の先端部のラグ87aの孔に一致させる。この状態で、図27に示すロックシリンダ17を操作してロックピン19aを挿入し、ラグ87aがジブ7に連結される。この後、ジブ7の中央部のつの84を固定しているピン80を抜き、、図30に示すように運転室9内の操作レバーによってブーム3を伸長し、ジブ7を支持しているつの84をラグ85から外す。これによりジブ7はロックピン19a及びピン98によって支持されることになる。
【0009】
次に、運転席9内の操作レバー又はスイッチボックス89内のスイッチの操作を行って回動シリンダ63を作動させてジブ7をロックピン19aの回りに回動し、図31に示すようにブーム3の前方に張り出す。スイッチボックス89によってロックシリンダ18を作動してロックピン19bをトップブーム6のラグ87bの孔に挿入する。これによって、ジブ7とトップブーム6との連結作業が完了する。ジブ7の格納作業は、これまでと逆の手順で行なう。
このようにして、作業者は運転室9内又はトップブーム6の上部に乗って各シリンダや作業機を操作し、ジブ7の張出及び格納作業を行う。これと同時に作業者は各作業工程の完了、例えばロックシリンダ17によりロックピン19aがラグ87aの孔に確実に挿入されたこと等をトップブーム6の上部で確認してから次の工程に進むようにしている。
【0010】
図33において、ピン80とピン83とのいずれか一方が挿入されている状態では、伸縮シリンダ15が絶対に伸びないので、トップブーム6操作弁を誤操作してもジブ7やラグ81,82,84,85等の破損が防止される。
【0011】
第3の従来技術は、第1、第2の従来技術において、ジブ7のつの84を上下に二つ設置し、このつの84が貫入する各穴をラグ85に設置することにより、ピン80を省略した構成であり、これによってジブ7の張出・格納作業を大幅に簡略化したものである。
【0012】
【発明が解決しようとする課題】
しかしながら、前記第1、第2の従来技術では次の問題点がある。
(1) ジブの張出、格納装置においては、作業者はブーム3上に居て作業をしなければならないことが多いので、高所及び狭所での作業における危険性が常に伴うことになる。
(2) 作業工程によっては工程完了の確認が非常に重要なものもある。例えば、ロックシリンダ17の操作でロックピン19aをラグ87aの孔に挿入したときに完全に挿入されない状態で、ピン80を抜いてブーム3を伸長すると、ブーム3とジブ7との連結が外れ、ジブ7が落下する危険性がある。
(3) ジブ7の格納時に、つの84とラグ85がピン80によって連結されない状態で、ロックピン19aを抜いてしまうと、同様にジブ7が落下する危険性がある。
(4) このような工程では工程完了(ピン挿入完了)の確認を確実に行う必要があるが、従来は作業者の確認に頼っているので作業者への負担が大きくなり過ぎて作業時の疲労を増大すると共に、もし誤ってこの確認が不十分であった場合は前記のような事故が発生する可能性がある。
【0013】
また第3の従来技術では次の問題点がある。
(5) ジブ7の格納作業において、ジブフート部の左ピン19aを抜いた後、ジブ格納ピン83を入れ忘れた場合、
(6) ジブ格納時における整備中でジブ格納ピン83を抜いて作業する場合、
(7)ジブ格納時にいたずらされてジブ格納ピン83が抜かれていた場合、
以上の場合には、これを検出してインタロックをかけることがないため、ブーム3を伸長操作するとジブ7が落下する恐れがあった。
【0014】
本発明は、上記の問題点に着目してなされたものであり、作業者のブーム上での作業を少なくして安全性を向上すると共に、ピン連結完了の不十分な確認によるジブの落下事故等の発生を防止し、かつクレーン作業状態をチェックする移動式クレーンの安全装置を提供することを目的としている。
【0015】
【課題を解決するための手段、作用及び効果】
上記の目的を達成するために、本発明の第1発明に係る移動式クレーンにおける安全装置は、伸縮自在なブーム3と、このブーム3の側方に固定手段30により支持されて格納されるジブ7と、このジブ7のブラケット7とブーム3先端の左右いずれか一方のブラケット61とに出入するロックピン19aとを有し、前記ジブ7使用時にはブラケット15とブラケット61とに挿入されたロックピン19aを中心に、ブーム3の側方に格納されたジブ7をブーム3の前方に回動して張出す移動式クレーンにおける安全装置において、
【0016】
ジブ7をブーム3に係止する係止手段20を備え、ジブ7はジブ格納位置からロックピン19aの挿入位置まで振り出す際に係止手段20の回りを回動し、ロックピン19aがブラケット15,16に挿入されたことを検出するロックピン挿入検出器70と、固定手段30の孔31aに挿入されて、ブーム3に格納されたジブ7を固定するためのジブ格納ピン33と、このジブ格納ピン33が孔31aに挿入されていること、またはジブ7がジブ格納位置にあることを検出するジブ格納完了検出器33b,33cと、ジブ7の格納位置におけるブームまたはシングルトップモードと、ジブ7の張出位置におけるジブモードと、ジブ7の張出、格納操作を行う準備モードのいずれかの作業モードを選択する上部作業モードスィッチ71と、これら検出器70,33b,33cと、スイッチ71の状況によりクレーン作業、もしくはその一部操作を停止するか、あるいは警報手段により警告するコントローラ52とを備えたことを特徴とする。
【0017】
第1の発明によれば、▲1▼ジブ格納時の格納ピン33の入れ忘れによるジブ7の落下防止。▲2▼ジブ張出、格納作業中のロックピン19a、格納ピン33の入れ忘れによるジブ7の落下防止。▲3▼ジブ張出状態で上部作業モードスイッチ71をブームモードに誤設定したことを警告する。▲4▼ジブ7を格納している時に上部作業モードスイッチ71をジブモードに誤設定することを防止するようにコントローラ52により自動的に制御する。
従ってジブ7の落下事故等を確実に防止できるため、クレーン作業の安全性が向上すると共に、確認作業が不要となり作業者の疲労を大幅に軽減できる。
【0018】
本発明の第2発明に係る移動式クレーンにおける安全装置は、第1発明において、作業モードスィッチ71で選択した各作業モードにおいて、コントローラ52がロックピン挿入検出器70、およびジブ格納完了検出器33b,33cからの検出信号を共に入力しないときには、警報ランプを点灯するか、警報ブザーを発報するか、モニタパネルに文字によりディスプレイするかの少なくとも一つにより警告するコントローラ52とを備えたことを特徴とする。
【0019】
第2発明によれば、コントローラ52がロックピン挿入検出器70、およびジブ格納完了検出器33b,33cからの検出信号を共に入力しないときには、警報ランプを点灯するか、警報ブザーを発報するか、モニタパネルに文字によりディスプレイするかの少なくとも一つにより警告するか、またはブーム3伸長等のクレーン作業の操作弁を自動的に操作不能とする。
従ってジブ7がブーム3に完全に格納されていない状態で、不用意にブーム3伸長等のクレーン作業を行うことにより、ジブ7がブーム3から落下するような事故を未然に防止でき、安全性を大幅に向上することができる。
【0020】
本発明の第3発明に係る移動式クレーンにおける安全装置は、第1の発明において、移動式クレーンの走行操作と作業機操作とを選択する選択スイッチを設置し、この選択スイッチが走行操作を選択したときに、ジブ格納完了検出器33b,33cの検出信号を入力しないときには、走行中におけるジブ7の落下の危険性を、警報ランプ、警報ブザー、あるいはメッセージ出力等で警告するコントローラ52を備えたことを特徴とする。
【0021】
第3発明によれば、コントローラ52がジブ格納完了検出器33b,33cからの検出信号を入力しないときには、警報ランプを点灯するか、警報ブザーを発報するか、モニタパネルにディスプレイする等によりジブ7がブーム3から落下する危険性を警告する。
従ってジブ7がブーム3に完全に格納されていない状態で、不用意に移動式クレーンの走行させ場合に、ジブ7がブーム3から落下するような事故を未然に防止でき、安全性を大幅に向上することができる。
【0022】
【発明の実施の形態】
以下、本発明の各実施例を図1〜図23を参照して説明する。
図1は、本発明に係わる移動式クレーンの全体側面図であり、ジブ7の格納状態を表している。図1においては、前記従来技術と同様な部材には同一符号を付しその説明を省略する。
ジブ7は車体1に起伏可能に装着されたブーム3の左側方(右側方でも可)に格納されている。ジブ7は、基端側のジブブラケット11と先端側のジブ本体12とからなっている。ジブブラケット11とジブ本体12とは水平なピン13によって起伏自在に連結されており、チルトシリンダ14によってピン13の回りに起伏可能となっている。
【0023】
ジブ本体12は、図3,5、および図7に詳細を示すような係止手段20と、図3,5、および図8〜12に詳細を示すような固定手段30とによって、基段ブーム4の左側面に固定されている。また、ジブ本体12の先端上面にはアイドラシーブ123が配設され、先端部にジブシーブ124を設けている。ジブブラケット11の基端部の左右には、図2,4,12,13に詳細を示すように、それぞれ上下にブーム3との連結用の左ブラケット15,15、および右ブラケット16,16(ブーム3の基端部から先端方向に向かい左右を定める。以後同様とする)が設けられ、これら各左ブラケット15と右ブラケット16の間には、それぞれ連結用のロックピン19a,19bを挿入するためにロックシリンダ17、18が配設されている。さらに、トップブーム6の先端部にはトップシーブ(以後、シングルトップと呼ぶ)125が設けられ、シングルトップ125を介して補巻ロープ121の先端に設けた補フック122が備えられている。
【0024】
図2は、ジブ7の格納状態におけるトップブーム6の先端部、およびジブブラケット11の連結部の平面図を表している。ジブブラケット11の上部には回動シリンダ63が配設されていて、回動シリンダ63のチューブ側はジブブラケット11の上面に回動自在に取着され、ロッド側は第2リンク65の中央部に回動自在に取着されている。第2リンク65の一端側はジブブラケット11の上面に回動自在に取着されており、他端側は第1リンク64の一端に回動自在に接続されている。また、第1リンク64の他端は第3リンク66の一端に回動自在に接続され、第3リンク66の他端はロックピン19a(以後「左ピン19a」と記す)の後述するボス131に回動自在に接続されている。
【0025】
トップブーム6の先端部左側の上下には、ジブ7の連結用の左ブラケット61が設けられている。上下の左ブラケット61にはそれぞれジブ7の左ブラケット15の連結用の孔61aが設けられている。上方の左ブラケット61には、さらに第1リンク64と第3リンク66との接続部のピン67が挿入される連結用の孔61bが設けられている。また、トップブーム6の先端部右側の上下にはジブ7の連結用の右ブラケット62が設けられ、上下の右ブラケット62にはそれぞれに連結用の孔62aが設けられている。さらに、上方の左ブラケット61の上面には孔61a部の上方にかけて第1ストッパ39が固着されており、同様にして、下方のブラケット61の下面には孔61a部の下方にかけて第1ストッパ39が固着されている。また、トップブーム6の左側面には、第2ストッパ42bがジブ7側に突出して設けられている。
【0026】
ジブブラケット11の基端部のブーム側の上下には、トップブーム6と連結するための左ピン19aが挿入される孔15aを有する左ブラケット15が設けられ、ブーム側と反対側の上下にはロックピン19b(「右ピン19b」と記す)が挿入される孔16aを有する右ブラケット16が設けられている。さらに、上方のブラケット15の上面で、かつ、孔15a部にはボス131が設けられており、ボス131を孔15aが貫通している。同様にして、下方のブラケット15の下面で、かつ、孔15a部には孔15aが貫通したボス131が設けられている。また、ジブブラケット11のブーム側側面には、トップブーム6側に突出して第2ストッパ42aが設けられている。ジブ連結時に、上記上下のボス131をトップブーム6側の上下のブラケット61の第1ストッパ39に押し当て、第2ストッパ42aをトップブーム6側の第2ストッパ42bに当接させることにより、孔15aと孔61aとの位置が一致するようになっている。なお、第2ストッパ42a及び第2ストッパ42bは、いずれか一方であっても良い。
【0027】
図3は基段ブーム4とジブ本体12の中央及び先端側の平面図である。ジブ本体12の略中央部には図6に詳細を示すような、ジブ7と基段ブーム4との係止手段20が設置されている。また、ジブ本体12の先端部分には図8〜図12に詳細を示すような、ジブ7と基段ブーム4との固定手段30が設置されている。
【0028】
図3のX−X断面図である図6、および図6のY−Y断面図である図7により係止手段20の詳細について説明する。
ジブ本体12のブーム3側の側面の上下に、ブーム3の長手方向に突出した係止ピン21が設けられている。上下の係止ピン21は、それぞれ基段ブーム4側に設けられた係止ブラケット22の係止用の孔22aに挿入されて係止されるようになっている。また、係止ブラケット22の下部にはブーム3の長手方向の孔22bを設けており、孔22bにはピン23が貫通している。ピン23の長手方向の両端部には上下方向の孔が設けられ、この両孔をネジ24が貫通している。両方のネジ24の略中央で、かつ、ピン23の下方にはナット24aが挿入されており、またネジ24の上下部は基段ブーム4の側面の下部に支持されている。このように、係止ブラケット22はピン23を介して両方のナット24aによって支持されている。そして、ナット24aの位置をネジ24の方向にそって調整することにより、係止ブラケット22のブーム3の上下方向の位置が調整できるようになっている。
【0029】
ブーム3の側面上部で、かつ、ピン23の上方にはブラケット25が設けられており、このブラケット25の上面には一対のネジ26を対向して設けている。両方のネジ26はブーム3の側面に直角な方向を向いており、その先端はお互いに対向している。また、両方のネジ26にはそれぞれナット26aが挿入されている。そして、係止ブラケット22の上部は両方のネジ26の先端部に挟まれた状態で支持されている。
このようにして、ナット26aの位置を調整することによって、係止ブラケット22のピン23の回りの傾斜を調整できるようになっている。
【0030】
ブラケット25の先端部には下方に延びた支持板28が取着されていて、支持板28の下部にジブ格納検出器29が取着されている。ジブ格納検出器29は、ジブ7が格納完了したこと、すなわち係止ピン21が係止ブラケット22の孔22aに完全に挿入されたことを検出するものである。本実施例では、ジブ格納検出器29の1つとして近接スイッチを使用した例を示しており、この近接スイッチの検知のためにジブ本体12側に検知板29aを取着している。なお、ジブ格納検出器29として近接スイッチを使用しているが、これに限定されず、例えばリミットスイッチ等でもよい。
【0031】
図8はジブ7をブーム3に格納する時の固定手段30の第1実施例を示す詳細平面図であり、図9は図8の側面図である。
基段ブーム4の側面下部には側方に突出したブラケット34が設けられていて、ジブ7の先端部は格納状態ではこのブラケット34の上部に支持され固定されている。ブラケット34の側面で、かつ、ジブ7の基端部側にはジブ7の固定用の孔31aを有するブラケット31が固着されており、また、ブラケット34の側面で、かつ、ジブ7の先端部側にはジブ7のガイド用の孔35aを有するブラケット35が取着されている。ガイド用の孔35aの位置は、固定用の孔31aの位置よりジブ7側に近く設けている。
【0032】
また、ジブ本体12の側面にはブーム3側の側方に突出したブラケット32が設けられていて、ブラケット32にはジブ7の固定用の孔32aが設けられている。ジブ本体12の側面には同じくブーム3側の側方に突出したブラケット38が設けられ、基段ブーム4のブラケット34の略中央部の上部にはピン38aを設けている。ブラケット38のジブ先端側の側面には、ブラケット36が設けられている。
ジブ7の格納時には、ブラケット38のブーム3側先端面をピン38aに当接させることにより、ブラケット31の孔31aとブラケット32の孔32aとの位置が一致するようになっている。そして、このとき、孔31aと孔32aとにピン33が挿入されて固定される。格納状態では、ピン33の先端部にジブ格納ピン33aが挿入される。なお、ブラケット38と当接するピン38aの先端部には衝撃吸収用の緩衝部材が設けられてもよく、この緩衝部材はゴムやバネ等で構成される。
【0033】
図9において、ブラケット36の先端下面36aは傾斜を有しており、この傾斜はブラケット34の上面に対する先端下面36aの高さがその先端部から基端部にかけて滑らかに低くなっている。また、図8においてブラケット36の先端部は先端からブーム側の側面36cにかけて傾斜部36bを有しており、ブラケット36の基端部の側面36cはジブ本体12の側面に略平行になっている。さらに、ブラケット34のジブ基端側の側面の上端部には、ブラケット36の先端下面36aのガイド用のバー37がブラケット34の上面に平行に固着されている。またブラケット34のジブ7の基端部側側面には、図8(B)に詳細を示すようなジブ格納ピン33が挿入されていることを検出するジブ格納ピン入り検出器33bが設置されている。
【0034】
図10はジブ7をブーム3に格納する時の固定手段30の第2実施例を示す詳細平面図であり、図8に示すようなブラケット34のジブ7の基端部側側面に設置されている、格納ピン入り検出器33bの代わりに、ジブ7が格納位置にあることを検出するジブ格納位置検出器33cを備えている。その他の構成については図8と同様のため説明を省略する。
【0035】
図11は、図8、および図9に示すような格納状態にあるジブ7をトップブーム6の前方に張り出す時に、図5に示すようにジブ7を係止手段20の回りに振出した時の固定手段30の詳細平面図であり、図12は図11の側面図である。ジブ7を「振り出す」とは、ジブ7の先端部をブーム3より離す方向に動かすことによってジブ7が係止ピン21の回りに回動し、ジブ7の基端部のブラケット15の孔15aをトップブーム6のブラケット61の孔61aに合わせる作業を言う。
【0036】
ピン33は孔31a及び32aから抜かれ、ジブ7の先端部はブーム3から離されている。ピン33はブラケット35の孔35aに挿入されており、この状態でピン33の側面はブラケット36の基端部のブーム3側の側面36cに当接している。これによって、ジブ7の先端部はピン33によってブーム3側に戻らないように固定される。このとき、図2におけるブラケット15のボス131がトップブーム6の第1ストッパに当接して前後方向の位置決めがなされ、また、ジブ7側の第2ストッパ42aがトップブーム6側の第2ストッパ42bに当接して左右方向の位置決めがなされることにより、孔15aをトップブーム6の孔61aに容易に合わせることが可能となっている。
【0037】
図13は図4に示すジブ7の振出状態から孔15aおよび孔61aに挿入された左左ピン19a回りに、シリンダ63により時計方向に回動されてブーム3の前方に完全に張出され、左左ピン19aと同様にして孔16aおよび孔62aに右右ピン19bを挿入して固定するように構成されている。
【0038】
図14は図2におけるZ視図であり、上下のブラケット15の間にロックシリンダ17および連結用のピン19a部分の側面図である。
ロックシリンダ17の上端部のチューブには第3リンク66の一端側が回動自在に取着されており、またピン19cにより上方の左ピン19aが取着されている。左ピン19aの軸心は、ロックシリンダ17の軸心に一致させている。また、第3リンク66の他端側の上面には、第1リンク64とトップブーム6のブラケット61の孔61bとを連結するためのピン67が固着されている。さらに、ロックシリンダ17の下端部のロッド側には下方の左ピン19aがピン19dにより取着されている。
【0039】
上下のブラケット15はそれぞれコの字型をしていて、コの字の上下の板15b、15c及び板15d、15eの間に、トップブーム6側に設置された孔15aを有する上下のブラケット61をそれぞれ挟むようにしている。上方の板15bの上面で、かつ、孔15a部には孔15aが貫通しているボス131が設けられている。同様にして、下方の板15eの下面で、かつ、孔15a部には孔15aが貫通しているボス131が設けられている。また、第1リンク64の第3リンク66との連結部側は、同様に上下板64a、64bで構成され、上下板64a、64bの間にトップブーム6の上方のブラケット61の孔61b部を挟むようになっている。
【0040】
また、ロックシリンダ17が最短に縮小している状態のとき、ジブブラケット11の基端部からロックシリンダ17の方に突出して設けたブラケット71の先端部がロックシリンダ17のチューブとロッドの間に挟まれるようになっている。この状態では、上方の左ピン19aの先端は上方のブラケット15の板15cに掛かっており、ピン67の先端は第1リンク64の下板64bに掛かっている。また、下方の左ピン19aの先端は下方のブラケット15の板15dに掛かっている。これによって、ロックシリンダ17、第1リンク64、上下の左ピン19a及びピン67はジブブラケット11から外れないようになっている。
【0041】
ロックシリンダ17のロッドには、上方に延びたブラケット69が取着されており、ブラケット69の上端には上下の左ピン19aの挿入完了を検出するためのロックピン挿入検出器70が取着されている。本実施例では、ロックピン挿入検出器70の一例として近接スイッチを採用しており、この近接スイッチの検出面はロックシリンダ17の伸縮方向の下方を向いている。また、ロックシリンダ17のチューブの下端部には下方に延びたポール68が取着され、ポール68の下端に近接スイッチの検知片68aが取着されている。
【0042】
図15は図13のA矢視図で、ロックシリンダ17が伸長してジブ7とトップブーム6とを連結した状態をトップブーム6の側面から見た図である。
ロックシリンダ17が伸長し、上下の左ピン19aが上下のブラケット15の孔15aに完全に挿入されたときに、ロックピン挿入検出器70の近接スイッチが検知片68aを所定距離で検知して作動するようになっている。
また、ジブ7の張出のとき、上方のブラケット61の上面及び下方のブラケット61の下面に設けられた上下の第1ストッパ39にブラケット15のボス131を押し当てている。これによって、孔15a及び孔61aの位置が一致し、左ピン19aがスムーズに挿入できるようになっている。
【0043】
なお、図示してはいないがブラケット15と同様にして、上下のブラケット16の間にはロックシリンダ18が設けられており、ロックシリンダ18のチューブ側上端部に上方の右ピン19bが、及びロックシリンダ18のロッド側下端部に下方の右ピン19bが取着されている。ロックシリンダ18が最短に縮小している状態のときは、同じく、ジブブラケット11の基端部からロックシリンダ18の方に突出して設けたブラケット(ブラケット71に相当)の先端部がロックシリンダ18のチューブとロッドの間に挟まれるようになっており、上下の右ピン19bの先端はそれぞれ上下のブラケット16のコの字板のシリンダ側板(板15c、板15dに相当)に掛かっている。これによって、ロックシリンダ18及び上下の右ピン19bはジブブラケット11から外れないようになっている。
【0044】
図16は、本発明に係わる移動式クレーンのジブの張出/格納を操作するためのフロントパネル40aを表しており、このフロントパネル40aは運転室9内に設けられている。ジブ7の張出/格納作業を選択するためのジブ張出/格納スイッチ41はシーソー型の切替えスイッチになっている。ジブ張出/格納スイッチ41を操作すると、図17、および図20に示す対応する出力接点がオンするようになっている。また、トップブーム6の左側面のブラケット61とジブ7のブラケット15とが、左ピン19aによって完全に連結されたときに表示する左ピンロック完了表示器43、及びジブ7の格納時に係止ピン21が係止ブラケット22の孔22aに完全に挿入されたことを表示するジブ格納位置表示器67が設けられている。
またジブ7がブーム3に固定されてジブ格納完了検出器33b,33cが検出したことを表示するジブ格納完了表示器44が設けられている。
【0045】
そしてフロントパネル40aには作業モードの切替えを行うモード切替スイッチ45を備えており、図18に示す一本の操作レバー56aの一方向の操作によってのみ、前記ロックシリンダ17(左ピン)、回動シリンダ63及びロックシリンダ18(右ピン)の作動が可能なように構成している。したがって、モード切替スイッチ45によりこれらの内のどのシリンダによる作業を行うのかを選択できるようになっている。またシリンダの作動方向は、前記ジブ張出/格納スイッチ41によって切り換えるようになっている。
【0046】
図17〜図19にそれぞれ示す、本発明の電気制御回路及び油圧制御回路の第1実施例について説明する。
図17に示す電気制御回路はモーメントリミッタコントローラ52とそれ以外のインターロック手段とから構成されている。モーメントリミッタコントローラ52はジブ張出時にブーム3の伸長可否を判定してブーム3の伸長を制御しており、例えばマイクロコンピュータ等で構成されている。モーメントリミッタコントローラ52は運転室9に設置された図21、および図22に示すような、モーメントリミッタ表示パネル40の上部作業モードスイッチ71により、準備(ジブ張出/格納)モード、ジブモード、ブーム/シングルトップモードの各上部作業モード信号を入力しており、この準備(ジブ張出/格納)モード信号に基づいてジブ自動張出モードリレー46のコイル46cにオン−オフ指令を出力している。また、ロックピン挿入検出器70の出力端子はケーブルドラム72を介して、モーメントリミッタコントローラ52と左ピンロック完了表示器43とに並列に接続されている。なお、本実施例の左ピンロック完了表示器43は抵抗と発光ダイオード(以後、LEDと呼ぶ)で構成されているが、ランプ等でもよい。また、ロックピン挿入検出器70の電源端子は、車両搭載の図示しないバッテリー電源ラインと、電源スイッチ(図示せず)やヒューズF等及びケーブルドラム72を介して接続されている。
【0047】
格納ピン入り検出器33bの出力はジブ格納完了表示器44を点灯すると共に、モーメントリミッタコントローラ52に出力される。
この格納ピン入り検出器33bの出力と、前記ロックピン挿入検出器70の出力を同時に入力するか、同時に入力しない時には、モーメントリミッタコントローラ52は図18に示すブームシリンダ141の切換操作弁143の伸長側パイロット操作部に接続された、アンロード弁50のソレノイド50aに通電するようになっている。
ソレノイド50aの通電によりアンロード弁50がアンロードされるため、ブームシリンダ141のブーム伸長側操作が不可能となる。
【0048】
ジブ自動張出モードリレー46のa接点出力46aのコモン端子は前記と同じくヒューズF等を介してバッテリー電源ラインに接続され、a接点出力端子はジブ張出/格納スイッチ41のコモン端子c、ジブ格納位置検出器29、および格納ピン入り検出器33bの電源端子、及びリレー47、48のa接点出力47a1、48a1のコモン端子に並列に接続されている。ジブ張出/格納スイッチ41の張出選択時の出力端子aはリレー47のコイル47cに接続され、格納選択時の出力端子bはリレー48のコイル48cと、ケーブルドラム72を介してリレー51のコイル51cとに並列に接続されている。また、ジブ格納位置検出器29の出力端子はジブ格納位置表示器67と、これと並列にリレー48のa接点出力48a2を介してリレー49のコイル49cに接続されている。
格納ピン入り検出器33bの出力端子は、ジブ格納完了表示器44と、これと並列にモーメントリミッタコントローラ52に接続されている。
【0049】
a接点出力47a1、48a1の並列回路の他端子側は、モード切替スイッチ45のコモン端子dに、及びケーブルドラム72を介してジブ側切換弁73のソレノイド73cに並列に接続されている。モード切替スイッチ45の左ピン選択時の出力端子aは、リレー47のa接点出力47a2とリレー49のa接点出力49a1との並列回路を介し、さらにケーブルドラム72を介してリレー51のコモン端子51c1に接続されている。同じく、モード切替スイッチ45の回動選択時の出力端子b及び右ピン選択時の出力端子cは、それぞれケーブルドラム72を介してリレー51の他のコモン端子51c2及びコモン端子51c3に接続されている。コモン端子51c1に対応するb接点出力51b1及びa接点出力51a1は、それぞれロックシリンダ17を駆動する左ロックシリンダ切換弁53のソレノイド53d、53eに接続されている。また、同様に、コモン端子51c2に対応するb接点出力51b2及びa接点出力51a2は、それぞれ回動シリンダ63を駆動する回動シリンダ切換弁54のソレノイド54d、54eに接続され、コモン端子51c3に対応するb接点出力51b3及びa接点出力51a3は、それぞれロックシリンダ18を駆動する右ロックシリンダ切換弁55のソレノイド55d、55eに接続されている。
【0050】
なお、上記の各リレーのコイル、表示器(LED)、ソレノイド及び検出器(近接スイッチ)等の他端側はバッテリーのグランドラインに接続されている。また、ケーブルドラム72はブーム先端側と車体側とを接続するケーブルを伸縮自在にするものである。
【0051】
図18に示す油圧制御回路は、チルトシリンダ14を操作するための操作レバー56aを有する操作弁56からのパイロット管は方向切換弁57のパイロット操作部に接続されている。油圧ポンプ58から吐出された圧油は方向切換弁57のPポートに導かれ、方向切換弁57のTポートはタンク59へ接続されている。方向切換弁57のAポートは管路76、リール74a、管路101及びパイロット操作逆止弁78を介してチルトシリンダ14のヘッド側に接続され、Bポートは管路77及びリール74bを介して方向切換弁73に接続されている。
【0052】
方向切換弁73は圧油をチルトシリンダ14側に供給するかジブ張出/格納用の各ロックシリンダ17、18及び回動シリンダ63側に供給するかを切り換えるものである。方向切換弁73のAポートは、管路102、カウンタバランス弁79を介してチルトシリンダ14のボトム側に接続されている。また、方向切換弁73のBポートは管路103を介して回動シリンダ切換弁54のPポートに、回動シリンダ切換弁54のTポートは管路104を介して右ロックシリンダ切換弁55のPポートに、右ロックシリンダ切換弁55のTポートは管路105を介して左ロックシリンダ切換弁53のPポートに、左ロックシリンダ切換弁53のTポートは管路106及び逆止弁75を介して管路101に接続されている。前記各左ロックシリンダ切換弁53、回動シリンダ切換弁54、及び右ロックシリンダ切換弁55の中立位置bでは、PポートとTポート同士が内部で連通している。
【0053】
左ロックシリンダ切換弁53のA,Bポートは、それぞれ管路107及び管路108を介してロックシリンダ17のボトム側及びヘッド側に接続されている。また、右ロックシリンダ切換弁55のA,Bポートは、それぞれ管路109及び管路110を介してロックシリンダ18のボトム側及びヘッド側に接続されている。さらに、回動シリンダ切換弁54のA,Bポートは、それぞれ管路111及び管路112を介して回動シリンダ63のボトム側及びヘッド側に接続されている。
【0054】
図19に示すブーム操作用油圧回路は、ブームシリンダ141を操作するためのブームレバー142aを有するブーム操作弁142からのパイロット管は方向切換弁143のパイロット操作部に接続されている。油圧ポンプ58から吐出された圧油は方向切換弁143のPポートに導かれ、方向切換弁143のTポートはタンク59へ接続されている。方向切換弁143のAポートはブームシリンダ141のヘッド側に接続され、Bポートはカウンタバランス弁144を介してブームシリンダ141のボトム側に接続されている。
【0055】
方向切換弁143の一方のパイロット操作部には、ソレノイド50aによって操作されるアンロード弁50が接続されている。
パイロットポンプ58aとブーム操作弁142とを接続する管路145は、圧力制御弁146により一定のパイロット元圧に維持されている。
【0056】
図20は本発明の電気制御回路の第2実施例を示す図である。図17に示す第1実施例と共通する部品には同一符号を付してその説明を省略し、異なる部分についてのみ説明する。
左ピン19aの挿入が完了すると、ロックピン挿入検出器70が検知片68aを検出し、ロックピン挿入検出器70の出力が左ピンロック完了表示器43を点灯すると共に、警報スイッチ69のコイルに通電するため、B接点となり、警報ブザー69aと警報ランプ69bには通電されない。
一方格納ピン33の入りを検出した格納ピン入り検出器33bの出力も、警報スイッチ69のコイルに通電されるため、B接点となり警報ブザー69aと警報ランプ69bとには通電されない。
従って左ピン19aの挿入が完了していないと共に、格納ピン33が入り状態にないときには、警報スイッチ69のコイルに通電されないため、A接点となり警報ブザー69aと警報ランプ69bに通電されるように構成されている。
【0057】
図21は本発明に係る移動式クレーンのモーメントリミッタ表示パネル40を示す図で、このモーメントリミッタ表示パネル40には、ジブ作業、ブーム/シングルトップ作業、および準備(ジブ張出/格納)作業の各上部作業モードを選択するための、上部作業モードスイッチ71が設置されている。
図22図は図21のP部拡大詳細である。
【0058】
次に、図17〜図19に示す電気制御回路及び油圧制御回路における作動について説明する。
図17において、上部作業モードスイッチ71からモーメントリミッタコントローラ52に準備(ジブ張出/格納)モード信号が出力されると、モーメントリミッタコントローラ52からジブ自動張出モードリレー46のコイル46cに通電され、a接点出力46aがオンする。
(1) 準備モード(ジブチルトシリンダの操作)
図15のフロントパネル40aのジブ張出/格納スイッチ41が張出側及び格納側のいずれにも操作されていないときは、このスイッチのコモン端子cは出力端子a及び出力端子bに接続されていない。よって、リレー47、48のコイル47c、48cは通電されずにa接点出力47a1、48a1は共にオフのままとなり、方向切換弁73のソレノイド73cは通電されない。したがって、方向切換弁73はa位置になり、チルトレバー56の操作によってチルトシリンダ14が伸縮する。
【0059】
例えば、チルトレバー56を手前に引くと、方向切換弁57はa位置に切り換わり、油圧ポンプ58から吐出された圧油のチルトレバー操作量に応じた流量が管路77、リール74bを介して方向切換弁73に導かれ、さらに方向切換弁73のa位置から管路102及びカウンタバランス弁79を介してチルトシリンダ14のボトム側に流入する。チルトシリンダ14のヘッド側から流出した油は、パイロット操作逆止弁78、管路101、リール74a及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、チルトレバー操作量に応じた速度でチルトシリンダ14は伸長する。チルトレバー56を反対方向に操作すると、方向切換弁57はc位置に切り換わり、油圧ポンプ58から吐出された圧油は上記と反対方向に流れ、チルトレバー操作量に応じた速度でチルトシリンダ14は縮小する。このとき、管路101の圧油は逆止弁75によって管路106側には流入しないようになっている。
【0060】
(2) 準備モード(ジブ張出操作)
ジブ張出/格納スイッチ41が張出側に操作されているときは、このスイッチのコモン端子cは出力端子aに接続される。よって、リレー47のコイル47cが通電されてa接点出力47a1がオンし、方向切換弁73のソレノイド73cが通電される。また、リレー51のコイル51cは通電されないので、各b接点出力51b1、51b2、51b3はコモン端子51c1、51c2、51c3に接続されている。このため、方向切換弁73はb位置に切り換わり、チルトレバー56の操作によってジブ張出の操作が可能となる。
【0061】
(i) フロントパネル40aのモード切替スイッチ45を「左ピン」側に切り替えたときは、モード切替スイッチ45のコモン端子dと端子aが接続する。また、リレー47のa接点出力47a2はオンしているので、左ロックシリンダ切換弁53のソレノイド53dが通電される。これによって、左ロックシリンダ切換弁53はa位置に切り換わる。このとき、チルトレバー56を手前に引くと、方向切換弁57はa位置に切り換わり、油圧ポンプ58から吐出された圧油のチルトレバー操作量に応じた流量が管路77、リール74bを介して方向切換弁73に導かれる。
【0062】
さらに、方向切換弁73のb位置から管路103、回動シリンダ切換弁54のb位置、管路104、右ロックシリンダ切換弁55のb位置及び管路105を介して左ロックシリンダ切換弁53のa位置に導かれ、管路107からロックシリンダ17のボトム側に流入する。ロックシリンダ17のヘッド側から流出した油は、管路108、左ロックシリンダ切換弁53、管路106、逆止弁75、管路101、リール74a及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、チルトレバー引き量に応じた速度でロックシリンダ17は伸長し、上下の左ピン19aが挿入される。
【0063】
(ii)モード切替スイッチ45を「回動」側に切り替えたときは、モード切替スイッチ45のコモン端子dと端子bが接続するので、回動シリンダ切換弁54のソレノイド54dが通電される。これによって、回動シリンダ切換弁54はa位置に切り換わる。このとき、チルトレバー56を手前に引くと、油圧ポンプ58から吐出された圧油が方向切換弁57のa位置を介して方向切換弁73に導かれ、方向切換弁73のb位置から管路103を介して回動シリンダ切換弁54のa位置に導かれ、管路111から回動シリンダ63のボトム側に流入する。回動シリンダ63のヘッド側から流出した油は、管路112、回動シリンダ切換弁54、管路104、逆止弁75、管路101及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、チルトレバー引き量に応じた速度で回動シリンダ63は伸長し、ジブ7がブーム3の側方から前方に上下の左ピン19aの回りに回動する。
【0064】
(iii) モード切替スイッチ45を「右ピン」側に切り替えたときは、モード切替スイッチ45のコモン端子dと端子cが接続するので、右ロックシリンダ切換弁55のソレノイド55dが通電される。これによって、右ロックシリンダ切換弁55はa位置に切り換わる。このとき、チルトレバー56を手前に引くと、同様にして、油圧ポンプ58から吐出された圧油が方向切換弁57のa位置を介して方向切換弁73に導かれ、方向切換弁73のb位置から管路103、管路104を介して右ロックシリンダ切換弁55のa位置に導かれ、管路109からロックシリンダ18のボトム側に流入する。ロックシリンダ18のヘッド側から流出した油は、管路110、右ロックシリンダ切換弁55、管路105、逆止弁75、管路101及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、チルトレバー引き量に応じた速度でロックシリンダ18は伸長し、上下の右ピン19bが挿入される。
【0065】
なお、上記のときにチルトレバー56を反対方向に操作すると、方向切換弁57はc位置に切り換わり、油圧ポンプ58から吐出された圧油は管路76、管路101に導かれる。しかし、管路101の圧油は逆止弁75によって管路106側には流入しないので、上記の各シリンダは縮小することはない。よって、誤操作を防止できる。
【0066】
(3) 準備モード(ジブ格納操作)
次に、ジブ張出/格納スイッチ41が格納側に操作されているときは、このスイッチのコモン端子cは出力端子bに接続される。よって、リレー48のコイル48cが通電されてa接点出力48a1がオンし、方向切換弁73のソレノイド73cが通電される。また、同時にリレー51のコイル51cが通電されるので、各a接点出力51a1、51a2、51a3はコモン端子51c1、51c2、51c3に接続される。このため、方向切換弁73はb位置に切り換わり、チルトレバー56の操作によってジブ格納の操作が可能となる。
【0067】
(i) フロントパネル40aのモード切替スイッチ45を「右ピン」側に切り替えたときは、モード切替スイッチ45のコモン端子dと端子cが接続し、右ロックシリンダ切換弁55のソレノイド55eが通電される。これによって、右ロックシリンダ切換弁55はc位置に切り換わる。このとき、操作レバー56を手前に引くと、同様に、油圧ポンプ58から吐出された圧油が方向切換弁57のa位置を介して方向切換弁73に導かれ、方向切換弁73のb位置から管路103、右ロックシリンダ切換弁55のc位置、管路110からロックシリンダ18のヘッド側に流入する。ロックシリンダ18のボトム側から流出した油は、管路109、右ロックシリンダ切換弁55、管路105、逆止弁75、管路101及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、操作レバー引き量に応じた速度でロックシリンダ18は縮小し、上下の右ピン19bが抜かれる。
【0068】
(ii) モード切替スイッチ45を「回動」側に切り替えたときは、回動シリンダ切換弁54のソレノイド54eが通電される。これによって、回動シリンダ切換弁54はc位置に切り換わる。このとき、操作レバー56を手前に引くと、油圧ポンプ58から吐出された圧油が方向切換弁57のa位置、方向切換弁73のb位置、管路103を介して回動シリンダ切換弁54のc位置に導かれ、管路112から回動シリンダ63のヘッド側に流入する。回動シリンダ63のボトム側から流出した油は、管路111、逆止弁75及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、操作レバー引き量に応じた速度で回動シリンダ63は縮小し、ジブ7がブーム3の前方から側方に上下の左ピン19aの回りに回動する。
【0069】
(iii) モード切替スイッチ45を「左ピン」側に切り替えたときは、モード切替スイッチ45のコモン端子dと端子aが接続する。このとき、リレー47のa接点出力47a2はオフしているので、リレー49のa接点出力49a1のオン/オフによって、左ロックシリンダ切換弁53のソレノイド53eの通電の可否が決まる。すなわち、ジブ格納検出器29の一例の近接スイッチが検知板29aを検知しているとき、ジブ格納検出器29の出力はa接点出力48a2を介してリレー49のコイル49cを通電し、このときのみ、a接点出力49a1のオンによって左ロックシリンダ切換弁53のソレノイド53eに通電される。これによって、左ロックシリンダ切換弁53はc位置に切り換わる。
【0070】
ここで、操作レバー56を手前に引くと、方向切換弁57はa位置に切り換わり、油圧ポンプ58から吐出された圧油が管路77、方向切換弁73のb位置、管路103、管路105、左ロックシリンダ切換弁53のc位置及び管路108からロックシリンダ17のヘッド側に流入する。ロックシリンダ17のボトム側から流出した油は、管路107、逆止弁75及び管路76を介して方向切換弁57からタンク59へドレーンする。これによって、操作レバー引き量に応じた速度でロックシリンダ17は縮小し、上下の左ピン19aが抜かれる。
【0071】
図17において、上部作業モードスイッチ71からモーメントリミッタコントローラ52にジブモード、またはブーム/シングルトップモード信号が出力されると、モーメントリミッタコントローラモーメントリミッタコントローラからジブ自動張出モードリレー46のコイル46cに通電されないため、a接点出力46aがオフする。
このときには通常のジブ作業、あるいはブーム/シングルトップ作業が可能となる。
【0072】
前記準備(ジブ張出/格納)作業の手順について説明する。
(1) 準備(ジブ張出/格納)作業
(i) ジブ張出作業の手順
1)作業者は、ジブ7の固定手段30のピン33を抜き、ジブ7の先端部を係止ピン21の回りに外側に振出した後、ピン33をブラケット35のガイド用の孔35aに挿入してジブ7が振り戻らないようにする。(図8〜図12参照)これに伴って、ジブ7の基端部の上下のブラケット15の上下板15b、15cの間に、及び上下板15d、15eの間に、トップブーム6の左側面上下のブラケット61を挟み込み、お互いの孔15a及び孔61aを一致させる。また、第1リンク64の上下板64a、64bの間にブラケット61を挟み込み、ピン67とのブラケット61の孔61bを一致させる。
【0073】
2)運転室9内の操作パネルのジブ張出/格納スイッチ41を「張出」側に、モード切替スイッチ45を「左ピン」側に切り換える。この状態で、操作レバー56を引く。前述のように、ロックシリンダ17が伸長し、上下の左ピン19aが上下のブラケット15の孔15a及びブラケット61の61aに挿入される。また、同時に、第3リンク66のピン67が第1リンク64の孔及び上部のブラケット61の孔61bに挿入される。
3)上下の左ピン19aの挿入が完了するまで待つ。左ピン19aの挿入が完了すると、ロックピン挿入検出器70の一例である近接スイッチが検知片68aを検出し、ロックピン挿入検出器70の出力が左ピンロック完了表示43を点灯させる。と同時に、上記検出信号をモーメントリミッタコントローラ52が入力する。
【0074】
4)作業者は上記の左ピンロック完了表示器43が点灯したことを確認してから、ジブ張出/格納スイッチ41の「張出」をオフ(これにより、ジブモードとなる)する。また、ブーム起伏レバー(図示せず)を操作してブームを所定角度起こした後、ブーム伸縮レバー(図示せず)を操作してブームを所定長さまで伸長する。このとき、モーメントリミッタコントローラ52は、ロックピン挿入検出器70の上記検出信号が入力されているときにのみ、ブーム3を伸長するようにしている。よって、左ピン19aの挿入が完了しないままブーム3を伸長することが無くなるので、ジブ7の落下事故等を防止でき、作業の安全性が向上で きる。
5)ブーム3を更に起こしながら、操作レバー56によってジブ7を徐々に伏せる。ブーム角度が所定角度となり、ジブ7が鉛直になったら、補巻ロープ121を緩めて補フック122を地面に寝かせる。補巻ロープ121をジブ7の先端部のアイドラシーブ123及びジブシーブ124に通した後、補巻ロープ121を少し巻き上げて補フック122を地面から浮かせ、操作レバー56によってジブ7を最大に(ブーム3に対して略直角)伏せる。
【0075】
6)ジブ張出/格納スイッチ41を「張出」側に、モード切替スイッチ45を「回動」側に切り換え、この状態で操作レバー56を引く。前述のように、回動シリンダ63が伸長し、ジブ7がブーム3の前方に回動する。図13に、回動シリンダ63が伸長してジブ7をブーム3の前方に回動して張り出した状態を示している。
7)モード切替スイッチ45を「右ピン」側に切り換え、操作レバー56を引く。ロックシリンダ18が伸長し、右ピン19bが上下のブラケット16とブラケット62の孔16a、62aに挿入される。
8)ジブ張出/格納スイッチ41の「張出」をオフし(これにより、ジブモードとなる)、操作レバー56によってジブ7を起こしながら、ブーム3を略水平になるまで最大に伏せる。
9)この後、補巻ロープ121の付け替え等を行う。
【0076】
以上のように、ジブ7の振出し以後の左ピン19aの挿入、ブーム3の起こし及び伸長、ジブ7の伏せ及び回動、右ピン19bの挿入、ジブ7の起こし、ブーム3の伏せ等の各操作が運転室9内でできるので、作業時の安全性が高くなる。また、左ピン19aの挿入完了を表示によって作業者に確認させると共に、左ピン19aが挿入完了していないときは、モーメントリミッタコントローラ52がブーム3を伸長しないようにしている。よって、挿入が不完全な状態でのブーム3の伸長によるジブ7の落下事故等を防止できる。
【0077】
(ii) ジブ格納作業の手順
これまで説明した張出時の作業手順及び操作をほぼ逆に行うことによって可能である。ここで、ジブ格納時は、ジブ張出/格納スイッチ41を「格納」にする。但し、張出時と一部異なる手順があり、以下にこの手順のみを説明する。上記ジブ格納時の手順を逆に行って、ジブ7をブーム3の前方から側方に回動し、さらにジブ7を起こしてブーム3と略平行にしているものとする。(ここまでは、上記9)から5)の逆手順を行う)
この後、手順4)に対応する作業として、ブーム3を縮小してジブ7の係止ピン21を係止ブラケット22の孔22aに挿入させる必要がある。図11はこのときのジブ7の先端部をガイドする様子を表している。ブーム3の縮小に伴って、ジブ7はブーム3の側面に沿ってブーム3の基端部方向へ移動する。ジブ7側面のブラケット36の先端下面36aが、ブーム3のブラケット34のバー37に当接する。ジブ7がブーム3の基端部方向へ移動すると、先端下面36aはバー37に案内され、ブラケット36がブラケット34上に乗るようになっている。
【0078】
また、ブラケット36の先端の傾斜部36bがピン33の側面に当接しながらブラケット36は移動し、最後にはブラケット36の側面36cがピン33の側面に当接した状態にブラケット36はガイドされる。この状態のときにジブ7の係止ピン21が係止ブラケット22の孔22aにちょうど挿入されるように、係止ピン21と孔22aとの位置関係を調整しておく。これは、ナット24aによる上下方向の調整、及びナット26aによる左右方向の調整によって行うことができる。(図6、7参照)この結果、ブーム3の縮小に伴って、ジブ7のブラケット36の先端下面36a及び傾斜部36bがそれぞれバー37及びピン33によってガイドされ、スムーズに係止ピン21が係止ブラケット22の孔22aに挿入される。
【0079】
3)に対応する手順として、係止ピン21が係止ブラケット22の孔22aに挿入完了するまで待つ。係止ピン21の孔22aへの挿入が完了すると、ジブ格納位置検出器29が検知板29aを検出し、ジブ格納位置検出器29の検出出力がリレー49のコイル49cを通電する。そして接点49a1を接続して左ピン19aの操作を可能にする。
2)に対応する手順として、ジブ張出/格納スイッチ41を「格納」側にし、モード切替スイッチ45を「左ピン」にしたとき、前述のように操作レバー56を引くとロックシリンダ17を縮小できるようになり、左ピン19aを抜くことができる。この結果、係止ピン21が孔22aに完全に挿入されて、ジブ格納位置検出がされていないと左ピン19aを抜くことができずジブ7が落下することを防止でき、作業の安全性が向上する。
【0080】
図20に示す電気制御回路の第2実施例の作用について説明する。図17に示す第1実施例と共通する部品には同一符号を付してその説明を省略し、異なる部分についてのみ説明する。
左ピン19aの挿入が完了すると、ロックピン挿入検出器70が検知片68aを検出し、ロックピン挿入検出器70の出力が左ピンロック完了表示器43を点灯すると共に、警報スイッチ69のコイルを励磁してB接点に切り換わるため、警報ブザー69aと警報ランプ69bとは作動しない。
【0081】
一方ジブ格納ピン33の入りを検出した格納ピン入り検出器33bの出力でも、警報スイッチ69のコイルを励磁してB接点に切り換わるため、警報ブザー69aと警報ランプ69bとは作動しない。
即ち左ピン19aがロック完了した張出時、または格納ピン33の入りを検出する格納時には警報スイッチ69はB接点に切り換わるため、警報ブザー68aと警報ランプ68bとは作動しない。
即ち左ピン19aがロック完了してなく、しかもジブ格納ピン33の入りを検出すしないときには、警報スイッチ69はA接点に切り換わるため、警報ブザー69aと警報ランプ69bとが作動して危険であることを知らせる。つまりこの2つのピン19a,33の両方が抜けていると警報する。
この場合には特に図16に示す第1実施例のようなソレノイド50aを有するアンロード弁50を必要としなくとも、警報ブザー69aと警報ランプ69bにより危険であることが分かる。
【0082】
次に、図23に示す移動式クレーンの安全装置の制御フローチャート、および表1により、本発明に係る移動式クレーンの作業状態検出の制御について説明する。
【0083】
【表1】

Figure 0003716952
【0084】
(1) 走行時
運転室9に設置された図示されないPTOスイッチにより「走行」を選択すると、図23においてステップS1からS2に進む。
(i) ステップS2において、図11に示すジブ格納位置検出器33bが格納ピン33が入っていることを検出すると、ステップS2からS3に進んで通常走行が行われる。この場合には表1の検出項;mに示すように、クレーン車の状態は正常であるためブザーにより警告しない。しかしクレーン車の走行状態ではブーム等のクレーン作業は常に不可能のように設定されている。
(ii)ステップS2において、ジブ格納位置検出器33bが格納ピン33が入っていることを検出しないと、ステップS2からS4に進んで走行は可能であるが、走行時に警報ブザーが発報されると共に、「格納ピン33が入っていない」ことを図21のモーメントリミッタ表示パネル40にディスプレイする。この場合には表1の検出項;nに示すように、ジブ7落下の危険性があるためブザーにより連続して警告する。
【0085】
(2) 作業時(ジブモード、ブームモード、準備モードの各作業モード共通)
運転室9に設置された図示されないPTOスイッチにより「作業」を選択すると、図23においてステップS1からS5に進む。
(i) ステップS5において、左左ピン19a、ジブ格納ピン33、および作業モードスイッチ71が正常であれば、ステップS5からS6に進んで、表1に示すジブ作業、ブーム/シングルトップ作業、および準備(ジブ張出/格納)作業の各通常作業が行われる。この場合には表1の検出項;a,f,i,jに示すように、クレーン車の状態は正常であり、検出項;a,f,iではブザーにより警告しないと共に、ブーム等のクレーン作業が可能となる。しかし検出項;jではジブ張出、格納のための準備作業を行うためブザーにより連続的に警告すると共に、ブーム等のクレーン作業は不可能にする。
【0086】
(ii)ステップS5において、左左ピン19a、格納ピン33、および作業モードスイッチ71が異常であれば、ステップS5からS7に進む。
▲1▼.ステップS7において作業モードスイッチ71の選択が正しければ、ステップS7からS8に進む。
(a) ステップS8で左左ピン19aと格納ピン33が共に抜けていれば、ステップS8からS9に進み、図17に示すモーメントリミッタコントローラ52から図19に示すアンロード弁50のソレノイド50aに通電され、ブームの切換操作弁の操作が不可能になるためブームの伸し作業が停止し、警報ブザーが発報されると共に、モーメントリミッタ表示パネル40のディスプレイに表1の検出項;d,h,lに示されるような、「危険 ジブ落下」、「確認 ジブ左ピン」、または「確認 格納ピン」のどれかを表示する。
(b) ステップS8で左左ピン19aと格納ピン33が共に入っていれば、ステップS8からS10に進み、このような現象は実際あり得ないためコントローラ52等の故障である。このような場合には表1の検出項;c,g,kに示すように、図19のアンロード弁50のソレノイド50aに通電され、ブーム作業を停止し、ブザーで10秒間断続的に警報すると共に、ディスプレイに「エラー」コードが表示される。
【0087】
▲2▼.ステップS7において作業モードスイッチ71の選択が正しくなければ、ステップS7からS11に進み、表1の検出項;b,eに示されるように、「確認 作業モードスイッチ」、「確認 ジブ左ピン」、または「確認 格納ピン」のどれかをモーメントリミッタ表示パネルに表示すると共に、ブザーにより10秒間断続的に警報する。
【0088】
表1の制御により以下のような誤操作を防止できるので安全となる。
(1) ジブ張出、格納中(ジブ準備モード)におけるピンの入れ忘れによるジブの落下防止、抜き忘れによる破損防止。
(2) ジブをブーム側面に格納しているときのピン入れ忘れによるジブの落下防止。
(3) ジブをブーム前方へ張出した状態でブーム作業をするような作業モード選択ミスの警報。
(4) 走行中のジブピンの入れ忘れ、抜けによるジブ落下防止。
【0089】
以上の各実施例ではブーム3の伸操作について説明したが、ブーム3の伸作業の他に、ブーム3の縮、ブーム3の起・伏、ジブ7の起・伏、主ウインチ巻上げ・巻下げ、補ウインチ巻上げ・巻下げ、左・右旋回の計11の移動式クレーンの作業についても同様に制御することが可能である。
【図面の簡単な説明】
【図1】本発明の一実施例に係る移動式クレーンの側面図である。
【図2】本発明の一実施例におけるジブ格納時の連結部を示す平面図である。
【図3】本発明の一実施例におけるジブ格納状態の平面図である。
【図4】本発明の一実施例におけるジブ振出時の連結部を示す平面図である。
【図5】本発明の一実施例におけるジブ振出状態を示す平面図である。
【図6】図3のX−X断面図である。
【図7】図6のY−Y断面図である。
【図8】図3のP部詳細図で、(A)はジブ固定手段の全体平面図、(B)は(A)のV矢視図である。
【図9】図8の側面図である。
【図10】図8に相当するジブ格納検出手段の第2実施例を示す平面図である。
【図11】図5のQ部の振出直前の状態を示す平面図である。
【図12】図11の側面図である。
【図13】本発明の一実施例におけるジブ張出状態を示す平面図である。
【図14】図2のZ矢視図である。
【図15】図12のA矢視図である。
【図16】本発明の一実施例におけるフロントパネルを示す平面図である。
【図17】本発明の一実施例における電気制御回路を示す図である。
【図18】本発明の一実施例における油圧制御回路を示す図である。
【図19】本発明の一実施例における油圧制御回路を示す図である。
【図20】図17に相当する本発明の第2実施例を示す図である。
【図21】本発明の一実施例におけるモーメントリミッタ表示パネルを示す図である。
【図22】図21のR部詳細図である。
【図23】本発明の一実施例における安全装置の制御フローチャートを示す図である。
【図24】従来技術を説明する移動式クレーンの全体側面図である。
【図25】従来技術の移動式クレーンのブームとジブのジブ格納状態における平面図である。
【図26】図23のブームとジブ連結部分の詳細平面図である。
【図27】従来技術の移動式クレーンのジブ張出完了時のブームとジブ連結部分の側面図である。
【図28】従来技術の移動式クレーンのブームとジブのジブ振出状態における平面図である。
【図29】図28のブームとジブ連結部分の詳細平面図である。
【図30】従来技術の移動式クレーンのジブ張出途中における平面図である。
【図31】従来技術の移動式クレーンのジブ張出完了状態の平面図である。
【図32】図25のピン回りの断面詳細図で、(A)はA−A断面図、(B)はB−B断面図である。
【図33】従来技術の移動式クレーンのブーム伸縮シリンダの制御回路図である。
【符号の説明】
1…車体、3…ブーム、4…基段ブーム、6…トップブーム、7…ジブ、8…上部旋回体、9…運転室、11…ジブブラケット、12…ジブ本体、13、23、33、38、80、83、94、96、97、98、99…ピン、14…チルトシリンダ、15、16、25、31、32、34、35、36、38、61、62、…ブラケット、15a、16a、22a、22b、31a、32a、35a、61a、61b、62a、95…孔、17、18…ロックシリンダ、19a…左ピン(請求項ではロックピン)、19b…右ピン、15b,15c,15d,15e…板、20…係止手段、21…係止ピン、22…係止ブラケット、24、26…ネジ、24a、26a…ナット、28…支持板、29…ジブ格納位置検出器、29a…検知板、30…固定手段、33…ジブ格納ピン、33a…ピン抜止めピン、33b…格納ピン入り検出器(請求項ではジブ格納完了検出器)、33c…ジブ格納完了検出器、36a…先端下面、36b…傾斜部、36c…側面、37…バー、39…第1ストッパ、40…モーメントリミッタ表示パネル、40a…フロントパネル、41…ジブ張出/格納スイッチ、42a、42b…第2ストッパ、43…左ピンロック完了表示器、44…ジブ格納完了表示器、45…モード切替スイッチ、46、47、48、49、51…リレー、50…アンロード弁、52…モーメントリミッタコントローラ、53…左ロックシリンダ切換弁、54…回動シリンダ切換弁、55…右ロックシリンダ切換弁、56a…操作レバー、56…操作弁、57、73…方向切換弁、58…油圧ポンプ、58aパイロットポンプ、59…タンク、63…回動シリンダ、64…第1リンク、65…第2リンク、66…第3リンク、67…ジブ格納位置表示器、68…ポール,68a…検知片、69…警報スイッチ、69a…警報ブザー、69b…警報ランプ、70…ロックピン挿入検出器、71…上部作業モードスイッチ、72…ケーブルドラム、74a、74b…リール、75…逆止弁、76、77、101、102、103、104、105、106、107、108、109、110、111、112…管路、78…パイロット操作逆止弁、79…カウンタバランス弁、81、82、85、87a、87b…ラグ、84…つの、89…スイッチボックス、92、93…リンク、121…補巻ロープ、122…補フック、123…アイドラシーブ、124…ジブシーブ、125…シングルトップ、131…ボス、141…ブームシリンダ、142…ブーム操作弁、142a…ブームレバー、143…方向切換弁、144…カウンタバランス弁、145…管路、146…圧力制御弁。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a safety device for a mobile crane, and more particularly, to a safety device for a mobile crane that checks a misoperation of a work mode switch and checks a work state of the mobile crane to prevent a jib from dropping.
[0002]
[Prior art]
The mobile crane is provided with a telescopic boom on a vehicle body so that it can be raised and lowered, and can be swung freely. However, when it is necessary to expand the workable range by each operation of the expansion, contraction, undulation and turning, there is a jib mounted mobile crane that can expand the work range by attaching a jib to the tip of the boom. used. As conventional techniques of such a jib-mounted mobile crane, for example, as shown in FIGS. 24 to 33, as the first conventional technique, “Japanese Utility Model Publication No. 5-44990” and as the second conventional technique, There is "Japanese Utility Model Publication No. 6-76283".
[0003]
In the first and second prior arts, in FIG. 24, an upper swing body 8 is provided at the upper part of the center of the lower traveling body 1 having front, rear, left and right wheels so that the upper swing body 8 can swing freely. 3 is provided up and down freely. A driver's cab 9 capable of traveling operation and working machine operation is disposed on the front side surface on the upper swing body 8. The boom 3 is a multistage telescopic boom, and includes a base boom 4 to a top boom 6. A jib 7 is mounted on the side of the boom 3 when the mobile crane is traveling. The jib 7 is rotated around the lock pin (19a) shown in FIG. 29 as needed during work, and is projected from the side of the boom 3 to the boom tip, and is attached to the boom tip as shown in FIG. It is designed to be connected.
[0004]
The extension and storage device of the jib 7 in such a jib-mounted mobile crane will be described in detail with reference to the drawings.
25 is a plan view showing the retracted state of the jib 7, FIG. 26 is a detailed plan view of the connecting portion between the top boom 6 and the jib 7 of FIG. 25, and FIG. 27 is a side view of the connecting portion in the extended state. A lug 81 for fixing the jib 7 is provided at the rear side of the side surface of the base boom 4, and a lug 82 provided at the tip of the jib 7 is connected to the lug 81 by a pin 83. In addition, a lug 85 is provided at the center of the side surface of the base boom 4, and one 84 provided at the center of the jib 7 is locked to the lug 85 and connected by a pin 80.
[0005]
As shown in FIG. 26, lugs 87a and 87b are provided on the left and right sides of the distal end side surface of the top boom 6, and lock pins for connecting the lugs 87a and 87b of the top boom 6 and the jib 7 to the base end portion of the jib 7, respectively. 19a and 19b are provided. Lock cylinders 17 and 18 for inserting and removing the lock pins 19a and 19b are attached. Further, on the upper surface of the base end portion of the jib 7, the rotation cylinder 63 for swinging out and retracting the jib 7 (turning the jib 7 around the pin 80) and rotating the tube side by the pin 99 is rotated. It is provided freely. The rod side of the rotating cylinder 63 is rotatably connected to a connecting portion of the link 92 and the link 93 by a pin 96. The other end of the link 93 is pivotally attached to the upper surface of the jib 7 by a pin 97, and the other end of the link 92 is pivotally attached to the upper surface of the jib 7 by a pin 94 during storage. .
[0006]
A switch box 89 is disposed on the top surface of the top boom 6. The switch box 89 accommodates switches (not shown) for operating the lock cylinders 17 and 18 and the rotation cylinder 63. Further, the pin 83, the pin 80, the pin 94, the pin 98, and the like for fixing the jib 7 to the base boom 4 are positioned so as to be easily removable from the top surface of the top boom 6. .
[0007]
As shown in FIG. 32 (A) in the first prior art, the second prior art is provided with a lug 85 provided on the side surface of the base boom 4 as shown in FIG. 25, and 84 provided on the jib 7. A limit switch 86 for detecting the pin 80 connecting the two is installed on the base boom 4.
Further, as shown in FIG. 32B, a limit switch 88 that detects a pin 83 that connects a lug 81 provided on the side surface of the base boom 4 as shown in FIG. 25 and a lug 82 provided on the jib 7. Is installed on the base boom 4.
As shown in FIG. 33, a solenoid valve 147 that opens and closes a pilot circuit of the direction switching valve 143 on the extension side of the top boom 6 is interposed in the drive circuit of the telescopic cylinder 141 for the top boom 6. For these limit switches 86 and 88, a circuit in which normally open contacts and normally closed contacts are connected in series is connected in parallel between the power supply 90 and the solenoid valve 147.
[0008]
The first conventional technique and the second conventional technique operate as follows.
As shown in FIG. 26, when the jib is extended, the operator first gets on the top surface of the top boom 6 and removes the pin 94 that attaches the link 92 to the jib 7. Then, the switch of the switch box 89 is operated to operate the rotating cylinder 63 so that the hole at the tip of the link 92 is aligned with the hole 95 provided at the upper surface side end of the top boom 6. And the link 92 and the top boom 6 are connected. Next, the pin 83 that fixes the tip end of the jib 7 shown in FIG. 25 to the base boom 4 is pulled out, and the rotating cylinder 63 is operated by the switch box 89, so that the jib shown in FIGS. 7 is swung around the pin 80, and the lock pin 19 a at the base end of the jib 7 is aligned with the hole of the lug 87 a at the tip end of the top boom 6. In this state, the lock cylinder 19 shown in FIG. 27 is operated to insert the lock pin 19a, and the lug 87a is connected to the jib 7. Thereafter, the pin 80 that fixes the central 84 of the jib 7 is removed, and the boom 3 is extended by the operation lever in the cab 9 as shown in FIG. 84 is removed from the lug 85. As a result, the jib 7 is supported by the lock pin 19a and the pin 98.
[0009]
Next, an operation lever in the driver's seat 9 or a switch in the switch box 89 is operated to operate the rotation cylinder 63 to rotate the jib 7 around the lock pin 19a, as shown in FIG. Overhang in front of 3. The lock cylinder 18 is operated by the switch box 89 to insert the lock pin 19b into the hole of the lug 87b of the top boom 6. Thereby, the connection work of the jib 7 and the top boom 6 is completed. The jib 7 is stored in the reverse order.
In this manner, the operator rides on the inside of the cab 9 or the upper part of the top boom 6 and operates each cylinder and work implement to perform the extension and storage work of the jib 7. At the same time, the operator confirms the completion of each work process, for example, the lock cylinder 19 is securely inserted into the hole of the lug 87a by the lock cylinder 17 before proceeding to the next process. Yes.
[0010]
In FIG. 33, when either one of the pin 80 and the pin 83 is inserted, the telescopic cylinder 15 never extends. Therefore, even if the top boom 6 operation valve is operated incorrectly, the jib 7 or lugs 81, 82, Damage to 84, 85, etc. is prevented.
[0011]
In the third prior art, in the first and second prior arts, two pins 84 of the jib 7 are installed up and down, and the holes through which the 84 penetrates are installed in the lug 85, whereby the pin 80 is This is an omitted configuration, and this greatly simplifies the overhanging / storing operation of the jib 7.
[0012]
[Problems to be solved by the invention]
However, the first and second prior arts have the following problems.
(1) In jib overhanging and retracting devices, workers often have to work on the boom 3, so there is always a danger in working in high places and narrow places. .
(2) Depending on the work process, confirmation of process completion is very important. For example, when the lock 3 is not completely inserted when the lock pin 19a is inserted into the hole of the lug 87a by operating the lock cylinder 17 and the boom 3 is extended and the boom 3 is extended, the connection between the boom 3 and the jib 7 is released. There is a risk of the jib 7 falling.
(3) When the jib 7 is stored, if the lock pin 19a is pulled out in a state where the 84 and the lug 85 are not connected by the pin 80, the jib 7 may be similarly dropped.
(4) In such a process, it is necessary to confirm the completion of the process (pin insertion completion), but in the past, since it relies on the operator's confirmation, the burden on the worker becomes too great and the work In addition to increasing fatigue, accidents such as those described above may occur if this confirmation is mistakenly insufficient.
[0013]
The third prior art has the following problems.
(5) If you forget to insert the jib storage pin 83 after unplugging the left pin 19a of the jib foot in the storage operation of the jib 7,
(6) When working with the jib storage pin 83 removed during maintenance when storing the jib,
(7) If the jib storage pin 83 has been pulled out when the jib is stored,
In the above case, since this is not detected and interlocked, the jib 7 may fall when the boom 3 is extended.
[0014]
The present invention has been made paying attention to the above-mentioned problems, and improves the safety by reducing the work on the boom of the worker, and the jib dropping accident due to the insufficient confirmation of the completion of the pin connection. It aims at providing the safety device of the mobile crane which prevents generation | occurrence | production of etc. and checks a crane working condition.
[0015]
[Means, actions and effects for solving the problems]
In order to achieve the above object, a safety device in a mobile crane according to the first invention of the present invention includes a telescopic boom 3 and a jib that is supported by a fixing means 30 on the side of the boom 3 and stored. 7 and a lock pin 19a that goes in and out of the bracket 7 of the jib 7 and either the left or right bracket 61 at the tip of the boom 3, and the lock pin inserted into the bracket 15 and the bracket 61 when the jib 7 is used. In the safety device in the mobile crane which rotates the jib 7 stored in the side of the boom 3 around the 19a to the front of the boom 3 and extends,
[0016]
A locking means 20 is provided for locking the jib 7 to the boom 3, and the jib 7 rotates around the locking means 20 when swinging from the jib storage position to the insertion position of the lock pin 19a. A lock pin insertion detector 70 for detecting that the lock pin 19a is inserted into the brackets 15 and 16 and a jib storage for fixing the jib 7 inserted in the hole 31a of the fixing means 30 and stored in the boom 3 A pin 33, jib storage completion detectors 33b and 33c for detecting that the jib storage pin 33 is inserted into the hole 31a or the jib 7 is in the jib storage position, and the boom or An upper work mode switch 71 for selecting one of the work modes of the single top mode, the jib mode at the position where the jib 7 is extended, and the preparation mode in which the jib 7 is extended and stored, and these detectors 70, 33b, 33c and the control of the crane 71 depending on the state of the switch 71, or a part of its operation is stopped or a warning is given by an alarm means. Characterized in that a chromatography La 52.
[0017]
According to the first invention, (1) the jib 7 is prevented from dropping due to forgetting to insert the storage pin 33 when the jib is stored. (2) Preventing the jib 7 from dropping due to overhanging the jib and forgetting to insert the lock pin 19a and the storage pin 33 during the storage operation. (3) A warning is given that the upper work mode switch 71 has been incorrectly set to the boom mode with the jib extended. (4) When the jib 7 is stored, the controller 52 automatically controls the upper work mode switch 71 to prevent erroneous setting of the upper work mode switch 71 to the jib mode.
Therefore, since the accident of dropping the jib 7 can be surely prevented, the safety of the crane work is improved and the confirmation work is not required, so that the operator's fatigue can be greatly reduced.
[0018]
The safety device for a mobile crane according to the second invention of the present invention is the safety device according to the first invention, in which the controller 52 has the lock pin insertion detector 70 and the jib storage completion detector 33b in each work mode selected by the work mode switch 71 in the first invention. , 33c is provided with a controller 52 that warns by at least one of turning on an alarm lamp, issuing an alarm buzzer, or displaying characters on a monitor panel when no detection signal is input. Features.
[0019]
According to the second aspect of the invention, when the controller 52 does not input the detection signals from the lock pin insertion detector 70 and the jib storage completion detectors 33b and 33c, whether to turn on the alarm lamp or issue an alarm buzzer. The warning is made by at least one of characters displayed on the monitor panel, or the operation valve for the crane work such as the extension of the boom 3 is automatically disabled.
Therefore, an accident in which the jib 7 falls from the boom 3 can be prevented by performing a crane operation such as extending the boom 3 carelessly in a state where the jib 7 is not completely stored in the boom 3, and safety is ensured. Can be greatly improved.
[0020]
A safety device for a mobile crane according to a third invention of the present invention is the safety device according to the first invention, wherein a selection switch for selecting a traveling operation and a work machine operation of the mobile crane is installed, and the selection switch selects the traveling operation. When the detection signal of the jib storage completion detectors 33b and 33c is not input, a controller 52 is provided to warn of the danger of the jib 7 falling during traveling by an alarm lamp, an alarm buzzer, or a message output. It is characterized by that.
[0021]
According to the third aspect of the present invention, when the controller 52 does not input the detection signal from the jib storage completion detectors 33b and 33c, the alarm lamp is turned on, the alarm buzzer is issued, the monitor panel is displayed, etc. 7 warns of the danger of falling from the boom 3.
Therefore, when the mobile crane is inadvertently moved in a state where the jib 7 is not completely stored in the boom 3, an accident that the jib 7 falls from the boom 3 can be prevented in advance, and the safety is greatly improved. Can be improved.
[0022]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to FIGS.
FIG. 1 is an overall side view of a mobile crane according to the present invention, and shows a retracted state of a jib 7. In FIG. 1, the same members as those in the prior art are denoted by the same reference numerals, and the description thereof is omitted.
The jib 7 is stored on the left side (or the right side is acceptable) of the boom 3 that is mounted on the vehicle body 1 so as to be able to move up and down. The jib 7 includes a base end side jib bracket 11 and a distal end side jib body 12. The jib bracket 11 and the jib main body 12 are connected to be able to be raised and lowered by a horizontal pin 13, and can be raised and lowered around the pin 13 by a tilt cylinder 14.
[0023]
The jib body 12 includes a base boom by locking means 20 as shown in detail in FIGS. 3, 5 and 7 and fixing means 30 as shown in detail in FIGS. 3, 5 and FIGS. 4 is fixed to the left side surface. An idler sheave 123 is disposed on the top surface of the tip of the jib body 12 and a jib sheave 124 is provided at the tip. As shown in detail in FIGS. 2, 4, 12, and 13, the left and right brackets 15, 15 for connecting to the boom 3 and the right brackets 16, 16 ( Left and right are determined from the base end portion of the boom 3 to the front end direction. The same applies hereinafter), and connecting lock pins 19a and 19b are inserted between the left bracket 15 and the right bracket 16, respectively. For this purpose, lock cylinders 17 and 18 are provided. Furthermore, a top sheave (hereinafter referred to as a single top) 125 is provided at the tip of the top boom 6, and a supplementary hook 122 provided at the tip of the supplementary rope 121 via the single top 125 is provided.
[0024]
FIG. 2 is a plan view of the tip end portion of the top boom 6 and the connecting portion of the jib bracket 11 when the jib 7 is stored. A rotating cylinder 63 is disposed on the upper part of the jib bracket 11, and the tube side of the rotating cylinder 63 is rotatably attached to the upper surface of the jib bracket 11, and the rod side is the central part of the second link 65. It is attached to be freely rotatable. One end side of the second link 65 is pivotally attached to the upper surface of the jib bracket 11, and the other end side is pivotally connected to one end of the first link 64. The other end of the first link 64 is rotatably connected to one end of the third link 66, and the other end of the third link 66 is a boss 131 described later of a lock pin 19a (hereinafter referred to as "left pin 19a"). Is pivotably connected to the.
[0025]
A left bracket 61 for connecting the jib 7 is provided above and below the left end of the top boom 6. The upper and lower left brackets 61 are provided with holes 61a for connecting the left bracket 15 of the jib 7 respectively. The upper left bracket 61 is further provided with a connecting hole 61b into which the pin 67 of the connecting portion between the first link 64 and the third link 66 is inserted. A right bracket 62 for connecting the jib 7 is provided on the upper and lower sides on the right side of the tip of the top boom 6, and a connecting hole 62 a is provided on each of the upper and lower right brackets 62. Further, a first stopper 39 is fixed to the upper surface of the upper left bracket 61 over the hole 61a portion, and similarly, the first stopper 39 is formed under the hole 61a portion on the lower surface of the lower bracket 61. It is fixed. A second stopper 42b is provided on the left side surface of the top boom 6 so as to protrude toward the jib 7 side.
[0026]
A left bracket 15 having a hole 15a into which a left pin 19a for connection to the top boom 6 is inserted is provided above and below the boom side of the base end portion of the jib bracket 11, and on the upper and lower sides opposite to the boom side. A right bracket 16 having a hole 16a into which a lock pin 19b (referred to as “right pin 19b”) is inserted is provided. Further, a boss 131 is provided on the upper surface of the upper bracket 15 and in the hole 15a, and the hole 15a passes through the boss 131. Similarly, a boss 131 through which the hole 15a passes is provided on the lower surface of the lower bracket 15 and in the hole 15a portion. Further, a second stopper 42a is provided on the side surface of the jib bracket 11 on the boom side so as to protrude toward the top boom 6 side. When the jib is connected, the upper and lower bosses 131 are pressed against the first stoppers 39 of the upper and lower brackets 61 on the top boom 6 side, and the second stoppers 42a are brought into contact with the second stoppers 42b on the top boom 6 side. The positions of 15a and hole 61a are matched. Note that the second stopper 42a and the second stopper 42b may be either one.
[0027]
FIG. 3 is a plan view of the center boom 4 and the jib main body 12 at the center and the front end side. A locking means 20 between the jib 7 and the base boom 4 as shown in detail in FIG. Further, a fixing means 30 between the jib 7 and the base boom 4 as shown in detail in FIGS.
[0028]
Details of the locking means 20 will be described with reference to FIG. 6 which is an XX cross-sectional view of FIG. 3 and FIG. 7 which is a YY cross-sectional view of FIG.
Lock pins 21 projecting in the longitudinal direction of the boom 3 are provided above and below the side surface of the jib body 12 on the boom 3 side. The upper and lower locking pins 21 are inserted into the locking holes 22a of the locking brackets 22 provided on the base boom 4 side and locked. Further, a hole 22b in the longitudinal direction of the boom 3 is provided in the lower part of the locking bracket 22, and a pin 23 passes through the hole 22b. Both ends of the pin 23 in the longitudinal direction are provided with holes in the vertical direction, and screws 24 pass through these holes. A nut 24 a is inserted substantially at the center of both screws 24 and below the pins 23, and the upper and lower portions of the screws 24 are supported by the lower portions of the side surfaces of the base boom 4. Thus, the locking bracket 22 is supported by both nuts 24a via the pins 23. Then, by adjusting the position of the nut 24a along the direction of the screw 24, the vertical position of the boom 3 of the locking bracket 22 can be adjusted.
[0029]
A bracket 25 is provided on the upper side of the boom 3 and above the pin 23, and a pair of screws 26 are provided on the upper surface of the bracket 25 so as to face each other. Both screws 26 face a direction perpendicular to the side surface of the boom 3, and their tips are opposed to each other. Also, nuts 26a are inserted into both screws 26, respectively. And the upper part of the latching bracket 22 is supported in the state pinched | interposed into the front-end | tip part of both the screws 26. FIG.
In this manner, the inclination of the locking bracket 22 around the pin 23 can be adjusted by adjusting the position of the nut 26a.
[0030]
A support plate 28 extending downward is attached to the front end portion of the bracket 25, and a jib storage detector 29 is attached to the lower portion of the support plate 28. The jib storage detector 29 detects that the jib 7 has been stored, that is, that the locking pin 21 has been completely inserted into the hole 22a of the locking bracket 22. In this embodiment, an example in which a proximity switch is used as one of the jib storage detectors 29 is shown, and a detection plate 29a is attached to the jib body 12 side for detection of this proximity switch. In addition, although the proximity switch is used as the jib storage detector 29, it is not limited to this, For example, a limit switch etc. may be sufficient.
[0031]
FIG. 8 is a detailed plan view showing a first embodiment of the fixing means 30 when the jib 7 is stored in the boom 3, and FIG. 9 is a side view of FIG.
A bracket 34 projecting sideways is provided at the lower side of the side of the base boom 4, and the tip of the jib 7 is supported and fixed to the upper part of the bracket 34 in the retracted state. A bracket 31 having a hole 31a for fixing the jib 7 is fixed to the side surface of the bracket 34 and to the base end portion side of the jib 7, and the side surface of the bracket 34 and the distal end portion of the jib 7 On the side, a bracket 35 having a guide hole 35a for the jib 7 is attached. The position of the guide hole 35a is closer to the jib 7 than the position of the fixing hole 31a.
[0032]
Further, a bracket 32 projecting sideward on the boom 3 side is provided on the side surface of the jib main body 12, and a hole 32 a for fixing the jib 7 is provided in the bracket 32. A bracket 38 is also provided on the side surface of the jib main body 12 so as to protrude sideways on the boom 3 side, and a pin 38 a is provided on the upper portion of the substantially central portion of the bracket 34 of the base boom 4. A bracket 36 is provided on the side surface of the bracket 38 on the jib tip side.
When the jib 7 is retracted, the position of the hole 31a of the bracket 31 and the hole 32a of the bracket 32 coincide with each other by bringing the end face of the bracket 38 on the boom 3 side into contact with the pin 38a. At this time, the pin 33 is inserted and fixed in the hole 31a and the hole 32a. In the retracted state, the jib storage pin 33 a is inserted into the tip of the pin 33. Note that a shock absorbing shock absorbing member may be provided at the tip of the pin 38a that contacts the bracket 38, and this shock absorbing member is made of rubber, a spring or the like.
[0033]
In FIG. 9, the front end lower surface 36 a of the bracket 36 has an inclination, and this inclination makes the height of the front end lower surface 36 a with respect to the upper surface of the bracket 34 smoothly lower from the front end portion to the base end portion. In FIG. 8, the distal end portion of the bracket 36 has an inclined portion 36 b from the distal end to the side surface 36 c on the boom side, and the side surface 36 c of the proximal end portion of the bracket 36 is substantially parallel to the side surface of the jib body 12. . Further, a guide bar 37 on the lower end surface 36 a of the bracket 36 is fixed to the upper end of the side surface of the bracket 34 on the jib base end side in parallel to the upper surface of the bracket 34. Further, a jib storage pin containing detector 33b for detecting the insertion of the jib storage pin 33 as shown in detail in FIG. Yes.
[0034]
FIG. 10 is a detailed plan view showing a second embodiment of the fixing means 30 when the jib 7 is stored in the boom 3, and is installed on the side surface of the base end side of the jib 7 of the bracket 34 as shown in FIG. Instead of the storage pin containing detector 33b, a jib storage position detector 33c for detecting that the jib 7 is in the storage position is provided. Other configurations are the same as those in FIG.
[0035]
11 shows a state in which the jib 7 in the retracted state as shown in FIGS. 8 and 9 is projected to the front of the top boom 6 and the jib 7 is swung around the locking means 20 as shown in FIG. FIG. 12 is a side plan view of FIG. 11. “Jinging out” the jib 7 means that the jib 7 is rotated around the locking pin 21 by moving the tip of the jib 7 away from the boom 3, and the hole of the bracket 15 at the base end of the jib 7. The operation of matching 15a with the hole 61a of the bracket 61 of the top boom 6 is referred to.
[0036]
The pin 33 is removed from the holes 31 a and 32 a, and the tip of the jib 7 is separated from the boom 3. The pin 33 is inserted into the hole 35 a of the bracket 35, and in this state, the side surface of the pin 33 is in contact with the side surface 36 c on the boom 3 side of the base end portion of the bracket 36. Thereby, the tip of the jib 7 is fixed by the pin 33 so as not to return to the boom 3 side. At this time, the boss 131 of the bracket 15 in FIG. 2 abuts against the first stopper of the top boom 6 for positioning in the front-rear direction, and the second stopper 42a on the jib 7 side is the second stopper 42b on the top boom 6 side. The hole 15a can be easily aligned with the hole 61a of the top boom 6 by positioning in the left-right direction in contact with.
[0037]
FIG. 13 shows the left and right pins 19a inserted into the holes 15a and 61a from the swinging state of the jib 7 shown in FIG. In the same manner as the left and right pins 19a, the right and right pins 19b are inserted and fixed in the holes 16a and 62a.
[0038]
14 is a Z view in FIG. 2, and is a side view of the lock cylinder 17 and the connecting pin 19 a portion between the upper and lower brackets 15.
One end side of the third link 66 is rotatably attached to the tube at the upper end of the lock cylinder 17, and the upper left pin 19a is attached by a pin 19c. The axis of the left pin 19 a is made to coincide with the axis of the lock cylinder 17. A pin 67 for connecting the first link 64 and the hole 61b of the bracket 61 of the top boom 6 is fixed to the upper surface of the third link 66 on the other end side. Further, a lower left pin 19a is attached to the rod side of the lower end portion of the lock cylinder 17 by a pin 19d.
[0039]
Each of the upper and lower brackets 15 has a U-shape, and an upper and lower bracket 61 having a hole 15a installed on the top boom 6 side between the upper and lower plates 15b and 15c and the plates 15d and 15e. Are sandwiched between them. A boss 131 through which the hole 15a passes is provided on the upper surface of the upper plate 15b and in the hole 15a portion. Similarly, a boss 131 through which the hole 15a passes is provided on the lower surface of the lower plate 15e and in the hole 15a portion. Similarly, the connecting portion side of the first link 64 with the third link 66 is composed of upper and lower plates 64a and 64b, and the hole 61b portion of the bracket 61 above the top boom 6 is provided between the upper and lower plates 64a and 64b. It comes to pinch.
[0040]
Further, when the lock cylinder 17 is contracted to the shortest, the distal end portion of the bracket 71 protruding from the base end portion of the jib bracket 11 toward the lock cylinder 17 is located between the tube and the rod of the lock cylinder 17. It is supposed to be sandwiched. In this state, the tip of the upper left pin 19 a is hooked on the plate 15 c of the upper bracket 15, and the tip of the pin 67 is hooked on the lower plate 64 b of the first link 64. The tip of the lower left pin 19a is hooked on the plate 15d of the lower bracket 15. Accordingly, the lock cylinder 17, the first link 64, the upper and lower left pins 19 a and the pins 67 are prevented from being detached from the jib bracket 11.
[0041]
A bracket 69 extending upward is attached to the rod of the lock cylinder 17, and a lock pin insertion detector 70 for detecting the completion of insertion of the upper and lower left pins 19 a is attached to the upper end of the bracket 69. ing. In this embodiment, a proximity switch is employed as an example of the lock pin insertion detector 70, and the detection surface of this proximity switch faces downward in the expansion / contraction direction of the lock cylinder 17. A pole 68 extending downward is attached to the lower end of the tube of the lock cylinder 17, and a proximity switch detection piece 68 a is attached to the lower end of the pole 68.
[0042]
FIG. 15 is a view as seen from the direction of arrow A in FIG.
When the lock cylinder 17 is extended and the upper and lower left pins 19a are completely inserted into the holes 15a of the upper and lower brackets 15, the proximity switch of the lock pin insertion detector 70 detects the detection piece 68a at a predetermined distance and operates. It is supposed to be.
Further, when the jib 7 is extended, the boss 131 of the bracket 15 is pressed against the upper and lower first stoppers 39 provided on the upper surface of the upper bracket 61 and the lower surface of the lower bracket 61. Thereby, the positions of the hole 15a and the hole 61a coincide with each other so that the left pin 19a can be inserted smoothly.
[0043]
Although not shown, a lock cylinder 18 is provided between the upper and lower brackets 16 in the same manner as the bracket 15, and an upper right pin 19 b is connected to the upper end of the tube side of the lock cylinder 18 and the lock cylinder 18 is locked. A lower right pin 19b is attached to the lower end of the cylinder 18 on the rod side. Similarly, when the lock cylinder 18 is contracted to the shortest, the tip of a bracket (corresponding to the bracket 71) provided so as to protrude from the base end of the jib bracket 11 toward the lock cylinder 18 The tip of the upper and lower right pins 19b hangs on the cylinder side plates (corresponding to the plates 15c and 15d) of the U-shaped brackets of the upper and lower brackets 16, respectively. As a result, the lock cylinder 18 and the upper and lower right pins 19b are prevented from being detached from the jib bracket 11.
[0044]
FIG. 16 shows a front panel 40a for operating the extension / retraction of the jib of the mobile crane according to the present invention, and this front panel 40a is provided in the cab 9. The jib extension / retraction switch 41 for selecting the extension / storage operation of the jib 7 is a seesaw type changeover switch. When the jib extension / retraction switch 41 is operated, the corresponding output contacts shown in FIGS. 17 and 20 are turned on. Further, the left pin lock completion indicator 43 displayed when the left side bracket 61 of the top boom 6 and the bracket 15 of the jib 7 are completely connected by the left pin 19a, and the locking pin when the jib 7 is stored. A jib storage position indicator 67 is provided to indicate that 21 has been completely inserted into the hole 22a of the locking bracket 22.
A jib storage completion indicator 44 is provided for displaying that the jib 7 is fixed to the boom 3 and detected by the jib storage completion detectors 33b and 33c.
[0045]
The front panel 40a is provided with a mode switch 45 for switching the work mode, and the lock cylinder 17 (left pin) can be rotated only by one-way operation of one operation lever 56a shown in FIG. The cylinder 63 and the lock cylinder 18 (right pin) can be operated. Therefore, the mode changeover switch 45 can select which of these cylinders is used for work. The cylinder operating direction is switched by the jib extension / retraction switch 41.
[0046]
A first embodiment of the electric control circuit and hydraulic control circuit of the present invention shown in FIGS. 17 to 19 will be described.
The electric control circuit shown in FIG. 17 includes a moment limiter controller 52 and other interlocking means. The moment limiter controller 52 controls the extension of the boom 3 by determining whether or not the boom 3 can be extended when the jib is extended, and is composed of, for example, a microcomputer. The moment limiter controller 52 is installed in the cab 9 as shown in FIG. 21 and FIG. 22 by an upper work mode switch 71 of the moment limiter display panel 40. Each upper work mode signal in the single top mode is input, and an on-off command is output to the coil 46c of the jib automatic extension mode relay 46 based on the preparation (jib extension / storage) mode signal. The output terminal of the lock pin insertion detector 70 is connected in parallel to the moment limiter controller 52 and the left pin lock completion indicator 43 via the cable drum 72. Although the left pin lock completion indicator 43 of this embodiment is composed of a resistor and a light emitting diode (hereinafter referred to as LED), it may be a lamp or the like. The power terminal of the lock pin insertion detector 70 is connected to a battery power line (not shown) mounted on the vehicle via a power switch (not shown), a fuse F, and the cable drum 72.
[0047]
The output of the storage pin containing detector 33b lights up the jib storage completion indicator 44 and is output to the moment limiter controller 52.
When the output of the storage pin containing detector 33b and the output of the lock pin insertion detector 70 are input simultaneously or not simultaneously, the moment limiter controller 52 extends the switching operation valve 143 of the boom cylinder 141 shown in FIG. The solenoid 50a of the unload valve 50 connected to the side pilot operation unit is energized.
Since the unload valve 50 is unloaded by energization of the solenoid 50a, the boom extension side operation of the boom cylinder 141 becomes impossible.
[0048]
The common terminal of the a contact output 46a of the jib automatic extension mode relay 46 is connected to the battery power line through the fuse F and the like as described above, and the a contact output terminal is the common terminal c of the jib extension / retraction switch 41 and the jib The power supply terminal of the storage position detector 29 and the storage pin containing detector 33b and the common terminals of the a contact outputs 47a1 and 48a1 of the relays 47 and 48 are connected in parallel. The output terminal a when the extension of the jib extension / retraction switch 41 is selected is connected to the coil 47c of the relay 47, and the output terminal b when storage is selected is connected to the coil 48c of the relay 48 and the relay 51 via the cable drum 72. It is connected in parallel with the coil 51c. The output terminal of the jib storage position detector 29 is connected to the coil 49c of the relay 49 through the j-contact storage position indicator 67 and the a contact output 48a2 of the relay 48 in parallel therewith.
The output terminal of the storage pin containing detector 33b is connected to the jib storage completion indicator 44 and the moment limiter controller 52 in parallel therewith.
[0049]
The other terminal side of the parallel circuit of the a contact outputs 47a1 and 48a1 is connected in parallel to the common terminal d of the mode changeover switch 45 and to the solenoid 73c of the jib side switching valve 73 via the cable drum 72. When the left pin of the mode changeover switch 45 is selected, the output terminal a is connected to the common terminal 51c1 of the relay 51 via the parallel circuit of the a contact output 47a2 of the relay 47 and the a contact output 49a1 of the relay 49, and further via the cable drum 72. It is connected to the. Similarly, the output terminal b when the mode switch 45 is selected for rotation and the output terminal c when the right pin is selected are connected to the other common terminal 51c2 and common terminal 51c3 of the relay 51 via the cable drum 72, respectively. . The b contact output 51b1 and the a contact output 51a1 corresponding to the common terminal 51c1 are connected to solenoids 53d and 53e of the left lock cylinder switching valve 53 that drive the lock cylinder 17, respectively. Similarly, the b contact output 51b2 and the a contact output 51a2 corresponding to the common terminal 51c2 are connected to the solenoids 54d and 54e of the rotating cylinder switching valve 54 that drives the rotating cylinder 63, respectively, and correspond to the common terminal 51c3. The b contact output 51b3 and the a contact output 51a3 are connected to solenoids 55d and 55e of the right lock cylinder switching valve 55 for driving the lock cylinder 18, respectively.
[0050]
The other end of each relay coil, indicator (LED), solenoid, detector (proximity switch), etc. is connected to the ground line of the battery. The cable drum 72 makes the cable connecting the boom tip side and the vehicle body side extendable and contractable.
[0051]
In the hydraulic control circuit shown in FIG. 18, a pilot pipe from an operation valve 56 having an operation lever 56 a for operating the tilt cylinder 14 is connected to a pilot operation portion of a direction switching valve 57. The pressure oil discharged from the hydraulic pump 58 is guided to the P port of the direction switching valve 57, and the T port of the direction switching valve 57 is connected to the tank 59. The A port of the direction switching valve 57 is connected to the head side of the tilt cylinder 14 via the conduit 76, the reel 74a, the conduit 101 and the pilot operation check valve 78, and the B port is connected via the conduit 77 and the reel 74b. It is connected to the direction switching valve 73.
[0052]
The direction switching valve 73 switches whether to supply the pressure oil to the tilt cylinder 14 side or to supply the lock cylinders 17 and 18 for the jib extension / storage and the rotation cylinder 63 side. The A port of the direction switching valve 73 is connected to the bottom side of the tilt cylinder 14 via a pipe line 102 and a counter balance valve 79. Further, the B port of the direction switching valve 73 is connected to the P port of the rotating cylinder switching valve 54 via the conduit 103, and the T port of the rotating cylinder switching valve 54 is connected to the right lock cylinder switching valve 55 via the conduit 104. To the P port, the T port of the right lock cylinder switching valve 55 is connected to the P port of the left lock cylinder switching valve 53 via the pipe line 105, and the T port of the left lock cylinder switching valve 53 is connected to the pipe line 106 and the check valve 75. It is connected to the pipe line 101 via. At the neutral position b of each of the left lock cylinder switching valve 53, the rotating cylinder switching valve 54, and the right lock cylinder switching valve 55, the P port and the T port communicate with each other inside.
[0053]
The A and B ports of the left lock cylinder switching valve 53 are connected to the bottom side and the head side of the lock cylinder 17 via a pipe line 107 and a pipe line 108, respectively. Further, the A and B ports of the right lock cylinder switching valve 55 are connected to the bottom side and the head side of the lock cylinder 18 via a pipe line 109 and a pipe line 110, respectively. Further, the A and B ports of the rotating cylinder switching valve 54 are connected to the bottom side and the head side of the rotating cylinder 63 via a pipe line 111 and a pipe line 112, respectively.
[0054]
In the boom operation hydraulic circuit shown in FIG. 19, the pilot pipe from the boom operation valve 142 having the boom lever 142 a for operating the boom cylinder 141 is connected to the pilot operation portion of the direction switching valve 143. The pressure oil discharged from the hydraulic pump 58 is guided to the P port of the direction switching valve 143, and the T port of the direction switching valve 143 is connected to the tank 59. The A port of the direction switching valve 143 is connected to the head side of the boom cylinder 141, and the B port is connected to the bottom side of the boom cylinder 141 via the counter balance valve 144.
[0055]
An unload valve 50 operated by a solenoid 50a is connected to one pilot operation portion of the direction switching valve 143.
A pipe line 145 that connects the pilot pump 58 a and the boom operation valve 142 is maintained at a constant pilot original pressure by the pressure control valve 146.
[0056]
FIG. 20 is a diagram showing a second embodiment of the electric control circuit according to the present invention. Components common to those in the first embodiment shown in FIG. 17 are denoted by the same reference numerals, description thereof is omitted, and only different portions will be described.
When the insertion of the left pin 19a is completed, the lock pin insertion detector 70 detects the detection piece 68a, the output of the lock pin insertion detector 70 lights the left pin lock completion indicator 43, and the coil of the alarm switch 69 is turned on. Since power is supplied, the contact B is formed, and the alarm buzzer 69a and the alarm lamp 69b are not energized.
On the other hand, the output of the storage pin entry detector 33b that has detected the entry of the storage pin 33 is also energized to the coil of the alarm switch 69, so that it becomes a B contact and is not energized to the alarm buzzer 69a and the alarm lamp 69b.
Therefore, when the insertion of the left pin 19a is not completed and the storage pin 33 is not in the on state, the coil of the alarm switch 69 is not energized, so that the alarm buzzer 69a and the alarm lamp 69b are energized. Has been.
[0057]
FIG. 21 is a diagram showing a moment limiter display panel 40 of a mobile crane according to the present invention. This moment limiter display panel 40 includes a jib work, a boom / single top work, and a preparation (jib extension / storage) work. An upper work mode switch 71 for selecting each upper work mode is provided.
FIG. 22 is an enlarged detail of a portion P in FIG.
[0058]
Next, operations in the electric control circuit and the hydraulic control circuit shown in FIGS. 17 to 19 will be described.
In FIG. 17, when a preparation (jib extension / storage) mode signal is output from the upper work mode switch 71 to the moment limiter controller 52, the coil 46 c of the jib automatic extension mode relay 46 is energized from the moment limiter controller 52. The a contact output 46a is turned on.
(1) Preparation mode (Dibutylt cylinder operation)
When the jib extension / retraction switch 41 of the front panel 40a in FIG. 15 is not operated on either the extension side or the storage side, the common terminal c of this switch is connected to the output terminal a and the output terminal b. Absent. Therefore, the coils 47c and 48c of the relays 47 and 48 are not energized, and both the a contact outputs 47a1 and 48a1 remain off, and the solenoid 73c of the direction switching valve 73 is not energized. Therefore, the direction switching valve 73 is in the a position, and the tilt cylinder 14 is expanded and contracted by the operation of the tilt lever 56.
[0059]
For example, when the tilt lever 56 is pulled forward, the direction switching valve 57 is switched to the position a, and a flow rate corresponding to the tilt lever operation amount of the pressure oil discharged from the hydraulic pump 58 is passed through the conduit 77 and the reel 74b. It is guided to the direction switching valve 73 and further flows from the position “a” of the direction switching valve 73 to the bottom side of the tilt cylinder 14 through the pipe line 102 and the counter balance valve 79. Oil that has flowed out from the head side of the tilt cylinder 14 is drained from the direction switching valve 57 to the tank 59 via the pilot operation check valve 78, the pipe line 101, the reel 74 a and the pipe line 76. Thus, the tilt cylinder 14 extends at a speed corresponding to the tilt lever operation amount. When the tilt lever 56 is operated in the opposite direction, the direction switching valve 57 is switched to the c position, the pressure oil discharged from the hydraulic pump 58 flows in the opposite direction, and the tilt cylinder 14 is moved at a speed corresponding to the tilt lever operation amount. Shrinks. At this time, the pressure oil in the pipe line 101 is prevented from flowing into the pipe line 106 side by the check valve 75.
[0060]
(2) Preparation mode (Jib overhanging operation)
When the jib extension / retraction switch 41 is operated to the extension side, the common terminal c of this switch is connected to the output terminal a. Accordingly, the coil 47c of the relay 47 is energized, the a contact output 47a1 is turned on, and the solenoid 73c of the direction switching valve 73 is energized. Further, since the coil 51c of the relay 51 is not energized, the b contact outputs 51b1, 51b2, 51b3 are connected to the common terminals 51c1, 51c2, 51c3. Therefore, the direction switching valve 73 is switched to the b position, and the jib overhanging operation can be performed by operating the tilt lever 56.
[0061]
(i) When the mode switch 45 of the front panel 40a is switched to the “left pin” side, the common terminal d and the terminal a of the mode switch 45 are connected. Further, since the contact a output 47a2 of the relay 47 is on, the solenoid 53d of the left lock cylinder switching valve 53 is energized. As a result, the left lock cylinder switching valve 53 is switched to the position a. At this time, when the tilt lever 56 is pulled forward, the direction switching valve 57 is switched to the position “a”, and a flow rate corresponding to the tilt lever operation amount of the pressure oil discharged from the hydraulic pump 58 is passed through the conduit 77 and the reel 74b. To the direction switching valve 73.
[0062]
Further, from the b position of the direction switching valve 73 to the pipe 103, the b position of the rotating cylinder switching valve 54, the pipe 104, the b position of the right lock cylinder switching valve 55 and the pipe 105, the left lock cylinder switching valve 53. To the bottom position of the lock cylinder 17 from the pipe 107. The oil flowing out from the head side of the lock cylinder 17 flows from the direction switching valve 57 via the pipe 108, the left lock cylinder switching valve 53, the pipe 106, the check valve 75, the pipe 101, the reel 74 a and the pipe 76. Drain to tank 59. As a result, the lock cylinder 17 extends at a speed corresponding to the tilt lever pulling amount, and the upper and lower left pins 19a are inserted.
[0063]
(ii) When the mode changeover switch 45 is switched to the “rotation” side, the common terminal d and the terminal b of the mode changeover switch 45 are connected, so that the solenoid 54d of the rotation cylinder changeover valve 54 is energized. Thereby, the rotation cylinder switching valve 54 is switched to the position a. At this time, when the tilt lever 56 is pulled forward, the pressure oil discharged from the hydraulic pump 58 is guided to the direction switching valve 73 through the position a of the direction switching valve 57, and the pipeline is connected from the position b of the direction switching valve 73. It is guided to the position “a” of the rotating cylinder switching valve 54 via 103 and flows into the bottom side of the rotating cylinder 63 from the pipe 111. Oil that has flowed out from the head side of the rotating cylinder 63 passes from the direction switching valve 57 to the tank 59 via the pipe 112, the rotating cylinder switching valve 54, the pipe 104, the check valve 75, the pipe 101, and the pipe 76. To drain. As a result, the rotation cylinder 63 is extended at a speed corresponding to the amount of pulling of the tilt lever, and the jib 7 is rotated from the side of the boom 3 forward around the upper and lower left pins 19a.
[0064]
(iii) When the mode selector switch 45 is switched to the “right pin” side, the common terminal d and the terminal c of the mode selector switch 45 are connected, so that the solenoid 55d of the right lock cylinder selector valve 55 is energized. As a result, the right lock cylinder switching valve 55 is switched to the position a. At this time, when the tilt lever 56 is pulled forward, similarly, the pressure oil discharged from the hydraulic pump 58 is guided to the direction switching valve 73 via the position “a” of the direction switching valve 57, and b of the direction switching valve 73. From the position, it is guided to the position a of the right lock cylinder switching valve 55 through the pipe line 103 and the pipe line 104, and flows from the pipe line 109 to the bottom side of the lock cylinder 18. The oil flowing out from the head side of the lock cylinder 18 is transferred from the direction switching valve 57 to the tank 59 via the pipe 110, the right lock cylinder switching valve 55, the pipe 105, the check valve 75, the pipe 101 and the pipe 76. Drain. As a result, the lock cylinder 18 extends at a speed corresponding to the amount of pulling of the tilt lever, and the upper and lower right pins 19b are inserted.
[0065]
When the tilt lever 56 is operated in the opposite direction at the time described above, the direction switching valve 57 is switched to the position c, and the pressure oil discharged from the hydraulic pump 58 is guided to the pipe line 76 and the pipe line 101. However, since the pressure oil in the pipe line 101 does not flow into the pipe line 106 side by the check valve 75, the above-described cylinders do not shrink. Therefore, erroneous operation can be prevented.
[0066]
(3) Preparation mode (jib storage operation)
Next, when the jib extension / retraction switch 41 is operated to the storage side, the common terminal c of this switch is connected to the output terminal b. Accordingly, the coil 48c of the relay 48 is energized, the a contact output 48a1 is turned on, and the solenoid 73c of the direction switching valve 73 is energized. At the same time, the coil 51c of the relay 51 is energized, so that the a contact outputs 51a1, 51a2, 51a3 are connected to the common terminals 51c1, 51c2, 51c3. For this reason, the direction switching valve 73 is switched to the b position, and the jib retracting operation can be performed by operating the tilt lever 56.
[0067]
(i) When the mode selector switch 45 of the front panel 40a is switched to the “right pin” side, the common terminal d and the terminal c of the mode selector switch 45 are connected, and the solenoid 55e of the right lock cylinder selector valve 55 is energized. The As a result, the right lock cylinder switching valve 55 is switched to the c position. At this time, when the operation lever 56 is pulled forward, similarly, the pressure oil discharged from the hydraulic pump 58 is guided to the direction switching valve 73 via the position a of the direction switching valve 57, and the position b of the direction switching valve 73. From the pipe 103 and the c position of the right lock cylinder switching valve 55 and from the pipe 110 to the head side of the lock cylinder 18. The oil flowing out from the bottom side of the lock cylinder 18 is transferred from the direction switching valve 57 to the tank 59 via the pipe 109, the right lock cylinder switching valve 55, the pipe 105, the check valve 75, the pipe 101 and the pipe 76. Drain. As a result, the lock cylinder 18 contracts at a speed corresponding to the pulling amount of the operation lever, and the upper and lower right pins 19b are pulled out.
[0068]
(ii) When the mode switch 45 is switched to the “turning” side, the solenoid 54e of the turning cylinder switching valve 54 is energized. As a result, the rotating cylinder switching valve 54 is switched to the c position. At this time, when the operation lever 56 is pulled forward, the pressure oil discharged from the hydraulic pump 58 is moved to the position “a” of the direction switching valve 57, the position “b” of the direction switching valve 73, and the rotating cylinder switching valve 54 via the conduit 103. And flows into the head side of the rotating cylinder 63 from the pipe line 112. Oil flowing out from the bottom side of the rotating cylinder 63 drains from the direction switching valve 57 to the tank 59 via the pipe 111, the check valve 75 and the pipe 76. Accordingly, the rotation cylinder 63 is reduced at a speed corresponding to the pulling amount of the operation lever, and the jib 7 is rotated around the upper and lower left pins 19a from the front of the boom 3 to the side.
[0069]
(iii) When the mode switch 45 is switched to the “left pin” side, the common terminal d and the terminal a of the mode switch 45 are connected. At this time, since the a-contact output 47a2 of the relay 47 is off, whether the solenoid 53e of the left lock cylinder switching valve 53 is energized is determined by the on / off of the a-contact output 49a1 of the relay 49. That is, when the proximity switch as an example of the jib storage detector 29 detects the detection plate 29a, the output of the jib storage detector 29 energizes the coil 49c of the relay 49 via the a contact output 48a2, and only at this time. When the a contact output 49a1 is turned on, the solenoid 53e of the left lock cylinder switching valve 53 is energized. As a result, the left lock cylinder switching valve 53 is switched to the c position.
[0070]
Here, when the operation lever 56 is pulled forward, the direction switching valve 57 is switched to the position a, and the pressure oil discharged from the hydraulic pump 58 is the pipe 77, the b position of the direction switching valve 73, the pipe 103, and the pipe. It flows into the head side of the lock cylinder 17 from the passage 105, the position c of the left lock cylinder switching valve 53 and the pipe 108. Oil that has flowed out from the bottom side of the lock cylinder 17 is drained from the direction switching valve 57 to the tank 59 via the pipe 107, the check valve 75, and the pipe 76. Thereby, the lock cylinder 17 is reduced at a speed corresponding to the pulling amount of the operation lever, and the upper and lower left pins 19a are pulled out.
[0071]
In FIG. 17, when a jib mode or boom / single top mode signal is output from the upper work mode switch 71 to the moment limiter controller 52, the coil 46c of the jib automatic extension mode relay 46 is not energized from the moment limiter controller moment limiter controller. Therefore, the a contact output 46a is turned off.
At this time, normal jib work or boom / single top work is possible.
[0072]
The preparation (jib overhang / storage) procedure will be described.
(1) Preparation (jib overhang / storage) work
(i) Jib overhang procedure
1) The operator pulls out the pin 33 of the fixing means 30 of the jib 7 and swings the tip of the jib 7 outward around the locking pin 21, and then inserts the pin 33 into the guide hole 35 a of the bracket 35. And prevent the jib 7 from turning back. (See FIGS. 8 to 12) Accordingly, the left side surface of the top boom 6 is located between the upper and lower plates 15b and 15c of the upper and lower brackets 15 at the base end of the jib 7 and between the upper and lower plates 15d and 15e. The upper and lower brackets 61 are sandwiched so that the holes 15a and the holes 61a coincide with each other. Further, the bracket 61 is sandwiched between the upper and lower plates 64 a and 64 b of the first link 64, and the hole 61 b of the bracket 61 with the pin 67 is matched.
[0073]
2) Switch the jib extension / retraction switch 41 of the operation panel in the cab 9 to the “extended” side and the mode changeover switch 45 to the “left pin” side. In this state, the operation lever 56 is pulled. As described above, the lock cylinder 17 extends, and the upper and lower left pins 19 a are inserted into the holes 15 a of the upper and lower brackets 15 and 61 a of the bracket 61. At the same time, the pin 67 of the third link 66 is inserted into the hole of the first link 64 and the hole 61 b of the upper bracket 61.
3) Wait until the insertion of the upper and lower left pins 19a is completed. When the insertion of the left pin 19a is completed, a proximity switch as an example of the lock pin insertion detector 70 detects the detection piece 68a, and the output of the lock pin insertion detector 70 lights the left pin lock completion display 43. At the same time, the moment limiter controller 52 inputs the detection signal.
[0074]
4) After confirming that the left pin lock completion indicator 43 is lit, the operator turns off the “extension” of the jib extension / retraction switch 41 (this sets the jib mode). Further, after operating the boom hoisting lever (not shown) to raise the boom at a predetermined angle, the boom extending lever (not shown) is operated to extend the boom to a predetermined length. At this time, the moment limiter controller 52 extends the boom 3 only when the detection signal of the lock pin insertion detector 70 is input. Therefore, since the boom 3 is not extended without completing the insertion of the left pin 19a, it is possible to prevent the jib 7 from being dropped and the like, and the work safety can be improved.
5) While raising the boom 3 further, the jib 7 is gradually lowered by the operation lever 56. When the boom angle reaches a predetermined angle and the jib 7 becomes vertical, the auxiliary winding rope 121 is loosened and the auxiliary hook 122 is laid on the ground. After passing the auxiliary winding rope 121 through the idler sheave 123 and the jib sheave 124 at the tip of the jib 7, the auxiliary winding 121 is slightly lifted to float the auxiliary hook 122 off the ground, and the operation lever 56 maximizes the jib 7 (boom 3 (Substantially at right angles to).
[0075]
6) The jib extension / retraction switch 41 is switched to the “extension” side and the mode changeover switch 45 is switched to the “rotation” side, and the operation lever 56 is pulled in this state. As described above, the rotation cylinder 63 extends and the jib 7 rotates in front of the boom 3. FIG. 13 shows a state in which the rotating cylinder 63 is extended and the jib 7 is rotated forward from the boom 3.
7) Switch the mode switch 45 to the “right pin” side and pull the operation lever 56. The lock cylinder 18 extends, and the right pin 19b is inserted into the upper and lower brackets 16 and the holes 16a and 62a of the bracket 62.
8) The “extension” of the jib extension / retraction switch 41 is turned off (by this, the jib mode is set), and the boom 3 is lowered to the maximum level while raising the jib 7 by the operation lever 56.
9) Thereafter, the auxiliary winding rope 121 is replaced.
[0076]
As described above, the insertion of the left pin 19a after the swinging out of the jib 7, the raising and extending of the boom 3, the lowering and turning of the jib 7, the insertion of the right pin 19b, the raising of the jib 7, the lowering of the boom 3, etc. Since the operation can be performed in the driver's cab 9, the safety during work is increased. Further, the operator confirms the completion of the insertion of the left pin 19a by displaying, and the moment limiter controller 52 is prevented from extending the boom 3 when the insertion of the left pin 19a is not completed. Therefore, it is possible to prevent the jib 7 from being accidentally dropped due to the extension of the boom 3 when the insertion is incomplete.
[0077]
(ii) Jib storage procedure
This is possible by performing the work procedure and operation at the time of overhanging explained so far almost in reverse. Here, when the jib is stored, the jib extension / storage switch 41 is set to “storage”. However, there are some procedures that are different from those for overhanging, and only this procedure will be described below. It is assumed that the jib storage procedure is reversed, the jib 7 is rotated from the front of the boom 3 to the side, and the jib 7 is raised to be substantially parallel to the boom 3. (Up to this point, reverse steps 9) to 5) above)
Thereafter, as an operation corresponding to the procedure 4), it is necessary to reduce the boom 3 and insert the locking pin 21 of the jib 7 into the hole 22a of the locking bracket 22. FIG. 11 shows how the tip of the jib 7 is guided at this time. As the boom 3 shrinks, the jib 7 moves along the side surface of the boom 3 toward the base end of the boom 3. The lower end surface 36 a of the bracket 36 on the side surface of the jib 7 abuts on the bar 37 of the bracket 34 of the boom 3. When the jib 7 moves toward the base end portion of the boom 3, the lower surface 36 a of the distal end is guided by the bar 37 so that the bracket 36 rides on the bracket 34.
[0078]
In addition, the bracket 36 moves while the inclined portion 36b at the tip of the bracket 36 contacts the side surface of the pin 33, and finally the bracket 36 is guided in a state where the side surface 36c of the bracket 36 contacts the side surface of the pin 33. . In this state, the positional relationship between the locking pin 21 and the hole 22a is adjusted so that the locking pin 21 of the jib 7 is just inserted into the hole 22a of the locking bracket 22. This can be performed by adjusting the nut 24a in the vertical direction and adjusting the nut 26a in the horizontal direction. (See FIGS. 6 and 7) As a result, as the boom 3 shrinks, the tip lower surface 36a and the inclined portion 36b of the bracket 36 of the jib 7 are guided by the bar 37 and the pin 33, respectively, and the locking pin 21 is smoothly engaged. It is inserted into the hole 22 a of the stop bracket 22.
[0079]
As a procedure corresponding to 3), the process waits until the locking pin 21 is completely inserted into the hole 22a of the locking bracket 22. When the insertion of the locking pin 21 into the hole 22a is completed, the jib storage position detector 29 detects the detection plate 29a, and the detection output of the jib storage position detector 29 energizes the coil 49c of the relay 49. The contact 49a1 is connected to enable the operation of the left pin 19a.
As a procedure corresponding to 2), when the jib extension / retraction switch 41 is set to the “retraction” side and the mode changeover switch 45 is set to the “left pin”, when the operation lever 56 is pulled as described above, the lock cylinder 17 is reduced. The left pin 19a can be pulled out. As a result, if the locking pin 21 is completely inserted into the hole 22a and the jib storage position is not detected, the left pin 19a cannot be pulled out and the jib 7 can be prevented from falling, and the work safety can be improved. improves.
[0080]
The operation of the second embodiment of the electric control circuit shown in FIG. 20 will be described. Components common to those in the first embodiment shown in FIG. 17 are denoted by the same reference numerals, description thereof is omitted, and only different portions will be described.
When the insertion of the left pin 19a is completed, the lock pin insertion detector 70 detects the detection piece 68a, the output of the lock pin insertion detector 70 lights the left pin lock completion indicator 43, and the coil of the alarm switch 69 is turned on. Since it is excited and switched to the B contact, the alarm buzzer 69a and the alarm lamp 69b do not operate.
[0081]
On the other hand, the alarm buzzer 69a and the alarm lamp 69b do not operate even with the output of the storage pin insertion detector 33b that detects the entry of the jib storage pin 33 because the coil of the alarm switch 69 is excited and switched to the B contact.
That is, the alarm buzzer 68a and the alarm lamp 68b do not operate because the alarm switch 69 is switched to the B contact when the left pin 19a is fully locked or when the storage pin 33 is detected to enter.
That is, when the left pin 19a has not been locked and the entry of the jib storage pin 33 is not detected, the alarm switch 69 is switched to the A contact, so that the alarm buzzer 69a and the alarm lamp 69b are activated, which is dangerous. Let them know. That is, an alarm is given if both of these two pins 19a, 33 are missing.
In this case, it is understood that the alarm buzzer 69a and the alarm lamp 69b are dangerous even if the unload valve 50 having the solenoid 50a as in the first embodiment shown in FIG. 16 is not required.
[0082]
Next, the control for detecting the work state of the mobile crane according to the present invention will be described with reference to the control flowchart of the safety device for the mobile crane shown in FIG.
[0083]
[Table 1]
Figure 0003716952
[0084]
(1) When driving
When “travel” is selected by a PTO switch (not shown) installed in the cab 9, the process proceeds from step S1 to S2 in FIG.
(i) In step S2, when the jib storage position detector 33b shown in FIG. 11 detects that the storage pin 33 is inserted, the routine proceeds from step S2 to S3, and normal running is performed. In this case, as shown in the detection term of Table 1; m, since the state of the crane vehicle is normal, no warning is given by the buzzer. However, the crane work such as the boom is always impossible in the traveling state of the crane vehicle.
(ii) If the jib storage position detector 33b does not detect that the storage pin 33 is inserted in step S2, the process proceeds from step S2 to S4, and the vehicle can travel, but an alarm buzzer is issued during traveling. At the same time, “the storage pin 33 is not inserted” is displayed on the moment limiter display panel 40 of FIG. In this case, as shown in the detection term; n in Table 1, there is a danger of the jib 7 falling, so that a warning is continuously given by the buzzer.
[0085]
(2) During work (common to each work mode in jib mode, boom mode, and preparation mode)
When “work” is selected by a PTO switch (not shown) installed in the cab 9, the process proceeds from step S1 to S5 in FIG.
(i) If the left and right pins 19a, the jib storage pin 33, and the work mode switch 71 are normal in step S5, the process proceeds from step S5 to S6, and the jib work, boom / single top work shown in Table 1, and Each normal operation of preparation (jib overhang / storage) operation is performed. In this case, as shown in the detection terms in Table 1, a, f, i, j, the state of the crane vehicle is normal, and in the detection terms; a, f, i, no warning is given by a buzzer and a crane such as a boom is used. Work becomes possible. However, in the detection term; j, a warning is continuously given by a buzzer to perform preparation work for overhanging and storing the jib, and crane work such as a boom is impossible.
[0086]
(ii) If the left / right pin 19a, the storage pin 33, and the work mode switch 71 are abnormal in step S5, the process proceeds from step S5 to S7.
(1). If the selection of the work mode switch 71 is correct in step S7, the process proceeds from step S7 to S8.
(a) If both the left and right pins 19a and the storage pin 33 are disconnected in step S8, the process proceeds from step S8 to S9, and the solenoid 50a of the unload valve 50 shown in FIG. 19 is energized from the moment limiter controller 52 shown in FIG. Since the boom switching operation valve becomes impossible, the boom extension operation is stopped, an alarm buzzer is issued, and the detection items in Table 1 are displayed on the display of the moment limiter display panel 40; d, h Display either “Danger Jib Drop”, “Confirm Jib Left Pin”, or “Confirmation Storage Pin” as shown in.
(b) If the left and right pins 19a and the storage pin 33 are included in step S8, the process proceeds from step S8 to S10. Since such a phenomenon cannot actually occur, this is a failure of the controller 52 or the like. In such a case, as shown in the detection terms of Table 1, c, g, and k, the solenoid 50a of the unload valve 50 in FIG. 19 is energized, the boom operation is stopped, and the buzzer intermittently warns for 10 seconds. In addition, an “error” code is displayed on the display.
[0087]
(2). If the selection of the work mode switch 71 is not correct in step S7, the process proceeds from step S7 to S11, and as shown in the detection terms in Table 1, b and e, “confirmation work mode switch”, “confirmation jib left pin”, Or, one of the “confirmation storage pins” is displayed on the moment limiter display panel, and an alarm is intermittently given by the buzzer for 10 seconds.
[0088]
The control shown in Table 1 is safe because the following erroneous operations can be prevented.
(1) Jib overhang, preventing jib dropping due to forgetting to insert pins during storage (jib preparation mode), and preventing damage due to forgetting to pull out.
(2) Preventing the jib from dropping due to forgetting to put the pin when the jib is stored on the side of the boom.
(3) Alarm of mistakes in work mode selection that causes the boom to work with the jib extended to the front of the boom.
(4) Forgetting to put in the jib pin while driving and preventing the jib from dropping.
[0089]
In each of the above embodiments, the extending operation of the boom 3 has been described. In addition to the extending operation of the boom 3, the boom 3 is contracted, the boom 3 is raised and lowered, the jib 7 is raised and lowered, and the main winch is wound and lowered. The operations of the 11 mobile cranes, that is, the auxiliary winch hoisting / lowering and the left / right turning can be similarly controlled.
[Brief description of the drawings]
FIG. 1 is a side view of a mobile crane according to an embodiment of the present invention.
FIG. 2 is a plan view showing a connecting portion when the jib is stored in an embodiment of the present invention.
FIG. 3 is a plan view of a jib storage state according to an embodiment of the present invention.
FIG. 4 is a plan view showing a connecting portion at the time of swinging out a jib in one embodiment of the present invention.
FIG. 5 is a plan view showing a jib swinging state in one embodiment of the present invention.
6 is a cross-sectional view taken along the line XX of FIG.
7 is a YY sectional view of FIG. 6;
8 is a detailed view of a portion P in FIG. 3, in which (A) is an overall plan view of the jib fixing means, and (B) is a view taken in the direction of arrow V in (A).
9 is a side view of FIG. 8. FIG.
FIG. 10 is a plan view showing a second embodiment of the jib storage detecting means corresponding to FIG. 8;
11 is a plan view showing a state immediately before swinging out of the Q part in FIG. 5; FIG.
12 is a side view of FIG. 11. FIG.
FIG. 13 is a plan view showing a jib overhanging state in one embodiment of the present invention.
14 is a view taken in the direction of arrow Z in FIG. 2;
15 is a view on arrow A in FIG.
FIG. 16 is a plan view showing a front panel according to an embodiment of the present invention.
FIG. 17 is a diagram showing an electric control circuit according to an embodiment of the present invention.
FIG. 18 is a diagram showing a hydraulic control circuit in one embodiment of the present invention.
FIG. 19 is a diagram illustrating a hydraulic control circuit according to an embodiment of the present invention.
FIG. 20 is a diagram showing a second embodiment of the present invention corresponding to FIG.
FIG. 21 is a diagram showing a moment limiter display panel according to an embodiment of the present invention.
22 is a detailed view of a portion R in FIG. 21. FIG.
FIG. 23 is a view showing a control flowchart of the safety device in one embodiment of the present invention.
FIG. 24 is an overall side view of a mobile crane for explaining the prior art.
FIG. 25 is a plan view of a conventional mobile crane in a jib retracted state of a boom and a jib.
26 is a detailed plan view of the boom and jib connection portion of FIG. 23. FIG.
FIG. 27 is a side view of a boom and a jib connecting portion when a jib overhang of a conventional mobile crane is completed.
FIG. 28 is a plan view showing the boom and jib of a conventional mobile crane in a jib swinging state.
29 is a detailed plan view of the boom and jib connection portion of FIG. 28. FIG.
FIG. 30 is a plan view of a conventional mobile crane in the middle of extending a jib.
FIG. 31 is a plan view showing a state where a jib overhang of a conventional mobile crane is completed.
32 is a detailed cross-sectional view around the pin of FIG. 25, (A) is a cross-sectional view taken along the line AA, and (B) is a cross-sectional view taken along the line BB.
FIG. 33 is a control circuit diagram of a boom telescopic cylinder of a conventional mobile crane.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Vehicle body, 3 ... Boom, 4 ... Base stage boom, 6 ... Top boom, 7 ... Jib, 8 ... Upper turning body, 9 ... Driver's cab, 11 ... Jib bracket, 12 ... Jib main body, 13, 23, 33, 38, 80, 83, 94, 96, 97, 98, 99 ... pin, 14 ... tilt cylinder, 15, 16, 25, 31, 32, 34, 35, 36, 38, 61, 62, ... bracket, 15a, 16a, 22a, 22b, 31a, 32a, 35a, 61a, 61b, 62a, 95 ... hole, 17, 18 ... lock cylinder, 19a ... left pin (lock pin in claims), 19b ... right pin, 15b, 15c, 15d, 15e ... plate, 20 ... locking means, 21 ... locking pin, 22 ... locking bracket, 24, 26 ... screw, 24a, 26a ... nut, 28 ... support plate, 29 ... jib storage position detector, 29a ... Detection plate 30 ... Fixing means, 33 ... Jib storage pin, 33a ... Pin retaining pin, 33b ... Detector with storage pin (Jib storage completion detector in the claims), 33c ... Jib storage completion detector, 36a ... Lower end of tip, 36b ... Inclined part, 36c ... Side, 37 ... Bar, 39 ... First stopper, 40 ... Moment limiter display panel, 40a ... Front panel, 41 ... Jib overhang / retraction switch, 42a, 42b ... Second stopper, 43 ... Left Pin lock completion indicator, 44 ... Jib storage completion indicator, 45 ... Mode selector switch, 46, 47, 48, 49, 51 ... Relay, 50 ... Unload valve, 52 ... Moment limiter controller, 53 ... Left lock cylinder switch Valve 54: Rotating cylinder switching valve 55 ... Right lock cylinder switching valve 56a Operation lever 56 56 Operation valve 57 73 Direction cut Valve, 58 ... Hydraulic pump, 58a pilot pump, 59 ... Tank, 63 ... Rotating cylinder, 64 ... First link, 65 ... Second link, 66 ... Third link, 67 ... Jib storage position indicator, 68 ... Pole 68a ... detection piece 69 ... alarm switch 69a ... alarm buzzer 69b ... alarm lamp 70 ... lock pin insertion detector 71 ... upper work mode switch 72 ... cable drum 74a, 74b ... reel 75 ... reverse Stop valve, 76, 77, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112 ... Pipe line, 78 ... Pilot operated check valve, 79 ... Counter balance valve, 81, 82, 85, 87a, 87b ... lugs, 84 ... one, 89 ... switch box, 92, 93 ... link, 121 ... auxiliary winding rope, 122 ... auxiliary hook , 123 ... idler sheave, 124 ... jib sheave, 125 ... single top, 131 ... boss, 141 ... boom cylinder, 142 ... boom operation valve, 142a ... boom lever, 143 ... direction switching valve, 144 ... counter balance valve, 145 ... Pipe line, 146 ... pressure control valve.

Claims (3)

伸縮自在なブーム(3) と、このブーム(3) の側方に固定手段(30)により支持されて格納されるジブ(7) と、このジブ(7) のブラケット(15)とブーム(3)先端の左右いずれか一方のブラケット(61)とに出入するロックピン(19a) とを有し、前記ジブ(7) 使用時にはブラケット(15)とブラケット(61)とに挿入されたロックピン(19a)を中心に、ブーム(3) の側方に格納されたジブ(7) をブーム(3) の前方に回動して張出す移動式クレーンにおける安全装置において、ジブ (7) をブーム (3) に係止する係止手段 (20) を備え、ジブ (7) はジブ格納位置からロックピン (19a) の挿入位置まで振り出す際に係止手段 (20) の回りを回動し、ロックピン(19a) がブラケット(15)、(61)に挿入されたことを検出するロックピン挿入検出器(70)と、固定手段(30)の孔(31a)に挿入されて、ブーム(3) に格納されたジブ(7) を固定するためのジブ格納ピン(33)と、このジブ格納ピン(33)が孔(31a) に挿入されていること、またはジブ(7)がジブ格納位置にあることを検出するジブ格納完了検出器(33b,33c) と、ジブ(7) の格納位置におけるブームまたはシングルトップモードと、ジブ(7)の張出位置におけるジブモードと、ジブ(7)の張出、格納操作を行う準備モードのいずれかの作業モードを選択する上部作業モードスィッチ(71)と、これら検出器(70,33b,33c) と、スイッチ(71)の状況によりクレーン作業、もしくはその一部操作を停止するか、あるいは警告するコントローラ(52)とを備えたことを特徴とする移動式クレーンにおける安全装置。A telescopic boom (3), a jib (7) that is supported and stored by a fixing means (30) on the side of the boom (3), a bracket (15) of the jib (7), and a boom (3 ) Lock pin (19a) that enters and exits either the left or right bracket (61) at the tip, and when the jib (7) is used, the lock pin inserted into the bracket (15) and the bracket (61) ( mainly 19a), in the safety device in a mobile crane which overhangs rotated in front of the jib stored laterally (7) of the boom (3) of the boom (3), the jib (7) boom ( 3) is provided with locking means (20) for locking , and the jib (7) rotates around the locking means (20) when swinging from the jib storage position to the insertion position of the lock pin (19a) , A lock pin insertion detector (70) for detecting that the lock pin (19a) is inserted into the brackets (15) and (61) and a hole (31a) of the fixing means (30) are inserted into the boom (3 ) Stored in (7) Jib storage pin (33) for fixing and detecting that this jib storage pin (33) is inserted into the hole (31a) or that the jib (7) is in the jib storage position Jib storage completion detector (33b, 33c), boom or single top mode when the jib (7) is stored, jib mode when the jib (7) is extended, and extension and storage of the jib (7). Depending on the status of the upper work mode switch (71), these detectors (70, 33b, 33c), and switch (71), which selects one of the work modes of the preparation mode to be performed, the crane work or part of the operation is stopped. A safety device for a mobile crane, comprising a controller (52) for performing or warning. 請求項1において、作業モードスィッチ(71)で選択した各作業モードにおいて、コントローラ52がロックピン挿入検出器(70)、およびジブ格納完了検出器(33b,33c) からの検出信号を共に入力しないときには、警報ランプを点灯するか、警報ブザーを発報するか、モニタパネルに文字によりディスプレイするかの少なくとも一つにより警告するコントローラ(52)とを備えたことを特徴とする移動式クレーンにおける安全装置。In claim 1, the controller 52 does not input detection signals from the lock pin insertion detector (70) and the jib storage completion detector (33b, 33c) in each operation mode selected by the operation mode switch (71). A safety in a mobile crane, characterized by having a controller (52) that warns by at least one of turning on an alarm lamp, issuing an alarm buzzer, or displaying text on a monitor panel. apparatus. 請求項1において、移動式クレーンの走行操作と作業機操作とを選択する選択スイッチを設置し、この選択スイッチが走行操作を選択したときに、ジブ格納完了検出器(33b,33c) からの検出信号を入力しないときには、走行中におけるジブの落下の危険性を、警報ランプ、警報ブザー、あるいはメッセージ出力等で警告するコントローラ(52)を備えたことを特徴とする移動式クレーンにおける安全装置。In claim 1, when a selection switch for selecting a traveling operation and a work machine operation of the mobile crane is installed and the selection switch selects the traveling operation, detection from the jib storage completion detector (33b, 33c) A safety device for a mobile crane, comprising a controller (52) for warning the danger of a jib dropping during traveling by an alarm lamp, an alarm buzzer, or a message output when no signal is input.
JP30712396A 1996-11-01 1996-11-01 Safety device in mobile crane Expired - Fee Related JP3716952B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30712396A JP3716952B2 (en) 1996-11-01 1996-11-01 Safety device in mobile crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30712396A JP3716952B2 (en) 1996-11-01 1996-11-01 Safety device in mobile crane

Publications (2)

Publication Number Publication Date
JPH10139377A JPH10139377A (en) 1998-05-26
JP3716952B2 true JP3716952B2 (en) 2005-11-16

Family

ID=17965316

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30712396A Expired - Fee Related JP3716952B2 (en) 1996-11-01 1996-11-01 Safety device in mobile crane

Country Status (1)

Country Link
JP (1) JP3716952B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4070473B2 (en) * 2002-02-08 2008-04-02 株式会社タダノ Crane car jib storage device
CN106395648A (en) * 2015-05-20 2017-02-15 鲁霄钢 Jig hoist provided with optimized coiling block connecting structure

Also Published As

Publication number Publication date
JPH10139377A (en) 1998-05-26

Similar Documents

Publication Publication Date Title
JPH07300880A (en) Operation controller for skid-steer-loader
US11702135B2 (en) Work vehicle
JP3716952B2 (en) Safety device in mobile crane
JP3640322B2 (en) Jib overhang, safety device in storage and control method thereof
EP0084981A2 (en) Method for folding and unfolding an extension jib in wheeled type crane, and crane therefor
JPH10139379A (en) Jib overhanging/storing operation device installed outside of operator cab of walking crane
US10829350B2 (en) Crane
US20150132094A1 (en) Working machine and method for operating working machine
JPH10139378A (en) Inspection/instructing device after projection and housing of jib in walking crane
JP4732060B2 (en) Steering device for work vehicle
JPH04316415A (en) Controlling apparatus for automatic traveling working vehicle
JP3462640B2 (en) Guided guided vehicles and their guideways
EP0747315A1 (en) Method and device for automatically stretching and storing a sub-jib for a crane
US20240003187A1 (en) Stair system for a working machine, working machine
JP3604050B2 (en) Cabin lifting control device and control method for cabin lifting hydraulic crane vehicle
JP4257048B2 (en) Safety equipment for aerial work platforms
JP4890790B2 (en) Working vehicle traveling device
JP3958510B2 (en) Safety device for work vehicle
JP3787056B2 (en) Safety device for high-altitude work equipment
JP2003040596A (en) Order picking vehicle
JP7469963B2 (en) Pile driver
JPH11322278A (en) Safety device for crane with luffing jib
JP2004249843A (en) Passage cutout device for moving cab of working machine
JP2733442B2 (en) Tower crane safety device
JP2003212499A (en) Forklift travel control device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040705

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041004

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041118

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20041118

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050824

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050824

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees