JP3712432B2 - Aggregate supply control method in asphalt plant - Google Patents
Aggregate supply control method in asphalt plant Download PDFInfo
- Publication number
- JP3712432B2 JP3712432B2 JP31316994A JP31316994A JP3712432B2 JP 3712432 B2 JP3712432 B2 JP 3712432B2 JP 31316994 A JP31316994 A JP 31316994A JP 31316994 A JP31316994 A JP 31316994A JP 3712432 B2 JP3712432 B2 JP 3712432B2
- Authority
- JP
- Japan
- Prior art keywords
- aggregate
- amount
- supply
- compartment
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Machines (AREA)
Description
【0001】
【産業上の利用分野】
本発明は、道路舗装材であるアスファルト合材を製造するアスファルトプラントの骨材供給制御方法に関する。
【0002】
【従来の技術】
一般にアスファルトプラントにおいては、各種骨材を種別毎に貯蔵する骨材ホッパから所望の割合で骨材を切り出し、骨材搬送用ベルコンにより加熱装置であるドライヤに送り込み、ドライヤにより加熱した後にプラント本体上部に持ち上げ、振動篩により粒径別に篩い分けて下位に配設する骨材貯蔵ビンの区画室に粒径別に一時貯蔵する。そして出荷要請に基づいて製造するアスファルト合材の配合に基づいて各種粒径の骨材を各区画室より払い出し、所定量計量してアスファルト等の他の材料と共にミキサにより混合してアスファルト合材を製造している。
【0003】
そして合材製造時の骨材供給量の制御は、出荷する合材種別に応じて各骨材ホッパより所定の割合で骨材を払い出し、搬送途中に配設したコンベヤスケールにより総骨材供給量を測定し、設定された総骨材供給量に達すると骨材の払い出しを停止するように制御している。
【0004】
【発明が解決しようとする課題】
しかしながら、上記従来の骨材供給制御方法では出荷合材に使用する総骨材量を供給することができるのであるが、骨材貯蔵ビンの各区画室に分配貯蔵された骨材量は、骨材ホッパにおける骨材粒度の変動や、スクリーンの篩効率、目詰まり等により過不足が生じることがある。このため、不足が生じないように骨材を多めに供給することもあって、一部の区画室では骨材の過剰供給によるオーバーフローが生じたり、また出荷終了後に多量の残材が残ることもあって煩わしい残材抜き取り作業をしなくてはならないこともある。
【0005】
本発明は上記の点に鑑み、アスファルト合材の出荷量に応じて適正な骨材量を骨材貯蔵ビンに供給し、出荷終了後に骨材貯蔵ビンに骨材が残材として極力残らないようにした効率の良いアスファルトプラントの骨材供給制御方法を提供することを目的とする。
【0006】
【課題を解決するための手段】
本発明は上記の目的を達成するために、請求項1の骨材供給制御方法は、骨材貯蔵ビンの各区画室に貯蔵量を検出するレベル計を配設すると共に、該レベル計よりの信号により骨材供給量を制御する骨材供給制御装置を具備し、骨材ホッパより骨材を供給する時に、予め、出荷しようとするアスファルト合材の出荷予定量と配合比とから各骨材の供給量を演算し、演算した各骨材の供給量を骨材貯蔵ビンの各区画室に供給したときに各骨材が到達する骨材貯蔵レベルを演算して目標レベルとして設定し、骨材供給中にアスファルト合材の出荷が行われておれば、アスファルト合材を1バッチ製造出荷する毎に予め設定した目標レベルより1バッチ分の骨材貯蔵レベルを減算して目標レベルを再設定し、レベル計により検出した各区画室の骨材貯蔵レベルが前記目標レベルに達した時点で骨材の供給を停止するようにしたことを特徴としている。
【0007】
また、請求項2記載の骨材供給制御方法は、前記骨材供給中は、所定のタイミング毎に前記レベル計によって各区画室の骨材貯蔵レベルを検出し、検出した前回と今回との骨材貯蔵レベル差と、この間に各区画室から払い出された骨材量とより各区画室への骨材の実供給割合を演算し、該実供給割合と出荷合材の骨材配合比に差異があるならば、出荷合材の各区画室の骨材使用量に対して特定の区画室への骨材供給に過不足有りと判断し、各区画室への骨材の実供給割合が出荷合材の骨材配合比に近付くように各可変速フィーダの切り出し割合を逐次補正して、出荷合材の各区画室の骨材使用量に対して過不足なく各区画室へ骨材を供給するようにしたことを特徴としている。
【0008】
【作用】
本発明の請求項1記載の骨材供給制御方法によれば、骨材供給時に出荷予定量とその配合比とより所要骨材量を演算すると共に、その所要骨材量から骨材貯蔵ビンの各区画室に貯蔵する時の目標レベルを演算して設定し、この目標レベルと各区画室に配設したレベル計によって検出した骨材の貯蔵レベルとが一致すると骨材の供給を停止するものである。そして出荷が行われている間は、1バッチ毎に骨材貯蔵ビンより払い出した1バッチ分の骨材量を先に設定した目標レベルより減算して再度目標レベルを設定し、レベル計により検出した骨材貯蔵レベルが再設定した目標レベルに達した時点で骨材の供給を停止する。このことにより出荷に必要な分だけの骨材量を供給することになり、出荷終了時には骨材貯蔵ビンに骨材が残材として残留するのが少なくなるのである。
【0009】
また、請求項2記載の骨材供給制御方法によれば、前記骨材供給中に、レベル計によって各区画室の骨材貯蔵レベルを検出し、検出した前回と今回との骨材貯蔵レベル差より各区画室に粒径別に分配される骨材の実供給割合を演算する。そして実供給割合と出荷合材の骨材配合比に差異があるならば、各区画室への骨材の実供給割合が出荷合材の骨材配合比に近付くように可変速フィーダの切り出し割合を逐次補正し、出荷合材の使用骨材量に見合った骨材供給を常に行うものである。これによって出荷途中においても骨材を過不足なく骨材貯蔵ビンに供給していけるので、出荷中に一部骨材の過小供給による骨材切れを起こすこともなく、また各骨材の貯蔵量が目標レベルに到達するのがほぼ同時期となって効率の良い骨材供給を行うことができる。
【0010】
【実施例】
以下本発明の実施例を図面に基づいて説明する。
【0011】
1a〜1dは骨材を種別毎に貯蔵する骨材ホッパであり、可変速フィーダ2a〜2dにより所定量の骨材を切り出し、引出しコンベヤ3、計量コンベヤ4を介して骨材加熱装置であるドライヤ5に投入し、ドライヤ5内を通過する間にバーナ6の熱風により所定の温度まで加熱昇温する。
【0012】
加熱した骨材はバケットエレベータ7によりプラント本体上部まで持ち上げ、振動篩8により骨材を粒径別に篩い分け、内部を複数に区画した骨材貯蔵ビン9に粒径別に貯蔵される。9a〜9dは砂利大、砂利中、砂利小及び砂の粒径別に骨材を貯蔵する区画室であり、それぞれの区画室9a〜9dには骨材貯蔵レベルを検出するレベル計10を配設している。図示したレベル計は静電容量式レベル計を利用した連続式レベル計であるが、このほかに区画室を独立させてロードセルを利用したり、また、非連続式レベル計のトルクモータ式及び熱伝対などを多数使用することにより、連続して骨材貯蔵レベルを計測するようにしても良い。
【0013】
11は骨材ホッパ1a〜1dの骨材の切り出しを制御する骨材供給制御装置であって、レベル計10よりのデータや操作盤12とのデータを送受信する送受信部13、取り込んだレベルデータより各種演算を行う演算部14、各種データを記憶する記憶部15、各種設定データを入力する入力部16及び骨材ホッパ1a〜1dの可変速フィーダ2a〜2dの速度を設定する速度設定器17を備える共に、これらの各要素を制御する制御部18を備えている。
【0014】
前記骨材ホッパ1a〜1dからの骨材の切り出し制御は、出荷合材の骨材配合に応じた切り出し割合にて各種骨材を切り出したり、また骨材貯蔵ビン9の各区画室9a〜9dのレベル計10により各区画室9a〜9dの骨材貯蔵レベルを検出し、この骨材貯蔵レベルから各区画室への骨材供給割合や貯蔵量を演算し、これをフィードバックして骨材の切り出し速度を補正し、出荷合材の骨材使用量に対し過不足なしに骨材を供給するようにしている。
【0015】
そして各区画室9a〜9dに貯蔵された各種粒径の骨材は、出荷合材の骨材配合に基づいて区画室9a〜9dから下位に設けた骨材計量槽19に払い出して計量し、石粉計量槽20及びアスファルト計量槽21で計量した石粉及び溶融アスファルトと共にミキサ22に投入して所定時間混合してアスファルト合材を製造している。
【0016】
次に、骨材貯蔵ビン9の骨材貯蔵レベルに基づいて骨材の供給制御を行う方法について、図2、図3のフローチャートにより説明する。図中のS1〜S22はフローチャートの各手順を表わすステップを示す。
【0017】
先ず、運転を開始する前に初期設定としてアスファルト合材の品種及びその配合等を操作盤12に登録する(S1)。また、骨材供給時に、アスファルト合材の品種に対応させて各骨材ホッパ1a〜1dからの骨材切り出し速度を設定するための切り出し割合の登録を行う(S2)。そして骨材の総供給量を設定すれば切り出し割合から各骨材ホッパ1a〜1dの切り出し速度が決定される。なお、アスファルト合材の品種により決定した各骨材の切り出し割合に応じて各骨材ホッパ1a〜1dの切り出し速度を直接入録しても良い。
【0018】
前記登録が完了すれば更に他の合材種類について登録を継続するか否かを判断し(S3)、終了ならばENDに進み登録操作を終了し、継続する場合はステップS1に戻って製造する全ての合材種類について登録作業を行う。
【0019】
次に、プラントの運転を開始して操作盤12に出荷する合材種類及び出荷予定量を入力すると、骨材供給制御装置11側ではデータ送受信部13を介して出荷合材の配合内容を受信し(S4)、続いて出荷予定量を受信する(S5)。配合内容を受信すると、次に配合内容に見合った各骨材ホッパ1a〜1dの切り出し割合を読み込む(S6)。また、出荷合材の配合内容と出荷予定量に基づいて必要とされる各骨材の供給量を演算して設定する(S7)。このとき、演算して求めた各骨材供給量に割り増し供給量としてプラスαを加味して供給量が不足しないように考慮しておくと良い。
【0020】
また、各骨材供給量が設定されると、各骨材供給量に基づく骨材貯蔵ビン9の骨材貯蔵の目標レベルの演算が行われる(S8)。この骨材貯蔵ビンの目標レベルは、各骨材供給量を骨材貯蔵ビン9の対応する区画室9a〜9dに送り込んだ時に各骨材が到達する骨材貯蔵レベルである。この骨材貯蔵レベルは空量を0%、満量を100%として%表示にて表わすと良い。なお、各骨材供給量が対応する区画室9a〜9dに貯蔵できる量であるなら問題ないが、量的に多くて全量を供給した時にオーバーフローする場合には、とりあえずはその区画室の貯蔵量の90%を目標レベルとし、骨材の出荷払い出しがあればその目標レベルを逐次修正していく。
【0021】
前記目標レベルは骨材貯蔵ビンに貯蔵する最終的な目標貯蔵レベルであるので、実際の骨材切り出し停止は、目標レベルから搬送過程中に滞留している骨材量を差し引いた骨材貯蔵レベルに達した時点で骨材の切り出しを停止する必要がある。このため、目標レベルより搬送過程に滞留する骨材量を差し引いた予測目標レベルの演算を行い、これを骨材供給制御の目標レベルとして設定する(S9)。
【0022】
予測目標レベルの設定が完了すると骨材供給の開始が可能となる。骨材の供給開始スイッチONにより設定された各骨材の切り出し割合に基づいて速度設定器17から各骨材ホッパ1a〜1dの可変速フィーダ2a〜2dに対して切り出し速度が指令され、各骨材ホッパ1a〜1dから所定量の骨材が切り出される(S10)。この骨材の切り出し開始と共に移送タイマーを起動させる(S11)。この移送タイマーは、切り出された骨材が骨材貯蔵ビン9まで到達する時間を設定している。
【0023】
そして移送タイマーがカウントアップして各骨材ホッパ1a〜1dから切り出した骨材が骨材貯蔵ビン9に供給され始めると、プラントの稼動状況を検出してアスファルト合材の出荷(骨材の払い出し)が行われているか否かを判断する(S12)。そしてアスファルト合材の出荷が行われていなければ、骨材の払い出しなしに骨材貯蔵ビン9の骨材貯蔵レベルが徐々に上昇している状態であり、骨材貯蔵レベルを所定の時間間隔毎で測定するための測定用タイマーがカウントアップしたか否かを判断し、まだカウントアップされていなければカウントアップ待ちとなり、カウントアップされていれば、各区画室9a〜9dに配設したレベル計10より各骨材の貯蔵レベルを受信する(S14)。このように受信した骨材貯蔵レベルは操作盤12の画面上に逐次表示してオペレータが監視しやすいようにする。
【0024】
また、アスファルト合材の出荷が行われている時には、1バッチ処理分の時間間隔にて骨材貯蔵レベルを測定するようにしている。そこで1バッチ分の混練が完了したか否かを判断し(S15)、まだ完了していない場合は混練完了待ちとなり、混練が完了すれば次のステップに移る。先ず、1バッチ分の骨材を払い出したので、骨材貯蔵の予想目標レベルが1バッチ分減少するはずであるからこの分の修正を行う必要がある。
【0025】
そこで、予測目標レベルから1バッチ分払い出した骨材量に相当するレベル量を差し引き、その値を予測目標レベルとして再設定する(S16)。なお、この1バッチ分の骨材払い出しによってどの程度のレベル(%)低下となるかは、予め区画室9a〜9b毎、更に好ましくは各区画室9a〜9bの貯蔵レベルの高さ位置毎に適宜計算して設定しておく。
【0026】
前記のように、予測目標レベルは出荷中であれば1バッチ毎に修正されて設定されることになる。
【0027】
次に、ステップS14に進み、各骨材貯蔵レベルの受信を行う。各区画室9a〜9dより各骨材の貯蔵レベルを受信すると、次に前回分の貯蔵レベルと今回分の貯蔵レベルを比較してその差より各骨材貯蔵ビンの実供給割合の演算を行う(S17)。この実供給割合は、前回貯蔵レベル検出時と今回貯蔵レベル検出時の間に各区画室9a〜9dに実質的に供給された骨材量の割合を示すものである。なお、この間に骨材が払い出されたのであれば、それを考慮して実供給割合を演算する。
【0028】
この演算された各区画室9a〜9dへの実供給割合と出荷合材の骨材配合比とを比較し(S18)、差があるか否かを判断する(S19)。両者に差がある時は出荷合材の使用骨材量に対し特定の骨材の供給が過不足ありということであるので、実供給割合が出荷合材の骨材配合比に近付くように各骨材ホッパ1a〜1dよりの切り出し割合を補正する(S20)。例えば、可変速フィーダ1aを5%増、可変速フィーダ1bを3%減等。なお、どの程度の差異が生ずれば切り出し割合をどの程度補正するかは予め決めておく。また、出荷合材の骨材配合比とは、出荷合材における各種粒径の骨材の構成比であって、その骨材粒径は各区画室9a〜9dにそれぞれ貯蔵されるものと対応している。
【0029】
前記のように各区画室9a〜9dの実供給割合と骨材配合比に差が出るのは、骨材ホッパ1a〜1dにおける骨材粒度の変動や、また合成供給される骨材の篩い分けが理想通りに行われていないからである。したがって、骨材貯蔵ビン9の各区画室9a〜9dに出荷合材の骨材配合に見合った骨材量が貯蔵されていくように骨材の切り出し割合の補正量を演算し、速度設定器17から可変速フィーダ2a〜2dに対し速度補正を行い、出荷合材に対し各種骨材を過不足なく供給しようとするものである。
【0030】
なお、骨材の切り出し割合の補正にあたっては、その補正量は次の点に考慮して補正量を決定する。先ず、補正によって骨材の合成粒度が所定の範囲から外れないようにする。また、砂等の割合が多くなり過ぎてドライヤの能力以上の切り出し割合にならないようにする。そして、補正値はオペレータが容易に把握できるように表示装置に表示する等である。
【0031】
次いで、ステップS21に進んで各骨材の貯蔵レベルが予測目標レベルに達したか否かの判断を行う。またステップ19において差がない場合はそのままステップS21に進んで各骨材の貯蔵レベルが予測目標レベルに達したか否かの判断を行う。予測目標レベルに達していない場合にはステップS12に戻り、出荷の確認から再度一連の操作を繰り返す。また予測目標レベルに達すると、更に次回の出荷があるか否か判断し(S22)、出荷がある場合はステップS4に戻って配合内容の受信から一連の操作を繰り返し、出荷がない場合にはENDに進んで骨材供給を停止する。骨材の供給を停止すれば搬送過程中の骨材が骨材貯蔵ビンに投入された時点で各区画室9a〜9dは所望の貯蔵レベルに到達する。
【0032】
このようにして、出荷予定量とその配合比とより各骨材の供給量を演算し、その各骨材供給量より骨材貯蔵ビン9の各区画室9a〜9dに対する目標となる貯蔵レベルを設定し、アスファルト合材出荷中は1バッチ毎にその目標レベルを更新していく。なお、出荷待ちの状態で骨材供給が行われている時にはその目標レベルは更新されない。そしてレベル計により検出した骨材貯蔵レベルが目標レベルと一致すると骨材の供給を停止するので、出荷に必要な骨材量のみを骨材貯蔵ビン8に供給して貯蔵でき、これによって出荷作業終了後の残材量も少なくなって残材抜き取り作業も短時間にて処理できる。更には特定の骨材の供給過剰もなくて骨材の加熱量も最小限に留めることができて燃費も削減できるのである。
【0033】
また、骨材貯蔵ビンの各区画室9a〜9dに分配貯蔵される骨材の貯蔵レベルを検出して実供給割合を演算し、この実供給割合と出荷合材の骨材配合比とを比較し、差があればその差値量に基づく切り出し量の補正を行って各区画室9a〜9dに貯蔵される骨材量の割合を骨材供給配合比に近づけるように供給制御を行っており、これによって出荷合材に対し適正量の骨材が過不足なく常に供給されることとなり、一部骨材の過小供給による骨材切れを起こすこともなくて運転操作が楽になり、また各骨材の貯蔵量が目標レベルに到達するのがほぼ同時期となって効率の良い骨材供給を行うことができるのである。
【0034】
なお、本発明においては、各区画室9a〜9bへ骨材の実供給割合と出荷合材の骨材配合比とを比較して各可変速フィーダ2a−2dの切り出し割合を補正するようにしているが、これを各区画室9a〜9bへの骨材の実供給量と、出荷合材の骨材配合比から演算した各骨材の設定供給量を比較して各可変速フィーダ2a−2dの切り出し量を補正するようにしても単位時間当たりの総骨材供給量がほぼ一定に設定されているので、両者は本質的には同等であり、本発明の技術範囲に属するものである。
【0035】
【発明の効果】
以上のように本発明に係る請求項1記載の骨材供給制御方法にあっては、骨材貯蔵ビン9の各区画室9a〜9dに貯蔵量を検出するレベル計10を配設すると共に、該レベル計10よりの信号により骨材供給量を制御する骨材供給制御装置11を備え、予め、出荷しようとするアスファルト合材の出荷予定量とその配合比から各骨材の供給量を演算し、その各骨材供給量より骨材貯蔵ビン9の各区画室9a〜9dに貯蔵する時に各骨材が到達する目標レベルを演算して設定し、骨材供給中にアスファルト合材の出荷が行われておれば、1バッチ毎に払い出した骨材分の貯蔵レベルを設定した目標レベルより差し引いて目標レベルを更新して再設定し、レベル計10により検出した骨材貯蔵レベルが前記目標レベルと一致すると骨材ホッパ1a〜1dよりの骨材の切り出しを停止するようにしたので、出荷しようとするアスファルト合材に必要な骨材量のみを供給して骨材貯蔵ビンに貯蔵でき、出荷終了時には残材として残留する骨材も極力少なくなり、面倒な残材抜き取り作業も短時間にて処理でき、また過剰な骨材を加熱することがなくて燃費節減による省エネルギー化を図ることができる。
【0036】
また、請求項2記載の骨材供給制御方法にあっては、前記骨材供給中は、所定のタイミング毎に前記レベル計10によって各区画室9a〜9dの骨材貯蔵レベルを検出し、検出した前回と今回との骨材貯蔵レベル差と、この間に各区画室9a〜9dから払い出された骨材量とより各区画室9a〜9dへの骨材の実供給割合を演算し、該実供給割合と出荷合材の骨材配合比に差異があるならば、出荷合材の各区画室9a〜9dの骨材使用量に対して特定の区画室への骨材供給に過不足有りと判断し、各区画室9a〜9dへの骨材の実供給割合が出荷合材の骨材配合比に近付くように可変速フィーダ2a〜2dの切り出し割合を逐次補正するようにしたので、出荷途中においても出荷合材に対し骨材を過不足なく供給することができ、出荷中に一部骨材の過小供給による骨材切れを起こすこともなく、また各骨材の貯蔵量の目標レベルへの到達がほぼ同時期となって効率の良い骨材供給を行うことができるのである。
【図面の簡単な説明】
【図1】本発明の骨材供給制御方法を採用するアスファルトプラントの概略構成を示す説明図である。
【図2】本発明の骨材供給制御方法の手順を示すフローチャートである。
【図3】本発明の骨材供給制御方法の手順を示すフローチャートである。
【符号の説明】
1a〜1d…骨材ホッパー 2a〜2d…可変速フィーダ
3…引出しコンベヤ 4…計量コンベヤ
5…ドライヤ 9…骨材貯蔵ビン
9a〜9d…区画室 10…レベル計
11…骨材供給制御装置 12…操作盤[0001]
[Industrial application fields]
The present invention relates to an aggregate supply control method for an asphalt plant that manufactures an asphalt mixture that is a road pavement material.
[0002]
[Prior art]
Generally, in an asphalt plant, the aggregate is cut out at a desired ratio from an aggregate hopper that stores various aggregates for each type, sent to a dryer, which is a heating device, using a bell-conveyor for transporting aggregates, heated by the dryer, and then the upper part of the plant body And is temporarily stored according to particle size in a compartment of an aggregate storage bin disposed below by sieving by particle size with a vibrating sieve. Based on the composition of the asphalt mixture to be manufactured based on the shipping request, aggregates of various particle sizes are dispensed from each compartment, weighed in a predetermined amount, and mixed with other materials such as asphalt by a mixer to manufacture the asphalt mixture are doing.
[0003]
Then, the aggregate supply amount at the time of manufacturing the composite material is controlled by the aggregate scale supplied from the aggregate hopper at a predetermined ratio according to the type of the composite material to be shipped, and by the conveyor scale arranged in the middle of transportation. Is measured, and when the set total aggregate supply amount is reached, the aggregate delivery is controlled to stop.
[0004]
[Problems to be solved by the invention]
However, in the above-described conventional aggregate supply control method, it is possible to supply the total amount of aggregate used for shipping composite, but the aggregate amount distributed and stored in each compartment of the aggregate storage bin is the aggregate amount. Excess or deficiency may occur due to changes in aggregate particle size in the hopper, screen sieving efficiency, clogging and the like. For this reason, a large amount of aggregate may be supplied so that there is no shortage, overflow in some compartments may occur due to excessive supply of aggregate, and a large amount of residual material may remain after shipment is completed. In some cases, it may be necessary to perform annoying remaining material extraction work.
[0005]
In view of the above points, the present invention supplies an appropriate aggregate amount to the aggregate storage bin according to the shipment amount of the asphalt mixture, so that the aggregate remains in the aggregate storage bin as much as possible after the shipment. An object of the present invention is to provide an efficient aggregate supply control method for an asphalt plant.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, according to the present invention, the aggregate supply control method according to
[0007]
The aggregate supply control method according to
[0008]
[Action]
According to the aggregate supply control method of
[0009]
Moreover, according to the aggregate supply control method of
[0010]
【Example】
Embodiments of the present invention will be described below with reference to the drawings.
[0011]
Reference numerals 1a to 1d denote aggregate hoppers that store aggregates for each type. A predetermined amount of aggregate is cut out by variable speed feeders 2a to 2d, and is a dryer that is an aggregate heating device via a
[0012]
The heated aggregate is lifted up to the upper part of the plant main body by the
[0013]
11 is an aggregate supply control device that controls the cutting of the aggregates of the aggregate hoppers 1a to 1d. The transmission /
[0014]
The aggregate cut-out control from the aggregate hoppers 1a to 1d is performed by cutting various aggregates at a cut-out ratio corresponding to the aggregate composition of the shipping composite, or for each of the
[0015]
And the aggregates of various particle sizes stored in the
[0016]
Next, a method for controlling the aggregate supply based on the aggregate storage level of the aggregate storage bin 9 will be described with reference to the flowcharts of FIGS. S1 to S22 in the figure indicate steps representing each procedure in the flowchart.
[0017]
First, before starting the operation, the asphalt mixture type and its blending are registered in the
[0018]
If the registration is completed, it is determined whether or not to continue the registration for another type of mixture (S3). If the registration is completed, the process proceeds to END to end the registration operation. If the registration is continued, the process returns to step S1 to manufacture. Register for all types of composites.
[0019]
Next, when the operation of the plant is started and the type of mixture to be shipped to the
[0020]
When each aggregate supply amount is set, calculation of the target level of aggregate storage of the aggregate storage bin 9 based on each aggregate supply amount is performed (S8). The target level of the aggregate storage bin is an aggregate storage level that each aggregate reaches when each aggregate supply amount is sent to the
[0021]
Since the target level is the final target storage level to be stored in the aggregate storage bin, the actual aggregate cut-off is the aggregate storage level obtained by subtracting the aggregate amount remaining during the transport process from the target level. It is necessary to stop the cutting of the aggregate when reaching the above. For this reason, a predicted target level is calculated by subtracting the aggregate amount staying in the conveyance process from the target level, and this is set as the target level for aggregate supply control (S9).
[0022]
When the setting of the predicted target level is completed, the aggregate supply can be started. Based on the cutting ratio of each aggregate set by the aggregate supply start switch ON, the cutting speed is commanded from the
[0023]
When the transfer timer counts up and aggregates cut out from the aggregate hoppers 1a to 1d begin to be supplied to the aggregate storage bin 9, the operation status of the plant is detected and asphalt mixture is shipped (disposal of aggregate). ) Is determined (S12). If the asphalt mixture is not shipped, the aggregate storage level of the aggregate storage bin 9 is gradually increased without discharging the aggregate, and the aggregate storage level is set at a predetermined time interval. It is determined whether or not the measurement timer for measuring in (1) has been counted up, and if it has not been counted up yet, it will wait for counting up, and if it has been counted up, the
[0024]
Moreover, when the asphalt mixture is shipped, the aggregate storage level is measured at a time interval corresponding to one batch process. Therefore, it is determined whether or not one batch of kneading has been completed (S15). If it has not been completed, the process waits for the completion of kneading. First, since one batch of aggregate has been dispensed, the expected target level of aggregate storage should be reduced by one batch, so this amount needs to be corrected.
[0025]
Therefore, the level amount corresponding to the aggregate amount paid out for one batch is subtracted from the predicted target level, and the value is reset as the predicted target level (S16). It should be noted that the level (%) of the reduction in the amount of aggregate delivered for one batch is appropriately determined in advance for each
[0026]
As described above, the predicted target level is corrected and set for each batch when shipping.
[0027]
Next, it progresses to step S14 and each aggregate storage level is received. When the storage level of each aggregate is received from each of the
[0028]
The calculated actual supply ratio to each of the
[0029]
As described above, the difference in the actual supply ratio and the aggregate blending ratio of the
[0030]
When correcting the aggregate cutout ratio, the correction amount is determined in consideration of the following points. First, the aggregate particle size of the aggregate is prevented from deviating from a predetermined range by correction. Also, make sure that the proportion of sand, etc. is not too high, and that it does not exceed the capacity of the dryer. The correction value is displayed on a display device so that the operator can easily grasp it.
[0031]
Next, the process proceeds to step S21 to determine whether or not the storage level of each aggregate has reached the predicted target level. If there is no difference in
[0032]
In this manner, the supply amount of each aggregate is calculated from the planned shipment amount and its blending ratio, and the target storage level for each of the
[0033]
Moreover, the storage level of the aggregate distributed and stored in each of the
[0034]
In the present invention, the actual supply ratio of the aggregate to each of the
[0035]
【The invention's effect】
As described above, in the aggregate supply control method according to
[0036]
In the aggregate supply control method according to
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing a schematic configuration of an asphalt plant that employs an aggregate supply control method of the present invention.
FIG. 2 is a flowchart showing a procedure of an aggregate supply control method of the present invention.
FIG. 3 is a flowchart showing a procedure of an aggregate supply control method of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1a-1d ... Aggregate hopper 2a-2d ...
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31316994A JP3712432B2 (en) | 1994-12-16 | 1994-12-16 | Aggregate supply control method in asphalt plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31316994A JP3712432B2 (en) | 1994-12-16 | 1994-12-16 | Aggregate supply control method in asphalt plant |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08170305A JPH08170305A (en) | 1996-07-02 |
JP3712432B2 true JP3712432B2 (en) | 2005-11-02 |
Family
ID=18037943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP31316994A Expired - Fee Related JP3712432B2 (en) | 1994-12-16 | 1994-12-16 | Aggregate supply control method in asphalt plant |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3712432B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7017834B2 (en) * | 2018-03-09 | 2022-02-09 | 日工株式会社 | How to display the amount of aggregate stored in the aggregate storage bottle of an asphalt plant |
-
1994
- 1994-12-16 JP JP31316994A patent/JP3712432B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH08170305A (en) | 1996-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4222498A (en) | Control system for aggregate delivery system | |
US9180605B2 (en) | Volumetric concrete mixing method and apparatus | |
US5149192A (en) | System for mixing cementitious construction materials | |
RU2351469C2 (en) | Method for preparation of concrete mix and process line for its realisation | |
CN101828099A (en) | Apparatus for metering and mixing pourable material components | |
CN209555713U (en) | A kind of continuous asphalt intelligence stirring system | |
WO2010015925A2 (en) | Tintometric system for the production of silk-screening colorants for ceramic products, particularly tiles, bricks, slabs and the like | |
CN211389483U (en) | Automatic batching system of concrete mixing plant | |
CN101560599B (en) | Thickness control method and control system of mixed material layer | |
JP3712431B2 (en) | Aggregate supply control method in asphalt plant | |
JP3712432B2 (en) | Aggregate supply control method in asphalt plant | |
JPH08177008A (en) | Control method of aggregate supply in asphalt plant | |
JP2001270378A (en) | Washing and loading methods for concrete mixer truck | |
JP4443384B2 (en) | Manufacturing method and manufacturing apparatus for asphalt mixture | |
CN111702961B (en) | Intelligent automatic feeding system | |
RU2374188C1 (en) | Method of controlling loading charge into glass-melting furnace | |
JP4014685B2 (en) | Mobile concrete material kneader | |
JP2002129516A (en) | Method and device for manufacturing asphalt mixture | |
JP4533523B2 (en) | Method for producing asphalt mixture | |
US20050283273A1 (en) | Apparatus and method for substantially continuous delivery of a substantially constant weight of material per unit of time from a bulk storage location and for weighing, blending, and mixing conveyable materials | |
RU2006137287A (en) | METHOD AND TOWER FOR DOSING FILLERS IN THE PLANT FOR THE PRODUCTION OF ASPHALT CONCRETE AND THE RELATED PRODUCTION PLANT | |
CN211211413U (en) | Mixing mechanism for processing tobacco lamina | |
JP4089760B2 (en) | Correction method of surface water content of fine aggregate when mixing concrete | |
RU2736666C1 (en) | Method of dosed supply of charge and cullet to glass melting furnace | |
WO2023178827A1 (en) | Feeding control method and apparatus, and asphalt stirring station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20041130 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050105 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050303 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050725 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050817 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090826 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100826 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110826 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110826 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120826 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120826 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130826 Year of fee payment: 8 |
|
LAPS | Cancellation because of no payment of annual fees |