JP3676489B2 - Bar arrangement indexing device - Google Patents
Bar arrangement indexing device Download PDFInfo
- Publication number
- JP3676489B2 JP3676489B2 JP09393296A JP9393296A JP3676489B2 JP 3676489 B2 JP3676489 B2 JP 3676489B2 JP 09393296 A JP09393296 A JP 09393296A JP 9393296 A JP9393296 A JP 9393296A JP 3676489 B2 JP3676489 B2 JP 3676489B2
- Authority
- JP
- Japan
- Prior art keywords
- bar arrangement
- indexing device
- slider
- link
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、建築、土木作業現場において、鉄筋工事をする際に縦筋と横筋を等間隔に配筋した後、番線で結束する為の配筋間隔割出し装置に関するものである。
【0002】
【従来の技術】
一般に従来の配筋作業は、例えばコンクリート壁を施工する場合、先ず基礎の墨出しに従って所定のピッチ毎に縦筋を配筋した後、横筋を配筋する際に、作業者がスケールを使用して寸法を割り出してから、基準とすべき縦筋に、チョーク、油性筆記具等で標線を記し、この標線を目安として横筋を順次配筋し、然る後、縦筋と横筋を番線等で絡げて結束していた。
【0003】
また、コンクリート床スラブを施工するには、先ず、パイプサポートである、支柱を割り付けに従って建て、これに大引き、根太を配し、その上で床型枠板を貼り合わせて床型枠を組立、床型枠の上方にスラブ筋を縦横に所定ピッチで配筋するものである。この時、予め配筋作業者がコンクリート壁施工の時と同様にスケールとチョーク、油性筆記具等で標線を記し、この標線を目安としてスラブ筋を順次配筋していた。
【0004】
【発明が解決しようとする課題】
しかし、上述のように従来の配筋作業では、設定強度に従って種々の配筋ピッチが必要となり、その都度、鉄筋の配筋位置をスケールで測定して標線を記入する必要があった。このため、作業が煩雑となり、手間と時間のかかる能率の悪いものであった。また、配筋ピッチを正確に行う為には、熟練工が必要であると云う欠点が存在した。更に、壁用鉄筋の横筋を結束する際には、作業者は配筋位置で鉄筋を支えたまま結束作業を行なわなければならず、作業が困難であった。
【0005】
本発明の目的は、これら従来の配筋作業の問題点に鑑み、なされたもので、種々の配筋幅に適合する配筋作業を迅速且つ正確にできる配筋間隔割出し装置を提供することにある。
【0006】
【課題を解決するための手段】
上記目的を達成するために、本発明の配筋間隔割出し装置は、平行配置された第1、第2の案内支柱と、該第1、第2の案内支柱の間隔を平行に規制する規制部材と、前記案内支柱に適宜間隔で摺動自在に配置された複数のスライダと、該スライダの内で第1の案内支柱を摺動するスライダと第2の案内支柱を摺動するスライダとを交互にピン結合する複数のリンク部材と連結リンクとから構成され、前記各々のリンク部材の端部に鉄筋材を載せることのできるフックを形成すると共に、前記スライダの摺動を規制する固定機構を備えたものである。
【0007】
また、前記各々のリンク部材の端部に形成されたフックは、第2の案内支柱の外側に配設されたものである。更に、リンク部材の端部に、当該配筋間隔割出し装置を鉄筋に保持固定する固定クランプが取り付けられたこと、;前記フックには、ピッチを示す指標が配設されたこと、;前記第2の案内支柱の両端に、配筋位置調整機構が備えられていることを含むものである。
【0008】
長さの等しい第1と第2のリンク部材をその中間点でピン結合してなるリンク要素を、複数個、夫々第1と第2とのリンク部材の端部でピン結合して装置本体を構成し、前記第1のリンク部材の端部に鉄筋材を載せることのできるフックを夫々取り付けると共に、前記装置本体の両端部に開度固定具を配設したことを特徴とするものである。更に、前記開度固定具の下には、高さ調整具を備えたものである。
【0009】
【発明の実施の形態】
以下、本発明の実施例について、図面を参照しつつ説明する。図1は本発明の一実施例である配筋間隔割出し装置を示す要部構成図、図2は第1、第2の案内支柱の間隔を狭くし、配筋ピッチを大きくした場合を示す説明図、図3は同配筋間隔割出し装置の要部横断面図である。
【0010】
ここで、配筋間隔割出し装置10は、垂直に配設された第1の案内支柱11と第2の案内支柱12とが間隔を平行に規制する規制部材13により、平行に保持されている。この規制部材13は、案内支柱の上下両端に配設されている。また、第1の案内支柱11と第2の案内支柱12は、本実施例では、重量を軽くする為に中空パイプで構成されている。
【0011】
案内支柱11,12には、適宜間隔で摺動自在に配置された複数のスライダ14と、このスライダの内で第1の案内支柱11を摺動するスライダ14aと、第2の案内支柱12を摺動するスライダ14Aとがピン結合するリンク部材15aによって連結されている。リンク部材15aとスライダ14a及びスライダ14Aとはピン16,16で回動可能に連結され、リンク部材15aの端部には、鉄筋材を載せる事ができるフック17が形成されている。また、案内支柱11には、図1,2に示すように目盛り11aが表示されており、スライダの移動量を表す事ができる。
【0012】
また、フック17の外側には、指標としての指標突起17aが形成されている。この指標突起17aによって鉄筋の間隔を容易に測定できる。更に、第1の案内支柱11の挿通されたスライダを14a、14b、14c,……14x、とし、第2の案内支柱12に挿通されたスライダを14A、14B、14C、……14Xとすると、スライダ14Aとスライダ14bとは、連結リンク18でピン結合されている。また、スライダ14aとスライダ14Aとは、リンク部材15aでピン結合されている。順次、千鳥状にスライダ14bとスライダ14Bとは、リンク部材15bにより、スライダ14Bとスライダ14cとは、連結リンク18によってピン結合されている。
【0013】
このように、第1の案内支柱11、第2の案内支柱12に挿通されたスライダは、リンク部材15、連結リンク18で夫々連結されており、隣接するフック17とフック17の間隔が常に等しい間隔となる。つまり、規制部材13,13によって平行に保たれた第1の案内支柱11と第2の案内支柱12は、リンク部材15と連結リンク18の有効長さ(角度)によってフック17、17の間隔を決定する。
【0014】
スライダ14aには、固定機構である螺子19が取り付けられており、この螺子19を締め付ける事によりスライダ14aを第1の案内支柱11に固定する事ができる。本実施例では、螺子19は、一番上のスライダ14aに取り付けられた場合について説明したが、これに限る事なく他のスライダに取り付けてもよい。更に、規制部材13を固定してもよく、これによりフック17の間隔を保持固定する事ができる。
【0015】
図3に示すように、リンク部材15aの第2の案内支柱12に位置する部位には、適宜高さに固定クランプ20が取り付けられている。固定クランプ20は、バネ21で閉方向に付勢された挟み部22で縦鉄筋23を挟み、配筋間隔割出し装置10を保持固定する事ができる。
【0016】
次に、以上のように構成された配筋間隔割出し装置の使用方法について説明する。先ず、配筋ピッチを大きくする場合は、図2,5に示す如く第1の案内支柱11、第2の案内支柱12の間隔を狭くしてスライダ14A、14B……14Xのピッチを大きくする。逆に、配筋ピッチを小さくする場合には、図1、6に示すように、第1の案内支柱11と第2の案内支柱12の間隔を大きくする。このように、フック17,17の間隔を決定した後、固定クランプ20で縦鉄筋23に固定する。
【0017】
配筋間隔割出し装置10を縦鉄筋23に固定した後、図4,7に示すように横鉄筋24をフック17に載せて、仮セットする。各高さのフック17に横鉄筋24をセットするのみで、自動的に配筋幅を割り付けでき、手で支えながら結束する必要がないので、作業能率を著しく向上する事ができる。なお、配筋間隔割出し装置10自体の高さ調整のためには、桟木25等を使用する事ができる。
【0018】
図8は、本発明の他の実施例を示す要部構成図である。配筋間隔割出し装置10は、長さの等しい第1のリンク部材26と第2のリンク部材27とがその中間点でピン28により回動自在に支承されたリンク要素29が複数個、夫々リンク部材26,27の端部でピン30,31によって結合されて、装置本体が構成されている。また、第1のリンク部材26の側端部には、フック32が形成されている。このフック32は、鉄筋材を載せる事ができる形状となっている。更に、フック32の外側には、指標としての指標突起32aが形成されており、フック32のピッチを容易に測定する事ができる。
【0019】
図12乃至図13に示すように、リンク要素29を複数個連結してなる装置本体の両端には開度固定具33が備えられている。開度固定具33には、図8に示すように、第2のリンク部材27の端部が固定端33aにピン34で連結されている。また、第2のリンク部材27の端部27aが長穴35内を移動可能に配設されている。図9に示すように、第2のリンク部材27の端部には、ボルト36及び蝶ナット37とが取り付けられており、蝶ナット37を締め付ける事により、ボルト36の長穴35内の移動を規制する。
【0020】
これにより、第1のリンク部材26,第2のリンク部材27の角度を決定し、結果としてフック32,32の間隔を定める事ができる。また、図8に示すように、開度固定具33には、目盛り38が形成されており、フック32の間隔をスケールで測る事なく予め定める事ができる。また、図10に示すようにリンク要素29には、固定クランプとしてバネ付勢された挟み部22が取り付けられており、縦鉄筋23に前記装置本体を容易に取り付ける事ができる。
【0021】
以上のような構成により、図12,13に示すようにフック32,32の間隔を調整する事ができる。また、本実施例では、案内支柱がないので短縮した場合、案内支柱が邪魔になる事がない。
【0022】
開度固定具33の下には、高さ調整具39が取り付けられている。高さ調整具39は、ピンで回動可能に取り付けられた脚部材40と長穴41内に固定可能に遊嵌された脚部材42とから構成され、脚部材40と脚部材42は、中央でピン43で連結されている。したがって、脚部材40,42が同一長さのリンク機構を形成し、開度固定具33を上下に平行移動する事ができる。
【0023】
以上のように構成された、高さ調整具39は、脚部材42の端部を長穴41内で移動する事により、高さ調整する事ができる。
【0024】
図11は、固定クランプ44の他の実施例を示す平面図である。ここで、固定クランプ44は、ピン45で開閉自在に支持された押え金具46と締付ボルト47と蝶ナット48等から構成されている。締付ボルト47は、矢印A方向に回動し、縦鉄筋23を挟んだ後に蝶ナット48を締める事により固定する。
【0025】
図15は、同配筋間隔割出し装置を床スラブの配筋に使用した場合を示す説明図である。配筋間隔割出し装置10は両側に配筋位置調整機構49を備えている。この配筋位置調整機構49によって、スラブ型枠50の上に固定すると共に、型枠からの位置を調整する。
【0026】
配筋位置調整機構49は、図16,17に示すように、取付台51に平行リンク52,53とアジャストボルト54及び調整ナット55等から構成されている。このような構成の配筋位置調整機構49において、調整ナット55を締めることにより、平行リンク52,53が倒れフック17がスラブ型枠50に接近する。逆に、調整ナット55を緩めると平行リンク52.53が起きあがり、第1の案内支柱11及び第2の案内支柱12を平行状態に保ったまま、スラブ型枠50から遠ざける事ができる。
【0027】
このように、本発明の配筋間隔割出し装置10は、床スラブの配筋についても使用する事ができる。
【0028】
【発明の効果】
以上説明したように、本発明の配筋間隔割出し装置では、平行配置された第1、第2の案内支柱と、該第1、第2の案内支柱の間隔を平行に規制する規制部材と、前記案内支柱に適宜間隔で摺動自在に配置された複数のスライダと、該スライダの内で第1の案内支柱を摺動するスライダと第2の案内支柱を摺動するスライダとを交互にピン結合する複数のリンク部材と連結リンクとから構成され、前記各々のリンク部材の端部に鉄筋材を載せることのできるフックを形成すると共に、前記スライダの摺動を規制する固定機構を備え、前記各々のリンク部材の端部に形成されたフックは、第2の案内支柱の外側に配設されたので、スケールとチョーク等により配筋ピッチを印す作業が必要なく、配筋作業を著しく能率化する事ができる。また、配筋ピッチを正確に行う事ができ、熟練した配筋工を必要とする事なく、確実な配筋及び結束作業ができる。
【0029】
また、前記リンク部材の一部には、固定クランプが取り付けられたので、配筋間隔割出し装置を容易に縦鉄筋に固定する事ができる。更に、前記フックには、ピッチを示す指標が配設されたので、フックの間隔を容易に測定できる。
【0030】
長さの等しい第1と第2のリンク部材をその中間点でピン結合してなるリンク要素を、複数個、夫々第1と第2とのリンク部材の端部でピン結合して装置本体を構成し、前記第1のリンク部材の端部に鉄筋材を載せることのできるフックを夫々取り付けると共に、前記装置本体の両端部に開度固定具を配設したので、案内支柱を必要とする事なく作業上の邪魔になる事がない。
【0031】
前記開度固定具の下には、高さ調整具を備えたので、配筋間隔割出し装置の高さ位置を調整する事ができる。また、スラブ型枠の上で水平にして使用する事により、床スラブの配筋に使用する事ができる。
【図面の簡単な説明】
【図1】本発明の一実施例である配筋間隔割出し装置を示す要部構成図である。
【図2】同配筋間隔割出し装置の第1、第2の案内支柱の間隔を狭くし、配筋ピッチを大きくした場合を示す説明図である。
【図3】同配筋間隔割出し装置の固定クランプ部を示す要部横断面図である。
【図4】同配筋間隔割出し装置を使用して壁鉄筋の横筋を配筋している状態を示す説明図である。
【図5】同配筋間隔割出し装置の伸張した状態を示す説明図である。
【図6】同配筋間隔割出し装置の短縮した状態を示す説明図である。
【図7】同配筋間隔割出し装置の使用状態を示す側面図である。
【図8】本発明の配筋間隔割出し装置の他の実施例を示す要部構成図である。
【図9】同配筋間隔割出し装置の開度固定具を示す横断面図である。
【図10】同配筋間隔割出し装置の固定クランプ部を示す説明図である。
【図11】同固定クランプ部の他の実施例を示す説明図である。
【図12】同配筋間隔割出し装置の伸張した状態を示す説明図である。
【図13】同配筋間隔割出し装置の短縮した状態を示す説明図である。
【図14】同配筋間隔割出し装置を使用して壁鉄筋の横筋を配筋する場合を示す説明図である。
【図15】同配筋間隔割出し装置を床スラブの配筋に使用した場合を示す説明図である。
【図16】同配筋間隔割出し装置を床スラブに使用する場合の配筋位置調整機構を示す説明図である。
【図17】同配筋間隔割出し装置の配筋位置調整機構の動作説明図である。
【符号の説明】
10 配筋間隔割出し装置
11 第1の案内支柱
11a 目盛り
12 第2の案内支柱
13 規制部材
14a〜x スライダ
14A〜X スライダ
15 リンク部材
16 ピン
17 フック
17a 指標突起
18 連結リンク
19 螺子
20 固定クランプ
21 バネ
22 挟み部
23 縦鉄筋
24 横鉄筋
25 桟木
26 第1のリンク部材
27 第2のリンク部材
28 ピン
29 リンク要素
30,31 ピン
32 フック
32a 指標突起
33 開度固定具
33a 固定端
34 ピン
35 長穴
36 ボルト
37 蝶ナット
38 目盛り
39 高さ調整具
40 脚部材
41 長穴
42 脚部材
43 ピン
44 固定クランプ
45 ピン
46 押え金具
47 締付ボルト
48 蝶ナット
49 配筋位置調整機構
50 スラブ型枠
51 取付台
52,53 平行リンク
54 アジャストボルト
55 調整ナット[0001]
BACKGROUND OF THE INVENTION
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bar arrangement indexing device for tying up vertical bars and horizontal bars at equal intervals when constructing a reinforcing bar at a construction or civil engineering work site, and binding them with a wire.
[0002]
[Prior art]
In general, in the conventional bar arrangement work, for example, when constructing a concrete wall, first, after arranging the vertical bars at a predetermined pitch according to the basic arrangement, the operator uses the scale when arranging the horizontal bars. After determining the dimensions, mark the vertical line with the chalk, oil-based writing instrument, etc. on the vertical line that should be used as a reference, then place the horizontal line in sequence using this standard line as a guide. It was tied and tied together.
[0003]
In addition, to construct a concrete floor slab, first lay the pillars, which are pipe supports, according to the layout, arrange the overhangs and joists on them, and then assemble the floor form plates together to assemble the floor form frames The slab bars are arranged vertically and horizontally at a predetermined pitch above the floor formwork. At this time, the reinforcing bar operator marked in advance with a scale, chalk, an oil-based writing instrument, etc. in the same manner as in the construction of the concrete wall, and the slab bars were successively arranged using this marked line as a guideline.
[0004]
[Problems to be solved by the invention]
However, as described above, in the conventional bar arrangement work, various bar arrangement pitches are required according to the set strength, and each time it is necessary to measure the bar arrangement position of the reinforcing bar with a scale and write a marked line. For this reason, the work is complicated, and it is inefficient and time consuming. In addition, in order to accurately perform the bar arrangement pitch, there is a drawback that a skilled worker is necessary. Further, when binding the horizontal bars of the wall reinforcing bars, the operator has to perform the binding work while supporting the reinforcing bars at the bar arrangement position, which is difficult.
[0005]
An object of the present invention has been made in view of the problems of the conventional bar arrangement work, and provides a bar arrangement interval indexing device that can quickly and accurately carry out bar arrangement work adapted to various bar arrangement widths. It is in.
[0006]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the bar arrangement indexing device of the present invention is a regulation that regulates in parallel the interval between the first and second guide columns arranged in parallel and the first and second guide columns. a member, a plurality of sliders which are slidably disposed at appropriate intervals on the guide post, and a slider that slides the slider and a second guide post which slides first guide columns among said slider A fixing mechanism that is composed of a plurality of link members and connection links that are alternately pin-coupled to form a hook on which a reinforcing bar material can be placed at the end of each of the link members , and that regulates sliding of the slider. It is provided.
[0007]
The hooks formed at the end portions of the respective link members are disposed outside the second guide column. Furthermore, a fixing clamp for holding and fixing the bar spacing indexing device to the reinforcing bar is attached to the end of the link member ; an index indicating the pitch is disposed on the hook ; This includes that a bar arrangement position adjusting mechanism is provided at both ends of the two guide struts.
[0008]
A plurality of link elements formed by pin-coupling first and second link members having the same length at the intermediate point thereof are pin-coupled at the end portions of the first and second link members , respectively. The hooks that can be configured and on which the reinforcing bars can be placed are attached to the end portions of the first link member, respectively, and opening degree fixing tools are disposed at both end portions of the apparatus main body . Furthermore , a height adjuster is provided under the opening fixing tool.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram of a main part showing a bar arrangement interval indexing apparatus according to an embodiment of the present invention, and FIG. 2 shows a case where the interval between the first and second guide columns is reduced and the bar arrangement pitch is increased. FIG. 3 is an explanatory cross-sectional view of the main part of the bar arrangement indexing device.
[0010]
Here, in the bar arrangement
[0011]
The
[0012]
In addition, an
[0013]
As described above, the sliders inserted through the
[0014]
A
[0015]
As shown in FIG. 3, a fixed
[0016]
Next, the usage method of the bar arrangement | positioning space | interval indexing apparatus comprised as mentioned above is demonstrated. First, when increasing the bar arrangement pitch, as shown in FIGS. 2 and 5, the interval between the
[0017]
After the bar
[0018]
FIG. 8 is a block diagram showing the principal part of another embodiment of the present invention. The bar
[0019]
As shown in FIGS. 12 to 13, opening
[0020]
Thereby, the angle of the
[0021]
With the above configuration, the distance between the
[0022]
A
[0023]
The
[0024]
FIG. 11 is a plan view showing another embodiment of the fixed
[0025]
FIG. 15 is an explanatory diagram showing a case where the same bar arrangement indexing device is used for bar slab arrangement. The bar arrangement
[0026]
As shown in FIGS. 16 and 17, the bar arrangement
[0027]
Thus, the bar arrangement | positioning space |
[0028]
【The invention's effect】
As described above, in the bar arrangement interval indexing device of the present invention, the first and second guide columns arranged in parallel, and the regulating member that regulates the interval between the first and second guide columns in parallel. a plurality of sliders which are slidably disposed at appropriate intervals on the guide post, and a slider that slides the slider and a second guide post which slides first guide columns among the slider alternately It is composed of a plurality of link members that are pin-coupled and a connecting link, and includes a fixing mechanism that restricts sliding of the slider, while forming a hook on which a reinforcing bar material can be placed at the end of each link member, Since the hooks formed at the end portions of the respective link members are disposed outside the second guide column, it is not necessary to mark the bar arrangement pitch with a scale and choke, and the bar arrangement work is remarkably performed. It can be streamlined. Further, the bar arrangement pitch can be accurately performed, and a reliable bar arrangement and binding work can be performed without requiring a skilled bar arrangement.
[0029]
In addition, since a fixing clamp is attached to a part of the link member, the bar spacing interval indexing device can be easily fixed to the vertical reinforcing bar. Furthermore, since the hook is provided with an index indicating the pitch, the distance between the hooks can be easily measured.
[0030]
A plurality of link elements formed by pin-coupling first and second link members having the same length at the intermediate point thereof are pin-coupled at the end portions of the first and second link members, respectively. The hooks that can be configured and mounted on the ends of the first link members are attached to the ends of the first link member, and the opening fixing tools are disposed at both ends of the apparatus main body. And will not interfere with work.
[0031]
Since a height adjusting tool is provided under the opening fixing tool, the height position of the bar spacing indexing device can be adjusted. Moreover, it can be used to arrange floor slabs by using it horizontally on the slab formwork.
[Brief description of the drawings]
FIG. 1 is a main part configuration diagram showing a bar arrangement interval indexing apparatus according to an embodiment of the present invention.
FIG. 2 is an explanatory diagram showing a case where the interval between the first and second guide columns of the bar arrangement indexing device is narrowed and the bar arrangement pitch is increased.
FIG. 3 is a cross-sectional view of a main part showing a fixed clamp part of the bar arrangement indexing device.
FIG. 4 is an explanatory view showing a state in which the horizontal reinforcing bars of the wall reinforcing bars are arranged using the reinforcing bar spacing indexing device.
FIG. 5 is an explanatory diagram showing an extended state of the bar arrangement indexing device.
FIG. 6 is an explanatory view showing a shortened state of the bar arrangement indexing device.
FIG. 7 is a side view showing the usage state of the bar arrangement indexing device.
FIG. 8 is a main part configuration diagram showing another embodiment of the bar arrangement indexing device of the present invention.
FIG. 9 is a cross-sectional view showing an opening degree fixing tool of the bar arrangement indexing device.
FIG. 10 is an explanatory view showing a fixed clamp portion of the bar arrangement indexing device.
FIG. 11 is an explanatory view showing another embodiment of the fixed clamp portion.
FIG. 12 is an explanatory view showing an extended state of the bar arrangement indexing device.
FIG. 13 is an explanatory view showing a shortened state of the bar arrangement indexing device.
FIG. 14 is an explanatory diagram showing a case where the horizontal reinforcing bars of the wall reinforcing bars are arranged using the reinforcing bar spacing indexing device.
FIG. 15 is an explanatory diagram showing a case where the bar arrangement indexing device is used for bar slab arrangement.
FIG. 16 is an explanatory view showing a bar arrangement position adjusting mechanism when the bar arrangement interval indexing device is used for a floor slab.
FIG. 17 is an operation explanatory diagram of a bar arrangement position adjusting mechanism of the bar arrangement interval indexing device.
[Explanation of symbols]
DESCRIPTION OF
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP09393296A JP3676489B2 (en) | 1996-04-16 | 1996-04-16 | Bar arrangement indexing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP09393296A JP3676489B2 (en) | 1996-04-16 | 1996-04-16 | Bar arrangement indexing device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH09279848A JPH09279848A (en) | 1997-10-28 |
JP3676489B2 true JP3676489B2 (en) | 2005-07-27 |
Family
ID=14096219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP09393296A Expired - Fee Related JP3676489B2 (en) | 1996-04-16 | 1996-04-16 | Bar arrangement indexing device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3676489B2 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11229634A (en) * | 1998-02-12 | 1999-08-24 | High Frequency Heattreat Co Ltd | Attaching member of shear reinforcing bar |
JP4521024B2 (en) * | 2007-11-14 | 2010-08-11 | 東日本旅客鉄道株式会社 | Reinforcing bar assembly method and reinforcing bar assembly jig for reinforcing structure of high structure |
JP5254686B2 (en) * | 2008-07-09 | 2013-08-07 | 東鉄工業株式会社 | Rebar assembly jig |
CN108071233A (en) * | 2016-11-16 | 2018-05-25 | 刘伟华 | Binding reinforcing bars positioner and its binding method |
CN106836820A (en) * | 2017-04-01 | 2017-06-13 | 中国水利水电第八工程局有限公司 | The means for correcting of the longitudinally connected reinforcing bar of precast shear wall and bearing calibration |
CN108643456B (en) * | 2018-05-21 | 2020-04-24 | 江苏省交通工程集团有限公司 | Mounting fixture of main rib of flanging die |
CN109811898A (en) * | 2019-03-13 | 2019-05-28 | 悉地国际设计顾问(深圳)有限公司 | A kind of connection structure and its construction method of reinforced concrete member |
CN110205896A (en) * | 2019-06-03 | 2019-09-06 | 中国建筑土木建设有限公司 | The method of its progress road construction of concrete road surface dowel mounting device and application |
CN110243262B (en) * | 2019-07-22 | 2020-12-29 | 中铁大桥局集团有限公司 | Steel bar binding space distance clamping ruler |
CN116255951B (en) * | 2023-03-14 | 2024-04-26 | 广东才泓工程管理有限公司 | Reinforcing bar on-spot detector for engineering management |
-
1996
- 1996-04-16 JP JP09393296A patent/JP3676489B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH09279848A (en) | 1997-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3676489B2 (en) | Bar arrangement indexing device | |
US5350162A (en) | Apparatus for assembling reinforcing bar pier cages | |
KR102211474B1 (en) | Construction support structure for fixing yoke by magnetic | |
US2832143A (en) | Masonry guide | |
CN110243262A (en) | A kind of reinforcing bar binding spacing card carpenters square | |
JP3105427B2 (en) | Rebar holding device | |
US6230447B1 (en) | Lifting anchor for prefabricated concrete panels | |
US3862479A (en) | Method for locating and supporting tendons in reinforced concrete structures | |
JP3144827B2 (en) | Bar arrangement method | |
CN220226306U (en) | Stair section steel bar positioning device | |
CN213774549U (en) | Steel bar positioning frame erecting device | |
JP4633506B2 (en) | Rebar rod manufacturing method and reinforcing bar rod manufacturing apparatus | |
US10697178B2 (en) | Reinforcing bar positioner and method | |
US1819906A (en) | Form for supporting monolithic slabs of cementitious material | |
KR0172034B1 (en) | Device for supporting an anchor bolt | |
JP3362800B2 (en) | Reinforcement structure of slab foundation | |
JP3303147B2 (en) | Rebar assembling method and rebar assembling apparatus used therefor | |
KR100503034B1 (en) | Opening and shutting using pressure type supporting apparatus for contruction | |
JPH04108960A (en) | Installation jig for wall reinforcement | |
JPH07286332A (en) | Execution method of precast concrete foundation and installation spacer used therefor | |
CN116537452A (en) | Assembled floor carrier plate reinforcing steel bar fixed support and floor thickness control device | |
JPH0882046A (en) | Supporting tool for building-up reinforcement | |
JP3073655B2 (en) | How to assemble beam reinforcement | |
JPH08177166A (en) | Reinforcement structure for concrete foundation and manufacture thereof | |
JPH0711236Y2 (en) | Scaffolding equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20041101 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20041122 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050112 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050404 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050428 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090513 Year of fee payment: 4 |
|
LAPS | Cancellation because of no payment of annual fees |