JP3649196B2 - Humidity control device - Google Patents
Humidity control device Download PDFInfo
- Publication number
- JP3649196B2 JP3649196B2 JP2002031108A JP2002031108A JP3649196B2 JP 3649196 B2 JP3649196 B2 JP 3649196B2 JP 2002031108 A JP2002031108 A JP 2002031108A JP 2002031108 A JP2002031108 A JP 2002031108A JP 3649196 B2 JP3649196 B2 JP 3649196B2
- Authority
- JP
- Japan
- Prior art keywords
- air
- heat exchanger
- adsorption element
- during
- humidity control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F3/00—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
- F24F3/12—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
- F24F3/14—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification
- F24F3/1411—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification by absorbing or adsorbing water, e.g. using an hygroscopic desiccant
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F3/00—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
- F24F3/12—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
- F24F3/14—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification
- F24F3/1411—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification by absorbing or adsorbing water, e.g. using an hygroscopic desiccant
- F24F3/1429—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification by absorbing or adsorbing water, e.g. using an hygroscopic desiccant alternatively operating a heat exchanger in an absorbing/adsorbing mode and a heat exchanger in a regeneration mode
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Central Air Conditioning (AREA)
- Drying Of Gases (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、空気の湿度調節を行う調湿装置に関するものである。
【0002】
【従来の技術】
従来より、吸着剤を用いて空気の湿度調節を行う調湿装置が知られている。例えば、特開平10−9633号公報には、吸着剤と空気を接触させるための吸着素子を2つ備えてバッチ式の動作を行う調湿装置が開示されている。また、この調湿装置には、冷凍サイクルを行う冷媒回路が設けられている。
【0003】
上記調湿装置は、第1の吸着素子で処理空気が減湿されて第2の吸着素子が再生される第1動作と、第1の吸着素子が再生されて第2の吸着素子で処理空気が減湿される第2動作とを交互に繰り返す。その際、処理空気は、吸着素子で減湿され、更に冷媒回路の蒸発器で冷却されてから室内へ供給される。また、再生空気は、冷媒回路の凝縮器で加熱されてから吸着素子へ供給される。そして、高温の再生空気が供給された吸着素子から水分が脱離し、その吸着素子が再生される。このように、上記調湿装置の冷媒回路では、その凝縮器において再生空気と冷媒が熱交換し、その蒸発器において処理空気と冷媒が熱交換する。
【0004】
【発明が解決しようとする課題】
上記調湿装置の冷媒回路では、その蒸発器において、いわゆる着霜(フロスト)の問題が生じる。つまり、冷媒回路の冷媒と熱交換する再生空気や処理空気の温度等は、調湿装置の運転条件によって変動する。そして、運転条件によっては、蒸発器における冷媒の蒸発温度が0℃を下回り、空気中の水分が蒸発器の表面て凍結する場合もある。
【0005】
このように、蒸発器の表面に霜が付着すると、冷媒と空気の熱交換が阻害され、空気が蒸発器を通過する際の抵抗も増大する。そして、蒸発器に付着した霜を放置しておくと、冷媒回路における冷凍サイクルを継続できなくなり、調湿装置の運転を停止させざるを得なくなる。
【0006】
ところが、上記調湿装置では、この着霜の問題に対して何ら対策が講じられていなかった。このため、上記調湿装置では、運転条件によっては調湿装置の運転ができなくなるという問題があった。
【0007】
本発明は、かかる点に鑑みてなされたものであり、その目的とするところは、冷媒回路を備える調湿装置において、蒸発器となる熱交換器に付着した霜を融かすための運転を行い、調湿装置の運転を継続可能とすることにある。
【0008】
【課題を解決するための手段】
本発明が講じた第1,第2,第3,第4,第8,第14及び第15の各解決手段は、吸着剤を空気と接触させるための吸着素子(81,82)と、冷媒を循環させて冷凍サイクルを行う冷媒回路(100)とを備え、第1空気中の水分を上記吸着素子(81,82)に吸着させる吸着動作と、上記冷媒回路(100)の冷媒により加熱された第2空気で上記吸着素子(81,82)を再生する再生動作とを行い、上記吸着素子(81,82)で加湿された第2空気を室内へ供給して、上記吸着素子(81,82)で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置を対象としている。
【0009】
そして、上記冷媒回路(100)には、凝縮器として機能して加湿運転中は上記吸着素子(81,82)へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器(102)と、蒸発器として機能して加湿運転中は上記吸着素子(81,82)で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器(104)とが設けられる一方、上記蒸発用熱交換器(104)に加湿運転中に付着した霜を融かすためのデフロスト運転を、加湿運転中とは異なる状態の空気を該蒸発用熱交換器(104)へ送ることによって行うものである。
【0010】
更に、上記第1の解決手段は、吸着素子(81,82)を複数備える一方、第1の吸着素子(81)へ第1空気を供給する吸着動作と第2の吸着素子(82)へ第2空気を供給する再生動作とを同時に行う第1動作と、第2の吸着素子(82)へ第1空気を供給する吸着動作と第1の吸着素子(81)へ第2空気を供給する再生動作とを同時に行う第2動作とを交互に繰り返すことによって加湿運転を行うものである。
【0011】
また、上記第2の解決手段は、吸着素子(81,82)には、流通する空気が吸着剤と接触する調湿側通路(85)と、流通する空気が上記調湿側通路(85)の空気と熱交換する冷却側通路(86)とが複数ずつ形成され、加湿運転中には、第1空気が上記吸着素子(81,82)の調湿側通路(85)を通過後に蒸発用熱交換器(104)へ供給され、第2空気が上記吸着素子(81,82)の冷却側通路(86)を通過後に凝縮用熱交換器(102)へ供給されるものである。
【0012】
また、上記第3の解決手段は、デフロスト運転中には、第1空気及び第2空気の流通経路が加湿運転中と同様に保持されると共に、蒸発用熱交換器(104)へ送られる第1空気の流量が加湿運転中よりも削減されるものである。
【0013】
また、上記第4の解決手段は、デフロスト運転中には、取り込まれた室内空気が凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)へ供給されるものである。
【0014】
本発明が講じた第5の解決手段は、上記第4の解決手段において、デフロスト運転中には、蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、取り込まれた室外空気が吸着素子(81,82)で吸着剤と接触してから室内へ供給されるものである。
【0015】
本発明が講じた第6の解決手段は、上記第2の解決手段において、デフロスト運転中には、取り込まれた室内空気が吸着素子(81,82)の冷却側通路(86)を通過後に凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)を通って室外へ排出されると共に、取り込まれた室外空気が上記吸着素子(81,82)の調湿側通路(85)を通過する際に上記冷却側通路(86)の室内空気と熱交換してから室内へ供給されるものである。
【0016】
本発明が講じた第7の解決手段は、上記第2の解決手段において、デフロスト運転中には、取り込まれた室内空気が吸着素子(81,82)の冷却側通路(86)を通過後に凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)を通って室外へ排出されると共に、取り込まれた室外空気が上記吸着素子(81,82)の調湿側通路(85)を通過する際に上記冷却側通路(86)の室内空気と熱交換し、該調湿側通路(85)を通過した室外空気の一部が室内へ供給されて残りが凝縮用熱交換器(102)で加熱された室内空気と共に蒸発用熱交換器(104)へ供給されるものである。
【0017】
また、上記第8の解決手段は、デフロスト運転中には、取り込まれた室内空気がそのままの状態で蒸発用熱交換器(104)へ供給されるものである。
【0018】
本発明が講じた第9の解決手段は、上記第8の解決手段において、デフロスト運転中には、蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、取り込まれた室外空気が凝縮用熱交換器(102)で加熱された後に吸着素子(81,82)で吸着剤と接触してから室内へ供給されるものである。
【0019】
本発明が講じた第10の解決手段は、上記第8の解決手段において、デフロスト運転中には、蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、取り込まれた室外空気が吸着素子(81,82)で吸着剤と接触してから室内へ供給されるものである。
【0020】
本発明が講じた第11の解決手段は、上記第2の解決手段において、デフロスト運転中には、取り込まれた室内空気が吸着素子(81,82)の調湿側通路(85)を通過後に蒸発用熱交換器(104)へ供給されると共に、上記吸着素子(81,82)の冷却側通路(86)に対する空気の流入が阻止されるものである。
【0021】
本発明が講じた第12の解決手段は、上記第11の解決手段において、デフロスト運転中には、蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、取り込まれた室外空気が凝縮用熱交換器(102)で加熱された後に室内空気の流れる調湿側通路(85)とは別の調湿側通路(85)を通過してから室内へ供給されるものである。
【0022】
本発明が講じた第13の解決手段は、上記第11の解決手段において、デフロスト運転中には、蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、取り込まれた室外空気が上記室内空気の流れる調湿側通路(85)とは別の調湿側通路(85)を通過してから室内へ供給されるものである。
【0023】
また、上記第14の解決手段は、デフロスト運転中には、取り込まれた室外空気が凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)へ供給されるものである。
【0024】
また、上記第15の解決手段は、デフロスト運転中には、取り込まれた室外空気が凝縮用熱交換器(102)で加熱され、加熱された該室外空気の一部が蒸発用熱交換器(104)へ供給されて残りが室内へ供給されるものである。
【0025】
本発明が講じた第16の解決手段は、上記第15の解決手段において、デフロスト運転中に室内へ供給される室外空気は、凝縮用熱交換器(102)で加熱された後に吸着素子(81,82)で吸着剤と接触してから室内へ送られるものである。
【0026】
本発明が講じた第17の解決手段は、上記第2の解決手段において、デフロスト運転中には、取り込まれた室外空気が凝縮用熱交換器(102)で加熱され、加熱された該室外空気の一部が蒸発用熱交換器(104)へ供給されて残りが吸着素子(81,82)の調湿側通路(85)を通過してから室内へ供給されると共に、取り込まれた室内空気が上記室外空気の流れる調湿側通路(85)とは別の調湿側通路(85)を通過してから室外へ排出されるものである。
【0027】
−作用−
上記第1,第2,第3,第4,第8,第14及び第15の各解決手段では、調湿装置において、吸着動作と再生動作とが行われる。吸着動作時の吸着素子(81,82)では、第1空気が吸着剤と接触し、第1空気中の水蒸気が吸着剤に吸着される。一方、再生動作時の吸着素子(81,82)では、加熱された第2空気が吸着剤と接触し、吸着剤から水蒸気が脱離する。つまり、吸着素子(81,82)が再生される。吸着剤から脱離した水蒸気は、第2空気に付与される。
【0028】
これらの解決手段の調湿装置は、加湿運転を行えるように構成される。加湿運転中には、吸着素子(81,82)で加湿された第2空気が室内へ供給されると共に、吸着素子(81,82)で減湿された第1空気が室外へ排出される。尚、この調湿装置は、加湿運転に加えて、吸着素子(81,82)で減湿された第1空気を室内へ供給する運転も可能に構成されていてもよい。
【0029】
これらの解決手段の冷媒回路(100)では、冷媒が循環して冷凍サイクルが行われる。加湿運転中に冷媒回路(100)を循環する冷媒は、凝縮用熱交換器(102)で第2空気へ放熱して凝縮し、蒸発用熱交換器(104)で第1空気から吸熱して蒸発する。再生動作時の吸着素子(81,82)に対しては、凝縮用熱交換器(102)で加熱された第2空気が供給される。
【0030】
加湿運転中に蒸発用熱交換器(104)で着霜が生じた場合には、デフロスト運転が行われる。デフロスト運転中は、蒸発用熱交換器(104)に対して、加湿運転中とは異なる状態の空気が供給される。尚、ここでいう空気の状態とは、空気の温度、湿度、流量などを意味する。このデフロスト運転を行うことで、蒸発用熱交換器(104)に付着した霜が融解する。
【0031】
上記第1の解決手段では、加湿運転中の調湿装置において、第1動作と第2動作とが交互に繰り返し行われる。
【0032】
先ず、第1動作時には、第1の吸着素子(81)へ第1空気が送られる。第1の吸着素子(81)では、第1空気中の水分が吸着剤に吸着される。一方、第2の吸着素子(82)へは、凝縮用熱交換器(102)で加熱された第2空気が供給される。第2の吸着素子(82)では、第2空気によって吸着剤が加熱され、吸着剤から水分が脱離する。つまり、第2の吸着素子(82)が再生され、同時に第2空気が加湿される。
【0033】
次に、第2動作時には、第2の吸着素子(82)へ第1空気が送られる。第2の吸着素子(82)では、第1空気中の水分が吸着剤に吸着される。一方、第1の吸着素子(81)へは、凝縮用熱交換器(102)で加熱された第2空気が供給される。第1の吸着素子(81)では、第2空気によって吸着剤が加熱され、吸着剤から水分が脱離する。つまり、第1の吸着素子(81)が再生され、同時に第2空気が加湿される。
【0034】
上記第2の解決手段では、吸着素子(81,82)に調湿側通路(85)と冷却側通路(86)とが設けられる。加湿運転中に吸着動作の対象となっている吸着素子(81,82)では、調湿側通路(85)へ第1空気が送り込まれて、冷却側通路(86)へ第2空気が送り込まれる。調湿側通路(85)では、第1空気中の水蒸気が吸着剤に吸着される際に吸着熱が発生する。一方、冷却側通路(86)では、流通する第2空気が調湿側通路(85)の第1空気と熱交換し、調湿側通路(85)で生じた吸着熱を吸収する。この冷却側通路(86)から出た第2空気は、凝縮用熱交換器(102)へ送られて更に加熱される。
【0035】
上記第3の解決手段において、デフロスト運転中の調湿装置では、第1空気及び第2空気の流通経路が加湿運転中と同様に保持される。従って、蒸発用熱交換器(104)に対しては、加湿運転中と同様に第1空気が供給される。ただし、蒸発用熱交換器(104)へ送られる第1空気の流量は、加湿運転中よりも少なく設定される。つまり、蒸発用熱交換器(104)に対しては、加湿運転中と異なる流量の第1空気が供給される。蒸発用熱交換器(104)で冷媒と熱交換する第1空気の流量が減ると、蒸発用熱交換器(104)における冷媒蒸発温度が上昇する。このため、蒸発用熱交換器(104)の温度が上昇し、その表面に付着した霜が融ける。
【0036】
上記第4の解決手段において、デフロスト運転中の調湿装置は、室内空気を取り込む。調湿装置に取り込まれた室内空気は、凝縮用熱交換器(102)で冷媒と熱交換してから蒸発用熱交換器(104)へ送られる。つまり、加湿運転中とは異なり、凝縮用熱交換器(102)で加熱された室内空気が蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、凝縮用熱交換器(102)で加熱された室内空気によって融かされる。
【0037】
上記第5の解決手段では、デフロスト運転中に蒸発用熱交換器(104)へ供給された室内空気が、蒸発用熱交換器(104)を通過した後に室外へ排出される。更に、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、吸着素子(81,82)で吸着剤と接触した後に室内へ供給される。吸着素子(81,82)では、室外空気中の水分が吸着剤に吸着される際に吸着熱が発生し、室外空気の温度が上昇する。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、室内の換気をも行う。また、デフロスト運転中に吸着素子(81,82)が室外空気から奪った水分は、加湿運転の再開後に第2空気の加湿に利用される。
【0038】
上記第6の解決手段において、デフロスト運転中の調湿装置は、室内空気と室外空気を取り込む。調湿装置に取り込まれた室内空気は、吸着素子(81,82)の冷却側通路(86)を通過し、その後に凝縮用熱交換器(102)で冷媒と熱交換してから蒸発用熱交換器(104)へ送られる。つまり、加湿運転中とは異なり、凝縮用熱交換器(102)で加熱された室内空気が蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、凝縮用熱交換器(102)で加熱された室内空気によって融かされる。
【0039】
一方、調湿装置に取り込まれた室外空気は、吸着素子(81,82)の調湿側通路(85)を通過し、その後に室内へ供給される。吸着素子(81,82)では、冷却側通路(86)の室内空気と調湿側通路(85)の室外空気とが熱交換を行う。つまり、吸着素子(81,82)では、室外へ排出される室内空気と、室内へ供給される室外空気とが熱交換を行う。尚、デフロスト運転中には室外空気中の水分が吸着素子(81,82)に奪われるが、この吸着素子(81,82)が奪った水分は、加湿運転の再開後に第2空気を加湿するために利用される。
【0040】
上記第7の解決手段において、デフロスト運転中の調湿装置は、室内空気と室外空気を取り込む。調湿装置に取り込まれた室内空気は、吸着素子(81,82)の冷却側通路(86)を通過し、その後に凝縮用熱交換器(102)で冷媒と熱交換してから蒸発用熱交換器(104)へ送られる。一方、調湿装置に取り込まれた室外空気は、吸着素子(81,82)の調湿側通路(85)を通過し、その際に冷却側通路(86)の室内空気と熱交換を行う。そして、吸着素子(81,82)の調湿側通路(85)から出た室外空気の一部が、蒸発用熱交換器(104)へ送られる。つまり、加湿運転中とは異なり、凝縮用熱交換器(102)で加熱された室内空気と、吸着素子(81,82)を通過した室外空気とが蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、供給された空気によって融かされる。
【0041】
本解決手段において、吸着素子(81,82)の調湿側通路(85)から出た室外空気の残りは、室内へ供給される。つまり、室外空気は、吸着素子(81,82)で室外へ排出される室内空気と熱交換した後に、室内へ供給される。尚、デフロスト運転中には室外空気中の水分が吸着素子(81,82)に奪われるが、この吸着素子(81,82)が奪った水分は、加湿運転の再開後に第2空気を加湿するために利用される。
【0042】
上記第8の解決手段では、デフロスト運転中の調湿装置は、室内空気を取り込む。調湿装置に取り込まれた室内空気は、温度調節や湿度調節を施されることなく、そのままの状態で蒸発用熱交換器(104)へ送られる。つまり、加湿運転中とは異なり、ほぼ調湿装置に取り込まれた状態の室内空気が蒸発用熱交換器(104)へ送られる。ここで、蒸発用熱交換器(104)における着霜の問題が生じるのは外気温の低い冬季であり、冬季には室内が暖房されている。従って、蒸発用熱交換器(104)に付着した霜は、暖房中の暖かい室内空気によって融かされる。
【0043】
上記第9の解決手段では、デフロスト運転中に蒸発用熱交換器(104)へ供給された室内空気が、蒸発用熱交換器(104)を通過した後に室外へ排出される。更に、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、凝縮用熱交換器(102)で加熱され、その後に吸着素子(81,82)へ送られる。吸着素子(81,82)では、加熱された室外空気との接触により吸着剤から水分が脱離し、室外空気が加湿される。そして、吸着素子(81,82)で加湿された室外空気が、室内へ供給される。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、室内の換気や、給気される室外空気の加湿をも行う。
【0044】
上記第10の解決手段では、デフロスト運転中に蒸発用熱交換器(104)へ供給された室内空気が、蒸発用熱交換器(104)を通過した後に室外へ排出される。更に、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、吸着素子(81,82)で吸着剤と接触した後に室内へ供給される。吸着素子(81,82)では、室外空気中の水分が吸着剤に吸着される際に吸着熱が発生し、室外空気の温度が上昇する。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、室内の換気をも行う。また、デフロスト運転中に吸着素子(81,82)が室外空気から奪った水分は、加湿運転の再開後に第2空気の加湿に利用される。
【0045】
上記第11の解決手段において、デフロスト運転中の調湿装置は、室内空気を取り込む。調湿装置に取り込まれた室内空気は、吸着素子(81,82)の調湿側通路(85)へ導入される。その際、吸着素子(81,82)の冷却側通路(86)では、空気の流通が阻止されている。吸着素子(81,82)の調湿側通路(85)では、室内空気中の水分が吸着剤に吸着される際に吸着熱が発生し、室内空気の温度が上昇する。つまり、加湿運転中とは異なり、吸着熱によって加熱された室内空気が蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、吸着素子(81,82)の調湿側通路(85)で加熱された室内空気によって融かされる。
【0046】
上記第12の解決手段では、デフロスト運転中に蒸発用熱交換器(104)へ供給された室内空気が、蒸発用熱交換器(104)を通過した後に室外へ排出される。更に、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、凝縮用熱交換器(102)で加熱され、その後に吸着素子(81,82)へ送られる。その際、加熱された室外空気は、室内空気の流れる調湿側通路(85)とは別の調湿側通路(85)へ導入される。この調湿側通路(85)では、加熱された室外空気との接触により吸着剤から水分が脱離し、室外空気が加湿される。そして、室内へは、吸着素子(81,82)で加湿された室外空気が供給される。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、室内の換気や、給気される室外空気の加湿をも行う。
【0047】
上記第13の解決手段では、デフロスト運転中に蒸発用熱交換器(104)へ供給された室内空気が、蒸発用熱交換器(104)を通過した後に室外へ排出される。更に、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、吸着素子(81,82)の調湿側通路(85)へ送られる。その際、この室外空気は、室内空気の流れる調湿側通路(85)とは別の調湿側通路(85)へ導入される。この調湿側通路(85)では、室外空気中の水分が吸着剤に吸着される際に吸着熱が発生し、室外空気の温度が上昇する。そして、室内へは、この調湿側通路(85)から出た室外空気が供給される。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、室内の換気をも行う。また、デフロスト運転中に吸着素子(81,82)が室外空気から奪った水分は、加湿運転の再開後に第2空気の加湿に利用される。
【0048】
上記第14の解決手段では、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、凝縮用熱交換器(102)で冷媒と熱交換してから蒸発用熱交換器(104)へ送られる。つまり、加湿運転中とは異なり、凝縮用熱交換器(102)で加熱された室外空気が蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、凝縮用熱交換器(102)で加熱された室外空気によって融かされる。
【0049】
上記第15の解決手段において、デフロスト運転中の調湿装置は、室内空気と室外空気を取り込む。調湿装置に取り込まれた室外空気は、凝縮用熱交換器(102)で冷媒と熱交換して加熱される。その後、加熱された室外空気は、その一部が蒸発用熱交換器(104)へ供給され、残りが室内へ供給される。つまり、加湿運転中とは異なり、凝縮用熱交換器(102)で加熱された室外空気が蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、供給された空気によって融かされる。
【0050】
上記第16の解決手段では、凝縮用熱交換器(102)で加熱された後に室内へ供給される室外空気が吸着素子(81,82)を通過する。つまり、凝縮用熱交換器(102)から出た室外空気は、吸着素子(81,82)を通過してから室内へ供給される。吸着素子(81,82)では、加熱された室外空気との接触により吸着剤から水分が脱離し、室外空気が加湿される。そして、吸着素子(81,82)で加湿された室外空気が、室内へ供給される。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、給気される室外空気の加湿をも行う。
【0051】
上記第17の解決手段において、デフロスト運転中の調湿装置は、室外空気を取り込む。調湿装置に取り込まれた室外空気は、凝縮用熱交換器(102)で冷媒と熱交換して加熱される。その後、加熱された室外空気は、その一部が蒸発用熱交換器(104)へ供給され、残りが吸着素子(81,82)の調湿側通路(85)へ導入される。つまり、加湿運転中とは異なり、凝縮用熱交換器(102)で加熱された室外空気が蒸発用熱交換器(104)へ送られる。そして、蒸発用熱交換器(104)に付着した霜は、供給された空気によって融かされる。また、吸着素子(81,82)の調湿側通路(85)では、加熱された室外空気との接触により吸着剤から水分が脱離し、室外空気が加湿される。そして、吸着素子(81,82)で加湿された室外空気が、室内へ供給される。
【0052】
また、本解決手段の調湿装置は、デフロスト運転中に室内空気を取り込む。調湿装置に取り込まれた室内空気は、吸着素子(81,82)の調湿側通路(85)へ送られる。その際、この室内空気は、室外空気の流れる調湿側通路(85)とは別の調湿側通路(85)へ導入される。この調湿側通路(85)では、室内空気中の水分が吸着剤に吸着される。この調湿側通路(85)から出た室内空気は、その後に室外へ排出される。このように、デフロスト運転中において、調湿装置は、蒸発用熱交換器(104)のデフロストと共に、室内の換気や、給気される室外空気の加湿をも行う。また、デフロスト運転中に吸着素子(81,82)が室内空気から奪った水分は、加湿運転の再開後に第2空気の加湿に利用される。
【0053】
【発明の効果】
本発明によれば、冷媒回路(100)を備える調湿装置において、蒸発用熱交換器(104)で着霜が生じた場合であっても、デフロスト運転を行うことによって蒸発用熱交換器(104)に付着した霜を融かすことができる。このため、蒸発用熱交換器(104)で着霜が生じるような運転条件であっても、デフロスト運転を行って蒸発用熱交換器(104)の霜を融かせば、その後は加湿運転を再開することが可能となる。従って、本発明によれば、そのような運転条件においても、調湿装置の運転を継続させることができる。
【0054】
ここで、例えば、いわゆる逆サイクルデフロストのように、冷媒回路(100)での冷媒の循環経路を変更することによっても、蒸発用熱交換器(104)の霜を融かすことは可能である。しかしながら、このような方策を採るには、冷媒の流れを切り換えるための弁などを冷媒回路(100)に設ける必要が生じ、冷媒回路(100)の複雑化を招く。
【0055】
これに対し、本発明に係る調湿装置では、加湿運転中と異なる状態の空気を該蒸発用熱交換器(104)へ送ることによってデフロスト運転を行っている。このため、冷媒回路(100)の構成を何ら変更することなく、デフロスト運転を行うことが可能となる。従って、本発明によれば、冷媒回路(100)の構成を簡素に維持しながら、デフロスト運転を行うことができる。
【0056】
上記第2の解決手段では、吸着素子(81,82)に冷却側通路(86)を形成し、吸着動作中に発生する吸着熱を第2空気に吸収させている。従って、本解決手段によれば、発生した吸着熱による第1空気の温度上昇を抑制することが可能となる。この結果、吸着素子(81,82)の調湿側通路(85)を流れる第1空気の相対湿度が低下するのを抑制でき、吸着剤に吸着される水蒸気の量を増大させることができる。
【0057】
更に、この解決手段では、第2空気を先ず冷却用流体として吸着素子(81,82)の冷却側通路(86)へ導入し、この冷却側通路(86)から出た第2空気を凝縮用熱交換器(102)で加熱している。つまり、吸着素子(81,82)の再生に用いられる第2空気は、凝縮用熱交換器(102)だけでなく吸着素子(81,82)の冷却側通路(86)においても加熱される。従って、本解決手段によれば、凝縮用熱交換器(102)で第2空気に与えねばならない熱量を削減でき、調湿装置の運転に要するエネルギを削減できる。
【0058】
上記第3の解決手段によれば、蒸発用熱交換器(104)に対する第1空気の供給量を変更するだけで、蒸発用熱交換器(104)のデフロスト(除霜)が可能となる。従って、本解決手段によれば、加湿運転からデフロスト運転へ移行する際における調湿装置の運転状態の変化を、最小限に留めることができる。
【0059】
上記第4の解決手段によれば、予め凝縮用熱交換器(102)で加熱された空気を蒸発用熱交換器(104)へ送ることで、蒸発用熱交換器(104)の霜を短時間で確実に融かすことができる。ここで、蒸発用熱交換器(104)における着霜の問題が生じるのは外気温の低い冬季であり、冬季には室内が暖房されている。そして、本解決手段のデフロスト運転では、暖房で暖められた状態の室内空気を凝縮用熱交換器(102)で更に加熱した上で、蒸発用熱交換器(104)へ供給している。従って、本解決手段によれば、蒸発用熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0060】
上記第5の解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、室内へ供給される室外空気を吸着素子(81,82)で吸着剤と接触させることにより、室外空気を吸着熱で暖めてから室内へ供給することが可能となる。
【0061】
上記第6,第7の解決手段によれば、凝縮用熱交換器(102)で加熱された空気を蒸発用熱交換器(104)へ送ることで、蒸発用熱交換器(104)の霜を短時間で確実に融かすことができる。また、これらの解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。
【0062】
ここで、蒸発用熱交換器(104)における着霜の問題が生じるのは外気温の低い冬季であり、冬季には室内が暖房されている。一方、第6,第7の解決手段に係る調湿装置では、デフロスト運転中に室内へ供給される室外空気を、暖房により暖められた室内空気と吸着素子(81,82)で熱交換させている。従って、排気される室内空気の温熱を給気される室外空気へと回収でき、換気に伴う暖房負荷の増大を抑制できる。
【0063】
特に、上記第7の解決手段では、吸着素子(81,82)で暖かい室内空気と熱交換した室外空気をも、蒸発用熱交換器(104)へ供給している。このため、本解決手段によれば、デフロスト運転中に蒸発用熱交換器(104)へ供給される空気量を充分に確保でき、蒸発用熱交換器(104)のデフロストを短時間で確実に行うことが可能となる。
【0064】
上記第8の解決手段によれば、取り込んだ室内空気をそのまま蒸発用熱交換器(104)へ送ることで、蒸発用熱交換器(104)の霜を融かすことができる。つまり、デフロスト運転が行われる冬季には室内が暖房されていることを利用し、暖房中の暖かい室内空気を用いて蒸発用熱交換器(104)のデフロストを確実に行うことができる。
【0065】
上記第9の解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、本解決手段によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、蒸発用熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0066】
上記第10の解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、室内へ供給される室外空気を吸着素子(81,82)で吸着剤と接触させることにより、室外空気を吸着熱で暖めてから室内へ供給することが可能となる。
【0067】
上記第11の解決手段では、取り込んだ室内空気を吸着素子(81,82)の調湿側通路(85)へ導入し、発生する吸着熱を吸収して温度上昇した室内空気を蒸発用熱交換器(104)へ送っている。ここで、蒸発用熱交換器(104)における着霜の問題が生じるのは外気温の低い冬季であり、冬季には室内が暖房されている。従って、本解決手段によれば、暖房により暖められた室内空気を吸着熱によって更に加熱してから蒸発用熱交換器(104)へ供給でき、蒸発用熱交換器(104)のデフロストを確実に行うことができる。
【0068】
上記第12の解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、本解決手段によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、蒸発用熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0069】
上記第13の解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、室内へ供給される室外空気を吸着素子(81,82)で吸着剤と接触させることにより、室外空気を吸着熱で暖めてから室内へ供給することが可能となる。
【0070】
上記第14,第15の解決手段によれば、予め凝縮用熱交換器(102)で加熱された空気を蒸発用熱交換器(104)へ送ることで、蒸発用熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本解決手段によれば、蒸発用熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0071】
上記第16の解決手段によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、蒸発用熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0072】
上記第17の解決手段によれば、予め凝縮用熱交換器(102)で加熱された空気を蒸発用熱交換器(104)へ送ることで、蒸発用熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本解決手段によれば、蒸発用熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0073】
また、本解決手段によれば、デフロスト運転中において、蒸発用熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本解決手段によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、蒸発用熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0074】
【発明の実施の形態】
以下、本発明の実施形態を図面に基づいて詳細に説明する。尚、以下の説明において、「上」 「下」 「左」 「右」 「前」 「後」 「手前」 「奥」 は、何れも参照する図面におけるものを意味している。
【0075】
本実施形態に係る調湿装置は、減湿された空気が室内へ供給される除湿運転と、加湿された空気が室内へ供給される加湿運転とを切り換えて行うように構成されている。また、この調湿装置は、冷媒回路(100)と2つの吸着素子(81,82)とを備え、いわゆるバッチ式の動作を行うように構成されている。ここでは、本実施形態に係る調湿装置の構成について、図1,図5,図6,図7を参照しながら説明する。
【0076】
《調湿装置の全体構成》
図1,図5に示すように、上記調湿装置は、やや扁平な直方体状のケーシング(10)を備えている。このケーシング(10)には、2つの吸着素子(81,82)と、冷媒回路(100)とが収納されている。冷媒回路(100)には、再生熱交換器(102)、第1熱交換器(103)、及び第2熱交換器(104)が設けられている。尚、冷媒回路(100)の詳細については後述する。
【0077】
図6に示すように、上記吸着素子(81,82)は、平板状の平板部材(83)と波形状の波板部材(84)とを交互に積層して構成されている。平板部材(83)は、その長辺の長さL1がその短辺の長さL2の2.5倍となる長方形状に形成されている。つまり、この平板部材(83)では、L1/L2=2.5となっている。尚、ここに示した数値は単なる例示である。波板部材(84)は、隣接する波板部材(84)の稜線方向が互いに90°ずれる姿勢で積層されている。そして、吸着素子(81,82)は、全体として直方体状ないし四角柱状に形成されている。
【0078】
上記吸着素子(81,82)には、平板部材(83)及び波板部材(84)の積層方向において、調湿側通路(85)と冷却側通路(86)とが平板部材(83)を挟んで交互に区画形成されている。この吸着素子(81,82)において、平板部材(83)の長辺側の側面に調湿側通路(85)が開口し、平板部材(83)の短辺側の側面に冷却側通路(86)が開口している。また、この吸着素子(81,82)において、同図の手前側と奥側の端面は、調湿側通路(85)と冷却側通路(86)の何れも開口しない閉塞面を構成している。
【0079】
上記吸着素子(81,82)において、調湿側通路(85)に臨む平板部材(83)の表面や、調湿側通路(85)に設けられた波板部材(84)の表面には、水蒸気を吸着するための吸着剤が塗布されている。この種の吸着剤としては、例えばシリカゲル、ゼオライト、イオン交換樹脂等が挙げられる。
【0080】
図1に示すように、上記ケーシング(10)において、最も手前側には室外側パネル(11)が設けられ、最も奥側には室内側パネル(12)が設けられている。室外側パネル(11)には、その左端寄りに室外側吸込口(13)が形成され、その右端寄りに室外側吹出口(16)が形成されている。一方、室内側パネル(12)には、その左端寄りに室内側吹出口(14)が形成され、その右端寄りに室内側吸込口(15)が形成されている。
【0081】
ケーシング(10)の内部には、手前側から奥側へ向かって順に、第1仕切板(20)と、第2仕切板(30)とが設けられている。ケーシング(10)の内部空間は、これら第1,第2仕切板(20,30)によって、前後に仕切られている。
【0082】
室外側パネル(11)と第1仕切板(20)の間の空間は、上側の室外側上部流路(41)と下側の室外側下部流路(42)とに区画されている。室外側上部流路(41)は、室外側吹出口(16)によって室外空間と連通されている。室外側下部流路(42)は、室外側吸込口(13)によって室外空間と連通されている。
【0083】
室外側パネル(11)と第1仕切板(20)の間の空間には、その右端寄りに排気ファン(96)が設置されている。また、室外側上部流路(41)には、第2熱交換器(104)が設置されている。第2熱交換器(104)は、蒸発用熱交換器を構成している。具体的に、この第2熱交換器(104)は、いわゆるクロスフィン型のフィン・アンド・チューブ熱交換器であって、排気ファン(96)へ向けて室外側上部流路(41)を流れる空気と冷媒回路(100)の冷媒とを熱交換させるように構成されている。つまり、第2熱交換器(104)は、室外へ排出される空気と冷媒とを熱交換させるためのものである。
【0084】
第1仕切板(20)には、第1右側開口(21)、第1左側開口(22)、第1右上開口(23)、第1右下開口(24)、第1左上開口(25)、及び第1左下開口(26)が形成されている。これらの開口(21,22,…)は、それぞれが開閉シャッタを備えて開閉自在に構成されている。
【0085】
第1右側開口(21)及び第1左側開口(22)は、縦長の長方形状の開口である。第1右側開口(21)は、第1仕切板(20)の右端近傍に設けられている。第1左側開口(22)は、第1仕切板(20)の左端近傍に設けられている。第1右上開口(23)、第1右下開口(24)、第1左上開口(25)、及び第1左下開口(26)は、横長の長方形状の開口である。第1右上開口(23)は、第1仕切板(20)の上部における第1右側開口(21)の左隣に設けられている。第1右下開口(24)は、第1仕切板(20)の下部における第1右側開口(21)の左隣に設けられている。第1左上開口(25)は、第1仕切板(20)の上部における第1左側開口(22)の右隣に設けられている。第1左下開口(26)は、第1仕切板(20)の下部における第1左側開口(22)の右隣に設けられている。
【0086】
第1仕切板(20)と第2仕切板(30)の間には、2つの吸着素子(81,82)が設置されている。これら吸着素子(81,82)は、所定の間隔をおいて左右に並んだ状態に配置されている。具体的には、右寄りに第1吸着素子(81)が設けられ、左寄りに第2吸着素子(82)が設けられている。
【0087】
第1,第2吸着素子(81,82)は、それぞれにおける平板部材(83)及び波板部材(84)の積層方向がケーシング(10)の長手方向(図1における手前から奥へ向かう方向)と一致すると共に、それぞれにおける平板部材(83)等の積層方向が互いに平行となる姿勢で設置されている。更に、各吸着素子(81,82)は、左右の側面がケーシング(10)の側板と、上下面がケーシング(10)の天板や底板と、前後の端面が室外側パネル(11)や室内側パネル(12)とそれぞれ略平行になる姿勢で配置されている。
【0088】
また、ケーシング(10)内に設置された各吸着素子(81,82)では、その左右の側面に冷却側通路(86)が開口している。つまり、第1吸着素子(81)において冷却側通路(86)の開口する1つの側面と、第2吸着素子(82)において冷却側通路(86)の開口する1つの側面とは、互いに向かい合っている。
【0089】
第1仕切板(20)と第2仕切板(30)の間の空間は、右側流路(51)、左側流路(52)、右上流路(53)、右下流路(54)、左上流路(55)、左下流路(56)、及び中央流路(57)に区画されている。
【0090】
右側流路(51)は、第1吸着素子(81)の右側に形成され、第1吸着素子(81)の冷却側通路(86)に連通している。左側流路(52)は、第2吸着素子(82)の左側に形成され、第2吸着素子(82)の冷却側通路(86)に連通している。
【0091】
右上流路(53)は、第1吸着素子(81)の上側に形成され、第1吸着素子(81)の調湿側通路(85)に連通している。右下流路(54)は、第1吸着素子(81)の下側に形成され、第1吸着素子(81)の調湿側通路(85)に連通している。左上流路(55)は、第2吸着素子(82)の上側に形成され、第2吸着素子(82)の調湿側通路(85)に連通している。左下流路(56)は、第2吸着素子(82)の下側に形成され、第2吸着素子(82)の調湿側通路(85)に連通している。
【0092】
中央流路(57)は、第1吸着素子(81)と第2吸着素子(82)の間に形成され、両吸着素子(81,82)の冷却側通路(86)に連通している。この中央流路(57)は、図1,図5に現れる流路断面の形状が四角形状となっている。
【0093】
再生熱交換器(102)は、凝縮用熱交換器を構成している。具体的に、この再生熱交換器(102)は、いわゆるクロスフィン型のフィン・アンド・チューブ熱交換器であって、中央流路(57)を流れる空気と冷媒回路(100)の冷媒とを熱交換させるように構成されている。この再生熱交換器(102)は、中央流路(57)に設置されている。また、再生熱交換器(102)は、ほぼ水平に寝かせられた姿勢で、この中央流路(57)を上下に仕切るように配置されている。更に、再生熱交換器(102)は、その上面が第1及び第2吸着素子(81,82)の下面よりも僅かに下となるように配置されている。
【0094】
左右に並べられた第1吸着素子(81)と第2吸着素子(82)の間には、右下シャッタ(61)、左下シャッタ(62)、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)が設けられている。これらのシャッタ(61,62,…)は、それぞれが開閉自在に構成されている。
【0095】
右下シャッタ(61)は、再生熱交換器(102)の右側で且つ第1吸着素子(81)の下側に設置され、中央流路(57)における再生熱交換器(102)の下側部分と右下流路(54)との間を仕切っている。左下シャッタ(62)は、再生熱交換器(102)の左側で且つ第2吸着素子(82)の下側に設置され、中央流路(57)における再生熱交換器(102)の下側部分と左下流路(56)との間を仕切っている。
【0096】
右上シャッタ(63)は、第1吸着素子(81)の左側面の上端から左方へ延び、再生熱交換器の右半分を覆うように設置されている。この右上シャッタ(63)は、中央流路(57)における再生熱交換器(102)の上側部分と右上流路(53)との間を仕切っている。左上シャッタ(64)は、第2吸着素子(82)の右側面の上端から右方へ延び、再生熱交換器の左半分を覆うように設置されている。この左上シャッタ(64)は、中央流路(57)における再生熱交換器(102)の上側部分と左上流路(55)との間を仕切っている。中央シャッタ(65)は、右上シャッタ(63)の左端及び左上シャッタ(64)の右端から上方へ延びる姿勢で設置され、右上流路(53)と左上流路(55)との間を仕切っている。
【0097】
室外側パネル(11)と第1仕切板(20)の間の流路(41,42)と、第1仕切板(20)と第2仕切板(30)の間の流路(51,52,…)とは、第1仕切板(20)の開口(21,22,…)に設けられた開閉シャッタによって、連通状態と遮断状態に切り換えられる。具体的に、第1右側開口(21)を開口状態とすると、右側流路(51)と室外側下部流路(42)が連通する。第1左側開口(22)を開口状態とすると、左側流路(52)と室外側下部流路(42)が連通する。第1右上開口(23)を開口状態とすると、右上流路(53)と室外側上部流路(41)が連通する。第1右下開口(24)を開口状態とすると、右下流路(54)と室外側下部流路(42)が連通する。第1左上開口(25)を開口状態とすると、左上流路(55)と室外側上部流路(41)が連通する。第1左下開口(26)を開口状態とすると、左下流路(56)と室外側下部流路(42)が連通する。
【0098】
第2仕切板(30)には、第2右側開口(31)、第2左側開口(32)、第2右上開口(33)、第2右下開口(34)、第2左上開口(35)、及び第2左下開口(36)が形成されている。これらの開口(31,32,…)は、それぞれが開閉シャッタを備えて開閉自在に構成されている。
【0099】
第2右側開口(31)及び第2左側開口(32)は、縦長の長方形状の開口である。第2右側開口(31)は、第2仕切板(30)の右端近傍に設けられている。第2左側開口(32)は、第2仕切板(30)の左端近傍に設けられている。第2右上開口(33)、第2右下開口(34)、第2左上開口(35)、及び第2左下開口(36)は、横長の長方形状の開口である。第2右上開口(33)は、第2仕切板(30)の上部における第2右側開口(31)の左隣に設けられている。第2右下開口(34)は、第2仕切板(30)の下部における第2右側開口(31)の左隣に設けられている。第2左上開口(35)は、第2仕切板(30)の上部における第2左側開口(32)の右隣に設けられている。第2左下開口(36)は、第2仕切板(30)の下部における第2左側開口(32)の右隣に設けられている。
【0100】
室内側パネル(12)と第2仕切板(30)の間の空間は、上側の室内側上部流路(46)と下側の室内側下部流路(47)とに区画されている。室内側上部流路(46)は、室内側吹出口(14)によって室内空間と連通されている。室内側下部流路(47)は、室内側吸込口(15)によって室内空間と連通されている。
【0101】
室内側パネル(12)と第2仕切板(30)の間の空間には、その左端寄りに給気ファン(95)が設置されている。また、室内側上部流路(46)には、第1熱交換器(103)が設置されている。第1熱交換器(103)は、いわゆるクロスフィン型のフィン・アンド・チューブ熱交換器であって、給気ファン(95)へ向けて室内側上部流路(46)を流れる空気と冷媒回路(100)の冷媒とを熱交換させるように構成されている。つまり、第1熱交換器(103)は、室内へ供給される空気と冷媒とを熱交換させるためのものである。
【0102】
第1仕切板(20)と第2仕切板(30)の間の流路と、第2仕切板(30)と室外側パネル(11)の間の流路とは、第2仕切板(30)の開口に設けられた開閉シャッタによって、連通状態と遮断状態に切り換えられる。具体的に、第2右側開口(31)を開口状態とすると、右側流路(51)と室内側下部流路(47)が連通する。第2左側開口(32)を開口状態とすると、左側流路(52)と室内側下部流路(47)が連通する。第2右上開口(33)を開口状態とすると、右上流路(53)と室内側上部流路(46)が連通する。第2右下開口(34)を開口状態とすると、右下流路(54)と室内側下部流路(47)が連通する。第2左上開口(35)を開口状態とすると、左上流路(55)と室内側上部流路(46)が連通する。第2左下開口(36)を開口状態とすると、左下流路(56)と室内側下部流路(47)が連通する。
【0103】
《冷媒回路の構成》
図7に示すように、上記冷媒回路(100)は、冷媒の充填された閉回路である。冷媒回路(100)には、圧縮機(101)、再生熱交換器(102)、第1熱交換器(103)、第2熱交換器(104)、レシーバ(105)、四方切換弁(120)、及び電動膨張弁(110)が設けられている。この冷媒回路(100)では、冷媒を循環させることで蒸気圧縮式の冷凍サイクルが行われる。
【0104】
冷媒回路(100)において、圧縮機(101)の吐出側は、再生熱交換器(102)の一端に接続されている。再生熱交換器(102)の他端は、レシーバ(105)を介して電動膨張弁(110)の一端に接続されている。電動膨張弁(110)の他端は、四方切換弁(120)の第1ポート(121)に接続されている。この四方切換弁(120)は、その第2ポート(122)が第2熱交換器(104)の一端に接続され、その第4ポート(124)が第1熱交換器(103)の一端に接続されている。また、四方切換弁(120)の第3ポート(123)は、封止されている。第1熱交換器(103)の他端と第2熱交換器(104)の他端とは、それぞれが圧縮機(101)の吸入側に接続されている。
【0105】
四方切換弁(120)は、第1ポート(121)と第2ポート(122)が互いに連通して第3ポート(123)と第4ポート(124)が互いに連通する状態と、第1ポート(121)と第4ポート(124)が互いに連通して第2ポート(122)と第3ポート(123)が互いに連通する状態とに切り換わる。上述のように、この四方切換弁(120)の第3ポート(123)は、閉塞されている。つまり、本実施形態の冷媒回路(100)では、四方切換弁(120)が三方弁として用いられている。従って、この冷媒回路(100)では、四方切換弁(120)に代えて三方弁を用いてもよい。
【0106】
−運転動作−
上記調湿装置の運転動作について説明する。この調湿装置は、除湿運転と加湿運転とを切り換えて行う。また、調湿装置は、第1動作と第2動作とを交互に繰り返すことによって除湿運転や加湿運転を行う。更に、調湿装置は、加湿運転中に第2熱交換器(104)へある程度の量の霜が付着すると、デフロスト運転を行う。
【0107】
《除湿運転》
図1,図2に示すように、除湿運転時において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。この室外空気は、第1空気として室外側下部流路(42)へ流入する。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。この室内空気は、第2空気として室内側下部流路(47)へ流入する。
【0108】
また、除湿運転時において、冷媒回路(100)では、再生熱交換器(102)が凝縮器となり、第1熱交換器(103)が蒸発器となる一方、第2熱交換器(104)が休止している。この冷媒回路(100)の動作については後述する。
【0109】
除湿運転の第1動作について、図1,図5を参照しながら説明する。この第1動作では、第1吸着素子(81)についての吸着動作と、第2吸着素子(82)についての再生動作とが行われる。つまり、第1動作では、第1吸着素子(81)で空気が減湿されると同時に、第2吸着素子(82)の吸着剤が再生される。
【0110】
図1に示すように、第1仕切板(20)では、第1右下開口(24)と第1左上開口(25)とが連通状態となり、残りの開口(21,22,23,26)が遮断状態となっている。この状態では、第1右下開口(24)によって室外側下部流路(42)と右下流路(54)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0111】
第2仕切板(30)では、第2右側開口(31)と第2右上開口(33)とが連通状態となり、残りの開口(32,34,35,36)が遮断状態となっている。この状態では、第2右側開口(31)によって室内側下部流路(47)と右側流路(51)とが連通され、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通される。
【0112】
右下シャッタ(61)は閉鎖状態となり、左下シャッタ(62)は開口状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分と左下流路(56)とが、左下シャッタ(62)を介して連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0113】
ケーシング(10)に取り込まれた第1空気は、室外側下部流路(42)から第1右下開口(24)を通って右下流路(54)へ流入する。一方、ケーシング(10)に取り込まれた第2空気は、室内側下部流路(47)から第2右側開口(31)を通って右側流路(51)へ流入する。
【0114】
図5(a)にも示すように、右下流路(54)の第1空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、第1空気に含まれる水蒸気が吸着剤に吸着される。第1吸着素子(81)で減湿された第1空気は、右上流路(53)へ流入する。
【0115】
一方、右側流路(51)の第2空気は、第1吸着素子(81)の冷却側通路(86)へ流入する。この冷却側通路(86)を流れる間に、第2空気は、調湿側通路(85)で水蒸気が吸着剤に吸着される際に生じた吸着熱を吸熱する。つまり、第2空気は、冷却用流体として冷却側通路(86)を流れる。吸着熱を奪った第2空気は、中央流路(57)へ流入して再生熱交換器(102)を通過する。その際、再生熱交換器(102)では、第2空気が冷媒との熱交換によって加熱される。その後、第2空気は、中央流路(57)から左下流路(56)へ流入する。
【0116】
第1吸着素子(81)及び再生熱交換器(102)で加熱された第2空気は、第2吸着素子(82)の調湿側通路(85)へ導入される。この調湿側通路(85)では、第2空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。つまり、第2吸着素子(82)の再生が行われる。吸着剤から脱離した水蒸気は、第2空気と共に左上流路(55)へ流入する。
【0117】
図1に示すように、右上流路(53)へ流入した減湿後の第1空気は、第2右上開口(33)を通って室内側上部流路(46)へ送り込まれる。この第1空気は、室内側上部流路(46)を流れる間に第1熱交換器(103)を通過し、冷媒との熱交換によって冷却される。その後、減湿されて冷却された第1空気は、室内側吹出口(14)を通って室内へ供給される。
【0118】
一方、左上流路(55)へ流入した第2空気は、第1左上開口(25)を通って室外側上部流路(41)へ流入する。この第2空気は、室外側上部流路(41)を流れる間に第2熱交換器(104)を通過する。その際、第2熱交換器(104)は休止しており、第2空気は加熱も冷却もされない。そして、第1吸着素子(81)の冷却と第2吸着素子(82)の再生に利用された第2空気は、室外側吹出口(16)を通って室外へ排出される。
【0119】
除湿運転の第2動作について、図2,図5を参照しながら説明する。この第2動作では、第1動作時とは逆に、第2吸着素子(82)についての吸着動作と、第1吸着素子(81)についての再生動作とが行われる。つまり、第2動作では、第2吸着素子(82)で空気が減湿されると同時に、第1吸着素子(81)の吸着剤が再生される。
【0120】
図2に示すように、第1仕切板(20)では、第1右上開口(23)と第1左下開口(26)とが連通状態となり、残りの開口(21,22,24,25)が遮断状態となっている。この状態では、第1右上開口(23)によって右上流路(53)と室外側上部流路(41)とが連通され、第1左下開口(26)によって室外側下部流路(42)と左下流路(56)とが連通される。
【0121】
第2仕切板(30)では、第2左側開口(32)と第2左上開口(35)とが連通状態となり、残りの開口(31,33,34,36)が遮断状態となっている。この状態では、第2左側開口(32)によって室内側下部流路(47)と左側流路(52)とが連通され、第2左上開口(35)によって左上流路(55)と室内側上部流路(46)とが連通される。
【0122】
左下シャッタ(62)は閉鎖状態となり、右下シャッタ(61)は開口状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分と右下流路(54)とが、右下シャッタ(61)を介して連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0123】
ケーシング(10)に取り込まれた第1空気は、室外側下部流路(42)から第1左下開口(26)を通って左下流路(56)へ流入する。一方、ケーシング(10)に取り込まれた第2空気は、室内側下部流路(47)から第2左側開口(32)を通って左側流路(52)へ流入する。
【0124】
図5(b)にも示すように、左下流路(56)の第1空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、第1空気に含まれる水蒸気が吸着剤に吸着される。第2吸着素子(82)で減湿された第1空気は、左上流路(55)へ流入する。
【0125】
一方、左側流路(52)の第2空気は、第2吸着素子(82)の冷却側通路(86)へ流入する。この冷却側通路(86)を流れる間に、第2空気は、調湿側通路(85)で水蒸気が吸着剤に吸着される際に生じた吸着熱を吸熱する。つまり、第2空気は、冷却用流体として冷却側通路(86)を流れる。吸着熱を奪った第2空気は、中央流路(57)へ流入して再生熱交換器(102)を通過する。その際、再生熱交換器(102)では、第2空気が冷媒との熱交換によって加熱される。その後、第2空気は、中央流路(57)から右下流路(54)へ流入する。
【0126】
第2吸着素子(82)及び再生熱交換器(102)で加熱された第2空気は、第1吸着素子(81)の調湿側通路(85)へ導入される。この調湿側通路(85)では、第2空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。つまり、第1吸着素子(81)の再生が行われる。吸着剤から脱離した水蒸気は、第2空気と共に右上流路(53)へ流入する。
【0127】
図2に示すように、左上流路(55)へ流入した減湿後の第1空気は、第2左上開口(35)を通って室内側上部流路(46)へ送り込まれる。この第1空気は、室内側上部流路(46)を流れる間に第1熱交換器(103)を通過し、冷媒との熱交換によって冷却される。その後、減湿されて冷却された第1空気は、室内側吹出口(14)を通って室内へ供給される。
【0128】
一方、右上流路(53)へ流入した第2空気は、第1右上開口(23)を通って室外側上部流路(41)へ流入する。この第2空気は、室外側上部流路(41)を流れる間に第2熱交換器(104)を通過する。その際、第2熱交換器(104)は休止しており、第2空気は加熱も冷却もされない。そして、第2吸着素子(82)の冷却と第1吸着素子(81)の再生に利用された第2空気は、室外側吹出口(16)を通って室外へ排出される。
【0129】
《加湿運転》
図3,図4に示すように、加湿運転時において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。この室外空気は、第2空気として室外側下部流路(42)へ流入する。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。この室内空気は、第1空気として室内側下部流路(47)へ流入する。
【0130】
また、加湿運転時において、冷媒回路(100)では、再生熱交換器(102)が凝縮器となり、第2熱交換器(104)が蒸発器となる一方、第1熱交換器(103)が休止している。この冷媒回路(100)の動作については後述する。
【0131】
加湿運転の第1動作について、図3,図5を参照しながら説明する。この第1動作では、第1吸着素子(81)についての吸着動作と、第2吸着素子(82)についての再生動作とが行われる。つまり、第1動作では、第2吸着素子(82)で空気が加湿され、第1吸着素子(81)の吸着剤が水蒸気を吸着する。
【0132】
図3に示すように、第1仕切板(20)では、第1右側開口(21)と第1右上開口(23)とが連通状態となり、残りの開口(22,24,25,26)が遮断状態となっている。この状態では、第1右側開口(21)によって室外側下部流路(42)と右側流路(51)とが連通され、第1右上開口(23)によって右上流路(53)と室外側上部流路(41)とが連通される。
【0133】
第2仕切板(30)では、第2右下開口(34)と第2左上開口(35)とが連通状態となり、残りの開口(31,32,33,36)が遮断状態となっている。この状態では、第2右下開口(34)によって室内側下部流路(47)と右下流路(54)とが連通され、第2左上開口(35)によって左上流路(55)と室内側上部流路(46)とが連通される。
【0134】
右下シャッタ(61)は閉鎖状態となり、左下シャッタ(62)は開口状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分と左下流路(56)とが、左下シャッタ(62)を介して連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0135】
ケーシング(10)に取り込まれた第1空気は、室内側下部流路(47)から第2右下開口(34)を通って右下流路(54)へ流入する。一方、ケーシング(10)に取り込まれた第2空気は、室外側下部流路(42)から第1右側開口(21)を通って右側流路(51)へ流入する。
【0136】
図5(a)にも示すように、右下流路(54)の第1空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、第1空気に含まれる水蒸気が吸着剤に吸着される。第1吸着素子(81)で水分を奪われた第1空気は、右上流路(53)へ流入する。
【0137】
一方、右側流路(51)の第2空気は、第1吸着素子(81)の冷却側通路(86)へ流入する。この冷却側通路(86)を流れる間に、第2空気は、調湿側通路(85)で水蒸気が吸着剤に吸着される際に生じた吸着熱を吸熱する。つまり、第2空気は、冷却用流体として冷却側通路(86)を流れる。吸着熱を奪った第2空気は、中央流路(57)へ流入して再生熱交換器(102)を通過する。その際、再生熱交換器(102)では、第2空気が冷媒との熱交換によって加熱される。その後、第2空気は、中央流路(57)から左下流路(56)へ流入する。
【0138】
第1吸着素子(81)及び再生熱交換器(102)で加熱された第2空気は、第2吸着素子(82)の調湿側通路(85)へ導入される。この調湿側通路(85)では、第2空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。つまり、第2吸着素子(82)の再生が行われる。そして、吸着剤から脱離した水蒸気が第2空気に付与され、第2空気が加湿される。第2吸着素子(82)で加湿された第2空気は、その後に左上流路(55)へ流入する。
【0139】
図3に示すように、左上流路(55)へ流入した第2空気は、第2左上開口(35)を通って室内側上部流路(46)へ流入する。この第2空気は、室内側上部流路(46)を流れる間に第1熱交換器(103)を通過する。その際、第1熱交換器(103)は休止しており、第2空気は加熱も冷却もされない。そして、加湿された第2空気は、室内側吹出口(14)を通って室内へ供給される。
【0140】
一方、右上流路(53)へ流入した第1空気は、第1右上開口(23)を通って室外側上部流路(41)へ送り込まれる。この第1空気は、室外側上部流路(41)を流れる間に第2熱交換器(104)を通過し、冷媒との熱交換によって冷却される。その後、水分と熱を奪われた第1空気は、室外側吹出口(16)を通って室外へ排出される。
【0141】
加湿運転の第2動作について、図4,図5を参照しながら説明する。この第2動作では、第1動作時とは逆に、第2吸着素子(82)についての吸着動作と、第1吸着素子(81)についての再生動作とが行われる。つまり、この第2動作では、第1吸着素子(81)で空気が加湿され、第2吸着素子(82)の吸着剤が水蒸気を吸着する。
【0142】
図4に示すように、第1仕切板(20)では、第1左側開口(22)と第1左上開口(25)とが連通状態となり、残りの開口(21,23,24,26)が遮断状態となっている。この状態では、第1左側開口(22)によって室外側下部流路(42)と左側流路(52)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0143】
第2仕切板(30)では、第2右上開口(33)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,34,35)が遮断状態となっている。この状態では、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0144】
左下シャッタ(62)は閉鎖状態となり、右下シャッタ(61)は開口状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分と右下流路(54)とが、右下シャッタ(61)を介して連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0145】
ケーシング(10)に取り込まれた第1空気は、室内側下部流路(47)から第2左下開口(36)を通って左下流路(56)へ流入する。一方、ケーシング(10)に取り込まれた第2空気は、室外側下部流路(42)から第1左側開口(22)を通って左側流路(52)へ流入する。
【0146】
図5(b)にも示すように、左下流路(56)の第1空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、第1空気に含まれる水蒸気が吸着剤に吸着される。第2吸着素子(82)で水分を奪われた第1空気は、左上流路(55)へ流入する。
【0147】
一方、左側流路(52)の第2空気は、第2吸着素子(82)の冷却側通路(86)へ流入する。この冷却側通路(86)を流れる間に、第2空気は、調湿側通路(85)で水蒸気が吸着剤に吸着される際に生じた吸着熱を吸熱する。つまり、第2空気は、冷却用流体として冷却側通路(86)を流れる。吸着熱を奪った第2空気は、中央流路(57)へ流入して再生熱交換器(102)を通過する。その際、再生熱交換器(102)では、第2空気が冷媒との熱交換によって加熱される。その後、第2空気は、中央流路(57)から右下流路(54)へ流入する。
【0148】
第2吸着素子(82)及び再生熱交換器(102)で加熱された第2空気は、第1吸着素子(81)の調湿側通路(85)へ導入される。この調湿側通路(85)では、第2空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。つまり、第1吸着素子(81)の再生が行われる。そして、吸着剤から脱離した水蒸気が第2空気に付与され、第2空気が加湿される。第1吸着素子(81)で加湿された第2空気は、その後に右上流路(53)へ流入する。
【0149】
図4に示すように、右上流路(53)へ流入した第2空気は、第2右上開口(33)を通って室内側上部流路(46)へ流入する。この第2空気は、室内側上部流路(46)を流れる間に第1熱交換器(103)を通過する。その際、第1熱交換器(103)は休止しており、第2空気は加熱も冷却もされない。そして、加湿された第2空気は、室内側吹出口(14)を通って室内へ供給される。
【0150】
一方、左上流路(55)へ流入した第1空気は、第1左上開口(25)を通って室外側上部流路(41)へ送り込まれる。この第1空気は、室外側上部流路(41)を流れる間に第2熱交換器(104)を通過し、冷媒との熱交換によって冷却される。その後、水分と熱を奪われた第1空気は、室外側吹出口(16)を通って室外へ排出される。
【0151】
《冷媒回路の動作》
冷媒回路(100)の動作について、図7〜図9を参照しながら説明する。
【0152】
先ず、除湿運転時の動作について説明する。除湿運転時において、四方切換弁(120)は、第1ポート(121)と第4ポート(124)が互いに連通して第2ポート(122)と第3ポート(123)が互いに連通する状態となる。また、電動膨張弁(110)は、その開度が運転条件に応じて適宜調節される。
【0153】
この状態で圧縮機(101)を運転すると、冷媒回路(100)で冷媒が循環して冷凍サイクルが行われる。その際、冷媒回路(100)では、再生熱交換器(102)が凝縮器となり、第1熱交換器(103)が蒸発器となり、第2熱交換器(104)が休止状態となる(図8参照)。
【0154】
具体的に、圧縮機(101)から吐出された冷媒は、再生熱交換器(102)へ送られる。再生熱交換器(102)へ流入した冷媒は、第2空気との熱交換を行い、第2空気に放熱して凝縮する。再生熱交換器(102)で凝縮した冷媒は、レシーバ(105)を通って電動膨張弁(110)へ送られる。この冷媒は、電動膨張弁(110)を通過する際に減圧される。電動膨張弁(110)で減圧された冷媒は、四方切換弁(120)を通って第1熱交換器(103)へ送られる。第1熱交換器(103)へ流入した冷媒は、第1空気との熱交換を行い、第1空気から吸熱して蒸発する。第1熱交換器(103)で蒸発した冷媒は、圧縮機(101)へ吸入されて圧縮され、その後に圧縮機(101)から吐出される。
【0155】
次に、加湿運転時の動作について説明する。加湿運転時において、四方切換弁(120)は、第1ポート(121)と第2ポート(122)が互いに連通して第3ポート(123)と第4ポート(124)が互いに連通する状態となる。また、電動膨張弁(110)は、その開度が運転条件に応じて適宜調節される。
【0156】
この状態で圧縮機(101)を運転すると、冷媒回路(100)で冷媒が循環して冷凍サイクルが行われる。その際、冷媒回路(100)では、再生熱交換器(102)が凝縮器となり、第2熱交換器(104)が蒸発器となり、第1熱交換器(103)が休止状態となる(図9参照)。
【0157】
具体的に、圧縮機(101)から吐出された冷媒は、再生熱交換器(102)へ送られる。再生熱交換器(102)へ流入した冷媒は、第2空気との熱交換を行い、第2空気に放熱して凝縮する。再生熱交換器(102)で凝縮した冷媒は、レシーバ(105)を通って電動膨張弁(110)へ送られる。この冷媒は、電動膨張弁(110)を通過する際に減圧される。電動膨張弁(110)で減圧された冷媒は、四方切換弁(120)を通って第2熱交換器(104)へ送られる。第2熱交換器(104)へ流入した冷媒は、第1空気との熱交換を行い、第1空気から吸熱して蒸発する。第2熱交換器(104)で蒸発した冷媒は、圧縮機(101)へ吸入されて圧縮され、その後に圧縮機(101)から吐出される。
【0158】
《デフロスト運転》
上述のように、本実施形態の調湿装置は、加湿運転中に第2熱交換器(104)へある程度の量の霜が付着すると、デフロスト運転を行う。このデフロスト運転は、所定の時間毎に定期的に行ってもよいし、第2熱交換器(104)に付着した霜の量を何らかの方法で検出したり推測し、霜の付着量がある程度以上に達した場合に行ってもよい。
【0159】
ここで、加湿運転中には、第1又は第2吸着素子(81,82)で減湿された第1空気が、蒸発器として機能する第2熱交換器(104)へ送られる(図9参照)。この第2熱交換器(104)へ送られる第1空気は、吸着素子(81,82)で第2空気と熱交換する。一方、加湿運転は室内を暖房する冬季に行われるのが通常であり、室外空気からなる第2空気は低温となっている。吸着素子(81,82)へ送られる第2空気の温度(即ち外気温)が低くなると、吸着素子(81,82)から第2熱交換器(104)へ送られる第1空気の温度も低くなる。
【0160】
第2熱交換器(104)で冷媒と熱交換する第1空気の温度が下がると、それに伴って、第2熱交換器(104)での冷媒蒸発温度も低く設定せざるを得なくなる。そして、第2熱交換器(104)での冷媒蒸発温度が0℃を下回るような状態となると、第2熱交換器(104)の表面に霜が付着する。第2熱交換器(104)に霜が付着すると、この霜によって冷媒と第1空気の熱交換が阻害され、更には第2熱交換器(104)における通風抵抗が増大する。そこで、調湿装置は、加湿運転を一旦中断し、第2熱交換器(104)の霜を融かすためにデフロスト運転を行う。
【0161】
上記調湿装置のデフロスト運転中の動作について、図10,図11を参照しながら説明する。
【0162】
図10に示すように、第1仕切板(20)では、第1左側開口(22)と第1左上開口(25)とが連通状態となり、残りの開口(21,23,24,26)が遮断状態となっている。この状態では、第1左側開口(22)によって室外側下部流路(42)と左側流路(52)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0163】
第2仕切板(30)では、第2右上開口(33)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,34,35)が遮断状態となっている。この状態では、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0164】
左下シャッタ(62)と右下シャッタ(61)は、共に開口状態となっている。この状態において、中央流路(57)における再生熱交換器(102)の下側部分は、右下シャッタ(61)を介して右下流路(54)と連通され、左下シャッタ(62)を介して左下流路(56)と連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0165】
この状態において、給気ファン(95)及び排気ファン(96)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれ、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量が、ケーシング(10)へ流入する室内空気の流量よりも多くなっている。
【0166】
図11にも示すように、ケーシング(10)に取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)へ流入する。第2吸着素子(82)から出た室外空気は、再生熱交換器(102)を通過する際に加熱され、その後に二手に分流される。分流された室外空気は、その一方が右下シャッタ(61)を通って第1吸着素子(81)へ送られ、残りが左下シャッタ(62)を通って第2吸着素子(82)へ送られる。
【0167】
第1吸着素子(81)へ送られる室外空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)では、導入された室外空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。そして、吸着剤から脱離した水蒸気が室外空気に付与され、室外空気が加湿される。第1吸着素子(81)で加湿された室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。つまり、デフロスト運転中であっても、室内へ供給される空気の加湿が行われる。
【0168】
一方、第2吸着素子(82)へ送られる室外空気は、左下流路(56)において、ケーシング(10)に取り込まれた室内空気と合流する。左下流路(56)の空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、空気中の水蒸気が吸着剤に吸着される。第2吸着素子(82)で水分を奪われた空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0169】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室外空気が、室内空気と共に第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)だけが第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0170】
尚、本実施形態のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室外空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室内空気と、再生熱交換器(102)で加熱された室外空気の一部とが導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室外空気の残りが導入される。
【0171】
このように、本実施形態の調湿装置で行われるデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0172】
また、このデフロスト運転では、取り込んだ室内空気を室外へ排出する動作を行っているが、この室内空気の排気を停止することも可能である。つまり、デフロスト運転中には、取り込んだ室外空気の一部を室内へ供給して残りを室外へ排出する動作だけを行ってもよい。ただし、この場合、室内の換気は行われない。
【0173】
−実施形態の効果−
本実施形態によれば、冷媒回路(100)を備える調湿装置において、第2熱交換器(104)で着霜が生じた場合であっても、デフロスト運転を行うことによって第2熱交換器(104)に付着した霜を融かすことができる。このため、第2熱交換器(104)で着霜が生じるような運転条件であっても、デフロスト運転を行って第2熱交換器(104)の霜を融かせば、その後は加湿運転を再開することが可能となる。従って、本実施形態によれば、そのような運転条件であっても、調湿装置の運転を確実に継続させることができる。
【0174】
ここで、例えば、いわゆる逆サイクルデフロストのように、冷媒回路(100)での冷媒の循環経路を変更することによっても、第2熱交換器(104)の霜を融かすことは可能である。しかしながら、このような方策を採るには、冷媒の流れを切り換えるための弁などを冷媒回路(100)に設ける必要が生じ、冷媒回路(100)の複雑化を招く。
【0175】
これに対し、本実施形態に係る調湿装置では、加湿運転中と異なる状態の空気を該第2熱交換器(104)へ送ることによってデフロスト運転を行っている。このため、冷媒回路(100)の構成を何ら変更することなく、デフロスト運転を行うことが可能となる。従って、本実施形態によれば、冷媒回路(100)の構成を簡素に維持しながら、デフロスト運転を行うことができる。
【0176】
また、本実施形態によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本実施形態によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0177】
また、本実施形態によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本実施形態によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、第2熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0178】
ここで、本実施形態では、吸着素子(81,82)に冷却側通路(86)を形成し、吸着動作中に発生する吸着熱を冷却用流体としての第2空気によって奪っている。このため、吸着動作時の吸着素子(81,82)では、調湿側通路(85)で発生した吸着熱による第1空気の温度上昇を抑制することが可能となる。
【0179】
従って、本実施形態によれば、吸着素子(81,82)の調湿側通路(85)を流れる第1空気の相対湿度が過度に低下するのを回避でき、吸着素子(81,82)に吸着される水蒸気の量を増大させることができる。そして、吸着素子(81,82)における水分の吸着量を増大させることで、調湿装置を大型化させることなく、調湿装置の能力向上を図ることができる。
【0180】
また、本実施形態では、除湿運転中や加湿運転中において、第2空気を先ず冷却用流体として吸着素子(81,82)の冷却側通路(86)へ導入し、この冷却側通路(86)から出た第2空気を再生熱交換器(102)で加熱している。つまり、吸着素子(81,82)の再生に用いられる第2空気は、再生熱交換器(102)だけでなく吸着素子(81,82)の冷却側通路(86)においても加熱される。従って、本実施形態によれば、再生熱交換器(102)で第2空気に与えねばならない熱量を削減でき、圧縮機(101)の消費電力を削減して調湿装置の運転に要するエネルギを削減できる。
【0181】
また、本実施形態では、再生熱交換器(102)を、ほぼ水平に寝かせた状態で、更にはその上面が第1及び第2吸着素子(81,82)の下面よりも僅かに下となるように配置している。このように再生熱交換器(102)を配置すると、調湿装置を設置する際の制約が小さくり、調湿装置の使い勝手を向上させることができる。
【0182】
つまり、調湿装置の保守作業においては、第1及び第2吸着素子(81,82)をケーシング(10)から取り出す場合もある。一方、本実施形態の調湿装置では、再生熱交換器(102)を吸着素子(81,82)よりも下方に配置している。このため、ケーシング(10)における左右の何れか一方の側面を開けば、吸着素子(81,82)を2つとも抜き取ることが可能となる。従って、この調湿装置については、例えばケーシング(10)の左右いずれかの側面が壁に密着するような状態でも据え付けることが可能となる。
【0183】
−実施形態の変形例1−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図12,図13を参照しながら説明する。
【0184】
図12に示すように、第1仕切板(20)では、第1左側開口(22)と第1左上開口(25)とが連通状態となり、残りの開口(21,23,24,26)が遮断状態となっている。この状態では、第1左側開口(22)によって室外側下部流路(42)と左側流路(52)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0185】
第2仕切板(30)では、第2右上開口(33)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,34,35)が遮断状態となっている。この状態では、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0186】
右下シャッタ(61)は開口状態となり、左下シャッタ(62)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分が、右下シャッタ(61)を介して右下流路(54)と連通される。また、中央シャッタ(65)は開口状態となり、右上シャッタ(63)と左上シャッタ(64)は閉鎖状態となっている。この状態では、右上流路(53)と左上流路(55)が、中央シャッタ(65)を介して互いに連通される。
【0187】
この状態において、給気ファン(95)及び排気ファン(96)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれ、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量が、ケーシング(10)へ流入する室内空気の流量よりも多くなっている。
【0188】
図13にも示すように、ケーシング(10)に取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)へ流入する。第2吸着素子(82)から出た室外空気は、再生熱交換器(102)を通過する際に加熱され、その後に第1吸着素子(81)の調湿側通路(85)へ導入される。この調湿側通路(85)では、導入された室外空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。そして、吸着剤から脱離した水蒸気が室外空気に付与され、室外空気が加湿される。
【0189】
第1吸着素子(81)で加湿された室外空気は、右上流路(53)へ流入する。右上流路(53)の室外空気は、その一部が中央シャッタ(65)を通って左上流路(55)へ流入し、残りが休止中の第1熱交換器(103)を通過して室内へ供給される。つまり、デフロスト運転中であっても、室内へ供給される空気の加湿が行われる。
【0190】
一方、ケーシング(10)に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、空気中の水蒸気が吸着剤に吸着される。第2吸着素子(82)で水分を奪われた室内空気は、左上流路(55)へ流入し、右上流路(53)から送り込まれた室外空気と合流する。その後、右上流路(53)の空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0191】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室外空気が、室内空気と共に第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)だけが第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0192】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室外空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室内空気が導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室外空気が導入される。
【0193】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0194】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0195】
また、本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本変形例によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、第2熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0196】
尚、本変形例のデフロスト運転では、取り込んだ室内空気を室外へ排出する動作を行っているが、この室内空気の排気を停止することも可能である。つまり、デフロスト運転中には、取り込んだ室外空気の一部を室内へ供給して残りを室外へ排出する動作だけを行ってもよい。ただし、この場合、室内の換気は行われない。
【0197】
−実施形態の変形例2−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図14,図15を参照しながら説明する。
【0198】
図14に示すように、第1仕切板(20)では、第1右側開口(21)と第1左上開口(25)とが連通状態となり、残りの開口(22,23,24,26)が遮断状態となっている。この状態では、第1右側開口(21)によって室外側下部流路(42)と右側流路(51)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0199】
第2仕切板(30)では、第2右上開口(33)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,34,35)が遮断状態となっている。この状態では、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0200】
右下シャッタ(61)は開口状態となり、左下シャッタ(62)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分が、右下シャッタ(61)を介して右下流路(54)と連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0201】
この状態において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量と、ケーシング(10)へ流入する室内空気の流量とが等しくなっている。
【0202】
図15にも示すように、ケーシング(10)に取り込まれた室外空気は、第1吸着素子(81)の冷却側通路(86)へ流入する。第1吸着素子(81)から出た室外空気は、再生熱交換器(102)を通過する際に加熱され、その後に第1吸着素子(81)の調湿側通路(85)へ導入される。この調湿側通路(85)から出た室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0203】
一方、ケーシング(10)に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、空気中の水蒸気が吸着剤に吸着される。この第2吸着素子(82)において、その冷却側通路(86)では空気が流通していない。暖房中の暖かい室内空気は、冷却されることなく、むしろ吸着熱によって温度上昇して第2吸着素子(82)から流出する。第2吸着素子(82)から出た室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0204】
このように、デフロスト運転中には、暖房中の暖かい室内空気が、冷却されることなく第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0205】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)へ室内空気が導入され、第2吸着素子(82)へ室外空気が導入される。
【0206】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0207】
本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を利用して、第2熱交換器(104)の霜を確実に融かすことができる。
【0208】
−実施形態の変形例3−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図16,図17を参照しながら説明する。
【0209】
図16に示すように、第1仕切板(20)では、第1右下開口(24)と第1左上開口(25)とが連通状態となり、残りの開口(21,22,23,26)が遮断状態となっている。この状態では、第1右下開口(24)によって室外側下部流路(42)と右下流路(54)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0210】
第2仕切板(30)では、第2右上開口(33)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,34,35)が遮断状態となっている。この状態では、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0211】
右下シャッタ(61)は閉鎖状態となり、左下シャッタ(62)は開口状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分が、左下シャッタ(62)を介して左下流路(56)と連通される。また、左上シャッタ(64)は開口状態となり、右上シャッタ(63)及び中央シャッタ(65)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の上側部分が、左上シャッタ(64)を介して左上流路(55)と連通される。
【0212】
この状態において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量と、ケーシング(10)へ流入する室内空気の流量とが等しくなっている。
【0213】
図17にも示すように、ケーシング(10)に取り込まれた室外空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、室外空気中の水蒸気が吸着剤に吸着される。その際、調湿側通路(85)では吸着熱が発生し、この吸着熱によって室外空気の温度が上昇する。この調湿側通路(85)から出た室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0214】
一方、ケーシング(10)に取り込まれた室内空気は、左下シャッタ(62)を通って中央流路(57)へ流入する。この室内空気は、中央流路(57)を流れる間に再生熱交換器(102)を通過して加熱される。再生熱交換器(102)で加熱された室内空気は、左上シャッタ(64)を通って左上流路(55)へ流入する。その後、左上流路(55)の室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0215】
このように、デフロスト運転中には、暖房中の暖かい室内空気が、再生熱交換器(102)で加熱された上で第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0216】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)へ室内空気が導入され、第2吸着素子(82)へ室外空気が導入される。
【0217】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0218】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0219】
更に、本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を利用して、第2熱交換器(104)の霜を確実に融かすことができる。
【0220】
尚、このデフロスト運転中には、吸着素子(81,82)で減湿された室外空気が供給されるが、吸着素子(81,82)が吸着した水分は、加熱運転の再開後に室内へ供給される。
【0221】
−実施形態の変形例4−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図18,図19を参照しながら説明する。
【0222】
図18に示すように、第1仕切板(20)では、第1右下開口(24)と第1左上開口(25)とが連通状態となり、残りの開口(21,22,23,26)が遮断状態となっている。この状態では、第1右下開口(24)によって室外側下部流路(42)と右下流路(54)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0223】
第2仕切板(30)では、第2右上開口(33)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,34,35)が遮断状態となっている。この状態では、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0224】
右下シャッタ(61)と左下シャッタ(62)は、何れも閉鎖状態となっている。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)も、全てが閉鎖状態となっている。
【0225】
この状態において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量と、ケーシング(10)へ流入する室内空気の流量とが等しくなっている。
【0226】
図19にも示すように、ケーシング(10)に取り込まれた室外空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、室外空気中の水蒸気が吸着剤に吸着される。その際、調湿側通路(85)では吸着熱が発生し、この吸着熱によって室外空気の温度が上昇する。この調湿側通路(85)から出た室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0227】
一方、ケーシング(10)に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、空気中の水蒸気が吸着剤に吸着される。この第2吸着素子(82)において、その冷却側通路(86)では空気が流通していない。暖房中の暖かい室内空気は、冷却されることなく、むしろ吸着熱によって温度上昇して第2吸着素子(82)から流出する。第2吸着素子(82)から出た室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0228】
このように、デフロスト運転中には、暖房中の暖かい室内空気が、冷却されることなく第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0229】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)へ室内空気が導入され、第2吸着素子(82)へ室外空気が導入される。
【0230】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0231】
本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を利用して、第2熱交換器(104)の霜を確実に融かすことができる。
【0232】
尚、このデフロスト運転中には、吸着素子(81,82)で減湿された室外空気が供給されるが、吸着素子(81,82)が吸着した水分は、加熱運転の再開後に室内へ供給される。従って、このデフロスト運転によって、室内の湿度が低下することはない。
【0233】
−実施形態の変形例5−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図20,図21を参照しながら説明する。
【0234】
図20に示すように、第1仕切板(20)では、第1右下開口(24)と第1左上開口(25)とが連通状態となり、残りの開口(21,22,23,26)が遮断状態となっている。この状態では、第1右下開口(24)によって室外側下部流路(42)と右下流路(54)とが連通され、第1左上開口(25)によって左上流路(55)と室外側上部流路(41)とが連通される。
【0235】
第2仕切板(30)では、第2左側開口(32)と第2右上開口(33)とが連通状態となり、残りの開口(31,34,35,36)が遮断状態となっている。この状態では、第2左側開口(32)によって室内側下部流路(47)と左側流路(52)とが連通され、第2右上開口(33)によって右上流路(53)と室内側上部流路(46)とが連通される。
【0236】
右下シャッタ(61)と左下シャッタ(62)は、何れも閉鎖状態となっている。また、左上シャッタ(64)は開口状態となり、右上シャッタ(63)及び中央シャッタ(65)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の上側部分が、左上シャッタ(64)を介して左上流路(55)と連通される。
【0237】
この状態において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量と、ケーシング(10)へ流入する室内空気の流量とが等しくなっている。
【0238】
図21にも示すように、ケーシング(10)に取り込まれた室外空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、室外空気中の水蒸気が吸着剤に吸着される。その際、調湿側通路(85)では吸着熱が発生し、この吸着熱によって室外空気の温度が上昇する。この調湿側通路(85)から出た室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0239】
一方、ケーシング(10)に取り込まれた室内空気は、第2吸着素子(82)の冷却側通路(86)へ流入する。この第2吸着素子(82)において、その調湿側通路(85)では空気が流通していない。暖房中の暖かい室内空気は、冷却されることなく、取り込まれたときの状態で第2吸着素子(82)から流出する。第2吸着素子(82)から出た室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0240】
このように、デフロスト運転中には、暖房中の暖かい室内空気が、冷却されることなく、取り込まれたときの状態のままで第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0241】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)へ室内空気が導入され、第2吸着素子(82)へ室外空気が導入される。
【0242】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0243】
本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を利用して、第2熱交換器(104)の霜を確実に融かすことができる。
【0244】
尚、このデフロスト運転中には、吸着素子(81,82)で減湿された室外空気が供給されるが、吸着素子(81,82)が吸着した水分は、加熱運転の再開後に室内へ供給される。
【0245】
−実施形態の変形例6−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図22,図23を参照しながら説明する。
【0246】
図22に示すように、第1仕切板(20)では、第1右上開口(23)と第1左下開口(26)とが連通状態となり、残りの開口(21,22,24,25)が遮断状態となっている。この状態では、第1右上開口(23)によって右上流路(53)と室外側上部流路(41)とが連通され、第1左下開口(26)によって室外側下部流路(42)と左下流路(56)とが連通される。
【0247】
第2仕切板(30)では、第2左側開口(32)と第2左上開口(35)とが連通状態となり、残りの開口(31,33,34,36)が遮断状態となっている。この状態では、第2左側開口(32)によって室内側下部流路(47)と左側流路(52)とが連通され、第2左上開口(35)によって左上流路(55)と室内側上部流路(46)とが連通される。
【0248】
右下シャッタ(61)は開口状態となり、左下シャッタ(62)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分が、右下シャッタ(61)を介して右下流路(54)と連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0249】
この状態において、給気ファン(95)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。一方、排気ファン(96)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量と、ケーシング(10)へ流入する室内空気の流量とが等しくなっている。
【0250】
図23にも示すように、ケーシング(10)に取り込まれた室外空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、室外空気中の水蒸気が吸着剤に吸着される。その際、調湿側通路(85)では吸着熱が発生し、この吸着熱によって室外空気の温度が上昇する。
【0251】
また、第2吸着素子(82)の冷却側通路(86)へは、暖房中の暖かい室内空気が流入する。第2吸着素子(82)では、調湿側通路(85)の室外空気と冷却側通路(86)の室内空気とが熱交換し、室内空気の温熱が室外空気に回収される。そして、第2吸着素子(82)の調湿側通路(85)から出た室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0252】
第2吸着素子(82)の冷却側通路(86)から出た室内空気は、再生熱交換器(102)を通過する際に加熱される。加熱された室内空気は、右下シャッタ(61)を通って第1吸着素子(81)の調湿側通路(85)へ送られる。第1吸着素子(81)の調湿側通路(85)から出た室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0253】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室内空気が第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0254】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室内空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室外空気が導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室内空気が導入される。
【0255】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0256】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0257】
本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を給気される室外空気へ回収でき、換気に伴う暖房負荷の増大を抑制できる。
【0258】
尚、このデフロスト運転中には、吸着素子(81,82)で減湿された室外空気が供給されるが、吸着素子(81,82)が吸着した水分は、加熱運転の再開後に室内へ供給される。
【0259】
−実施形態の変形例7−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図24,図25を参照しながら説明する。
【0260】
図24に示すように、第1仕切板(20)では、第1右上開口(23)と第1左下開口(26)とが連通状態となり、残りの開口(21,22,24,25)が遮断状態となっている。この状態では、第1右上開口(23)によって右上流路(53)と室外側上部流路(41)とが連通され、第1左下開口(26)によって室外側下部流路(42)と左下流路(56)とが連通される。
【0261】
第2仕切板(30)では、第2左側開口(32)と第2左上開口(35)とが連通状態となり、残りの開口(31,33,34,36)が遮断状態となっている。この状態では、第2左側開口(32)によって室内側下部流路(47)と左側流路(52)とが連通され、第2左上開口(35)によって左上流路(55)と室内側上部流路(46)とが連通される。
【0262】
右下シャッタ(61)は開口状態となり、左下シャッタ(62)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分が、右下シャッタ(61)を介して右下流路(54)と連通される。また、中央シャッタ(65)は開口状態となり、右上シャッタ(63)及び左上シャッタ(64)は閉鎖状態となっている。この状態では、右上流路(53)と左上流路(55)が、中央シャッタ(65)を介して互いに連通される。
【0263】
この状態において、給気ファン(95)及び排気ファン(96)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれ、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量が、ケーシング(10)へ流入する室内空気の流量よりも多くなっている。
【0264】
図25にも示すように、ケーシング(10)に取り込まれた室外空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、室外空気中の水蒸気が吸着剤に吸着される。その際、調湿側通路(85)では吸着熱が発生し、この吸着熱によって室外空気の温度が上昇する。また、第2吸着素子(82)の冷却側通路(86)へは、暖房中の暖かい室内空気が流入する。第2吸着素子(82)では、調湿側通路(85)の室外空気と冷却側通路(86)の室内空気とが熱交換し、室内空気の温熱が室外空気に回収される。
【0265】
第2吸着素子(82)の調湿側通路(85)から出た室外空気は、左上流路(55)へ流入する。左上流路(55)の室外空気は、その一部が中央シャッタ(65)を通って右上流路(53)へ流入し、残りが休止中の第1熱交換器(103)を通過して室内へ供給される。
【0266】
第2吸着素子(82)の冷却側通路(86)から出た室内空気は、再生熱交換器(102)を通過する際に加熱される。加熱された室内空気は、右下シャッタ(61)を通って第1吸着素子(81)の調湿側通路(85)へ送られる。第1吸着素子(81)の調湿側通路(85)から出た室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0267】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室内空気が第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0268】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室内空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室外空気が導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室内空気が導入される。
【0269】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0270】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0271】
本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を給気される室外空気へ回収でき、換気に伴う暖房負荷の増大を抑制できる。
【0272】
尚、このデフロスト運転中には、吸着素子(81,82)で減湿された室外空気が供給されるが、吸着素子(81,82)が吸着した水分は、加熱運転の再開後に室内へ供給される。従って、このデフロスト運転によって、室内の湿度が低下することはない。
【0273】
−実施形態の変形例8−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、図26,図27を参照しながら説明する。
【0274】
図26に示すように、第1仕切板(20)では、第1左側開口(22)と第1右上開口(23)とが連通状態となり、残りの開口(21,24,25,26)が遮断状態となっている。この状態では、第1左側開口(22)によって室外側下部流路(42)と左側流路(52)とが連通され、第1右上開口(23)によって右上流路(53)と室外側上部流路(41)とが連通される。
【0275】
第2仕切板(30)では、第2左上開口(35)と第2左下開口(36)とが連通状態となり、残りの開口(31,32,33,34)が遮断状態となっている。この状態では、第2左上開口(35)によって左上流路(55)と室内側上部流路(46)とが連通され、第2左下開口(36)によって室内側下部流路(47)と左下流路(56)とが連通される。
【0276】
右下シャッタ(61)は開口状態となり、左下シャッタ(62)は閉鎖状態となっている。この状態では、中央流路(57)における再生熱交換器(102)の下側部分が、右下シャッタ(61)を介して右下流路(54)と連通される。また、右上シャッタ(63)、左上シャッタ(64)、及び中央シャッタ(65)は、その何れもが閉鎖状態となっている。
【0277】
この状態において、給気ファン(95)を駆動すると、室内空気が室内側吸込口(15)を通じてケーシング(10)内に取り込まれる。一方、排気ファン(96)を駆動すると、室外空気が室外側吸込口(13)を通じてケーシング(10)内に取り込まれる。このデフロスト運転時には、給気ファン(95)や排気ファン(96)の回転数が適宜設定され、ケーシング(10)へ流入する室外空気の流量と、ケーシング(10)へ流入する室内空気の流量とが等しくなっている。
【0278】
図27にも示すように、ケーシング(10)に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)から出た室内空気は、休止中の第1熱交換器(103)を通過して室内へ送り返される。
【0279】
一方、ケーシング(10)に取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)へ導入される。この冷却側通路(86)から出た室外空気は、再生熱交換器(102)を通過する際に加熱される。加熱された室外空気は、右下シャッタ(61)を通って第1吸着素子(81)の調湿側通路(85)へ送られる。第1吸着素子(81)の調湿側通路(85)から出た室外空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ送り返される。
【0280】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室外空気が第2熱交換器(104)へ供給される。一方、加湿運転中には、上述のように、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0281】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室外空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室内空気が導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室外空気が導入される。
【0282】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0283】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0284】
尚、本変形例のデフロスト運転では、室内空気を一旦取り込んで再び室内へ送り返す動作を行っているが、この動作を停止することも可能である。つまり、デフロスト運転中には、取り込んだ室外空気を再生熱交換器(102)で加熱して第2熱交換器(104)へ送る動作だけを行ってもよい。
【0285】
−実施形態の変形例9−
本実施形態の調湿装置では、デフロスト運転として次のような運転を行ってもよい。ここでは、本変形例のデフロスト運転中の動作について、加湿運転の第2動作の途中でデフロスト運転が開始された場合を例に説明する。
【0286】
このデフロスト運転中において、第1空気及び第2空気の流通経路は、加湿運転の第2動作中と同様に保たれる(図9(b)参照)。つまり、第1空気として取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)を通って第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。一方、第2空気として取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)、再生熱交換器(102)、第1吸着素子(81)の調湿側通路(85)を順に通過し、その後に室内へ供給される。
【0287】
本変形例のデフロスト運転中には、ケーシング(10)に取り込まれる室内空気、即ち第1空気の流量が、加湿運転中よりも少なく設定される。つまり、第2熱交換器(104)へは、加湿運転時と異なる状態の空気が供給される。第2熱交換器(104)で冷媒と熱交換する第1空気の流量が減ると、第2熱交換器(104)における冷媒蒸発温度が上昇する。このため、第2熱交換器(104)の温度が上昇し、その表面に付着した霜が融解する。
【0288】
尚、第1動作の途中で第2熱交換器(104)を除霜する場合のデフロスト運転では、第1空気及び第2空気が第1動作中と同様の状態に保持され(図9(a)参照)、この状態で第1空気の流量が削減される。ただし、本変形例のデフロスト運転中は、第1空気及び第2空気の流通経路を加湿運転の第1動作又は第2動作中と同様に保持してもよいし、第1動作中の状態と第2動作中の状態とを相互に切り換えてもよい。
【0289】
本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本変形例によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、第2熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0290】
【発明のその他の実施の形態】
本発明の実施形態に係る調湿装置は、次のようなデフロスト運転を行うように構成されていてもよい。
【0291】
尚、以下の変形例に係る調湿装置は、上記実施形態のものと同様に、2つの吸着素子(81,82)を備えてバッチ式の動作を行うように構成されている。また、この調湿装置の除湿運転や加湿運転中の第1空気及び第2空気の流通経路は、上記実施形態のものと同様である。更に、この調湿装置の各吸着素子(81,82)や冷媒回路(100)は、上記実施形態のものと同様に構成されている。
【0292】
−第1の変形例−
第1の変形例のデフロスト運転について、図28を参照しながら説明する。
【0293】
調湿装置に取り込まれた室内空気は、吸着素子(81,82)や再生熱交換器(102)をバイパスし、第2熱交換器(104)へ直接送られる。つまり、暖房中の暖かい室内空気は、取り込まれたときの状態のままで第2熱交換器(104)へ供給される。この室内空気は、第2熱交換器(104)を通過後に室外へ排出される。
【0294】
一方、調湿装置に取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)を通過し、再生熱交換器(102)において加熱される。加熱された室外空気は、第1吸着素子(81)の調湿側通路(85)へ導入される。この調湿側通路(85)では、導入された室外空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。そして、吸着剤から脱離した水蒸気が室外空気に付与され、室外空気が加湿される。加湿された室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0295】
このように、デフロスト運転中には、暖房中の暖かい室内空気が、取り込まれたときの状態のまま第2熱交換器(104)へ供給される。一方、加湿運転中には、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0296】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、取り込まれた室外空気が第1吸着素子(81)の冷却側通路(86)へ導入され、再生熱交換器(102)で加熱された室外空気が第2吸着素子(82)の調湿側通路(85)へ導入される。
【0297】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0298】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0299】
また、本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本変形例によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、第2熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0300】
−第2の変形例−
第2の変形例のデフロスト運転について、図29を参照しながら説明する。
【0301】
調湿装置に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、空気中の水蒸気が吸着剤に吸着される。この第2吸着素子(82)において、その冷却側通路(86)では空気が流通していない。暖房中の暖かい室内空気は、冷却されることなく、むしろ吸着熱によって温度上昇して第2吸着素子(82)から流出する。第2吸着素子(82)から出た室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0302】
一方、調湿装置に取り込まれた室外空気は、再生熱交換器(102)へ送り込まれ、冷媒との熱交換によって加熱される。加熱された室外空気は、第1吸着素子(81)の調湿側通路(85)へ導入される。この調湿側通路(85)では、導入された室外空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。そして、吸着剤から脱離した水蒸気が室外空気に付与され、室外空気が加湿される。加湿された室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0303】
このように、デフロスト運転中には、暖房中の暖かい室内空気が吸着熱を吸収して温度上昇してから第2熱交換器(104)へ供給される。一方、加湿運転中には、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0304】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、取り込まれた室内空気が第1吸着素子(81)の調湿側通路(85)へ導入され、再生熱交換器(102)で加熱された室外空気が第2吸着素子(82)の調湿側通路(85)へ導入される。
【0305】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0306】
本変形例によれば、暖房中の暖かい室内空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。また、本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本変形例によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、第2熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0307】
−第3の変形例−
第3の変形例のデフロスト運転について、図30を参照しながら説明する。
【0308】
調湿装置に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、空気中の水蒸気が吸着剤に吸着される。第2吸着素子(82)で水分を奪われた空気は、第2熱交換器(104)へ送られる。
【0309】
一方、調湿装置に取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)へ流入する。第2吸着素子(82)から出た室外空気は、再生熱交換器(102)を通過する際に加熱され、その後に二手に分流される。分流された室外空気は、その一方が第1吸着素子(81)へ送られ、残りが減湿後の室内空気と共に第2熱交換器(104)へ送られる。
【0310】
第1吸着素子(81)へ送られる室外空気は、第1吸着素子(81)の調湿側通路(85)へ流入する。この調湿側通路(85)では、導入された室外空気によって吸着剤が加熱され、吸着剤から水蒸気が脱離する。そして、吸着剤から脱離した水蒸気が室外空気に付与され、室外空気が加湿される。第1吸着素子(81)で加湿された室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。つまり、デフロスト運転中であっても、室内へ供給される空気の加湿が行われる。
【0311】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室外空気が、室内空気と共に第2熱交換器(104)へ供給される。一方、加湿運転中には、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)だけが第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0312】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室外空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室内空気が導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室外空気の残りが導入される。
【0313】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0314】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0315】
また、本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。更に、本変形例によれば、デフロスト運転中であっても、室内へ供給される空気の加湿を継続することができる。従って、第2熱交換器(104)のデフロストを行いながらも、加湿運転中と同様に室内へ供給される空気を加湿することが可能となる。
【0316】
尚、このデフロスト運転では、取り込んだ室内空気を室外へ排出する動作を行っているが、この室内空気の排気を停止することも可能である。つまり、デフロスト運転中には、取り込んだ室外空気の一部を室内へ供給して残りを室外へ排出する動作だけを行ってもよい。ただし、この場合、室内の換気は行われない。
【0317】
−第4の変形例−
第4の変形例のデフロスト運転について、図31を参照しながら説明する。
【0318】
調湿装置に取り込まれた室外空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)を流れる間に、室外空気中の水蒸気が吸着剤に吸着される。その際、調湿側通路(85)では吸着熱が発生し、この吸着熱によって室外空気の温度が上昇する。
【0319】
また、第2吸着素子(82)の冷却側通路(86)へは、暖房中の暖かい室内空気が流入する。第2吸着素子(82)では、調湿側通路(85)の室外空気と冷却側通路(86)の室内空気とが熱交換し、室内空気の温熱が室外空気に回収される。そして、第2吸着素子(82)の調湿側通路(85)から出た室外空気は、休止中の第1熱交換器(103)を通過して室内へ供給される。
【0320】
第2吸着素子(82)の冷却側通路(86)から出た室内空気は、再生熱交換器(102)を通過する際に加熱される。加熱された室内空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ排出される。
【0321】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室内空気が第2熱交換器(104)へ供給される。一方、加湿運転中には、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0322】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へ室内空気が導入され、第1吸着素子(81)の調湿側通路(85)へ室外空気が導入される。
【0323】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0324】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0325】
また、本変形例によれば、デフロスト運転中において、第2熱交換器(104)のデフロストだけでなく、室内の換気をも行うことができる。また、換気のために排気される室内空気の温熱を給気される室外空気へ回収でき、換気に伴う暖房負荷の増大を抑制できる。
【0326】
−第5の変形例−
第5の変形例のデフロスト運転について、図32を参照しながら説明する。
【0327】
調湿装置に取り込まれた室内空気は、第2吸着素子(82)の調湿側通路(85)へ流入する。この調湿側通路(85)から出た室内空気は、休止中の第1熱交換器(103)を通過して室内へ送り返される。
【0328】
一方、調湿装置に取り込まれた室外空気は、第2吸着素子(82)の冷却側通路(86)へ導入される。この冷却側通路(86)から出た室外空気は、再生熱交換器(102)を通過する際に加熱される。加熱された室外空気は、第2熱交換器(104)へ送られ、第2熱交換器(104)を通過後に室外へ送り返される。
【0329】
このように、デフロスト運転中には、再生熱交換器(102)で加熱された室外空気が第2熱交換器(104)へ供給される。一方、加湿運転中には、第1又は第2吸着素子(81,82)で第2空気(室外空気)と熱交換した第1空気(室内空気)が第2熱交換器(104)へ供給される(図9参照)。従って、デフロスト運転中には、加湿運転時と異なる状態の空気が第2熱交換器(104)へ供給される。そして、デフロスト運転中には、第2熱交換器(104)へ供給される空気の温度が加湿運転中よりも上昇し、第2熱交換器(104)の霜が融解する。
【0330】
尚、本変形例のデフロスト運転では、第1吸着素子(81)と第2吸着素子(82)の状態が入れ替わっていてもよい。この場合、第1吸着素子(81)の冷却側通路(86)へは、取り込まれた室外空気が導入される。第1吸着素子(81)の調湿側通路(85)へは、取り込まれた室内空気が導入される。第2吸着素子(82)の調湿側通路(85)へは、再生熱交換器(102)で加熱された室外空気が導入される。
【0331】
このように、本変形例のデフロスト運転としては、2通りの動作が考えられる。そして、この調湿装置は、デフロスト運転中において、何れか一方の動作だけを継続して行ってもよいし、必要に応じて2通りの動作を相互に切り換えるようにしてもよい。
【0332】
本変形例によれば、予め再生熱交換器(102)で加熱された空気を第2熱交換器(104)へ送ることで、第2熱交換器(104)の霜を短時間で確実に融かすことができる。従って、本変形例によれば、第2熱交換器(104)のデフロストを確実に行うことができ、更にはデフロスト運転に要する時間を短縮できる。
【0333】
尚、本変形例のデフロスト運転では、室内空気を一旦取り込んで再び室内へ送り返す動作を行っているが、この動作を停止することも可能である。つまり、デフロスト運転中には、取り込んだ室外空気を再生熱交換器(102)で加熱して第2熱交換器(104)へ送る動作だけを行ってもよい。
【図面の簡単な説明】
【図1】 実施形態に係る調湿装置の構成および除湿運転中の第1動作を示す分解斜視図である。
【図2】 実施形態に係る調湿装置での除湿運転中の第2動作を示す分解斜視図である。
【図3】 実施形態に係る調湿装置での加湿運転中の第1動作を示す分解斜視図である。
【図4】 実施形態に係る調湿装置での加湿運転中の第2動作を示す分解斜視図である。
【図5】 実施形態に係る調湿装置の要部を示す概略構成図である。
【図6】 実施形態に係る調湿装置の吸着素子を示す概略斜視図である。
【図7】 実施形態に係る冷媒回路の構成を示す配管系統図である。
【図8】 実施形態に係る調湿装置の除湿運転中の動作を概念的に示す説明図である。
【図9】 実施形態に係る調湿装置の加湿運転中の動作を概念的に示す説明図である。
【図10】 実施形態に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図11】 実施形態に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図12】 実施形態の変形例1に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図13】 実施形態の変形例1に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図14】 実施形態の変形例2に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図15】 実施形態の変形例2に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図16】 実施形態の変形例3に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図17】 実施形態の変形例3に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図18】 実施形態の変形例4に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図19】 実施形態の変形例4に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図20】 実施形態の変形例5に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図21】 実施形態の変形例5に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図22】 実施形態の変形例6に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図23】 実施形態の変形例6に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図24】 実施形態の変形例7に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図25】 実施形態の変形例7に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図26】 実施形態の変形例8に係る調湿装置でのデフロスト運転中の動作を示す分解斜視図である。
【図27】 実施形態の変形例8に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図28】 その他の実施形態の第1変形例に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図29】 その他の実施形態の第2変形例に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図30】 その他の実施形態の第3変形例に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図31】 その他の実施形態の第4変形例に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【図32】 その他の実施形態の第5変形例に係る調湿装置でのデフロスト運転中の動作を概念的に示す説明図である。
【符号の説明】
(81) 第1吸着素子
(82) 第2吸着素子
(85) 調湿側通路
(86) 冷却側通路
(100) 冷媒回路
(102) 再生熱交換器(凝縮用熱交換器)
(103) 第1熱交換器
(104) 第2熱交換器(蒸発用熱交換器)[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a humidity control device that adjusts the humidity of air.
[0002]
[Prior art]
Conventionally, a humidity control apparatus that adjusts the humidity of air using an adsorbent is known. For example, Japanese Patent Laid-Open No. 10-9633 discloses a humidity control apparatus that includes two adsorbing elements for bringing an adsorbent into contact with air and performs a batch-type operation. The humidity control apparatus is provided with a refrigerant circuit that performs a refrigeration cycle.
[0003]
The humidity control apparatus includes a first operation in which the process air is dehumidified by the first adsorption element and the second adsorption element is regenerated, and the first adsorption element is regenerated and the process air is regenerated by the second adsorption element. The second operation of dehumidifying is alternately repeated. At that time, the treated air is dehumidified by the adsorption element and further cooled by the evaporator of the refrigerant circuit before being supplied to the room. The regenerated air is heated by the condenser of the refrigerant circuit and then supplied to the adsorption element. Then, moisture is desorbed from the adsorption element supplied with the high-temperature regeneration air, and the adsorption element is regenerated. Thus, in the refrigerant circuit of the humidity control apparatus, the regeneration air and the refrigerant exchange heat in the condenser, and the processing air and the refrigerant exchange heat in the evaporator.
[0004]
[Problems to be solved by the invention]
In the refrigerant circuit of the humidity control apparatus, a so-called frost problem occurs in the evaporator. In other words, the temperature of the regenerated air or the processing air that exchanges heat with the refrigerant in the refrigerant circuit varies depending on the operating conditions of the humidity control apparatus. Depending on the operating conditions, the evaporation temperature of the refrigerant in the evaporator may be lower than 0 ° C., and moisture in the air may freeze on the surface of the evaporator.
[0005]
Thus, when frost adheres to the surface of the evaporator, heat exchange between the refrigerant and the air is hindered, and the resistance when air passes through the evaporator also increases. If the frost adhering to the evaporator is left unattended, the refrigeration cycle in the refrigerant circuit cannot be continued, and the operation of the humidity control device must be stopped.
[0006]
However, the humidity control apparatus has not taken any measures against the problem of frost formation. For this reason, the humidity control apparatus has a problem that the humidity control apparatus cannot be operated depending on the operation conditions.
[0007]
This invention is made | formed in view of this point, The place made into the objective is performing the operation | movement for melting the frost adhering to the heat exchanger used as an evaporator in a humidity control apparatus provided with a refrigerant circuit. It is to enable the operation of the humidity control device to be continued.
[0008]
[Means for Solving the Problems]
The present invention has taken First, second, third, fourth, eighth, fourteenth and fifteenth The solving means includes an adsorbing element (81, 82) for bringing the adsorbent into contact with air, and a refrigerant circuit (100) for circulating a refrigerant to perform a refrigeration cycle, and the moisture in the first air is removed from the adsorbing element. An adsorption operation for adsorbing the adsorption element (81, 82) and a regeneration operation for regenerating the adsorption element (81, 82) with the second air heated by the refrigerant of the refrigerant circuit (100) are performed, and the adsorption element (81 , 82) is supplied to the indoors, and the humidity control device performs at least a humidifying operation for discharging the first air dehumidified by the adsorption element (81, 82) to the outside. .
[0009]
The refrigerant circuit (100) functions as a condenser and heats the second air supplied to the adsorption element (81, 82) during the humidification operation with the refrigerant for heat exchange (102). And an evaporating heat exchanger (104) for exchanging heat with the refrigerant for the first air dehumidified by the adsorption element (81, 82) during the humidifying operation functioning as an evaporator. The defrost operation for melting frost adhered to the heat exchanger (104) for humidification during the humidification operation is performed by sending air in a state different from that during the humidification operation to the evaporation heat exchanger (104). is there.
[0010]
Further, the first The solving means includes a plurality of adsorption elements (81, 82), an adsorption operation for supplying the first air to the first adsorption element (81), and a second air to the second adsorption element (82). A first operation for simultaneously performing the regeneration operation, an adsorption operation for supplying the first air to the second adsorption element (82), and a regeneration operation for supplying the second air to the first adsorption element (81) are simultaneously performed. The humidification operation is performed by alternately repeating the second operation.
[0011]
In addition, the second In the adsorbing element (81 82), the adsorbing element (81 82) has a humidity adjusting side passageway (85) in which the circulating air contacts the adsorbent, and the circulating air exchanges heat with the air in the humidity adjusting side passageway (85). A plurality of cooling side passages (86) are formed, and during the humidification operation, the first air passes through the humidity adjustment side passage (85) of the adsorption element (81, 82) and then the evaporation heat exchanger (104 ) And the second air is supplied to the heat exchanger for condensation (102) after passing through the cooling side passage (86) of the adsorption element (81, 82).
[0012]
In addition, the third In the defrosting operation, the flow paths of the first air and the second air are maintained during the defrost operation in the same manner as during the humidification operation, and the flow rate of the first air sent to the evaporating heat exchanger (104) is reduced. This is less than during humidification operation.
[0013]
In addition, the fourth In the defrosting operation, the taken-in indoor air is heated by the condensation heat exchanger (102) and then supplied to the evaporation heat exchanger (104).
[0014]
The present invention has taken 5th The solution of 4th In this solution, during the defrost operation, the indoor air that has passed through the evaporating heat exchanger (104) is discharged to the outside of the room, and the outdoor air that has been taken in contact with the adsorbent by the adsorption element (81, 82). After that, it is supplied to the room.
[0015]
The present invention has taken 6th The solution of Second In the above solution, during the defrost operation, the taken-in indoor air passes through the cooling side passage (86) of the adsorption element (81, 82) and is heated by the heat exchanger for condensation (102) and then the heat for evaporation. The outdoor air that has been discharged through the exchanger (104) and passed through the humidity adjustment side passage (85) of the adsorption element (81, 82) is supplied to the cooling side passage (86). The heat is exchanged with room air and then supplied to the room.
[0016]
The present invention has taken 7th The solution of Second In the above solution, during the defrost operation, the taken-in indoor air passes through the cooling side passage (86) of the adsorption element (81, 82) and is heated by the heat exchanger for condensation (102) and then the heat for evaporation. The outdoor air that has been discharged through the exchanger (104) and passed through the humidity adjustment side passage (85) of the adsorption element (81, 82) is supplied to the cooling side passage (86). Heat exchange with room air, a part of the outdoor air that passed through the humidity control passage (85) is supplied to the room, and the rest is heat exchange for evaporation together with the room air heated by the heat exchanger for condensation (102) To the container (104).
[0017]
In addition, the eighth In this solution, during the defrost operation, the taken-in room air is supplied as it is to the evaporation heat exchanger (104).
[0018]
The present invention has taken 9th The solution of 8th In this solution, during the defrost operation, the indoor air that has passed through the evaporating heat exchanger (104) is discharged to the outside of the room, and the taken-out outdoor air is heated by the condensing heat exchanger (102). It is supplied into the room after coming into contact with the adsorbent by the adsorbing element (81, 82) later.
[0019]
The present invention has taken 10th The solution of 8th In this solution, during the defrost operation, the indoor air that has passed through the evaporating heat exchanger (104) is discharged to the outside of the room, and the outdoor air that has been taken in contact with the adsorbent by the adsorption element (81, 82). After that, it is supplied to the room.
[0020]
The present invention has taken 11th The solution of Second In the above solution, during the defrosting operation, the taken indoor air is supplied to the evaporation heat exchanger (104) after passing through the humidity adjustment side passage (85) of the adsorption element (81, 82), and Inflow of air to the cooling side passageway (86) of the adsorption element (81, 82) is prevented.
[0021]
The present invention has taken 12th The solution of 11th In this solution, during the defrost operation, the indoor air that has passed through the evaporating heat exchanger (104) is discharged to the outside of the room, and the taken-out outdoor air is heated by the condensing heat exchanger (102). After passing through a humidity adjustment side passage (85) different from the humidity adjustment side passage (85) through which room air flows later, the air is supplied to the room.
[0022]
The present invention has taken 13th The solution of 11th In the above solution, during the defrost operation, the indoor air that has passed through the evaporating heat exchanger (104) is discharged to the outside of the room, and the taken-in outdoor air flows through the humidity control side passage (85) through which the indoor air flows. It is supplied to the room after passing through a humidity control side passageway (85).
[0023]
In addition, the fourteenth In this solution, during the defrost operation, the outdoor air taken in is heated by the heat exchanger for condensation (102) and then supplied to the heat exchanger for evaporation (104).
[0024]
In addition, the fifteenth During the defrost operation, the taken outdoor air is heated by the condensation heat exchanger (102), and a part of the heated outdoor air is supplied to the evaporation heat exchanger (104). The rest is supplied to the room.
[0025]
The present invention has taken 16th The solution of 15th In this solution, the outdoor air supplied into the room during the defrost operation is heated by the heat exchanger for condensation (102) and then brought into contact with the adsorbent by the adsorption element (81, 82) before being sent into the room. Is.
[0026]
The present invention has taken 17th The solution of Second In the above solution, during the defrost operation, the taken-in outdoor air is heated by the heat exchanger for condensation (102), and a part of the heated outdoor air is supplied to the heat exchanger for evaporation (104). The remainder passes through the humidity adjustment side passage (85) of the adsorption element (81, 82) and then is supplied to the room, and the taken-in room air is the humidity adjustment side passage (85) through which the outdoor air flows. After passing through another humidity control side passageway (85), it is discharged outside the room.
[0027]
-Action-
the above First, second, third, fourth, eighth, fourteenth and fifteenth In the solution, the adsorption operation and the regeneration operation are performed in the humidity control apparatus. In the adsorption element (81 82) during the adsorption operation, the first air comes into contact with the adsorbent, and water vapor in the first air is adsorbed by the adsorbent. On the other hand, in the adsorption element (81, 82) during the regeneration operation, the heated second air comes into contact with the adsorbent, and water vapor is desorbed from the adsorbent. That is, the adsorption element (81, 82) is regenerated. The water vapor desorbed from the adsorbent is given to the second air.
[0028]
these The humidity control apparatus of the solving means is configured to perform a humidifying operation. During the humidifying operation, the second air humidified by the adsorption element (81, 82) is supplied into the room, and the first air dehumidified by the adsorption element (81, 82) is discharged outside the room. The humidity control apparatus may be configured to be capable of supplying the first air dehumidified by the adsorption element (81, 82) to the room in addition to the humidifying operation.
[0029]
these In the refrigerant circuit (100) of the solving means, the refrigerant circulates to perform a refrigeration cycle. The refrigerant circulating in the refrigerant circuit (100) during the humidifying operation dissipates heat to the second air in the condensation heat exchanger (102) and condenses, and absorbs heat from the first air in the evaporation heat exchanger (104). Evaporate. The second air heated by the heat exchanger for condensation (102) is supplied to the adsorption elements (81, 82) during the regeneration operation.
[0030]
When frosting occurs in the evaporating heat exchanger (104) during the humidifying operation, the defrosting operation is performed. During the defrost operation, air in a state different from that during the humidification operation is supplied to the evaporation heat exchanger (104). In addition, the air state here means air temperature, humidity, flow rate, and the like. By performing this defrost operation, the frost adhering to the evaporation heat exchanger (104) is melted.
[0031]
the above First In the solution, the first operation and the second operation are alternately repeated in the humidity control apparatus during the humidifying operation.
[0032]
First, during the first operation, the first air is sent to the first adsorption element (81). In the first adsorption element (81), moisture in the first air is adsorbed by the adsorbent. On the other hand, the second air heated by the heat exchanger for condensation (102) is supplied to the second adsorption element (82). In the second adsorption element (82), the adsorbent is heated by the second air, and moisture is desorbed from the adsorbent. That is, the second adsorption element (82) is regenerated and the second air is humidified at the same time.
[0033]
Next, during the second operation, the first air is sent to the second adsorption element (82). In the second adsorption element (82), moisture in the first air is adsorbed by the adsorbent. On the other hand, the second air heated by the heat exchanger for condensation (102) is supplied to the first adsorption element (81). In the first adsorption element (81), the adsorbent is heated by the second air, and moisture is desorbed from the adsorbent. That is, the first adsorption element (81) is regenerated and the second air is humidified at the same time.
[0034]
the above Second In the above solution, the humidity adjusting side passageway (85) and the cooling side passageway (86) are provided in the adsorption element (81, 82). In the adsorption element (81, 82) that is the target of the adsorption operation during the humidifying operation, the first air is sent to the humidity adjustment side passage (85) and the second air is sent to the cooling side passage (86). . In the humidity adjusting side passageway (85), heat of adsorption is generated when water vapor in the first air is adsorbed by the adsorbent. On the other hand, in the cooling side passage (86), the circulating second air exchanges heat with the first air in the humidity adjustment side passage (85) and absorbs the heat of adsorption generated in the humidity adjustment side passage (85). The 2nd air which came out of this cooling side channel | path (86) is sent to the heat exchanger for condensation (102), and is further heated.
[0035]
the above Third In the above solution, in the humidity control apparatus during the defrost operation, the flow paths of the first air and the second air are maintained in the same manner as during the humidification operation. Accordingly, the first air is supplied to the evaporating heat exchanger (104) as in the humidifying operation. However, the flow rate of the first air sent to the evaporation heat exchanger (104) is set to be smaller than that during the humidifying operation. That is, the first air having a flow rate different from that during the humidifying operation is supplied to the evaporation heat exchanger (104). When the flow rate of the first air that exchanges heat with the refrigerant in the evaporation heat exchanger (104) decreases, the refrigerant evaporation temperature in the evaporation heat exchanger (104) increases. For this reason, the temperature of the evaporation heat exchanger (104) rises, and the frost adhering to the surface melts.
[0036]
the above 4th In the above solution, the humidity control apparatus during the defrost operation takes in indoor air. The room air taken into the humidity controller is exchanged with the refrigerant in the condensation heat exchanger (102), and then sent to the evaporation heat exchanger (104). That is, unlike the humidifying operation, the room air heated by the condensation heat exchanger (102) is sent to the evaporation heat exchanger (104). The frost adhering to the evaporation heat exchanger (104) is melted by the indoor air heated by the condensation heat exchanger (102).
[0037]
the above 5th In this solution, the indoor air supplied to the evaporating heat exchanger (104) during the defrost operation passes through the evaporating heat exchanger (104) and is then discharged to the outside. Furthermore, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity controller is supplied into the room after coming into contact with the adsorbent by the adsorbing elements (81, 82). In the adsorption element (81, 82), heat of adsorption is generated when moisture in the outdoor air is adsorbed by the adsorbent, and the temperature of the outdoor air rises. In this way, during the defrost operation, the humidity control apparatus also ventilates the room together with the defrost of the evaporating heat exchanger (104). Further, the moisture taken from the outdoor air by the adsorption element (81, 82) during the defrost operation is used for humidifying the second air after the humidification operation is resumed.
[0038]
the above 6th In this solution, the humidity control apparatus during the defrost operation takes in indoor air and outdoor air. The indoor air taken into the humidity control device passes through the cooling side passage (86) of the adsorption element (81, 82), and then exchanges heat with the refrigerant in the heat exchanger for condensation (102) before evaporating heat. It is sent to the exchanger (104). That is, unlike the humidifying operation, the room air heated by the condensation heat exchanger (102) is sent to the evaporation heat exchanger (104). The frost adhering to the evaporation heat exchanger (104) is melted by the indoor air heated by the condensation heat exchanger (102).
[0039]
On the other hand, the outdoor air taken into the humidity control apparatus passes through the humidity control side passageway (85) of the adsorption element (81, 82), and is then supplied into the room. In the adsorption element (81 82), the indoor air in the cooling side passage (86) and the outdoor air in the humidity adjustment side passage (85) exchange heat. That is, in the adsorption element (81, 82), the indoor air discharged to the outside and the outdoor air supplied to the room exchange heat. During the defrost operation, the moisture in the outdoor air is taken away by the adsorption element (81, 82). The moisture taken by the adsorption element (81, 82) humidifies the second air after resuming the humidification operation. Used for.
[0040]
the above 7th In this solution, the humidity control apparatus during the defrost operation takes in indoor air and outdoor air. The indoor air taken into the humidity control device passes through the cooling side passage (86) of the adsorption element (81, 82), and then exchanges heat with the refrigerant in the heat exchanger for condensation (102) before evaporating heat. It is sent to the exchanger (104). On the other hand, the outdoor air taken into the humidity control apparatus passes through the humidity adjustment side passage (85) of the adsorption element (81, 82), and exchanges heat with the indoor air in the cooling side passage (86). And a part of outdoor air which came out from the humidity control side channel | path (85) of the adsorption | suction element (81,82) is sent to the heat exchanger (104) for evaporation. That is, unlike the humidifying operation, the indoor air heated by the condensation heat exchanger (102) and the outdoor air that has passed through the adsorption element (81, 82) are sent to the evaporation heat exchanger (104). . And the frost adhering to the heat exchanger for evaporation (104) is melted by the supplied air.
[0041]
In this solution, the remainder of the outdoor air that has come out of the humidity control side passageway (85) of the adsorption element (81, 82) is supplied to the room. That is, the outdoor air is supplied into the room after exchanging heat with the room air discharged to the outside by the adsorption element (81, 82). During the defrost operation, the moisture in the outdoor air is taken away by the adsorption element (81, 82). The moisture taken by the adsorption element (81, 82) humidifies the second air after resuming the humidification operation. Used for.
[0042]
the above 8th In the above solution, the humidity control apparatus during the defrost operation takes in indoor air. The room air taken into the humidity control device is sent to the evaporation heat exchanger (104) as it is without being subjected to temperature adjustment or humidity adjustment. That is, unlike in the humidifying operation, the room air almost taken into the humidity control device is sent to the evaporation heat exchanger (104). Here, the problem of frost formation in the evaporating heat exchanger (104) occurs in the winter when the outside air temperature is low, and the room is heated in the winter. Therefore, the frost adhering to the evaporation heat exchanger (104) is melted by the warm indoor air during heating.
[0043]
the above 9th In this solution, the indoor air supplied to the evaporating heat exchanger (104) during the defrost operation passes through the evaporating heat exchanger (104) and is then discharged to the outside. Furthermore, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity control apparatus is heated by the heat exchanger for condensation (102) and then sent to the adsorption elements (81, 82). In the adsorption element (81 82), moisture is desorbed from the adsorbent by contact with the heated outdoor air, and the outdoor air is humidified. And the outdoor air humidified by the adsorption | suction element (81,82) is supplied indoors. As described above, during the defrost operation, the humidity control apparatus performs indoor ventilation and humidification of the outdoor air supplied together with the defrost of the evaporating heat exchanger (104).
[0044]
the above 10th In this solution, the indoor air supplied to the evaporating heat exchanger (104) during the defrost operation passes through the evaporating heat exchanger (104) and is then discharged to the outside. Furthermore, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity controller is supplied into the room after coming into contact with the adsorbent by the adsorbing elements (81, 82). In the adsorption element (81, 82), heat of adsorption is generated when moisture in the outdoor air is adsorbed by the adsorbent, and the temperature of the outdoor air rises. In this way, during the defrost operation, the humidity control apparatus also ventilates the room together with the defrost of the evaporating heat exchanger (104). Further, the moisture taken from the outdoor air by the adsorption element (81, 82) during the defrost operation is used for humidifying the second air after the humidification operation is resumed.
[0045]
the above 11th In the above solution, the humidity control apparatus during the defrost operation takes in indoor air. The room air taken into the humidity control device is introduced into the humidity control side passageway (85) of the adsorption element (81, 82). At that time, air circulation is blocked in the cooling side passageway (86) of the adsorption element (81, 82). In the humidity control side passageway (85) of the adsorption element (81, 82), heat of adsorption is generated when moisture in the room air is adsorbed by the adsorbent, and the temperature of the room air rises. That is, unlike the humidifying operation, the indoor air heated by the adsorption heat is sent to the evaporation heat exchanger (104). And the frost adhering to the evaporating heat exchanger (104) is melted by the indoor air heated in the humidity control side passage (85) of the adsorption element (81, 82).
[0046]
the above 12th In this solution, the indoor air supplied to the evaporating heat exchanger (104) during the defrost operation passes through the evaporating heat exchanger (104) and is then discharged to the outside. Furthermore, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity control apparatus is heated by the heat exchanger for condensation (102) and then sent to the adsorption elements (81, 82). At that time, the heated outdoor air is introduced into the humidity adjustment side passage (85) different from the humidity adjustment side passage (85) through which the indoor air flows. In the humidity adjusting side passageway (85), moisture is desorbed from the adsorbent by contact with the heated outdoor air, and the outdoor air is humidified. Then, outdoor air humidified by the adsorption elements (81, 82) is supplied into the room. As described above, during the defrost operation, the humidity control apparatus performs indoor ventilation and humidification of the outdoor air supplied together with the defrost of the evaporating heat exchanger (104).
[0047]
the above 13th In this solution, the indoor air supplied to the evaporating heat exchanger (104) during the defrost operation passes through the evaporating heat exchanger (104) and is then discharged to the outside. Furthermore, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity control device is sent to the humidity control side passageway (85) of the adsorption element (81, 82). At this time, the outdoor air is introduced into the humidity adjustment side passage (85) different from the humidity adjustment side passage (85) through which the indoor air flows. In the humidity adjusting passage (85), heat of adsorption is generated when moisture in the outdoor air is adsorbed by the adsorbent, and the temperature of the outdoor air rises. And the outdoor air which came out of this humidity control side channel | path (85) is supplied indoors. In this way, during the defrost operation, the humidity control apparatus also ventilates the room together with the defrost of the evaporating heat exchanger (104). Further, the moisture taken from the outdoor air by the adsorption element (81, 82) during the defrost operation is used for humidifying the second air after the humidification operation is resumed.
[0048]
the above 14th In the solution, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity control apparatus exchanges heat with the refrigerant in the condensation heat exchanger (102), and then is sent to the evaporation heat exchanger (104). That is, unlike the humidifying operation, the outdoor air heated by the condensation heat exchanger (102) is sent to the evaporation heat exchanger (104). The frost adhering to the evaporation heat exchanger (104) is melted by the outdoor air heated by the condensation heat exchanger (102).
[0049]
the above 15th In this solution, the humidity control apparatus during the defrost operation takes in indoor air and outdoor air. The outdoor air taken into the humidity controller is heated by exchanging heat with the refrigerant in the condensation heat exchanger (102). Thereafter, a part of the heated outdoor air is supplied to the evaporation heat exchanger (104), and the rest is supplied indoors. That is, unlike the humidifying operation, the outdoor air heated by the condensation heat exchanger (102) is sent to the evaporation heat exchanger (104). And the frost adhering to the heat exchanger for evaporation (104) is melted by the supplied air.
[0050]
the above 16th In this solution, outdoor air supplied to the room after being heated by the heat exchanger for condensation (102) passes through the adsorption element (81, 82). That is, outdoor air that has exited from the heat exchanger for condensation (102) passes through the adsorption elements (81, 82) and is then supplied to the room. In the adsorption element (81 82), moisture is desorbed from the adsorbent by contact with the heated outdoor air, and the outdoor air is humidified. And the outdoor air humidified by the adsorption | suction element (81,82) is supplied indoors. Thus, during the defrost operation, the humidity control apparatus also humidifies the outdoor air supplied together with the defrost of the evaporating heat exchanger (104).
[0051]
the above 17th In the solution, the humidity control apparatus during the defrost operation takes in outdoor air. The outdoor air taken into the humidity controller is heated by exchanging heat with the refrigerant in the condensation heat exchanger (102). Thereafter, a part of the heated outdoor air is supplied to the evaporating heat exchanger (104), and the rest is introduced into the humidity control side passage (85) of the adsorption element (81, 82). That is, unlike the humidifying operation, the outdoor air heated by the condensation heat exchanger (102) is sent to the evaporation heat exchanger (104). And the frost adhering to the heat exchanger for evaporation (104) is melted by the supplied air. Further, in the humidity adjusting side passageway (85) of the adsorption element (81 82), moisture is desorbed from the adsorbent by contact with the heated outdoor air, and the outdoor air is humidified. And the outdoor air humidified by the adsorption | suction element (81,82) is supplied indoors.
[0052]
Further, the humidity control apparatus of the present solution takes in indoor air during the defrost operation. The room air taken into the humidity control device is sent to the humidity control side passageway (85) of the adsorption element (81, 82). At this time, the indoor air is introduced into the humidity adjustment side passage (85) different from the humidity adjustment side passage (85) through which the outdoor air flows. In the humidity adjusting side passageway (85), moisture in the room air is adsorbed by the adsorbent. The room air that has exited from the humidity adjusting side passageway (85) is then discharged to the outside. As described above, during the defrost operation, the humidity control apparatus performs indoor ventilation and humidification of the outdoor air supplied together with the defrost of the evaporating heat exchanger (104). Further, the moisture taken from the room air by the adsorption element (81, 82) during the defrost operation is used for humidifying the second air after the humidification operation is resumed.
[0053]
【The invention's effect】
According to the present invention, in the humidity control apparatus including the refrigerant circuit (100), even when frost formation occurs in the evaporating heat exchanger (104), the evaporating heat exchanger ( 104) The frost adhering to can be melted. For this reason, even under operating conditions where frost formation occurs in the evaporation heat exchanger (104), if the frost of the evaporation heat exchanger (104) is melted by performing the defrost operation, then the humidification operation is performed. It is possible to resume. Therefore, according to the present invention, the operation of the humidity control apparatus can be continued even under such operating conditions.
[0054]
Here, for example, frost in the evaporating heat exchanger (104) can be melted by changing the circulation path of the refrigerant in the refrigerant circuit (100) as in a so-called reverse cycle defrost. However, in order to adopt such a measure, it is necessary to provide the refrigerant circuit (100) with a valve or the like for switching the refrigerant flow, which leads to complication of the refrigerant circuit (100).
[0055]
On the other hand, in the humidity control apparatus according to the present invention, the defrosting operation is performed by sending air in a state different from that during the humidifying operation to the evaporating heat exchanger (104). For this reason, it becomes possible to perform a defrost operation, without changing the structure of a refrigerant circuit (100) at all. Therefore, according to the present invention, the defrosting operation can be performed while the configuration of the refrigerant circuit (100) is simply maintained.
[0056]
the above Second In the solution, the cooling side passageway (86) is formed in the adsorption element (81, 82), and the adsorption heat generated during the adsorption operation is absorbed by the second air. Therefore, according to this solution, it is possible to suppress the temperature rise of the first air due to the generated heat of adsorption. As a result, it is possible to suppress a decrease in the relative humidity of the first air flowing through the humidity adjusting side passageway (85) of the adsorption element (81, 82), and it is possible to increase the amount of water vapor adsorbed by the adsorbent.
[0057]
Further, in this solution, the second air is first introduced into the cooling side passage (86) of the adsorption element (81, 82) as a cooling fluid, and the second air exiting from the cooling side passage (86) is condensed. It is heated with a heat exchanger (102). That is, the second air used for regeneration of the adsorption element (81, 82) is heated not only in the condensation heat exchanger (102) but also in the cooling side passage (86) of the adsorption element (81, 82). Therefore, according to the present solution, the amount of heat that must be given to the second air by the heat exchanger for condensation (102) can be reduced, and the energy required for operating the humidity controller can be reduced.
[0058]
the above Third According to this solution, defrosting (defrosting) of the evaporating heat exchanger (104) becomes possible only by changing the supply amount of the first air to the evaporating heat exchanger (104). Therefore, according to this solution, the change in the operating state of the humidity control apparatus when shifting from the humidifying operation to the defrosting operation can be minimized.
[0059]
the above 4th According to this solution, the frost of the evaporating heat exchanger (104) can be reliably secured in a short time by sending the air heated in advance by the condensing heat exchanger (102) to the evaporating heat exchanger (104). Can be melted into Here, the problem of frost formation in the evaporating heat exchanger (104) occurs in the winter when the outside air temperature is low, and the room is heated in the winter. In the defrosting operation of the present solution, the indoor air heated by heating is further heated by the condensation heat exchanger (102) and then supplied to the evaporation heat exchanger (104). Therefore, according to this solution, the defrosting of the evaporating heat exchanger (104) can be performed reliably, and further, the time required for the defrosting operation can be shortened.
[0060]
the above 5th According to this solution, during the defrosting operation, not only the defrosting of the evaporation heat exchanger (104) but also the indoor ventilation can be performed. Further, outdoor air supplied to the room is brought into contact with the adsorbent by the adsorbing elements (81, 82), so that the outdoor air can be supplied to the room after being heated by adsorption heat.
[0061]
the above 6th and 7th According to this solution, the air heated by the condensation heat exchanger (102) is sent to the evaporation heat exchanger (104), so that the frost of the evaporation heat exchanger (104) can be reliably and quickly obtained. Can be melted. In addition, according to these solutions, not only the defrost of the evaporating heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation.
[0062]
Here, the problem of frost formation in the evaporating heat exchanger (104) occurs in the winter when the outside air temperature is low, and the room is heated in the winter. on the other hand, 6th and 7th In the humidity control apparatus according to the above solution, the outdoor air supplied to the room during the defrost operation is exchanged with the indoor air heated by the heating by the adsorbing elements (81, 82). Therefore, the heat of the exhausted indoor air can be recovered into the outdoor air supplied, and an increase in heating load accompanying ventilation can be suppressed.
[0063]
In particular, the above 7th In this solution, outdoor air heat-exchanged with warm indoor air by the adsorbing elements (81, 82) is also supplied to the evaporating heat exchanger (104). Therefore, according to this solution, a sufficient amount of air is supplied to the evaporating heat exchanger (104) during the defrosting operation, and the defrosting of the evaporating heat exchanger (104) can be ensured in a short time. Can be done.
[0064]
the above 8th According to this solution, the frost in the evaporation heat exchanger (104) can be melted by sending the taken room air to the evaporation heat exchanger (104) as it is. That is, by utilizing the fact that the room is heated in the winter season when the defrost operation is performed, it is possible to reliably defrost the evaporating heat exchanger (104) using the warm indoor air during heating.
[0065]
the above 9th According to this solution, during the defrosting operation, not only the defrosting of the evaporation heat exchanger (104) but also the indoor ventilation can be performed. Further, according to the present solution, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Accordingly, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the evaporation heat exchanger (104).
[0066]
the above 10th According to this solution, during the defrosting operation, not only the defrosting of the evaporation heat exchanger (104) but also the indoor ventilation can be performed. Further, outdoor air supplied to the room is brought into contact with the adsorbent by the adsorbing elements (81, 82), so that the outdoor air can be supplied to the room after being heated by adsorption heat.
[0067]
the above 11th In the above solution, the taken room air is introduced into the humidity adjusting side passageway (85) of the adsorption element (81, 82), and the room air whose temperature is increased by absorbing the generated heat of adsorption is converted into an evaporation heat exchanger (104 ). Here, the problem of frost formation in the evaporating heat exchanger (104) occurs in the winter when the outside air temperature is low, and the room is heated in the winter. Therefore, according to this solution, the indoor air heated by the heating can be further heated by the adsorption heat and then supplied to the evaporating heat exchanger (104), and the defrosting of the evaporating heat exchanger (104) can be surely performed. It can be carried out.
[0068]
the above 12th According to this solution, during the defrosting operation, not only the defrosting of the evaporation heat exchanger (104) but also the indoor ventilation can be performed. Further, according to the present solution, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Accordingly, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the evaporation heat exchanger (104).
[0069]
the above 13th According to this solution, during the defrosting operation, not only the defrosting of the evaporation heat exchanger (104) but also the indoor ventilation can be performed. Further, outdoor air supplied to the room is brought into contact with the adsorbent by the adsorbing elements (81, 82), so that the outdoor air can be supplied to the room after being heated by adsorption heat.
[0070]
the above 14th and 15th According to this solution, the frost of the evaporating heat exchanger (104) can be reliably secured in a short time by sending the air heated in advance by the condensing heat exchanger (102) to the evaporating heat exchanger (104). Can be melted into Therefore, according to this solution, the defrosting of the evaporating heat exchanger (104) can be performed reliably, and further, the time required for the defrosting operation can be shortened.
[0071]
the above 16th According to this solution, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Accordingly, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the evaporation heat exchanger (104).
[0072]
the above 17th According to this solution, the frost of the evaporating heat exchanger (104) can be reliably secured in a short time by sending the air heated in advance by the condensing heat exchanger (102) to the evaporating heat exchanger (104). Can be melted into Therefore, according to this solution, the defrosting of the evaporating heat exchanger (104) can be performed reliably, and further, the time required for the defrosting operation can be shortened.
[0073]
Moreover, according to this solution, during the defrost operation, not only the defrost of the evaporating heat exchanger (104) but also the indoor ventilation can be performed. Furthermore, according to this solution, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Accordingly, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the evaporation heat exchanger (104).
[0074]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the following description, “top”, “bottom”, “left”, “right”, “front”, “rear”, “front”, and “back” all mean those in the referenced drawings.
[0075]
The humidity control apparatus according to the present embodiment is configured to switch between a dehumidifying operation in which dehumidified air is supplied into the room and a humidifying operation in which humidified air is supplied into the room. The humidity control apparatus includes a refrigerant circuit (100) and two adsorbing elements (81, 82), and is configured to perform a so-called batch operation. Here, the configuration of the humidity control apparatus according to the present embodiment will be described with reference to FIGS. 1, 5, 6, and 7.
[0076]
<Overall configuration of humidity control device>
As shown in FIGS. 1 and 5, the humidity control apparatus includes a somewhat flat rectangular parallelepiped casing (10). In the casing (10), two adsorbing elements (81, 82) and a refrigerant circuit (100) are accommodated. The refrigerant circuit (100) is provided with a regenerative heat exchanger (102), a first heat exchanger (103), and a second heat exchanger (104). Details of the refrigerant circuit (100) will be described later.
[0077]
As shown in FIG. 6, the adsorption element (81 82) is configured by alternately laminating flat plate members (83) and corrugated corrugated plate members (84). The flat plate member (83) has a long side length L. 1 Is the length L of the short side 2 It is formed in a rectangular shape that is 2.5 times as large as. That is, in this flat plate member (83), L 1 / L 2 = 2.5. The numerical values shown here are merely examples. The corrugated plate members (84) are laminated so that the ridge line directions of the adjacent corrugated plate members (84) are shifted from each other by 90 °. And the adsorption | suction element (81,82) is formed in the rectangular parallelepiped shape thru | or square column shape as a whole.
[0078]
In the adhering element (81 82), the humidity adjusting side passageway (85) and the cooling side passageway (86) in the stacking direction of the flat plate member (83) and the corrugated plate member (84) are connected to the flat plate member (83). The sections are alternately formed with a sandwich. In this adsorption element (81, 82), the humidity adjusting side passageway (85) opens on the long side surface of the flat plate member (83), and the cooling side passageway (86) on the short side surface of the flat plate member (83). ) Is open. Further, in this adsorption element (81, 82), the front and back end faces in the figure constitute a closed surface where neither the humidity adjustment side passage (85) nor the cooling side passage (86) opens. .
[0079]
In the adsorption element (81, 82), on the surface of the flat plate member (83) facing the humidity adjustment side passage (85) and on the surface of the corrugated plate member (84) provided in the humidity adjustment side passage (85), An adsorbent for adsorbing water vapor is applied. Examples of this type of adsorbent include silica gel, zeolite, ion exchange resin and the like.
[0080]
As shown in FIG. 1, in the casing (10), an outdoor side panel (11) is provided on the foremost side, and an indoor side panel (12) is provided on the innermost side. In the outdoor panel (11), an outdoor suction port (13) is formed near the left end, and an outdoor air outlet (16) is formed near the right end. On the other hand, the indoor side panel (12) is formed with an indoor outlet (14) near the left end and an indoor suction port (15) near the right end.
[0081]
Inside the casing (10), a first partition plate (20) and a second partition plate (30) are provided in order from the near side to the back side. The internal space of the casing (10) is partitioned forward and backward by these first and second partition plates (20, 30).
[0082]
The space between the outdoor panel (11) and the first partition plate (20) is partitioned into an upper outdoor upper channel (41) and a lower outdoor lower channel (42). The outdoor upper channel (41) communicates with the outdoor space through the outdoor air outlet (16). The outdoor lower channel (42) communicates with the outdoor space through the outdoor suction port (13).
[0083]
In the space between the outdoor panel (11) and the first partition plate (20), an exhaust fan (96) is installed near the right end. A second heat exchanger (104) is installed in the outdoor upper flow path (41). The second heat exchanger (104) constitutes an evaporation heat exchanger. Specifically, the second heat exchanger (104) is a so-called cross fin type fin-and-tube heat exchanger, and flows through the outdoor upper channel (41) toward the exhaust fan (96). Heat is exchanged between the air and the refrigerant in the refrigerant circuit (100). That is, the second heat exchanger (104) is for exchanging heat between the air discharged outside and the refrigerant.
[0084]
The first partition plate (20) includes a first right opening (21), a first left opening (22), a first upper right opening (23), a first lower right opening (24), and a first upper left opening (25). And a first lower left opening (26). Each of these openings (21, 22,...) Includes an opening / closing shutter and is configured to be freely opened and closed.
[0085]
The first right opening (21) and the first left opening (22) are vertically long rectangular openings. The first right opening (21) is provided in the vicinity of the right end of the first partition plate (20). The first left opening (22) is provided in the vicinity of the left end of the first partition plate (20). The first upper right opening (23), the first lower right opening (24), the first upper left opening (25), and the first lower left opening (26) are horizontally long rectangular openings. The first upper right opening (23) is provided to the left of the first right opening (21) in the upper part of the first partition plate (20). The first lower right opening (24) is provided to the left of the first right opening (21) in the lower part of the first partition plate (20). The first upper left opening (25) is provided right next to the first left opening (22) in the upper part of the first partition plate (20). The first lower left opening (26) is provided right next to the first left opening (22) in the lower part of the first partition plate (20).
[0086]
Between the first partition plate (20) and the second partition plate (30), two adsorption elements (81, 82) are installed. These adsorbing elements (81, 82) are arranged in a state where they are arranged on the left and right sides at a predetermined interval. Specifically, the first adsorption element (81) is provided on the right side, and the second adsorption element (82) is provided on the left side.
[0087]
In the first and second adsorption elements (81, 82), the laminating direction of the flat plate member (83) and the corrugated plate member (84) is the longitudinal direction of the casing (10) (the direction from the front to the back in FIG. 1). And the stacking directions of the flat plate members (83) and the like in each of them are installed so as to be parallel to each other. Further, each adsorption element (81, 82) has a side plate on the left and right sides, a top plate and a bottom plate on the casing (10) on the left and right sides, and an outdoor panel (11) and a chamber on the front and rear sides. The inner panel (12) is arranged so as to be substantially parallel to each other.
[0088]
In each adsorption element (81, 82) installed in the casing (10), the cooling side passageway (86) is opened on the left and right side surfaces. That is, one side surface of the first adsorption element (81) where the cooling side passageway (86) opens and one side surface of the second adsorption element (82) where the cooling side passageway (86) opens face each other. Yes.
[0089]
The space between the first partition plate (20) and the second partition plate (30) is the right channel (51), left channel (52), upper right channel (53), lower right channel (54), left The upper channel (55), the lower left channel (56), and the central channel (57) are partitioned.
[0090]
The right channel (51) is formed on the right side of the first adsorption element (81) and communicates with the cooling side passage (86) of the first adsorption element (81). The left channel (52) is formed on the left side of the second adsorption element (82) and communicates with the cooling side passage (86) of the second adsorption element (82).
[0091]
The upper right channel (53) is formed on the upper side of the first adsorption element (81) and communicates with the humidity adjustment side passageway (85) of the first adsorption element (81). The lower right flow path (54) is formed below the first adsorption element (81) and communicates with the humidity adjusting side passageway (85) of the first adsorption element (81). The upper left channel (55) is formed on the upper side of the second adsorption element (82) and communicates with the humidity adjusting side passageway (85) of the second adsorption element (82). The lower left channel (56) is formed below the second adsorption element (82) and communicates with the humidity adjustment side passageway (85) of the second adsorption element (82).
[0092]
The central flow path (57) is formed between the first adsorption element (81) and the second adsorption element (82) and communicates with the cooling side passageway (86) of both adsorption elements (81, 82). The central channel (57) has a quadrangular channel cross-sectional shape appearing in FIGS.
[0093]
The regenerative heat exchanger (102) constitutes a heat exchanger for condensation. Specifically, the regenerative heat exchanger (102) is a so-called cross-fin type fin-and-tube heat exchanger, which is configured to connect the air flowing through the central flow path (57) and the refrigerant in the refrigerant circuit (100). It is configured to exchange heat. The regenerative heat exchanger (102) is installed in the central flow path (57). Further, the regenerative heat exchanger (102) is arranged so as to divide the central flow path (57) up and down in a posture lying almost horizontally. Further, the regenerative heat exchanger (102) is arranged such that the upper surface thereof is slightly below the lower surfaces of the first and second adsorption elements (81, 82).
[0094]
Between the first adsorbing element (81) and the second adsorbing element (82) arranged side by side, a lower right shutter (61), a lower left shutter (62), an upper right shutter (63), an upper left shutter (64), And a central shutter (65). These shutters (61, 62,...) Are configured to be openable and closable.
[0095]
The lower right shutter (61) is installed on the right side of the regenerative heat exchanger (102) and below the first adsorption element (81), and below the regenerative heat exchanger (102) in the central flow path (57). The part and the lower right channel (54) are partitioned off. The lower left shutter (62) is installed on the left side of the regenerative heat exchanger (102) and below the second adsorption element (82), and the lower part of the regenerative heat exchanger (102) in the central flow path (57). And the lower left channel (56).
[0096]
The upper right shutter (63) extends leftward from the upper end of the left side surface of the first adsorption element (81) and is installed so as to cover the right half of the regenerative heat exchanger. The upper right shutter (63) partitions the upper portion of the regenerative heat exchanger (102) in the central flow path (57) from the upper right flow path (53). The upper left shutter (64) extends rightward from the upper end of the right side surface of the second adsorption element (82) and is installed so as to cover the left half of the regenerative heat exchanger. The upper left shutter (64) partitions the upper portion of the regenerative heat exchanger (102) in the central flow path (57) and the upper left flow path (55). The central shutter (65) is installed in a posture extending upward from the left end of the upper right shutter (63) and the right end of the upper left shutter (64), and partitions the upper right channel (53) and the upper left channel (55). Yes.
[0097]
The flow path (41, 42) between the outdoor panel (11) and the first partition plate (20), and the flow path (51, 52) between the first partition plate (20) and the second partition plate (30) ,... Is switched between a communication state and a blocking state by an open / close shutter provided in the opening (21, 22,...) Of the first partition plate (20). Specifically, when the first right opening (21) is in the open state, the right channel (51) and the outdoor lower channel (42) communicate with each other. When the first left opening (22) is in the open state, the left channel (52) and the outdoor lower channel (42) communicate with each other. When the first upper right opening (23) is in the open state, the upper right channel (53) communicates with the outdoor upper channel (41). When the first lower right opening (24) is in the open state, the lower right flow path (54) and the outdoor lower flow path (42) communicate with each other. When the first upper left opening (25) is in the open state, the upper left channel (55) and the outdoor upper channel (41) communicate with each other. When the first lower left opening (26) is in the open state, the lower left flow path (56) and the outdoor lower flow path (42) communicate with each other.
[0098]
The second partition plate (30) includes a second right opening (31), a second left opening (32), a second upper right opening (33), a second lower right opening (34), and a second upper left opening (35). And a second lower left opening (36). Each of these openings (31, 32,...) Includes an open / close shutter and is configured to be freely opened and closed.
[0099]
The second right side opening (31) and the second left side opening (32) are vertically long rectangular openings. The second right opening (31) is provided in the vicinity of the right end of the second partition plate (30). The second left opening (32) is provided near the left end of the second partition plate (30). The second upper right opening (33), the second lower right opening (34), the second upper left opening (35), and the second lower left opening (36) are horizontally long rectangular openings. The second upper right opening (33) is provided on the left side of the second right opening (31) in the upper part of the second partition plate (30). The second lower right opening (34) is provided to the left of the second right opening (31) in the lower part of the second partition plate (30). The second upper left opening (35) is provided right next to the second left opening (32) in the upper part of the second partition plate (30). The second lower left opening (36) is provided right next to the second left opening (32) in the lower part of the second partition plate (30).
[0100]
A space between the indoor side panel (12) and the second partition plate (30) is partitioned into an upper indoor side upper flow path (46) and a lower indoor side lower flow path (47). The indoor side upper flow path (46) communicates with the indoor space through the indoor side air outlet (14). The indoor side lower flow path (47) is communicated with the indoor space by the indoor side suction port (15).
[0101]
In the space between the indoor side panel (12) and the second partition plate (30), an air supply fan (95) is installed near the left end. Further, the first heat exchanger (103) is installed in the indoor-side upper flow path (46). The first heat exchanger (103) is a so-called cross fin type fin-and-tube heat exchanger, and air and a refrigerant circuit flowing through the indoor upper flow path (46) toward the air supply fan (95). (100) refrigerant is configured to exchange heat. That is, the first heat exchanger (103) is for exchanging heat between the air supplied to the room and the refrigerant.
[0102]
The flow path between the first partition plate (20) and the second partition plate (30) and the flow path between the second partition plate (30) and the outdoor panel (11) are the second partition plate (30 The open / close shutter provided in the opening) is switched between a communication state and a cutoff state. Specifically, when the second right opening (31) is in the open state, the right channel (51) and the indoor lower channel (47) communicate with each other. When the second left side opening (32) is in the open state, the left side channel (52) and the indoor side lower channel (47) communicate with each other. When the second upper right opening (33) is in the open state, the upper right channel (53) communicates with the indoor upper channel (46). When the second lower right opening (34) is in the open state, the lower right channel (54) and the indoor lower channel (47) communicate with each other. When the second upper left opening (35) is in the open state, the upper left channel (55) and the indoor upper channel (46) communicate with each other. When the second lower left opening (36) is in the open state, the lower left flow path (56) and the indoor lower flow path (47) communicate with each other.
[0103]
<Configuration of refrigerant circuit>
As shown in FIG. 7, the refrigerant circuit (100) is a closed circuit filled with a refrigerant. The refrigerant circuit (100) includes a compressor (101), a regenerative heat exchanger (102), a first heat exchanger (103), a second heat exchanger (104), a receiver (105), a four-way switching valve (120 ), And an electric expansion valve (110). In the refrigerant circuit (100), a vapor compression refrigeration cycle is performed by circulating the refrigerant.
[0104]
In the refrigerant circuit (100), the discharge side of the compressor (101) is connected to one end of the regenerative heat exchanger (102). The other end of the regenerative heat exchanger (102) is connected to one end of the electric expansion valve (110) via the receiver (105). The other end of the electric expansion valve (110) is connected to the first port (121) of the four-way switching valve (120). The four-way switching valve (120) has a second port (122) connected to one end of the second heat exchanger (104), and a fourth port (124) connected to one end of the first heat exchanger (103). It is connected. The third port (123) of the four-way switching valve (120) is sealed. The other end of the first heat exchanger (103) and the other end of the second heat exchanger (104) are each connected to the suction side of the compressor (101).
[0105]
The four-way switching valve (120) includes a state in which the first port (121) and the second port (122) communicate with each other and the third port (123) and the fourth port (124) communicate with each other, 121) and the fourth port (124) communicate with each other, and the second port (122) and the third port (123) communicate with each other. As described above, the third port (123) of the four-way switching valve (120) is closed. That is, in the refrigerant circuit (100) of the present embodiment, the four-way switching valve (120) is used as a three-way valve. Therefore, in this refrigerant circuit (100), a three-way valve may be used instead of the four-way switching valve (120).
[0106]
-Driving action-
The operation of the humidity control apparatus will be described. This humidity control apparatus switches between a dehumidifying operation and a humidifying operation. In addition, the humidity control apparatus performs the dehumidifying operation and the humidifying operation by alternately repeating the first operation and the second operation. Furthermore, the humidity controller performs a defrost operation when a certain amount of frost adheres to the second heat exchanger (104) during the humidification operation.
[0107]
《Dehumidification operation》
As shown in FIGS. 1 and 2, when the air supply fan (95) is driven during the dehumidifying operation, outdoor air is taken into the casing (10) through the outdoor suction port (13). This outdoor air flows into the outdoor lower flow path (42) as the first air. On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). This room air flows into the indoor side lower flow path (47) as the second air.
[0108]
In the dehumidifying operation, in the refrigerant circuit (100), the regenerative heat exchanger (102) serves as a condenser, the first heat exchanger (103) serves as an evaporator, and the second heat exchanger (104) serves as an evaporator. Paused. The operation of the refrigerant circuit (100) will be described later.
[0109]
The first operation of the dehumidifying operation will be described with reference to FIGS. In the first operation, an adsorption operation for the first adsorption element (81) and a regeneration operation for the second adsorption element (82) are performed. That is, in the first operation, air is dehumidified by the first adsorption element (81) and at the same time, the adsorbent of the second adsorption element (82) is regenerated.
[0110]
As shown in FIG. 1, in the first partition plate (20), the first lower right opening (24) and the first upper left opening (25) are in communication, and the remaining openings (21, 22, 23, 26). Is cut off. In this state, the outdoor lower channel (42) and the lower right channel (54) are communicated with each other by the first lower right opening (24), and the upper left channel (55) and the outdoor side are communicated by the first upper left opening (25). The upper channel (41) communicates with the upper channel (41).
[0111]
In the second partition plate (30), the second right opening (31) and the second upper right opening (33) are in communication with each other, and the remaining openings (32, 34, 35, 36) are in a blocking state. In this state, the indoor lower flow channel (47) and the right flow channel (51) are communicated with each other by the second right opening (31), and the upper right flow channel (53) and the indoor upper portion are communicated by the second upper right opening (33). The flow path (46) is in communication.
[0112]
The lower right shutter (61) is in a closed state, and the lower left shutter (62) is in an open state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) and the lower left channel (56) communicate with each other via the lower left shutter (62). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0113]
The first air taken into the casing (10) flows from the outdoor lower flow path (42) into the lower right flow path (54) through the first lower right opening (24). On the other hand, the second air taken into the casing (10) flows into the right channel (51) from the indoor lower channel (47) through the second right opening (31).
[0114]
As shown in FIG. 5 (a), the first air in the lower right channel (54) flows into the humidity control side passageway (85) of the first adsorption element (81). While flowing through the humidity adjusting side passageway (85), water vapor contained in the first air is adsorbed by the adsorbent. The first air dehumidified by the first adsorption element (81) flows into the upper right channel (53).
[0115]
On the other hand, the second air in the right channel (51) flows into the cooling side passage (86) of the first adsorption element (81). While flowing through the cooling side passage (86), the second air absorbs heat of adsorption generated when water vapor is adsorbed by the adsorbent in the humidity adjustment side passage (85). That is, the second air flows through the cooling side passage (86) as a cooling fluid. The second air deprived of heat of adsorption flows into the central flow path (57) and passes through the regenerative heat exchanger (102). At that time, in the regenerative heat exchanger (102), the second air is heated by heat exchange with the refrigerant. Thereafter, the second air flows from the central channel (57) into the lower left channel (56).
[0116]
The second air heated by the first adsorption element (81) and the regenerative heat exchanger (102) is introduced into the humidity adjustment side passageway (85) of the second adsorption element (82). In the humidity adjusting passage (85), the adsorbent is heated by the second air, and water vapor is desorbed from the adsorbent. That is, the regeneration of the second adsorption element (82) is performed. The water vapor desorbed from the adsorbent flows into the upper left channel (55) together with the second air.
[0117]
As shown in FIG. 1, the dehumidified first air that has flowed into the upper right channel (53) is sent to the indoor upper channel (46) through the second upper right opening (33). The first air passes through the first heat exchanger (103) while flowing through the indoor upper flow path (46), and is cooled by heat exchange with the refrigerant. Thereafter, the dehumidified and cooled first air is supplied into the room through the indoor air outlet (14).
[0118]
On the other hand, the second air flowing into the upper left channel (55) flows into the outdoor upper channel (41) through the first upper left opening (25). The second air passes through the second heat exchanger (104) while flowing through the outdoor upper flow path (41). At that time, the second heat exchanger (104) is at rest, and the second air is neither heated nor cooled. And the 2nd air utilized for the cooling of the 1st adsorption | suction element (81) and the reproduction | regeneration of the 2nd adsorption | suction element (82) is discharged | emitted outside through an outdoor side blower outlet (16).
[0119]
The second operation of the dehumidifying operation will be described with reference to FIGS. In the second operation, contrary to the first operation, an adsorption operation for the second adsorption element (82) and a regeneration operation for the first adsorption element (81) are performed. That is, in the second operation, air is dehumidified by the second adsorption element (82), and at the same time, the adsorbent of the first adsorption element (81) is regenerated.
[0120]
As shown in FIG. 2, in the first partition plate (20), the first upper right opening (23) and the first lower left opening (26) are in communication, and the remaining openings (21, 22, 24, 25) are in communication. Blocked state. In this state, the upper right channel (53) communicates with the outdoor upper channel (41) by the first upper right opening (23), and the outdoor lower channel (42) and the left channel by the first lower left opening (26). The lower flow path (56) communicates with the lower flow path (56).
[0121]
In the second partition plate (30), the second left opening (32) and the second upper left opening (35) are in communication, and the remaining openings (31, 33, 34, 36) are in a blocking state. In this state, the lower left channel (47) and the left channel (52) communicate with each other by the second left opening (32), and the upper left channel (55) and the upper indoor side by the second upper left opening (35). The flow path (46) is in communication.
[0122]
The lower left shutter (62) is in a closed state, and the lower right shutter (61) is in an open state. In this state, the lower part of the regenerative heat exchanger (102) in the central flow path (57) and the lower right flow path (54) communicate with each other via the lower right shutter (61). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0123]
The first air taken into the casing (10) flows from the outdoor lower flow path (42) through the first lower left opening (26) to the lower left flow path (56). On the other hand, the second air taken into the casing (10) flows into the left channel (52) from the indoor lower channel (47) through the second left opening (32).
[0124]
As shown also in FIG.5 (b), the 1st air of a lower left flow path (56) flows in into the humidity control side channel | path (85) of a 2nd adsorption | suction element (82). While flowing through the humidity adjusting side passageway (85), water vapor contained in the first air is adsorbed by the adsorbent. The first air dehumidified by the second adsorption element (82) flows into the upper left flow path (55).
[0125]
On the other hand, the second air in the left channel (52) flows into the cooling side passage (86) of the second adsorption element (82). While flowing through the cooling side passage (86), the second air absorbs heat of adsorption generated when water vapor is adsorbed by the adsorbent in the humidity adjustment side passage (85). That is, the second air flows through the cooling side passage (86) as a cooling fluid. The second air deprived of heat of adsorption flows into the central flow path (57) and passes through the regenerative heat exchanger (102). At that time, in the regenerative heat exchanger (102), the second air is heated by heat exchange with the refrigerant. Thereafter, the second air flows from the central channel (57) into the lower right channel (54).
[0126]
The second air heated by the second adsorption element (82) and the regenerative heat exchanger (102) is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). In the humidity adjusting passage (85), the adsorbent is heated by the second air, and water vapor is desorbed from the adsorbent. That is, the regeneration of the first adsorption element (81) is performed. The water vapor desorbed from the adsorbent flows into the upper right channel (53) together with the second air.
[0127]
As shown in FIG. 2, the dehumidified first air flowing into the upper left channel (55) is sent to the indoor upper channel (46) through the second upper left opening (35). The first air passes through the first heat exchanger (103) while flowing through the indoor upper flow path (46), and is cooled by heat exchange with the refrigerant. Thereafter, the dehumidified and cooled first air is supplied into the room through the indoor air outlet (14).
[0128]
On the other hand, the second air flowing into the upper right channel (53) flows into the outdoor upper channel (41) through the first upper right opening (23). The second air passes through the second heat exchanger (104) while flowing through the outdoor upper flow path (41). At that time, the second heat exchanger (104) is at rest, and the second air is neither heated nor cooled. Then, the second air used for cooling the second adsorbing element (82) and regenerating the first adsorbing element (81) is discharged to the outside through the outdoor air outlet (16).
[0129]
《Humidification operation》
As shown in FIGS. 3 and 4, when the air supply fan (95) is driven during the humidifying operation, outdoor air is taken into the casing (10) through the outdoor suction port (13). This outdoor air flows into the outdoor lower flow path (42) as the second air. On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). This room air flows into the indoor side lower flow path (47) as the first air.
[0130]
In the humidifying operation, in the refrigerant circuit (100), the regenerative heat exchanger (102) serves as a condenser, the second heat exchanger (104) serves as an evaporator, and the first heat exchanger (103) serves as an evaporator. Paused. The operation of the refrigerant circuit (100) will be described later.
[0131]
The first operation of the humidifying operation will be described with reference to FIGS. In the first operation, an adsorption operation for the first adsorption element (81) and a regeneration operation for the second adsorption element (82) are performed. That is, in the first operation, air is humidified by the second adsorption element (82), and the adsorbent of the first adsorption element (81) adsorbs water vapor.
[0132]
As shown in FIG. 3, in the first partition plate (20), the first right opening (21) and the first upper right opening (23) are in communication with each other, and the remaining openings (22, 24, 25, 26) are connected. Blocked state. In this state, the outdoor lower channel (42) and the right channel (51) are communicated with each other by the first right opening (21), and the upper right channel (53) and the upper outdoor portion are communicated by the first upper right opening (23). The flow path (41) is in communication.
[0133]
In the second partition plate (30), the second lower right opening (34) and the second upper left opening (35) are in communication, and the remaining openings (31, 32, 33, 36) are in a blocked state. . In this state, the indoor lower flow path (47) and the lower right flow path (54) are communicated with each other by the second lower right opening (34), and the upper left flow path (55) and the indoor side are communicated by the second upper left opening (35). The upper channel (46) communicates with the upper channel (46).
[0134]
The lower right shutter (61) is in a closed state, and the lower left shutter (62) is in an open state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) and the lower left channel (56) communicate with each other via the lower left shutter (62). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0135]
The first air taken into the casing (10) flows from the indoor lower flow path (47) through the second lower right opening (34) to the lower right flow path (54). On the other hand, the second air taken into the casing (10) flows from the outdoor lower flow path (42) through the first right opening (21) into the right flow path (51).
[0136]
As shown in FIG. 5 (a), the first air in the lower right channel (54) flows into the humidity control side passageway (85) of the first adsorption element (81). While flowing through the humidity adjusting side passageway (85), water vapor contained in the first air is adsorbed by the adsorbent. The first air deprived of moisture by the first adsorption element (81) flows into the upper right channel (53).
[0137]
On the other hand, the second air in the right channel (51) flows into the cooling side passage (86) of the first adsorption element (81). While flowing through the cooling side passage (86), the second air absorbs heat of adsorption generated when water vapor is adsorbed by the adsorbent in the humidity adjustment side passage (85). That is, the second air flows through the cooling side passage (86) as a cooling fluid. The second air deprived of heat of adsorption flows into the central flow path (57) and passes through the regenerative heat exchanger (102). At that time, in the regenerative heat exchanger (102), the second air is heated by heat exchange with the refrigerant. Thereafter, the second air flows from the central channel (57) into the lower left channel (56).
[0138]
The second air heated by the first adsorption element (81) and the regenerative heat exchanger (102) is introduced into the humidity adjustment side passageway (85) of the second adsorption element (82). In the humidity adjusting passage (85), the adsorbent is heated by the second air, and water vapor is desorbed from the adsorbent. That is, the regeneration of the second adsorption element (82) is performed. Then, water vapor desorbed from the adsorbent is applied to the second air, and the second air is humidified. The second air humidified by the second adsorption element (82) then flows into the upper left channel (55).
[0139]
As shown in FIG. 3, the second air flowing into the upper left channel (55) flows into the indoor upper channel (46) through the second upper left opening (35). The second air passes through the first heat exchanger (103) while flowing through the indoor-side upper flow path (46). At that time, the first heat exchanger (103) is at rest, and the second air is neither heated nor cooled. Then, the humidified second air is supplied into the room through the indoor outlet (14).
[0140]
On the other hand, the first air that has flowed into the upper right channel (53) is sent to the outdoor upper channel (41) through the first upper right opening (23). The first air passes through the second heat exchanger (104) while flowing through the outdoor upper flow path (41), and is cooled by heat exchange with the refrigerant. Thereafter, the first air deprived of moisture and heat is discharged to the outside through the outdoor air outlet (16).
[0141]
The second operation of the humidifying operation will be described with reference to FIGS. In the second operation, contrary to the first operation, an adsorption operation for the second adsorption element (82) and a regeneration operation for the first adsorption element (81) are performed. That is, in this second operation, air is humidified by the first adsorption element (81), and the adsorbent of the second adsorption element (82) adsorbs water vapor.
[0142]
As shown in FIG. 4, in the first partition plate (20), the first left opening (22) and the first upper left opening (25) are in communication with each other, and the remaining openings (21, 23, 24, 26) are connected. Blocked state. In this state, the outdoor lower channel (42) and the left channel (52) are communicated with each other by the first left opening (22), and the upper left channel (55) and the outdoor upper channel are communicated by the first upper left opening (25). The flow path (41) is in communication.
[0143]
In the second partition plate (30), the second upper right opening (33) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 34, 35) are in a blocked state. In this state, the upper right channel (53) communicates with the indoor upper channel (46) by the second upper right opening (33), and the indoor lower channel (47) and the left channel by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0144]
The lower left shutter (62) is in a closed state, and the lower right shutter (61) is in an open state. In this state, the lower part of the regenerative heat exchanger (102) in the central flow path (57) and the lower right flow path (54) communicate with each other via the lower right shutter (61). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0145]
The first air taken into the casing (10) flows from the indoor lower channel (47) through the second lower left opening (36) to the lower left channel (56). On the other hand, the second air taken into the casing (10) flows from the outdoor lower flow path (42) through the first left opening (22) into the left flow path (52).
[0146]
As shown also in FIG.5 (b), the 1st air of a lower left flow path (56) flows in into the humidity control side channel | path (85) of a 2nd adsorption | suction element (82). While flowing through the humidity adjusting side passageway (85), water vapor contained in the first air is adsorbed by the adsorbent. The first air deprived of moisture by the second adsorption element (82) flows into the upper left channel (55).
[0147]
On the other hand, the second air in the left channel (52) flows into the cooling side passage (86) of the second adsorption element (82). While flowing through the cooling side passage (86), the second air absorbs heat of adsorption generated when water vapor is adsorbed by the adsorbent in the humidity adjustment side passage (85). That is, the second air flows through the cooling side passage (86) as a cooling fluid. The second air deprived of heat of adsorption flows into the central flow path (57) and passes through the regenerative heat exchanger (102). At that time, in the regenerative heat exchanger (102), the second air is heated by heat exchange with the refrigerant. Thereafter, the second air flows from the central channel (57) into the lower right channel (54).
[0148]
The second air heated by the second adsorption element (82) and the regenerative heat exchanger (102) is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). In the humidity adjusting passage (85), the adsorbent is heated by the second air, and water vapor is desorbed from the adsorbent. That is, the regeneration of the first adsorption element (81) is performed. Then, water vapor desorbed from the adsorbent is applied to the second air, and the second air is humidified. The second air humidified by the first adsorption element (81) then flows into the upper right channel (53).
[0149]
As shown in FIG. 4, the second air that has flowed into the upper right channel (53) flows into the indoor upper channel (46) through the second upper right opening (33). The second air passes through the first heat exchanger (103) while flowing through the indoor-side upper flow path (46). At that time, the first heat exchanger (103) is at rest, and the second air is neither heated nor cooled. Then, the humidified second air is supplied into the room through the indoor outlet (14).
[0150]
On the other hand, the first air that has flowed into the upper left channel (55) is sent to the outdoor upper channel (41) through the first upper left opening (25). The first air passes through the second heat exchanger (104) while flowing through the outdoor upper flow path (41), and is cooled by heat exchange with the refrigerant. Thereafter, the first air deprived of moisture and heat is discharged to the outside through the outdoor air outlet (16).
[0151]
<Operation of refrigerant circuit>
The operation of the refrigerant circuit (100) will be described with reference to FIGS.
[0152]
First, the operation during the dehumidifying operation will be described. During the dehumidifying operation, the four-way switching valve (120) has a state in which the first port (121) and the fourth port (124) communicate with each other and the second port (122) and the third port (123) communicate with each other. Become. Further, the opening degree of the electric expansion valve (110) is appropriately adjusted according to the operating conditions.
[0153]
When the compressor (101) is operated in this state, the refrigerant circulates in the refrigerant circuit (100) to perform a refrigeration cycle. At that time, in the refrigerant circuit (100), the regenerative heat exchanger (102) serves as a condenser, the first heat exchanger (103) serves as an evaporator, and the second heat exchanger (104) enters a dormant state (FIG. 8).
[0154]
Specifically, the refrigerant discharged from the compressor (101) is sent to the regenerative heat exchanger (102). The refrigerant flowing into the regenerative heat exchanger (102) performs heat exchange with the second air, dissipates heat to the second air, and condenses. The refrigerant condensed in the regenerative heat exchanger (102) is sent to the electric expansion valve (110) through the receiver (105). This refrigerant is decompressed when passing through the electric expansion valve (110). The refrigerant decompressed by the electric expansion valve (110) is sent to the first heat exchanger (103) through the four-way switching valve (120). The refrigerant flowing into the first heat exchanger (103) exchanges heat with the first air, absorbs heat from the first air, and evaporates. The refrigerant evaporated in the first heat exchanger (103) is sucked into the compressor (101) and compressed, and then discharged from the compressor (101).
[0155]
Next, the operation during the humidifying operation will be described. During the humidifying operation, the four-way selector valve (120) is in a state where the first port (121) and the second port (122) communicate with each other and the third port (123) and the fourth port (124) communicate with each other. Become. Further, the opening degree of the electric expansion valve (110) is appropriately adjusted according to the operating conditions.
[0156]
When the compressor (101) is operated in this state, the refrigerant circulates in the refrigerant circuit (100) to perform a refrigeration cycle. At that time, in the refrigerant circuit (100), the regenerative heat exchanger (102) serves as a condenser, the second heat exchanger (104) serves as an evaporator, and the first heat exchanger (103) enters a dormant state (FIG. 9).
[0157]
Specifically, the refrigerant discharged from the compressor (101) is sent to the regenerative heat exchanger (102). The refrigerant flowing into the regenerative heat exchanger (102) performs heat exchange with the second air, dissipates heat to the second air, and condenses. The refrigerant condensed in the regenerative heat exchanger (102) is sent to the electric expansion valve (110) through the receiver (105). This refrigerant is decompressed when passing through the electric expansion valve (110). The refrigerant decompressed by the electric expansion valve (110) is sent to the second heat exchanger (104) through the four-way switching valve (120). The refrigerant flowing into the second heat exchanger (104) exchanges heat with the first air, absorbs heat from the first air, and evaporates. The refrigerant evaporated in the second heat exchanger (104) is sucked into the compressor (101) and compressed, and then discharged from the compressor (101).
[0158]
《Defrost operation》
As described above, the humidity control apparatus of the present embodiment performs the defrost operation when a certain amount of frost adheres to the second heat exchanger (104) during the humidification operation. This defrost operation may be performed periodically every predetermined time, or the amount of frost attached to the second heat exchanger (104) is detected or estimated by some method, and the amount of frost attached is more than a certain amount. You may go if you reach.
[0159]
Here, during the humidification operation, the first air dehumidified by the first or second adsorption element (81 82) is sent to the second heat exchanger (104) functioning as an evaporator (FIG. 9). reference). The first air sent to the second heat exchanger (104) exchanges heat with the second air by the adsorption elements (81, 82). On the other hand, the humidifying operation is usually performed in the winter season when the room is heated, and the second air composed of outdoor air is at a low temperature. When the temperature of the second air sent to the adsorption element (81, 82) (that is, the outside air temperature) becomes low, the temperature of the first air sent from the adsorption element (81, 82) to the second heat exchanger (104) also becomes low. Become.
[0160]
If the temperature of the 1st air which heat-exchanges with a refrigerant | coolant with a 2nd heat exchanger (104) falls, the refrigerant | coolant evaporation temperature in a 2nd heat exchanger (104) will have to be set low accordingly. And if it will be in the state where the refrigerant | coolant evaporation temperature in a 2nd heat exchanger (104) will be less than 0 degreeC, frost will adhere to the surface of a 2nd heat exchanger (104). When frost adheres to the second heat exchanger (104), heat exchange between the refrigerant and the first air is hindered by the frost, and further, ventilation resistance in the second heat exchanger (104) increases. Therefore, the humidity control apparatus temporarily stops the humidification operation, and performs the defrost operation in order to melt the frost of the second heat exchanger (104).
[0161]
The operation of the humidity control apparatus during the defrosting operation will be described with reference to FIGS.
[0162]
As shown in FIG. 10, in the first partition plate (20), the first left opening (22) and the first upper left opening (25) are in communication with each other, and the remaining openings (21, 23, 24, 26) are connected. Blocked state. In this state, the outdoor lower channel (42) and the left channel (52) are communicated with each other by the first left opening (22), and the upper left channel (55) and the outdoor upper channel are communicated by the first upper left opening (25). The flow path (41) is in communication.
[0163]
In the second partition plate (30), the second upper right opening (33) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 34, 35) are in a blocked state. In this state, the upper right channel (53) communicates with the indoor upper channel (46) by the second upper right opening (33), and the indoor lower channel (47) and the left channel by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0164]
The lower left shutter (62) and the lower right shutter (61) are both open. In this state, the lower part of the regenerative heat exchanger (102) in the central flow path (57) communicates with the lower right flow path (54) via the lower right shutter (61) and passes through the lower left shutter (62). And communicated with the lower left channel (56). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0165]
In this state, when the air supply fan (95) and the exhaust fan (96) are driven, outdoor air is taken into the casing (10) through the outdoor suction port (13), and indoor air is taken into the indoor suction port (15). Through the casing (10). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is appropriately set, and the flow rate of the outdoor air flowing into the casing (10) is determined from the flow rate of the indoor air flowing into the casing (10). Has also increased.
[0166]
As shown in FIG. 11, the outdoor air taken into the casing (10) flows into the cooling side passageway (86) of the second adsorption element (82). The outdoor air that has come out of the second adsorption element (82) is heated when passing through the regenerative heat exchanger (102), and then divided into two hands. One of the diverted outdoor air passes through the lower right shutter (61) and is sent to the first adsorption element (81), and the rest passes through the lower left shutter (62) and sent to the second adsorption element (82). .
[0167]
The outdoor air sent to the first adsorption element (81) flows into the humidity adjustment side passage (85) of the first adsorption element (81). In the humidity adjusting side passageway (85), the adsorbent is heated by the introduced outdoor air, and water vapor is desorbed from the adsorbent. Then, the water vapor desorbed from the adsorbent is given to the outdoor air, and the outdoor air is humidified. The outdoor air humidified by the first adsorbing element (81) is supplied to the room through the first heat exchanger (103) being stopped. That is, even during the defrosting operation, the air supplied to the room is humidified.
[0168]
On the other hand, the outdoor air sent to the second adsorption element (82) merges with the indoor air taken into the casing (10) in the lower left channel (56). The air in the lower left channel (56) flows into the humidity control side passage (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the air is adsorbed by the adsorbent. The air deprived of moisture by the second adsorption element (82) is sent to the second heat exchanger (104), passes through the second heat exchanger (104), and is discharged outside the room.
[0169]
As described above, during the defrost operation, the outdoor air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104) together with the indoor air. On the other hand, during the humidification operation, as described above, only the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is subjected to the second heat exchange. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0170]
In the defrost operation of the present embodiment, the states of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-out outdoor air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken-in indoor air and a part of the outdoor air heated by the regenerative heat exchanger (102) are introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). The remaining outdoor air heated by the regenerative heat exchanger (102) is introduced into the humidity control side passageway (85) of the second adsorption element (82).
[0171]
Thus, as the defrost operation performed in the humidity control apparatus of the present embodiment, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0172]
Moreover, in this defrost operation, the operation | movement which discharges the taken indoor air to the exterior is performed, but it is also possible to stop the exhaust of this indoor air. That is, during the defrost operation, only the operation of supplying a part of the taken outdoor air to the room and discharging the remaining part to the outside may be performed. In this case, however, the room is not ventilated.
[0173]
-Effect of the embodiment-
According to this embodiment, in the humidity control apparatus including the refrigerant circuit (100), even if frost formation occurs in the second heat exchanger (104), the second heat exchanger is performed by performing the defrost operation. The frost adhering to (104) can be melted. For this reason, even if the operating conditions are such that frost formation occurs in the second heat exchanger (104), if the defrost operation is performed and the frost of the second heat exchanger (104) is melted, then the humidification operation is performed. It is possible to resume. Therefore, according to this embodiment, the operation of the humidity control apparatus can be reliably continued even under such operating conditions.
[0174]
Here, the frost of the second heat exchanger (104) can be melted by changing the refrigerant circulation path in the refrigerant circuit (100), for example, so-called reverse cycle defrosting. However, in order to adopt such a measure, it is necessary to provide the refrigerant circuit (100) with a valve or the like for switching the refrigerant flow, which leads to complication of the refrigerant circuit (100).
[0175]
On the other hand, in the humidity control apparatus according to the present embodiment, the defrost operation is performed by sending air in a state different from that during the humidification operation to the second heat exchanger (104). For this reason, it becomes possible to perform a defrost operation, without changing the structure of a refrigerant circuit (100) at all. Therefore, according to the present embodiment, the defrosting operation can be performed while the configuration of the refrigerant circuit (100) is simply maintained.
[0176]
Moreover, according to this embodiment, the frost of a 2nd heat exchanger (104) can be made to send in a short time by sending the air heated with the reproduction | regeneration heat exchanger (102) previously to a 2nd heat exchanger (104). It can be melted reliably. Therefore, according to the present embodiment, the defrosting of the second heat exchanger (104) can be reliably performed, and further, the time required for the defrosting operation can be shortened.
[0177]
Further, according to the present embodiment, during the defrost operation, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed. Furthermore, according to the present embodiment, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Therefore, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the second heat exchanger (104).
[0178]
Here, in the present embodiment, the cooling side passageway (86) is formed in the adsorption element (81, 82), and the adsorption heat generated during the adsorption operation is taken away by the second air as the cooling fluid. For this reason, in the adsorption | suction element (81, 82) at the time of adsorption | suction operation | movement, it becomes possible to suppress the temperature rise of 1st air by the adsorption heat which generate | occur | produced in the humidity control side channel | path (85).
[0179]
Therefore, according to the present embodiment, it is possible to avoid the relative humidity of the first air flowing through the humidity adjusting side passageway (85) of the adsorption element (81,82) from being excessively reduced, and the adsorption element (81,82) The amount of water vapor adsorbed can be increased. And the capability improvement of a humidity control apparatus can be aimed at, without enlarging a humidity control apparatus by increasing the adsorption amount of the water | moisture content in an adsorption | suction element (81,82).
[0180]
In this embodiment, during the dehumidifying operation or the humidifying operation, the second air is first introduced as a cooling fluid into the cooling side passage (86) of the adsorption element (81, 82), and this cooling side passage (86) The 2nd air which came out from is heated with a regeneration heat exchanger (102). That is, the second air used for regeneration of the adsorption element (81, 82) is heated not only in the regeneration heat exchanger (102) but also in the cooling side passage (86) of the adsorption element (81, 82). Therefore, according to the present embodiment, the amount of heat that must be given to the second air by the regenerative heat exchanger (102) can be reduced, and the energy required for operating the humidity control device can be reduced by reducing the power consumption of the compressor (101). Can be reduced.
[0181]
In the present embodiment, the regenerative heat exchanger (102) is laid almost horizontally, and the upper surface thereof is slightly lower than the lower surfaces of the first and second adsorption elements (81, 82). Are arranged as follows. When the regenerative heat exchanger (102) is arranged in this manner, restrictions when installing the humidity control device are reduced, and usability of the humidity control device can be improved.
[0182]
That is, in the maintenance work of the humidity control apparatus, the first and second adsorption elements (81, 82) may be taken out from the casing (10). On the other hand, in the humidity control apparatus of the present embodiment, the regenerative heat exchanger (102) is disposed below the adsorption elements (81, 82). For this reason, if either one of the left and right side surfaces of the casing (10) is opened, both the adsorption elements (81, 82) can be extracted. Therefore, the humidity control apparatus can be installed even in a state in which either the left or right side surface of the casing (10) is in close contact with the wall.
[0183]
-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrosting operation of the present modification will be described with reference to FIGS.
[0184]
As shown in FIG. 12, in the first partition plate (20), the first left opening (22) and the first upper left opening (25) are in communication, and the remaining openings (21, 23, 24, 26) are in communication. Blocked state. In this state, the outdoor lower channel (42) and the left channel (52) are communicated with each other by the first left opening (22), and the upper left channel (55) and the outdoor upper channel are communicated by the first upper left opening (25). The flow path (41) is in communication.
[0185]
In the second partition plate (30), the second upper right opening (33) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 34, 35) are in a blocked state. In this state, the upper right channel (53) communicates with the indoor upper channel (46) by the second upper right opening (33), and the indoor lower channel (47) and the left channel by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0186]
The lower right shutter (61) is in an open state, and the lower left shutter (62) is in a closed state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) communicates with the lower right channel (54) via the lower right shutter (61). The central shutter (65) is in an open state, and the upper right shutter (63) and the upper left shutter (64) are in a closed state. In this state, the upper right channel (53) and the upper left channel (55) communicate with each other via the central shutter (65).
[0187]
In this state, when the air supply fan (95) and the exhaust fan (96) are driven, outdoor air is taken into the casing (10) through the outdoor suction port (13), and indoor air is taken into the indoor suction port (15). Through the casing (10). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is appropriately set, and the flow rate of the outdoor air flowing into the casing (10) is determined from the flow rate of the indoor air flowing into the casing (10). Has also increased.
[0188]
As shown in FIG. 13, the outdoor air taken into the casing (10) flows into the cooling side passageway (86) of the second adsorption element (82). The outdoor air that has exited from the second adsorption element (82) is heated when passing through the regenerative heat exchanger (102), and then introduced into the humidity control side passageway (85) of the first adsorption element (81). . In the humidity adjusting side passageway (85), the adsorbent is heated by the introduced outdoor air, and water vapor is desorbed from the adsorbent. Then, the water vapor desorbed from the adsorbent is given to the outdoor air, and the outdoor air is humidified.
[0189]
The outdoor air humidified by the first adsorption element (81) flows into the upper right channel (53). A part of the outdoor air in the upper right channel (53) flows into the upper left channel (55) through the central shutter (65), and the rest passes through the first heat exchanger (103) that is not operating. Supplied indoors. That is, even during the defrosting operation, the air supplied to the room is humidified.
[0190]
On the other hand, the indoor air taken into the casing (10) flows into the humidity control side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the air is adsorbed by the adsorbent. The room air deprived of moisture by the second adsorption element (82) flows into the upper left channel (55) and merges with the outdoor air sent from the upper right channel (53). Thereafter, the air in the upper right channel (53) is sent to the second heat exchanger (104), and is discharged to the outside after passing through the second heat exchanger (104).
[0191]
As described above, during the defrost operation, the outdoor air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104) together with the indoor air. On the other hand, during the humidification operation, as described above, only the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is subjected to the second heat exchange. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0192]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-out outdoor air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken-in room air is introduced into the humidity control side passageway (85) of the first adsorption element (81). Outdoor air heated by the regenerative heat exchanger (102) is introduced into the humidity control side passageway (85) of the second adsorption element (82).
[0193]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0194]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0195]
Further, according to this modification, during the defrost operation, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed. Furthermore, according to this modification, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Therefore, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the second heat exchanger (104).
[0196]
In the defrosting operation of the present modification, the operation is performed to discharge the taken room air to the outside. However, the exhaust of the room air can be stopped. That is, during the defrost operation, only the operation of supplying a part of the taken outdoor air to the room and discharging the remaining part to the outside may be performed. In this case, however, the room is not ventilated.
[0197]
-Modification 2 of embodiment-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrost operation of this modification will be described with reference to FIGS. 14 and 15.
[0198]
As shown in FIG. 14, in the first partition plate (20), the first right opening (21) and the first upper left opening (25) are in communication, and the remaining openings (22, 23, 24, 26) are in communication. Blocked state. In this state, the outdoor lower channel (42) and the right channel (51) are communicated with each other by the first right opening (21), and the upper left channel (55) and the outdoor upper channel are communicated by the first upper left opening (25). The flow path (41) is in communication.
[0199]
In the second partition plate (30), the second upper right opening (33) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 34, 35) are in a blocked state. In this state, the upper right channel (53) communicates with the indoor upper channel (46) by the second upper right opening (33), and the indoor lower channel (47) and the left channel by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0200]
The lower right shutter (61) is in an open state, and the lower left shutter (62) is in a closed state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) communicates with the lower right channel (54) via the lower right shutter (61). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0201]
In this state, when the air supply fan (95) is driven, outdoor air is taken into the casing (10) through the outdoor suction port (13). On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is set as appropriate, and the flow rate of outdoor air flowing into the casing (10) and the flow rate of indoor air flowing into the casing (10) Are equal.
[0202]
As shown in FIG. 15, the outdoor air taken into the casing (10) flows into the cooling side passageway (86) of the first adsorption element (81). The outdoor air that has exited from the first adsorption element (81) is heated when passing through the regenerative heat exchanger (102), and is then introduced into the humidity adjustment side passageway (85) of the first adsorption element (81). . The outdoor air that has exited from the humidity adjusting passage (85) passes through the first heat exchanger (103) that is not operating and is supplied to the room.
[0203]
On the other hand, the indoor air taken into the casing (10) flows into the humidity control side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the air is adsorbed by the adsorbent. In the second adsorption element (82), air does not flow in the cooling side passage (86). Warm indoor air during heating is not cooled, but rather rises in temperature due to adsorption heat and flows out of the second adsorption element (82). The room air that has come out of the second adsorption element (82) is sent to the second heat exchanger (104), passes through the second heat exchanger (104), and is discharged outside the room.
[0204]
Thus, during the defrost operation, warm indoor air being heated is supplied to the second heat exchanger (104) without being cooled. On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0205]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, room air is introduced into the first adsorption element (81) and outdoor air is introduced into the second adsorption element (82).
[0206]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0207]
According to this modification, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation. Moreover, the frost of a 2nd heat exchanger (104) can be melt | dissolved reliably using the warm heat of the indoor air exhausted for ventilation.
[0208]
—Modification 3 of Embodiment—
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrost operation of this modification will be described with reference to FIGS. 16 and 17.
[0209]
As shown in FIG. 16, in the first partition plate (20), the first lower right opening (24) and the first upper left opening (25) are in communication with each other, and the remaining openings (21, 22, 23, 26). Is cut off. In this state, the outdoor lower channel (42) and the lower right channel (54) are communicated with each other by the first lower right opening (24), and the upper left channel (55) and the outdoor side are communicated by the first upper left opening (25). The upper channel (41) communicates with the upper channel (41).
[0210]
In the second partition plate (30), the second upper right opening (33) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 34, 35) are in a blocked state. In this state, the upper right channel (53) communicates with the indoor upper channel (46) by the second upper right opening (33), and the indoor lower channel (47) and the left channel by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0211]
The lower right shutter (61) is in a closed state, and the lower left shutter (62) is in an open state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) communicates with the lower left channel (56) via the lower left shutter (62). The upper left shutter (64) is in an open state, and the upper right shutter (63) and the central shutter (65) are in a closed state. In this state, the upper part of the regenerative heat exchanger (102) in the central flow path (57) communicates with the upper left flow path (55) via the upper left shutter (64).
[0212]
In this state, when the air supply fan (95) is driven, outdoor air is taken into the casing (10) through the outdoor suction port (13). On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is set as appropriate, and the flow rate of outdoor air flowing into the casing (10) and the flow rate of indoor air flowing into the casing (10) Are equal.
[0213]
As shown in FIG. 17, the outdoor air taken into the casing (10) flows into the humidity adjustment side passageway (85) of the first adsorption element (81). During the flow through the humidity adjusting side passageway (85), water vapor in the outdoor air is adsorbed by the adsorbent. At that time, heat of adsorption is generated in the humidity adjusting side passageway (85), and the temperature of the outdoor air rises due to the heat of adsorption. The outdoor air that has exited from the humidity adjusting passage (85) passes through the first heat exchanger (103) that is not operating and is supplied to the room.
[0214]
On the other hand, the room air taken into the casing (10) flows into the central flow path (57) through the lower left shutter (62). This room air passes through the regenerative heat exchanger (102) and is heated while flowing through the central flow path (57). The room air heated by the regenerative heat exchanger (102) flows into the upper left channel (55) through the upper left shutter (64). Thereafter, the room air in the upper left channel (55) is sent to the second heat exchanger (104), and is discharged outside the room after passing through the second heat exchanger (104).
[0215]
Thus, during the defrost operation, warm indoor air that is being heated is heated by the regenerative heat exchanger (102) and then supplied to the second heat exchanger (104). On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0216]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, room air is introduced into the first adsorption element (81) and outdoor air is introduced into the second adsorption element (82).
[0217]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0218]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0219]
Furthermore, according to this modification, during the defrosting operation, not only the defrosting of the second heat exchanger (104) but also the indoor ventilation can be performed. Moreover, the frost of a 2nd heat exchanger (104) can be melt | dissolved reliably using the warm heat of the indoor air exhausted for ventilation.
[0220]
During this defrost operation, outdoor air dehumidified by the adsorption element (81, 82) is supplied, but the moisture adsorbed by the adsorption element (81, 82) is supplied into the room after the heating operation is resumed. Is done.
[0221]
-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrost operation of this modification will be described with reference to FIGS.
[0222]
As shown in FIG. 18, in the first partition plate (20), the first lower right opening (24) and the first upper left opening (25) are in communication, and the remaining openings (21, 22, 23, 26). Is cut off. In this state, the outdoor lower channel (42) and the lower right channel (54) are communicated with each other by the first lower right opening (24), and the upper left channel (55) and the outdoor side are communicated by the first upper left opening (25). The upper channel (41) communicates with the upper channel (41).
[0223]
In the second partition plate (30), the second upper right opening (33) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 34, 35) are in a blocked state. In this state, the upper right channel (53) communicates with the indoor upper channel (46) by the second upper right opening (33), and the indoor lower channel (47) and the left channel by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0224]
The lower right shutter (61) and the lower left shutter (62) are both closed. Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0225]
In this state, when the air supply fan (95) is driven, outdoor air is taken into the casing (10) through the outdoor suction port (13). On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is set as appropriate, and the flow rate of outdoor air flowing into the casing (10) and the flow rate of indoor air flowing into the casing (10) Are equal.
[0226]
As shown in FIG. 19, the outdoor air taken into the casing (10) flows into the humidity adjustment side passageway (85) of the first adsorption element (81). During the flow through the humidity adjusting side passageway (85), water vapor in the outdoor air is adsorbed by the adsorbent. At that time, heat of adsorption is generated in the humidity adjusting side passageway (85), and the temperature of the outdoor air rises due to the heat of adsorption. The outdoor air that has exited from the humidity adjusting passage (85) passes through the first heat exchanger (103) that is not operating and is supplied to the room.
[0227]
On the other hand, the indoor air taken into the casing (10) flows into the humidity control side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the air is adsorbed by the adsorbent. In the second adsorption element (82), air does not flow in the cooling side passage (86). Warm indoor air during heating is not cooled, but rather rises in temperature due to adsorption heat and flows out of the second adsorption element (82). The room air that has come out of the second adsorption element (82) is sent to the second heat exchanger (104), passes through the second heat exchanger (104), and is discharged outside the room.
[0228]
Thus, during the defrost operation, warm indoor air being heated is supplied to the second heat exchanger (104) without being cooled. On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0229]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, room air is introduced into the first adsorption element (81) and outdoor air is introduced into the second adsorption element (82).
[0230]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0231]
According to this modification, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation. Moreover, the frost of a 2nd heat exchanger (104) can be melt | dissolved reliably using the warm heat of the indoor air exhausted for ventilation.
[0232]
During this defrost operation, outdoor air dehumidified by the adsorption element (81, 82) is supplied, but the moisture adsorbed by the adsorption element (81, 82) is supplied into the room after the heating operation is resumed. Is done. Therefore, the indoor humidity does not decrease by this defrost operation.
[0233]
-Modification 5 of embodiment-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrosting operation of the present modification will be described with reference to FIGS.
[0234]
As shown in FIG. 20, in the first partition plate (20), the first lower right opening (24) and the first upper left opening (25) are in communication with each other, and the remaining openings (21, 22, 23, 26). Is cut off. In this state, the outdoor lower channel (42) and the lower right channel (54) are communicated with each other by the first lower right opening (24), and the upper left channel (55) and the outdoor side are communicated by the first upper left opening (25). The upper channel (41) communicates with the upper channel (41).
[0235]
In the second partition plate (30), the second left opening (32) and the second upper right opening (33) are in communication with each other, and the remaining openings (31, 34, 35, 36) are in a blocking state. In this state, the lower left channel (47) and the left channel (52) communicate with each other by the second left opening (32), and the upper right channel (53) and the upper indoor side by the second upper opening (33). The flow path (46) is in communication.
[0236]
The lower right shutter (61) and the lower left shutter (62) are both closed. The upper left shutter (64) is in an open state, and the upper right shutter (63) and the central shutter (65) are in a closed state. In this state, the upper part of the regenerative heat exchanger (102) in the central flow path (57) communicates with the upper left flow path (55) via the upper left shutter (64).
[0237]
In this state, when the air supply fan (95) is driven, outdoor air is taken into the casing (10) through the outdoor suction port (13). On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is set as appropriate, and the flow rate of outdoor air flowing into the casing (10) and the flow rate of indoor air flowing into the casing (10) Are equal.
[0238]
As shown in FIG. 21, the outdoor air taken into the casing (10) flows into the humidity adjustment side passageway (85) of the first adsorption element (81). During the flow through the humidity adjusting side passageway (85), water vapor in the outdoor air is adsorbed by the adsorbent. At that time, heat of adsorption is generated in the humidity adjusting side passageway (85), and the temperature of the outdoor air rises due to the heat of adsorption. The outdoor air that has exited from the humidity adjusting passage (85) passes through the first heat exchanger (103) that is not operating and is supplied to the room.
[0239]
On the other hand, the room air taken into the casing (10) flows into the cooling side passageway (86) of the second adsorption element (82). In the second adsorbing element (82), air does not flow through the humidity adjusting side passageway (85). Warm indoor air during heating flows out of the second adsorbing element (82) in a state of being taken in without being cooled. The room air that has come out of the second adsorption element (82) is sent to the second heat exchanger (104), passes through the second heat exchanger (104), and is discharged outside the room.
[0240]
As described above, during the defrost operation, the warm indoor air being heated is supplied to the second heat exchanger (104) without being cooled but in the state of being taken in. On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0241]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, room air is introduced into the first adsorption element (81) and outdoor air is introduced into the second adsorption element (82).
[0242]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0243]
According to this modification, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation. Moreover, the frost of a 2nd heat exchanger (104) can be melt | dissolved reliably using the warm heat of the indoor air exhausted for ventilation.
[0244]
During this defrost operation, outdoor air dehumidified by the adsorption element (81, 82) is supplied, but the moisture adsorbed by the adsorption element (81, 82) is supplied into the room after the heating operation is resumed. Is done.
[0245]
-Modification 6 of embodiment-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrosting operation of the present modification will be described with reference to FIGS.
[0246]
As shown in FIG. 22, in the first partition plate (20), the first upper right opening (23) and the first lower left opening (26) are in communication, and the remaining openings (21, 22, 24, 25) are in communication. Blocked state. In this state, the upper right channel (53) communicates with the outdoor upper channel (41) by the first upper right opening (23), and the outdoor lower channel (42) and the left channel by the first lower left opening (26). The lower flow path (56) communicates with the lower flow path (56).
[0247]
In the second partition plate (30), the second left opening (32) and the second upper left opening (35) are in communication, and the remaining openings (31, 33, 34, 36) are in a blocking state. In this state, the lower left channel (47) and the left channel (52) communicate with each other by the second left opening (32), and the upper left channel (55) and the upper indoor side by the second upper left opening (35). The flow path (46) is in communication.
[0248]
The lower right shutter (61) is in an open state, and the lower left shutter (62) is in a closed state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) communicates with the lower right channel (54) via the lower right shutter (61). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0249]
In this state, when the air supply fan (95) is driven, outdoor air is taken into the casing (10) through the outdoor suction port (13). On the other hand, when the exhaust fan (96) is driven, room air is taken into the casing (10) through the room-side suction port (15). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is set as appropriate, and the flow rate of outdoor air flowing into the casing (10) and the flow rate of indoor air flowing into the casing (10) Are equal.
[0250]
As shown in FIG. 23, the outdoor air taken into the casing (10) flows into the humidity adjustment side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the outdoor air is adsorbed by the adsorbent. At that time, heat of adsorption is generated in the humidity adjusting side passageway (85), and the temperature of the outdoor air rises due to the heat of adsorption.
[0251]
Further, warm room air during heating flows into the cooling side passageway (86) of the second adsorption element (82). In the second adsorption element (82), the outdoor air in the humidity adjusting side passage (85) and the indoor air in the cooling side passage (86) exchange heat, and the heat of the indoor air is recovered to the outdoor air. And the outdoor air which came out of the humidity control side channel | path (85) of the 2nd adsorption | suction element (82) passes through the 1st heat exchanger (103) in a pause, and is supplied indoors.
[0252]
The room air exiting from the cooling side passageway (86) of the second adsorption element (82) is heated when passing through the regenerative heat exchanger (102). The heated room air is sent to the humidity adjusting side passageway (85) of the first adsorption element (81) through the lower right shutter (61). The room air that has exited from the humidity adjustment side passageway (85) of the first adsorption element (81) is sent to the second heat exchanger (104), and is discharged to the outside after passing through the second heat exchanger (104). .
[0253]
Thus, during the defrost operation, the room air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104). On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0254]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-in room air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken outdoor air is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). The room air heated by the regenerative heat exchanger (102) is introduced into the humidity adjusting side passageway (85) of the second adsorption element (82).
[0255]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0256]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0257]
According to this modification, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation. Moreover, the heat of the indoor air exhausted for ventilation can be collected into the outdoor air supplied, and an increase in the heating load accompanying ventilation can be suppressed.
[0258]
During this defrost operation, outdoor air dehumidified by the adsorption element (81, 82) is supplied, but the moisture adsorbed by the adsorption element (81, 82) is supplied into the room after the heating operation is resumed. Is done.
[0259]
-Modification 7 of the embodiment-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrost operation of the present modification will be described with reference to FIGS.
[0260]
As shown in FIG. 24, in the first partition plate (20), the first upper right opening (23) and the first lower left opening (26) are in communication, and the remaining openings (21, 22, 24, 25) are in communication. Blocked state. In this state, the upper right channel (53) communicates with the outdoor upper channel (41) by the first upper right opening (23), and the outdoor lower channel (42) and the left channel by the first lower left opening (26). The lower flow path (56) communicates with the lower flow path (56).
[0261]
In the second partition plate (30), the second left opening (32) and the second upper left opening (35) are in communication, and the remaining openings (31, 33, 34, 36) are in a blocking state. In this state, the lower left channel (47) and the left channel (52) communicate with each other by the second left opening (32), and the upper left channel (55) and the upper indoor side by the second upper left opening (35). The flow path (46) is in communication.
[0262]
The lower right shutter (61) is in an open state, and the lower left shutter (62) is in a closed state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) communicates with the lower right channel (54) via the lower right shutter (61). The central shutter (65) is in an open state, and the upper right shutter (63) and the upper left shutter (64) are in a closed state. In this state, the upper right channel (53) and the upper left channel (55) communicate with each other via the central shutter (65).
[0263]
In this state, when the air supply fan (95) and the exhaust fan (96) are driven, outdoor air is taken into the casing (10) through the outdoor suction port (13), and indoor air is taken into the indoor suction port (15). Through the casing (10). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is appropriately set, and the flow rate of the outdoor air flowing into the casing (10) is determined from the flow rate of the indoor air flowing into the casing (10). Has also increased.
[0264]
As shown in FIG. 25, the outdoor air taken into the casing (10) flows into the humidity adjustment side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the outdoor air is adsorbed by the adsorbent. At that time, heat of adsorption is generated in the humidity adjusting side passageway (85), and the temperature of the outdoor air rises due to the heat of adsorption. Further, warm room air during heating flows into the cooling side passageway (86) of the second adsorption element (82). In the second adsorption element (82), the outdoor air in the humidity adjusting side passage (85) and the indoor air in the cooling side passage (86) exchange heat, and the heat of the indoor air is recovered to the outdoor air.
[0265]
The outdoor air that has exited from the humidity adjustment side passageway (85) of the second adsorption element (82) flows into the upper left channel (55). A part of the outdoor air in the upper left channel (55) flows into the upper right channel (53) through the central shutter (65), and the rest passes through the first heat exchanger (103) that is not operating. Supplied indoors.
[0266]
The room air exiting from the cooling side passageway (86) of the second adsorption element (82) is heated when passing through the regenerative heat exchanger (102). The heated room air is sent to the humidity adjusting side passageway (85) of the first adsorption element (81) through the lower right shutter (61). The room air that has exited from the humidity adjustment side passageway (85) of the first adsorption element (81) is sent to the second heat exchanger (104), and is discharged to the outside after passing through the second heat exchanger (104). .
[0267]
Thus, during the defrost operation, the room air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104). On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0268]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-in room air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken outdoor air is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). The room air heated by the regenerative heat exchanger (102) is introduced into the humidity adjusting side passageway (85) of the second adsorption element (82).
[0269]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0270]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0271]
According to this modification, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation. Moreover, the heat of the indoor air exhausted for ventilation can be collected into the outdoor air supplied, and an increase in the heating load accompanying ventilation can be suppressed.
[0272]
During this defrost operation, outdoor air dehumidified by the adsorption element (81, 82) is supplied, but the moisture adsorbed by the adsorption element (81, 82) is supplied into the room after the heating operation is resumed. Is done. Therefore, the indoor humidity does not decrease by this defrost operation.
[0273]
-Modification 8 of the embodiment-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrosting operation of the present modification will be described with reference to FIGS.
[0274]
As shown in FIG. 26, in the first partition plate (20), the first left opening (22) and the first upper right opening (23) are in communication, and the remaining openings (21, 24, 25, 26) are in communication. Blocked state. In this state, the outdoor lower channel (42) and the left channel (52) are communicated with each other by the first left opening (22), and the upper right channel (53) and the outdoor upper channel are communicated by the first upper right opening (23). The flow path (41) is in communication.
[0275]
In the second partition plate (30), the second upper left opening (35) and the second lower left opening (36) are in communication, and the remaining openings (31, 32, 33, 34) are in a blocked state. In this state, the upper left channel (55) communicates with the indoor upper channel (46) by the second upper left opening (35), and the indoor lower channel (47) and the left channel are communicated by the second lower left opening (36). The lower flow path (56) communicates with the lower flow path (56).
[0276]
The lower right shutter (61) is in an open state, and the lower left shutter (62) is in a closed state. In this state, the lower part of the regenerative heat exchanger (102) in the central channel (57) communicates with the lower right channel (54) via the lower right shutter (61). Further, the upper right shutter (63), the upper left shutter (64), and the central shutter (65) are all closed.
[0277]
In this state, when the air supply fan (95) is driven, room air is taken into the casing (10) through the room-side intake port (15). On the other hand, when the exhaust fan (96) is driven, outdoor air is taken into the casing (10) through the outdoor suction port (13). During this defrost operation, the rotation speed of the air supply fan (95) and the exhaust fan (96) is set as appropriate, and the flow rate of outdoor air flowing into the casing (10) and the flow rate of indoor air flowing into the casing (10) Are equal.
[0278]
As shown in FIG. 27, the room air taken into the casing (10) flows into the humidity adjustment side passageway (85) of the second adsorption element (82). The room air that has exited from the humidity adjustment side passageway (85) passes through the first heat exchanger (103) that is stopped and is sent back into the room.
[0279]
On the other hand, the outdoor air taken into the casing (10) is introduced into the cooling side passage (86) of the second adsorption element (82). The outdoor air exiting from the cooling side passageway (86) is heated when passing through the regenerative heat exchanger (102). The heated outdoor air is sent to the humidity adjustment side passageway (85) of the first adsorption element (81) through the lower right shutter (61). The outdoor air that has exited from the humidity adjustment side passageway (85) of the first adsorption element (81) is sent to the second heat exchanger (104), and is sent back to the outside after passing through the second heat exchanger (104).
[0280]
Thus, during the defrost operation, outdoor air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104). On the other hand, during the humidification operation, as described above, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81, 82) is the second heat exchanger. (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0281]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-out outdoor air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken-in room air is introduced into the humidity control side passageway (85) of the first adsorption element (81). Outdoor air heated by the regenerative heat exchanger (102) is introduced into the humidity control side passageway (85) of the second adsorption element (82).
[0282]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0283]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0284]
In the defrosting operation of this modification, the operation of taking in indoor air and sending it back into the room is performed again. However, this operation can be stopped. That is, during the defrosting operation, the outdoor air taken in may be heated only by the regenerative heat exchanger (102) and sent to the second heat exchanger (104).
[0285]
-Modification 9 of the embodiment-
In the humidity control apparatus of the present embodiment, the following operation may be performed as the defrost operation. Here, the operation during the defrost operation of the present modification will be described by taking as an example a case where the defrost operation is started in the middle of the second operation of the humidification operation.
[0286]
During the defrost operation, the flow paths of the first air and the second air are maintained in the same manner as in the second operation of the humidification operation (see FIG. 9B). That is, the indoor air taken in as the first air is sent to the second heat exchanger (104) through the humidity adjustment side passage (85) of the second adsorption element (82), and the second heat exchanger (104 ) And then discharged outside the room. On the other hand, the outdoor air taken in as the second air passes through the cooling side passage (86) of the second adsorption element (82), the regenerative heat exchanger (102), and the humidity adjustment side passage (85 of the first adsorption element (81)). ) In order, and then supplied to the room.
[0287]
During the defrost operation of this modification, the flow rate of the indoor air taken into the casing (10), that is, the first air is set to be smaller than that during the humidification operation. That is, air in a state different from that during the humidifying operation is supplied to the second heat exchanger (104). When the flow rate of the first air that exchanges heat with the refrigerant in the second heat exchanger (104) decreases, the refrigerant evaporation temperature in the second heat exchanger (104) increases. For this reason, the temperature of a 2nd heat exchanger (104) rises, and the frost adhering to the surface melt | dissolves.
[0288]
In the defrost operation when the second heat exchanger (104) is defrosted during the first operation, the first air and the second air are maintained in the same state as in the first operation (FIG. 9 (a)). In this state, the flow rate of the first air is reduced. However, during the defrost operation of this modification, the flow paths of the first air and the second air may be maintained in the same manner as during the first operation or the second operation of the humidification operation, and the state during the first operation You may mutually switch between the states in 2nd operation | movement.
[0289]
According to this modification, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed during the defrost operation. Furthermore, according to this modification, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Therefore, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the second heat exchanger (104).
[0290]
Other Embodiments of the Invention
The humidity control apparatus according to the embodiment of the present invention may be configured to perform the following defrost operation.
[0291]
Note that the humidity control apparatus according to the following modification is configured to perform a batch-type operation by including two adsorption elements (81, 82), as in the above-described embodiment. Further, the flow paths of the first air and the second air during the dehumidifying operation and the humidifying operation of the humidity control apparatus are the same as those in the above embodiment. Furthermore, each adsorption element (81, 82) and refrigerant circuit (100) of the humidity control apparatus are configured in the same manner as in the above embodiment.
[0292]
-First modification-
The defrosting operation of the first modification will be described with reference to FIG.
[0293]
The room air taken into the humidity controller bypasses the adsorption elements (81, 82) and the regenerative heat exchanger (102) and is sent directly to the second heat exchanger (104). That is, warm indoor air that is being heated is supplied to the second heat exchanger (104) as it is taken in. This room air is discharged to the outside after passing through the second heat exchanger (104).
[0294]
On the other hand, the outdoor air taken into the humidity controller passes through the cooling side passage (86) of the second adsorption element (82) and is heated in the regenerative heat exchanger (102). The heated outdoor air is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). In the humidity adjusting side passageway (85), the adsorbent is heated by the introduced outdoor air, and water vapor is desorbed from the adsorbent. Then, the water vapor desorbed from the adsorbent is given to the outdoor air, and the outdoor air is humidified. The humidified outdoor air passes through the first heat exchanger (103) being stopped and is supplied to the room.
[0295]
Thus, during the defrost operation, warm indoor air that is being heated is supplied to the second heat exchanger (104) as it is taken in. On the other hand, during the humidifying operation, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81 82) is supplied to the second heat exchanger (104). (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0296]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken outdoor air is introduced into the cooling side passageway (86) of the first adsorption element (81), and the outdoor air heated by the regenerative heat exchanger (102) is adjusted by the second adsorption element (82). It is introduced into the wet side passageway (85).
[0297]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0298]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0299]
Further, according to this modification, during the defrost operation, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed. Furthermore, according to this modification, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Therefore, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the second heat exchanger (104).
[0300]
-Second modification-
The defrosting operation of the second modification will be described with reference to FIG.
[0301]
The room air taken into the humidity control apparatus flows into the humidity control side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the air is adsorbed by the adsorbent. In the second adsorption element (82), air does not flow in the cooling side passage (86). Warm indoor air during heating is not cooled, but rather rises in temperature due to adsorption heat and flows out of the second adsorption element (82). The room air that has come out of the second adsorption element (82) is sent to the second heat exchanger (104), passes through the second heat exchanger (104), and is discharged outside the room.
[0302]
On the other hand, the outdoor air taken into the humidity controller is sent to the regenerative heat exchanger (102) and heated by heat exchange with the refrigerant. The heated outdoor air is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81). In the humidity adjusting side passageway (85), the adsorbent is heated by the introduced outdoor air, and water vapor is desorbed from the adsorbent. Then, the water vapor desorbed from the adsorbent is given to the outdoor air, and the outdoor air is humidified. The humidified outdoor air passes through the first heat exchanger (103) being stopped and is supplied to the room.
[0303]
In this way, during the defrost operation, warm indoor air being heated absorbs the heat of adsorption and rises in temperature, and then is supplied to the second heat exchanger (104). On the other hand, during the humidifying operation, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81 82) is supplied to the second heat exchanger (104). (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0304]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-in indoor air is introduced into the humidity adjusting side passageway (85) of the first adsorption element (81), and the outdoor air heated by the regenerative heat exchanger (102) becomes the second adsorption element (82). It is introduced into the humidity control side passageway (85).
[0305]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0306]
According to this modification, the warm indoor air during heating is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be reliably melted in a short time. Further, according to this modification, during the defrost operation, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed. Furthermore, according to this modification, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Therefore, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the second heat exchanger (104).
[0307]
-Third modification-
The defrosting operation of the third modification will be described with reference to FIG.
[0308]
The room air taken into the humidity control apparatus flows into the humidity control side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the air is adsorbed by the adsorbent. The air deprived of moisture by the second adsorption element (82) is sent to the second heat exchanger (104).
[0309]
On the other hand, the outdoor air taken into the humidity control apparatus flows into the cooling side passage (86) of the second adsorption element (82). The outdoor air that has come out of the second adsorption element (82) is heated when passing through the regenerative heat exchanger (102), and then divided into two hands. One of the divided outdoor air is sent to the first adsorption element (81), and the remainder is sent to the second heat exchanger (104) together with the room air after dehumidification.
[0310]
The outdoor air sent to the first adsorption element (81) flows into the humidity adjustment side passage (85) of the first adsorption element (81). In the humidity adjusting side passageway (85), the adsorbent is heated by the introduced outdoor air, and water vapor is desorbed from the adsorbent. Then, the water vapor desorbed from the adsorbent is given to the outdoor air, and the outdoor air is humidified. The outdoor air humidified by the first adsorbing element (81) is supplied to the room through the first heat exchanger (103) being stopped. That is, even during the defrosting operation, the air supplied to the room is humidified.
[0311]
As described above, during the defrost operation, the outdoor air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104) together with the indoor air. On the other hand, during the humidification operation, only the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81 82) is transferred to the second heat exchanger (104). Supplied (see FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0312]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-out outdoor air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken-in room air is introduced into the humidity control side passageway (85) of the first adsorption element (81). The remaining outdoor air heated by the regenerative heat exchanger (102) is introduced into the humidity control side passageway (85) of the second adsorption element (82).
[0313]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0314]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0315]
Further, according to this modification, during the defrost operation, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed. Furthermore, according to this modification, it is possible to continue humidifying the air supplied to the room even during the defrost operation. Therefore, it is possible to humidify the air supplied to the room as in the humidifying operation while defrosting the second heat exchanger (104).
[0316]
In this defrosting operation, the taken-out indoor air is discharged to the outside, but the exhaust of the indoor air can be stopped. That is, during the defrost operation, only the operation of supplying a part of the taken outdoor air to the room and discharging the remaining part to the outside may be performed. In this case, however, the room is not ventilated.
[0317]
-Fourth modification-
The defrosting operation of the fourth modification will be described with reference to FIG.
[0318]
The outdoor air taken into the humidity control apparatus flows into the humidity control side passageway (85) of the second adsorption element (82). During the flow through the humidity adjusting side passageway (85), water vapor in the outdoor air is adsorbed by the adsorbent. At that time, heat of adsorption is generated in the humidity adjusting side passageway (85), and the temperature of the outdoor air rises due to the heat of adsorption.
[0319]
Further, warm room air during heating flows into the cooling side passageway (86) of the second adsorption element (82). In the second adsorption element (82), the outdoor air in the humidity adjusting side passage (85) and the indoor air in the cooling side passage (86) exchange heat, and the heat of the indoor air is recovered to the outdoor air. And the outdoor air which came out of the humidity control side channel | path (85) of the 2nd adsorption | suction element (82) passes through the 1st heat exchanger (103) in a pause, and is supplied indoors.
[0320]
The room air exiting from the cooling side passageway (86) of the second adsorption element (82) is heated when passing through the regenerative heat exchanger (102). The heated room air is sent to the second heat exchanger (104), passes through the second heat exchanger (104), and is discharged outside the room.
[0321]
Thus, during the defrost operation, the room air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104). On the other hand, during the humidifying operation, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81 82) is supplied to the second heat exchanger (104). (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0322]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, room air is introduced into the cooling side passage (86) of the first adsorption element (81), and outdoor air is introduced into the humidity adjustment side passage (85) of the first adsorption element (81).
[0323]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0324]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0325]
Further, according to this modification, during the defrost operation, not only the defrost of the second heat exchanger (104) but also the indoor ventilation can be performed. Moreover, the heat of the indoor air exhausted for ventilation can be collected into the outdoor air supplied, and an increase in the heating load accompanying ventilation can be suppressed.
[0326]
-Fifth modification-
The defrosting operation of the fifth modification will be described with reference to FIG.
[0327]
The room air taken into the humidity control apparatus flows into the humidity control side passageway (85) of the second adsorption element (82). The room air that has exited from the humidity adjustment side passageway (85) passes through the first heat exchanger (103) that is stopped and is sent back into the room.
[0328]
On the other hand, the outdoor air taken into the humidity control apparatus is introduced into the cooling side passage (86) of the second adsorption element (82). The outdoor air exiting from the cooling side passageway (86) is heated when passing through the regenerative heat exchanger (102). The heated outdoor air is sent to the second heat exchanger (104), and is sent back to the outside after passing through the second heat exchanger (104).
[0329]
Thus, during the defrost operation, outdoor air heated by the regenerative heat exchanger (102) is supplied to the second heat exchanger (104). On the other hand, during the humidifying operation, the first air (indoor air) exchanged with the second air (outdoor air) by the first or second adsorption element (81 82) is supplied to the second heat exchanger (104). (See FIG. 9). Therefore, during the defrost operation, air in a state different from that during the humidification operation is supplied to the second heat exchanger (104). During the defrost operation, the temperature of the air supplied to the second heat exchanger (104) rises more than during the humidification operation, and the frost in the second heat exchanger (104) melts.
[0330]
In the defrosting operation of this modification, the state of the first adsorption element (81) and the second adsorption element (82) may be switched. In this case, the taken-out outdoor air is introduced into the cooling side passageway (86) of the first adsorption element (81). The taken-in room air is introduced into the humidity control side passageway (85) of the first adsorption element (81). Outdoor air heated by the regenerative heat exchanger (102) is introduced into the humidity control side passageway (85) of the second adsorption element (82).
[0331]
Thus, as the defrost operation of this modification, two kinds of operations are conceivable. And this humidity control apparatus may continue performing only one operation | movement during a defrost driving | operation, and may be made to switch two operations mutually as needed.
[0332]
According to this modification, the air heated in advance by the regenerative heat exchanger (102) is sent to the second heat exchanger (104), so that the frost of the second heat exchanger (104) can be surely prevented in a short time. Can be melted. Therefore, according to this modification, defrosting of the second heat exchanger (104) can be performed reliably, and further, the time required for defrosting operation can be shortened.
[0333]
In the defrosting operation of this modification, the operation of taking in indoor air and sending it back into the room is performed again. However, this operation can be stopped. That is, during the defrosting operation, the outdoor air taken in may be heated only by the regenerative heat exchanger (102) and sent to the second heat exchanger (104).
[Brief description of the drawings]
FIG. 1 is an exploded perspective view showing a configuration of a humidity control apparatus according to an embodiment and a first operation during a dehumidifying operation.
FIG. 2 is an exploded perspective view showing a second operation during a dehumidifying operation in the humidity control apparatus according to the embodiment.
FIG. 3 is an exploded perspective view showing a first operation during a humidifying operation in the humidity control apparatus according to the embodiment.
FIG. 4 is an exploded perspective view showing a second operation during a humidifying operation in the humidity control apparatus according to the embodiment.
FIG. 5 is a schematic configuration diagram illustrating a main part of the humidity control apparatus according to the embodiment.
FIG. 6 is a schematic perspective view showing an adsorption element of the humidity control apparatus according to the embodiment.
FIG. 7 is a piping system diagram showing a configuration of a refrigerant circuit according to the embodiment.
FIG. 8 is an explanatory diagram conceptually showing an operation during a dehumidifying operation of the humidity control apparatus according to the embodiment.
FIG. 9 is an explanatory diagram conceptually showing an operation during a humidifying operation of the humidity control apparatus according to the embodiment.
FIG. 10 is an exploded perspective view showing an operation during the defrost operation in the humidity control apparatus according to the embodiment.
FIG. 11 is an explanatory diagram conceptually showing an operation during a defrost operation in the humidity control apparatus according to the embodiment.
FIG. 12 is an exploded perspective view showing an operation during a defrost operation in the humidity control apparatus according to the first modification of the embodiment.
FIG. 13 is an explanatory diagram conceptually showing an operation during a defrost operation in the humidity control apparatus according to the first modification of the embodiment.
FIG. 14 is an exploded perspective view showing an operation during a defrost operation in the humidity control apparatus according to the second modification of the embodiment.
FIG. 15 is an explanatory diagram conceptually showing an operation during the defrost operation in the humidity control apparatus according to the second modification of the embodiment.
FIG. 16 is an exploded perspective view showing an operation during the defrost operation in the humidity control apparatus according to the third modification of the embodiment.
FIG. 17 is an explanatory diagram conceptually showing an operation during a defrost operation in a humidity control apparatus according to a third modification of the embodiment.
FIG. 18 is an exploded perspective view showing an operation during the defrost operation in the humidity control apparatus according to the fourth modification of the embodiment.
FIG. 19 is an explanatory diagram conceptually showing an operation during the defrost operation in the humidity control apparatus according to the
FIG. 20 is an exploded perspective view showing an operation during the defrost operation in the humidity control apparatus according to the modification 5 of the embodiment.
FIG. 21 is an explanatory diagram conceptually showing an operation during the defrost operation in the humidity control apparatus according to the modification 5 of the embodiment.
FIG. 22 is an exploded perspective view showing an operation during the defrost operation in the humidity control apparatus according to the modification 6 of the embodiment.
FIG. 23 is an explanatory diagram conceptually showing an operation during the defrost operation in the humidity control apparatus according to the modification 6 of the embodiment.
FIG. 24 is an exploded perspective view showing the operation during the defrosting operation in the humidity control apparatus according to the modified example 7 of the embodiment.
FIG. 25 is an explanatory diagram conceptually showing an operation during the defrost operation in the humidity control apparatus according to the modified example 7 of the embodiment.
FIG. 26 is an exploded perspective view showing an operation during the defrost operation in the humidity control apparatus according to the modification 8 of the embodiment.
FIG. 27 is an explanatory diagram conceptually showing an operation during a defrost operation in the humidity control apparatus according to the modification 8 of the embodiment.
FIG. 28 is an explanatory diagram conceptually showing an operation during a defrost operation in a humidity control apparatus according to a first modification of the other embodiment.
FIG. 29 is an explanatory diagram conceptually showing an operation during a defrost operation in a humidity control apparatus according to a second modification of the other embodiment.
FIG. 30 is an explanatory diagram conceptually illustrating an operation during a defrost operation in a humidity control apparatus according to a third modification of the other embodiment.
FIG. 31 is an explanatory diagram conceptually showing an operation during a defrost operation in a humidity control apparatus according to a fourth modification of the other embodiment.
FIG. 32 is an explanatory diagram conceptually showing an operation during a defrost operation in a humidity control apparatus according to a fifth modification of the other embodiment.
[Explanation of symbols]
(81) First adsorption element
(82) Second adsorption element
(85) Humidity control passage
(86) Cooling side passage
(100) Refrigerant circuit
(102) Regenerative heat exchanger (condensation heat exchanger)
(103) 1st heat exchanger
(104) Second heat exchanger (heat exchanger for evaporation)
Claims (17)
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 )へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられ、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転を、加湿運転中とは異なる状態の空気を該蒸発用熱交換器( 104 )へ送ることによって行う一方、
上記吸着素子(81,82)を複数備え、第1の吸着素子(81)へ第1空気を供給する吸着動作と第2の吸着素子(82)へ第2空気を供給する再生動作とを同時に行う第1動作と、第2の吸着素子(82)へ第1空気を供給する吸着動作と第1の吸着素子(81)へ第2空気を供給する再生動作とを同時に行う第2動作とを交互に繰り返すことによって加湿運転を行う調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . An evaporating heat exchanger ( 104 ) that functions as an evaporator and exchanges heat between the first air dehumidified by the adsorption element ( 81, 82 ) and the refrigerant during the humidifying operation ;
The defrosting operation for melting frost attached to the evaporating heat exchanger ( 104 ) during the humidifying operation is performed by sending air in a state different from that during the humidifying operation to the evaporating heat exchanger ( 104 ). on the other hand,
A plurality of the adsorption elements (81, 82) are provided, and an adsorption operation for supplying the first air to the first adsorption element (81) and a regeneration operation for supplying the second air to the second adsorption element (82) are performed simultaneously. A first operation to be performed, and a second operation to simultaneously perform an adsorption operation for supplying the first air to the second adsorption element (82) and a regeneration operation for supplying the second air to the first adsorption element (81). Humidity control device that performs humidification operation by repeating alternately.
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 )へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられ、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転を、加湿運転中とは異なる状態の空気を該蒸発用熱交換器( 104 )へ送ることによって行う一方、
上記吸着素子(81,82)には、流通する空気が吸着剤と接触する調湿側通路(85)と、流通する空気が上記調湿側通路(85)の空気と熱交換する冷却側通路(86)とが複数ずつ形成され、
加湿運転中には、第1空気が上記吸着素子(81,82)の調湿側通路(85)を通過後に蒸発用熱交換器(104)へ供給され、第2空気が上記吸着素子(81,82)の冷却側通路(86)を通過後に凝縮用熱交換器(102)へ供給される調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . An evaporating heat exchanger ( 104 ) that functions as an evaporator and exchanges heat between the first air dehumidified by the adsorption element ( 81, 82 ) and the refrigerant during the humidifying operation ;
The defrosting operation for melting frost attached to the evaporating heat exchanger ( 104 ) during the humidifying operation is performed by sending air in a state different from that during the humidifying operation to the evaporating heat exchanger ( 104 ). on the other hand,
The adsorbing element (81, 82) includes a humidity adjusting side passage (85) in which the circulating air contacts the adsorbent, and a cooling side passage in which the circulating air exchanges heat with the air in the humidity adjusting side passage (85). (86) and a plurality are formed,
During the humidification operation, the first air passes through the humidity adjustment side passage (85) of the adsorption element (81, 82) and then is supplied to the evaporation heat exchanger (104), and the second air is supplied to the adsorption element (81 , 82) is supplied to the condensation heat exchanger (102) after passing through the cooling side passageway (86).
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 ) へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられる一方、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転中には、第1空気及び第2空気の流通経路が加湿運転中と同様に保持されると共に、蒸発用熱交換器(104)へ送られる第1空気の流量が加湿運転中よりも削減される調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . An evaporating heat exchanger ( 104 ) is provided that functions as an evaporator and exchanges heat between the first air dehumidified by the adsorption element ( 81, 82 ) and the refrigerant during the humidifying operation .
During the defrost operation for melting frost adhering to the evaporation heat exchanger ( 104 ) during the humidification operation, the flow paths of the first air and the second air are maintained in the same manner as during the humidification operation, A humidity control apparatus in which the flow rate of the first air sent to the evaporating heat exchanger (104) is reduced as compared with during the humidifying operation.
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 )へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられる一方、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転中には、取り込まれた室内空気が凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)へ供給される調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . An evaporating heat exchanger ( 104 ) is provided that functions as an evaporator and exchanges heat between the first air dehumidified by the adsorption element ( 81, 82 ) and the refrigerant during the humidifying operation .
During the defrost operation for melting the frost adhering to the evaporating heat exchanger ( 104 ) during the humidifying operation , the captured indoor air is heated by the condensing heat exchanger (102) and then the evaporating heat A humidity control device supplied to the exchanger (104).
デフロスト運転中には、
蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、
取り込まれた室外空気が吸着素子(81,82)で吸着剤と接触してから室内へ供給される調湿装置。 The humidity control apparatus according to claim 4 ,
During defrost operation,
The indoor air that has passed through the evaporating heat exchanger (104) is discharged outside the room,
A humidity control device in which the outdoor air taken in is brought into contact with the adsorbent by the adsorbing elements (81, 82) and then supplied into the room.
デフロスト運転中には、
取り込まれた室内空気が吸着素子(81,82)の冷却側通路(86)を通過後に凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)を通って室外へ排出されると共に、
取り込まれた室外空気が上記吸着素子(81,82)の調湿側通路(85)を通過する際に上記冷却側通路(86)の室内空気と熱交換してから室内へ供給される調湿装置。 The humidity control apparatus according to claim 2 ,
During defrost operation,
The taken indoor air passes through the cooling side passage (86) of the adsorption element (81, 82), is heated by the condensation heat exchanger (102), and then passes through the evaporation heat exchanger (104) to be discharged outside the room. As
When the outdoor air taken in passes through the humidity adjustment side passage (85) of the adsorption element (81, 82), heat is exchanged with the indoor air of the cooling side passage (86) and then supplied to the room. apparatus.
デフロスト運転中には、
取り込まれた室内空気が吸着素子(81,82)の冷却側通路(86)を通過後に凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)を通って室外へ排出されると共に、
取り込まれた室外空気が上記吸着素子(81,82)の調湿側通路(85)を通過する際に上記冷却側通路(86)の室内空気と熱交換し、該調湿側通路(85)を通過した室外空気の一部が室内へ供給されて残りが凝縮用熱交換器(102)で加熱された室内空気と共に蒸発用熱交換器(104)へ供給される調湿装置。 The humidity control apparatus according to claim 2 ,
During defrost operation,
The taken indoor air passes through the cooling side passage (86) of the adsorption element (81, 82), is heated by the condensation heat exchanger (102), and then passes through the evaporation heat exchanger (104) to be discharged outside the room. As
When the outdoor air taken in passes through the humidity adjustment side passage (85) of the adsorption element (81, 82), heat is exchanged with the room air of the cooling side passage (86), and the humidity adjustment side passage (85) A humidity control apparatus in which part of the outdoor air that has passed through is supplied to the room and the remainder is supplied to the evaporating heat exchanger (104) together with the indoor air heated by the condensation heat exchanger (102).
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 )へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機 能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられる一方、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転中には、取り込まれた室内空気がそのままの状態で蒸発用熱交換器(104)へ供給される調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . while in a humidified operation with functions as an evaporator first evaporative heat exchanger in which air with the refrigerant heat exchanger dehumidified by the adsorption element (81, 82) (104) and is provided,
During the defrost operation for melting the frost adhering to the evaporating heat exchanger ( 104 ) during the humidifying operation , the taken-in room air is supplied to the evaporating heat exchanger (104) as it is. Humidity control device.
デフロスト運転中には、
蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、
取り込まれた室外空気が凝縮用熱交換器(102)で加熱された後に吸着素子(81,82)で吸着剤と接触してから室内へ供給される調湿装置。 The humidity control apparatus according to claim 8 ,
During defrost operation,
The indoor air that has passed through the evaporating heat exchanger (104) is discharged outside the room,
A humidity control apparatus in which the outdoor air taken in is heated by the heat exchanger for condensation (102) and then is brought into contact with the adsorbent by the adsorption element (81, 82) before being supplied indoors.
デフロスト運転中には、
蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、
取り込まれた室外空気が吸着素子(81,82)で吸着剤と接触してから室内へ供給される調湿装置。 The humidity control apparatus according to claim 8 ,
During defrost operation,
The indoor air that has passed through the evaporating heat exchanger (104) is discharged outside the room,
A humidity control device in which the outdoor air taken in is brought into contact with the adsorbent by the adsorbing elements (81, 82) and then supplied into the room.
デフロスト運転中には、
取り込まれた室内空気が吸着素子(81,82)の調湿側通路(85)を通過後に蒸発用熱交換器(104)へ供給されると共に、
上記吸着素子(81,82)の冷却側通路(86)に対する空気の流入が阻止される調湿装置。 The humidity control apparatus according to claim 2 ,
During defrost operation,
The taken indoor air passes through the humidity adjustment side passage (85) of the adsorption element (81, 82) and is then supplied to the evaporation heat exchanger (104).
A humidity control apparatus that prevents air from flowing into the cooling side passageway (86) of the adsorption element (81, 82).
デフロスト運転中には、
蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、
取り込まれた室外空気が凝縮用熱交換器(102)で加熱された後に室内空気の流れる調湿側通路(85)とは別の調湿側通路(85)を通過してから室内へ供給される調湿装置。 The humidity control apparatus according to claim 11 ,
During defrost operation,
The indoor air that has passed through the evaporating heat exchanger (104) is discharged outside the room,
The taken outdoor air is heated by the heat exchanger for condensation (102) and then passes through the humidity adjustment side passage (85) different from the humidity adjustment side passage (85) through which the indoor air flows and then supplied to the room. Humidity control device.
デフロスト運転中には、
蒸発用熱交換器(104)を通過した室内空気が室外へ排出されると共に、
取り込まれた室外空気が上記室内空気の流れる調湿側通路(85)とは別の調湿側通路(85)を通過してから室内へ供給される調湿装置。 The humidity control apparatus according to claim 11 ,
During defrost operation,
The indoor air that has passed through the evaporating heat exchanger (104) is discharged outside the room,
A humidity control apparatus in which the taken outdoor air passes through a humidity control side passage (85) different from the humidity control side passage (85) through which the indoor air flows, and then is supplied to the room.
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 )へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられる一方、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転中には、取り込まれた室外空気が凝縮用熱交換器(102)で加熱されてから蒸発用熱交換器(104)へ供給される調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . An evaporating heat exchanger ( 104 ) is provided that functions as an evaporator and exchanges heat between the first air dehumidified by the adsorption element ( 81, 82 ) and the refrigerant during the humidifying operation .
During the defrost operation for melting the frost adhering to the evaporating heat exchanger ( 104 ) during the humidifying operation, the outdoor air taken in is heated in the condensing heat exchanger (102) and then the evaporating heat. A humidity control device supplied to the exchanger (104).
第1空気中の水分を上記吸着素子( 81,82 )に吸着させる吸着動作と、上記冷媒回路( 100 )の冷媒により加熱された第2空気で上記吸着素子( 81,82 )を再生する再生動作とを行い、
上記吸着素子( 81,82 )で加湿された第2空気を室内へ供給して、上記吸着素子( 81,82 )で減湿された第1空気を室外へ排出する加湿運転を少なくとも行う調湿装置であって、
上記冷媒回路( 100 )には、凝縮器として機能して加湿運転中は上記吸着素子( 81,82 )へ供給される第2空気を冷媒と熱交換させる凝縮用熱交換器( 102 )と、蒸発器として機能して加湿運転中は上記吸着素子( 81,82 )で減湿された第1空気を冷媒と熱交換させる蒸発用熱交換器( 104 )とが設けられる一方、
上記蒸発用熱交換器( 104 )に加湿運転中に付着した霜を融かすためのデフロスト運転中には、取り込まれた室外空気が凝縮用熱交換器(102)で加熱され、加熱された該室外空気の一部が蒸発用熱交換器(104)へ供給されて残りが室内へ供給される調湿装置。 An adsorbing element ( 81,82 ) for bringing the adsorbent into contact with air, and a refrigerant circuit ( 100 ) for performing a refrigeration cycle by circulating the refrigerant ,
A suction operation for adsorbing moisture in the first air to the adsorption element (81, 82), reproduction for reproducing the suction element in the second air heated by the refrigerant (81, 82) of the refrigerant circuit (100) Perform and
Humidity control that performs at least a humidifying operation in which the second air humidified by the adsorption element ( 81,82 ) is supplied to the room and the first air dehumidified by the adsorption element ( 81,82 ) is discharged outside the room. A device,
The refrigerant circuit ( 100 ) includes a condensing heat exchanger ( 102 ) that functions as a condenser and exchanges heat between the second air supplied to the adsorption element ( 81,82 ) and the refrigerant during the humidifying operation . An evaporating heat exchanger ( 104 ) is provided that functions as an evaporator and exchanges heat between the first air dehumidified by the adsorption element ( 81, 82 ) and the refrigerant during the humidifying operation .
During the defrost operation for melting the frost adhering to the evaporating heat exchanger ( 104 ) during the humidifying operation , the taken outdoor air is heated by the condensing heat exchanger (102) and is heated. A humidity control apparatus in which a part of the outdoor air is supplied to the evaporation heat exchanger (104) and the rest is supplied indoors.
デフロスト運転中に室内へ供給される室外空気は、凝縮用熱交換器(102)で加熱された後に吸着素子(81,82)で吸着剤と接触してから室内へ送られる調湿装置。 The humidity control apparatus according to claim 15 ,
A humidity control device in which outdoor air supplied to the room during the defrost operation is heated by the heat exchanger for condensation (102) and then brought into contact with the adsorbent by the adsorption element (81, 82) before being sent to the room.
デフロスト運転中には、
取り込まれた室外空気が凝縮用熱交換器(102)で加熱され、加熱された該室外空気の一部が蒸発用熱交換器(104)へ供給されて残りが吸着素子(81,82)の調湿側通路(85)を通過してから室内へ供給されると共に、
取り込まれた室内空気が上記室外空気の流れる調湿側通路(85)とは別の調湿側通路(85)を通過してから室外へ排出される調湿装置。 The humidity control apparatus according to claim 2 ,
During defrost operation,
The taken-in outdoor air is heated by the heat exchanger for condensation (102), a part of the heated outdoor air is supplied to the heat exchanger for evaporation (104), and the rest is absorbed by the adsorption element (81, 82). After passing through the humidity control passage (85), it is supplied to the room,
A humidity control apparatus in which the taken indoor air passes through a humidity control side passage (85) different from the humidity control side passage (85) through which the outdoor air flows, and is then discharged to the outside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002031108A JP3649196B2 (en) | 2002-02-07 | 2002-02-07 | Humidity control device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002031108A JP3649196B2 (en) | 2002-02-07 | 2002-02-07 | Humidity control device |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003232540A JP2003232540A (en) | 2003-08-22 |
JP3649196B2 true JP3649196B2 (en) | 2005-05-18 |
Family
ID=27774605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002031108A Expired - Fee Related JP3649196B2 (en) | 2002-02-07 | 2002-02-07 | Humidity control device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3649196B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107300270A (en) * | 2017-03-16 | 2017-10-27 | 财团法人交大思源基金会 | Dehumidification device for enhancing dehumidification effect |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3668785B2 (en) | 2003-10-09 | 2005-07-06 | ダイキン工業株式会社 | Air conditioner |
JP2005164148A (en) * | 2003-12-03 | 2005-06-23 | Daikin Ind Ltd | Humidity conditioning device |
JP3861902B2 (en) | 2004-09-09 | 2006-12-27 | ダイキン工業株式会社 | Humidity control device |
JP4830316B2 (en) * | 2005-03-02 | 2011-12-07 | パナソニック株式会社 | Dehumidifier |
JP4760095B2 (en) * | 2005-03-31 | 2011-08-31 | パナソニック株式会社 | Dehumidifier |
-
2002
- 2002-02-07 JP JP2002031108A patent/JP3649196B2/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107300270A (en) * | 2017-03-16 | 2017-10-27 | 财团法人交大思源基金会 | Dehumidification device for enhancing dehumidification effect |
CN107300270B (en) * | 2017-03-16 | 2020-04-10 | 财团法人交大思源基金会 | Dehumidification device for enhancing dehumidification effect |
US10883741B2 (en) | 2017-03-16 | 2021-01-05 | National Chiao Tung Unviersity | Dehumidification device with enhanced dehumidification effect |
Also Published As
Publication number | Publication date |
---|---|
JP2003232540A (en) | 2003-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3891207B2 (en) | Humidity control device | |
JP3992051B2 (en) | Air conditioning system | |
WO2003046441A1 (en) | Humidity controller | |
JP2010065927A (en) | Humidity controller | |
JP3695417B2 (en) | Humidity control device | |
JP3624893B2 (en) | Humidity control device | |
JP3807319B2 (en) | Humidity control device | |
JP3649196B2 (en) | Humidity control device | |
JP2005164148A (en) | Humidity conditioning device | |
JP3807320B2 (en) | Humidity control device | |
JP2004060954A (en) | Humidity controller | |
KR100708628B1 (en) | Moisture conditioner | |
WO2006103968A1 (en) | Humidity regulation device | |
JP4496821B2 (en) | Humidity control device | |
JP4110840B2 (en) | Humidity control device | |
JP2005291535A (en) | Humidifier | |
JP2005140372A (en) | Air conditioner | |
JP2003232538A (en) | Humidity controller | |
JP3649203B2 (en) | Humidity control device | |
JP4457653B2 (en) | Humidity control device | |
JP2005049047A (en) | Humidity controller | |
JP4311110B2 (en) | Air conditioner | |
JP2004060966A (en) | Humidity controller | |
JP4529530B2 (en) | Humidity control device | |
JP4206853B2 (en) | Humidity control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20041109 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050105 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050125 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050207 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080225 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090225 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090225 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100225 Year of fee payment: 5 |
|
LAPS | Cancellation because of no payment of annual fees |