JP3645477B2 - Wooden floor laying equipment - Google Patents
Wooden floor laying equipment Download PDFInfo
- Publication number
- JP3645477B2 JP3645477B2 JP2000295736A JP2000295736A JP3645477B2 JP 3645477 B2 JP3645477 B2 JP 3645477B2 JP 2000295736 A JP2000295736 A JP 2000295736A JP 2000295736 A JP2000295736 A JP 2000295736A JP 3645477 B2 JP3645477 B2 JP 3645477B2
- Authority
- JP
- Japan
- Prior art keywords
- piece
- joist
- groove
- longitudinal direction
- pieces
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Floor Finish (AREA)
Description
【0001】
【産業上の利用分野】
本発明は、コンクリートスラブ上に木製床材を敷設するために用いる木製床材の敷設装置に関するものである。
【0002】
【従来の技術】
例えば、特開平11−100978号公報に記載の通り、スラブ上に並設した根太材に床材を載置し、床材と根太材を結合金具を用いて結合するようにした構造のものがある。
【0003】
この従来例は、根太材の長手方向に沿う側面に溝を設け、該溝に固定部片をハンマー等で打ち込んで結合金具を根太材に固定し、根太材より上方に配置した結合金具の結合部片に、床材の長手方向に沿う側面に形成した溝を嵌合するようにして床材を順次敷設するようにしたものである。
【0004】
【発明が解決しようとする課題】
前記従来例は、根太材を比較的硬質な木材で構成し、該木材の性質を利用して結合金具を固定部片において打ち込み固定するようにしたものであるため、打込み固定操作するための空間域を必要とし、従って、壁面に近接した領域において前記の操作が行えないため適用上の制約がある。
【0005】
また、いわば直線上の溝内に結合金具(の固定部片)を、木製床材の敷設数に応じ、かつ、床材の幅に対応する間隔を置いて打込まねばならない構造になっているため、根太材に前記溝に沿う亀裂が生じるおそれがあり(亀裂の発生によって耐久性に問題が生じることになる)、この亀裂を回避するためには根太材を構成する木材を相応に吟味しなければならず、また、ある程度の幅を備えた床材を用いなければならない。
【0006】
本発明は斯様な従来例の欠点に着目し、使い勝手の良好な敷設装置を提供することを目的として創案したものである。
【0007】
【課題を解決するための手段】
長手方向に沿って相対して立設した一対のL形部片を備え、しかも、コンクリートスラブ上に高さ調節自在に並設する根太材と、この根太材の前記L形案内部片で構成する係合溝に部片において摺嵌し、前記長手方向と直交する方向に結合部片を設けた、所要数の結合駒および前記結合部片を係合する組付け溝を長手方向に沿う側面に設け、しかも、前記根太材上に載置する木製床材とで成るものである。
【0008】
【実施例】
図面は本発明に係る木製床材の敷設装置の一実施例を示し、図1は一部欠截正面図、図2は図1のa−a線拡大断面図、図3は結合駒の正面図、図4は結合駒の側面図である。
【0009】
本発明は、アルミ押出し形材より成る根太材1をコンクリートスラブb上に並設し、該根太材1に摺嵌した結合駒2を用いて根太材1上に載置した木製の床材3を根太材1に結合して敷設するようにしたもので、根太材1は断面方形状の中空主体4の上下部片4a,4bのそれぞれに、中空主体4の長手方向に沿って相対する上下それぞれ一対のL形部片5,5、6,6を突設して構成し、上L形部片5,5と前記上部片4aとで構成する上側の係合溝7,7に前記結合駒2を部片8,8において摺嵌して組付け、下L形部片6,6と前記下部片4bとで構成する下側の係合溝9にはナット材10を係合してある。
【0010】
ナット材10はほぼ中央に螺子孔11を設けた方形金属板で成り、両端を前記上側の係合溝9の奥端に位置させるようにして前記の通り係合溝9に係合したもので、方形な形状に構成することにより、前記螺子孔11を中心とする回転方向に外力が負荷しても係合溝9の奥壁に衝接して回転が規制されるようになっている。
【0011】
ナット材10の螺子孔11には、ナット材10の下側から受支ボルト12を螺合し、該ボルト12の先端をナット材10と重なり合う下部片4bに設けた透孔13を通じて前記中空主体4内に配し、ワッシャー14を介して締付けナット15を螺合する。
【0012】
受支ボルト12は、中空主体4内に配した先端部に工具(ドライバー)係止溝16を備え、該係止溝16に、中空主体4の前記上部片4aに形成した窓孔17を通じて工具先端を係止してボルト12を回転させると、受支ボルト12には根太材1によって回転を規制されたナット材10が螺合してあるので、ナット材10は係合溝9部において組付け関係にある根太材1を伴って縦動し、この結果、根太材1の上下調節操作が行われることになり、前記窓孔17を通じて前記締付けナット15をワッシャー14を介して前記下部片4bに締め付けることにより根太材1の当該調節高さが維持される。
【0013】
前記結合駒2は、前記根太材1の上L形部片5,5の先端間の間隙幅より下部18bの板幅を狭くし、上部18aの板幅を広くしたほぼ平板状の縦部片18の上端に、前記上部18aの板幅と同幅の上板を載置して前記縦部片18に対して翼部片状にした左右一対の結合部片19,19を連接し、主体部片18の下端には前記結合部片19,19と相対するようにして下板を連設し、該下板の前記縦部片18の上部18aの直下に位置する部分を前記部片8として構成し、結合部片19を前記床材3の長手方向に沿う側面に設けた組付け溝20に係合するようにし、部片8を結合駒2に設けた上側の係合溝7に前記の通り摺嵌するようにしたものである。
【0014】
なお、図示21は、結合駒2の縦部片18の上部18aの下端に設けた厚肉部で、この厚肉部21は床材3,3間に介在してスペーサとして機能する。
【0015】
しかして、根太材1の適所に窓孔17および透孔13を互いに一致させて形成しておき、係合溝9に摺嵌するようにしてナット材10を当該窓孔17等の位置に配して螺子孔11に受支ボルト12を螺合し、該受支ボルト12にワッシャー14および締付けナット15を組付けて、係止溝16を利用してボルト12を回転させると、ナット材10は根太材1を伴って縦動し、この結果、根太材1は所要の高さ位置に設定され、締付けナット15を締め付けることにより当該設定位置は維持される。
【0016】
このようにしてコンクリートスラブb上に所要位置に根太材1を配して並設し、各根太材1には上側の係合溝7に部片8を摺嵌するようにして所要数の結合駒2を組付け、該結合駒2の結合部片19に組付け溝20を係合するようにして根太材1上に床材1を載置し、順次組付け、敷設するのである。
【0017】
【発明の効果】
本発明は前記の通り、結合駒は根太材に摺嵌組付ける構成を採るから結合駒を根太材に予め組付けておくことにより、壁面近傍においても支障なく適用することができ、従って適用上(場所的な)の制約を受けることがない。
【0018】
もとより、敷設作業時に、各部材に損傷を与えることなく、各部材を互いに組付けて床材の敷設作業を行えるから、常に設計通りの床装置を得られる。
【図面の簡単な説明】
【図1】一部欠截正面図。
【図2】図1のa−a線拡大断面図。
【図3】結合駒の正面図。
【図4】結合駒の側面図。
【符号の説明】
1 根太材
2 結合駒
3 床材
5 L形部片
7 係合溝
8 部片
19 結合部片
20 組付け溝[0001]
[Industrial application fields]
The present invention relates to a wooden floor laying apparatus used for laying a wooden floor on a concrete slab.
[0002]
[Prior art]
For example, as described in Japanese Patent Application Laid-Open No. 11-100780, there is a structure in which a flooring is placed on a joist arranged side by side on a slab, and the flooring and joist are joined using a fitting. is there.
[0003]
In this conventional example, a groove is provided on the side surface along the longitudinal direction of the joistwood, and a fixing piece is driven into the groove with a hammer or the like to fix the jointing fixture to the joistwood. The floor material is sequentially laid so that the groove formed in the side surface along the longitudinal direction of the floor material is fitted to the piece.
[0004]
[Problems to be solved by the invention]
In the conventional example, the joist is made of relatively hard wood, and the coupling metal is driven and fixed in the fixed piece using the properties of the wood. Therefore, there is a limitation in application because the above operation cannot be performed in a region close to the wall surface.
[0005]
In other words, it has a structure in which a fitting (fixed part thereof) must be driven into a straight groove in accordance with the number of wooden floor coverings and at intervals corresponding to the width of the floor covering. Therefore, there is a possibility that a crack along the groove will occur in the joist (this will cause a problem in durability due to the occurrence of the crack). In order to avoid this crack, the wood constituting the joist is examined appropriately. And flooring with a certain width must be used.
[0006]
The present invention has been devised for the purpose of providing an easy-to-use laying apparatus, paying attention to the drawbacks of such a conventional example.
[0007]
[Means for Solving the Problems]
It comprises a pair of L-shaped pieces standing upright along the longitudinal direction, and a joist that is juxtaposed on a concrete slab so that the height can be adjusted, and the L-shaped guide piece of the joist. A side surface along the longitudinal direction of a required number of coupling pieces and an assembly groove for engaging the coupling piece, which is slidably fitted into the engaging groove at the piece and provided with a coupling piece in a direction orthogonal to the longitudinal direction. And a wooden flooring placed on the joist.
[0008]
【Example】
The drawings show an embodiment of a wooden floor laying apparatus according to the present invention, FIG. 1 is a partially cutaway front view, FIG. 2 is an enlarged sectional view taken along the line aa of FIG. 1, and FIG. FIG. 4 is a side view of the coupling piece.
[0009]
In the present invention, a
[0010]
The nut member 10 is formed of a rectangular metal plate provided with a
[0011]
A receiving
[0012]
The receiving
[0013]
The connecting
[0014]
21 is a thick portion provided at the lower end of the
[0015]
Accordingly, the window hole 17 and the through-
[0016]
In this way, the
[0017]
【The invention's effect】
As described above, the present invention employs a structure in which the coupling piece is slidably assembled to the joist material, so that it can be applied without any trouble even in the vicinity of the wall surface by pre-assembling the coupling piece to the joist material. There are no (location) restrictions.
[0018]
Of course, during the laying operation, the members can be assembled with each other without damaging the members, so that the floor material can be laid, so that a floor device as designed can always be obtained.
[Brief description of the drawings]
FIG. 1 is a partially cutaway front view.
FIG. 2 is an enlarged cross-sectional view taken along line aa in FIG.
FIG. 3 is a front view of a coupling piece.
FIG. 4 is a side view of a coupling piece.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000295736A JP3645477B2 (en) | 2000-09-28 | 2000-09-28 | Wooden floor laying equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000295736A JP3645477B2 (en) | 2000-09-28 | 2000-09-28 | Wooden floor laying equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2002106155A JP2002106155A (en) | 2002-04-10 |
JP3645477B2 true JP3645477B2 (en) | 2005-05-11 |
Family
ID=18778113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000295736A Expired - Fee Related JP3645477B2 (en) | 2000-09-28 | 2000-09-28 | Wooden floor laying equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3645477B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006283420A (en) * | 2005-04-01 | 2006-10-19 | Daiwa House Ind Co Ltd | Backing structure of deck |
JP4781907B2 (en) * | 2006-05-23 | 2011-09-28 | フクビ化学工業株式会社 | Deck material, deck structure, deck assembly method and deck floor |
CN103590573B (en) * | 2013-10-23 | 2016-08-24 | 苏州金螳螂建筑装饰股份有限公司 | Non-nail anti-corrosion wood mounting structure |
-
2000
- 2000-09-28 JP JP2000295736A patent/JP3645477B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2002106155A (en) | 2002-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20150072143A (en) | Building non-welding truss structures | |
JP3645477B2 (en) | Wooden floor laying equipment | |
JPH1061640A (en) | Connection fixing tool and connection fixing structure for c-channel | |
KR20200112460A (en) | Structure for installing of base truss bracket | |
JP3025375B2 (en) | Roof / floor panel mounting method and structure | |
JP6727090B2 (en) | ALC mounting frame and its assembly method | |
US6536984B1 (en) | Taper lock fastening bracket system and method of assembly | |
KR101453626B1 (en) | Connection structure of steel member with a closed section | |
JP2868504B1 (en) | Concrete wall structure | |
JPH08260658A (en) | Double-wall bearing material | |
JP4050687B2 (en) | Pillar fixing device in wooden buildings | |
JP2000192550A (en) | Joining metal fitting and joining part structure of framework member | |
JPH10131475A (en) | Erection material for temporary scaffold | |
JP2595124Y2 (en) | Metal fittings for building equipment | |
JPH0229127Y2 (en) | ||
JP2861539B2 (en) | Dry floor structure | |
KR200345121Y1 (en) | Non-skid connector of pipe scaffold for construction work | |
KR200201315Y1 (en) | Connector for rails | |
JPH09221766A (en) | Pc foundation connector | |
JPH0217082Y2 (en) | ||
JPH0626733Y2 (en) | Nuts for profiles | |
JP2001152555A (en) | Connecting method and joint plate for building unit | |
JP4455069B2 (en) | Shaft assembly joining equipment | |
JPS5924725Y2 (en) | Assembly fittings for heavy temporary gantry | |
JPH0726496U (en) | Connecting bracket for temporary slab material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050201 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050203 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3645477 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090210 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090210 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100210 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110210 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120210 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120210 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130210 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130210 Year of fee payment: 8 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313532 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130210 Year of fee payment: 8 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140210 Year of fee payment: 9 |
|
LAPS | Cancellation because of no payment of annual fees |