JP3629092B2 - Container loading / unloading equipment for container hangars - Google Patents

Container loading / unloading equipment for container hangars Download PDF

Info

Publication number
JP3629092B2
JP3629092B2 JP10430396A JP10430396A JP3629092B2 JP 3629092 B2 JP3629092 B2 JP 3629092B2 JP 10430396 A JP10430396 A JP 10430396A JP 10430396 A JP10430396 A JP 10430396A JP 3629092 B2 JP3629092 B2 JP 3629092B2
Authority
JP
Japan
Prior art keywords
container
loading
unloading
stage
cart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP10430396A
Other languages
Japanese (ja)
Other versions
JPH09267903A (en
Inventor
末多 井形
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP10430396A priority Critical patent/JP3629092B2/en
Publication of JPH09267903A publication Critical patent/JPH09267903A/en
Application granted granted Critical
Publication of JP3629092B2 publication Critical patent/JP3629092B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、コンテナ格納庫のコンテナ搬出入設備に係り、更に詳しくは、コンテナの段積み及び移載機能を有するコンテナ格納庫のコンテナ搬出入設備に関する。
【0002】
【従来の技術】
例えば船舶運送用コンテナや鉄道輸送用コンテナの陸上での保管は、限られたコンテナ格納庫を有効に利用するために、保管床の床幅方向及び床長さ方向にそれぞれ段積み状態で配列されるのが一般的である。
このように段積みされたコンテナ群のうち、所定列の所定番地にあるコンテナを、例えばフォークリフト車や天井クレーンにより取り出す場合には、その選択されたコンテナがある列の所定番地において、所望のコンテナが露呈するまで、最上段から順に保管床の外の仮置き場に運び出している。
その後、コンテナは、フォークリフト車や天井クレーンに吊られたまま、コンテナ格納庫近傍のコンテナ搬出入ステージで待機中のトレーラに積み込まれ、所定の目的地まで運搬されている。
【0003】
【発明が解決しようとする課題】
しかしながら、このように従来のフォークリフト車や天井クレーンを利用したものでは、その段積みされた列のコンテナと仮置き場との間をフォークリフト車や天井クレーンが移動するのに時間がかかり、その間に例えば数珠繋ぎに待機してしまったトレーラに、各々選択されたコンテナを、短時間で能率良く受け渡すことができないという問題点があった。
本発明はかかる事情に鑑みてなされたもので、コンテナの搬出入の作業性を向上できて、作業時間の短縮化が図れるコンテナ格納庫のコンテナ搬出入設備を提供することを目的とする。
【0004】
【課題を解決するための手段】
前記目的に沿う請求項1記載のコンテナ格納庫のコンテナ搬出入設備は、コンテナを段積み状態で収納する保管床の一部分に設けられたコンテナ渡しステージと、該コンテナ渡しステージに設けられて、前記コンテナの載置パレットを昇降させるリフタと、上部に前記載置パレットを載置して、前記リフタの下降位置から外部のコンテナ搬出入ステージまで移動可能な前記コンテナの入出庫台車と、前記コンテナ搬出入ステージに設けられた前記コンテナのバッファー台と、前記コンテナを、前記入出庫台車及び前記バッファー台間で移動させる第1の移載装置と、前記コンテナを、前記バッファー台及び前記コンテナ搬出入ステージに乗り入れてきた運搬車間で移動させる第2の移載装置とを備えている。
【0005】
【発明の実施の形態】
続いて、添付した図面を参照しつつ、本発明を具体化した実施の形態につき説明し、本発明の理解に供する。なお、説明の都合上、図面においてコンテナの保管床の長さ方向をX方向、幅方向をY方向、コンテナの段積み方向をZ方向とする。
図1に示すように、本発明の一実施の形態に係るコンテナ格納庫のコンテナ搬出入設備10は、コンテナ格納庫200の一側部に配置されて、コンテナ11を段積み状態で保管するX方向に長い4列の保管床12上に配備されたコンテナハンドリング装置100へ、コンテナ搬出入ステージS2で停車中の運搬車の一例であるトレーラ101上のコンテナ11を、保管床12の一端部のコンテナ渡しステージS1から受け渡したり、反対にコンテナハンドリング装置100からコンテナ11を受け取ってトレーラ101に積み込んだりする設備である。まず、図1、2を参照してコンテナ格納庫200を詳細に説明する。
【0006】
各保管床12には、4段積みのコンテナ11が、床幅方向であるY方向に6列、床長さ方向であるX方向に12個整列されている。なお、各列の前、後端に段積みされた各コンテナ11だけが、長尺コンテナである。
各保管床12の床幅方向の両側には、合計5本の枠架台20が、各々多数本の鉄骨脚20aを介して立設されており、各枠架台20上に、それぞれX方向に延びるレール21が設けられている。レール21間には、自走式のガーダ22が横架されている。
ガーダ22は、搭載された図外のモータの回転力をチェーン式動力伝達構造体(図示せず)を介して図外の駆動車輪に伝達することで、レール21上を走行する、Y方向に長い枠形の台車であり、ガーダ22の両側枠22a間下には、側面視して受け皿状の複数台のコンテナ仮置き台車28が、図外のレールを介して、Y方向へ走行可能に横架されている。
【0007】
また、図1、3に示すように、ガーダ22の両側枠22a間上には、各コンテナ仮置き台車28の上方を、図外の別レールを介してY方向へ自走可能で、しかも各コンテナ11に掛止可能な吊り具32と、その昇降用のウインチ33が搭載されたピックアップ台車34が横架されている。
吊り具32には、コンテナ11の上部の4つの角部に形成された図外の長孔に、抜き差し可能に挿入されたロックピン(図示せず)を90°回転させてロック又はロック解除する図外のツイストロックが配設されている。次に、図1〜3を参照して、コンテナ格納庫のコンテナ搬出入設備10を詳細に説明する。
【0008】
図1〜3に示すように、各列の保管床12のX方向の一端部にはコンテナ渡しステージS1がある。コンテナ渡しステージS1には、それぞれのコンテナハンドリング装置100へコンテナ11を受け渡したり、反対にコンテナハンドリング装置100からコンテナ11を受け取ったりする載置パレットPの昇降用のリフタ14が2機ずつ並設されている。
各リフタ14の下方には、各保管床12を跨いで、一端部が保管床12の外部のコンテナ搬出入ステージS2の近傍まで延びた、Y方向へ長い一対の入出庫台車レール16が設けられており、入出庫台車レール16上に、図外のモータにより駆動される自走式の入出庫台車13が、下部に4個ある車輪13aを介して載置されている。
各リフタ14は、各入出庫台車レール16の外側部に立設された一対のスタンド102を有しており、各スタンド102の対向面には、壁内側に内蔵された図外の電動ジャッキや油圧シリンダなどの駆動部により同期昇降される左、右一対の昇降板103が突設されている。なお、この昇降板103の最大下降位置は、図3の部分拡大図に示すように、支持していた載置パレットPを入出庫台車13上に完全に受け渡しできる位置である。
【0009】
また、コンテナ搬出入ステージS2上には、一端部が隣接するコンテナ渡しステージS1の一部分まで延びている門型枠架台18が立設されている。門型枠架台18のX方向の両上部梁105上には、それぞれY方向に延びる移載レール106が設けられており、移載レール106間に第1の移載装置17Aと、第2の移載装置17Bとが移動可能に載置されている。これらの第1、2の移載装置17A、17Bは、コンテナハンドリング装置100と同様に、一対のウインチ33により、ワイヤを導出させたり巻き上げたりして、コンテナ11を吊り上げるツイストロック式の吊り具32を昇降させる。
また、コンテナ搬出入ステージS2のコンテナ渡しステージS1側の床には、コンテナ収納穴107が設けられており、コンテナ収納穴107の底面上に、X方向に長くて、コンテナ11を搬出状態で待機させる第1、2のバッファー台19A、19Bが並設されている。
【0010】
各コンテナハンドリング装置100により取り出されたコンテナ11は、対応するコンテナ渡しステージS1において、予めリフタ14により上昇された載置パレットP上に受け渡され、その後、リフタ14による下降により載置パレットPが、入出庫台車レール16上の入出庫台車13に載置される。コンテナ11が載置された入出庫台車13は、コンテナ搬出入ステージS2に送り込まれ、第1の移載装置17Aにより第1、2のバッファー台19A、19Bに一旦載置してから、第2の移載装置17Bにより、待機中のトレーラ101に積み込まれる。
【0011】
次に、本発明の一実施の形態に係るコンテナ格納庫のコンテナ搬出入設備10の作動を説明する。
図1に示すように、各保管床12上にXY方向へ段積みされたコンテナ11は、ガーダ22を枠架台20上のレール21に沿って所定番地までX方向に走行させる。次いで、4台のコンテナ仮置き台車28を、所望のコンテナ11のある所定番地上から退避させた後、ピックアップ台車34のウインチ33を作動させて吊り具32を昇降させることでコンテナ11を吊り上げ、その後、ピックアップ台車34をY方向に移動させて吊り具32を下降させることにより、コンテナ仮置き台車28にコンテナ11を載置する。
このコンテナ仮置き台車28へのコンテナ11の載置は、所望のコンテナ1が最上段にある場合は、選択された1つのコンテナ11だけを、1台のコンテナ仮置き台車28に載置してもよいし、所望のコンテナ1が例えば最下段にある場合は、所定番地の全てのコンテナ11を各コンテナ仮置き台車28に1つずつ載置した後、所望のコンテナ11を残して、再び所定番地に載置してもよい。
【0012】
続いて、ガーダ22を保管床12の一端部にあるコンテナ渡しステージS1上までX方向に移動させ、そこでピックアップ台車34を用いて、コンテナ仮置き台車28上のコンテナ11を載置パレットP上に載置する。それから、図外の昇降駆動部により左、右の昇降板103を同期下降させると、載置パレットP及び該載置パレットP上のコンテナ11が、予め真下に待機していた入出庫台車13上に載置される。この際、昇降板103の下降動作は、昇降板103の上面が入出庫台車13の上面より下がる位置まで行なわれる。それから、入出庫台車13を入出庫台車レール16に沿ってコンテナ搬出入ステージS2の付近である、門型枠架台18の一側部の下方まで移送する。
【0013】
その後、載置パレットP及びコンテナ11は、一旦、第1の移載装置17Aにより、空になっている第1のバッファー台19A又は第2のバッファー台19B上に載置されて、コンテナ収納穴107内で搬出・待機される。なお、これらの一連の操作を、コンテナ格納庫200内の4つの各保管床12において連続的に行なうことにより、第1、2のバッファー台19A、19Bは、常時使用状態にあるものとする。
トレーラ101がコンテナ搬出入ステージS2へ乗り入れて来ると、第2の移載装置17Bが作動して、吊り具32により、第1のバッファー台19A又は第2のバッファー台19B上のコンテナ11を吊り上げ、それからトレーラ101の荷台に積み込む。
その後、荷台が空のトレーラ101が順次コンテナ搬出入ステージS2へ乗り込んできても、コンテナ収納穴107内の第1、2のバッファー台19A、19B上には、各コンテナハンドリング装置100からコンテナ11を受け取るリフタ14、入出庫台車13及び第1の移載装置17Aによる一連の自動搬送作業により、常時、コンテナ11が載置されているので、殆ど途切れることなく、連続的に第2の移載装置17Bによって、次のトレーラ101へコンテナ11を移載できる。これにより、コンテナ11の搬出の作業性を向上できて、その作業時間の短縮化が図れる。
【0014】
なお、これとは反対に、コンテナ搬出入ステージS2に乗り入れてきたトレーラ101上のコンテナ11を、コンテナ格納庫のコンテナ搬出入設備10及び各保管床12上のコンテナハンドリング装置100を用いて、コンテナ格納庫200に搬入する場合も、操作が反対になるだけで、同様にコンテナ11の搬入の作業性を向上できて、その作業時間の短縮化が図れる。
また、コンテナ搬出入ステージS2に、第1、2のバッファー台19A、19Bを配設したので、第1の移載装置17Aによりコンテナ収納穴107に収納されるコンテナ11の数が増加することにより、トレーラ101の乗り入れに合わせて途切れることなく、第2の移載装置17Bを介して、コンテナ11をトレーラ101に搭載できる。
そして、コンテナ格納庫のコンテナ搬出入設備10を、複数のコンテナ11を一度に移送可能なコンテナハンドリング装置100を有するコンテナ格納庫200に配備するようにしたので、コンテナ11の搬出入の自動化が図れると共に、その搬出入の作業効率をさらに向上できる。
【0015】
以上、本発明の実施の形態を示したが、本発明はこれに限定されるものではなく、要旨を逸脱しない範囲での設計の変更があっても本発明に含まれる。
例えば、本実施の形態では、コンテナ渡しステージを、保管床の一端部に設けたが、これに限定しなくても、例えば保管床の中央部など、その他どの位置に設けてもよい。
また、コンテナ渡しステージに設けられるリフタは、コンテナの載置パレットを昇降できるものであれば、どのような構造のものでもよい。
本実施の形態では、入出庫台車をレール走行式のものとしたが、これに限定しなくても、例えばタイヤを有する自走式の車両でもよい。また、入出庫台車の車線を、2つ以上の複数車線にしてもよい。
本実施の形態では、コンテナ格納庫の保管床上にコンテナハンドリング装置を配備させたが、これに限定しなくても、例えば従来通り、フォークリフト車や通常の天井クレーンによりコンテナを1つずつ搬出入するようにしてもよい。
【0016】
本実施の形態では、コンテナ搬出入ステージに、コンテナのバッファー台を2つ設けたが、これに限定しなくても、1又は3つ以上でもよい。
さらに、本実施の形態では、第1、2の移載装置として、吊り具をウインチによりワイヤ昇降させるものを採用したが、これに限定しなくても、例えばパンタグラフ式や伸縮ロッド式のものなどを採用してもよい。また、コンテナ搬出入ステージに配置される第1、2の移載装置を1台ずつとしたが、これに限定しなくても、2台以上の複数台ずつとしてもよい。要は、少なくとも1台ずつの第1、2の移載装置を有していればよい。
本実施の形態では、コンテナの運搬車としてトレーラを採用したが、これに限定しなくても、例えば電車の貨車などでもよい。
【0017】
【発明の効果】
請求項1記載のコンテナ格納庫のコンテナ搬出入設備においては、このように運搬車が、順次、コンテナ搬出入ステージへ乗り込んできても、バッファー台上には、リフタ、入出庫台車及び第1の移載装置による一連の自動搬送作業により、常時、コンテナが載置されているので、殆ど途切れることなく、連続的に第2の移載装置によって次の運搬車へコンテナを移載できて、コンテナの搬出入の作業性が向上でき、その作業時間の短縮化が図れる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係るコンテナ格納庫のコンテナ搬出入設備の使用状態を示す全体斜視図である。
【図2】同コンテナ搬出入ステージ周辺の拡大正面図である。
【図3】同拡大側面図である。
【符号の説明】
10 コンテナ格納庫のコンテナ搬出入設備
11 コンテナ 12 保管床
13 入出庫台車 13a 車輪
14 リフタ 16 入出庫台車レール
17A 第1の移載装置 17B 第2の移載装置
18 門型枠架台 19A 第1のバッファー台
19B 第2のバッファー台 20 枠架台
20a 鉄骨脚 21 レール
22 ガーダ 22a 側枠
28 コンテナ仮置き台車 32 吊り具
33 ウインチ 34 ピックアップ台車
100 コンテナハンドリング装置 101 トレーラ(運搬車)
102 スタンド 103 昇降板
105 上部梁 106 移載レール
107 コンテナ収納穴 200 コンテナ格納庫
P 載置パレット S1 コンテナ渡しステージ
S2 コンテナ搬出入ステージ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a container loading / unloading facility for a container hangar, and more particularly, to a container loading / unloading facility for a container hangar having container stacking and transfer functions.
[0002]
[Prior art]
For example, on-shore storage of shipping containers and rail transport containers is arranged in a stacked state in the floor width direction and floor length direction of the storage floor in order to effectively use the limited container hangar. It is common.
In the case of taking out a container at a predetermined address in a predetermined row from the group of containers stacked in this way, for example, by using a forklift truck or an overhead crane, a desired container at the predetermined address in the row where the selected container is located. Until it is exposed, it is carried out to the temporary storage area outside the storage floor in order from the top.
After that, the container is loaded on a waiting trailer at a container loading / unloading stage in the vicinity of the container hangar while being suspended by a forklift truck or an overhead crane, and is transported to a predetermined destination.
[0003]
[Problems to be solved by the invention]
However, in the case of using conventional forklift trucks and overhead cranes in this way, it takes time for the forklift trucks and overhead cranes to move between the stacked rows of containers and the temporary storage area. There was a problem that each selected container could not be delivered efficiently in a short time to the trailer that had been waiting in a row.
The present invention has been made in view of such circumstances, and an object of the present invention is to provide a container loading / unloading facility for a container hangar capable of improving the workability of loading / unloading of containers and shortening the working time.
[0004]
[Means for Solving the Problems]
The container loading / unloading facility for a container hangar according to claim 1, which meets the object, includes a container transfer stage provided at a part of a storage floor for storing containers in a stacked state, and the container transfer stage provided at the container transfer stage. A lifter for raising and lowering the loading pallet, a loading / unloading cart for the container that can be moved from the lowered position of the lifter to an external container loading / unloading stage by placing the loading pallet on the upper part, and the container loading / unloading A buffer stand for the container provided on a stage; a first transfer device for moving the container between the loading / unloading cart and the buffer stand; and the container for the buffer stand and the container loading / unloading stage. And a second transfer device that moves between the transported vehicles.
[0005]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the accompanying drawings for understanding of the present invention. For convenience of explanation, in the drawings, the length direction of the storage floor of the container is the X direction, the width direction is the Y direction, and the stacking direction of the containers is the Z direction.
As shown in FIG. 1, a container loading / unloading facility 10 of a container hangar according to an embodiment of the present invention is arranged on one side of a container hangar 200 and stores containers 11 in a stacked state in the X direction. The container 11 on the trailer 101, which is an example of a transport vehicle stopped at the container loading / unloading stage S2, is delivered to the container handling device 100 arranged on the long four rows of storage floors 12 at one end of the storage floor 12. This is a facility for delivering from the stage S1 and receiving the container 11 from the container handling apparatus 100 and loading it on the trailer 101. First, the container storage 200 will be described in detail with reference to FIGS.
[0006]
In each storage floor 12, four rows of containers 11 are arranged in six rows in the Y direction which is the floor width direction and twelve in the X direction which is the floor length direction. Note that only the containers 11 stacked at the front and rear ends of each row are long containers.
A total of five frame mounts 20 are erected on both sides in the floor width direction of each storage floor 12 via a plurality of steel frame legs 20a, and extend in the X direction on each frame mount 20, respectively. Rails 21 are provided. A self-propelled girder 22 is placed between the rails 21.
The girder 22 travels on the rail 21 in the Y direction by transmitting the rotational force of the mounted motor (not shown) to the driving wheel (not shown) via a chain type power transmission structure (not shown). It is a long frame-shaped carriage, and between the two side frames 22a of the girder 22, a plurality of container-like temporary storage carriages 28 in a side view can be run in the Y direction via rails not shown. It is horizontal.
[0007]
As shown in FIGS. 1 and 3, between the side frames 22 a of the girder 22, the upper part of each container temporary placing carriage 28 can be self-propelled in the Y direction via another rail not shown, and each A lifting cart 32 that can be hooked on the container 11 and a pick-up carriage 34 on which a winch 33 for raising and lowering the same are mounted horizontally.
The hanging tool 32 is locked or unlocked by rotating a lock pin (not shown) removably inserted into a long hole (not shown) formed in the four corners of the upper portion of the container 11 by 90 °. A twist lock (not shown) is provided. Next, the container carry-in / out facility 10 of the container hangar will be described in detail with reference to FIGS.
[0008]
As shown in FIGS. 1-3, the container delivery stage S1 exists in the one end part of the X direction of the storage floor 12 of each row | line | column. In the container delivery stage S1, two lifters 14 for raising and lowering the mounting pallet P for delivering the container 11 to each container handling apparatus 100 and receiving the container 11 from the container handling apparatus 100 are arranged in parallel. ing.
Below each lifter 14, a pair of loading / unloading cart rails 16 extending in the Y direction and having one end extending to the vicinity of the container loading / unloading stage S2 outside the storage floor 12 are provided across the storage floors 12. A self-propelled loading / unloading cart 13 driven by a motor (not shown) is placed on the loading / unloading cart rail 16 via four wheels 13a at the bottom.
Each lifter 14 has a pair of stands 102 erected on the outer side of each loading / unloading cart rail 16, and on the opposite surface of each stand 102, A pair of left and right lifting plates 103 that are lifted and lowered synchronously by a driving unit such as a hydraulic cylinder are provided. The maximum lowering position of the elevating plate 103 is a position at which the supported mounting pallet P can be completely delivered onto the loading / unloading cart 13 as shown in the partially enlarged view of FIG.
[0009]
Further, on the container carry-in / out stage S2, a gate-type frame base 18 having one end extending to a part of the adjacent container transfer stage S1 is erected. On both upper beams 105 in the X direction of the portal frame 18, transfer rails 106 extending in the Y direction are provided, and the first transfer device 17 </ b> A and the second transfer device 106 are provided between the transfer rails 106. A transfer device 17B is movably mounted. These first and second transfer devices 17A and 17B, like the container handling device 100, are twist-lock-type lifting devices 32 that lift the container 11 by pulling out and winding up wires by a pair of winches 33. Raise and lower.
In addition, a container storage hole 107 is provided on the floor of the container transfer stage S2 on the container transfer stage S1 side. The container storage hole 107 is long in the X direction on the bottom surface of the container storage hole 107 and waits for the container 11 in the transfer state. The first and second buffer bases 19A and 19B are arranged side by side.
[0010]
The container 11 taken out by each container handling device 100 is transferred onto the mounting pallet P that has been raised by the lifter 14 in advance at the corresponding container transfer stage S1, and then the loading pallet P is lowered by the lifter 14 to be lowered. It is placed on the loading / unloading cart 13 on the loading / unloading cart rail 16. The loading / unloading cart 13 on which the container 11 is placed is sent to the container loading / unloading stage S2 and is temporarily placed on the first and second buffer stands 19A and 19B by the first transfer device 17A. Is loaded on the trailer 101 on standby.
[0011]
Next, the operation of the container carry-in / out facility 10 of the container hangar according to the embodiment of the present invention will be described.
As shown in FIG. 1, the containers 11 stacked in the XY direction on each storage floor 12 run the girder 22 in the X direction along a rail 21 on the frame base 20 to a predetermined address. Subsequently, after the four container temporary storage carts 28 are retracted from the predetermined ground where the desired container 11 is located, the winch 33 of the pickup cart 34 is operated to lift and lower the lifting tool 32 to lift the container 11, Thereafter, the container 11 is placed on the container temporary placement carriage 28 by moving the pickup carriage 34 in the Y direction and lowering the hanging tool 32.
The container 11 is placed on the temporary container carriage 28 when the desired container 1 is at the uppermost level, only one selected container 11 is placed on the temporary container carriage 28. Alternatively, if the desired container 1 is at the lowest level, for example, all containers 11 at a predetermined address are placed one by one on each container temporary storage cart 28, then the desired container 11 is left and again predetermined. It may be placed at the address.
[0012]
Subsequently, the girder 22 is moved in the X direction to the container delivery stage S1 at one end of the storage floor 12, and the container 11 on the temporary container carriage 28 is placed on the placement pallet P using the pickup carriage 34 there. Place. Then, when the left and right elevating plates 103 are synchronously lowered by an elevating drive unit (not shown), the loading pallet P and the container 11 on the loading pallet P are placed on the loading / unloading cart 13 that has been waiting in advance. Placed on. At this time, the lowering operation of the elevating plate 103 is performed to a position where the upper surface of the elevating plate 103 is lowered from the upper surface of the loading / unloading cart 13. Then, the loading / unloading cart 13 is transferred along the loading / unloading cart rail 16 to the lower side of one side portion of the gate-type frame mount 18 near the container loading / unloading stage S2.
[0013]
Thereafter, the placement pallet P and the container 11 are once placed on the empty first buffer table 19A or the second buffer table 19B by the first transfer device 17A, and then the container storage hole. It is carried out and waiting in 107. It is assumed that the first and second buffer bases 19A and 19B are always in use by performing these series of operations continuously on each of the four storage floors 12 in the container storage 200.
When the trailer 101 enters the container loading / unloading stage S2, the second transfer device 17B is activated, and the lifting device 32 lifts the container 11 on the first buffer table 19A or the second buffer table 19B. Then, it is loaded on the loading platform of the trailer 101.
After that, even when the trailer 101 with an empty loading platform has sequentially entered the container loading / unloading stage S2, the containers 11 from the container handling devices 100 are placed on the first and second buffer platforms 19A and 19B in the container storage hole 107. Since the container 11 is always placed by a series of automatic transfer operations by the receiving lifter 14, the loading / unloading cart 13 and the first transfer device 17A, the second transfer device is continuously cut almost without interruption. The container 11 can be transferred to the next trailer 101 by 17B. Thereby, the workability of carrying out the container 11 can be improved, and the work time can be shortened.
[0014]
On the other hand, the container 11 on the trailer 101 that has entered the container loading / unloading stage S2 is stored in the container hangar using the container loading / unloading facility 10 of the container hangar and the container handling device 100 on each storage floor 12. In the case of carrying in 200, the operation of carrying in the container 11 can be improved in the same manner only by the reverse operation, and the working time can be shortened.
In addition, since the first and second buffer bases 19A and 19B are arranged in the container loading / unloading stage S2, the number of containers 11 stored in the container storage holes 107 by the first transfer device 17A increases. The container 11 can be mounted on the trailer 101 via the second transfer device 17B without interruption as the trailer 101 enters.
Since the container loading / unloading facility 10 of the container hangar is arranged in the container hangar 200 having the container handling apparatus 100 capable of transferring a plurality of containers 11 at a time, the loading / unloading of the container 11 can be automated. The work efficiency of the carrying in / out can be further improved.
[0015]
As mentioned above, although embodiment of this invention was shown, this invention is not limited to this, Even if there is a design change in the range which does not deviate from a summary, it is contained in this invention.
For example, in the present embodiment, the container delivery stage is provided at one end of the storage floor, but the present invention is not limited to this, and may be provided at any other position such as the center of the storage floor.
Further, the lifter provided on the container delivery stage may have any structure as long as it can raise and lower the container mounting pallet.
In the present embodiment, the loading / unloading cart is of a rail traveling type, but the present invention is not limited thereto, and may be a self-propelled vehicle having tires, for example. Further, the lane of the entry / exit cart may be two or more lanes.
In the present embodiment, the container handling device is arranged on the storage floor of the container hangar. However, the present invention is not limited to this. It may be.
[0016]
In the present embodiment, two container buffer stages are provided on the container carry-in / out stage.
Furthermore, in the present embodiment, as the first and second transfer devices, those that lift and lower the lifting tool with a winch are adopted, but the present invention is not limited to this, for example, a pantograph type or a telescopic rod type, etc. May be adopted. Moreover, although the 1st, 2nd transfer apparatus arrange | positioned at a container carrying in / out stage was made into 1 unit | set, it is good also as 2 units | sets or more units | sets, if not limited to this. In short, it is only necessary to have at least one first and second transfer device.
In the present embodiment, a trailer is adopted as a container transport vehicle. However, the present invention is not limited to this. For example, a train wagon may be used.
[0017]
【The invention's effect】
In the container loading / unloading facility of the container hangar according to claim 1, even if the transport vehicle sequentially enters the container loading / unloading stage in this way, the lifter, the loading / unloading cart and the first transfer cart are placed on the buffer table. Since the container is always placed by a series of automatic transfer operations by the loading device, the container can be transferred to the next transporting vehicle continuously by the second transfer device with almost no interruption. The workability of carry-in / out can be improved, and the work time can be shortened.
[Brief description of the drawings]
FIG. 1 is an overall perspective view showing a use state of a container carry-in / out facility of a container hangar according to an embodiment of the present invention.
FIG. 2 is an enlarged front view around the container carry-in / out stage.
FIG. 3 is an enlarged side view of the same.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Container container loading / unloading equipment 11 Container 12 Storage floor 13 Loading / unloading cart 13a Wheel 14 Lifter 16 Loading / unloading cart rail 17A 1st transfer device 17B 2nd transfer device 18 Gate type frame mount 19A 1st buffer Table 19B Second buffer table 20 Frame base 20a Steel leg 21 Rail 22 Girder 22a Side frame 28 Container temporary storage cart 32 Lifting tool 33 Winch 34 Pickup cart 100 Container handling device 101 Trailer (carrier vehicle)
102 Stand 103 Elevating plate 105 Upper beam 106 Transfer rail 107 Container storage hole 200 Container storage P Loading pallet S1 Container delivery stage S2 Container loading / unloading stage

Claims (1)

コンテナを段積み状態で収納する保管床の一部分に設けられたコンテナ渡しステージと、
該コンテナ渡しステージに設けられて、前記コンテナの載置パレットを昇降させるリフタと、
上部に前記載置パレットを載置して、前記リフタの下降位置から外部のコンテナ搬出入ステージまで移動可能な前記コンテナの入出庫台車と、
前記コンテナ搬出入ステージに設けられた前記コンテナのバッファー台と、
前記コンテナを、前記入出庫台車及び前記バッファー台間で移動させる第1の移載装置と、
前記コンテナを、前記バッファー台及び前記コンテナ搬出入ステージに乗り入れてきた運搬車間で移動させる第2の移載装置とを備えたことを特徴とするコンテナ格納庫のコンテナ搬出入設備。
A container delivery stage provided on a part of a storage floor for storing containers in a stacked state;
A lifter provided on the container delivery stage for raising and lowering the placement pallet of the container;
The container pallet that can move from the lowered position of the lifter to the external container loading / unloading stage by placing the mounting pallet on the top,
A buffer stand for the container provided in the container loading / unloading stage;
A first transfer device for moving the container between the loading / unloading cart and the buffer table;
A container loading / unloading facility for a container hangar, comprising: a second transfer device for moving the container between the buffer table and a transport vehicle that has entered the container loading / unloading stage.
JP10430396A 1996-03-29 1996-03-29 Container loading / unloading equipment for container hangars Expired - Fee Related JP3629092B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10430396A JP3629092B2 (en) 1996-03-29 1996-03-29 Container loading / unloading equipment for container hangars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10430396A JP3629092B2 (en) 1996-03-29 1996-03-29 Container loading / unloading equipment for container hangars

Publications (2)

Publication Number Publication Date
JPH09267903A JPH09267903A (en) 1997-10-14
JP3629092B2 true JP3629092B2 (en) 2005-03-16

Family

ID=14377165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10430396A Expired - Fee Related JP3629092B2 (en) 1996-03-29 1996-03-29 Container loading / unloading equipment for container hangars

Country Status (1)

Country Link
JP (1) JP3629092B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100707994B1 (en) * 2006-02-10 2007-04-16 정경자 Tower type container loading equipment
WO2007091855A1 (en) * 2006-02-10 2007-08-16 Kyong-Ja Jung Method and apparatus for storaging and transfering containers
KR100791123B1 (en) * 2006-03-29 2008-01-02 한국해양수산개발원 Container terminal system using high stacking system and control method that system

Also Published As

Publication number Publication date
JPH09267903A (en) 1997-10-14

Similar Documents

Publication Publication Date Title
JP3760203B2 (en) Device for parking a car in a space-saving way
KR100474103B1 (en) Gantry crane
JP3629092B2 (en) Container loading / unloading equipment for container hangars
JP3051527B2 (en) How to use the elevator type multi-story parking device
JPH0617640B2 (en) Statka crane multi-level parking lot
JP3139698B2 (en) Container hangar
JPS62130908A (en) Chassis accommodating equipment
JP3164204B2 (en) Article transfer equipment for article storage shelves
JPH06166438A (en) Controller for pallet in gantry crane
KR19980045030A (en) Cargo handling / shipping method and device
JPH11106009A (en) Automatic high-rise warehouse for container
JP3323267B2 (en) Freight carrier
US20230192425A1 (en) Apparatus and method for unloading and loading a transport unit
JPH0818648B2 (en) Temporary storage / import facility for tunnel segment
JPS63154502A (en) Three-dimensional cargo containing device
JP2000264406A (en) Automatic warehouse with bridging function
CN110080579B (en) Container trailer stereo garage
JP2666906B2 (en) Heavy object attitude changing device
JPH09263386A (en) Container handling device
JP2568947B2 (en) Multi-level parking device
JPH04353174A (en) Multi-tier parking device
JP3091941B2 (en) Mechanical parking equipment
JP2001261165A (en) Pallet loading and unloading equipment and loading and unloading method
JP2002019916A (en) Container storage device
JPH09255282A (en) Stack crane

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041130

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041210

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081217

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081217

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091217

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees