JP3607651B2 - Column steel frame construction equipment - Google Patents
Column steel frame construction equipment Download PDFInfo
- Publication number
- JP3607651B2 JP3607651B2 JP2001271269A JP2001271269A JP3607651B2 JP 3607651 B2 JP3607651 B2 JP 3607651B2 JP 2001271269 A JP2001271269 A JP 2001271269A JP 2001271269 A JP2001271269 A JP 2001271269A JP 3607651 B2 JP3607651 B2 JP 3607651B2
- Authority
- JP
- Japan
- Prior art keywords
- column
- steel frame
- column steel
- receiving
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、鉄骨または鉄骨コンクリート造の建築、その他の構造物を構築する建設工事において、柱鉄骨を建込むために、垂直もしくはこれに近い状態で立ち上がらせる作業を行うのに使用する柱鉄骨の建方装置および方法に関するものである。
【0002】
【従来の技術】
柱鉄骨を建込みのもっとも一般的に行われている方法を図7〜図9にて示すと、まず、図7に示すように、三角形の末広がり脚部14aを有する固定架台14を適宜な間隔で配置し、その上に柱鉄骨12を載置して水平状態に支承しておく。そして、柱鉄骨12の両側にクレーン17を配置してこのクレーン17で柱鉄骨両端部に設けたワイヤーフック13をそれぞれワイヤー15を介して吊り上げ、水平状態で浮かして固定架台14から外す。
【0003】
次いで、図8に示すように柱鉄骨12の一方のクレーン17で吊支したワイヤーフック13を高く吊り上げ、他方のワイヤーフック13の部分と高低差をつける。こうすることにより柱鉄骨12を地面に対して徐々に斜めに傾ける。柱鉄骨12を垂直に近い状態まで吊り上げたら、下端側になったワイヤーフック13からワイヤー15をはずし、図9に示すように上端側のワイヤーフック13のみをワイヤー15にて吊り上げることで、柱鉄骨12を完全に垂直に立ち上げる。
【0004】
一方、柱を建方するための発明としてクレーンを設置出来ないような狭い場所に柱を建てるものも提案されている。例えば、特願平11- 201029号(特開2001−27045号公報)では図10に示すように、フォークリフトをベースマシンとした自走台車18の前部に、建方すべき柱19を起立させた状態で昇降自在に保持する保持機構20を備えた柱建方装置を使用し、柱19のワイヤーフック13をワイヤー15によりクレーンフック16と接続し、クレーンにより柱19を吊り上げることでほぼ垂直状態まで起立させてそれを保持機構20により保持する。保持機構20は前後方向への若干の起倒が可能であり、これにより柱19を完全に垂直な状態にする。垂直状態となった柱19を保持機構20で持ち上げ、柱建設位置まで移動させる。
【0005】
【発明が解決しようとする課題】
前記図7〜図9に示した従来最も多く行われている柱鉄骨の建方方法では、クレーンを2機使用することになり、このため、機材を多く必要とするだけでなく、クレーン2機が設置できるだけの広い場所の確保も必要となる。また、2機のクレーンを同時に操作する必要があるので、クレーン操作に熟練した手腕が問われ、危険も多い。
【0006】
また、特開2001−27045号公報の柱建方装置および柱建方方法では、まず柱をほぼ垂直状態まで起立させる必要があり、それには従来のクレーンを2機使用する方法を必要とする。さらに複雑な機構の柱建方装置が必要であり、また柱を立て起してから柱の場所を移動させるため、作業手順数が増えてしまう。
【0007】
本発明の目的は前記従来例の不都合を解消し、クレーンが1機でも、安全にかつ容易に柱鉄骨を垂直もしくはこれに近い状態で立ち上げることができる柱鉄骨の建方装置および方法を提供することにある。
【0008】
【課題を解決するための手段】
本発明は前記目的を達成するため、回転架台として、接地用の枠組み基部に左右支柱を立設し、その先端の軸受けで柱鉄骨の受け梁材を回転自在に支承し、この受け梁材に、受け梁材に直交して取り付ける水平アーム材とこの水平アーム材の端に立ち上げる垂直支持部材としての枠体からなり、水平アーム材は垂直支持部材立上げ側端と反対側の端を支柱より外側に突出させた柱受部を取り付け、支柱と柱受部にピン挿通孔を設け、支柱に柱受部が水平になる位置で、ピン挿通孔同士にピンを差し入れるようにしたことを要旨とするものである。
【0009】
請求項1記載の発明によれば、柱鉄骨は地上に水平状態で載置するが、その際上端側を固定架台で支持し、下端部側面を本発明装置の受け梁材で支承し、また柱受部に柱鉄骨下端面を当接しておく。柱鉄骨に下端にベースプレートが接合されている場合は柱受部に当接するのはこのベースプレート裏面になる。これら梁材および柱受部は軸受けにて回転自在であるため、柱鉄骨の角度に合わせて回転可能であるので、固定架台側の柱鉄骨端をワイヤーで吊り上げ、同時に回転架台の回転部で柱鉄骨端を支承する状態で、柱鉄骨を垂直もしくはこれに近い状態で立ち上がらせることができる。
【0010】
また、前記作用に加えて、柱受部は、受け梁材に直交して取り付ける水平アーム材とこの水平アーム材の端に立ち上げる垂直支持部材としての枠体からなることで、受け梁材と垂直支持部材間に空所が確保できてベースプレートの出っ張り分を受け入れることができる。また、柱受部は枠体により構成されるため、簡潔かつ軽量であり、かつ確実に柱鉄骨下端面を受け止めることができる。
【0011】
水平アーム材の垂直支持部材立上げ側端と反対側の端を支柱より外側に突出させたことでこの部分が水平アーム材部のバランサーとなり、水平アーム材部が急激に回転してしまうことを防止できる。
【0012】
さらに、支柱と柱受部に設けたピン挿通孔同士にピンを差し入れることで支柱に対し柱受部が水平となる位置での固定が可能であり、梁材および柱受部が不用意に回転するのを防ぎ、安定性を確保できる。
【0013】
【発明の実施の形態】
以下、図面について本発明の実施の形態を詳細に説明する。図1は本発明の柱鉄骨の建方装置の1実施形態を示す正面図、図2は同上側面図、図3は同上平面図で、図中1は接地用の土台部としての枠組み基部である。
【0014】
この枠組み基部1は地面に柱鉄骨の建方装置を設置したとき、地面に接する部分で、本実施形態では同じ長さのH形鋼を長短2本ずつ2組を組んだ長方形の枠体である。図2および図3で示すように枠組み基部1は縦横に適度な長さを持ち、柱鉄骨の建方装置に柱鉄骨を載置しても、地面に対して安定しているようになっている。これにより、柱鉄骨の建方作業を行う際に、柱鉄骨の建方装置は地面に対して固置され、安全に作業ができる。
【0015】
枠組み基部1の長手方向の部材の中央に支柱2を立ち上げ、その先端にベアリングを介在させた軸受け(ピローブロック)3を設け、この軸受け3で受け梁材5からの回転軸4を軸支した。支柱2は枠組み基部1の左右で立設され、受け梁材5は形鋼を利用したもので、枠組み基部1の短長方向に掛渡され、軸受け3を介して回転自在に支承されるものである。
【0016】
受け梁材5の上面には、柱鉄骨の径に見合う間隔を存して垂直壁面6aを対向させた受け止め6をボルト等で着脱自在に設ける。該受け止め6はブロック材として鋼材で形成する。
【0017】
この受け梁材5に、端部に垂直支持部材21を立ち上げた柱受部7を取り付ける。この柱受部7は前記受け梁材5に直交して下面側に取り付ける水平アーム材8とこの水平アーム材8の端に立ち上げる垂直支持部材21としてのコの字形またはロの字形の枠体からなる。
【0018】
前記水平アーム材8も形鋼材を使用し、受け梁材5の下面に溶接またはボルト止め等で固設するが、前記垂直支持部材21を立上げた側の端と反対側の端を支柱2の位置より外側に突出させてバランサー部9とした。バランサー部9は支柱2に対してバランサー部9と反対側の水平アーム材8や柱受部7との重量バランスをとるためのものであり、バランサー部9を設けることで、柱鉄骨の建方装置を静置したときに、柱受部7は支柱2に対して前後のバランスがとれ、垂直支持部材21側の荷重で急激に回転してしまうことを防止できる。
【0019】
支柱2にはピン挿通孔10を穿設し、図は省略するが、柱受部7の水平アーム材8にもピン挿通孔を設け、これらピン挿通孔は支柱2に対して柱受部7が水平状態になったときに位置が一致するようにした。
【0020】
前記ピン挿通孔同士が一致した状態で支柱2のピン挿通孔10から挿入するピン11を準備するが、このピン11は鎖22で支柱2側に繋ぎ、遺失を防いでいる。
【0021】
ピン挿通孔にピン11を挿入することで、柱鉄骨置載部と土台部の相互位置を固定することができる。これは柱鉄骨の建方装置を輸送するときや、作業中に柱鉄骨置載部が不用意に土台部に対して回転することを防ぐものである。これにより安全に柱鉄骨の建方装置を使用することができる。ピン11を抜けば、柱鉄骨置載部と土台部は再び回転自在となる。
【0022】
次に前記柱鉄骨の建方装置を用いて行う柱鉄骨の建方方法について説明する。図4〜図6は本発明の柱鉄骨の建方方法の各工程を示す側面図で、まず図4に示すように、一方に固定架台14を、他方に本発明の柱鉄骨の建方装置を配置し、柱鉄骨12を水平に支承する。なお固定架台14を配置する側が柱鉄骨12の上端、柱鉄骨の建方装置を配置する側が下端となるようにする。
【0023】
固定架台14は柱鉄骨12を水平になるように支承するものであり、特別な装置である必要はなく、前記従来例の図7に示したものと同じで三角形の末広がり脚部14aを有するものでよい。固定架台14の高さは柱鉄骨の建方装置の受け梁材5の高さとほぼ同じであり、柱鉄骨12を支承することが可能なものなら、材料等も特に限定するものではない。柱鉄骨の建方装置はピン11により柱鉄骨置載部と土台部の相互位置を固定しておくものとする。
【0024】
本発明の柱鉄骨の建方装置で柱鉄骨12の一端を支承するにあたり、柱鉄骨12を受け梁材5の受け止め6の間に収まるようにして、受け梁材5で柱鉄骨12の下端部側面を支承し、また柱受部7の垂直支持部材21に柱鉄骨12の下端面を当接しておく。
【0025】
図4に示すように、柱鉄骨12の下端にはベースプレート12aが存在するが、このような場合にも、受け梁材5と水平アーム材8を段差をつけて接合することにより受け梁材5と垂直支持部材21間に空所が確保できてここでベースプレート12aの出っ張り分を受け入れることができる。
【0026】
次に図5に示すように、柱鉄骨12に設けたワイヤーフック13をワイヤー15によりクレーンフック16と接続する。クレーンによりクレーンフック16を引き上げ、ワイヤーフック13を吊り上げる。ワイヤーフック13は柱鉄骨12の上端部に存在するため、柱鉄骨12の上端を吊り上げることとなる。その際、ピン11は抜いておく。
【0027】
上端を吊り上げるにつれ、柱鉄骨12は地面に対しての傾きを増していく。それに従い、受け梁材5を中心に柱鉄骨の建方装置の柱鉄骨置載部は回転し、柱鉄骨12の傾きに対応する。
【0028】
図6に示されるように、柱鉄骨12が垂直状態になるまでクレーンフック16を吊り上げる。さらにクレーンフック16を吊り上げることで、柱鉄骨12の下端面は柱受部7から離れ、垂直状態で完全に浮上する。この状態でクレーンにより柱鉄骨12を本来建込む位置に移動させる。
【0029】
【発明の効果】
以上述べたように本発明の柱鉄骨の建方装置は、クレーンが1機でも、安全にかつ容易に柱鉄骨を垂直もしくはこれに近い状態で立ち上げることができるものである。
【図面の簡単な説明】
【図1】本発明の柱鉄骨の建方装置の1実施形態を示す正面図である。
【図2】本発明の柱鉄骨の建方装置の1実施形態を示す側面図である。
【図3】本発明の柱鉄骨の建方装置の1実施形態を示す平面図である。
【図4】本発明の柱鉄骨の建方装置を用いた柱鉄骨の建方方法の第1工程の側面図である。
【図5】本発明の柱鉄骨の建方装置を用いた柱鉄骨の建方方法の第2工程の側面図である。
【図6】本発明の柱鉄骨の建方装置を用いた柱鉄骨の建方方法の第3工程の側面図である。
【図7】従来例の第1工程を示す側面図である。
【図8】従来例の第2工程を示す側面図である。
【図9】従来例の第3工程を示す側面図である。
【図10】他の従来例を示す側面図である。
【符合の説明】
1…枠組み基部 2…支柱
3…軸受け 4…回転軸
5…受け梁材 6…受け止め
6a…垂直壁面 7…柱受部
8…水平アーム材 9…バランサー部
10…ピン挿通孔 11…ピン
12…柱鉄骨 12a…ベースプレート
13…ワイヤーフック 14…固定架台
14a…脚部 15…ワイヤー
16…クレーンフック 17…クレーン
18…自走台車 19…柱
20…保持機構 21…垂直支持部材
22…鎖[0001]
BACKGROUND OF THE INVENTION
The present invention relates to the construction of a column steel frame used for the work of standing up in a vertical or near state in order to build a column steel frame in a construction work for constructing a steel frame or a steel concrete structure or other structure. The present invention relates to a construction apparatus and method.
[0002]
[Prior art]
7 to 9 show the most commonly used method of erection of the column steel frame. First, as shown in FIG. 7, the
[0003]
Next, as shown in FIG. 8, the
[0004]
On the other hand, as an invention for constructing a pillar, there is also proposed a construction in which a pillar is built in a narrow place where a crane cannot be installed. For example, in Japanese Patent Application No. 11-201029 (Japanese Patent Laid-Open No. 2001-27045), as shown in FIG. 10, a
[0005]
[Problems to be solved by the invention]
7 to 9, the most commonly used method for constructing pillar steel frames requires two cranes. Therefore, not only a lot of equipment is required, but two cranes are used. It is also necessary to secure a large space that can be installed. In addition, since it is necessary to operate two cranes at the same time, the skill of crane operation is required, and there are many dangers.
[0006]
Further, in the column building apparatus and column building method disclosed in Japanese Patent Laid-Open No. 2001-27045, it is necessary to first erect the column to a substantially vertical state, which requires a method of using two conventional cranes. Furthermore, a column construction apparatus having a complicated mechanism is required, and the number of work procedures increases because the location of the column is moved after raising the column.
[0007]
An object of the present invention is to provide a column steel frame construction apparatus and method that can eliminate the disadvantages of the conventional example and can safely and easily start up a column steel frame vertically or close to it even with a single crane. There is to do.
[0008]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the present invention, as a rotating mount, has left and right support columns upright on a grounding frame base, and rotatably supports a column steel receiving beam member with a bearing at its tip. The arm consists of a horizontal arm member that is mounted perpendicular to the receiving beam member and a frame as a vertical support member that rises at the end of the horizontal arm member. The horizontal arm member has a column on the opposite end to the vertical support member rising side end. A column receiving part that protrudes more outward is installed, and a pin insertion hole is provided in the column and the column receiving part, and the pin is inserted between the pin insertion holes at a position where the column receiving part is horizontal to the column. It is a summary.
[0009]
According to the first aspect of the present invention, the column steel frame is placed in a horizontal state on the ground. At this time, the upper end side is supported by the fixed base, the lower end side surface is supported by the receiving beam material of the device of the present invention, and The lower end surface of the column steel frame is brought into contact with the column receiving portion. When the base plate is joined to the lower end of the column steel frame, it is the back surface of the base plate that comes into contact with the column receiving portion. Since these beam members and column bearings can be rotated by bearings, they can be rotated according to the angle of the column steel frame, so the column steel end on the fixed frame side is lifted with a wire, and at the same time the column is rotated by the rotation unit of the rotation frame. The column steel frame can be made to stand upright or close to the state in which the steel frame end is supported.
[0010]
Further, in addition to the above action, the column receiving portion is composed of a horizontal arm material that is attached orthogonal to the receiving beam material and a frame as a vertical support member that rises at the end of the horizontal arm material. A space can be secured between the vertical support members, and the protruding portion of the base plate can be received. Moreover, since the column receiving portion is constituted by a frame, it is simple and lightweight, and can reliably receive the lower end surface of the column steel frame.
[0011]
By projecting the end of the horizontal arm material opposite the vertical support member rising side end to the outside of the column, this part becomes a balancer of the horizontal arm material part, and the horizontal arm material part suddenly rotates. Can be prevented.
[0012]
Furthermore, by inserting a pin between the pin insertion holes provided in the column and the column holder, it is possible to fix the column holder in a position where it is horizontal to the column, and the beam material and the column holder are inadvertent. Prevents rotation and secures stability.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a front view showing an embodiment of a pillar steel frame construction apparatus according to the present invention, FIG. 2 is a side view of the same, FIG. 3 is a plan view of the same, and 1 is a framework base as a grounding base part is there.
[0014]
This
[0015]
A
[0016]
On the upper surface of the
[0017]
A
[0018]
The
[0019]
Although the
[0020]
A
[0021]
By inserting the
[0022]
Next, a method for building a column steel using the column steel frame building apparatus will be described. 4 to 6 are side views showing the steps of the method for constructing a column steel frame according to the present invention. First, as shown in FIG. And the
[0023]
The fixed
[0024]
In order to support one end of the
[0025]
As shown in FIG. 4, a
[0026]
Next, as shown in FIG. 5, the
[0027]
As the upper end is lifted, the
[0028]
As shown in FIG. 6, the
[0029]
【The invention's effect】
As described above, the column steel frame erection device of the present invention can safely and easily start up the column steel frame vertically or close to it even with one crane.
[Brief description of the drawings]
FIG. 1 is a front view showing an embodiment of a column steel frame erection device according to the present invention.
FIG. 2 is a side view showing one embodiment of the column steel frame erection device of the present invention.
FIG. 3 is a plan view showing one embodiment of the column steel frame erection device of the present invention.
FIG. 4 is a side view of a first step of a method for building a column steel using the column steel frame building apparatus of the present invention.
FIG. 5 is a side view of a second step of a method for constructing a column steel frame using the column steel frame construction apparatus of the present invention.
FIG. 6 is a side view of a third step of the method for constructing a column steel frame using the column steel frame construction apparatus of the present invention.
FIG. 7 is a side view showing a first step of a conventional example.
FIG. 8 is a side view showing a second step of a conventional example.
FIG. 9 is a side view showing a third step of the conventional example.
FIG. 10 is a side view showing another conventional example.
[Explanation of sign]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001271269A JP3607651B2 (en) | 2001-09-07 | 2001-09-07 | Column steel frame construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001271269A JP3607651B2 (en) | 2001-09-07 | 2001-09-07 | Column steel frame construction equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003074186A JP2003074186A (en) | 2003-03-12 |
JP3607651B2 true JP3607651B2 (en) | 2005-01-05 |
Family
ID=19096797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001271269A Expired - Lifetime JP3607651B2 (en) | 2001-09-07 | 2001-09-07 | Column steel frame construction equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3607651B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639334A (en) * | 2016-10-21 | 2017-05-10 | 钟立朋 | Construction steel member conveying frame |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470057B (en) * | 2013-08-22 | 2016-03-23 | 安徽鸿路钢结构(集团)股份有限公司 | A kind of high-altitude component hoisting construction method |
JP6767657B2 (en) * | 2016-10-13 | 2020-10-14 | ジャパンパイル株式会社 | Ups and downs assisting device for construction equipment and mounting stand |
JP2020063648A (en) * | 2019-02-24 | 2020-04-23 | 富士重工ハウス株式会社 | Folding unit house |
JP7283254B2 (en) * | 2019-06-24 | 2023-05-30 | 株式会社大林組 | Long material supply system and long material erection method |
-
2001
- 2001-09-07 JP JP2001271269A patent/JP3607651B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639334A (en) * | 2016-10-21 | 2017-05-10 | 钟立朋 | Construction steel member conveying frame |
Also Published As
Publication number | Publication date |
---|---|
JP2003074186A (en) | 2003-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4654055B2 (en) | Lifting device for material transportation used for building scaffolding | |
JP3607651B2 (en) | Column steel frame construction equipment | |
JP2005248585A6 (en) | Temporary arm and assembly method of arm bracket in transmission line tower using this temporary arm | |
JP2005248585A (en) | Temporary arm and assembling method of crossarm in power transmission line steel tower using the temporary arm | |
CN209780923U (en) | Support bracket and support equipment | |
JPH071195U (en) | Steel frame erection equipment | |
JP2000247568A (en) | Suspending jig, standing jig and angle regulating jig | |
JP2011046482A (en) | Supporting device during transport of upper revolving body, and method for transporting upper revolving body | |
CN220684624U (en) | High-altitude operation equipment and safety supporting mechanism thereof | |
JPH05505Y2 (en) | ||
JP6579962B2 (en) | Tubing equipment transportation jig | |
JP3779510B2 (en) | Heavy lifting | |
CN217627218U (en) | Power head installation mechanism | |
JP3787657B2 (en) | Stock platform for beam members for construction | |
CN214531828U (en) | Civil engineering construction mounting frame | |
JP3937974B2 (en) | Machine support method | |
JPH062437A (en) | Device for building steel structure cage | |
JPH07279433A (en) | Erection method of rack and positioning device practically used for the erection method | |
JP3054575U (en) | Ink laser | |
JPH0732549Y2 (en) | Portable gantry crane | |
JP2525250Y2 (en) | Tower climbing equipment for tower cranes | |
CN117230972A (en) | Civil engineering construction safety frame | |
JPH0625503Y2 (en) | Winch mounting structure for bucket | |
JPH0411162A (en) | Mast removing device of elevator for construction | |
JP2001130900A (en) | Handrail for high lift work bench |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040127 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040217 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040415 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20040518 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040615 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040618 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20040726 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040928 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20041007 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3607651 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071015 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081015 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081015 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091015 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101015 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101015 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111015 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111015 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121015 Year of fee payment: 8 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121015 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131015 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |