JP3600604B2 - Steam generation equipment blowdown recovery system - Google Patents

Steam generation equipment blowdown recovery system Download PDF

Info

Publication number
JP3600604B2
JP3600604B2 JP2002254733A JP2002254733A JP3600604B2 JP 3600604 B2 JP3600604 B2 JP 3600604B2 JP 2002254733 A JP2002254733 A JP 2002254733A JP 2002254733 A JP2002254733 A JP 2002254733A JP 3600604 B2 JP3600604 B2 JP 3600604B2
Authority
JP
Japan
Prior art keywords
blowdown
water level
flash tank
steam
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002254733A
Other languages
Japanese (ja)
Other versions
JP2004093343A (en
Inventor
俊樹 小嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2002254733A priority Critical patent/JP3600604B2/en
Publication of JP2004093343A publication Critical patent/JP2004093343A/en
Application granted granted Critical
Publication of JP3600604B2 publication Critical patent/JP3600604B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Description

【0001】
【発明の属する技術分野】
本発明は、蒸気発生設備ブローダウン熱回収システムに関するものである。
【0002】
【従来の技術】
原子力発電プラントにおいては通常、原子炉の熱を利用した高温水を蒸気発生器に送り熱交換させた後に回収するいわゆる一次系と、蒸気発生器内で一次系の高温水を利用して蒸気を発生させ、この蒸気でタービンを回転させて発電し、その後、復水器にて復水させた後、蒸気発生器に回収するいわゆる二次系とを備え、二次系には、蒸気発生器の器内水の一部を取り出して不純物を浄化した後に復水へ回収するSGブローダウン系を備えている。SGブローダウン系では、必要に応じてブローダウンした流体の熱回収が行われる。
【0003】
図4に、SGブローダウン系を有する原子力発電プラントの二次系において、ブローダウンした流体からの熱回収を行う場合の主要な構成要素を示す。
二次系を構成する蒸気発生器1の下流には、高圧タービン3、湿分分離加熱器5、低圧タービン7、復水器9が配置されている。復水器9の下流は、途中に開閉弁10及び復水脱塩装置(コンデミ)11を備える主流配管13と、復水脱塩装置11の迂回路として機能し、開閉弁14を備える復水脱塩装置バイパス配管15とに分岐している。主流配管13と復水脱塩装置バイパス配管15との合流点17の下流には、復水ブースタポンプ21、低圧ヒータ23、脱気器25、給水ブースタポンプ27、給水ポンプ29及び高圧ヒータ31が設けられ、高圧ヒータ31が蒸気発生器1に接続され、二次系の循環経路が構成されている。復水ブースタポンプ21の上流には、必要に応じて復水ろ過器19が設置される。
【0004】
また、SGブローダウン系は以下のような主要構成を有する。蒸気発生器1はSGBD(steam generator blow down)管33を備え、SGBD管33の途中には、SGBD遮断弁35、SGBD絞り弁36が設けられている。SGBD絞り弁36の下流は、フラッシュタンク41に接続されるブローダウン常用ライン37と、復水器9に接続されるブローダウンバイパスライン38とに分岐している。それぞれのラインの配管には、SGブローダウンの回収先を手動で切り替える切替弁39a,39bが設けられている。
フラッシュタンク41の下流は、SGBD冷却器43、F/T(フラッシュタンク)水位制御弁45を備え、ブローダウン常用ライン37の一部を構成する配管49を介して、開閉弁10の下流であって復水脱塩装置11の上流の部分に接続される。また、フラッシュタンク41で分離された蒸気は、圧力制御弁48を備えた配管からなる熱回収ライン50を介して、脱気器25に接続される。
【0005】
このようなSGブローダウン系を備えた原子力発電プラントにおいては、通常運転時には、オペレータが手動で切替弁39aを開き切替弁39bを閉じた状態にし、蒸気発生器1でブローダウンされた流体を、SGブローダウンとしてフラッシュタンク41に導入し、フラッシュタンク41でフラッシュさせた、いわゆるフラッシュ蒸気を脱気器25に回収すると共に、残った液体は、SGブローダウン液体として、SGBD冷却器43に導入され、復水脱塩装置11の許容温度以下まで冷却された後、F/T水位制御弁45を介して復水脱塩装置11に送られる。復水脱塩装置11の許容温度とは、復水脱塩装置11のイオン交換樹脂の耐熱温度から定まる値であって、例えば40℃程度である。
【0006】
また、図5に示されるように、SGブローダウン系を制御し且つ異常を監視するため、フラッシュタンク41には、圧力スイッチ51、レベルスイッチ53、圧力コントローラ55、レベルコントローラ57が設けられている。さらに、SGBD冷却器43の下流には温度スイッチ59が設けられている。
ここで、圧力スイッチ51は、フラッシュタンク41内の圧力異常を感知して、圧力異常時にはSGBD遮断弁35を強制的に閉じるように構成されている。レベルスイッチ53は、フラッシュタンク41内のSGブローダウン液体の水位を感知し、異常水位HHWLになると、SGBD遮断弁35を強制的に閉じるように構成されている。圧力コントローラ55は、フラッシュタンク41内の圧力を感知して圧力制御弁48の開度を調節する。レベルコントローラ57は、フラッシュタンク41内のSGブローダウン液体の水位を感知し、水位が基準水位NWLとなるようにF/T水位制御弁45の開度を調節する。すなわち、水位が基準水位NWL以上になると、F/T水位制御弁45の開度を増加させ、基準水位NWL未満になると、F/T水位制御弁45の開度を減少させるように構成されている。
温度スイッチ59は、SGBD冷却器43から流出され、復水脱塩装置11に導入されるSGブローダウン液体の温度を感知して、その温度が復水脱塩装置11の許容温度に基づく基準温度以上の場合にSGBD遮断弁35を強制的に閉じるように構成されている。
【0007】
このような各種スイッチ、コントローラにより、SGBD遮断弁35及びF/T水位制御弁45に対して以下のような動作が行われる。
フラッシュタンク41内に圧力異常があると圧力スイッチ51がSGBD遮断弁35を閉じる。復水脱塩装置11に導入される液体に温度異常があると、温度スイッチ59がSGBD遮断弁35を閉じる。
また、図6に示されるように、フラッシュタンク41の水位が基準水位NWL以上になると、レベルコントローラ57はF/T水位制御弁45の開度を増加させ、フラッシュタンク41の水位を下げるように作用する。それにもかかわらず、フラッシュタンク41の水位が上昇して、異常水位HHWLまで達すると、レベルスイッチ53がSGBD遮断弁35を閉じる。
【0008】
上述したような異常によりSGBD遮断弁35が強制的に閉じた場合、オペレータは、まず手動で切替弁39a、39bを操作して、切替弁39aを閉じ切替弁39bを開いた状態にし、その後、SGBD遮断弁35を強制的に開いて、SGブローダウンの流れをブローダウン常用ライン37からブローダウンバイパスライン38に切り替え、SGブローダウンをバイパスライン38に導き復水器9に送る。
【0009】
【発明が解決しようとする課題】
しかしながら、上述したSGブローダウン系の異常のうち、フラッシュタンク41内の水位や復水脱塩装置11に導入されるSGブローダウン液体の温度の異常については、フラッシュタンク41でのフラッシュ蒸気による熱回収に不都合を生じるものではない。それにもかかわらず、SGBD遮断弁35が強制的に閉じ、フラッシュタンク41にSGブローダウンが導入されないため、フラッシュ蒸気による熱回収を継続することができないという問題点がある。
また、フラッシュタンク41内の水位や復水脱塩装置11導入前のSGブローダウン液体に温度異常が発生した場合、SGBD遮断弁35が強制的に閉じ、手動で切替弁39a、39bを操作してSGブローダウンをバイパスライン38に導く必要があった。
【0010】
この発明は、このような課題を解消するためになされたものであり、SGブローダウン系に異常が発生した場合であっても、フラッシュタンクでのフラッシュ蒸気による熱回収を効率的に行い、且つSGブローダウン液体の回収先を自動切替してフラッシュタンク水位の制御及び復水脱塩装置へ流入する流体の温度管理を適切に行うことができる蒸気発生設備ブローダウン回収システムを提供することを目的とする。
【0011】
【課題を解決するための手段】
上述の目的を達成するため、この発明の蒸気発生設備ブローダウン回収システムは、蒸気発生器、蒸気発生器からの蒸気を復水する復水器、復水器の下流に設けられた復水脱塩装置及び復水脱塩装置の下流に設けられた脱気器を備えた二次系において、蒸気発生器の流体の一部をブローダウンして導入するフラッシュタンクと、フラッシュタンクで分離された蒸気を脱気器に回収して熱回収を行う熱回収ラインと、フラッシュタンクの下流に設けられ、フラッシュタンクで蒸気と分離されたブローダウン液体を復水脱塩装置に送る流路を形成するブローダウン常用ラインと、フラッシュタンクの下流に設けられ、フラッシュタンクで蒸気と分離されたブローダウン液体を復水器へ送る流路を形成するブローダウンバイパスラインと、フラッシュタンクの下流に設けられ、ブローダウン常用ライン及びブローダウンバイパスラインの流量をそれぞれ決定する流路決定手段とを備えたことを特徴とするものである。
【0012】
フラッシュタンクのブローダウン液体の水位を検知する水位検知手段を備え、流路決定手段は、水位検知手段により検知された水位が、基準水位以上の場合にブローダウン常用ラインの流量を増加させ、基準高水位以上の場合にブローダウンバイパスラインの流量を増加させるができる。
ブローダウン常用ラインは、ブローダウン液体を冷却するSGBD冷却器を備え、さらに、SGBD冷却器の下流にブローダウン液体の温度を検知する温度検知手段を備え、流路決定手段は、温度検知手段により検知された温度が、復水脱塩装置の許容温度に基づいた基準温度以上の場合に、ブローダウン常用ラインの流路を閉じることができる。
流路決定手段は、ブローダウン常用ライン及びブローダウンバイパスラインにそれぞれ設けられた流量調節弁を含むことが好適である。
【0013】
【発明の実施の形態】
以下、この発明の実施の形態を表1及び添付図面に基づいて説明するが、図中、同一符号は同一又は対応部分を示すものとする。
【0014】
図1に、この発明の実施の形態に係る蒸気発生設備ブローダウン回収システムを備えた原子力発電プラントの二次系の主要な構成要素を示す。二次系を構成する蒸気発生器1の下流には、高圧タービン3、湿分分離加熱器5が設けられている。湿分分離加熱器5の下流に低圧タービン7が設けられている。低圧タービン7の下流には、復水器9が配置されている。復水器9の下流は、途中に開閉弁10及び復水脱塩装置11を備える主流配管13と、復水脱塩装置11の迂回路として機能し、開閉弁14を備える復水脱塩装置バイパス配管15とに分岐している。主流配管13と復水脱塩装置バイパス配管15との合流点17の下流には、復水ブースタポンプ21、低圧ヒータ23、脱気器25、給水ブースタポンプ27、給水ポンプ29、高圧ヒータ31が設けられ、高圧ヒータ31の下流は蒸気発生器1に接続され、二次系の循環経路が構成されている。復水ブースタポンプ21の上流には、必要に応じて復水ろ過器19が設置される。
【0015】
また、二次系に含まれるSGブローダウン系は以下のような主要構成を有する。蒸気発生器1は、SGBD管33を備え、SGBD管33の途中には、SGBD遮断弁35、SGBD絞り弁36が設けられている。SGBD絞り弁36の下流で、SGBD管33はフラッシュタンク41に接続される。
フラッシュタンク41の下流には、一端がフラッシュタンク41に接続され、途中にSGBD冷却器43、第1F/T水位制御弁61が設けられ、他端が開閉弁10の下流であって復水脱塩装置11の上流の部分に接続されたブローダウン常用ライン60が配置されている。また、フラッシュタンク41の下流であってSGBD冷却器43の上流で、ブローダウン常用ライン60から分岐し、途中に第2F/T水位制御弁71が設けられたブローダウンバイパスライン70が配置されている。このブローダウンバイパスライン70は、一端がフラッシュタンク41に接続され、他端が復水器9に接続される。ここで、第1F/T水位制御弁61及び第2F/T水位制御弁71は、流量調節が可能な流量調節弁であり、流路決定手段を構成する。
【0016】
さらに、フラッシュタンク41には、並列に配置された圧力制御弁48及びバイパス弁81を備え、低圧ヒータ23の下流であって脱気器25に接続される熱回収ライン80が設けられている。フラッシュタンク41で分離された蒸気は、この熱回収ライン80を介して脱気器25に送られる。ここで、バイパス弁81は、圧力制御弁48の迂回路手段として手動で流量調節が可能な弁である。
【0017】
また、図2に示されるように、SGブローダウン系を制御し且つ異常を監視するため、フラッシュタンク41には、圧力スイッチ51、レベルスイッチ53、圧力コントローラ55、レベルコントローラ63が設けられている。さらに、SGBD冷却器43の下流には温度スイッチ65が設けられている。
ここで、圧力スイッチ51は、フラッシュタンク41内の圧力異常を感知して、圧力異常時にはSGBD遮断弁35を強制的に閉じるように構成されている。
圧力コントローラ55は、フラッシュタンク41内の圧力を感知して圧力制御弁48の開度を調節する。
【0018】
レベルコントローラ63は、図3に示されるように、フラッシュタンク41内のSGブローダウン液体の水位を検知して、その水位に基づいて、第1F/T水位制御弁61及び第2F/T水位制御弁71の開度を調節する。すなわち、レベルコントローラ63は、水位検知手段及び流路決定手段を構成する。
具体的には、レベルコントローラ63は、フラッシュタンク41内のSGブローダウン液体の水位が基準水位NWLとなるように第1F/T水位制御弁61の開度を調節し、水位が基準水位NWL以上になると第1F/T水位制御弁61の開度を増加させ、流量を増加させるように構成されている。一方、基準水位NWL未満になると、第1F/T水位制御弁61の開度を減少させ、流量を減少させるように構成されている。第1F/T水位制御弁61の開度を増加しても、さらに、フラッシュタンク41の水位が上昇して基準高水位HWL以上になると、レベルコントローラ63は、第2F/T水位制御弁71の開度を増加し、流量を増加させるように構成されている。
【0019】
一方、レベルスイッチ53は、図3に示されるように、第1F/T水位制御弁及び第2F/T水位制御弁71の開度を増加しても、フラッシュタンク41内のSGブローダウン液体の水位がさらに上昇して異常水位HHWLになると、SGBD遮断弁35を強制的に閉じるように構成されている。
温度スイッチ65は、温度検知手段を機能し、SGBD冷却器43から流出され復水脱塩装置11に導入されるSGブローダウン液体の温度を検知して、その温度が復水脱塩装置11の許容温度を上回るような場合に、復水脱塩装置11へSGブローダウン液体がさらに流入するのを防止すべく、第1F/T水位制御弁61を強制的に全閉するように構成されている。
【0020】
次に、このような構成を有する蒸気発生設備ブローダウン回収システムの動作について説明する。
蒸気発生設備ブローダウン回収システムの通常運転時には、SGBD遮断弁35は開いており、蒸気発生器1でブローダウンされた流体は、SGブローダウンとしてフラッシュタンク41に導入される。フラッシュタンク41では、SGブローダウンをフラッシュさせ、いわゆるフラッシュ蒸気として脱気器25に回収する。一方、フラッシュタンク41内に残った液体は、SGブローダウン液体として、SGBD冷却器43に導入され、復水脱塩装置11の許容温度以下まで冷却される。
ここで、フラッシュタンク41内のSGブローダウン液体の水位は、レベルコントローラ63による第1F/T水位制御弁61の開度調節により、基準水位NWL近傍以下に制御されている。このとき、第2F/T水位制御弁の開度は減少し、通常は全閉となっている。
【0021】
しかしながら、例えば、SGBD冷却器や第1F/T水位制御弁61の異常のように、ブローダウン常用ライン60になんらかの異常が生じ、第1F/T水位制御弁61の開度が増加してもさらに水位が上昇し、基準高水位HWLを越える場合、第2F/T水位制御弁71が開き、ブローダウンバイパスライン70を介してSGブローダウン液体が復水器9に自動的に導入される。
さらに、ブローダウンバイパスライン70が連通しているにもかかわらず、フラッシュタンク41内の水位がさらに上昇して異常水位HHWLになると、レベルスイッチ53によりSGBD遮断弁35が強制的に閉じられる。
【0022】
また、SGBD冷却器43から流出されたSGブローダウン液体の温度が復水脱塩装置11の許容温度に基づいた基準温度以上の場合に、温度スイッチ65が作動して、第1F/T水位制御弁61を強制的に全閉する。この結果、復水脱塩装置11にとって不適切なSGブローダウン液体は、復水脱塩装置11に導入されない。そのため、フラッシュタンク41内の水位はさらに上昇し、基準高水位HWLを越えると、レベルコントローラ63の動作によりSGブローダウン液体はブローダウンバイパスライン70に流出する。さらに、フラッシュタンク41内の水位が異常水位HHWLを越えると、レベルスイッチ53によりSGBD遮断弁35が強制的に閉じられる。
【0023】
以上に説明したこの発明の実施の形態の構成及び動作について、従来例と比較したものを表1に示す。
【0024】
【表1】

Figure 0003600604
【0025】
表1に示されるように、この実施の形態では、ブローダウンバイパスライン70の取り出し位置をフラッシュタンク(F/T)41の下流に設け、フラッシュタンク41内の水位異常(表1における*1)や復水脱塩装置11に導入されるSGブローダウン液体の温度異常(*2)については、ブローダウンバイパスライン70への切り替えを、オペレータの手動操作に頼ることなく自動的に行っている。したがって、これらの異常については、最初からSGBD遮断弁35を閉じことがないので、フラッシュタンク41にSGブローダウンが継続して導入され、フラッシュ蒸気による熱回収を継続することができる(*3)。
さらに、熱回収ライン80の圧力制御弁48に並列に、手動で流量を調節できるバイパス弁81を設けたので、圧力制御弁48に異常が発生しても、オペレータがバイパス弁81を操作することによってフラッシュ蒸気による熱回収を継続することができる。
【0026】
以上説明してきたこの発明は、上記に限定されるものではなく、適宜改変して実施することができる。
例えば、第1F/T水位制御弁61及び第2F/T水位制御弁71の代わりにそれぞれ開閉弁を設けてもよい。この場合、ブローダウン常用ライン60の開閉弁は、基準水位NWL以上で開き、基準水位NWL未満で閉じる。ブローダウンバイパスライン70の開閉弁は、基準高水位HWL以上で開き、基準高水位HWL未満で閉じる。さらに、SGブローダウン液体の温度異常の場合は、ブローダウン常用ライン60の開閉弁を強制的に閉じる。
また、上記のブローダウンバイパスライン70の開閉弁の代わりに、フラッシュタンク41の下流の、ブローダウン常用ライン60とブローダウンバイパスライン70との分岐部に、三方弁を設けてもよい。この三方弁により、フラッシュタンク41の水位が基準高水位HWLを下回る場合は、フラッシュタンク41とブローダウン常用ライン60とを連通させ、基準高水位HWL以上の場合は、フラッシュタンク41とブローダウンバイパスライン70とを連通させる。
【0027】
【発明の効果】
以上説明したように、この発明の蒸気発生設備ブローダウン回収システムによれば、フラッシュタンクの下流に設けられ、フラッシュタンクで蒸気と分離されたブローダウン液体を復水脱塩装置に接続されるブローダウン常用ラインと共に、復水器に接続されるブローダウンバイパスラインを設け、流路決定手段によりブローダウン常用ライン及びブローダウンバイパスラインのそれぞれの流量を決定するので、SGブローダウン系に異常が発生した場合であっても、フラッシュタンクでの熱回収を効率的に行い、且つSGブローダウン液体の回収先を自動切替してフラッシュタンク水位の制御及び復水脱塩装置へ流入する流体の温度管理を適切に行うことができる。
【図面の簡単な説明】
【図1】この発明の実施の形態に係る蒸気発生設備ブローダウン回収システムを適用する原子力発電プラントの二次系の主要な構成要素を示す図である。
【図2】実施の形態に係る蒸気発生設備ブローダウン回収システムの要部の構成を示す図である。
【図3】実施の形態に係る蒸気発生設備ブローダウン回収システムに用いられるF/Tの水位と弁制御の関係を示す図である。
【図4】従来の蒸気発生設備ブローダウン回収システムを適用する原子力発電プラントの二次系の主要な構成要素を示す図である。
【図5】従来の蒸気発生設備ブローダウン回収システムの要部の構成を示す図である。
【図6】従来の蒸気発生設備ブローダウン回収システムに用いられるF/Tの水位と弁制御の関係を示す図である。
【符号の説明】
1…蒸気発生器、9…復水器、11…復水脱塩装置、25…脱気器、41…フラッシュタンク、60…ブローダウン常用ライン、61…第1F/T水位制御弁、63…レベルコントローラ、65…温度スイッチ、70…ブローダウンバイパスライン、71…第2F/T水位制御弁、NWL…基準水位、HWL…基準高水位。[0001]
TECHNICAL FIELD OF THE INVENTION
TECHNICAL FIELD The present invention relates to a blowdown heat recovery system for steam generation equipment.
[0002]
[Prior art]
In a nuclear power plant, usually, a so-called primary system, in which high-temperature water using the heat of a nuclear reactor is sent to a steam generator for heat exchange and then recovered, and steam is generated in the steam generator using the primary high-temperature water. A steam generator is used to generate electricity, and the steam is used to rotate the turbine to generate electricity.Then, the steam is condensed by a condenser and then collected by a steam generator. An SG blowdown system is provided to remove a part of the water inside the vessel, purify impurities, and then recover the contaminated water. In the SG blowdown system, heat recovery of the blown-down fluid is performed as necessary.
[0003]
FIG. 4 shows main components of a secondary system of a nuclear power plant having an SG blowdown system when heat is recovered from the blown-down fluid.
Downstream of the steam generator 1 constituting the secondary system, a high-pressure turbine 3, a moisture separation heater 5, a low-pressure turbine 7, and a condenser 9 are arranged. Downstream of the condenser 9, a main flow pipe 13 provided with an on-off valve 10 and a condensate desalination device (condemi) 11 on the way, and a condensate functioning as a bypass of the condensate desalination device 11 and having an on-off valve 14 It is branched to a desalination device bypass pipe 15. Downstream of the junction 17 between the main flow pipe 13 and the condensing water desalination device bypass pipe 15, a condensing booster pump 21, a low pressure heater 23, a deaerator 25, a water supply booster pump 27, a water supply pump 29, and a high pressure heater 31 are provided. The high-pressure heater 31 is provided and connected to the steam generator 1 to form a secondary circulation path. A condensate filter 19 is installed upstream of the condensate booster pump 21 as needed.
[0004]
The SG blowdown system has the following main configuration. The steam generator 1 includes an SGBD (steam generator blow down) pipe 33, and an SGBD shutoff valve 35 and an SGBD throttle valve 36 are provided in the middle of the SGBD pipe 33. The downstream of the SGBD throttle valve 36 branches into a blowdown regular line 37 connected to the flash tank 41 and a blowdown bypass line 38 connected to the condenser 9. The piping of each line is provided with switching valves 39a and 39b for manually switching the collection destination of the SG blowdown.
Downstream of the flash tank 41 is provided with an SGBD cooler 43 and an F / T (flash tank) water level control valve 45, and is downstream of the on-off valve 10 via a pipe 49 constituting a part of the blowdown regular line 37. Connected to the upstream part of the condensate desalination device 11. The steam separated in the flash tank 41 is connected to the deaerator 25 via a heat recovery line 50 including a pipe provided with a pressure control valve 48.
[0005]
In a nuclear power plant equipped with such an SG blowdown system, during normal operation, the operator manually opens the switching valve 39a and closes the switching valve 39b to remove the fluid blown down by the steam generator 1. Introduced into the flash tank 41 as SG blowdown, the so-called flash vapor flashed in the flash tank 41 is collected in the deaerator 25, and the remaining liquid is introduced into the SGBD cooler 43 as SG blowdown liquid. After being cooled to a temperature equal to or lower than the allowable temperature of the condensate and desalination unit 11, it is sent to the condensate and desalination unit 11 via the F / T water level control valve 45. The allowable temperature of the condensate desalination apparatus 11 is a value determined from the heat-resistant temperature of the ion exchange resin of the condensate desalination apparatus 11, and is, for example, about 40 ° C.
[0006]
As shown in FIG. 5, the flash tank 41 is provided with a pressure switch 51, a level switch 53, a pressure controller 55, and a level controller 57 in order to control the SG blowdown system and monitor an abnormality. . Further, a temperature switch 59 is provided downstream of the SGBD cooler 43.
Here, the pressure switch 51 is configured to detect a pressure abnormality in the flash tank 41 and to forcibly close the SGBD shutoff valve 35 when the pressure is abnormal. The level switch 53 detects the level of the SG blowdown liquid in the flash tank 41, and forcibly closes the SGBD shutoff valve 35 when the level of the SG blowdown liquid reaches the abnormal level HHWL. The pressure controller 55 senses the pressure in the flash tank 41 and adjusts the opening of the pressure control valve 48. The level controller 57 detects the water level of the SG blowdown liquid in the flash tank 41 and adjusts the opening of the F / T water level control valve 45 so that the water level becomes the reference water level NWL. That is, when the water level is equal to or higher than the reference water level NWL, the opening of the F / T water level control valve 45 is increased, and when the water level is lower than the reference water level NWL, the opening of the F / T water level control valve 45 is reduced. I have.
The temperature switch 59 senses the temperature of the SG blowdown liquid flowing out of the SGBD cooler 43 and introduced into the condensate desalination apparatus 11, and the temperature is set to a reference temperature based on the allowable temperature of the condensate desalination apparatus 11. In this case, the SGBD shutoff valve 35 is forcibly closed.
[0007]
The following operations are performed on the SGBD cutoff valve 35 and the F / T water level control valve 45 by such various switches and controllers.
When there is a pressure abnormality in the flash tank 41, the pressure switch 51 closes the SGBD shutoff valve 35. When the liquid introduced into the condensate desalination apparatus 11 has a temperature abnormality, the temperature switch 59 closes the SGBD shutoff valve 35.
As shown in FIG. 6, when the water level of the flash tank 41 becomes equal to or higher than the reference water level NWL, the level controller 57 increases the opening of the F / T water level control valve 45 to lower the water level of the flash tank 41. Works. Nevertheless, when the water level of the flash tank 41 rises and reaches the abnormal water level HHWL, the level switch 53 closes the SGBD shutoff valve 35.
[0008]
When the SGBD shutoff valve 35 is forcibly closed due to the above-described abnormality, the operator first manually operates the switching valves 39a and 39b to close the switching valve 39a to open the switching valve 39b, and thereafter, The SGBD shutoff valve 35 is forcibly opened, the flow of the SG blowdown is switched from the blowdown regular line 37 to the blowdown bypass line 38, and the SG blowdown is guided to the bypass line 38 and sent to the condenser 9.
[0009]
[Problems to be solved by the invention]
However, among the abnormalities of the SG blowdown system described above, the abnormalities of the water level in the flash tank 41 and the temperature of the SG blowdown liquid introduced into the condensate desalination apparatus 11 are caused by the heat generated by the flash steam in the flash tank 41. It does not cause inconvenience in recovery. Nevertheless, there is a problem that the heat recovery by the flash steam cannot be continued because the SGBD shutoff valve 35 is forcibly closed and the SG blowdown is not introduced into the flash tank 41.
In addition, when a temperature abnormality occurs in the water level in the flash tank 41 or the SG blowdown liquid before the introduction of the condensate desalination device 11, the SGBD shutoff valve 35 is forcibly closed, and the switching valves 39a and 39b are manually operated. Therefore, it was necessary to guide the SG blowdown to the bypass line 38.
[0010]
The present invention has been made to solve such a problem, and even when an abnormality occurs in the SG blowdown system, heat is efficiently recovered by flash steam in a flash tank, and An object of the present invention is to provide a blowdown recovery system for a steam generation facility that can automatically switch the recovery destination of SG blowdown liquid to control the flush tank water level and appropriately control the temperature of the fluid flowing into the condensate desalination device. And
[0011]
[Means for Solving the Problems]
In order to achieve the above object, a blowdown recovery system for steam generation equipment according to the present invention includes a steam generator, a condenser for condensing steam from the steam generator, and a condensate drain provided downstream of the condenser. In a secondary system equipped with a deaerator provided downstream of a salt unit and a condensate desalination unit, a flash tank that blows down and introduces a part of the fluid of the steam generator was separated by a flash tank. A heat recovery line that collects steam in a deaerator for heat recovery, and a flow path that is provided downstream of the flash tank and that sends blowdown liquid separated from steam in the flash tank to a condensate desalination device. A blowdown service line, a blowdown bypass line provided downstream of the flash tank and forming a flow path for sending blowdown liquid separated from steam in the flash tank to the condenser, Provided downstream of the tank, it is characterized in that a flow path determining means for determining the flow rate of the blowdown conventional line and blowdown bypass line, respectively.
[0012]
The flush tank includes a water level detecting means for detecting the water level of the blowdown liquid, and the flow path determining means increases the flow rate of the blowdown regular line when the water level detected by the water level detecting means is equal to or higher than the reference water level, and When the water level is higher than the high water level, the flow rate of the blowdown bypass line can be increased.
The blowdown service line includes an SGBD cooler that cools the blowdown liquid, and further includes a temperature detection unit that detects the temperature of the blowdown liquid downstream of the SGBD cooler. The flow path determination unit includes a temperature detection unit. When the detected temperature is equal to or higher than the reference temperature based on the allowable temperature of the condensate desalination device, the flow path of the blowdown regular line can be closed.
Preferably, the flow path determining means includes a flow control valve provided in each of the blowdown regular line and the blowdown bypass line.
[0013]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to Table 1 and the accompanying drawings, in which the same reference numerals indicate the same or corresponding parts.
[0014]
FIG. 1 shows main components of a secondary system of a nuclear power plant including a blowdown recovery system for a steam generating facility according to an embodiment of the present invention. A high-pressure turbine 3 and a moisture separator / heater 5 are provided downstream of the steam generator 1 constituting the secondary system. A low-pressure turbine 7 is provided downstream of the moisture separation heater 5. A condenser 9 is arranged downstream of the low-pressure turbine 7. Downstream of the condenser 9, a main flow pipe 13 provided with an on-off valve 10 and a condensate desalination device 11 on the way, and a condensate desalination device functioning as a bypass of the condensate desalination device 11 and having an on-off valve 14. It branches to a bypass pipe 15. Downstream of the junction 17 between the main flow pipe 13 and the condensing water desalination device bypass pipe 15, a condensing booster pump 21, a low pressure heater 23, a deaerator 25, a water supply booster pump 27, a water supply pump 29, and a high pressure heater 31 are provided. The downstream side of the high-pressure heater 31 is connected to the steam generator 1 to form a secondary circulation path. A condensate filter 19 is installed upstream of the condensate booster pump 21 as needed.
[0015]
The SG blowdown system included in the secondary system has the following main configuration. The steam generator 1 includes an SGBD pipe 33, and an SGBD shutoff valve 35 and an SGBD throttle valve 36 are provided in the middle of the SGBD pipe 33. Downstream of the SGBD throttle valve 36, the SGBD pipe 33 is connected to a flash tank 41.
Downstream of the flash tank 41, one end is connected to the flash tank 41, an SGBD cooler 43 and a first F / T water level control valve 61 are provided in the middle, and the other end is downstream of the on-off valve 10 and A blowdown service line 60 connected to an upstream portion of the salt device 11 is provided. Further, downstream of the flash tank 41 and upstream of the SGBD cooler 43, the blow-down bypass line 70 having a second F / T water level control valve 71 is provided in the middle of the blow-down bypass line 70. I have. The blowdown bypass line 70 has one end connected to the flash tank 41 and the other end connected to the condenser 9. Here, the first F / T water level control valve 61 and the second F / T water level control valve 71 are flow rate control valves capable of adjusting the flow rate, and constitute flow path determining means.
[0016]
Further, the flash tank 41 includes a pressure control valve 48 and a bypass valve 81 arranged in parallel, and a heat recovery line 80 downstream of the low-pressure heater 23 and connected to the deaerator 25 is provided. The steam separated in the flash tank 41 is sent to the deaerator 25 through the heat recovery line 80. Here, the bypass valve 81 is a valve that can manually adjust the flow rate as a detour means of the pressure control valve 48.
[0017]
As shown in FIG. 2, the flash tank 41 is provided with a pressure switch 51, a level switch 53, a pressure controller 55, and a level controller 63 in order to control the SG blowdown system and monitor an abnormality. . Further, a temperature switch 65 is provided downstream of the SGBD cooler 43.
Here, the pressure switch 51 is configured to detect a pressure abnormality in the flash tank 41 and to forcibly close the SGBD shutoff valve 35 when the pressure is abnormal.
The pressure controller 55 senses the pressure in the flash tank 41 and adjusts the opening of the pressure control valve 48.
[0018]
As shown in FIG. 3, the level controller 63 detects the water level of the SG blowdown liquid in the flash tank 41, and based on the detected water level, controls the first F / T water level control valve 61 and the second F / T water level control. The opening of the valve 71 is adjusted. That is, the level controller 63 constitutes a water level detection unit and a flow path determination unit.
Specifically, the level controller 63 adjusts the opening of the first F / T water level control valve 61 so that the water level of the SG blowdown liquid in the flash tank 41 becomes the reference water level NWL, and the water level is equal to or higher than the reference water level NWL. , The opening of the first F / T water level control valve 61 is increased to increase the flow rate. On the other hand, when the water level becomes lower than the reference water level NWL, the opening degree of the first F / T water level control valve 61 is reduced, and the flow rate is reduced. Even if the opening of the first F / T water level control valve 61 is increased, when the water level of the flash tank 41 further rises and becomes equal to or higher than the reference high water level HWL, the level controller 63 controls the second F / T water level control valve 71. It is configured to increase the opening and increase the flow rate.
[0019]
On the other hand, as shown in FIG. 3, even if the opening degree of the first F / T water level control valve and the second F / T water level control valve 71 is increased, the level of the SG blowdown liquid in the flash tank 41 is increased. When the water level further rises to the abnormal water level HHWL, the SGBD shutoff valve 35 is forcibly closed.
The temperature switch 65 functions as a temperature detecting means, detects the temperature of the SG blowdown liquid flowing out of the SGBD cooler 43 and introduced into the condensate desalination apparatus 11, and the temperature is detected by the condensate desalination apparatus 11. When the temperature exceeds the allowable temperature, the first F / T water level control valve 61 is forcibly fully closed so as to prevent the SG blowdown liquid from further flowing into the condensate desalination apparatus 11. I have.
[0020]
Next, the operation of the steam generation equipment blowdown recovery system having such a configuration will be described.
During normal operation of the steam generation equipment blowdown recovery system, the SGBD shutoff valve 35 is open, and the fluid blown down by the steam generator 1 is introduced into the flash tank 41 as SG blowdown. In the flash tank 41, the SG blowdown is flashed and collected in the deaerator 25 as so-called flash steam. On the other hand, the liquid remaining in the flash tank 41 is introduced into the SGBD cooler 43 as an SG blowdown liquid, and is cooled to a temperature equal to or lower than the allowable temperature of the condensate desalination apparatus 11.
Here, the water level of the SG blowdown liquid in the flash tank 41 is controlled to be lower than the vicinity of the reference water level NWL by adjusting the opening of the first F / T water level control valve 61 by the level controller 63. At this time, the opening of the second F / T water level control valve decreases, and is normally fully closed.
[0021]
However, for example, even if an abnormality occurs in the blowdown service line 60 such as an abnormality of the SGBD cooler or the first F / T water level control valve 61 and the opening of the first F / T water level control valve 61 increases, furthermore, When the water level rises and exceeds the reference high water level HWL, the second F / T water level control valve 71 opens and the SG blowdown liquid is automatically introduced into the condenser 9 via the blowdown bypass line 70.
Further, when the water level in the flash tank 41 further rises to the abnormal water level HHWL even though the blowdown bypass line 70 is in communication, the level switch 53 forcibly closes the SGBD shutoff valve 35.
[0022]
Further, when the temperature of the SG blowdown liquid flowing out of the SGBD cooler 43 is equal to or higher than a reference temperature based on the allowable temperature of the condensate desalination device 11, the temperature switch 65 is operated to control the first F / T water level control. The valve 61 is forcibly fully closed. As a result, an SG blowdown liquid that is inappropriate for the condensate desalination apparatus 11 is not introduced into the condensate desalination apparatus 11. Therefore, when the water level in the flash tank 41 further rises and exceeds the reference high water level HWL, the SG blowdown liquid flows out to the blowdown bypass line 70 by the operation of the level controller 63. Further, when the water level in the flash tank 41 exceeds the abnormal water level HHWL, the level switch 53 forcibly closes the SGBD shutoff valve 35.
[0023]
Table 1 shows the configuration and operation of the embodiment of the present invention described above in comparison with a conventional example.
[0024]
[Table 1]
Figure 0003600604
[0025]
As shown in Table 1, in this embodiment, the take-out position of the blowdown bypass line 70 is provided downstream of the flash tank (F / T) 41, and the water level in the flash tank 41 is abnormal (* 1 in Table 1). For the abnormal temperature (* 2) of the SG blowdown liquid introduced into the condensate and desalination apparatus 11, the switching to the blowdown bypass line 70 is automatically performed without depending on the manual operation of the operator. Therefore, for these abnormalities, the SGBD shutoff valve 35 is not closed from the beginning, so that the SG blowdown is continuously introduced into the flash tank 41, and the heat recovery by the flash steam can be continued (* 3). .
Furthermore, since the bypass valve 81 capable of manually adjusting the flow rate is provided in parallel with the pressure control valve 48 of the heat recovery line 80, even if an abnormality occurs in the pressure control valve 48, the operator can operate the bypass valve 81. Thus, heat recovery by flash steam can be continued.
[0026]
The present invention described above is not limited to the above, and can be implemented with appropriate modifications.
For example, an opening / closing valve may be provided instead of the first F / T water level control valve 61 and the second F / T water level control valve 71. In this case, the open / close valve of the blowdown regular line 60 opens at the reference water level NWL or higher and closes at the reference water level NWL or lower. The on-off valve of the blow-down bypass line 70 opens at the reference high water level HWL or higher and closes below the reference high water level HWL. Further, when the temperature of the SG blowdown liquid is abnormal, the on-off valve of the blowdown service line 60 is forcibly closed.
Further, instead of the on-off valve of the blowdown bypass line 70, a three-way valve may be provided at a branch portion of the blowdown regular line 60 and the blowdown bypass line 70 downstream of the flash tank 41. When the water level of the flash tank 41 is lower than the reference high water level HWL, the three-way valve connects the flash tank 41 to the blowdown service line 60. When the water level is higher than the reference high water level HWL, the flash tank 41 and the blowdown bypass are connected. The communication with the line 70 is established.
[0027]
【The invention's effect】
As described above, according to the blowdown recovery system of the steam generation equipment of the present invention, the blowdown liquid provided downstream of the flash tank and separated from the steam in the flash tank is connected to the condensate desalination apparatus. A blowdown bypass line connected to the condenser is provided along with the down service line, and the flow rate determining means determines the flow rate of each of the blow down service line and the blow down bypass line. Even if it does, the heat recovery in the flash tank is performed efficiently and the recovery destination of the SG blowdown liquid is automatically switched to control the flush tank water level and control the temperature of the fluid flowing into the condensate desalination device. Can be appropriately performed.
[Brief description of the drawings]
FIG. 1 is a diagram showing main components of a secondary system of a nuclear power plant to which a blowdown recovery system for steam generation equipment according to an embodiment of the present invention is applied.
FIG. 2 is a diagram showing a configuration of a main part of a steam generation equipment blowdown recovery system according to the embodiment.
FIG. 3 is a diagram illustrating a relationship between a water level of F / T and a valve control used in the blowdown recovery system for the steam generating equipment according to the embodiment.
FIG. 4 is a diagram showing main components of a secondary system of a nuclear power plant to which a conventional steam generation equipment blowdown recovery system is applied.
FIG. 5 is a diagram showing a configuration of a main part of a conventional steam generation equipment blowdown recovery system.
FIG. 6 is a diagram showing the relationship between the water level of F / T used in a conventional steam generation equipment blowdown recovery system and valve control.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Steam generator, 9 ... Condenser, 11 ... Condensate desalination apparatus, 25 ... Deaerator, 41 ... Flash tank, 60 ... Blowdown regular line, 61 ... 1st F / T water level control valve, 63 ... Level controller, 65 temperature switch, 70 blowdown bypass line, 71 second F / T water level control valve, NWL reference water level, HWL reference high water level.

Claims (4)

蒸気発生器、蒸気発生器からの蒸気を復水する復水器、復水器の下流に設けられた復水脱塩装置及び復水脱塩装置の下流に設けられた脱気器を備えた二次系において、
蒸気発生器の流体の一部をブローダウンして導入するフラッシュタンクと、
フラッシュタンクで分離された蒸気を脱気器に回収して熱回収を行う熱回収ラインと、
フラッシュタンクの下流に設けられ、フラッシュタンクで蒸気と分離されたブローダウン液体を復水脱塩装置に送る流路を形成するブローダウン常用ラインと、
フラッシュタンクの下流に設けられ、フラッシュタンクで蒸気と分離されたブローダウン液体を復水器へ送る流路を形成するブローダウンバイパスラインと、
フラッシュタンクの下流に設けられ、ブローダウン常用ライン及びブローダウンバイパスラインのそれぞれの流量を決定する流路決定手段と
を備えたことを特徴とする蒸気発生設備ブローダウン回収システム。
A steam generator, a condenser for condensing steam from the steam generator, a condensate desalination device provided downstream of the condenser, and a deaerator provided downstream of the condensate desalination device. In the secondary system,
A flash tank that blows down and introduces a part of the fluid of the steam generator,
A heat recovery line for recovering heat by collecting the steam separated in the flash tank in a deaerator,
A blowdown regular line that is provided downstream of the flash tank and forms a flow path that sends the blowdown liquid separated from the vapor in the flash tank to the condensate desalination device,
A blow-down bypass line provided downstream of the flash tank and forming a flow path for sending blow-down liquid separated from steam in the flash tank to the condenser;
A blowdown recovery system for steam generation equipment, comprising: flow path determination means provided downstream of the flash tank and configured to determine a flow rate of each of a blowdown service line and a blowdown bypass line.
フラッシュタンクのブローダウン液体の水位を検知する水位検知手段を備え、
流路決定手段は、水位検知手段により検知された水位が、
基準水位以上の場合にブローダウン常用ラインの流量を増加させ、
基準高水位以上の場合にブローダウンバイパスラインの流量を増加させる請求項1に記載の蒸気発生設備ブローダウン回収システム。
Equipped with water level detection means for detecting the water level of the blowdown liquid of the flash tank,
The flow path determination means, the water level detected by the water level detection means,
If the water level is higher than the reference water level, increase the flow rate of the blowdown service line,
The steam generation equipment blowdown recovery system according to claim 1, wherein the flow rate of the blowdown bypass line is increased when the reference water level is equal to or higher than the reference high water level.
ブローダウン常用ラインは、ブローダウン液体を冷却するSGBD冷却器を備え、さらに、SGBD冷却器の下流にブローダウン液体の温度を検知する温度検知手段を備え、
流路決定手段は、温度検知手段により検知された温度が、
復水脱塩装置の許容温度に基づいた基準温度以上の場合に、ブローダウン常用ラインの流路を閉じる請求項1または2に記載の蒸気発生設備ブローダウン回収システム。
The blowdown service line includes an SGBD cooler that cools the blowdown liquid, and further includes a temperature detection unit that detects the temperature of the blowdown liquid downstream of the SGBD cooler,
The flow path determination unit is configured to determine whether the temperature detected by the temperature detection unit is
The blowdown recovery system according to claim 1 or 2, wherein the flow path of the blowdown service line is closed when the temperature is equal to or higher than a reference temperature based on an allowable temperature of the condensate desalination apparatus.
流路決定手段は、ブローダウン常用ライン及びブローダウンバイパスラインにそれぞれ設けられた流量調節弁を含む請求項1〜3のいずれか一項に記載の蒸気発生設備ブローダウン回収システム。The steam generation equipment blowdown recovery system according to any one of claims 1 to 3, wherein the flow path determination means includes a flow control valve provided in each of the blowdown regular line and the blowdown bypass line.
JP2002254733A 2002-08-30 2002-08-30 Steam generation equipment blowdown recovery system Expired - Fee Related JP3600604B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002254733A JP3600604B2 (en) 2002-08-30 2002-08-30 Steam generation equipment blowdown recovery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002254733A JP3600604B2 (en) 2002-08-30 2002-08-30 Steam generation equipment blowdown recovery system

Publications (2)

Publication Number Publication Date
JP2004093343A JP2004093343A (en) 2004-03-25
JP3600604B2 true JP3600604B2 (en) 2004-12-15

Family

ID=32060432

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002254733A Expired - Fee Related JP3600604B2 (en) 2002-08-30 2002-08-30 Steam generation equipment blowdown recovery system

Country Status (1)

Country Link
JP (1) JP3600604B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2500684B (en) * 2012-03-30 2018-08-15 Spirax Sarco Ltd Steam plant and method of operating the same
CN112539406B (en) * 2020-12-07 2023-12-19 江苏中伟机械制造有限公司 Discharge expander for discharging sewage of power plant

Also Published As

Publication number Publication date
JP2004093343A (en) 2004-03-25

Similar Documents

Publication Publication Date Title
JPH11241604A (en) Gas turbine combined plant, its operation method and gas turbine high temperature section steem cooling system
JP3600604B2 (en) Steam generation equipment blowdown recovery system
JP6492749B2 (en) Flash steam generator
EP0031711B1 (en) Method and system for controlling the fluid level in a drain tank
JP4551028B2 (en) Nuclear power generation equipment
JP6255932B2 (en) Boiler system
CN114034030A (en) System and method applied to fixed-exhaust waste heat recovery of gas-fired boiler
JP2014112018A (en) Power generation unit, and method of recovering flash tank drain in starting power generation unit
CN108443861B (en) Energy-saving device for eliminating back pressure of closed condensate water recovery system
JP2005197108A (en) Fuel cell power generation hot-water supply system
JP3664759B2 (en) Flash prevention device
JP2004092408A (en) Steam turbine plant
AU2007201125B2 (en) A waste heat boiler (WHB) system
JPH0691125A (en) Operation of dust collecting device for blast furnace in generation of abnormality high-temperature gas
JP2000345811A (en) Exhaust heat recovery boiler plant and operating method thereof
JP3759083B2 (en) Steam turbine plant
JP6156094B2 (en) Flash steam generator
US11873723B2 (en) Steam turbine plant and method for cleaning same
CN217382988U (en) Steam soot blowing system of power generation boiler and generator set
JPH05196206A (en) Drain recovery controller for supply water heater
JP3447840B2 (en) Automatic isolation device for moisture separation heater of nuclear power plant
JP2001296389A (en) Nuclear power facility
JP3317536B2 (en) Saturated drain discharge piping system
JPH0820045B2 (en) Feed water heater Drain collection control device
JP6439494B2 (en) Flash steam generator

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040820

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040824

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040916

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080924

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080924

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090924

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090924

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100924

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110924

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110924

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120924

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120924

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130924

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees