JP3600169B2 JP2001049568A JP2001049568A JP3600169B2 JP 3600169 B2 JP3600169 B2 JP 3600169B2 JP 2001049568 A JP2001049568 A JP 2001049568A JP 2001049568 A JP2001049568 A JP 2001049568A JP 3600169 B2 JP3600169 B2 JP 3600169B2
Authority
JP
Japan
Prior art keywords
boom
bridle
crane
gantry
bail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001049568A
Other languages
Japanese (ja)
Other versions
JP2002255479A (en
Inventor
孝行 坪井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Construction Crane Co Ltd
Original Assignee
Sumitomo Heavy Industries Construction Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Construction Crane Co Ltd filed Critical Sumitomo Heavy Industries Construction Crane Co Ltd
Priority to JP2001049568A priority Critical patent/JP3600169B2/en
Publication of JP2002255479A publication Critical patent/JP2002255479A/en
Application granted granted Critical
Publication of JP3600169B2 publication Critical patent/JP3600169B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はクレーンの輸送方法に関するものであり、特に、ラチスブームの俯仰をベイル・ブライドル間の距離を変更することにより行うクレーンに於けるブームなしでの輸送方法に関するものである。
【0002】
【従来の技術及び発明が解決しようとする課題】
従来の此種クレーンは、下部走行体に上部旋回体を旋回自在に載置し、該上部旋回体の前部にブームを俯仰可能に装着するとともに、該上部旋回体の後部にガントリを起立倒回自在に設け、このガントリの先端部にベイルを取り付けるとともに前記ブームの先端部側にブライドルを取り付け、これらベイル・ブライドル間にブーム起伏ロープを卷装し、該ブーム起伏ロープの巻き上げ下げにてベイル・ブライドル間の距離を変更することにより前記ブームを俯仰するように構成されている。
【0003】
そして、此種クレーンを輸送する際には、前記ブーム起伏ロープを巻下げてブームを上部旋回体の前方へ倒回した後に、該ブームから前記ブライドルを取り外すとともに該ブームを上部旋回体から離脱させて、該ブームをクレーン本体とは別に輸送している。一方、クレーン本体は、図3に示すように、上部旋回体1の後方へガントリ2を倒回し、上部旋回体1の上部にガントリ2を略水平に載置する。また、ベイル3はガントリ2の先端部に取り付けたままの状態で、ブライドル4をブームから取り外してガントリ2の上部に載置する。
【0004】
しかし、ガントリ2の上部にブライドル4を載置して運搬すると、輸送高さがAと高くなって、移動時の高さ制限に制約を受ける。このため、ブームを上部旋回体の前方へ倒回した後に、ブライドル4をクレーン本体から取り外して別に輸送することもあるが、その際に、ベイル3とブライドル4間に卷装されているブーム起伏ロープ5を、上部旋回体1に設けられているブーム起伏ウインチ6へすべて巻き込む必要があり、輸送準備に時間がかかるとともに、輸送後の組立作業では、抜き取ったブーム起伏ロープ5を再度ベイル3とブライドル4間に卷装しなければならず、多くの時間と労力が必要とされる。
【0005】
そこで、ブームを取り外してクレーン本体を輸送する際に、輸送高さを低く抑えつつ、ブライドル脱着のためのブーム起伏ロープの巻き込み作業をなくして、輸送準備及び組立準備を簡易且つ短時間で行えるようにするために解決すべき技術的課題が生じてくるのであり、本発明はこの課題を解決することを目的とする。
【0006】
【課題を解決するための手段】
本発明は上記目的を達成するために提案されたものであり、下部走行体に上部旋回体を旋回自在に載置し、該上部旋回体の前部にブームを俯仰可能に装着するとともに、該上部旋回体の後部にガントリを起立倒回自在に設け、このガントリの先端部にベイルを取り付けるとともに前記ブームの先端部側にブライドルを取り付け、これらベイル・ブライドル間にブーム起伏ロープを巻装し、該ブーム起伏ロープの巻き上げ下げにてベイル・ブライドル間の距離を変更することにより前記ブームを俯仰するように構成したクレーンであって、且つ、前記ブーム起伏ロープを巻き下げてブームを上部旋回体の前方へ倒回した後に、該ブームから前記ブライドルを取り外すとともに該ブームを上部旋回体から離脱させ、更に、前記ガントリを上部旋回体の後方へ倒回して上部旋回体の上部にガントリを略水平に載置して輸送するようにしたクレーンの輸送方法に於いて、
前記ブームから取り外された前記ブライドルは前記上部旋回体の前部に設けられているブライドル固定用ラグに固定されることにより、該ブライドルを上部旋回体の前部であって、且つ、ガントリの載置位置よりも低位置に固定して輸送することを特徴とするクレーンの輸送方法を提供するものである。
【0007】
【発明の実施の形態】
以下、本発明の一実施の形態を図1及び図2に従って詳述する。尚、説明の都合上、従来と同一構成部分には同一符号を使用する。図1はラチスブームタイプのクレーン10を示し、下部走行体7に上部旋回体1を旋回自在に載置し、該上部旋回体1の前部にブーム8を俯仰自在に枢着してある。ブーム8の先端部にはシーブ9,9を取り付けてあり、上部旋回体1に装着したフロントウインチ11からフックロープ12を繰り出してこのシーブ9,9に掛け回し、ブーム8の先端からフック13を吊り下げる。
【0008】
一方、上部旋回体1の後部にはカウンタウエイト14を装着するとともに、ガントリ2を起立倒回自在に設けてある。そして、ガントリ2の先端部にベイル3を取り付けるとともに、前記ブーム8の先端部に係止したペンダントロープ15にブライドル4を取り付け、上部旋回体1に装着したブーム起伏ウインチ6からブーム起伏ロープ5を繰り出して、これらベイル3とブライドル4間にブーム起伏ロープ5を卷装する。
【0009】
斯くして、当該クレーン10にてクレーン作業を行う際は、前記ブーム起伏ウインチ6を駆動し、ブーム起伏ロープ5の巻上げ下げにてベイル3とブライドル4間の距離を変更することにより前記ブーム8を俯仰させるとともに、前記フロントウインチ11を駆動し、フックロープ12を巻き上げ下げしてフック13を昇降させる。
【0010】
ここで、当該クレーン10を輸送する際は、前記クレーン本体からブーム8を取り外して輸送し易くする。先ず、前記ブーム起伏ロープ5を巻下げてブーム8を上部旋回体1の前方へ倒回し、前記ガントリ2を上部旋回体1の後方へ倒回する。次に、フックロープ12及びフック13、ペンダントロープ15等を取り外してブーム8を上部旋回体1から離脱する。そして、図2に示すように、上部旋回体1の上部にガントリ2を略水平に載置した状態でトラック16に積載する。
【0011】
同図に示すように、上部旋回体1の前部に設けられているブーム取り付け部17にブライドル固定用ラグ18を装着し、該ブライドル固定用ラグ18に前記ブライドル4を固定する。即ち、ブライドル4を上部旋回体1の前部低位置に固定するので、従来のように、ガントリ2の上部にブライドル4を載置した場合の輸送高さAに比べて、本発明の輸送方法では輸送高さがBと低くなり、移動時の高さ制限に制約を受け難い。また、従来のブライドル4を取り外して収納する輸送方法と比較すれば、ブーム起伏ロープ5を外さないので、ブーム起伏ウインチ6にブーム起伏ロープ5をすべて巻き込む必要がない。
【0012】
一方、輸送後の組立作業については、前述とは逆の工程で行うが、ブライドル4をブーム8のペンダントロープ15に係止する際に、ブーム起伏ロープ5がベイル3とブライドル4間に卷装された状態のままであるので、従来のようにブーム起伏ロープ5を多数回掛け回す作業がなく、組立作業を簡略化できる。
【0013】
尚、本発明は、本発明の精神を逸脱しない限り種々の改変を為すことができ、そして、本発明が該改変されたものに及ぶことは当然である。
【0014】
【発明の効果】
本発明は上記一実施の形態に詳述したように、クレーンを輸送する際には、ブライドルを外さず、而も、ガントリの載置位置よりも低位置であって、且つ、上部旋回体の前部に設けられているブライドル固定用ラグに該ブライドルを固定するので、輸送高さを低く抑えることができ、移送時の高さ制限を受け難い。更に又、ブライドルを前記固定位置に固定するのであるから、ベイルイドルとの間に巻装されているブーム起伏ロープす必要がなくなり、従って、ブーム起伏ロープをブーム起伏ウインチにすべて巻き込む必要もなくなり、輸送準備及び組立準備が著しく簡素化されて、労力の軽減並びに作業時間の短縮に寄与できる等、正に諸種の効果を奏する発明である。
【図面の簡単な説明】
【図1】本発明の一実施の形態を示し、クレーンの側面図。
【図2】本発明の一実施の形態を示し、クレーンの輸送状態を示す側面図。
【図3】従来のクレーンの輸送状態を示す側面図。
【符号の説明】
1 上部旋回体
2 ガントリ
3 ベイル
4 ブライドル
5 ブーム起伏ロープ
7 下部走行体
8 ブーム
18 ブライドル固定用ラグ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method of transporting a crane, and more particularly, to a method of transporting a lattice boom without a boom in a crane by changing the distance between a bail and a bridle.
[0002]
Problems to be solved by the prior art and the invention
In a conventional crane of this type, an upper revolving structure is mounted on a lower traveling structure so as to be freely rotatable, a boom is mounted on a front portion of the upper revolving structure so as to be able to descend, and a gantry is set upright on a rear portion of the upper revolving structure. A bail is attached to the tip of the gantry, a bridle is attached to the tip of the boom, a boom hoisting rope is wound between the bail bridles, and the bail is raised and lowered by raising and lowering the boom hoisting rope. -The boom is configured to be raised by changing the distance between the bridles.
[0003]
Then, when transporting this kind of crane, after lowering the boom hoisting rope and turning the boom forward of the upper rotating body, the bridle is removed from the boom and the boom is detached from the upper rotating body. Thus, the boom is transported separately from the crane body. On the other hand, as shown in FIG. 3, the crane main body turns the gantry 2 backward from the upper rotating body 1 and places the gantry 2 on the upper part of the upper rotating body 1 substantially horizontally. The bridle 4 is detached from the boom and placed on the gantry 2 with the bail 3 attached to the tip of the gantry 2.
[0004]
However, when the bridle 4 is placed on the gantry 2 and transported, the transport height is increased to A, and the height limit during movement is restricted. For this reason, the bridle 4 may be detached from the crane body and transported separately after the boom is turned forward in front of the upper revolving superstructure. In this case, the boom undulation wound between the bail 3 and the bridle 4 is required. It is necessary to wind all the ropes 5 into the boom hoisting winch 6 provided on the upper swing body 1, and it takes time to prepare for transportation, and in the assembling work after the transportation, the removed boom hoisting rope 5 is again connected to the bail 3. It has to be wound between the bridles 4, requiring a lot of time and effort.
[0005]
Therefore, when the boom is removed and the crane body is transported, the transport height and the preparation work for transport and assembly can be performed easily and in a short time while keeping the transport height low and eliminating the work of winding the boom hoisting rope for attaching and detaching the bridle. Therefore, a technical problem to be solved arises, and an object of the present invention is to solve this problem.
[0006]
[Means for Solving the Problems]
The present invention has been proposed in order to achieve the above-mentioned object, and an upper revolving structure is mounted on a lower traveling structure so as to be freely rotatable, and a boom is mounted on a front portion of the upper revolving structure so as to be able to descend. A gantry is provided at the rear of the upper revolving structure so as to be able to stand up and down, a bail is attached to the tip of this gantry and a bridle is attached to the tip of the boom, and a boom hoisting rope is wrapped between these bail bridles, A crane configured to raise and lower the boom by changing the distance between the bail and the bridle by hoisting and lowering the boom hoisting rope, and lowering the boom hoisting rope to move the boom to the upper revolving structure. after倒回forward, along with removing the bridle from the boom to disengage the boom from the upper rotating body, further, the upper rotating the gantry In rearward倒回to the top of the upper rotating body of the crane transport methods so as to transport placed substantially horizontally said gantry,
The bridle removed from the boom is fixed to a bridle fixing lug provided at the front of the upper revolving unit, so that the bridle is at the front of the upper revolving unit and the gantry is mounted. An object of the present invention is to provide a method of transporting a crane, which is transported while being fixed at a position lower than the installation position.
[0007]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of the present invention will be described in detail with reference to FIGS. For convenience of description, the same reference numerals are used for the same components as those in the related art. FIG. 1 shows a lattice boom type crane 10 in which an upper revolving unit 1 is mounted on a lower traveling unit 7 so as to be revolvable, and a boom 8 is pivotally mounted on a front portion of the upper revolving unit 1 so as to be able to move up and down. Sheaves 9 and 9 are attached to the tip of the boom 8, and a hook rope 12 is drawn out from a front winch 11 attached to the upper swing body 1, wrapped around the sheaves 9 and 9, and a hook 13 is attached from the tip of the boom 8. Be suspended.
[0008]
On the other hand, a counterweight 14 is mounted on the rear part of the upper revolving unit 1, and the gantry 2 is provided so as to be able to stand up and down. Then, the bail 3 is attached to the tip of the gantry 2 and the bridle 4 is attached to the pendant rope 15 locked to the tip of the boom 8, and the boom hoisting rope 5 is attached to the boom hoisting winch 6 attached to the upper rotating body 1. Then, a boom hoisting rope 5 is wound between the bail 3 and the bridle 4.
[0009]
Thus, when crane work is performed by the crane 10, the boom hoisting winch 6 is driven, and the distance between the bail 3 and the bridle 4 is changed by hoisting and lowering the boom hoisting rope 5, thereby changing the distance between the bail 8 and the bridle 4. The front winch 11 is driven, the hook rope 12 is wound up and down, and the hook 13 is raised and lowered.
[0010]
Here, when transporting the crane 10, the boom 8 is detached from the crane body to facilitate transport. First, the boom hoisting rope 5 is lowered, the boom 8 is turned forward in front of the upper swing body 1, and the gantry 2 is turned backward behind the upper swing body 1. Next, the hook rope 12, the hook 13, the pendant rope 15, and the like are removed, and the boom 8 is separated from the upper swing body 1. Then, as shown in FIG. 2, the gantry 2 is placed on the truck 16 in a state where the gantry 2 is placed substantially horizontally on the upper part of the upper rotating body 1.
[0011]
As shown in the figure, a bridle fixing lug 18 is attached to a boom mounting portion 17 provided at a front portion of the upper swing body 1, and the bridle 4 is fixed to the bridle fixing lug 18. That is, since the bridle 4 is fixed to the front lower position of the upper swing body 1, the transport method of the present invention is compared with the transport height A when the bridle 4 is placed on the gantry 2 as in the related art. In this case, the transport height is as low as B, so that it is hard to be restricted by height restrictions during movement. Further, as compared with the conventional transportation method in which the bridle 4 is detached and stored, the boom hoisting rope 5 is not removed, so that it is not necessary to wind the boom hoisting rope 5 all around the boom hoisting winch 6.
[0012]
On the other hand, the assembling work after the transportation is performed in the reverse process, but when the bridle 4 is locked to the pendant rope 15 of the boom 8, the boom hoisting rope 5 is wound between the bail 3 and the bridle 4. In this state, there is no need to hang the boom hoisting rope 5 many times as in the related art, and the assembling work can be simplified.
[0013]
The present invention can be variously modified without departing from the spirit of the present invention, and it goes without saying that the present invention extends to the modified ones.
[0014]
【The invention's effect】
As described in detail in the one embodiment, the present invention does not remove the bridle when transporting the crane, and is also at a lower position than the mounting position of the gantry , and Since the bridle is fixed to the bridle fixing lug provided at the front part , the transportation height can be suppressed low, and the height at the time of transportation is hardly restricted. Furthermore, since it is to fix the bridle to the fixed position, also eliminates the need to outer boom pivoting rope is wound between the bail and the blanking La idle, therefore, all the boom hoisting rope boom hoisting winch The present invention does not need to be involved, and greatly simplifies preparation for transportation and assembly, thereby contributing to a reduction in labor and a reduction in working time.
[Brief description of the drawings]
FIG. 1 shows an embodiment of the present invention and is a side view of a crane.
FIG. 2 is a side view showing the embodiment of the present invention and illustrating a transport state of the crane.
FIG. 3 is a side view showing a transportation state of a conventional crane.
[Explanation of symbols]
REFERENCE SIGNS LIST 1 upper revolving unit 2 gantry 3 bail 4 bridle 5 boom hoisting rope 7 lower traveling unit 8 boom 18 bridle fixing lug

Claims (1)

下部走行体に上部旋回体を旋回自在に載置し、該上部旋回体の前部にブームを俯仰可能に装着するとともに、該上部旋回体の後部にガントリを起立倒回自在に設け、このガントリの先端部にベイルを取り付けるとともに前記ブームの先端部側にブライドルを取り付け、これらベイル・ブライドル間にブーム起伏ロープを巻装し、該ブーム起伏ロープの巻き上げ下げにてベイル・ブライドル間の距離を変更することにより前記ブームを俯仰するように構成したクレーンであって、且つ、前記ブーム起伏ロープを巻き下げてブームを上部旋回体の前方へ倒回した後に、該ブームから前記ブライドルを取り外すとともに該ブームを上部旋回体から離脱させ、更に、前記ガントリを上部旋回体の後方へ倒回して上部旋回体の上部にガントリを略水平に載置して輸送するようにしたクレーンの輸送方法に於いて、
前記ブームから取り外された前記ブライドルは前記上部旋回体の前部に設けられているブライドル固定用ラグに固定されることにより、該ブライドルを上部旋回体の前部であって、且つ、ガントリの載置位置よりも低位置に固定して輸送することを特徴とするクレーンの輸送方法。
An upper revolving structure is mounted on the lower traveling structure so as to be freely rotatable, a boom is mounted on the front portion of the upper revolving structure so as to be able to elevate, and a gantry is provided on a rear portion of the upper revolving structure so as to be able to stand up and down. A bail is attached to the tip of the boom and a bridle is attached to the end of the boom, a boom hoisting rope is wound between these bail bridles, and the distance between the bail bridles is changed by raising and lowering the boom hoisting rope. A crane configured to lower the boom by lifting the boom hoisting rope and inverting the boom forward of the upper revolving structure, and then removing the bridle from the boom and was separated from the upper rotating body, further, substantially horizontal the gantry at the top of the upper frame to倒回the gantry to the rear of the upper swing structure In the crane method of transport that was to transport it is placed,
The bridle removed from the boom is fixed to a bridle fixing lug provided at the front of the upper revolving unit, so that the bridle is at the front of the upper revolving unit and the gantry is mounted. A method of transporting a crane, characterized in that the crane is transported while being fixed at a position lower than the installation position.
JP2001049568A 2001-02-26 2001-02-26 Crane transportation method Expired - Fee Related JP3600169B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001049568A JP3600169B2 (en) 2001-02-26 2001-02-26 Crane transportation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001049568A JP3600169B2 (en) 2001-02-26 2001-02-26 Crane transportation method

Publications (2)

Publication Number Publication Date
JP2002255479A JP2002255479A (en) 2002-09-11
JP3600169B2 true JP3600169B2 (en) 2004-12-08

Family

ID=18910654

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001049568A Expired - Fee Related JP3600169B2 (en) 2001-02-26 2001-02-26 Crane transportation method

Country Status (1)

Country Link
JP (1) JP3600169B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5713687B2 (en) * 2011-01-11 2015-05-07 Ihi建機株式会社 Equalizer sheave installation device

Also Published As

Publication number Publication date
JP2002255479A (en) 2002-09-11

Similar Documents

Publication Publication Date Title
US20070256999A1 (en) Crane and boom hoisting device thereof
JP2008127150A (en) Crane
JP2010241604A5 (en)
JP2014144853A (en) Boom and boom hoisting member
US7290671B2 (en) Crane
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP2011190084A (en) Assembling method for crane attachment
JP2010018355A (en) Boom derricking device
JP3600169B2 (en) Crane transportation method
JP6396256B2 (en) Jib crane
JP2005126212A (en) Crane
WO2008047471A1 (en) Jib crane
JP4922780B2 (en) Crane and disassembling method of crane
JP2004026315A (en) Cargo handling device
JP5504141B2 (en) Mobile crane
JP2518563B2 (en) Wheel-type crane hook storage device
JP2018048014A (en) Method for assembling mobile crane
JP5408867B2 (en) Auxiliary jib for mobile crane
JP2019199310A (en) Specification changing method of crane and specification-changeable crane
CN214570251U (en) Derrick mast lifting mechanism convenient to operate
JP2019112152A (en) Crane and crane assembling method
JP2009040571A (en) Boom derricking mechanism of crane
JP2001310895A (en) Counter weight detaching/attaching device for crawler crane
JPH0192198A (en) Method and equipment for mounting and dismounting jib to crane
JPH0455027Y2 (en)

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040914

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040915

R150 Certificate of patent or registration of utility model

Ref document number: 3600169

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070924

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100924

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100924

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110924

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120924

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130924

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees