JP3547213B2 - Plasma melting furnace - Google Patents

Plasma melting furnace Download PDF

Info

Publication number
JP3547213B2
JP3547213B2 JP12198695A JP12198695A JP3547213B2 JP 3547213 B2 JP3547213 B2 JP 3547213B2 JP 12198695 A JP12198695 A JP 12198695A JP 12198695 A JP12198695 A JP 12198695A JP 3547213 B2 JP3547213 B2 JP 3547213B2
Authority
JP
Japan
Prior art keywords
plasma
electrode
melting furnace
outer cylinder
combustion chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12198695A
Other languages
Japanese (ja)
Other versions
JPH08312928A (en
Inventor
清一 阿部
史朗 上林
洋仁 吉岡
知之 三好
哲夫 清田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP12198695A priority Critical patent/JP3547213B2/en
Publication of JPH08312928A publication Critical patent/JPH08312928A/en
Application granted granted Critical
Publication of JP3547213B2 publication Critical patent/JP3547213B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Incineration Of Waste (AREA)
  • Plasma Technology (AREA)
  • Discharge Heating (AREA)
  • Gasification And Melting Of Waste (AREA)

Description

【0001】
【産業上の利用分野】
本発明は、都市排水などを処理した後の下水汚泥や都市ゴミなどを焼却した後の焼却灰、破砕不燃物等を溶融してスラグに変えるプラズマ溶融炉に関するものである。
【0002】
【従来の技術】
従来の廃棄物を溶融する溶融炉としては表面式溶融炉がある。図5は従来の表面式溶融炉の断面図である。この表面式溶融炉は竪形円筒回転炉であって、炉体は同心に配置した内筒1と外筒2とからなり、内筒1の底部をなす炉天井1aの下方には主燃焼室3が形成してある。天井部1aの中央部にはバーナ等の燃焼装置4が設けてあり、その周囲に複数の空気供給孔5が分散して設けてある。燃焼装置4は天井部のセンターの周囲に適当間隔で複数基を配置することも可能である。
【0003】
運転時には、燃焼装置4あるいは空気供給孔5から空気を供給する状態において、燃料タンク6から供給する灯油などの燃料が燃焼装置4において燃焼するとともに、主燃焼室3内に収容した下水汚泥、焼却灰、破砕不燃物等の被溶融物7に含まれた可燃物が自燃焼し、燃焼装置4における高温の燃焼熱、および被溶融物7の燃焼熱によって、被溶融物7が主燃焼室3に臨む表層において効率良く溶融する。
【0004】
内筒1と外筒2の間に形成する環状間隙には被処理物が貯留してあり、外筒2の回転により被処理物を主燃焼室3内に供給する。また、被処理物の投入は上部一箇所の供給部8より行う。主燃焼室3の下部には二次燃焼室9が備えてあり、未燃ガスを完全燃焼するよう構成している。二次燃焼室9の側壁には二次燃焼用の燃焼装置10(設けない場合もある)が設けてあり、二次燃焼室9には燃焼ガスを排煙するための煙道11が連通し、二次燃焼室9の下部にはスラグコンベア12aを備えたスラグ排出装置12が設置してある。被溶融物7の溶融スラグは高温の燃焼ガスと共に、炉底部のスラグポート13から二次燃焼室9を通って連続的にスラグ排出装置12に流下し、冷却固化してスラグとなり、スラグコンベア12aがスラグを炉外に搬送する。
【0005】
【発明が解決しようとする課題】
上記した表面式溶融炉においては、燃焼装置4において灯油等の燃料が燃焼することによって生じる燃焼熱を溶融のための熱源としているので、主燃焼室内を1300〜1500℃の高温雰囲気に維持するためには、燃料が高効率で燃焼することが必要であり、燃料量と空気量の適宜な制御が必要である。また、主燃焼室における燃焼を効果的に行うためには、燃料分と酸素との接触ならびに反応に十分な滞留時間を確保できる燃焼空間の広がりが必要である。また、燃焼エネルギーを熱源として利用するために、燃料燃焼排ガスが必然的に多く発生する。
【0006】
本発明は、上記した課題を解決するものであり、被溶融物の溶融に要する主な熱エネルギーを酸素消費を伴うことなく発生させることにより、主燃焼室で発生する排ガス量を低減するとともに、燃焼のための空間を不要となして主燃焼室を小さくすることができるプラズマ溶融炉を提供することを目的とする。
【0007】
【課題を解決するための手段】
上記した課題を解決するために、本発明のプラズマ溶融炉は、同心に配置する内筒と外筒とを、内筒の底部をなす炉天井と外筒の底部との間に主燃焼室を形成して設け、外筒の底部にスラグポートを形成し、内筒と外筒の間に形成した環状の間隙を通して外筒内に投入する被溶融物をスラグポートの周囲に沿って堆積配置し、炉天井に作動ガスとして圧縮空気を使用するプラズマトーチを堆積層表面に向けてプラズマアークを噴射するように設けた構成としたものである。
【0008】
また、複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、他方の電極を各ノズル口の前方に同心に配置した構成としたものである。
【0009】
また、複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、各プラズマトーチに対応する他方の電極を外筒の底部にスラグポートの周囲に位置して設置した構成としたものである。
【0010】
また、複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、各プラズマトーチに対応する他方の電極を一方の電極と並列にしてスラグポートの周囲に設置した構成としたものである。
【0011】
また、スラグポートの下方に二次燃焼室を設けた構成としたものである。
【0012】
【作用】
上記した構成により、運転時には、プラズマトーチの陽極と陰極の間にアークを発生させるとともに、アークの周囲に作動ガスとして圧縮空気を供給し、生起する高温プラズマを被溶融物の堆積層表面に向けて噴射し、プラズマアークの放射熱により被溶融物を表層から溶融する。作動ガスである圧縮空気は、被溶融物の燃焼用空気として作用し、被溶融物は自らの燃焼熱およびプラズマアークの放射熱により効率良く溶融し、溶融した溶融スラグはスラグポートから炉外に流れ出る。
【0013】
したがって、被溶融物の溶融に要する主な熱量を高温のプラズマにより供給することによって、酸素消費を伴わない熱分解反応によって効率のよい溶融処理を行うことができる。このため、主燃焼室に燃焼用空気を供給することはほとんど不要であり、燃料の燃焼を伴う場合に比して排ガス量は少ないものとなり、燃焼のための空間を不要となして主燃焼室を小さくすることができる。
【0014】
また、複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、他方の電極を適宜に配置することにより、プラズマアークの形状を任意の形態に保持することができ、被溶融物に対する熱量供給に好適なプラズマアークの形状を選定することができる。
【0015】
また、主燃焼室で被溶融物を熱分解することにより発生した未燃ガスは二次燃焼室において完全燃焼させることができる。
【0016】
【実施例】
以下、本発明の一実施例を図面に基づいて説明する。図1において、プラズマ溶融炉21は同心に配置する内筒22と外筒23とを備えており、内筒22と外筒23は共に有底形状をなしている。内筒22と外筒23は、内筒22の底部をなす炉天井24と外筒23の底部をなす炉底25との間に主燃焼室26を形成するように配置してあり、炉底25にはスラグポート27が形成してある。
【0017】
内筒22と外筒23の間には環状に間隙28が形成してあり、間隙28の適当位置には被溶融物29を投入するためのホッパ(図示せず)が設けてある。内筒22の上部外周には間隙28の開口を覆ってカバー30が固定してある。カバー30の外周縁は外筒23の上部外周に設けた水封装置31内に没しており、内筒22は固定部材(図示せず)により固定支持している。
【0018】
外筒23は軸心廻りに回転自在に配置してあり、固定部材32には外筒23の底部を支持する支持ローラ33が設けてある。外筒23の下部外周にはラック34が設けてあり、このラック34に噛合するピニオン35を駆動する減速機36および駆動装置37が外筒23の側方に位置して固定部材38に設けてある。
【0019】
被溶融物29は下水汚泥、焼却灰、破砕不燃物等からなり、スラグポート27の周囲に沿って堆積配置しており、その堆積層表面39はスラグポート27の開口周縁に向けて安息角をなす傾斜面を形成している。
【0020】
炉天井24にはノントランスファー型の複数のプラズマトーチ40がスラグポート27を囲んで設けてあり、プラズマトーチ40は作動ガスとして圧縮空気を使用し、堆積層表面39に向けてプラズマアーク41を噴射するものである。プラズマトーチ40はノズル形状をなす本体40aが金属円筒体をなして水冷ジャケットを有しており、本体40aの上端には冷却水供給手段42および圧縮空気供給手段43が接続してある。プラズマトーチ40は本体自身が一方の電極を形成し、他方の電極なす電極部材44がノズル口の前方に同心に配置してあり、本体40aが陽極をなし電極部材44が陰極をなすように電源装置45を接続している。
【0021】
スラグポート27の下方には二次燃焼室46が備えてある。図示を省略するが、二次燃焼室46の側壁には二次燃焼用の燃焼装置と燃焼した燃焼ガスを排煙するための煙道が設けてあり、二次燃焼室46の下部には冷却装置およびスラグコンベアを設置し、冷却固化したスラグを炉外に搬送するように構成している。
【0022】
以下、上記した構成における作用を説明する。運転時には、電源装置45によって、プラズマトーチ40の陽極をなす本体40aと陰極をなす電極部材44の間に高圧電圧を印加し、電極間にアークを発生させるとともに、圧縮空気供給手段43によってアークの周囲に作動ガスとして圧縮空気を供給する。本体40a内において生起する高温プラズマは、圧縮空気の気流とともにノズル口から被溶融物29の堆積層表面39に向けて噴出し、陰極に導かれてプラズマアークを形成し、プラズマアークの放射熱により被溶融物29を表層から溶融する。
【0023】
このように、被溶融物29の溶融に要する主な熱量を高温のプラズマにより供給することによって、集中して高密度に高エネルギーを供給することができ、酸素消費を伴わない熱分解反応によって、小さい空間領域において効率のよい溶融処理を行うことができる。このため、主燃焼室26に燃焼用空気を供給することはほとんど不要であり、燃料の燃焼を伴う場合に比して排ガス量は少ないものとなり、主燃焼室26を小さくすることができる。溶融した溶融スラグ47はスラグポート27から二次燃焼室46を通って冷却装置(図示せず)に滴下する。また、主燃焼室26において熱分解により発生した未燃ガス(CO2 )は、二次燃焼室46において完全燃焼させる。
【0024】
一方で、減速機36および駆動装置37によりピニオン35を駆動し、ピニオン35とラック34の噛合により外筒23を回転駆動し、内筒24の下端周縁において堆積層から切り出す被溶融物29を堆積層表面39に供給し、連続的に被溶融物29の溶融を行う。
【0025】
ところで、耐火壁等により主燃焼室を形成した場合には、壁体の熱による損壊を防止するために冷却を行う必要があり、冷却によって熱の損失が生じる。しかし、本実施例のように、堆積層をなす被溶融物29が断熱層として機能することにより、断熱層の冷却が不要となり、加熱された断熱層が表面において溶融することによって主燃焼室26における熱量を全て溶融に供することができ、主燃焼室26における熱損失がなくなる。
【0026】
また、従来の溶融炉の構成として、溶融スラグの一定量を主燃焼室内に貯留しつつ、オーバーフローによって溶融スラグ取り出す構成があるが、この構成においては貯留した溶融スラグの熱量によって被溶融物を溶融させるので、貯留した溶融スラグに新たな被溶融物を断続的に供給することになり、スラグの排出が断続的となるとともに、主燃焼室における温度が変動する。しかし、本実施例のように、主燃焼室26を形成する堆積層の表面において溶融を行い、堆積層の表面に新たな被溶融物を供給することによって、溶融スラグを連続して排出するとともに、主燃焼室26における温度を安定に維持することができる。これは、プラズマによりエネルギーを集中して供給する構成において特に有用である。
【0027】
また、溶融炉と焼却炉を併設する場合には、焼却炉等の排熱を利用して行う発電の電力をプラズマトーチの作動電源として利用することが可能である。
図2は本発明の他の実施例を示すものであり、先の実施例と同様の作用を行う部材については同一番号を付して説明を省略する。図2において、プラズマトーチ400はトランスファー型をなすもので、プラズマトーチ400の本体400aは、炭素材からなる直胴状の円筒体をなし、一方の電極をなしている。各プラズマトーチ40に対応して他方の電極をなす電極部材51がスラグポート27の周囲に位置して外筒21の炉底25に埋設してある。
【0028】
この構成においては、各本体40aのノズル口と電極部材51の間に形成するプラズマアーク41がスラグポート27の周囲に放射状に存在することになるので、プラズマアーク41の放射熱をより広範な領域の堆積層表面39に対して直接的に照射することが可能である。
【0029】
また、プラズマトーチ400の本体400aの全体が炭素材によって電極を構成するので、電極の先端が摩耗し、他方の電極との間の距離が拡がった場合には、電極の交換等を伴うことなく、プラズマトーチ400の本体400aを下方に繰り出すだけで、調整を行うことができ、メンテナンスが容易である。プラズマトーチ400は先の実施例のように金属材で構成することも可能である。
【0030】
図3〜図4は、本発明の他の実施例を示すものであり、先の実施例と同様の作用を行う部材については同一番号を付して説明を省略する。図3〜図4において、プラズマトーチ40はトランスファー型をなすもので、プラズマトーチ40の本体40aが一方の電極をなすとともに、各プラズマトーチ40に対応して他方の電極をなす電極部材52が、スラグポート27の周囲に位置し、かつ一方の電極をなす本体40aと並列にして炉天井24に設けてある。
【0031】
この構成においては、各本体40aと電極部材52の間に形成するプラズマアーク41がスラグポート27の周囲を囲むように存在するので、プラズマアーク41の放射熱をより広範な領域の堆積層表面39に対して直接的に照射することが可能である。また、プラズマトーチ40の本体40aは先の実施例のように炭素材で構成することも可能である。
【0032】
【発明の効果】
以上述べたように本発明によれば、圧縮空気を作動ガスとするプラズマトーチを主熱源とし、被溶融物の溶融に要する主な熱量を高温のプラズマにより供給することによって、酸素消費を伴わない熱分解反応によって効率のよい溶融処理を行うことができ、主燃焼室における燃焼用空気をほとんど不要となし、排ガス量を低減するとともに、燃焼のための空間を不要となして主燃焼室を小さくすることができる。また、本体を一方の電極となし、他方の電極を適宜の位置に配置することにより、プラズマアークの形状を任意の形態に保持し、被溶融物に対する熱量供給に好適なプラズマアークの形状を選定することができる。また、主燃焼室で被溶融物を熱分解することにより発生した未燃ガスは二次燃焼室において完全燃焼させることができる。
【図面の簡単な説明】
【図1】本発明の一実施例を示すプラズマ溶融炉の断面図である。
【図2】本発明の他の実施例を示すプラズマ溶融炉の断面図である。
【図3】本発明のさらに他の実施例を示すプラズマ溶融炉の断面図である。
【図4】同実施例におけるプラズマトーチと電極部材の配置を示す模式図である。
【図5】従来の表面式溶融炉の断面図である。
【符号の説明】
21 プラズマ溶融炉
22 内筒
23 外筒
24 炉天井
25 炉底
26 主燃焼室
27 スラグポート
29 被溶融物
39 堆積層表面
40 プラズマトーチ
41 プラズマアーク
44 電極部材
[0001]
[Industrial applications]
TECHNICAL FIELD The present invention relates to a plasma melting furnace that melts incinerated ash after incineration of sewage sludge or municipal garbage after treating city wastewater and the like, crushed incombustibles, etc., and converts it into slag.
[0002]
[Prior art]
As a conventional melting furnace for melting waste, there is a surface melting furnace. FIG. 5 is a sectional view of a conventional surface melting furnace. This surface melting furnace is a vertical cylindrical rotary furnace, and the furnace body is composed of an inner cylinder 1 and an outer cylinder 2 arranged concentrically, and a main combustion chamber is provided below a furnace ceiling 1a which forms the bottom of the inner cylinder 1. 3 are formed. A combustion device 4 such as a burner is provided at the center of the ceiling 1a, and a plurality of air supply holes 5 are provided around the combustion device 4 in a distributed manner. A plurality of combustion devices 4 can be arranged around the center of the ceiling at appropriate intervals.
[0003]
During operation, fuel such as kerosene supplied from a fuel tank 6 is burned in the combustion device 4 in a state where air is supplied from the combustion device 4 or the air supply hole 5, and sewage sludge contained in the main combustion chamber 3 is incinerated. The combustibles contained in the material to be melted 7 such as ash and crushed incombustibles self-combust, and the high-temperature combustion heat in the combustion device 4 and the combustion heat of the material to be molten 7 cause the material to be melted 7 into the main combustion chamber 3 Melts efficiently in the surface layer facing the surface.
[0004]
An object to be processed is stored in an annular gap formed between the inner cylinder 1 and the outer cylinder 2, and the object to be processed is supplied into the main combustion chamber 3 by rotation of the outer cylinder 2. In addition, the loading of the object to be processed is performed from the supply unit 8 at one upper position. A secondary combustion chamber 9 is provided below the main combustion chamber 3 so as to completely burn unburned gas. A combustion device 10 for secondary combustion (which may not be provided) is provided on a side wall of the secondary combustion chamber 9, and a flue 11 for discharging combustion gas communicates with the secondary combustion chamber 9. A slag discharge device 12 having a slag conveyor 12a is installed below the secondary combustion chamber 9. The molten slag of the material to be melted 7 together with the high-temperature combustion gas flows continuously from the slag port 13 at the bottom of the furnace through the secondary combustion chamber 9 to the slag discharge device 12, where it is cooled and solidified to form slag, and the slag conveyor 12a Transports the slag out of the furnace.
[0005]
[Problems to be solved by the invention]
In the above-mentioned surface melting furnace, since the combustion heat generated by burning fuel such as kerosene in the combustion device 4 is used as a heat source for melting, the main combustion chamber is maintained at a high temperature atmosphere of 1300 to 1500 ° C. Requires that the fuel be burned with high efficiency, and appropriate control of the fuel amount and the air amount is required. Further, in order to effectively perform combustion in the main combustion chamber, it is necessary to expand a combustion space capable of securing a sufficient residence time for contact and reaction between fuel and oxygen. Further, since combustion energy is used as a heat source, a large amount of fuel combustion exhaust gas is inevitably generated.
[0006]
The present invention is to solve the above-described problems, and by reducing the amount of exhaust gas generated in the main combustion chamber by generating the main heat energy required for melting the material to be melted without accompanying oxygen consumption, An object of the present invention is to provide a plasma melting furnace capable of reducing the size of a main combustion chamber without requiring a space for combustion.
[0007]
[Means for Solving the Problems]
In order to solve the above-described problems, the plasma melting furnace of the present invention has an inner cylinder and an outer cylinder which are arranged concentrically, and a main combustion chamber between a furnace ceiling forming the bottom of the inner cylinder and a bottom of the outer cylinder. A slag port is formed at the bottom of the outer cylinder, and the material to be charged into the outer cylinder through an annular gap formed between the inner cylinder and the outer cylinder is deposited and arranged along the periphery of the slag port. In addition, a plasma torch using compressed air as a working gas is provided on the furnace ceiling so as to jet a plasma arc toward the surface of the deposition layer.
[0008]
In addition, a plurality of plasma torches are arranged around a slag port, a body forming a nozzle shape of each plasma torch is formed as one electrode, and the other electrode is arranged concentrically in front of each nozzle port. is there.
[0009]
In addition, a plurality of plasma torches are arranged around the slag port, a body forming a nozzle shape of each plasma torch is formed as one electrode, and the other electrode corresponding to each plasma torch is provided on the bottom of the outer cylinder around the slag port. It is configured to be installed in a location.
[0010]
In addition, a plurality of plasma torches are arranged around the slag port, a body forming a nozzle shape of each plasma torch is formed as one electrode, and the other electrode corresponding to each plasma torch is arranged in parallel with one electrode to form a slag port. It is configured to be installed around the device.
[0011]
In addition, a secondary combustion chamber is provided below the slag port.
[0012]
[Action]
With the above configuration, during operation, an arc is generated between the anode and the cathode of the plasma torch, and compressed air is supplied as a working gas around the arc to direct the generated high-temperature plasma toward the surface of the deposited layer of the material to be melted. And melts the material from the surface layer by the radiation heat of the plasma arc. The compressed gas, which is the working gas, acts as combustion air for the material to be melted, and the material to be melted is efficiently melted by its own combustion heat and the radiation heat of the plasma arc. Run out.
[0013]
Therefore, by supplying the main amount of heat required for melting the material to be melted by high-temperature plasma, an efficient melting process can be performed by a thermal decomposition reaction without oxygen consumption. For this reason, it is almost unnecessary to supply combustion air to the main combustion chamber, and the amount of exhaust gas is smaller than in the case where combustion of fuel is involved. Can be reduced.
[0014]
In addition, by arranging a plurality of plasma torches around the slag port, forming a body forming a nozzle shape of each plasma torch as one electrode, and appropriately arranging the other electrode, the shape of the plasma arc can be changed to an arbitrary form. And the shape of the plasma arc suitable for supplying heat to the material to be melted can be selected.
[0015]
Further, unburned gas generated by pyrolyzing the melt in the main combustion chamber can be completely burned in the secondary combustion chamber.
[0016]
【Example】
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In FIG. 1, a plasma melting furnace 21 includes an inner cylinder 22 and an outer cylinder 23 which are arranged concentrically, and both the inner cylinder 22 and the outer cylinder 23 have a bottomed shape. The inner cylinder 22 and the outer cylinder 23 are arranged so as to form a main combustion chamber 26 between a furnace ceiling 24 forming a bottom of the inner cylinder 22 and a furnace bottom 25 forming a bottom of the outer cylinder 23. 25 has a slag port 27 formed therein.
[0017]
A gap 28 is formed annularly between the inner cylinder 22 and the outer cylinder 23, and a hopper (not shown) for charging a melt 29 is provided at an appropriate position in the gap 28. A cover 30 is fixed to the upper outer periphery of the inner cylinder 22 so as to cover the opening of the gap 28. The outer peripheral edge of the cover 30 is submerged in a water seal device 31 provided on the outer periphery of the upper part of the outer cylinder 23, and the inner cylinder 22 is fixedly supported by a fixing member (not shown).
[0018]
The outer cylinder 23 is rotatably arranged around the axis, and the fixing member 32 is provided with a support roller 33 for supporting the bottom of the outer cylinder 23. A rack 34 is provided on the outer periphery of the lower part of the outer cylinder 23, and a speed reducer 36 and a driving device 37 for driving a pinion 35 meshing with the rack 34 are provided on a fixed member 38 located on the side of the outer cylinder 23. is there.
[0019]
The material to be melted 29 is composed of sewage sludge, incinerated ash, crushed incombustible material, etc., and is disposed around the periphery of the slag port 27. The surface 39 of the deposited layer raises the angle of repose toward the periphery of the opening of the slag port 27. An inclined surface is formed.
[0020]
A plurality of non-transfer-type plasma torches 40 are provided on the furnace ceiling 24 so as to surround the slag port 27. The plasma torches 40 use compressed air as a working gas and inject a plasma arc 41 toward the surface 39 of the deposition layer. Is what you do. In the plasma torch 40, a main body 40a in the form of a nozzle is formed of a metal cylinder and has a water cooling jacket, and a cooling water supply unit 42 and a compressed air supply unit 43 are connected to an upper end of the main body 40a. The plasma torch 40 has a power source such that the main body itself forms one electrode, the electrode member 44 forming the other electrode is concentrically disposed in front of the nozzle port, and the main body 40a forms an anode and the electrode member 44 forms a cathode. The device 45 is connected.
[0021]
A secondary combustion chamber 46 is provided below the slag port 27. Although not shown, a combustion device for secondary combustion and a flue for exhausting the burned combustion gas are provided on the side wall of the secondary combustion chamber 46. An apparatus and a slag conveyor are installed to transport the cooled and solidified slag out of the furnace.
[0022]
Hereinafter, the operation of the above configuration will be described. During operation, a high voltage is applied between the main body 40a forming the anode of the plasma torch 40 and the electrode member 44 forming the cathode by the power supply device 45, and an arc is generated between the electrodes. Compressed air is supplied to the surroundings as working gas. The high-temperature plasma generated in the main body 40a is ejected from the nozzle orifice toward the deposition layer surface 39 of the material 29 to be melted together with the compressed air flow, and is guided to the cathode to form a plasma arc. The object 29 is melted from the surface layer.
[0023]
In this way, by supplying the main amount of heat required for melting the material 29 to be melted by the high-temperature plasma, high energy can be concentrated and supplied at high density, and the thermal decomposition reaction without oxygen consumption allows An efficient melting process can be performed in a small space region. For this reason, it is almost unnecessary to supply combustion air to the main combustion chamber 26, and the amount of exhaust gas is smaller than in the case where combustion of fuel is involved, so that the size of the main combustion chamber 26 can be reduced. The molten slag 47 is dropped from the slag port 27 through the secondary combustion chamber 46 to a cooling device (not shown). Unburned gas (CO 2 ) generated by thermal decomposition in the main combustion chamber 26 is completely burned in the secondary combustion chamber 46.
[0024]
On the other hand, the pinion 35 is driven by the reduction gear 36 and the driving device 37, the outer cylinder 23 is rotationally driven by the engagement of the pinion 35 and the rack 34, and the material 29 to be cut out from the accumulation layer at the lower peripheral edge of the inner cylinder 24 is deposited. It is supplied to the layer surface 39 to continuously melt the material 29 to be melted.
[0025]
By the way, when the main combustion chamber is formed by a fire-resistant wall or the like, it is necessary to perform cooling in order to prevent the wall body from being damaged by heat, and cooling causes heat loss. However, as in the present embodiment, the material to be melted 29 forming the deposited layer functions as a heat insulating layer, so that cooling of the heat insulating layer becomes unnecessary, and the heated heat insulating layer is melted on the surface, so that the main combustion chamber 26 is melted. Can be used for melting, and heat loss in the main combustion chamber 26 is eliminated.
[0026]
Also, as a configuration of a conventional melting furnace, there is a configuration in which a certain amount of molten slag is stored in the main combustion chamber and the molten slag is taken out by overflow, but in this configuration, the material to be melted is melted by the calorific value of the stored molten slag. Therefore, a new material to be melted is intermittently supplied to the stored molten slag, the slag is intermittently discharged, and the temperature in the main combustion chamber fluctuates. However, as in the present embodiment, the molten slag is continuously discharged by melting at the surface of the deposition layer forming the main combustion chamber 26 and supplying a new melted material to the surface of the deposition layer. The temperature in the main combustion chamber 26 can be maintained stably. This is particularly useful in a configuration in which energy is concentrated and supplied by plasma.
[0027]
When a melting furnace and an incinerator are provided side by side, it is possible to use the electric power generated by using the exhaust heat of the incinerator or the like as the operating power source of the plasma torch.
FIG. 2 shows another embodiment of the present invention, and members performing the same operations as those in the previous embodiment are denoted by the same reference numerals, and description thereof will be omitted. In FIG. 2, a plasma torch 400 is of a transfer type, and a main body 400a of the plasma torch 400 is a straight cylindrical body made of a carbon material and has one electrode. An electrode member 51 forming the other electrode corresponding to each plasma torch 40 is located around the slag port 27 and is embedded in the furnace bottom 25 of the outer cylinder 21.
[0028]
In this configuration, since the plasma arc 41 formed between the nozzle port of each main body 40a and the electrode member 51 exists radially around the slag port 27, the radiant heat of the plasma arc 41 can be reduced over a wider area. It is possible to directly irradiate the surface 39 of the deposited layer.
[0029]
In addition, since the entire body 400a of the plasma torch 400 forms an electrode with a carbon material, when the tip of the electrode is worn and the distance between the electrode and the other electrode is increased, the electrode does not need to be replaced. The adjustment can be performed only by extending the main body 400a of the plasma torch 400 downward, and the maintenance is easy. The plasma torch 400 can be made of a metal material as in the previous embodiment.
[0030]
FIGS. 3 and 4 show another embodiment of the present invention, in which members having the same functions as those in the previous embodiment are denoted by the same reference numerals and description thereof will be omitted. 3 and 4, the plasma torch 40 is of a transfer type, and a main body 40a of the plasma torch 40 forms one electrode, and an electrode member 52 forming the other electrode corresponding to each plasma torch 40 includes: It is located around the slag port 27 and is provided on the furnace ceiling 24 in parallel with the main body 40a forming one electrode.
[0031]
In this configuration, since the plasma arc 41 formed between each main body 40a and the electrode member 52 exists so as to surround the slag port 27, the radiant heat of the plasma arc 41 can be transferred to the deposition layer surface 39 in a wider area. Can be directly irradiated. Further, the main body 40a of the plasma torch 40 can be made of a carbon material as in the previous embodiment.
[0032]
【The invention's effect】
As described above, according to the present invention, a plasma torch using compressed air as a working gas is used as a main heat source, and the main heat amount required for melting the material to be melted is supplied by high-temperature plasma, thereby eliminating oxygen consumption. Efficient melting treatment can be performed by the pyrolysis reaction, making the combustion air in the main combustion chamber almost unnecessary, reducing the amount of exhaust gas, and making the space for combustion unnecessary, making the main combustion chamber smaller. can do. In addition, by forming the main body as one electrode and disposing the other electrode at an appropriate position, the shape of the plasma arc is maintained in an arbitrary form, and a shape of the plasma arc suitable for supplying heat to the melt is selected. can do. Further, unburned gas generated by pyrolyzing the melt in the main combustion chamber can be completely burned in the secondary combustion chamber.
[Brief description of the drawings]
FIG. 1 is a sectional view of a plasma melting furnace showing one embodiment of the present invention.
FIG. 2 is a sectional view of a plasma melting furnace showing another embodiment of the present invention.
FIG. 3 is a sectional view of a plasma melting furnace showing still another embodiment of the present invention.
FIG. 4 is a schematic view showing an arrangement of a plasma torch and an electrode member in the embodiment.
FIG. 5 is a cross-sectional view of a conventional surface melting furnace.
[Explanation of symbols]
21 Plasma Melting Furnace 22 Inner Cylinder 23 Outer Cylinder 24 Furnace Top 25 Furnace Bottom 26 Main Combustion Chamber 27 Slag Port 29 Melted Material 39 Deposition Layer Surface 40 Plasma Torch 41 Plasma Arc 44 Electrode Member

Claims (5)

同心に配置する内筒と外筒とを、内筒の底部をなす炉天井と外筒の底部との間に主燃焼室を形成して設け、外筒の底部にスラグポートを形成し、内筒と外筒の間に形成した環状の間隙を通して外筒内に投入する被溶融物をスラグポートの周囲に沿って堆積配置し、炉天井に作動ガスとして圧縮空気を使用するプラズマトーチを堆積層表面に向けてプラズマアークを噴射するように設けたことを特徴とするプラズマ溶融炉。An inner cylinder and an outer cylinder arranged concentrically are provided by forming a main combustion chamber between a furnace ceiling forming a bottom of the inner cylinder and a bottom of the outer cylinder, and a slag port is formed at a bottom of the outer cylinder. The melt to be injected into the outer cylinder is deposited and arranged along the periphery of the slag port through the annular gap formed between the cylinder and the outer cylinder, and a plasma torch using compressed air as working gas is deposited on the furnace ceiling. A plasma melting furnace characterized by being provided so as to spray a plasma arc toward a surface. 複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、他方の電極を各ノズル口の前方に同心に配置したことを特徴とする請求項1記載のプラズマ溶融炉。A plurality of plasma torches are arranged around a slag port, a body forming a nozzle shape of each plasma torch is formed as one electrode, and the other electrode is arranged concentrically in front of each nozzle port. 2. The plasma melting furnace according to 1. 複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、各プラズマトーチに対応する他方の電極を外筒の底部にスラグポートの周囲に位置して設置したことを特徴とする請求項1記載のプラズマ溶融炉。A plurality of plasma torches are arranged around the slag port, the main body in the form of a nozzle for each plasma torch is formed as one electrode, and the other electrode corresponding to each plasma torch is located at the bottom of the outer cylinder around the slag port. The plasma melting furnace according to claim 1, wherein the plasma melting furnace is installed. 複数のプラズマトーチをスラグポートの周囲に配置し、各プラズマトーチのノズル形状をなす本体を一方の電極となし、各プラズマトーチに対応する他方の電極を一方の電極と並列にしてスラグポートの周囲に設置したことを特徴とする請求項1記載のプラズマ溶融炉。A plurality of plasma torches are arranged around the slag port, and a body forming a nozzle shape of each plasma torch is formed as one electrode, and the other electrode corresponding to each plasma torch is arranged in parallel with one electrode to surround the slag port. The plasma melting furnace according to claim 1, wherein the plasma melting furnace is installed in a furnace. スラグポートの下方に二次燃焼室を設けたことを特徴とする請求項1から4の何れかの項に記載のプラズマ溶融炉。The plasma melting furnace according to any one of claims 1 to 4, wherein a secondary combustion chamber is provided below the slag port.
JP12198695A 1995-05-22 1995-05-22 Plasma melting furnace Expired - Fee Related JP3547213B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12198695A JP3547213B2 (en) 1995-05-22 1995-05-22 Plasma melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12198695A JP3547213B2 (en) 1995-05-22 1995-05-22 Plasma melting furnace

Publications (2)

Publication Number Publication Date
JPH08312928A JPH08312928A (en) 1996-11-26
JP3547213B2 true JP3547213B2 (en) 2004-07-28

Family

ID=14824742

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12198695A Expired - Fee Related JP3547213B2 (en) 1995-05-22 1995-05-22 Plasma melting furnace

Country Status (1)

Country Link
JP (1) JP3547213B2 (en)

Also Published As

Publication number Publication date
JPH08312928A (en) 1996-11-26

Similar Documents

Publication Publication Date Title
AU2009238232A1 (en) Methods and apparatus for waste treatment by melt decomposition assisted with plasma arc heating
KR100582753B1 (en) Cyclonic Plasma Pyrolysis/Vitrification System
WO2011114794A1 (en) Method for supplying combustion air in vertical waste incinerator, and vertical waste incinerator
JP3547213B2 (en) Plasma melting furnace
JP3793466B2 (en) Waste plastic combustion burner for electric furnace
JP3850088B2 (en) Burner for powder combustion of industrial waste incinerator
JPH0355410A (en) Melting and disposing method for incinerated ash
JPH10132229A (en) Waste melting furnace and waste melting method
CN216114068U (en) Dangerous waste melting and secondary combustion chamber integrated furnace
JP2004257631A (en) Plasma melting treatment apparatus for waste disposal
JP2004156819A (en) Plasma arc melting furnace
JP3575785B2 (en) Method and apparatus for treating fall ash in secondary combustion chamber
JP2002195519A (en) Method and system for gasifying/melting refuse
JP3926205B2 (en) Plasma melting furnace restart method and plasma melting furnace equipment
JP3212663B2 (en) Ash melting equipment
JP2896562B2 (en) Waste melting furnace
JP3071172B2 (en) Waste melting equipment
JP4972458B2 (en) Ash melting furnace combustion chamber
JPH02217788A (en) Smelting of scrap in electric arc furnace and electric arc furnace therefor
CN113513760A (en) Dangerous waste melting and secondary combustion chamber integrated furnace
JPH1182952A (en) Plasma melting furnace
JP2006010199A (en) Melting treatment method of waste
JP3921784B2 (en) Ash melting furnace
CN114659123A (en) Harmful ash incineration device
RU2484372C2 (en) Device for refuse and wastes treatment

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040316

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040413

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees