JP3542407B2 - 低残留応力構造の溶接方法 - Google Patents
低残留応力構造の溶接方法 Download PDFInfo
- Publication number
- JP3542407B2 JP3542407B2 JP14714795A JP14714795A JP3542407B2 JP 3542407 B2 JP3542407 B2 JP 3542407B2 JP 14714795 A JP14714795 A JP 14714795A JP 14714795 A JP14714795 A JP 14714795A JP 3542407 B2 JP3542407 B2 JP 3542407B2
- Authority
- JP
- Japan
- Prior art keywords
- welding
- residual stress
- welded
- order
- point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14714795A JP3542407B2 (ja) | 1995-06-14 | 1995-06-14 | 低残留応力構造の溶接方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14714795A JP3542407B2 (ja) | 1995-06-14 | 1995-06-14 | 低残留応力構造の溶接方法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JPH091376A JPH091376A (ja) | 1997-01-07 |
| JPH091376A5 JPH091376A5 (enExample) | 2001-08-28 |
| JP3542407B2 true JP3542407B2 (ja) | 2004-07-14 |
Family
ID=15423652
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14714795A Expired - Fee Related JP3542407B2 (ja) | 1995-06-14 | 1995-06-14 | 低残留応力構造の溶接方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3542407B2 (enExample) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4936813B2 (ja) * | 2006-07-24 | 2012-05-23 | 株式会社東芝 | 炉心シュラウドの溶接方法 |
| JP4951448B2 (ja) * | 2007-09-07 | 2012-06-13 | 日立Geニュークリア・エナジー株式会社 | 両側溶接方法及び両側溶接構造物 |
| CN105195860B (zh) * | 2015-09-17 | 2018-09-07 | 中建钢构有限公司 | 阴面对接斜立焊接方法 |
| JP7572313B2 (ja) * | 2021-06-23 | 2024-10-23 | 株式会社神戸製鋼所 | 積層造形支援装置、積層造形装置、積層造形支援方法、及びプログラム |
| CN115139000B (zh) * | 2022-05-27 | 2024-02-20 | 中国能源建设集团天津电力建设有限公司 | 一种跳跃回中式焊接方法 |
| JPWO2025069817A1 (enExample) * | 2023-09-28 | 2025-04-03 |
-
1995
- 1995-06-14 JP JP14714795A patent/JP3542407B2/ja not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH091376A (ja) | 1997-01-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Mochizuki | Control of welding residual stress for ensuring integrity against fatigue and stress–corrosion cracking | |
| Joseph et al. | Evaluation of residual stresses in dissimilar weld joints | |
| CN113702403B (zh) | 核电站boss头焊缝检测方法、设备及介质 | |
| Zondi | Factors that affect welding-induced residual stress and distortions in pressure vessel steels and their mitigation techniques: a review | |
| Wu et al. | Influence of extra coarse grains on the creep properties of 9 percent CrMoV (P91) steel weldment | |
| Amirafshari et al. | A review of nondestructive examination methods for new-building ships undergoing classification society survey | |
| Rizvi et al. | Application of grey-based fuzzy logic algorithm in MIG welding-A case study | |
| Liu et al. | Experimental investigation on residual stress distribution in an austenitic stainless steel weld overlay pipe after local ultrasonic impact treatment | |
| Dokme et al. | Corrosion behavior of a dissimilar Inconel 625 superalloy and AISI 316L stainless steel weld | |
| JPH091376A (ja) | 低残留応力構造の溶接方法 | |
| Xie et al. | Controlling method of the welding residual stress in support platform of hydrogenation reactor | |
| Brickstad et al. | The use of risk based methods for establishing ISI-priorities for piping components at Oskarshamn 1 nuclear power station | |
| Danielewski | Laser welding of pipe stubs made from super 304 steel. Numerical simulation and weld properties | |
| Corigliano et al. | Review of Fatigue Assessment Approaches for Welded Marine Joints and Structures. Metals 2022, 12, 1010 | |
| Siefert et al. | Complexities of in-service failures in dissimilar metal welds between grade 91 and austenitic stainless steels | |
| Broussard III | Standardized through-wall distributions of dissimilar metal weld residual stress | |
| Dowling et al. | The Development of Structural Integrity | |
| Chandima Ratnayake et al. | Optimal arc welding process parameter combination design and metallographic examination for SDSS butt welds | |
| Suryakusumah et al. | Analysis Of Metal Joining Process On Offshore Gangway And Walkway Bridges In Tanjung Lesung | |
| Borgmann et al. | Integrated weld quality concept—A holistic design approach for steam turbine rotor weld joints | |
| Gannon et al. | Shakedown of welding-induced residual stress and effect on stiffened plate strength and behavior | |
| Benghalia et al. | Multiscale measurements of residual stress in a low-alloy carbon steel weld clad with IN625 superalloy. Materials Performance and Characterization | |
| Lunceford et al. | Applications of Welding to Repair Irradiated Reactor Internals | |
| Ahmed | Intelligent Process Monitoring for Enhancing Weld Integrity and Reliability in Advanced Manufacturing of LPG Energy Infrastructure | |
| HASMUKHRAY | PROCESS PARAMETERS OPTIMIZATION AND EXPERIMENTAL INVESTIGATION OF RESISTANCE SPOT WELDING ON WELD QUALITY |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040323 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040331 |
|
| LAPS | Cancellation because of no payment of annual fees |