JP3522485B2 JP06100197A JP6100197A JP3522485B2 JP 3522485 B2 JP3522485 B2 JP 3522485B2 JP 06100197 A JP06100197 A JP 06100197A JP 6100197 A JP6100197 A JP 6100197A JP 3522485 B2 JP3522485 B2 JP 3522485B2
Authority
JP
Japan
Prior art keywords
hot water
floor
water pipe
floor material
back surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06100197A
Other languages
Japanese (ja)
Other versions
JPH10253085A (en
Inventor
吉成 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eidai Co Ltd
Original Assignee
Eidai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eidai Co Ltd filed Critical Eidai Co Ltd
Priority to JP06100197A priority Critical patent/JP3522485B2/en
Publication of JPH10253085A publication Critical patent/JPH10253085A/en
Application granted granted Critical
Publication of JP3522485B2 publication Critical patent/JP3522485B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、温水式暖房床の施
工方法及び温水式暖房床、並びにそれに用いる床材に関
し、特に、床材施工と暖房施工とを分離して行なうこと
を可能とし、それにより、作業性の改善を図り低コスト
化を可能とした温水式暖房床の施工方法及び該施工方法
により構築される温水式暖房床、並びに、そこに用いら
れる床材に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hot water type heating floor construction method, a hot water type heating floor, and a floor material used therefor. In particular, it is possible to perform floor material construction and heating construction separately. Accordingly, the present invention relates to a hot water heating floor construction method capable of improving workability and reducing costs, a hot water heating floor constructed by the construction method, and a floor material used therefor.

【0002】[0002]

【従来の技術】コンクリート床あるいはコンクリート床
上に張られた下地合板のような床下地上に、木質系床材
に電気ヒータあるいは温水用パイプ等の発熱源を組み込
んだ床材を配置するようにした暖房床は知られている。
その一つの形態に、発熱源として温水を用い、ガス給湯
器のような温水発生源からの温水を温水循環用のパイプ
を通して循環させるようにしたものが実用化されてい
る。図17は、温水循環型の暖房床に用いられている暖
房パネルの一例であり、通常、中間パネルa、端末パネ
ルb及び接合用パネルcの組み合わせにより構成され
る。
2. Description of the Related Art Heating in which a floor material in which a heat source such as an electric heater or a hot water pipe is incorporated into a wooden floor material is arranged on a concrete floor or a floor substrate such as a base plywood stretched on the concrete floor. The floor is known.
In one form, hot water is used as a heat source, and hot water from a hot water generating source such as a gas water heater is circulated through a pipe for circulating hot water. FIG. 17 is an example of a heating panel used in a hot water circulation type heating floor, and is usually composed of a combination of an intermediate panel a, a terminal panel b, and a joining panel c.

【0003】いずれのパネルも、フローリング床を施工
するときに用いられると同様の木質系床材の内部に温水
用のパイプを一体に埋め込んだものであり、図示のよう
に、中間パネルaには長さ方向の両端に開口を持つ2本
のパイプPa1、Pa2が埋め込まれ、端末パネルbには長
さ方向の一方の端部に入口と出口の開口を持つ1本のパ
イプPbが埋め込まれ、さらに、接合用パネルcには裏
面側に一部(図17の斜線部分)を露出する形で2本の
パイプPc1、Pc2が埋め込まれている。
Each of the panels is a wooden floor material similar to that used when constructing a flooring floor, and a pipe for hot water is integrally embedded therein. Two pipes P a1 and P a2 having openings at both ends in the length direction are embedded, and one pipe Pb having an opening for an inlet and an outlet at one end in the length direction is embedded in the terminal panel b. Further, two pipes P c1 and P c2 are embedded in the joining panel c so as to expose a part (hatched portion in FIG. 17) on the back surface side.

【0004】この温水用パイプを埋め込んだ各単位パネ
ルa、b、cは、それぞれ分離した状態で工場で製造さ
れ、暖房床の施工現場に搬入後、所定の継手により各パ
イプを接続して連続した循環路を形成する場合と、図1
7に示すように、工場において単位パネルa、b、cを
所定枚数、所定の順序で接続し、それを施工現場に搬入
して施工する方法とが取られる。現場でのパイプ接続作
業あるいはパネル敷設作業を少なくするために、各パネ
ルは幅広に形成され、そこに温水供給側のパイプの経路
が長くなるように何度か折曲させて埋め込まれるのが普
通である。
The unit panels a, b, c in which the pipes for hot water are embedded are manufactured in a factory in a separated state, and after being carried into the construction site of the heating floor, the pipes are connected by a predetermined joint to continuously connect them. Figure 1
As shown in FIG. 7, a method is employed in which a predetermined number of unit panels a, b, and c are connected in a factory in a predetermined order, and the unit panels a, b, and c are brought into a construction site for construction. In order to reduce on-site pipe connection work or panel laying work, each panel is usually made wide and is embedded by bending it several times to lengthen the pipe path on the hot water supply side. Is.

【0005】図18は、暖房床の一施工例を示す平面図
であり、通常、床面の4周には放熱源を持たない通常の
床材がボーダーパネルdとして配置され、その内側に、
単位パネルa、b、cが所定の配列で配置される。この
例では、図17に示した4枚組の暖房パネルが13枚、
階段状に位置をずらして配置されており、その左側端部
に位置する各接合用パネルcに埋め込まれたパイプ
c1、Pc2の露出部に温水連絡器がそれぞれ取り付けら
れ、そこにジョイントボックスGに連接する引き込みパ
イプPgが接続される。
FIG. 18 is a plan view showing an example of construction of a heating floor. Usually, a normal floor material having no heat radiation source is arranged as a border panel d on the four circumferences of the floor surface, and inside the border panel d,
The unit panels a, b, and c are arranged in a predetermined arrangement. In this example, the four heating panels shown in FIG. 17 are thirteen,
The hot water contactors are attached to the exposed portions of the pipes P c1 and P c2 embedded in the respective joining panels c located at the left end portion thereof, which are arranged in a staircase-like manner, and joint boxes are attached thereto. A lead-in pipe Pg connected to G is connected.

【0006】ジョイントボックスGには図示しない温水
発生源に接続する温水導入配管(往路配管)とその戻り
管(復路配管)が接続しており、温水発生源からの温水
は、往路配管→ジョイントボックスG→引き込みパイプ
Pg→温水連絡器→接合用パネルcのパイプPc2→中間
パネルaのパイプPa2→端部パネルbのパイプPb→中
間パネルaのパイプPa1→接合用パネルcのパイプPc1
→温水連絡器→引き込みパイプPg→ジョイントボック
スG→復路配管と循環し、床暖房を行なう。
The joint box G is connected with a hot water introducing pipe (outgoing pipe) and a return pipe (returning pipe) thereof, which are connected to a hot water generating source (not shown). G → pull pipe Pg → hot water contact unit → the pipe P in the pipe P c2 → pipe Pb → intermediate panel a pipe P a2 → end panels b of the intermediate panel a pipe P a1 → joining panel c of the bonding panel c c1
-> Hot water contact device-> Intake pipe Pg-> Joint box G-> Return pipe is circulated to perform floor heating.

【0007】[0007]

【発明が解決しようとする課題】上記ように、現在の温
水式暖房床に用いられる床材パネルは、木質系床材に温
水用パイプを一体に埋め込んだ形に工場において製造さ
れ、それが施工現場に持ち込まれて床材パネルの敷設作
業と温水循環路形成のための配管接続作業とが行なわれ
る。現場の作業において、床材の敷設は大工の仕事であ
り、温水循環路形成のための諸作業は暖房機器店側の作
業であることから、作業効率を落とさないために、双方
の作業者を同時に配置することが必要とされている。
As described above, the floor panel used in the current hot water heating floor is manufactured in the factory in such a manner that the hot water pipe is integrally embedded in the wooden floor, and the panel is constructed. The work is brought to the site and the work of laying the floor panel and the pipe connection work for forming the hot water circulation path are performed. In the field work, the laying of flooring is a carpenter's work, and the work for forming the hot water circulation path is the work of the heating equipment shop side. It is required to be placed at the same time.

【0008】また、各単位パネル間で温水用パイプを継
手を用いて接続していくことは煩雑な作業であり、ま
た、継手部分の点検口をパネル側に設ける必要もあり、
作業量からもまたパネルの構造上からも、高い施工コス
トを必要としている。図17に示すように、工場で複数
枚の単位パネルが接続したものを製造しそれを現場に搬
入する場合には、施工現場でのパイプの接続作業量を低
減することはできるが、このような連続状のパネルを工
場から現場へ搬送するのには特別な包装を必要とし、さ
らに、施工現場での敷設作業も困難となる。また、パイ
プの露出部にキズや不用な折曲が生じ、パネル全体が不
良品となるケースも生じやすい。
Further, connecting hot water pipes between the unit panels using joints is a complicated work, and it is necessary to provide an inspection port for the joints on the panel side.
High construction costs are required due to the amount of work and the panel structure. As shown in FIG. 17, in the case of manufacturing a product in which a plurality of unit panels are connected in a factory and bringing it into the site, it is possible to reduce the amount of pipe connecting work at the construction site. Special continuous packaging is required to transport such continuous panels from the factory to the site, and the laying work at the construction site becomes difficult. Further, the exposed portion of the pipe is likely to be scratched or unnecessarily bent, resulting in a case where the entire panel is defective.

【0009】さらに、前記のように単位パネル内での温
水経路を長くするために、通常、幅広の床材が用いら
れ、そこに複数の曲がり部を持つ凹溝が加工されるが、
この凹溝加工はきわめて煩雑でありコストの高騰を招い
ている。また、図17に示すように複雑な経路に加工さ
れた凹溝の中に、温水用パイプを埋め込みかつそこに安
定的に固定させる作業にも長い時間を必要としており、
改善が求められている。
Further, in order to lengthen the hot water path in the unit panel as described above, a wide floor material is usually used, and a concave groove having a plurality of bent portions is processed therein.
This grooving is extremely complicated and causes a cost increase. Further, as shown in FIG. 17, it takes a long time to bury a hot water pipe in a groove processed into a complicated path and to fix it stably there.
Improvement is required.

【0010】本発明の目的は、現在の温水循環方式によ
る暖房床及びその施工方法が持つ上記のような不都合を
解消することにあり、より具体的には、大工側の作業で
ある床材の配置作業と暖房設備店側の作業である温水用
パイプの接続、配設作業とを分離した工程として施工す
ることを可能とし、それにより、施工コストを低減可能
とした温水式暖房床の施工方法を得ることにある。
An object of the present invention is to eliminate the above-mentioned inconveniences of the heating floor and the construction method thereof by the current hot water circulation system, and more specifically, the floor material which is the work of the carpenter side. Installation method of hot water heating floor that enables installation work and connection of hot water pipes, which are operations on the heating equipment store side, and installation work to be performed as separate processes, thereby reducing construction costs. Is to get.

【0011】また、本発明の他の目的は、床材裏面に形
成される温水用パイプの収容用凹溝の軌跡を簡素化し、
それにより、床材の製造コストを低減可能とした温水式
暖房床の施工方法を得ることにある。
Another object of the present invention is to simplify the locus of the concave groove for accommodation of the hot water pipe formed on the back surface of the floor material,
Therefore, it is to obtain a hot water heating floor construction method capable of reducing the manufacturing cost of the floor material.

【0012】さらに本発明の他の目的は、温水用パイプ
の接続箇所を少なくし、それにより、施工作業を簡素化
すると共に水漏れの発生確率を低減した温水式暖房床の
施工方法を得ることにある。
Still another object of the present invention is to provide a hot water heating floor construction method in which the number of hot water pipe connections is reduced, thereby simplifying the construction work and reducing the probability of water leakage. It is in.

【0013】さらに本発明の他の目的は、施工方法を簡
素化し、結果として低コストで施工可能であり、温水用
パイプの配置作業が容易であり、かつ、温水用パイプに
損傷が発生するのを大きく回避して、万一、床材あるい
は温水循環系に損傷あるいは異常が発生した場合でも、
温水用パイプのみを容易に交換し補修することができる
ようにした温水式暖房床を得ることにある。
Still another object of the present invention is to simplify the construction method so that the construction can be carried out at low cost, the hot water pipe can be easily arranged, and the hot water pipe is damaged. By avoiding a large amount, even if the floor material or hot water circulation system is damaged or abnormal,
The purpose is to obtain a hot water heating floor in which only the hot water pipe can be easily replaced and repaired.

【0014】[0014]

【課題を解決するための手段】上記の課題を解決するた
めの本発明による温水式暖房床の施工方法は、基本的
に、温水用パイプの循環路の形状に対応した凹溝を裏面
に形成した複数の床材を床下地上に配置する工程、該配
置した複数の床材の一部を取り外す工程、該取り外した
床材に隣接して配置されている床材に形成された凹溝を
通して温水用パイプを連続的に配設する工程、温水用パ
イプの配設終了後に前記取り外した床材を元の位置に再
配置する工程、とを有しており、前記取り外される床材
以外の床材として、少なくとも裏面に形成した凹溝部分
を被覆する裏面シートを持つ床材を用いて施工すること
を特徴とする。
A method of constructing a hot water heating floor according to the present invention for solving the above-mentioned problems is basically such that a concave groove corresponding to the shape of a circulation path of a hot water pipe is formed on the back surface. Arranging the plurality of floor materials on the floor base, removing a part of the plurality of arranging floor materials, hot water through a groove formed in the floor material arranged adjacent to the removed floor materials A floor material other than the floor material to be removed, and a step of continuously arranging the water pipe, and a step of rearranging the removed floor material to the original position after the hot water pipe is completely arranged. As a feature, the construction is performed using a floor material having a back surface sheet that covers at least the concave groove portion formed on the back surface.

【0015】好ましくは、前記の取り外される床材以外
の床材として、裏面に形成した凹溝部分に沿って余分な
接着剤を取り込むための細い第2の溝がさらに形成され
ている床材を用いる。
Preferably, as the floor material other than the above-mentioned floor material to be removed, a floor material further having a thin second groove for taking in an excessive adhesive along the concave groove portion formed on the back surface is used. To use.

【0016】本発明による温水式暖房床の施工方法にお
いては、床下地上に配設すべき温水用パイプの配管パタ
ーンに応じた形状に凹溝が切られた複数の床材が工場で
製造され、該床材はそのままで施工現場に搬入される。
施工現場では、該複数の床材の中、前記した少なくとも
裏面に形成した凹溝部分を被覆する裏面シートを持つ床
材を各凹溝が連続するようにして所要枚数多数段にわた
り組付け、好ましくは周囲に形成される実部分の釘打ち
や接着剤を用いて床下地上に固定配置する。
In the method for constructing a hot water heating floor according to the present invention, a plurality of floor materials in which concave grooves are cut in a shape corresponding to the piping pattern of the hot water pipe to be arranged on the floor substrate are manufactured in a factory, The floor material is delivered to the construction site as it is.
At the construction site, among the plurality of floor materials, a floor material having a back sheet that covers at least the above-described groove portion formed on the back surface is assembled over a required number of stages so that each groove is continuous, preferably Is fixedly placed on the floor base using nailing or adhesive of the actual part formed around it.

【0017】次に、裏面に曲線(例えば、U字状)的な
凹溝が切られている床材(すなわち、取り外される床
材)を、その凹溝端部がすでに固定配置した前記床材の
凹溝の端部と連続するようにして配置する。そのように
してすべての床材を床下地上に配置することにより、配
置された床材の裏面には連続した一つの循環路が形成さ
れ、その時点で、大工側の作業である床材の配置作業は
終了する。
Next, a floor material having a curved (for example, U-shaped) concave groove on the back surface (that is, a floor material to be removed) is fixedly arranged at the end of the concave groove. It is arranged so as to be continuous with the end of the groove. By arranging all the floor materials on the floor base material in this way, one continuous circulation path is formed on the back surface of the placed floor material, and at that time, the floor material arrangement which is the work of the carpenter side is arranged. The work ends.

【0018】次に、暖房設備店側の作業として、温水用
パイプの接続、配設作業を行う。先ず、先に配置した曲
線的な凹溝を持つ床材のみを取り外し、隣接した床材に
形成された凹溝内に、温水用パイプを一方端から他方端
まで挿通する。この床材は主に直線状の凹溝が形成され
ており、かつ、少なくとも裏面に形成した凹溝部分は裏
面シートで被覆されているので、床下地面との接着に用
いた接着剤が凹溝内に侵入することはなく、凹溝内への
温水用パイプの挿通は障害なく行われる。万一、床下地
上に釘等の異物が残っている場合でも、該裏面シートに
よりそれが凹溝内に入り込むのを阻止することができ、
温水用パイプが損傷を受けるのを防止できる。さらに、
裏面に形成した凹溝に沿って余分な接着剤を取り込むた
めの細い第2の溝をさらに形成した床材を用いる場合に
は、例えば不均一な厚みに接着剤が塗布されたような場
合に、その盛り上がり部分(余剰な接着剤)を該第2の
溝内に逃がすことができる。それにより、接着が不安定
になったり接着面が凹凸状となったりするのを阻止する
ことができる。さらに、接着面が平坦になることから、
接着剤の盛り上がりによって裏面シートが凹溝部分内に
押し込まれて裏面シートの剥離が生じたり、温水用パイ
プの挿通に不都合を生じさせたりすることも回避でき
る。
Next, as work on the side of the heating equipment store, the work of connecting and arranging the hot water pipe is performed. First, only the floor material having the curved concave groove arranged earlier is removed, and the hot water pipe is inserted from one end to the other end in the concave groove formed in the adjacent floor material. Since this floor material is mainly formed with a linear groove, and at least the groove portion formed on the back surface is covered with a back sheet, the adhesive used for adhesion to the floor base surface is a groove groove. The hot water pipe can be inserted into the groove without any obstacle. Even if foreign matter such as nails remains on the floor substrate, the back sheet can prevent the foreign matter from entering the groove,
It is possible to prevent the hot water pipe from being damaged. further,
When using a flooring material further formed with a thin second groove along the concave groove formed on the back surface to take in the excess adhesive, for example, when the adhesive is applied to a non-uniform thickness The raised portion (excess adhesive) can be released into the second groove. As a result, the adhesion is unstable
To prevent it from becoming uneven or the adhesive surface becoming uneven
be able to. Furthermore, since the adhesive surface becomes flat,
Due to the swelling of the adhesive, the back sheet will be in the groove
If the back sheet is peeled off when pushed in,
It is possible to avoid inconvenience in inserting the
It

【0019】挿通に際して、一本の温水用パイプをU状
に折曲させ、一枚の床材の2本の凹溝に同時に挿通させ
てもよい。すべての凹溝に温水用パイプを挿通させた後
に、床材の端部から延出している温水用パイプの端部同
志を一つの連続した循環路を形成するように適宜の連結
具を介して接続する。
Upon insertion, one hot water pipe may be bent in a U shape and inserted into two recessed grooves of one floor material at the same time. After inserting the hot water pipes into all the grooves, the end parts of the hot water pipes extending from the end parts of the floor material are connected via an appropriate connecting tool so as to form one continuous circulation path. Connecting.

【0020】その際に、好ましくは、先に取り外した床
材の裏面に形成される凹溝の軌跡と略同じ軌跡が描かれ
た台紙を用い、該取り外した床材の位置に前記台紙を置
く。そして、床材の端部から延出している温水用パイプ
の折曲部あるいは接続部の形状を、該台紙に描かれた軌
跡に沿うように姿勢を合わせながら、折曲あるいは接続
を行なう。
At this time, it is preferable to use a mount having a trace substantially the same as the trace of the concave groove formed on the back surface of the floor that was previously removed, and place the mount at the position of the removed floor. . Then, the shape of the bent portion or the connecting portion of the hot water pipe extending from the end portion of the floor material is bent or connected while adjusting the posture so as to follow the locus drawn on the mount.

【0021】上記作業の後に、先に取り外しておいた床
材をもとの位置に再配置する。その際に、接着剤や釘打
ち等により固定するようにしてもよく、螺子止め等の手
段により着脱自在な形態で定着してもよい。温水用パイ
プの軌跡は前記の台紙を用いることにより、裏面に形成
された凹溝の軌跡とほぼ一致した軌跡となっており、配
管後の床材の取り付けは容易である。このようにして形
成された温水循環系路の両端を、従来の温水式暖房床の
場合と同様に、温水発生源側に接続することにより、暖
房床の施工は終了する。
After the above work, the floor material previously removed is relocated to the original position. At that time, it may be fixed by an adhesive or nailing, or may be fixed in a detachable form by means such as screwing. By using the above-mentioned mount, the locus of the pipe for hot water is a locus that substantially coincides with the locus of the concave groove formed on the back surface, and it is easy to attach the floor material after the piping. The construction of the heating floor is completed by connecting both ends of the hot water circulation path thus formed to the hot water generating source side, as in the case of the conventional hot water heating floor.

【0022】好ましくは、前記取り外される床材とし
て、周囲の1ケ所又は数カ所に取り外し用のテープを貼
着したものを用い、大工側の作業としての該床材の配置
作業時に、該取り外し用のテープの端部を表面から露出
した状態としておく。そうすることにより、暖房設備店
側の作業員は該床材を容易に取り外すことができる。温
水用パイプの配設終了後に、該取り外し用のテープを除
去した状態で該床材を元の位置に再配置する。
Preferably, as the floor material to be removed, one having a tape for removal attached to one or several locations around the floor material is used, and the floor material to be removed is placed at the time of arranging the floor material as a work on the carpenter's side. Leave the end of the tape exposed from the surface. By doing so, the worker on the heating equipment store side can easily remove the floor material. After the disposition of the hot water pipe, the flooring material is repositioned to its original position with the tape for removal removed.

【0023】好ましくは、本発明に用いる床材は、均熱
板としての金属箔が中間層として配置される。これによ
り、温水用パイプの付近のみ加熱されるのを防ぎ、均熱
効果が高められる。
Preferably, in the flooring material used in the present invention, a metal foil as a soaking plate is arranged as an intermediate layer. This prevents heating only in the vicinity of the hot water pipe and enhances the soaking effect.

【0024】上記の説明で分かるように、本発明の温水
式暖房床の施工方法によれば、床材を配置するいわゆる
床材施工と温水循環系を形成する暖房施工とを完全に独
立した工程として行なうことが可能となり、かつ、床材
施工は通常のフローリング床施工と同じようにして実施
可能である。そのために作業効率は向上し施工コストは
低減する。また、床材は、主に直線状の凹溝を持つもの
と曲線状の凹溝を持つものとに分けることができ、か
つ、曲線状の凹溝を持つものは必要とされる床材の総個
数の一部であることから、床材全体としての凹溝加工作
業は低減し、製造コストは低減する。
As can be seen from the above description, according to the hot water type heating floor construction method of the present invention, the so-called floor material construction for arranging the floor material and the heating construction for forming the hot water circulation system are completely independent steps. The floor material can be constructed in the same manner as the ordinary flooring floor construction. Therefore, work efficiency is improved and construction cost is reduced. In addition, floor materials can be divided into those that mainly have linear grooves and those that have curved grooves, and those that have curved grooves are Since it is a part of the total number, the work of forming the groove as the whole floor material is reduced, and the manufacturing cost is reduced.

【0025】また、主に直線状の凹溝を持つ床材の裏面
には少なくとも該凹溝部分を覆うように裏面シートが配
置されるので、温水用パイプの挿通作業は容易であり、
かつ、異物の侵入により温水用パイプが損傷を受けるこ
ともない。
Further, since the back sheet is arranged so as to cover at least the groove portion mainly on the back surface of the flooring material having the linear groove, it is easy to insert the hot water pipe,
Moreover, the hot water pipe is not damaged by the intrusion of foreign matter.

【0026】なお、上記の温水循環系は床面全体で1つ
の循環系としてもよく、床面積が広い場合には、温水循
環系を複数系形成し各系統毎に温水を循環させるように
してもよい。さらに、温水循環系は施工すべき床面の全
面に行なってもよく、部分的に行なってもよい。また、
従来の場合のように、必要に応じて、周囲に通常の床材
をボーダーパネルとして配置するようにしてもよい。
The hot water circulation system may be one circulation system for the entire floor surface. When the floor area is large, a plurality of hot water circulation systems are formed and hot water is circulated for each system. Good. Furthermore, the hot water circulation system may be provided on the entire surface of the floor to be constructed, or may be provided partially. Also,
As in the conventional case, a normal floor material may be arranged as a border panel around the periphery, if necessary.

【0027】上記の説明からわかるように、本発明での
裏面シートを持つ床材に形成される凹溝の長手方向の形
状は、床下地上に該床材を配置した後に凹溝の一方端か
ら他方端まで温水用パイプを挿通することができる形状
であればよく、好ましくは直線状の凹溝であるがそれに
限られず、例えば床材の長手方向に大きな曲率で湾曲す
るような形状であってもよい。従って、本発明において
「主に温水用パイプの直線部分」あるいは「主に直線状
の凹溝」等というような場合における「主に」の語は、
真に直線状のみならず、そのような大きな曲率で湾曲す
るような形状をも含むものとして用いられる。
As can be seen from the above description, the longitudinal shape of the concave groove formed in the flooring material having the back sheet according to the present invention is such that one side of the concave groove is formed after the flooring material is placed on the floor base. Any shape may be used as long as the hot water pipe can be inserted to the other end, and the groove is preferably a linear groove, but is not limited thereto. For example, the groove may be curved with a large curvature in the longitudinal direction of the floor material. Good. Therefore, in the present invention, the term "mainly" in the case of "mainly a straight line portion of a pipe for hot water" or "mainly a linear groove",
It is used not only as a straight line but also as a shape that curves with such a large curvature.

【0028】[0028]

【発明の実施の形態】以下、本発明による温水式暖房床
の施工方法、温水式暖房床、及び、用いる床材の一実施
例を図面を参照して説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a hot water type heating floor construction method, a hot water type heating floor, and a flooring material to be used according to the present invention will be described below with reference to the drawings.

【0029】図1は、本発明による温水式暖房床の施工
方法により施工された温水式暖房床を上方から見た状態
を示しており、施工床面の4周に沿った部分を除いて配
置される裏面シートを持つ床材A、Aa(斜線部分)、
図でその右方側辺に沿って配置される第1の端末用床材
Ba、その左方側辺に沿って配置される第2の端末用床
材Bb、及び、その上下の側辺に沿って配置されるボー
ダー床材Cとが、コンクリートスラブに敷設した床下地
合板上に配置されている。好ましくは、従来工法におけ
ると同様に、床下地合板の下面には合成樹脂発泡材等の
断熱材が施工される。後記するように、この状態は本発
明による施工方法における床材施工工程の終了状態でも
ある。
FIG. 1 shows a state in which a hot water heating floor constructed by the method for constructing a hot water heating floor according to the present invention is viewed from above, and is arranged except for a portion along four laps of the construction floor surface. Floor material A, Aa (hatched area) with back sheet
In the figure, the first terminal floor material Ba arranged along the right side edge thereof, the second terminal floor material Bb arranged along the left side edge thereof, and the upper and lower side edges thereof. The border flooring material C arranged along the flooring material is placed on the floor base plywood laid on the concrete slab. Preferably, as in the conventional method, a heat insulating material such as a synthetic resin foam material is applied to the lower surface of the floor base plywood. As will be described later, this state is also the end state of the floor material construction step in the construction method according to the present invention.

【0030】図2、図3は、裏面シートを持つ床材Aの
一つの実施例を示している。図2aはその平面図、図2
bは背面図であり、図3はその拡大して示す短片に沿っ
た断面図である。この例において、裏面シートを持つ床
材Aは、表面側合板1aと裏面側合板1bとの間に均熱
板として機能するアルミ箔3を配置した3層構造であ
り、例えば同時熱圧成形等の手段により一体成形され
る。図示しないが、アルミ箔3には、均熱作用を低下さ
せない程度の開孔率で多数の小孔を形成し、各層の接着
性を向上させようにしてもよい。図示のように、裏面側
合板1bの周囲には、通常の床材の場合と同様に雄実5
a、雌実5bが形成される。
2 and 3 show one embodiment of the flooring material A having a back sheet. 2a is a plan view thereof, FIG.
FIG. 3b is a rear view, and FIG. 3 is a sectional view taken along the enlarged short piece. In this example, the flooring material A having a back sheet has a three-layer structure in which an aluminum foil 3 functioning as a heat equalizing plate is arranged between a front surface side plywood 1a and a back surface side plywood 1b. It is integrally molded by the means. Although not shown, a large number of small holes may be formed in the aluminum foil 3 with an opening ratio that does not reduce the soaking effect, and the adhesiveness of each layer may be improved. As shown in the drawing, around the back side plywood 1b, the male seeds 5
a, a female seed 5b is formed.

【0031】裏面側合板1bの裏面には、後記する温水
用パイプPを収容できる大きさの凹溝2が長辺方向に平
行に複数本(この例では4本)形成されており、該凹溝
2に沿って細い第2の溝2a、2aがさらに形成されて
いる。そして、前記凹溝2を覆うようにして好ましくは
その全長にわたりポリエチレンラミネート紙のような裏
面シート4が例えば水溶性接着剤により貼着されてい
る。好ましくは、図示のように、表面側合板1aの表面
には突板等の適宜の表面層が形成され、かつ、疑似溝1
cが設けられる。なお、裏面シート4は、後記するよう
に床下地面に塗布した接着剤が凹溝2内に入り込むのを
抑制することができ、かつ、異物により容易に破損しな
い強度を持つ素材であれば任意のものを用いることがで
き、他に、ポリオレフィン系シートのラミネート紙のよ
うな複合紙や不織布、あるいは、ポリエチレンやポリプ
ロピレンのようなオレフィン系樹脂シートそのもの等を
有効に用いることができる。
On the back surface of the back surface side plywood 1b, a plurality of recessed grooves 2 (four in this example) are formed parallel to the long side direction, the recessed grooves 2 having a size capable of accommodating a hot water pipe P described later. Second thin grooves 2a, 2a are further formed along the groove 2. Then, a back sheet 4 such as polyethylene laminated paper is preferably attached over its entire length so as to cover the groove 2 with, for example, a water-soluble adhesive. Preferably, as shown in the drawing, an appropriate surface layer such as a protruding plate is formed on the surface of the front side plywood 1a, and the pseudo groove 1 is formed.
c is provided. The back sheet 4 can be made of any material as long as it can suppress the adhesive applied to the floor base surface from entering the groove 2 as described later and has a strength that is not easily damaged by foreign matter. In addition, a composite paper such as a laminated paper of a polyolefin sheet or a non-woven fabric, or an olefin resin sheet itself such as polyethylene or polypropylene can be effectively used.

【0032】図4は、第1の端末用床材Baと第2の端
末用床材Bbを説明するものであり、この例では、両者
が一体に形成された端末用床材Bとして示されている。
後記するように、この端末用床材Bは施工現場におい
て、図4cに示すように、例えば線10の位置により2
分割され、図4cにおいて右側の第1の端末用床材Ba
と左側の第2の端末用床材Bbとに分離される。この例
において、端末用床材Bは、前記した裏面シートを持つ
床材Aと同じ素材、すなわち、表面側合板1aとアルミ
箔3と裏面側合板1bとからなる3層構造をなす素材か
ら構成され、少なくともその幅と厚みは同じとされる。
FIG. 4 illustrates the first terminal flooring material Ba and the second terminal flooring material Bb. In this example, both are shown as the terminal flooring material B integrally formed. ing.
As will be described later, this terminal flooring material B is used at the construction site as shown in FIG.
The first terminal flooring material Ba which is divided and is on the right side in FIG. 4c
And the second terminal floor material Bb on the left side. In this example, the terminal flooring material B is made of the same material as the flooring material A having the back sheet, that is, a material having a three-layer structure including the front surface side plywood 1a, the aluminum foil 3, and the back surface side plywood 1b. The width and the thickness are at least the same.

【0033】図示のように、裏面側合板1bの中央部分
には長手方向に直交する多数の切り込み6が形成され、
さらに、右辺及び左辺の近傍には、裏面シートを持つ床
材Aに形成した凹溝2とほぼ同じ大きさの凹条71 〜7
4 及び81 〜84 が、その短辺側の側面に端部を開放し
てかつ4本の凹溝2と等しい間隔で形成される。そし
て、右辺側においては凹条71 と72 及び凹条73 と7
4 とは互いに連通してU字状の凹溝7a、7bを構成
し、左辺側においては凹条82 と83 とが互いに連通し
てU字状の凹溝8aを構成する。さらに、上方及び下方
の凹条81 と84 は、前記U字状の凹溝8aのU字状折
曲部よりも幾分内方において長手方向に直交して形成さ
れた第3の凹溝9にまで達していると共に、途中におい
て長手方向の側面側に向かって分岐し、全体として略ト
字状の凹溝8b、8cを形成している。さらに、裏面側
合板1bの4側面には、裏面シートを持つ床材Aの4周
に形成された雄実5a、雌実5bに衝接することなく床
材Aと連続的に接合できるように、内方への切欠き部1
1が形成されている。また、その短辺側の裏面には、そ
れぞれ2本の取り外し用のテープ12が図4cによく示
すように表面側合板1aを越えて延出する長さで貼着さ
れている。
As shown in the figure, a large number of notches 6 are formed in the central portion of the back side plywood 1b, which are orthogonal to the longitudinal direction.
Further, in the vicinity of the right side and the left side, there are recessed strips 7 1 to 7 having substantially the same size as the recessed groove 2 formed in the floor material A having the back sheet.
4 and 8 1 to 8 4 are formed on the side surface on the short side thereof with the ends open and at the same intervals as the four concave grooves 2. And on the right side, the concave lines 7 1 and 7 2 and the concave lines 7 3 and 7
4 communicates with each other to form U-shaped concave grooves 7a and 7b, and on the left side, the concave lines 8 2 and 8 3 communicate with each other to form a U-shaped concave groove 8a. Further, the upper and lower recessed lines 8 1 and 8 4 are the third recesses formed orthogonally to the longitudinal direction slightly inward of the U-shaped bent portion of the U-shaped recessed groove 8a. While reaching the groove 9, the groove is branched toward the side face side in the longitudinal direction on the way to form concave grooves 8b and 8c that are substantially C-shaped as a whole. Further, on the four side surfaces of the back side plywood 1b, the male material 5a and female fruit 5b formed on the four circumferences of the floor material A having the back sheet can be continuously joined to the floor material A without colliding with each other. Inward cutout 1
1 is formed. Further, on the back surface of the short side, two tapes 12 for removal are attached respectively with a length extending beyond the front side plywood 1a as well shown in FIG. 4c.

【0034】図5は、ボーダー床材Cを示している。ボ
ーダー床材Cは従来のフローリング床に用いられる木質
系床材と同じものであってよく、この例では、床材Aと
同様に、表面側合板1aと裏面側合板1bとを有し、裏
面側合板1bの周囲には雄実2aと雌実2bが形成され
ると共に、少なくともその幅と厚みは同じとされてい
る。
FIG. 5 shows a border floor material C. The border floor material C may be the same as the wooden floor material used for the conventional flooring floor, and in this example, like the floor material A, it has the front surface side plywood 1a and the back surface side plywood 1b, and the back surface. A male seed 2a and a female seed 2b are formed around the side plywood 1b, and at least the width and the thickness are the same.

【0035】本発明による温水式暖房床の施工方法にお
いては、施工すべき床面に必要とされる数の前記床材
A、B、Cが工場で製造されて施工現場に搬入され、最
初に、それらが床面上に配置される。第1の端末用床材
Baと第2の端末用床材Bbとを当初から別のものとし
て工場で製造するようにしてもよい。
In the hot water heating floor construction method according to the present invention, the required number of floor materials A, B and C for the floor surface to be constructed are manufactured in the factory and brought into the construction site. , They are placed on the floor. The first terminal flooring material Ba and the second terminal flooring material Bb may be manufactured separately from the beginning in a factory.

【0036】それらの床材を用いて図1に示す形状の暖
房床を施工する場合を以下に説明する。最初に、各床材
A、B、Cが図6a〜cに示す手順で床面(床下地上)
に配置される。すなわち、先ず、ボーダー床材Cが床面
50の上辺51に沿って3枚、1列に配置される(図6
a)。配置に際しては、従来のフローリング床の場合と
同様に、接着剤を用いてあるいは必要に応じて雌実部分
に釘打ち等を行って床面に定着させる。床材の配置に先
立って、従来の暖房床施工の場合と同様に、床面(床下
地)上に適宜の断熱処理、均熱処理を施すようにしても
よい。また、従来工法と同様に、図示しない温水発生源
からの温水導入用の往路配管及び温水発生源への復路配
管の配設工事も行なわれる。
A case of constructing a heating floor having the shape shown in FIG. 1 using these floor materials will be described below. First, the floor materials A, B, and C are placed on the floor surface (on the floor substrate) by the procedure shown in FIGS.
Is located in. That is, first, three border floor materials C are arranged in a row along the upper side 51 of the floor surface 50 (FIG. 6).
a). At the time of arrangement, as in the case of the conventional flooring floor, an adhesive agent is used or nailing or the like is performed on the female part as needed to fix it on the floor surface. Prior to arranging the floor material, as in the case of the conventional heating floor construction, appropriate heat insulating treatment and soaking treatment may be performed on the floor surface (floor base). Further, similarly to the conventional construction method, the installation work of the outward piping for introducing hot water from a hot water generation source (not shown) and the return piping to the hot water generation source is also performed.

【0037】次に、図4に示す端末用床材Bを床面の寸
法に合わせて2分割し、第1の端末用床材Baと第2の
端末用床材Bbとに分離する。分離した第1の端末用床
材Baを床面の右側辺に接して、かつ、裏面のU字状の
凹溝7a、7bの開放端側が内側方向となるようにして
配置する(図6b)。この際、第1の端末用床材Baは
床面上に置くだけとして床下地に対して固定しなくても
よいが、作業の安定性を考慮して、接着剤あるいは仮固
定釘等により仮固定してもよい。いずれの場合であって
も、裏面に貼着した取り外し用のテープ12の先端が表
面側に現れるようにしておく。
Next, the terminal flooring material B shown in FIG. 4 is divided into two parts according to the size of the floor surface, and is divided into a first terminal flooring material Ba and a second terminal flooring material Bb. The separated first terminal flooring material Ba is placed in contact with the right side of the floor surface, and the open ends of the U-shaped concave grooves 7a, 7b on the back surface are directed inward (FIG. 6b). . At this time, the first terminal flooring material Ba does not have to be fixed to the floor base only by placing it on the floor surface, but in consideration of the stability of the work, it is temporarily fixed with an adhesive or a temporary fixing nail. You may fix it. In any case, the tip of the tape 12 for removal attached to the back surface should be exposed on the front surface side.

【0038】なお、裏面側合板1bの中央部分には多数
の切り込み6が形成されていることから、分離後の各端
末用床材は、床面への配置時に側辺側となる部分が比較
的曲がりやすくなっている。そのために、壁面に幅木を
取り付けているような場合であっても、床面への取り付
け、取り外しが容易となる。
Since a large number of cuts 6 are formed in the central portion of the back surface side plywood 1b, the terminal materials after separation are compared with each other in the portion on the side of the side when placed on the floor surface. It is easier to bend. Therefore, even when the skirting board is attached to the wall surface, it is easy to attach and detach it to the floor surface.

【0039】次に、配置した第1の端末用床材Baに接
して裏面シートを持つ床材Aを3枚配置する。その際、
図1及び図6cに示すように、床面の幅方向の長さに応
じて、単位長さの床材Aよりも短い長さの裏面シートを
持つ床材Aaも用いられる。この裏面シートを持つ床材
Aaは施工現場で切断して得てもよく、当初から工場に
おいて製造しておいてもよい。裏面シートを持つ床材
A、Aaは、ボーダー床材Cと同様に、接着剤を用いて
あるいは必要に応じて雌実部分に釘打ち等を行って床面
に定着させる。
Next, three floor materials A having back sheets are placed in contact with the placed first terminal floor material Ba. that time,
As shown in FIGS. 1 and 6c, a floor material Aa having a back sheet having a length shorter than that of the floor material A having a unit length is also used according to the widthwise length of the floor surface. The floor material Aa having this back sheet may be obtained by cutting at the construction site, or may be manufactured in the factory from the beginning. As with the border floor material C, the floor materials A and Aa having the back sheet are fixed to the floor surface by using an adhesive or by nailing the female part as needed.

【0040】接着剤の塗布は、床下地材に対して筋状に
行ってもよく、床材A、Aaの裏面に対して行ってもよ
い。床材A、Aaの裏面に接着剤を塗布する場合には、
好ましくは、裏面シート4を除いた箇所に塗布するよう
にする。いずれの場合でも、接着剤の塗布厚みにむらが
ある場合に、配置時に床材A、Aaを押し付けながら幾
分スライドさせることにより、余分な接着剤は前記した
細い第2の溝2a内に入り込むので、均平な接着面が得
られる。それにより、接着剤の盛り上がりによって裏面
シートが凹溝部分内に押し込まれて裏面シートの剥離が
生じたり、凹溝部分の有効断面積が縮小して、温水用パ
イプの挿通に不都合を生じさせたりすることは回避され
る。
The application of the adhesive may be performed in a streak pattern on the floor base material or on the back surface of the floor materials A and Aa. When applying an adhesive to the back surface of the floor materials A and Aa,
Preferably, it is applied to a place excluding the back sheet 4. In any case, when there is unevenness in the applied thickness of the adhesive, by sliding the floor materials A and Aa while pressing the floor materials A and Aa at the time of placement, the excess adhesive enters the thin second groove 2a. Therefore, a flat adhesive surface can be obtained. As a result, the backside of
The sheet is pushed into the groove and the back sheet peels off.
May occur or the effective cross-sectional area of the groove may be reduced,
It is possible to avoid inconvenience in inserting the ip.
It

【0041】次に、前記分離した第2の端末用床材Bb
を裏面シートを持つ床材Aの端部と床面の左側辺との間
に、かつ、底面のU字状の凹溝8aの開放端側が内側方
向となるようにして配置する。必要な場合には切り込み
6に沿って一部を破断して長さを調節する。この際、前
記第1の端末用床材Baと同様に、第2の端末用床材B
bは床下地に対して接着固定しなくてもよく、接着剤あ
るいは仮固定釘等により仮固定してもよい。いずれの場
合であっても、裏面に貼着した取り外し用のテープ12
の先端が表面側に現れるようにしておく。
Next, the separated second terminal floor material Bb.
Is arranged between the end of the floor material A having the back sheet and the left side of the floor surface, and the open end side of the U-shaped concave groove 8a on the bottom surface is directed inward. If necessary, cut a part along the notch 6 to adjust the length. At this time, similarly to the first terminal floor material Ba, the second terminal floor material B
b does not have to be adhesively fixed to the floor base, but may be temporarily fixed with an adhesive, a temporary fixing nail, or the like. In any case, the removal tape 12 attached to the back surface
Leave the tip of the to appear on the front side.

【0042】以下、この作業を必要回数(この例では1
0回)反復し、最後に、床面50の下辺に沿って3枚の
ボーダー床材Cを定着して、図1に示す形状の床材施工
工程は終了する。
Hereinafter, this work is required a required number of times (1 in this example).
(0 times), and finally, three border floor materials C are fixed along the lower side of the floor surface 50, and the floor material construction step of the shape shown in FIG. 1 is completed.

【0043】次に、暖房施工を行なう。暖房施工は大工
ではなく暖房器具店の作業員により行なわれる。作業者
は、先ず、図7に示すように、表面に飛び出している取
り外し用のテープ12を手で引き上げることにより、第
1の端末用床材Baと第2の端末用床材Bbを取り外
し、次に、図8に示すように、所定長に切断された架橋
ポリエチレンパイプのような温水用パイプPを、裏面シ
ートを持つ床材Aの裏面に形成した各凹溝2を通して、
一方端から他方端まで貫通させる。床材Aの凹溝2は裏
面シート4により覆われているので、凹溝2内に床材A
の接着時に用いた接着剤が入り込むことはなく、温水用
パイプPは円滑に凹溝2内を通過する。
Next, heating is carried out. The heating work is done by the workers of the heating equipment store, not the carpenter. First, the operator removes the first terminal floor material Ba and the second terminal floor material Bb by manually pulling up the tape 12 for removal protruding on the surface as shown in FIG. Next, as shown in FIG. 8, a hot water pipe P such as a cross-linked polyethylene pipe cut into a predetermined length is passed through each groove 2 formed on the back surface of the floor material A having a back sheet,
Penetrate from one end to the other. Since the concave groove 2 of the floor material A is covered with the back sheet 4, the floor material A is placed in the concave groove 2.
The adhesive used during the bonding of No. 1 does not enter, and the hot water pipe P smoothly passes through the concave groove 2.

【0044】好ましくは、図9に示すように、1本の温
水用パイプPの長さを床面に定着した裏面シートを持つ
床材Aの長さLLの2倍よりも幾分長いものとし、それ
をU状に折り曲げて、2本の凹溝に右端から左端に向け
て挿通する。以下、同様にして、隣接する2本の凹溝に
対して1本の温水用パイプPを挿通していく。それによ
り、先に取り外した第1の端末用床材Baの場所には温
水用パイプPのU状の折曲部Puが露出し、第2の端末
用床材Bbの場所にはその両端部Peが露出した状態と
なる。
Preferably, as shown in FIG. 9, the length of one hot water pipe P is slightly longer than twice the length LL of the floor material A having the back sheet fixed to the floor surface. Bend it in a U shape and insert it into the two grooves from the right end to the left end. Thereafter, similarly, one hot water pipe P is inserted into the two adjacent concave grooves. As a result, the U-shaped bent portion Pu of the hot water pipe P is exposed at the location of the first terminal flooring material Ba that was previously removed, and both end portions thereof are exposed at the location of the second terminal flooring material Bb. Pe is exposed.

【0045】このようにしてすべての裏面シートを持つ
床材Aに形成した凹溝2に温水用パイプPを挿通した後
で、その温水用パイプP群が一つの循環路を形成するよ
うに端部同志の連接を行なう。床面の広さに応じて、2
以上の循環路を形成するように連接してもよい。図10
は5段分の裏面シートを持つ床材Aに挿通された温水用
パイプP群で一つの温水循環路を構成する場合の例であ
り、図において、最も上位に配置される温水用パイプP
の一方の端部Pe1は、床面に別途配置されたジョイント
ボックスGの温水供給側に、引き込みパイプPg1を介し
て接続され、他方の端部Pe2は下位に位置する温水用パ
イプPの一端Pe3に接続される。また、その温水用パイ
プPの他端はより下位に位置する温水用パイプPの一端
に接続される、というようにして順次接続され、5段目
の裏面シートを持つ床材Aの下位に位置する温水用パイ
プPの他端Pex側が引き込みパイプPg2を介してジョイ
ントボックスGに接続されることにより、一つの温水循
環路が形成される。
After the hot water pipes P are inserted into the recessed grooves 2 formed in the floor material A having all the back sheets in this way, the hot water pipes P end are formed so as to form one circulation path. Connect club members. 2 according to the size of the floor
You may connect so that the above circulation path may be formed. Figure 10
Is an example of a case where one hot water circulation path is configured by a group of hot water pipes P inserted in a floor material A having a back sheet for five steps, and the hot water pipes P arranged at the highest position in the drawing are shown.
One end P e1 is connected to a hot water supply side of a joint box G separately arranged on the floor via a lead-in pipe P g1 , and the other end P e2 is a lower-ranking hot water pipe P. Is connected to one end P e3 . Further, the other end of the hot water pipe P is connected to one end of the hot water pipe P located at a lower position in this order, and the hot water pipe P is located at a lower position of the floor material A having the fifth back sheet. The other end P ex side of the hot water pipe P is connected to the joint box G via the lead-in pipe P g2, thereby forming one hot water circulation path.

【0046】そのようにして温水循環路を形成した後
に、先に取り外しておいた第1の端末用床材Baと第2
の端末用床材Bbから取り外し用のテープ12を除去
し、該床材を接着剤によりあるいは必要に応じて疑似溝
1c部分に釘打ちを行うことによって元の位置に固定す
ることにより、暖房施工工程は終了する。
After forming the hot water circulation path in this way, the first terminal floor material Ba and the second terminal material previously removed are
The removal tape 12 is removed from the terminal floor material Bb, and the floor material is fixed in its original position by an adhesive or by nailing the pseudo groove 1c portion as needed, thereby performing heating work. The process ends.

【0047】先に説明した第1の端末用床材Baと第2
の端末用床材Bbの裏面に形成したU字状の凹溝7a、
7b、8aの形状及び略ト字状の凹溝8b、8cの形状
は、前記のように温水循環路を構築した場合での、第1
の端末用床材Ba側及び第2の端末用床材Bb側におけ
る温水用パイプPの軌跡に相当するものであり、また、
第2の端末用床材Bbの裏面に形成した第3の凹溝9は
引き込みパイプPg1あるいはPg2の軌跡に相当するもの
である。従って、循環路形成時にそれらの凹溝の形状に
一致するように、温水用パイプPのU状部の軌跡及び接
続部の軌跡を定め、また、場所を一致させることで、第
1の端末用床材Baと第2の端末用床材Bbの循環路形
成後の取り付けは容易となる。
The above-mentioned first terminal flooring material Ba and second
U-shaped groove 7a formed on the back surface of the terminal floor material Bb,
The shapes of 7b and 8a and the shapes of the substantially U-shaped concave grooves 8b and 8c are the same as those in the case of constructing the hot water circulation path as described above.
Corresponding to the loci of the hot water pipe P on the terminal flooring material Ba side and the second terminal flooring material Bb side,
The third concave groove 9 formed on the back surface of the second terminal floor material Bb corresponds to the locus of the lead-in pipe P g1 or P g2 . Therefore, the locus of the U-shaped portion and the locus of the connecting portion of the hot water pipe P are determined so as to match the shapes of the recessed grooves when the circulation path is formed, and the locations are matched so that the first terminal The floor material Ba and the second terminal floor material Bb can be easily attached after the circulation path is formed.

【0048】実際の暖房施工時に、該温水用パイプPの
U状部の軌跡及び接続部の軌跡等を第1の端末用床材B
a及び第2の端末用床材Bbの裏面に形成した各凹溝の
形状に一致させて作業を進めることは容易でない。図1
1はその作業を容易かつ確実に行なうために用いる台紙
60の一例を示している。この台紙60の右側には第1
の端末用床材Ba裏面に形成したU字状の凹溝7a、7
bの軌跡がそのまま転写されて印刷模様60aとしてあ
り、左側には第2の端末用床材Bb裏面に形成したU字
状の凹溝8a、略ト状の凹溝8b、8c及び第3の凹溝
9軌跡と、温水用パイプPの互いに接続されるべき2本
の端部Peがカットされるべき長さを示す目印63a、
63bとが印刷されている。
At the time of actual heating, the locus of the U-shaped portion and the locus of the connecting portion of the hot water pipe P are traced to the first terminal floor material B.
It is not easy to advance the work by matching the shapes of the concave grooves formed on the back surface of the a and the second terminal floor material Bb. Figure 1
Reference numeral 1 shows an example of a mount 60 used for easily and surely performing the work. On the right side of this mount 60 is the first
U-shaped grooves 7a, 7 formed on the back surface of the terminal flooring material Ba
The locus of b is transferred as it is as a printed pattern 60a, and on the left side is a U-shaped concave groove 8a formed on the back surface of the second terminal floor material Bb, substantially groove-shaped concave grooves 8b and 8c, and a third groove. A mark 63a indicating the length of the groove 9 trace and the length at which the two ends Pe of the hot water pipe P to be connected to each other should be cut,
63b is printed.

【0049】作業者は、第1の端末用床材Baを取り外
した後で、図12aに示すように該台紙60を、その印
刷模様60a側の先端が定着された裏面シートを持つ床
材Aの4本の凹溝2に一致するように床面上に置く。ま
た、第2の端末用床材Bbを取り外した後で、図13a
に示すように該台紙60を、その印刷模様60b側の先
端が定着された裏面シートを持つ床材Aの4本の凹溝2
に一致するように床面上に置く。
After removing the first terminal flooring material Ba, the operator mounts the backing sheet 60 on the flooring material A having the back sheet having the front end fixed on the printed pattern 60a side as shown in FIG. 12a. It is placed on the floor so as to match the four concave grooves 2 of. In addition, after removing the second terminal flooring Bb, FIG.
As shown in FIG. 4, the backing sheet 60 is provided with four recessed grooves 2 of the floor material A having a back sheet on which the front end on the printed pattern 60b side is fixed.
Place it on the floor to match.

【0050】その状態で、U状に折曲した2本の温水用
パイプPを裏面シートを持つ床材Aの4本の凹溝2に挿
通し、そのU状部分60uを台紙60に転写された印刷
模様60aと一致するように姿勢を矯正する。必要に応
じて、台紙60を取り外し、図12bに示すように、第
1の端末用床材Baを定着することにより作業は終了す
る。以下、この作業を反復する。
In this state, the two hot water pipes P bent in a U shape are inserted into the four recessed grooves 2 of the floor material A having the back sheet, and the U-shaped portion 60u is transferred to the mount 60. The posture is corrected so as to match the printed pattern 60a. If necessary, the mount 60 is removed, and as shown in FIG. 12b, the work is completed by fixing the first terminal flooring material Ba. Hereinafter, this work is repeated.

【0051】第2の端末用床材Bb側では、先ず、温水
用パイプPの一番上に位置する端部Pe1を真っ直ぐに延
ばして第3の凹溝9に該当する印刷模様部分でカット
し、そこで曲がり継手S1 を介して引き込みパイプPg1
に接続する。次に、その下の端部Pe2をパイプカットラ
イン63aに合わせてカットし、その下に位置する端部
e3をパイプカットライン63bに合わせてカットし
て、そこに直線継手S2 を取り付ける(図13b)。そ
して、端部Pe2と端部Pe3とを印刷された軌跡軌跡と同
じくなるように微調整しながら継手に挿入し連接する
(図13bで点線で示す)。必要に応じて、台紙60を
取り外し、第1の端末用床材Ba側と同じように第2の
端末用床材Bbを定着することにより作業は終了する。
以下、この作業を反復する。
On the side of the second terminal floor material Bb, first, the uppermost end P e1 of the hot water pipe P is straightened and cut at the printed pattern portion corresponding to the third groove 9. And there through the bend joint S 1 the lead-in pipe P g1
Connect to. Next, the lower end P e2 is cut along the pipe cut line 63a, the lower end P e3 is cut along the pipe cut line 63b, and the linear joint S 2 is attached thereto. (Fig. 13b). Then, the end portion P e2 and the end portion P e3 are inserted into the joint and finely adjusted so as to be the same as the printed trajectory, and are connected (shown by the dotted line in FIG. 13b). If necessary, the mount 60 is removed, and the second terminal floor material Bb is fixed in the same manner as the first terminal floor material Ba side, and the operation is completed.
Hereinafter, this work is repeated.

【0052】このように、台紙60を用いることにより
温水用パイプPの折曲部あるいは接続部での姿勢制御は
容易かつ確実となり、温水用パイプの循環路形成後に取
り外した端部用床材を容易に床面に定着することができ
る。なお、前記台紙として、裏面に均熱板を張り付けた
ものを用いてもよく、その場合には、該台紙は取り外さ
れることなくそのまま床面上に残される。
As described above, by using the mount 60, the posture control at the bent portion or the connection portion of the hot water pipe P becomes easy and reliable, and the end floor material removed after the circulation path of the hot water pipe is removed. It can be easily fixed on the floor. As the mount, one having a heat equalizing plate attached to the back side may be used, and in that case, the mount is left on the floor as it is without being removed.

【0053】図14は、端末用床材Bの他の形態を示す
背面図である。この端末用床材Bsは、裏面に形成され
る凹溝の配置を除き、他の構成は図4に基づき説明した
端末用床材Bと同じである。すなわち、端末用床材Bs
において、裏面側合板1bの中央部分には長手方向に直
交する多数の切り込み6が形成され、さらに、右辺及び
左辺の近傍には、裏面シートを持つ床材Aに形成した凹
溝2とほぼ同じ大きさの凹条711〜714及び811、812
が形成されている。図で右辺側の凹条711〜714は、そ
の一端解放部を、端末用床材Bsの右側短辺に、床材A
に形成した4本の凹溝2と等しい間隔でそれぞれ位置さ
せており、他端解放部は左右に対称的に2本ずつ湾曲し
て長手方向の両側面にそれぞれ位置させている。左辺側
の凹条811と812は全体としてU字状に湾曲しており、
両端を左側短辺に、床材Aに形成した4本の凹溝2と等
しい間隔となるように位置させている。すなわち、外側
に位置する凹条811は、その両端が床材Aに形成した4
本の凹溝2の外側の2本と一致する位置となっており、
外側に位置する凹条812は、その両端が凹溝2の内側の
2本と一致する位置となっている。
FIG. 14 is a rear view showing another form of the terminal flooring B. The terminal flooring material Bs is the same as the terminal flooring material B described with reference to FIG. 4 except for the arrangement of the groove formed on the back surface. That is, the floor material for terminals Bs
In the central part of the back side plywood 1b, a large number of notches 6 orthogonal to the longitudinal direction are formed, and further, in the vicinity of the right side and the left side, substantially the same as the groove 2 formed in the floor material A having the back sheet. Recessed lines 7 11 to 7 14 and 8 11 , 8 12
Are formed. Concave 7 11-7 14 right side in the figure, one end of release unit, the right short side of the flooring Bs terminal, flooring A
The four other recessed grooves 2 are formed at the same intervals as each other, and the other end releasing portions are symmetrically curved in the left-right direction by two, and are positioned on both side surfaces in the longitudinal direction. The concave lines 8 11 and 8 12 on the left side are curved in a U shape as a whole,
Both ends are positioned on the left short side so as to have the same intervals as the four concave grooves 2 formed in the floor material A. That is, the concave strip 8 11 located on the outer side is formed on the floor material A at both ends thereof.
The position is the same as the outer two of the groove 2 of the book,
Both ends of the recessed strip 8 12 located on the outer side are aligned with the two inner strips of the recessed groove 2.

【0054】さらに、右辺側には、凹溝711と凹溝712
を連結しかつ側辺に延びる連結溝7 15、及び、凹溝713
と凹溝714を連結しかつ他方の側辺に延びる連結溝716
が形成されており、左辺側には、凹溝812の湾曲部を接
続する連結溝813が形成されている。
Further, the concave groove 7 is provided on the right side.11And groove 712
Connecting groove 7 which connects the 15And the concave groove 713
And groove 714Connecting groove 7 that connects the two and extends to the other side.16
Is formed, and the concave groove 8 is formed on the left side.12The curved part of
Continued connecting groove 813Are formed.

【0055】この端末用床材Bsも、前記した端末用床
材Bと同様に、床面の寸法に合わせて2分割され、分離
した第1の端末用床材Bsaを床面の右側辺に配置さ
れ、第2の端末用床材Bsb床面の左右側辺に配置され
る。そして、端末用床材Bの場合と同様にして配管作業
が行われるが、端末用床材Bsの裏面に形成した凹溝の
配置が異なることにより、温水用パイプの接続形態が図
4の端末用床材Bと場合と相違する。特に説明しない
が、端末用床材Bsの裏面に形成したU字状の凹溝の軌
跡をそのまま転写印刷した台紙も必要に応じて用いられ
る。
The terminal flooring material Bs is also divided into two parts according to the size of the floor surface, like the above-mentioned terminal flooring material B, and the separated first terminal floor material Bsa is placed on the right side of the floor surface. The second terminal floor material Bsb is disposed on the left and right sides of the floor surface. Then, the piping work is performed in the same manner as in the case of the terminal flooring material B, but the arrangement of the recessed grooves formed on the back surface of the terminal flooring material Bs is different, so that the connection form of the hot water pipe is the terminal of FIG. It is different from the case of floor material B. Although not specifically described, a mount having a U-shaped groove formed on the back surface of the terminal flooring Bs directly printed thereon is also used as needed.

【0056】図15、図16は、前記した端末用床材B
sを用いる場合の温水用パイプの配管系の異なる例を示
している。いずれの場合も、前作業として、所定長に切
断された温水用パイプP1 を裏面シートを持つ床材Aの
裏面に形成した4本の凹溝2のうち外側に位置する2本
を通して左側から右側に向けて貫通させ、もう一本の温
水用パイプP2 を内側に位置する2本を通して同様に左
側から右側に向けて貫通させる。それにより、先に取り
外した第2の端末用床材Bsbの場所には温水用パイプ
1 とP2 のU状の折曲部が露出し、第1の端末用床材
Bsaの場所にはその両端部が露出した状態となる。
FIGS. 15 and 16 show the above-mentioned terminal floor material B.
The example of a different piping system of the pipe for hot water when s is used is shown. In any case, as a pre-work, from the left side through two of the four recessed grooves 2 formed on the back surface of the flooring material A having the back sheet, the hot water pipe P 1 cut into a predetermined length from the outside. It penetrates toward the right side, and another hot water pipe P 2 is penetrated through the two inner pipes from the left side toward the right side in the same manner. As a result, the U-shaped bent portions of the hot water pipes P 1 and P 2 are exposed at the location of the previously removed second terminal floor material Bsb, and at the location of the first terminal floor material Bsa. Both ends thereof are exposed.

【0057】このようにしてすべての裏面シートを持つ
床材Aに形成した凹溝2に温水用パイプPを挿通した後
で、その温水用パイプP群が一つの循環路を形成するよ
うに端部同志の連接を行なう。図15は2段の床材群で
1つの循環路を形成する場合であり、図16は3段の床
材群で1つの循環路を形成する場合である。
After the hot water pipes P are inserted into the recessed grooves 2 formed in the floor material A having all the back sheets in this way, the hot water pipes P end form one circulation path. Connect club members. FIG. 15 shows a case where one circulation path is formed by a two-stage floor material group, and FIG. 16 shows a case where one circulation path is formed by a three-stage floor material group.

【0058】図15の場合には、図示のように、上段の
第1の端末用床材Bsaの場所では、温水用パイプP1
とP2 の一方の両端部が接続具Pc1 により連通状態に
接続され、他方の両端部は下段の温水用パイプP1 とP
2 の一方の両端部とそれぞれ接続具Pc2 、Pc3 によ
り連通状態に接続される。また、下段の第1の端末用床
材Bsaの場所では、温水用パイプP1 とP2 の他方の
両端部同志が接続具Pc1 によりそれぞれ連通状態に接
続される。それにより、温水の循環系が上下2段の床材
群内に構築される。そして、図示しないT型ジョイント
等を介して、前記接続具Pc2 はジョイントボックスG
(図9参照)の温水供給側に接続され、他方の接続具P
3 は戻り側に接続され、接続具Pc2 から供給される
温水は、図で矢印で示すような上下2段の床材群内を循
環し、再び他方の接続具Pc3 からジョイントボックス
Gに戻される。
In the case of FIG. 15, as shown, at the location of the first terminal floor material Bsa in the upper stage, the hot water pipe P 1
And P 2 are connected at one end to each other by a connecting member Pc 1 in a communicating state, and the other end is connected to the lower hot water pipes P 1 and P 2.
The two end portions of 2 are connected to each other by connecting members Pc 2 and Pc 3 , respectively. Further, at the place of the first floor material for terminal Bsa in the lower stage, the other ends of the hot water pipes P 1 and P 2 are connected to each other by the connection tool Pc 1 . As a result, a circulation system of hot water is constructed in the floor material group of two upper and lower stages. Then, the connecting tool Pc 2 is connected to the joint box G via a T-shaped joint (not shown).
(See FIG. 9), which is connected to the hot water supply side, and the other connecting tool P
c 3 is connected to the return side, and the hot water supplied from the connecting tool Pc 2 circulates in the floor material group in the upper and lower two stages as shown by the arrow in the figure, and again from the other connecting tool Pc 3 to the joint box G. Returned to.

【0059】図16の場合は、上段と下段の床材群の接
続態様は図15のものと同様であり、中段の床材群の温
水用パイプP1 とP2 の双方の両端部がそれぞれ接続具
Pc1 によって上方及び下方の温水用パイプP1 とP2
の端部とそれぞれ連通状態に接続している。それによ
り、温水の循環系が上中下3段の床材群内に構築され
る。そして、中段の床材群における前記第2の端末用床
材Bsbの位置における温水用パイプP2 の湾曲部には
接続具Pc2 が連通状態に配置されて、また、温水用パ
イプP1 の湾曲部には接続具Pc3 が連通状態で組付け
られる。そして、図示しないが、図15の場合と同様
に、図示しないT型ジョイント等を介して、前記接続具
Pc2 はジョイントボックスG(図9参照)の温水供給
側に接続され、他方の接続具Pc3 は戻り側に接続され
る。それにより、この場合も、接続具Pc2 から供給さ
れる温水は、図で矢印で示すような上中下3段の床材群
内を循環し、再び他方の接続具Pc3 からジョイントボ
ックスGに戻される。
In the case of FIG. 16, the connection manner of the upper and lower floor material groups is similar to that of FIG. 15, and both ends of both the hot water pipes P 1 and P 2 of the middle floor material group are respectively. The upper and lower hot water pipes P 1 and P 2 are connected by the connecting tool Pc 1 .
Are connected in communication with the ends of. As a result, a circulation system of hot water is constructed in the floor material group of the upper, middle, and lower three stages. The connecting member Pc 2 is placed in communication with the curved portion of the hot water pipe P 2 at the position of the second terminal floor material Bsb in the middle floor material group, and the hot water pipe P 1 A connecting tool Pc 3 is attached to the curved portion in a communicating state. Although not shown, as in the case of FIG. 15, the connector Pc 2 is connected to the hot water supply side of the joint box G (see FIG. 9) via a T-shaped joint or the like not shown, and the other connector is connected. Pc 3 is connected to the return side. Thereby, also in this case, the hot water supplied from the connecting tool Pc 2 circulates in the floor material group of the upper, middle, and lower three steps as shown by the arrow in the figure, and again from the other connecting tool Pc 3 to the joint box G. Returned to.

【0060】そのようにして温水循環路を形成した後
に、先の実施形態の場合と同様にして先に取り外してお
いた第1の端末用床材Bsaと第2の端末用床材Bsb
が元の位置に固定され、暖房施工工程は終了する。な
お、端末用床材Bsの裏面に形成した凹溝のうち、連結
溝715及び連結溝813は、接続具Pc1 〜Pc3 が入り
込むための凹溝である。この端末用床材Bsでは、図4
に示した端末用床材Bと比較して温水用パイプPの湾曲
部の曲率を大きくとることができるので、配管作業が容
易化する利点がある。また、同様な接続法を繰り返すこ
とにより、4段以上の床材群内に循環系を構築すること
も容易である。
After the hot water circulation path is formed in this way, the first terminal floor material Bsa and the second terminal floor material Bsb previously removed in the same manner as in the previous embodiment.
Is fixed in its original position, and the heating construction process ends. In addition, among the concave grooves formed on the back surface of the terminal flooring Bs, the connecting groove 7 15 and the connecting groove 8 13 are concave grooves into which the connectors Pc 1 to Pc 3 are inserted. In this terminal floor material Bs, as shown in FIG.
Since the curvature of the curved portion of the hot water pipe P can be made larger than that of the terminal flooring B shown in (1), there is an advantage that the piping work is facilitated. It is also easy to build a circulation system in a floor material group having four or more stages by repeating the same connection method.

【0061】上記の説明は、本発明による温水式暖房床
の施工方法及び温水式暖房床並びに床材の好ましい実施
の形態の説明であって、他に多くの変形例が存在する。
例えば、各床材に設けた均熱板としての機能を果たす金
属箔3は必ずしも必須でなく、省略してもよい。裏面シ
ートを持つ床材Aに形成した第2の溝も、接着性を向上
させるために設けるものであり、接着剤の塗布が均一厚
さに行えるように施工環境においては、第2の溝を有し
ない床材を用いても、良好な接着性は確保される。取り
外し用のテープも作業の効率化の観点から用いられるも
のであり、省略可能である。
The above description is a description of preferred embodiments of the hot water heating floor construction method and hot water heating floor and flooring material according to the present invention, and there are many other variations.
For example, the metal foil 3 provided on each floor material and functioning as a heat equalizing plate is not always essential and may be omitted. The second groove formed on the floor material A having the back sheet is also provided to improve the adhesiveness, and the second groove is formed in the construction environment so that the adhesive can be applied to a uniform thickness. Good adhesiveness is ensured even if a flooring material that does not have such a material is used. The detaching tape is also used from the viewpoint of improving work efficiency and can be omitted.

【0062】[0062]

【発明の効果】本発明によれば、床材の配置作業である
大工側の作業工程と温水用パイプの敷設作業である暖房
設備店側の作業工程とを完全に分離することが可能とな
り、作業管理の自由度が大きくなることから、結果とし
て施工の低コスト化がもたらされる。
According to the present invention, it becomes possible to completely separate the work process on the carpenter side, which is the work for arranging the floor material, and the work process on the heating equipment store, which is the work for laying the hot water pipe, Since the degree of freedom in work management is increased, the cost of construction can be reduced as a result.

【0063】また、床材はその裏面に凹溝を加工しかつ
該凹溝を裏面シートで被覆するのみであり、温水用パイ
プの組み込みを要しないので、低コスト化が可能とな
る。また、通常の床材と同様に完成品としての在庫管理
及び出荷であり、施工管理も容易となる。
Further, the floor material only has a recess groove formed on its back surface and is covered with a back surface sheet, and does not require incorporation of a hot water pipe, so that the cost can be reduced. Further, as in the case of ordinary flooring materials, inventory management and shipment as finished products facilitates construction management.

【0064】さらに、床材を施工した後に温水用パイプ
を挿通する作業手順であり、従来のように運搬時にパイ
プが損傷して暖房床材全体が欠陥品となるようなことは
なく、例え暖房施工時に温水用パイプが損傷した場合で
も、損傷した温水用パイプのみを交換すればよく、メン
テナンスも容易でありかつ維持コストも低下する。
Furthermore, this is a work procedure in which a hot water pipe is inserted after the floor material has been installed, and there is no possibility that the pipe will be damaged during transportation and the entire heating floor material will become defective as in the conventional case. Even if the hot water pipe is damaged during construction, only the damaged hot water pipe needs to be replaced, which facilitates maintenance and reduces maintenance costs.

【0065】また、凹溝を持つ床材の裏面には少なくと
も該凹溝を覆うように裏面シートが配置されるので、温
水用パイプの挿通作業は容易であり、かつ、異物の侵入
により温水用パイプが損傷を受けるのも回避できる。
らに、裏面に形成した凹溝に沿って余分な接着剤を取り
込むための細い第2の溝をさらに形成した床材を用いる
場合には、例えば不均一な厚みに接着剤が塗布されたよ
うな場合に、その盛り上がり部分(余剰な接着剤)を該
第2の溝内に逃がすことができる。それにより、接着が
不安定になったり接着面が凹凸状となったりするのを阻
止することができる。さらに、接着面が平坦になること
から、接着剤の盛り上がりによって裏面シートが凹溝部
分内に押し込まれて裏面シートの剥離が生じたり、温水
用パイプの挿通に不都合を生じさせたりすることも回避
できる。
Further, since the back sheet is arranged at least on the back surface of the flooring material having the recessed groove so as to cover the recessed groove, it is easy to insert the hot water pipe, and the foreign matter invades the hot water. It also avoids damage to the pipe. It
In addition, remove excess adhesive along the groove formed on the back surface.
Use a flooring material that is further formed with a thin second groove for embedding
In this case, for example, the adhesive was applied with a non-uniform thickness.
In such a case, the raised part (excess adhesive) should be
It can escape into the second groove. This will ensure the adhesion
Prevents instability and uneven bonding surfaces
You can stop. In addition, the adhesive surface should be flat
The adhesive sheet rises, causing the back sheet to
The back sheet is peeled off due to being pushed into the
Avoids causing inconvenience in inserting the pipe for use
it can.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による暖房床を示す平面図。FIG. 1 is a plan view showing a heating floor according to the present invention.

【図2】取り外される床材以外の床材である凹溝を持つ
床材の一実施形態を示す図であり、aは平面図、bは背
面図。
2A and 2B are views showing an embodiment of a floor material having a groove, which is a floor material other than the floor material to be removed, where a is a plan view and b is a rear view.

【図3】図1の床材のIII-III 線による拡大断面図。FIG. 3 is an enlarged cross-sectional view taken along line III-III of the floor material in FIG.

【図4】端部用床材の一例を示す図であり、aは平面
図、bは背面図、cは正面図、dは拡大した右側面図。
FIG. 4 is a view showing an example of an end floor material, in which a is a plan view, b is a rear view, c is a front view, and d is an enlarged right side view.

【図5】ボーダー用床材を示す図であり、aは平面図、
bはV-V 線による断面図。
FIG. 5 is a diagram showing a floor material for a border, where a is a plan view,
b is a sectional view taken along the line VV.

【図6】各床材の配置手順を示す図。FIG. 6 is a diagram showing a procedure for arranging each floor material.

【図7】暖房施工の最初の手順を説明する図。FIG. 7 is a diagram illustrating a first procedure of heating construction.

【図8】暖房施工の次の手順を説明する図。FIG. 8 is a diagram for explaining the next procedure of heating construction.

【図9】ヒーター用床材に温水用パイプを挿通した状態
を説明する図。
FIG. 9 is a diagram illustrating a state in which a hot water pipe is inserted through a heater floor material.

【図10】温水用パイプによる温水循環系の一例を説明
する図。
FIG. 10 is a diagram illustrating an example of a hot water circulation system using a hot water pipe.

【図11】温水用パイプの配設に用いる台紙を示す図。FIG. 11 is a diagram showing a mount used to dispose a hot water pipe.

【図12】台紙の使用状態を説明する図。FIG. 12 is a diagram illustrating a usage state of a mount.

【図13】台紙の他の使用状態を説明する図。FIG. 13 is a diagram illustrating another usage state of the mount.

【図14】端部用床材の他の例を示す図であり、aは平
面図、bは背面図、cは正面図、dは拡大した右側面
図。
FIG. 14 is a diagram showing another example of the floor material for an end portion, in which a is a plan view, b is a rear view, c is a front view, and d is an enlarged right side view.

【図15】温水用パイプによる温水循環系の他の例を説
明する図。
FIG. 15 is a diagram illustrating another example of a hot water circulation system using a hot water pipe.

【図16】温水用パイプによる温水循環系のさらに他の
例を説明する図。
FIG. 16 is a view for explaining still another example of the hot water circulation system using the hot water pipe.

【図17】従来の温水用暖房パネルを説明する図。FIG. 17 is a diagram illustrating a conventional heating panel for hot water.

【図18】従来の温水用暖房パネルにより構築された暖
房床を説明する図。
FIG. 18 is a diagram illustrating a heating floor constructed by a conventional heating panel for hot water.

【符号の説明】[Explanation of symbols]

A…裏面シートを持つ床材、B…端末用床材、C…ボー
ター用床材、P…温水用パイプ、2…裏面シートを持つ
床材の裏面に形成される凹溝、2a…凹溝に沿って形成
される第2の溝、3…均熱板、4…凹溝部分を覆う裏面
シート
A ... Floor material having back sheet, B ... Floor material for terminal, C ... Floor material for boater, P ... Pipe for hot water, 2 ... Groove formed on back surface of floor material having back sheet, 2a ... Groove 2nd groove formed along the side, 3 ... Soaking plate, 4 ... Back sheet covering the groove portion

フロントページの続き (56)参考文献 特開 平8−296861(JP,A) 特開 平2−44129(JP,A) 特開 平8−128658(JP,A) 特開 平7−269082(JP,A) 特開 平8−144491(JP,A) 実開 平6−44935(JP,U) 実開 平6−47178(JP,U) 登録実用新案3002453(JP,U) (58)調査した分野(Int.Cl.7,DB名) F24D 3/16 Continuation of the front page (56) Reference JP-A-8-296861 (JP, A) JP-A-2-44129 (JP, A) JP-A-8-128658 (JP, A) JP-A-7-269082 (JP , A) Japanese Unexamined Patent Publication No. 8-144491 (JP, A) Actual Opening Flat 6-44935 (JP, U) Actual Opening Flat 6-47178 (JP, U) Registered Utility Model 3002453 (JP, U) (58) Field (Int.Cl. 7 , DB name) F24D 3/16

Claims (12)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 温水用パイプの循環路の形状に対応した
凹溝を裏面に形成した複数の床材を床下地上に配置する
工程、該配置した複数の床材の一部を取り外す工程、該
取り外した床材に隣接して配置されている床材に形成さ
れた凹溝を通して温水用パイプを連続的に配設する工
程、温水用パイプの配設終了後に前記取り外した床材を
元の位置に再配置する工程、とを有しており、前記取り
外される床材以外の床材として、少なくとも裏面に形成
した凹溝部分を被覆する裏面シートを持つ床材を用いて
施工することを特徴とする温水式暖房床の施工方法。
1. A step of arranging a plurality of floor materials having concave grooves corresponding to a shape of a circulation path of a hot water pipe on a back surface on a floor base, a step of removing a part of the plurality of arranged floor materials, The step of continuously arranging the hot water pipe through the concave groove formed in the floor material arranged adjacent to the removed floor material, the removed floor material is in the original position after the installation of the hot water pipe is completed. And a step of rearranging, and as a flooring material other than the flooring material to be removed, a flooring material having a back sheet covering at least the groove portion formed on the back surface is used for construction. Hot water heating floor construction method.
【請求項2】 前記取り外される床材以外の床材とし
て、裏面に形成した凹溝に沿って余分な接着剤を取り込
むための細い第2の溝がさらに形成されている床材を用
いて施工することを特徴とする請求項1記載の温水式暖
房床の施工方法。
2. The floor material other than the floor material to be removed is constructed by using a floor material in which a second thin groove for taking in an excessive adhesive is further formed along a concave groove formed on the back surface. The method for constructing a hot water heating floor according to claim 1, wherein:
【請求項3】 前記取り外される床材として、周囲の1
ケ所又は数カ所に取り外し用のテープをさらに貼着した
床材を用い、温水用パイプの配設終了後に、該取り外し
用のテープを除去した状態で該床材を元の位置に再配置
することを特徴とする請求項1記載の温水式暖房床の施
工方法。
3. The surrounding floor as the floor material to be removed.
It is recommended to use the flooring material to which the removal tape is further attached at one or several places, and to relocate the flooring material to the original position with the removal tape removed after the hot water pipe is installed. The method for constructing a hot water heating floor according to claim 1, which is characterized in that.
【請求項4】 前記取り外される床材は、温水循環路を
形成するに際して、該温水用パイプを折曲させる必要の
ある場所又は温水用パイプを接続する必要のある場所に
配置される床材であることを特徴とする請求項1ないし
3いずれか記載の温水式暖房床の施工方法。
4. The floor material to be removed is a floor material arranged at a place where the hot water pipe needs to be bent or a place where the hot water pipe needs to be connected when the hot water circulation path is formed. The hot water type heating floor construction method according to any one of claims 1 to 3, wherein:
【請求項5】 前記取り外される床材の裏面に形成され
た凹溝の軌跡と略同じ軌跡が描かれた台紙を用い、該取
り外した床材の位置に前記台紙を置き、該台紙に描かれ
た軌跡に沿って温水用パイプを配設するようにしたこと
を特徴とする請求項1ないし4いずれか記載の温水式暖
房床の施工方法。
5. A mount having a trace substantially the same as the trace of a concave groove formed on the back surface of the floor material to be removed is used, the mount is placed at the position of the removed floor material, and the trace is drawn on the mount. 5. The hot water heating floor construction method according to claim 1, wherein the hot water pipes are arranged along the locus.
【請求項6】 温水供給源との間で温水を循環させるた
めに床下地上に配設された温水用パイプと、該温水用パ
イプの循環路に沿った凹溝が裏面に形成された床材であ
って該配設された温水用パイプを該凹溝中に収容した状
態で床下地上に配置されている複数の床材とを有してお
り、該複数の床材は、温水用パイプの主に直線部分を収
容する床材と主に温水用パイプの折曲部分又は接続箇所
を収容する床材とで構成されており、かつ、前記主に温
水用パイプの直線部分を収容する床材は少なくとも裏面
に形成した凹溝部分が裏面シートで被覆された床材であ
ることを特徴とする温水式暖房床。
6. A hot water pipe arranged on a floor substrate for circulating hot water between the hot water supply source and a flooring material having a groove formed on the back surface along a circulation path of the hot water pipe. And having a plurality of floor materials arranged on the floor base in a state where the arranged hot water pipe is housed in the groove, the plurality of floor materials being the hot water pipe A flooring material mainly containing a linear portion and a flooring material mainly containing a bent portion or a connection portion of the hot water pipe, and mainly containing a linear portion of the hot water pipe. Is a flooring material in which at least the concave groove portion formed on the back surface is covered with a back surface sheet.
【請求項7】 前記主に温水用パイプの直線部分を収容
する床材は、裏面に形成した凹溝部分に沿って余分な接
着剤を取り込むための細い第2の溝がさらに形成されて
いることを特徴とする請求項6記載の温水式暖房床。
7. A floor material for accommodating the straight portion of the hot water pipe is further provided with a thin second groove for taking in an excessive adhesive along the concave groove portion formed on the back surface. The hot water heating floor according to claim 6, wherein
【請求項8】 前記主に温水用パイプの折曲部分又は接
続箇所を収容する床材は裏面に所定の深さの切り込みが
形成されていることを特徴とする請求項6記載の温水式
暖房床。
8. The hot water heating system according to claim 6, wherein the floor material mainly containing the bent portion or the connection portion of the hot water pipe has a notch having a predetermined depth formed on the back surface thereof. floor.
【請求項9】 前記床材は、均熱板としての金属箔を中
間層として有していることを特徴とする請求項6記載の
温水式暖房床。
9. The hot water heating floor according to claim 6, wherein the flooring material has a metal foil as a soaking plate as an intermediate layer.
【請求項10】 温水用パイプを収容するための裏面に
形成した1本又は複数本の凹溝と、少なくとも該凹溝部
分を被覆する裏面シートとを有することを特徴とする温
水式暖房床用の床材。
10. A hot water heating floor characterized by having one or a plurality of recessed grooves formed on the back surface for accommodating a hot water pipe, and a back sheet for covering at least the recessed groove portions. Flooring.
【請求項11】 前記凹溝部分に沿って形成された細い
第2の溝をさらに有することを特徴とする請求項10記
載の床材。
11. The flooring material according to claim 10, further comprising a thin second groove formed along the concave groove portion.
【請求項12】 均熱板としての機能を果たす金属箔を
中間層としてさらに有することを特徴とする請求項10
又は11記載の床材。
12. The method according to claim 10, further comprising a metal foil serving as a soaking plate as an intermediate layer.
Or the floor material according to item 11.
JP06100197A 1997-03-14 1997-03-14 Construction method of hot water type heating floor, hot water type heating floor and floor material Expired - Fee Related JP3522485B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06100197A JP3522485B2 (en) 1997-03-14 1997-03-14 Construction method of hot water type heating floor, hot water type heating floor and floor material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06100197A JP3522485B2 (en) 1997-03-14 1997-03-14 Construction method of hot water type heating floor, hot water type heating floor and floor material

Publications (2)

Publication Number Publication Date
JPH10253085A JPH10253085A (en) 1998-09-25
JP3522485B2 true JP3522485B2 (en) 2004-04-26

Family

ID=13158697

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06100197A Expired - Fee Related JP3522485B2 (en) 1997-03-14 1997-03-14 Construction method of hot water type heating floor, hot water type heating floor and floor material

Country Status (1)

Country Link
JP (1) JP3522485B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4045012B2 (en) * 1998-04-20 2008-02-13 大建工業株式会社 Hot water floor heating panel and construction method thereof
KR100847798B1 (en) 2007-11-19 2008-07-25 천열에너지 주식회사 A methode of excution of heating panel

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002453U (en) 1994-03-28 1994-09-27 株式会社オリエンタル容器工業 Air conditioning panel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002453U (en) 1994-03-28 1994-09-27 株式会社オリエンタル容器工業 Air conditioning panel

Also Published As

Publication number Publication date
JPH10253085A (en) 1998-09-25

Similar Documents

Publication Publication Date Title
US7162847B2 (en) Apparatus and method for fabricating foam wall panels
JP3522485B2 (en) Construction method of hot water type heating floor, hot water type heating floor and floor material
JP3045135B2 (en) How to install floor heating panels
JP4516906B2 (en) Floor heating system
JP4071361B2 (en) Electric floor heating floor construction method, electric floor heating floor and flooring
JP3488555B2 (en) Hot water heating floor construction method and hot water heating floor
JPH11256803A (en) Floor heating panel and construction of floor heating using same, and floor panel for wiring used for construction
JP3842020B2 (en) Sheet circuit device and wiring method for sheet circuit device
JPH11211114A (en) Method for constructing hot water circulated heating floor, hot water circulated heating floor and floor material
JP5225656B2 (en) Electric floor heating structure and construction method thereof
JPS6126524Y2 (en)
JP2991578B2 (en) Floor heating structure and panel structure used therefor
JP4045012B2 (en) Hot water floor heating panel and construction method thereof
JP2001056130A (en) Floor material for heating floor
JP2006083568A (en) Direct-sticking construction method of electric floor heating structure, and wiring tool used for the same
JP2001020508A (en) Flooring for heated floor
JP2001020510A (en) Flooring for heated floor
JP2002195591A (en) Electric floor heating panel
JP4100840B2 (en) Floor heating panel
JP3841539B2 (en) Hot water floor heating panel and construction method thereof
JP2000074401A (en) Floor heater
JPH0894100A (en) Floor heating panel and electrical connecting structure thereof
JP2005061638A (en) Floor heating device
JPH0645544Y2 (en) Electrothermal flooring
JP4558241B2 (en) Floor finishing materials and hot water pipe units for hot water floor heating floors

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040113

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040127

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040204

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080220

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090220

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090220

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100220

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees