JP3500912B2 - Connection fitting - Google Patents

Connection fitting

Info

Publication number
JP3500912B2
JP3500912B2 JP14050397A JP14050397A JP3500912B2 JP 3500912 B2 JP3500912 B2 JP 3500912B2 JP 14050397 A JP14050397 A JP 14050397A JP 14050397 A JP14050397 A JP 14050397A JP 3500912 B2 JP3500912 B2 JP 3500912B2
Authority
JP
Japan
Prior art keywords
bell mouth
special
joint
pipe
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP14050397A
Other languages
Japanese (ja)
Other versions
JPH10336864A (en
Inventor
重夫 秋本
省三 堀田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaneka Corp
Original Assignee
Kaneka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=15270165&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP3500912(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Kaneka Corp filed Critical Kaneka Corp
Priority to JP14050397A priority Critical patent/JP3500912B2/en
Publication of JPH10336864A publication Critical patent/JPH10336864A/en
Application granted granted Critical
Publication of JP3500912B2 publication Critical patent/JP3500912B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、電線共同溝等に用
いるハンドホールやマンホール等の特殊部と地中埋設管
を接続するための接続用継手に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connecting joint for connecting a special portion such as a handhole or a manhole used for an electric wire common groove to a buried underground pipe.

【0002】[0002]

【従来の技術】上記電線共同溝とは、電線類である電力
ケーブル、通信ケーブル、道路管理者用ケーブル等をま
とめて地中埋設化を実現するために設置する特殊部(接
続部、分岐部)と管路部と地上機器とに類別定義されて
いる。その特徴は、従来のキャブ(ケーブルボックス)
方式に比較して管路部の埋設間隔を狭くコンパクトにす
ることや浅層埋設にすること、あるいは低価格化(キャ
ブの1/3程度)を目指している点である。
2. Description of the Related Art The electric wire common groove is a special section (connection section, branch section) which is installed to realize underground embedding of electric cables such as electric power cables, communication cables and cables for road managers. ), Pipelines and ground equipment. The feature is the conventional cab (cable box)
Compared to the method, the aim is to make the interval of burying the pipeline narrow and compact, to bury it in a shallow layer, or to lower the cost (about 1/3 of the cab).

【0003】上記特殊部と地中埋設管を接続するための
接続用継手について説明すれば、例えば図9に示される
ものが一般的である。この接続用継手10は、一端に略
ラッパ状に形成された部位を有する第1筒部10Aと、
他端に前記第1筒部10Aよりも径が大きく、且つ、地
中埋設管を移動自在に内嵌するための第2筒部10Bと
からなっている。このように構成された接続用継手10
を特殊部1に固定する場合には、まず、特殊部1の貫通
孔1Aに接続用継手10の第1筒部10A側先端部から
挿入して位置決めする。こののち、第1筒部10Aの外
面と特殊部1の貫通孔1Aの周面との隙間にモルタル7
を充填し、このモルタル7が固化することによって、接
続用継手10の固定が完了する。そして、この接続用継
手10の第2筒部10Bに地中埋設管2を内嵌するので
ある。
The connection joint for connecting the special portion and the underground buried pipe will be described. For example, the joint shown in FIG. 9 is general. The connecting joint 10 includes a first tubular portion 10A having a substantially trumpet-shaped portion at one end,
The other end has a second tubular portion 10B having a diameter larger than that of the first tubular portion 10A and for movably fitting an underground buried pipe therein. Connection joint 10 configured in this way
In the case of fixing to the special portion 1, first, the special joint 1 is inserted into the through hole 1A from the tip end of the connecting joint 10 on the side of the first cylinder portion 10A and positioned. After this, the mortar 7 is placed in the gap between the outer surface of the first tubular portion 10A and the peripheral surface of the through hole 1A of the special portion 1.
And the mortar 7 is solidified, whereby the fixing of the connecting joint 10 is completed. Then, the underground pipe 2 is fitted in the second tubular portion 10B of the connecting joint 10.

【0004】上記接続用継手10は、特殊部1の貫通孔
1Aに挿入した状態で、第1筒部10Aの一部及び第2
筒部10Bが特殊部1の外部に大きく突出することにな
るため、突出した部位の重量のために、モルタル7が固
化するまでの間に接続用継手10が徐々に外部側ほど下
方に傾斜する状態になってしまうことがあった。又、前
記のように突出した部位があると、設置作業を完了して
いる接続用継手10の突出部位に他の接続用継手10を
設置作業中に、他物や人の手が不測に接当してしまい、
モルタル7が固化するまでの間に接続用継手10の姿勢
が大きく変更されてしまうこともあった。これを解消す
るためには、モルタル7が固化するまで接続用継手10
を水平姿勢に保持しておくための何らかの手段を施さな
ければならないだけでなく、モルタル7が固化したのち
前記手段を解除しなければならず、接続用継手10の取
付け作業が手間のかかる煩わしいものであった。
The connecting joint 10 is inserted into the through hole 1A of the special portion 1 and a part of the first tubular portion 10A and the second tubular portion 10A.
Since the cylindrical portion 10B largely projects to the outside of the special portion 1, the connecting joint 10 gradually inclines downward toward the outside until the mortar 7 solidifies due to the weight of the protruding portion. I was sometimes in a state. Further, if there is a protruding portion as described above, another object or a person's hand unexpectedly comes into contact with the protruding portion of the connecting joint 10 for which the installation work has been completed, while the other connecting joint 10 is being installed. I got hit,
The attitude of the connecting joint 10 may be changed significantly before the mortar 7 solidifies. In order to eliminate this, the joint 10 for connection is formed until the mortar 7 is solidified.
Not only has to be provided with some means for holding the horizontal position, but also the means has to be released after the mortar 7 has solidified, and the installation work of the connecting joint 10 is troublesome and cumbersome. Met.

【0005】又、上記のように、予め設置されている特
殊部1の貫通孔1Aに接続用継手10を挿入して固定す
る場合の他、特殊部1を製作する際に、接続用継手10
を特殊部1に一体化させる場合もある。この場合、図1
0に示すように、底板11と、4つの周縁を囲むための
4枚の側板12…(図では2枚のみを図示)とからなる
型枠内に、接続用継手10をボルト13及びナット14
により固定する。この状態において、モルタル7を設定
した厚みになるまで流し込み、流し込んだモルタル7が
固化したのちに前記型枠を取り外して接続用継手10を
備えた特殊部1の側面部1aを形成できるようにしてい
る。前記接続用継手10がモルタル7に比較して軽量で
あるため、接続用継手10を底板11に固定していない
と、モルタル7を流し込んでいるときに、接続用継手1
0が浮き上がることになり、接続用継手10を底板11
に固定しておく必要がある。そして、図11に示すよう
に、前記のように形成された側面部1aの2つを両端に
配置するとともに、これら側面部1a,1aの間にU字
形状の一対の中間部1b,1bを配置し、これらをボル
ト等により接続することにより特殊部1を構成できるよ
うにしている。
Further, as described above, in addition to the case where the connecting joint 10 is inserted and fixed in the through hole 1A of the special portion 1 which is installed in advance, the connecting joint 10 is used when the special portion 1 is manufactured.
May be integrated with the special unit 1. In this case,
As shown in FIG. 0, the joint 10 for connection is connected to the bolt 13 and the nut 14 in a form made up of a bottom plate 11 and four side plates 12 for surrounding four peripheral edges (only two are shown in the figure).
Fixed by. In this state, the mortar 7 is poured to a set thickness, and after the poured mortar 7 is solidified, the mold is removed so that the side surface portion 1a of the special portion 1 having the connection joint 10 can be formed. There is. Since the connecting joint 10 is lighter than the mortar 7, the connecting joint 10 must be fixed to the bottom plate 11 when the mortar 7 is being poured.
0 will rise, and the joint 10 for connection will be attached to the bottom plate 11
Need to be fixed to. Then, as shown in FIG. 11, two side surface portions 1a formed as described above are arranged at both ends, and a pair of U-shaped intermediate portions 1b and 1b are provided between the side surface portions 1a and 1a. The special portions 1 are arranged by connecting them with bolts or the like.

【0006】前記のように、特殊部1を製作する場合に
は、側面部1aだけでなく中間部1bをも作らなければ
ならない製造面での不利や、製造した側面部1aと中間
部1bとを一体化しなければならない組付工数の増加に
よる組付面での不利があり、特殊部1の製作に多くの時
間を費やしていた。しかも、側面部1aを作る度に、接
続用継手10を底板11に固定しなければならないだけ
でなく、モルタルが固化したのちにボルト13及びナッ
ト14を取り外さなければならず、一層手間がかかって
いた。又、側面部1aを作る場合には、接続用継手10
が上方に突出し、且つ、面が水平方向になる状態でしか
作ることができないため、作成のための作業スペースを
多く要するだけでなく、出来上がった側面部1aを縦姿
勢に姿勢変更して中間部1bに組付けなければならな
い。このように、重量のある側面部1aを移動させるこ
とは、多大な労力を要するものであり、作業者に大きな
負担がかかっていた。又、出来上がった特殊部1を運搬
したり、据え付ける時に、側面部1aから外部に突出し
ている接続用継手10に他物等が接当して外面を傷付け
たり、破損する恐れもあった。
As described above, when the special portion 1 is manufactured, not only the side surface portion 1a but also the intermediate portion 1b must be formed, which is disadvantageous in terms of manufacturing, and the manufactured side surface portion 1a and the intermediate portion 1b. There is a disadvantage in the assembling surface due to an increase in the assembling man-hours that need to be integrated, and a lot of time was spent in manufacturing the special portion 1. Moreover, each time the side surface 1a is formed, not only the connecting joint 10 has to be fixed to the bottom plate 11, but also the bolts 13 and the nuts 14 have to be removed after the mortar has solidified, which is more troublesome. It was When the side surface 1a is made, the connecting joint 10
Can be made only in a state in which it projects upward and the surface is in the horizontal direction, so not only does it require a lot of work space for creation, but also the finished side surface portion 1a is changed to a vertical posture and the intermediate portion is changed. Must be assembled to 1b. As described above, moving the heavy side surface portion 1a requires a great deal of labor and imposes a heavy burden on the operator. Further, when the finished special portion 1 is transported or installed, there is a possibility that another object or the like may come into contact with the connecting joint 10 projecting from the side surface portion 1a to the outside to damage or damage the outer surface.

【0007】[0007]

【発明が解決しようとする課題】本発明が前述の状況に
鑑み、解決しようとするところは、特殊部への接続用継
手の固定を容易迅速に行うことができるとともに、モル
タルが固化するまで接続用継手が接当により姿勢変更さ
れることを確実に回避することができ、又、接続用継手
を備える特殊部の製作を、短時間に且つ多大な労力を要
することがなく行えるようにするとともに、出来上がっ
た特殊部を運搬したり、据え付ける時に、接続用継手を
傷付けたり、破損することがないようにする点にある。
SUMMARY OF THE INVENTION In view of the above-mentioned situation, the present invention is to solve the problems that the connection joint can be easily and quickly fixed to the special portion and the connection is made until the mortar is solidified. It is possible to surely avoid changing the posture of the joint for abutment, and to make it possible to manufacture the special portion including the joint for connection in a short time and without much labor. , The point is to prevent the joint for connection from being scratched or damaged when the finished special part is transported or installed.

【0008】[0008]

【課題を解決するための手段】本発明は、前述の課題解
決のために、電線共同溝等に用いるハンドホールやマン
ホール等の特殊部に地中埋設管を接続するための接続用
継手であって、前記特殊部内部側先端部の内面を外拡が
りの略ラッパ状に形成し、且つ、該特殊部に貫通固定さ
れる管軸方向の寸法を特殊部の厚みと略等しい寸法に構
成したベルマウスと、一端を前記地中埋設管にそれの管
軸方向で移動自在に接続し、且つ、他端を前記ベルマウ
スに内嵌固定可能なダクトスリーブとからなる接続用継
手。従って、接続用継手を特殊部に固定する場合には、
ベルマウスを特殊部に形成された貫通孔に挿入したの
ち、ベルマウスの外面と貫通孔の内面との間にモルタル
を充填してベルマウスを特殊部に固定するのである。こ
のようにモルタルを充填したときに、ベルマウスが特殊
部の外部に大きく突出することがなく、貫通孔に対する
ベルマウスの姿勢が変更されることがない。そして、充
填したモルタルが固化して、ベルマウスが特殊部に固定
されたのち、ダクトスリーブをベルマウスに内嵌固定し
て接続用継手の特殊部への固定が完了するのである。
又、前記ベルマウスの寸法が特殊部の厚みと略等しい寸
法に構成していることから、例えば型枠を外枠と内枠と
底枠とから構成し、この型枠内にモルタルを流し込んで
特殊部を製作する際に、ベルマウスを外枠と内枠との間
に固定したのち、モルタルを流し込むことができ、4つ
の側面と底面とからなる特殊部1を一工程で製作しなが
らも、ベルマウスを同時に備えさせることができるので
ある。そして、地中埋設管を特殊部に接続する場合に、
ベルマウスにダクトスリーブを内嵌して地中埋設管をダ
クトスリーブに接続すればよいことから、ベルマウスを
備えた特殊部を運搬する、又は据え付ける際に、特殊部
からベルマウスは勿論のこと、特殊部の外部に突出する
ものがないから、ベルマウスやダクトスリーブに他物等
が接当することがない。
In order to solve the above-mentioned problems, the present invention is a connecting joint for connecting an underground buried pipe to a special portion such as a handhole or manhole used for an electric wire common groove or the like. A bell in which the inner surface of the tip portion on the inner side of the special portion is formed in a substantially trumpet shape with an outward expansion, and the dimension in the pipe axis direction fixed through the special portion in the pipe axis direction is substantially equal to the thickness of the special portion. A connecting joint comprising a mouse and a duct sleeve, one end of which is movably connected to the underground buried pipe in the direction of the pipe axis thereof, and the other end of which is internally fittable and fixable to the bell mouth. Therefore, when fixing the joint for connection to a special part,
After inserting the bell mouth into the through hole formed in the special portion, the mortar is filled between the outer surface of the bell mouth and the inner surface of the through hole to fix the bell mouth to the special portion. In this way, when the mortar is filled, the bell mouth does not largely project outside the special portion, and the posture of the bell mouth with respect to the through hole is not changed. Then, after the filled mortar is solidified and the bell mouth is fixed to the special portion, the duct sleeve is fitted in and fixed to the bell mouth, and the fixing of the connecting joint to the special portion is completed.
Further, since the bell mouth has a size substantially equal to the thickness of the special portion, for example, the mold is composed of an outer frame, an inner frame and a bottom frame, and mortar is poured into the mold. When manufacturing the special part, after fixing the bell mouth between the outer frame and the inner frame, mortar can be poured and the special part 1 consisting of four side surfaces and the bottom surface can be manufactured in one process. The Bellmouth can be equipped at the same time. And when connecting the underground pipe to the special part,
Since it is sufficient to fit the duct sleeve inside the bell mouth and connect the underground pipe to the duct sleeve, when transporting or installing the special part equipped with the bell mouth, let alone the bell mouth from the special part. Since there is nothing that protrudes to the outside of the special portion, no other object will come into contact with the bell mouth or the duct sleeve.

【0009】前記ベルマウスの外面に複数の突起を設け
るとともに、これら複数の突起を周方向に設定距離隔て
て設けることによって、外面の突起により貫通孔にモル
タルを介して固定する際にモルタルへの接触面積を増大
させて、貫通孔に対するベルマウスの姿勢変更が起こり
難いだけでなく、多数のベルマウスを積み重ねる場合
や、特殊部に多数のベルマウスを設置する場合に、隣接
するベルマウスの外面の突起同士が重なり合うことがな
いように位置をずらすことができる。
By providing a plurality of protrusions on the outer surface of the bell mouth and by arranging the plurality of protrusions at a predetermined distance in the circumferential direction, when the protrusions on the outer surface fix the through hole to the mortar through the mortar. Not only does it make it difficult to change the position of the bell mouth with respect to the through hole by increasing the contact area, but also when stacking a large number of bell mouths or when installing a large number of bell mouths in a special part, the outer surface of the adjacent bell mouth It is possible to shift the positions so that the projections of do not overlap each other.

【0010】前記ベルマウスをそれの外径寸法が管軸方
向で同径になるように構成することによって、例えば多
数のベルマウスを束ねて運搬する際に積み重ね易いだけ
でなく、外面が外部に突出するように構成されたベルマ
ウスの出っ張り部を運搬中に接当させ易いこと等を回避
させ易い利点がある。
By constructing the bell mouth so that the outer diameter of the bell mouth becomes the same in the tube axis direction, not only is it easy to stack, for example, when a large number of bell mouths are bundled and transported, but the outer surface is exposed to the outside. There is an advantage that it is easy to avoid that the protruding portion of the bell mouth configured so as to project is abutted during transportation.

【0011】[0011]

【発明の実施の形態】図1に、電線をまとめて地中に配
設するために設置するマンホールやハンドホール等の特
殊部1に複数(図では2本)の地中埋設管2がそれぞれ
接続用継手3を介して接続された断面図が示されてい
る。
BEST MODE FOR CARRYING OUT THE INVENTION In FIG. 1, a plurality of (two in the figure) underground pipes 2 are provided in a special portion 1 such as a manhole or a handhole which is installed to collectively arrange electric wires in the ground. A cross-section is shown connected via a connecting joint 3.

【0012】前記接続用継手3は、特殊部1に貫通設置
されるベルマウス4と、このベルマウス4の基端部4B
から内嵌されて一端が接着剤(溶剤、2液混合、1液硬
化型他を使用)により固定されるダクトスリーブ5とか
らなり、このダクトスリーブ5の他端に前記地中埋設管
2をそれの長手方向での移動を許容する状態で内嵌する
ことにより接続している。尚、図に示す6は、ダクトス
リーブ5内面と地中埋設管2外面との隙間を無くして気
密性を高めるためのゴム輪であり、ダクトスリーブ5に
外方側に突出させた突出部5Cの内方側に形成された凹
部5Dに入り込ませることによって、ダクトスリーブ5
の移動時にゴム輪6が移動しないようにしている。前記
ベルマウス4とダクトスリーブ5との固定を接着剤によ
り行う他、係止やねじ止め等、各種の方法により固定し
てもよいが、係止やねじ止め等の場合には、ベルマウス
4とダクトスリーブ5との間にシール部材を介在して実
施することになる。
The connecting joint 3 has a bell mouth 4 penetratingly installed in the special portion 1 and a base end portion 4B of the bell mouth 4.
And a duct sleeve 5 fixed at one end with an adhesive (using a solvent, a two-liquid mixture, a one-liquid curing type, etc.) and the other end of the duct sleeve 5 with the underground buried pipe 2 It is connected by being internally fitted while allowing its movement in the longitudinal direction. Reference numeral 6 shown in the figure is a rubber ring for increasing the airtightness by eliminating a gap between the inner surface of the duct sleeve 5 and the outer surface of the underground buried pipe 2, and a protruding portion 5C protruding outward from the duct sleeve 5. By inserting into the recess 5D formed on the inner side of the duct sleeve 5
The rubber ring 6 is prevented from moving when moving. Besides fixing the bell mouth 4 and the duct sleeve 5 with an adhesive, they may be fixed by various methods such as locking and screwing. In the case of locking and screwing, the bell mouth 4 The sealing member is interposed between the duct sleeve 5 and the duct sleeve 5.

【0013】前記ベルマウス4は、本来ケーブルを引き
込む際に、ケーブルに傷を付けさせないために使用する
ものであり、図1及び図2に示すように、ベルマウス4
の特殊部1内部側先端部の内面4Aをその先端部側ほど
外拡がりに湾曲した側面視略ラッパ状に形成し、且つ、
該特殊部1に貫通固定されるベルマウス4の管軸方向の
寸法を特殊部1の厚みと等しい寸法に構成するととも
に、このベルマウス4の先端部内面4Aを除いた前記基
端部4Bを直線状に形成してある。そして、ベルマウス
4の外径寸法を管軸方向で同径に構成するとともに、ベ
ルマウス4の外面4Dに4つの突起4E…を周方向にお
いて設定間隔を隔てて、つまり図3に示すように正面視
において90度間隔で突起4Eが位置するように設けて
いる。従って、ベルマウス4が特殊部1から突出するこ
とがないだけでなく、例えば図4に示すように、特殊部
1に形成された角型の貫通孔1Aに4つのベルマウス4
…を設置する場合に隣接するベルマウス4,4の突起4
E,4E同士が重なり合うことを回避することができる
とともに、これら突起4E…によりモルタル7との接触
面積を増大させることができる。前記ベルマウス4の管
軸方向の寸法を特殊部1の厚みと等しい寸法に構成する
他、特殊部1の厚みよりも小さい寸法にすることが好ま
しいが、特殊部1の厚みよりも少し大きな寸法に構成し
てもよい。前記ベルマウス4の内面4Aのダクトスリー
ブ5連結側端部に、ベルマウス4に対するダクトスリー
ブ5の入り込み深さを規制するための段部4Fを設けて
ある。前記ベルマウス4及びダクトスリーブ5の材質
は、合成樹脂の他、金属等各種の材質のものを用いるこ
とができる。合成樹脂で構成する場合には、前記突起4
E…をベルマウス4を製造する過程で容易に一体形成す
ることができるから、前記突起4E…に代えて、ベルマ
ウス4の外面4Dを凹凸状に形成することもできるが、
金属等の場合には、別体形成された突起4E…をベルマ
ウス4の外面4Dに取り付けることになる。前記突起4
E…の形状は、図に示した形状に限定されるものではな
い。図2に示すように、ベルマウス4の外面4Dを砂付
け加工する、又は図に示していないがベルマウス4の外
面4Dを凹凸加工することによって、モルタル7に対し
て滑り難くすることができ、モルタル7が充填されたの
ちのベルマウス4が特殊部1の貫通孔1Aに対して姿勢
変更することを更に確実に回避することができる利点が
ある。
The bell mouth 4 is originally used to prevent the cable from being damaged when the cable is pulled in. As shown in FIGS. 1 and 2, the bell mouth 4 is used.
The inner surface 4A of the inner end of the special portion 1 is formed into a substantially trumpet shape in a side view, which is outwardly curved toward the front end, and
The bell mouth 4 fixed through the special portion 1 has a dimension in the tube axis direction equal to the thickness of the special portion 1, and the base end portion 4B of the bell mouth 4 excluding the inner surface 4A of the tip portion is It is formed in a straight line. The outer diameter of the bell mouth 4 is configured to have the same diameter in the tube axis direction, and the four protrusions 4E ... Are provided on the outer surface 4D of the bell mouth 4 at predetermined intervals in the circumferential direction, that is, as shown in FIG. The projections 4E are provided so as to be located at 90-degree intervals in a front view. Therefore, the bell mouth 4 does not protrude from the special portion 1, and as shown in FIG. 4, for example, four bell mouths 4 are provided in the rectangular through hole 1A formed in the special portion 1.
When installing ..., the protrusions 4 of the bell mouths 4 and 4 adjacent to each other
It is possible to prevent the E and 4E from overlapping each other, and it is possible to increase the contact area with the mortar 7 by these protrusions 4E. It is preferable that the bell-mouth 4 has a dimension in the tube axis direction equal to the thickness of the special portion 1 and is smaller than the thickness of the special portion 1, but slightly larger than the thickness of the special portion 1. You may comprise. A step portion 4F is provided at the end of the inner surface 4A of the bell mouth 4 on the side where the duct sleeve 5 is connected, for controlling the depth of the duct sleeve 5 entering the bell mouth 4. As the material of the bell mouth 4 and the duct sleeve 5, various materials such as metal can be used other than synthetic resin. If it is made of synthetic resin, the protrusion 4
Since E ... can be easily integrally formed in the process of manufacturing the bell mouth 4, the outer surface 4D of the bell mouth 4 can be formed in an uneven shape instead of the protrusions 4E.
In the case of metal or the like, the separately formed protrusions 4E are attached to the outer surface 4D of the bell mouth 4. The protrusion 4
The shape of E ... is not limited to the shape shown in the figure. As shown in FIG. 2, the outer surface 4D of the bell mouth 4 may be sanded, or the outer surface 4D of the bell mouth 4 may be processed to have irregularities, which is not shown in the figure, so that the mortar 7 can be prevented from slipping. There is an advantage that the bell mouth 4 after being filled with the mortar 7 can be more surely prevented from changing its posture with respect to the through hole 1A of the special portion 1.

【0014】前記ダクトスリーブ5は、前記ベルマウス
4に内嵌されて固定される先端部5Aと、この先端部5
Aよりも大径な寸法を有し、且つ、先端部5Aと反対側
に位置して前記地中埋設管2を内嵌可能な基端部5Bと
から構成されている。前記ダクトスリーブ5の管軸方向
の寸法及び形状は、図に示すものに限定されるものでは
ない。
The duct sleeve 5 has a tip portion 5A which is fitted and fixed in the bell mouth 4 and a tip portion 5A.
The base end portion 5B has a diameter larger than that of A and is located on the opposite side of the tip end portion 5A so that the underground buried pipe 2 can be fitted therein. The size and shape of the duct sleeve 5 in the tube axis direction are not limited to those shown in the drawings.

【0015】特殊部1に接続用継手3を介して地中埋設
管2を接続する場合について説明すれば、図1では、ま
ず特殊部1に形成された貫通孔1Aに前述のように特殊
部1の内側からベルマウス4を挿入して位置決めしたの
ち、モルタル7によりベルマウス4を貫通孔1Aに固定
する。モルタル7が固化することにより固定されたベル
マウス4の基端部4Bにダクトスリーブ5を内嵌すると
ともに、接着剤により固定し、このダクトスリーブ5の
基端部5Bに地中埋設管2を内嵌するのである。これら
ベルマウス4、ダクトスリーブ5、地中埋設管2の接続
順序はこれに限定されるものではない。又、モルタル7
をベルマウス4貫通用孔1Aに挿入する前に貫通孔1A
に塗布しておいてもよい。
The case where the underground buried pipe 2 is connected to the special portion 1 via the connecting joint 3 will be described. In FIG. 1, first, the special portion 1 is formed in the through hole 1A formed in the special portion 1 as described above. After the bell mouth 4 is inserted and positioned from the inside of 1, the bell mouth 4 is fixed to the through hole 1A by the mortar 7. The duct sleeve 5 is fitted in the base end portion 4B of the bell mouth 4 fixed by the mortar 7 being solidified and fixed by an adhesive, and the underground buried pipe 2 is fixed to the base end portion 5B of the duct sleeve 5. It fits inside. The connection order of the bell mouth 4, the duct sleeve 5, and the underground buried pipe 2 is not limited to this. Also, mortar 7
Before inserting the bell mouth 4 into the through hole 1A, the through hole 1A
It may be applied to.

【0016】前記のように、ベルマウス4の管軸方向の
寸法を特殊部1の厚みと等しい寸法に構成することによ
って、特殊部1を製作する際に、前記ベルマウス4を特
殊部1に備えさせることができる。詳述すれば、図5に
示すように、4つの外枠8A…と、矩形状の内枠8B
と、底枠8Cとからなる型枠8を設け、この型枠8内に
モルタル7を流し込んで特殊部1を製作するのである
が、特殊部1の厚みとベルマウス4の管軸方向の寸法が
同一であることから、前記両側に位置する外枠8A,8
Aとこれに対向位置する内枠8B,8Bとの間に特定個
数のベルマウス4…を枠同士の挟持力により、又は接着
剤等により固定したのち、図6に示すように型枠8内に
モルタルを流し込んで特殊部1を製作することにより、
特殊部1の製作時にベルマウス4…を同時に備えさせる
ことができる。尚、前記特殊部1を製作したのち、型枠
8を取り外すことになる。前記型枠8の具体構成は、図
示した構成に限定されるものではない。
As described above, by configuring the bell mouth 4 in the tube axis direction to have the same dimension as the thickness of the special portion 1, the bell mouth 4 is set to the special portion 1 when the special portion 1 is manufactured. Can be prepared. More specifically, as shown in FIG. 5, four outer frames 8A ... And a rectangular inner frame 8B.
And a bottom frame 8C, a mold 8 is provided, and the mortar 7 is poured into the mold 8 to manufacture the special portion 1. The thickness of the special portion 1 and the dimension of the bell mouth 4 in the tube axis direction Are the same, the outer frames 8A, 8 located on the both sides are
A specific number of bell mouths 4 ... Are fixed between A and the inner frames 8B, 8B facing each other by a clamping force between the frames or by an adhesive or the like, and then, as shown in FIG. By casting mortar into the special part 1,
The bell mouth 4 ... Can be provided at the same time when the special portion 1 is manufactured. After the special section 1 is manufactured, the mold 8 is removed. The specific structure of the mold 8 is not limited to the illustrated structure.

【0017】図5及び図6では、ベルマウス4の管軸方
向の寸法が特殊部1の厚みと等しい場合を示したが、図
7及び図8では、ベルマウス4の管軸方向の寸法が特殊
部1の厚みよりも小さい場合を示している。図7では、
前記内枠8Bの外面の設定箇所に磁石9Aを接着剤等に
より固定し、この磁石9Aに嵌合するとともに磁力によ
り固定される金属製の位置決め治具9B及びベルマウス
4の一端に内嵌固定される弾性体9Cを設けている。前
記弾性体9Cは、挿入方向終端部側ほど径が大きくなっ
ており、弾性体9Cをベルマウス4の一端に押し込む押
し込み量により弾性体9Cとベルマウス4の連結力が変
化するようにしている。従って、ベルマウス4の内部に
磁石9Aが位置するように内枠8Bの外面にベルマウス
4の一端を接当させた状態にし、この状態においてベル
マウス4の他端の開口部から位置決め治具9Bを挿入し
ていき、位置決め治具9Bの凹部9bを磁石9Aに嵌合
させるのである。このとき、磁石9Aの磁力により位置
決め治具9Bの凹部9bを磁石9Aに容易に嵌合させる
ことができるとともに、嵌合後は磁力により位置決め治
具9Bを介してベルマウス4を位置決めすることができ
る。次に、前記したベルマウス4の他端の開口部から弾
性体9Cを押し込むことにより両者を嵌合固定したの
ち、外枠8Aを弾性体9Cに押し当てることによりベル
マウス4を外枠8Aと内枠8Bとの間に弾性体9Cによ
る復元力で固定することができる。そして、この状態に
おいて、前記のようにモルタルを流し込み、このモルタ
ルが固化したのち、外枠8A、磁石9Aの付いた内枠8
B、弾性体9C、位置決め治具9Bを取り外すことにな
る。このように製作された特殊部1を設置したのち、地
中埋設管2を特殊部1に接続することになるが、地中埋
設管2を接続する数がベルマウス4の個数よりも少な
く、余ってしまった余分なベルマウス4が存在する場合
には、前記弾性体9Cを余分なベルマウス4に挿入する
ことにより栓をすれば、砂等の進入がないとともに、特
別な栓部材を不要にすることができる利点がある。
5 and 6 show the case where the dimension of the bell mouth 4 in the tube axis direction is equal to the thickness of the special portion 1, but in FIGS. 7 and 8, the dimension of the bell mouth 4 in the tube axis direction is The case where the thickness is smaller than the thickness of the special portion 1 is shown. In Figure 7,
A magnet 9A is fixed to a set position on the outer surface of the inner frame 8B with an adhesive or the like, and is fitted to one end of a metal positioning jig 9B and the bell mouth 4 which are fitted to the magnet 9A and fixed by magnetic force. The elastic body 9C is provided. The diameter of the elastic body 9C is increased toward the terminal end side in the insertion direction, and the connecting force between the elastic body 9C and the bell mouth 4 is changed by the amount of pushing the elastic body 9C into one end of the bell mouth 4. . Therefore, one end of the bell mouth 4 is brought into contact with the outer surface of the inner frame 8B so that the magnet 9A is located inside the bell mouth 4, and in this state, the positioning jig is inserted from the opening of the other end of the bell mouth 4. 9B is inserted, and the recess 9b of the positioning jig 9B is fitted into the magnet 9A. At this time, the recess 9b of the positioning jig 9B can be easily fitted to the magnet 9A by the magnetic force of the magnet 9A, and the bell mouth 4 can be positioned by the magnetic force after the fitting through the positioning jig 9B. it can. Next, the elastic body 9C is inserted and fixed from the opening of the other end of the bell mouth 4 described above so as to be fitted and fixed together, and then the outer frame 8A is pressed against the elastic body 9C so that the bell mouth 4 becomes the outer frame 8A. It can be fixed to the inner frame 8B by the restoring force of the elastic body 9C. Then, in this state, the mortar is poured as described above, and after the mortar is solidified, the outer frame 8A and the inner frame 8 with the magnet 9A are attached.
B, the elastic body 9C, and the positioning jig 9B are to be removed. After installing the special portion 1 manufactured in this way, the underground buried pipe 2 is connected to the special portion 1, but the number of underground buried pipes 2 connected is less than the number of bellmouths 4, When there is an extra bell mouth 4 that has been left over, if the elastic body 9C is inserted into the extra bell mouth 4 to plug it, sand does not enter and no special plug member is required. There is an advantage that can be.

【0018】図8では、前記弾性体9Cに代えて、ベル
マウス4に移動可能に内嵌されるパイプ9Dと、このパ
イプ9Dをベルマウス4の外方側に移動付勢するための
コイルスプリング9Eとから構成した場合を示してい
る。このようにコイルスプリング9Eを使用するものの
場合には、前記ベルマウス4の他端の開口部から弾性体
9Cを押し込むものの場合に比べて、ベルマウス4に対
するパイプ9Dの挿入深さを容易に変更することができ
る利点がある。この場合も、特殊部1を製作したのち
は、外枠8A、磁石9Aの付いた内枠8B、パイプ9
D、コイルスプリング9Eを取り外すことになる。
In FIG. 8, instead of the elastic body 9C, a pipe 9D movably fitted in the bell mouth 4 and a coil spring for urging the pipe 9D to move outwardly of the bell mouth 4 are provided. 9E and 9E. In the case of using the coil spring 9E as described above, the insertion depth of the pipe 9D into the bell mouth 4 can be easily changed as compared with the case of pressing the elastic body 9C from the opening at the other end of the bell mouth 4. There is an advantage that can be done. Also in this case, after the special portion 1 is manufactured, the outer frame 8A, the inner frame 8B with the magnet 9A, the pipe 9
D, the coil spring 9E will be removed.

【0019】[0019]

【発明の効果】請求項1によれば、管軸方向の寸法が特
殊部の厚みと略等しいベルマウスを特殊部に固定する構
成にすることによって、ベルマウスが特殊部の外部に大
きく突出することがない、又は外部に全く突出すること
がないから、充填されたモルタルが固化するまでの間
に、従来のように突出した部位の重量により又は突出し
た部位へ他物や人の手等の接当により、貫通孔に対する
ベルマウスの姿勢が変更されることがなく、従来必要と
されていたベルマウス用姿勢維持手段が不要になり、こ
れに伴いモルタルが固化したのち前記ベルマウス用姿勢
維持手段を解除することも不要になる。そして、充填し
たモルタルが固化して、ベルマウスが特殊部に固定され
たのち、ダクトスリーブをベルマウスに内嵌固定して接
続用継手の特殊部への固定が完了する構成であるから、
特殊部への接続用継手の固定を容易迅速に行うことがで
きるとともに、モルタルが固化するまでの間に接続用継
手の姿勢が不測に変更されることを確実に回避すること
ができる。又、接続用継手をベルマウスとダクトスリー
ブとから分割構成し、このベルマウスをそれの寸法が特
殊部の厚みと略等しい寸法になるように構成しているこ
とから、特殊部を作成する工程において、ベルマウスを
特殊部に備えさせることができるから、従来のように接
続用継手を備える重量のある側面部と中間部とを位置合
わせしながら接続する作業を不要にすることができる。
従って、短時間に且つ多大な労力を要することなく接続
用継手を備える特殊部を作成することができるととも
に、出来上がった特殊部を運搬したり、据え付ける時
に、地中埋設管に接続されるダクトスリーブをベルマウ
スに固定しておく必要性がないから、ダクトスリーブや
ベルマウスを傷付けたり、破損することを回避すること
ができる。又、外面に設けた突起により貫通孔にモルタ
ルを介して固定する際にモルタルへの接触面積を増大さ
せることができるから、貫通孔に対するベルマウスの姿
勢変更が起こり難いだけでなく、多数のベルマウスを積
み重ねる場合や、特殊部に多数のベルマウスを設置する
場合に、隣接するベルマウスの外面の突起同士が重なり
合うことがないように位置をずらすことができ、施工面
において有利である。
According to the first aspect of the invention, the bell mouth is largely projected to the outside of the special portion by fixing the bell mouth to the special portion, the dimension of which in the tube axial direction is substantially equal to the thickness of the special portion. Since it does not, or does not project to the outside at all, until the filled mortar solidifies, due to the weight of the projecting part as in the past or to the projecting part By the contact, the posture of the bell mouth with respect to the through hole is not changed, and the conventionally required posture maintaining means for the bell mouth is not required, and the posture maintenance for the bell mouth is then performed after the mortar solidifies. It also becomes unnecessary to cancel the means. Then, the filled mortar is solidified, and after the bell mouth is fixed to the special portion, since the duct sleeve is internally fitted and fixed to the bell mouth, the fixing to the special portion of the connection joint is completed,
It is possible to easily and quickly fix the connecting joint to the special portion, and it is possible to reliably prevent the posture of the connecting joint from being unexpectedly changed before the mortar solidifies. Also, the connecting joint is divided into a bell mouth and a duct sleeve, and the bell mouth is formed to have a dimension substantially equal to the thickness of the special portion. In the above, since the bell mouth can be provided in the special portion, it is possible to eliminate the conventional work of connecting the heavy side portion having the connecting joint and the intermediate portion while aligning them.
Therefore, it is possible to create a special portion including a joint for connection in a short time without requiring a great deal of labor, and at the time of carrying or installing the finished special portion, a duct sleeve connected to the underground pipe. Since there is no need to fix the bell mouth to the bell mouth, it is possible to avoid damaging or damaging the duct sleeve or the bell mouth. Also, the protrusions provided on the outer surface allow the
Increase the contact area to the mortar when fixing via
The shape of the bell mouth against the through hole
Not only is it difficult to change tides, but a large number of bellmouths
In case of stacking or stacking a large number of bell mouths in a special part
If the protrusions on the outer surface of the adjacent bellmouth overlap,
The position can be shifted so that they do not fit, and the construction surface
Is advantageous in.

【0020】 請求項2によれば、請求項1と同様に、
管軸方向の寸法が特殊部の厚みと略等しいベルマウスを
特殊部に固定する構成にすることによって、ベルマウス
が特殊部の外部に大きく突出することがない、又は外部
に全く突出することがないから、充填されたモルタルが
固化するまでの間に、従来のように突出した部位の重量
により又は突出した部位へ他物や人の手等の接当によ
り、貫通孔に対するベルマウスの姿勢が変更されること
がなく、従来必要とされていたベルマウス用姿勢維持手
段が不要になり、これに伴いモルタルが固化したのち前
記ベルマウス用姿勢維持手段を解除することも不要にな
る。そして、充填したモルタルが固化して、ベルマウス
が特殊部に固定されたのち、ダクトスリーブをベルマウ
スに内嵌固定して接続用継手の特殊部への固定が完了す
る構成であるから、特殊部への接続用継手の固定を容易
迅速に行うことができるとともに、モルタルが固化する
までの間に接続用継手の姿勢が不測に変更されることを
確実に回避することができる。又、請求項1と同様に、
接続用継手をベルマウスとダクトスリーブとから分割構
成し、このベルマウスをそれの寸法が特殊部の厚みと略
等しい寸法になるように構成していることから、特殊部
を作成する工程において、ベルマウスを特殊部に備えさ
せることができるから、従来のように接続用継手を備え
る重量のある側面部と中間部とを位置合わせしながら接
続する作業を不要にすることができる。従って、短時間
に且つ多大な労力を要することなく接続用継手を備える
特殊部を作成することができるとともに、出来上がった
特殊部を運搬したり、据え付ける時に、地中埋設管に接
続されるダクトスリーブをベルマウスに固定しておく必
要性がないから、ダクトスリーブやベルマウスを傷付け
たり、破損することを回避することができる。又、ベル
マウスの外径寸法を管軸方向で同径に構成することによ
って、例えば多数のベルマウスを束ねて運搬する際に積
み重ね易いだけでなく、外面が外部に突出するように構
成されたベルマウスの出っ張り部を運搬中に接当させる
こと等を回避させ易い利点があり、取扱面において有利
にできる。
According to claim 2, like claim 1,
Use a bell mouth whose dimension in the tube axis direction is approximately equal to the thickness of the special part.
By using a configuration that is fixed to a special part, the bell mouth
Does not significantly project outside the special section, or
The filled mortar is
The weight of the protruding part as in the past until it solidifies
By contacting other parts or people's hands, etc.
The attitude of the bell mouth with respect to the through hole is changed.
There is no need to maintain the position of the bell mouth
Steps are no longer needed, and the mortar solidifies accordingly
It is no longer necessary to release the posture maintaining means for bellmouth.
It Then, the filled mortar solidifies and bellmouth
After it is fixed to the special part, the duct sleeve is
And fixed to the special part of the joint for connection.
It is easy to fix the joint for connection to the special part because of the structure
Can be done quickly and the mortar solidifies
The posture of the connecting joint may be changed unexpectedly during
It can be avoided without fail. Also, as in claim 1,
The joint for connection is separated from the bell mouth and the duct sleeve.
This Bell Mouth has dimensions that are similar to the thickness of the special part.
Since it is configured to have the same dimensions, the special part
In the process of creating
Since it can be done, it is equipped with a connecting joint as in the past
While aligning the heavy side parts and the middle part,
The subsequent work can be eliminated. Therefore, a short time
Equipped with a connecting joint without much labor
A special part can be created and completed
When transporting or installing special parts, contact the underground pipe
It is necessary to fix the following duct sleeve to the bell mouth.
No need to scratch duct sleeves or bellmouths
It is possible to avoid the damage. Also bell
By configuring the outer diameter of the mouse to have the same diameter in the tube axis direction
For example, when stacking and transporting many bellmouths,
Not only is it easy to stack, but the outer surface is designed to project to the outside.
Hold the formed bell mouth protrusion during transportation
There is an advantage that it is easy to avoid such things, and it is advantageous in terms of handling
You can

【0021】[0021]

【図面の簡単な説明】[Brief description of drawings]

【図1】特殊部に接続用継手を介して地中埋設管が接続
された状態を示す断面図
FIG. 1 is a cross-sectional view showing a state in which an underground pipe is connected to a special portion via a connecting joint.

【図2】接続用継手の分解斜視図FIG. 2 is an exploded perspective view of a joint for connection.

【図3】ベルマウスの正面図[Fig. 3] Front view of bell mouth

【図4】多数のベルマウスを上下左右に配置した状態を
示す正面図
FIG. 4 is a front view showing a state in which many bell mouths are arranged vertically and horizontally.

【図5】ベルマウスを備えた特殊部を製作するための型
枠を示す分解斜視図
FIG. 5 is an exploded perspective view showing a formwork for manufacturing a special part having a bell mouth.

【図6】型枠にモルタルを流し込んでベルマウスを備え
た特殊部を製作した状態を示す横断平面図
FIG. 6 is a cross-sectional plan view showing a state where a special portion having a bell mouth is manufactured by pouring mortar into a mold.

【図7】特殊部の厚みよりも小さなベルマウスを第1の
方法により埋め込まれた状態を示す要部の縦断面図
FIG. 7 is a vertical cross-sectional view of a main part showing a state in which a bell mouth smaller than the thickness of the special part is embedded by the first method.

【図8】特殊部の厚みよりも小さなベルマウスを第2の
方法により埋め込まれた状態を示す要部の縦断面図
FIG. 8 is a vertical cross-sectional view of a main part showing a state in which a bell mouth smaller than the thickness of the special part is embedded by the second method.

【図9】従来の接続用継手を示す断面図FIG. 9 is a sectional view showing a conventional connecting joint.

【図10】従来の方法により接続用継手を備えた側面部
を作成した状態を示す縦断面図
FIG. 10 is a vertical cross-sectional view showing a state in which a side surface portion having a joint for connection is formed by a conventional method

【図11】従来の方法により特殊部を製作するための最
終段階を示す分解斜視図
FIG. 11 is an exploded perspective view showing a final stage for manufacturing a special portion by a conventional method.

【符号の説明】[Explanation of symbols]

1 特殊部 1A 貫通孔 1a 側面部 1b 中間部 2 地中埋設管 3 接続用継手 4 ベルマウス 4A 内面 4B 基端部 4D 外面 4E 突起 4F 段部 5 ダクトスリーブ 5A 先端部 5B 基端部 5C 突出部 5D 凹部 6 ゴム輪 7 モルタル 8 型枠 8A 外枠 8B 内枠 8C 底枠 9A 磁石 9B 位置決め治具 9C 弾性体 9D パイプ 9E コイルスプリング 9b 凹部 10 接続用継手 10A 第1筒部 10B 第2筒部 11 底板 12 側板 13 ボルト 14 ナット 1 Special section 1A through hole 1a Side part 1b middle part 2 underground pipes 3 Connection joint 4 Bellmouth 4A inside 4B base end 4D exterior 4E protrusion 4F step 5 duct sleeve 5A tip 5B base end 5C protrusion 5D recess 6 rubber ring 7 Mortar 8 formwork 8A outer frame 8B inner frame 8C bottom frame 9A magnet 9B positioning jig 9C elastic body 9D pipe 9E coil spring 9b recess 10 Connection fitting 10A First tube part 10B Second tube part 11 Bottom plate 12 side plate 13 volt 14 nuts

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 電線共同溝等に用いるハンドホールやマ
ンホール等の特殊部に地中埋設管を接続するための接続
用継手であって、前記特殊部内部側先端部の内面を外拡
がりの略ラッパ状に形成し、且つ、該特殊部に貫通固定
される管軸方向の寸法を特殊部の厚みと略等しい寸法に
構成したベルマウスと、一端を前記地中埋設管にそれの
管軸方向で移動自在に接続し、且つ、他端を前記ベルマ
ウスに内嵌固定可能なダクトスリーブとからなり、前記
ベルマウスの外面に複数の突起を設けるとともに、これ
ら複数の突起を周方向に設定距離隔てて設けてなる接続
用継手。
1. A connecting joint for connecting a buried underground pipe to a special portion such as a handhole or manhole used for a common groove for electric wires, wherein the inner surface of the tip portion on the inner side of the special portion is formed by expanding the outer surface. A bell mouth formed in a trumpet shape and having a dimension in the pipe axial direction fixed to the special portion so as to be substantially equal to the thickness of the special portion; and one end of the bell mouth in the underground buried pipe in the pipe axial direction thereof. in moving freely connected and made the other end and a fixable duct sleeve fitted into said bell mouth, said
In addition to providing multiple protrusions on the outer surface of the bell mouth,
A joint for connection that is provided with a plurality of protrusions at a set distance in the circumferential direction .
【請求項2】 電線共同溝等に用いるハンドホールやマ
ンホール等の特殊部に地中埋設管を接続するための接続
用継手であって、前記特殊部内部側先端部の内面を外拡
がりの略ラッパ状に形成し、且つ、該特殊部に貫通固定
される管軸方向の寸法を特殊部の厚みと略等しい寸法に
構成したベルマウスと、一端を前記地中埋設管にそれの
管軸方向で移動自在に接続し、且つ、他端を前記ベルマ
ウスに内嵌固定可能なダクトスリーブとからなり、前記
ベルマウスをそれの外径寸法が管軸方向で同径になるよ
うに構成してなる接続用継手。
2. A hand hole or a marker used for the electric wire common groove, etc.
Connections for connecting underground pipes to special parts such as
Is a joint for use in which the inner surface of the tip on the inner side of the special section is expanded outward.
It is formed into a substantially trumpet-like shape and is fixed through the special part.
The dimension in the axial direction of the pipe to be approximately equal to the thickness of the special part
Configured bell mouth and one end of it into the underground pipe
Connected movably in the tube axis direction, and the other end of the bell
Consisting of a duct sleeve that can be internally fitted and fixed to the
The outer diameter of the bell mouth is the same in the tube axis direction.
A connecting joint configured as described above .
JP14050397A 1997-05-29 1997-05-29 Connection fitting Expired - Lifetime JP3500912B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14050397A JP3500912B2 (en) 1997-05-29 1997-05-29 Connection fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14050397A JP3500912B2 (en) 1997-05-29 1997-05-29 Connection fitting

Publications (2)

Publication Number Publication Date
JPH10336864A JPH10336864A (en) 1998-12-18
JP3500912B2 true JP3500912B2 (en) 2004-02-23

Family

ID=15270165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14050397A Expired - Lifetime JP3500912B2 (en) 1997-05-29 1997-05-29 Connection fitting

Country Status (1)

Country Link
JP (1) JP3500912B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700284B (en) * 2021-09-27 2022-10-18 中国建筑第八工程局有限公司 Quick-release connecting device for scaffold extension rod and scaffold steel tube extension method

Also Published As

Publication number Publication date
JPH10336864A (en) 1998-12-18

Similar Documents

Publication Publication Date Title
US3792878A (en) Conduit sections
EP2696124B1 (en) System for embedding a sealable conduit for ducting a tube or cable in a wall or floor which is to be produced by a casting process and method for embedding such a conduit
US6357188B1 (en) Connector for connecting cable-protecting pipe
JP3500912B2 (en) Connection fitting
JP3587058B2 (en) Assembly duct sleeve
JP2991674B2 (en) Propulsion pipe and pushing wheel for propulsion method
JP7121535B2 (en) Structure of plumbing box with conduit fitting and manufacturing method thereof
JP2002286183A (en) Connecting device of underground buried pipeline material
JP3217028B2 (en) Connection
US5951924A (en) Method of forming holes in concrete
KR200381324Y1 (en) A mold for jointed tube
JPH0614968Y2 (en) Concrete panel pipeline structure
JP4178528B2 (en) Block body for cable conduit formation
JPH0999421A (en) Form for concrete product
JP2880413B2 (en) Fixing method and fixture for propulsion pipe at shaft shaft
JP3500849B2 (en) Connection type duct sleeve and connection method to special part of connection type duct sleeve
JP4008705B2 (en) Connection plate for installation on the inner surface of an existing pipe of an extension pipe fixing device, and installation method of extension pipe using the connection plate
JP2021196010A (en) Joint member of pipe buried in precast concrete wall and method of application thereof
JPS6014568B2 (en) Method for embedding and fixing hard resin flexible tubes for conduit conduits into manhole side walls
JPH11108246A (en) Underground buried pipe execution method
JP2022035011A (en) Joint member for buried pipe in precast concrete wall and use thereof
JPH0710247U (en) Joint joint sheath for PC precast member
JP3069557U (en) Duct sleeve insertion length holding jig
JPH112370A (en) Cable laying pipe, and its connecting structure
JP2001208245A (en) Pipe connecting structure

Legal Events

Date Code Title Description
A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031124

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

RVTR Cancellation of determination of trial for invalidation