JP3483722B2 - Test run method and test run device for hot water heating system - Google Patents

Test run method and test run device for hot water heating system

Info

Publication number
JP3483722B2
JP3483722B2 JP04521897A JP4521897A JP3483722B2 JP 3483722 B2 JP3483722 B2 JP 3483722B2 JP 04521897 A JP04521897 A JP 04521897A JP 4521897 A JP4521897 A JP 4521897A JP 3483722 B2 JP3483722 B2 JP 3483722B2
Authority
JP
Japan
Prior art keywords
hot water
heater
temperature
valve
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04521897A
Other languages
Japanese (ja)
Other versions
JPH10238791A (en
Inventor
佳幹 可児
繁明 安井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rinnai Corp
Original Assignee
Rinnai Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rinnai Corp filed Critical Rinnai Corp
Priority to JP04521897A priority Critical patent/JP3483722B2/en
Publication of JPH10238791A publication Critical patent/JPH10238791A/en
Application granted granted Critical
Publication of JP3483722B2 publication Critical patent/JP3483722B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、ガス給湯器のバー
ナで加熱した高温の温水を一次温水として温風暖房機で
使用し、該温風暖房機からバーナへ還流する温水に高温
の一次温水を必要量混合してやや低温の二次温水を作
り、これを床暖房に使用するようにした温水式の暖房装
置を、試運転するための方法及び装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention uses high-temperature hot water heated by a burner of a gas water heater as primary hot water in a hot-air heater, and the hot primary water supplied to the burner from the hot-air heater is high-temperature hot water. The present invention relates to a method and a device for performing a trial run of a hot water type heating device in which a required amount of secondary water is mixed to produce a slightly low temperature secondary hot water and the secondary hot water is used for floor heating.

【0002】[0002]

【従来の技術】室内に温風を送る温風暖房機と、床暖房
器として作用する温水マットを備えた温水式の暖房装置
としては、例えば特開平8−270961号公報に示さ
れるものがある。この種の装置では、バーナで80℃程
度に加熱された高温の温水を一次温水として温風暖房機
に導き、該温風暖房機を出てバーナへ戻る温水に適量の
高温の一次温水を加えて60℃程度の二次温水に調整
し、該二次温水を温水マットに分流させたのち、一次温
水の戻り湯と共にバーナに戻すようになっている。
2. Description of the Related Art A hot-water type heating device provided with a warm-air heater for sending warm air into a room and a warm-water mat that acts as a floor heater is disclosed in, for example, Japanese Patent Application Laid-Open No. 8-270961. . In this type of device, high temperature hot water heated to about 80 ° C by a burner is introduced as a primary hot water to a warm air heater, and an appropriate amount of high temperature primary hot water is added to the warm water that exits the warm air heater and returns to the burner. The temperature of the secondary warm water is adjusted to about 60 ° C., the secondary warm water is diverted to the warm water mat, and then the primary warm water is returned to the burner together with the hot water.

【0003】そして、通常運転時に温水マットに温水が
供給される運転条件は、通常、温風暖房機が暖房作用を
始めた後であること、一次温水の温度が所定温度以上で
あることなどであり、これに加えて床面に熱が伝達され
るまでに時間がかかるので、床暖房の立上がりは遅くな
る。このため温水式暖房装置を新設又は修理したとき、
工事の不備の有無を調べるために試運転をしても、温水
マットに二次温水が回って暖房作用をしていることが判
るまでには長時間を要し、極めて非能率である。
The operating conditions for supplying hot water to the hot water mat during normal operation are usually after the warm air heater has started the heating operation, and the temperature of the primary hot water is above a predetermined temperature. In addition to this, it takes time for heat to be transferred to the floor surface, so the rise of floor heating is delayed. Therefore, when a new hot water heater is installed or repaired,
Even if a trial run is performed to check whether or not there is a flaw in the construction, it takes a long time before it can be seen that the secondary hot water has turned to the hot water mat and is heating, which is extremely inefficient.

【0004】[0004]

【発明が解決しようとする課題】本発明は、試運転が短
時間でできるようにすることを課題とする。
SUMMARY OF THE INVENTION An object of the present invention is to make a trial run in a short time.

【0005】[0005]

【課題を解決するための手段】前記課題を解決するため
の手段のうち、第1の手段は、請求項1に記載したとお
り、温水装置で加熱した高温の温水を一次温水として温
風暖房機に往路及び復路を介して循環させ、前記復路の
温水中に往路の一次温水をバイパスさせてやや低温の二
次温水を調整し、該二次温水を床暖房器に循環させるも
のであって、暖房作用の立ち上がり時間が温風暖房機よ
り床暖房器が長い温水式暖房装置で温風暖房機と床暖房
器を同時運転し、且つ通常運転の始動時に温風暖房機の
始動から一定時間経過した後に二次温水通路の開閉弁を
開くものにおいて、試運転時に、二次温水の通路を開閉
する弁の開弁時期を通常運転の開弁時期より強制的に早
めて床暖房器の温度上昇を早め、その暖房作用の立ち上
がりを早期に検知可能にすることを特徴とする温水式暖
房装置の試運転方法である。
[Means for Solving the Problems] Among the means for solving the above problems, the first means is, as described in claim 1 , a hot air heater which uses high-temperature hot water heated by a hot water device as primary hot water. To circulate through the outward and return paths, by adjusting the secondary hot water of a slightly lower temperature by bypassing the primary hot water of the outgoing path in the warm water of the return path, and circulating the secondary hot water to the floor heater, The floor heating is longer than the warm-air heating when the heating action takes a longer time.The hot-water heating system simultaneously operates the hot-air heating system and the floor-heating system. After opening the secondary hot water passage, the opening timing of the valve that opens and closes the secondary hot water passage is forcibly advanced from the opening timing of normal operation to increase the temperature of the floor heater during trial operation. Early detection of the start of heating effect A commissioning process of the hot water type heating apparatus, characterized by the ability.

【0006】第2の手段は、請求項2に記載したとお
り、温水装置で加熱した高温の温水を一次温水として温
風暖房機に往路及び復路を介して循環させ、前記復路の
温水中に往路の一次温水をバイパスさせてやや低温の二
次温水を調整し、該二次温水を床暖房器に循環させるも
のであって、暖房作用の立ち上がり時間が温風暖房機よ
り床暖房器が長い温水式暖房装置で温風暖房機と床暖房
器を同時運転し、且つ通常運転の始動時に温風暖房機の
始動から一定時間経過した後に二次温水通路の開閉弁を
開くものにおいて、二次温水の通路を開閉する弁に、通
常運転時の開弁時期より早期に開閉する、試運転用の強
制開弁手段を設けたことを特徴とする温水式暖房装置の
試運転装置である。
[0006] The second means is as described in claim 2, is circulated through the forward path and backward path to the warm air heater the hot water of the hot heated with hot water device as the primary hot water forward in the returning path hot water The secondary hot water of a slightly lower temperature is adjusted by bypassing the primary hot water of the above, and the secondary hot water is circulated to the floor heater. in those open the expression heating hot air heater and a floor heating device simultaneously driving the apparatus, and the normal on-off valve of the secondary hot water passage after a predetermined time has elapsed from the starting of the warm air heater at the start of the operation, the secondary hot water A trial operation device for a hot water heating device, characterized in that the valve for opening and closing the passage is provided with a forced valve opening means for trial operation that opens and closes earlier than the valve opening time during normal operation.

【0007】前記請求項1,2の手段によれば、それぞ
れ、試運転時に二次温水を早期から流通させて床暖房作
用の立上がりを早めることができる。
According to the means of claims 1 and 2, the secondary hot water can be circulated from an early stage during the trial run to accelerate the rise of the floor heating action.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。図1において1はガス給湯器で、
そのバーナによって80℃程度に加熱した温水を一次温
水として、往路f1から温風暖房機すなわちエアコンA
に供給し、該エアコンAで熱交換して温度が低下した温
水を復路b1からガス給湯器1に戻し、この温水を40
〜60℃程度に昇温させて二次温水とし、往路f2、セ
パレータS、往路f3,f4を経て二つの温水マットF
a,Fbに供給し、ここを通過した水を前記復路b1に
合流させる。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. In FIG. 1, 1 is a gas water heater,
The warm water heated to about 80 ° C. by the burner is used as the primary warm water, and the warm air heater, that is, the air conditioner A is fed from the outward path f1.
To the gas water heater 1 from the return path b1 and the hot water whose temperature has dropped due to heat exchange by the air conditioner A is returned to the
The temperature is increased to about 60 ° C. to obtain secondary hot water, and the two hot water mats F are passed through the outward path f2, the separator S, and the outward paths f3 and f4.
a, Fb, and the water passing therethrough is merged with the return path b1.

【0009】図中Bは追焚きできる浴槽で、該浴槽Bに
は別個の給湯器から湯が供給されるが、該湯が冷えたと
きは、その冷えた湯が復路b2からガス給湯器1内に設
けた熱交換器に導かれ、高温の一次温水と液−液の熱交
換をして追焚き作用を受け、往路f5から浴槽Bに供給
される。
In the figure, B is a bathtub that can be reheated, and hot water is supplied to the bathtub B from a separate water heater. When the hot water has cooled, the cold water is supplied from the return path b2 to the gas water heater 1 The liquid is introduced into a heat exchanger provided therein, heat-exchanges between the high-temperature primary hot water and the liquid-liquid, receives a reheating effect, and is supplied to the bath B from the outward path f5.

【0010】なお、Dは温水マットFa,Fbが設けら
れている室温を検知するための室温センサである。
Incidentally, D is a room temperature sensor for detecting the room temperature in which the hot water mats Fa and Fb are provided.

【0011】図2を参照して、ガス給湯1内にはバー
ナ10を熱源とする熱交換器11が設けられており、ポ
ンプ2によって循環される温水がバーナ10により熱交
換器11を介して加熱され一次温水となって管路12か
ら上記往路f1に供給される。復路b1を通って帰って
きた復水は一旦シスターン3に入った後、上記ポンプ2
に吸引される。ところで、該ポンプ2から吐出される復
水は管路13を通って上記熱交換器11に還流するが、
復水の一部は二次温水として管路14に分流され往路f
2を通ってセパレータSに到達する。なお、一次温水の
温度は管路12に設けられた温度センサ5Hで検知さ
れ、二次温水の温度は管路14に設けられた温度センサ
5Lで検知され、両温度センサ5H,5Lの検知信号は
電線L1,L2によって制御装置6に送られる。
Referring to FIG. 2, a heat exchanger 11 having a burner 10 as a heat source is provided in the gas water heater 1, and hot water circulated by the pump 2 is passed by the burner 10 via the heat exchanger 11. Is heated to be primary hot water and supplied from the conduit 12 to the outward path f1. Condensed water that has returned via the return path b1 once enters the cistern 3 and then the pump 2
Is sucked into. By the way, the condensate discharged from the pump 2 returns to the heat exchanger 11 through the pipe line 13,
Part of the condensate is diverted to the pipeline 14 as secondary warm water and the outward route f
It reaches the separator S through 2. The temperature of the primary hot water is detected by the temperature sensor 5H provided in the pipeline 12, the temperature of the secondary hot water is detected by the temperature sensor 5L provided in the pipeline 14, and the detection signals of both temperature sensors 5H and 5L are detected. Is sent to the control device 6 by the electric wires L1 and L2.

【0012】上記セパレータS内には往路f3,f4に
対応して熱動式の開閉弁Va,Vbが設けられており、
ガス給湯1内に設けられた制御装置6からの制御信号
により往路f3,f4の入口を個々に開閉し温水マット
Fa,Fbへの二次温水の供給を通断させることができ
る。この開閉弁Va,Vbは内部にワックスペレットと
該ワックスペレットを加熱するヒータとを備え、ワック
スペレット内に摺動自在のピストンにより封入したワッ
クスをヒータで加熱して膨張させることによりピストン
を摺動させ、ピストンに一体のワックスペレットのロッ
ドで弁杆を押して開弁させるものであり、前記ヒータを
加熱するための電流は制御装置6から回路L3,L4を
介して制御される。開閉弁Va,Vbは、通常運転時に
はエアコンAの運転が開始されてから一定時間経過後開
弁するように制御されるが、作業能率の点から開閉弁V
a,Vbを急速に開弁することが望まれる試運転時に
は、ヒータを加熱する電流値を増大して開弁時期を早め
るように、制御装置の設定を変更する。また、温水マッ
トFa,Fbからでてくる還流水は復路b1を通ってシ
スターン3に戻る。
Thermal separators Va and Vb are provided in the separator S corresponding to the outward paths f3 and f4.
By the control signal from the controller 6 provided in the gas water heater 1, the inlets of the outward paths f3 and f4 can be individually opened and closed to interrupt the supply of the secondary hot water to the hot water mats Fa and Fb. The on-off valves Va and Vb are provided with wax pellets and a heater for heating the wax pellets inside, and the wax enclosed in the wax pellets by a slidable piston is heated by the heater and expanded to slide the pistons. Then, the rod of wax pellets integrated with the piston pushes the valve rod to open the valve. The current for heating the heater is controlled by the control device 6 via the circuits L3 and L4. The on-off valves Va and Vb are controlled so as to be opened after a certain period of time has passed since the operation of the air conditioner A was started during normal operation.
During a test operation in which it is desired to open the valves a and Vb rapidly, the setting of the control device is changed so that the current value for heating the heater is increased and the valve opening timing is advanced. Further, the reflux water coming out from the warm water mats Fa and Fb returns to the cistern 3 through the return path b1.

【0013】ところで、上記往路f1と該復路b1との
間はバイパスBPで連通されており、エアコンA内の比
例制御弁Vを閉弁してエアコンAの作動を停止し床暖房
を単独で運転する場合には、一次温水はバイパスBPを
通って直接シスターン3に流れ、その一部を二次温水と
して温水マットFa,Fbに流し床暖房の単独運転がで
きるようにした。通常運転時にエアコンAから放出され
る熱量は、例えば3,000〜900kcal/hであ
り、温水マットFa,Fbから放出される熱量は、1,
000kcal/hである。
By the way, the forward path f1 and the return path b1 are connected by a bypass BP, and the proportional control valve V in the air conditioner A is closed to stop the operation of the air conditioner A to operate the floor heating independently. In this case, the primary hot water directly flows to the cistern 3 through the bypass BP, and a part of the primary hot water is passed as the secondary hot water to the hot water mats Fa and Fb so that the floor heating can be independently operated. The amount of heat released from the air conditioner A during normal operation is, for example, 3,000 to 900 kcal / h, and the amount of heat released from the hot water mats Fa and Fb is 1.
It is 000 kcal / h.

【0014】シスターン3には高水位を検知するための
電極31と低水位を検知するための電極32とが設けら
れており、シスターンの水量が少なくなって水面が電極
32の下端から離れると電極31の先端に水面が接する
まで水道水が給水管33を通って給水され、また、例え
シスターン3内の水面が電極31の下端位置を超えオー
バーフローしても排水管34を通って余剰の水または温
水が排出される。
The cistern 3 is provided with an electrode 31 for detecting a high water level and an electrode 32 for detecting a low water level. When the water level of the cistern becomes small and the water surface moves away from the lower end of the electrode 32, the electrode 31 Tap water is supplied through the water supply pipe 33 until the water surface comes into contact with the tip of 31, and even if the water surface in the cistern 3 exceeds the lower end position of the electrode 31 and overflows, excess water flows through the drain pipe 34 or Hot water is discharged.

【0015】また、浴槽Bに対する追焚き手段として上
記管路12の途中から一次温水の一部を液−液式の熱交
換器4に分岐するように配管されており、該熱交換器4
の一次温水の入口部分には熱動式の開閉弁Vcが設けら
れいる。該開閉弁Vcは上記浴槽B内の湯を追焚きする
場合だけ上記制御装置から制御信号をうけ開弁される。
該熱交換器4にはポンプ40により浴槽B内の湯が循環
されるが、湯張りや足し湯を行なう際には別途図外の給
湯器から管路41を介して湯が供給され、熱交換器4及
び往路f5や復路b2を通って浴槽B内に供給される。
なお、42は常閉の開閉弁であり、管路41を介して湯
を浴槽B内に供給する際に開弁され、該開閉弁42を通
過した湯は逆止弁43及び流量計44を通って浴槽B内
に供給される。また45は水流スイッチであり、ポンプ
40の作動による復路b2からの湯が実際に熱交換器4
に流入されていることを検知し、必ず浴槽B内に湯があ
る状態でのみポンプ40を作動させポンプ40の空運転
による破損や騒音を防止するものである。
Further, as a reheating means for the bath B, it is arranged so as to branch a part of the primary hot water to the liquid-liquid type heat exchanger 4 from the middle of the pipe 12, and the heat exchanger 4
A thermal type on-off valve Vc is provided at the inlet of the primary hot water. The on-off valve Vc is opened by receiving a control signal from the control device only when reheating the hot water in the bathtub B.
The hot water in the bathtub B is circulated to the heat exchanger 4 by the pump 40. However, when performing hot water filling or adding hot water, hot water is separately supplied from a hot water supply device (not shown) through the pipe line 41 to generate heat. It is supplied into the bathtub B through the exchanger 4, the outward path f5 and the return path b2.
Reference numeral 42 is a normally-closed on-off valve, which is opened when hot water is supplied into the bathtub B through the conduit 41, and the hot water that has passed through the on-off valve 42 passes through the check valve 43 and the flow meter 44. It is supplied through the bathtub B. Further, reference numeral 45 is a water flow switch, and the hot water from the return path b2 due to the operation of the pump 40 is actually the heat exchanger 4
Is detected and the pump 40 is operated only when there is hot water in the bath B to prevent damage and noise caused by the idle operation of the pump 40.

【0016】上記構成により、冬場のように、エアコン
Aによる温風暖房運転の内の強暖房と温水マットFa,
Fbによる床暖房とを同時に行なう場合には熱交換器1
1内での沸騰防止や強暖房による温風温度の確保を優先
して、温度センサ5Hからの検知信号に基づいて一次温
水の温度が例えば80℃になるようにバーナ10の燃焼
量を制御し、エアコンAの温風温度を強暖房時の所定温
度に保つようにする。温水マットFa,Fbが設置され
ている部屋の室温は室温センサDにより検知され、該室
温が任意に設定される所定温度まで上昇すると足下の温
度が高いと感じるようになり、このため温水マットF
a,Fbの二次温水の循環量を減少させ床暖房による暖
房量を減らす必要が生じる。そのためには開閉弁Va,
Vbへの通電電流値を、開閉弁Va,Vbを完全に閉鎖
する電流値より小さくし、開閉弁Va,Vbを完全に閉
鎖させずに開度を絞って温水マットFa,Fbへの二次
温水循環量を減少させればよい。但し、上記実施例のよ
うに開閉弁Va,Vbが熱動式の場合には電磁比例弁の
ように開度を正確にコントロールしづらいので、周期的
に開閉し、単位時間あたりの二次温水循環量が減少する
ように制御してもよい。
With the above structure, the strong heating and hot water mat Fa in the warm air heating operation by the air conditioner A, such as in winter,
When performing floor heating with Fb at the same time, heat exchanger 1
In order to prevent boiling in 1 and secure hot air temperature by strong heating, the combustion amount of the burner 10 is controlled based on the detection signal from the temperature sensor 5H so that the temperature of the primary hot water becomes, for example, 80 ° C. The warm air temperature of the air conditioner A is maintained at a predetermined temperature during strong heating. The room temperature of the room in which the warm water mats Fa and Fb are installed is detected by the room temperature sensor D, and when the room temperature rises to a predetermined temperature that is arbitrarily set, it is felt that the temperature at the feet is high.
It is necessary to reduce the circulation amount of the secondary hot water of a and Fb to reduce the heating amount by floor heating. For that purpose, the on-off valve Va,
The energization current value to Vb is made smaller than the current value to completely close the on-off valves Va and Vb, and the opening degree is reduced without completely closing the on-off valves Va and Vb to secondary to the hot water mats Fa and Fb. The circulating amount of hot water should be reduced. However, when the on-off valves Va and Vb are of the thermal type as in the above-described embodiment, it is difficult to control the opening accurately like a solenoid proportional valve, so that the secondary hot water per unit time is opened and closed periodically. The circulation amount may be controlled so as to decrease.

【0017】次に、例えば除湿運転のように弱暖房をす
る場合には、エアコンAの冷房機能と温風暖房機能(弱
暖房)とを同時に作動させ、室内空気を一旦冷却して空
気中の水分を結露させ除去した後、一次温水により温め
て乾燥空気として室内に吹き出させる。また床暖房を同
時に行う場合には上述のように温水マットFa,Fbに
二次温水を循環させる。このように弱暖房時に床暖房を
併用する場合は、温度センサ5Lにより検知される二次
温水の温度を基に、該二次温水の温度が例えば60℃に
なるように上記バーナ10の燃焼量を制御し床暖房によ
る効果が十分に発揮されるようにする。なお、このよう
に二次温水温を60℃になるように制御すると一次温水
温は強暖房時の温度である80℃に近い温度になるが、
エアコンA内の比例制御弁の開度が自動的に狭められ一
次温水の循環量が弱暖房に適するように減少される。す
ると、バイパスBPを通ってシスターン3に流れる一次
温水の量が増え二次温水の温度が上昇しようとするがバ
ーナの燃焼量が減少されて弱暖房と床暖房とが行なわれ
る状態で安定する。
Next, in the case of weak heating such as dehumidifying operation, the cooling function of the air conditioner A and the warm air heating function (weak heating) are simultaneously activated to temporarily cool the room air and After the moisture is condensed and removed, it is warmed with primary warm water and blown into the room as dry air. When floor heating is performed simultaneously, the secondary hot water is circulated through the hot water mats Fa and Fb as described above. When the floor heating is also used at the time of the weak heating as described above, based on the temperature of the secondary hot water detected by the temperature sensor 5L, the combustion amount of the burner 10 is set so that the temperature of the secondary hot water becomes, for example, 60 ° C. Control so that the effect of floor heating is fully exerted. In addition, if the secondary hot water temperature is controlled to be 60 ° C. in this way, the primary hot water temperature is close to 80 ° C. which is the temperature during strong heating,
The opening of the proportional control valve in the air conditioner A is automatically narrowed, and the circulation amount of the primary hot water is reduced to be suitable for weak heating. Then, the amount of primary hot water flowing to the cistern 3 through the bypass BP increases and the temperature of the secondary hot water tries to rise, but the combustion amount of the burner is reduced and stable in a state where weak heating and floor heating are performed.

【0018】また、室温センサDにより検知される室温
が所定温度になると足下の温度が高いと感じるようにな
るため床暖房による暖房量を減少させる必要が生じる。
従って、上記強暖房と床暖房とを同時に行う場合と同様
に開閉弁Va,Vbの開度を絞り、あるいは開閉弁V
a,Vbを周期的に開閉する。ところで、弱暖房と床暖
房とを同時に行う場合は温度センサ5Lが検知する二次
温水の温度に基づいてバーナ10の燃焼量を制御してい
るので、二次温水は常に循環されていることが望まし
い。従って室温が所定温度以上になり開閉弁Va,Vb
を周期的に開閉する場合には開閉弁Va,Vbの開閉周
期をずらして開閉弁Va,Vbの少なくとも一方が常に
開弁するように制御することが望ましい。また、開閉弁
Va,Vbの双方が同時に閉弁する場合や温水マットが
1つしか設けられていない場合には開閉周期内に二次温
水が循環されない期間が生じる。その場合には二次温水
の循環が再開されるまで暫定的に温度センサ5Hが検知
する一次温水の温度を基にバーナ10の燃焼量を制御
し、開閉弁Va,Vbの少なくとも一方が開弁し二次温
水の循環が再開されると再び温度センサ5Lが検知する
二次温水の温度を基にバーナ10の燃焼量を制御するよ
うにすればよい。
Further, when the room temperature detected by the room temperature sensor D reaches a predetermined temperature, the user feels that the temperature at the feet is high, so that it becomes necessary to reduce the heating amount by the floor heating.
Therefore, as in the case where the strong heating and the floor heating are simultaneously performed, the opening degree of the opening / closing valves Va and Vb is reduced or the opening / closing valve V is changed.
Open and close a and Vb periodically. By the way, when performing the weak heating and the floor heating at the same time, since the combustion amount of the burner 10 is controlled based on the temperature of the secondary hot water detected by the temperature sensor 5L, the secondary hot water is always circulated. desirable. Therefore, the room temperature becomes equal to or higher than the predetermined temperature, and the on-off valves Va, Vb
When the valve is opened and closed periodically, it is desirable to shift the opening and closing cycles of the opening and closing valves Va and Vb so that at least one of the opening and closing valves Va and Vb is always opened. In addition, when both the open / close valves Va and Vb are closed at the same time or when only one hot water mat is provided, a period during which the secondary hot water is not circulated occurs in the open / close cycle. In that case, the combustion amount of the burner 10 is temporarily controlled based on the temperature of the primary hot water detected by the temperature sensor 5H until the circulation of the secondary hot water is restarted, and at least one of the on-off valves Va and Vb is opened. Then, when the circulation of the secondary hot water is restarted, the combustion amount of the burner 10 may be controlled again based on the temperature of the secondary hot water detected by the temperature sensor 5L.

【0019】この装置を新設、増設又は修理したときは
試運転をしなければならないが、温水マットFa,Fb
の暖房作用の立上がりは遅いため、通常運転モードで運
転しては試運転に長時間を要す。
When this equipment is newly installed, added or repaired, it is necessary to carry out a trial run, but hot water mats Fa, Fb
Since the heating action of is slow to start up, it takes a long time to perform a trial operation in the normal operation mode.

【0020】この不都合を改善するために、本発明にお
いては、暖房装置の制御装置6に試運転モードを組込
み、温風暖房機に暖房作用をさせながら、床暖房器に早
期に暖房作用を生じさせて、暖房装置全体の試運転を能
率的に行なえるようにした。
In order to remedy this inconvenience, in the present invention, a trial operation mode is incorporated in the control device 6 of the heating device to cause the warming air heater to perform the heating action and to cause the floor heater to perform the heating action at an early stage. By doing so, the trial operation of the entire heating system can be performed efficiently.

【0021】その手段は、一次温水の温度を通常運転の
温度とし、二次温水を温水マットFa,Fbに流す時期
を通常運転モードより早めることであり、この場合の試
運転モードでは、前記のとおり二次温水の開閉弁Va,
Vbの開弁用のヒータに加える電流値を増大して開弁の
ON・OFF制御をして供給熱量を増大させる。
The means is to set the temperature of the primary hot water to the temperature of the normal operation and to advance the timing of flowing the secondary hot water to the hot water mats Fa and Fb earlier than the normal operation mode. In this case, the trial operation mode is as described above. Secondary hot water on-off valve Va,
The current value applied to the heater for opening the Vb valve is increased to control ON / OFF of the valve opening to increase the amount of heat supplied.

【0022】図は、温水マットFa,Fbに供給する
二次温水の通路に設けた開閉弁Va ,VbをON・OF
Fして温水マットFa,Fbを温度制御し、試運転時に
前記開閉弁を強制開放して昇温を早めるようにした場
のフローを示し、制御装置を試運転モードにして、ステ
ップS1で試運転モードが検知されれば、ステップS2
で前記開閉弁が強制開放され、温水マットが早期昇温す
る。
In FIG. 3 , the on / off valves Va and Vb provided in the passage of the secondary hot water supplied to the hot water mats Fa and Fb are turned on / of.
And hot water mat Fa, and Fb and temperature control F, shows the flow of cases which is adapted to force open the on-off valve during commissioning hasten heating, and a control device to commissioning mode, stearyl
If the trial operation mode is detected in step S1 , step S2
Then, the on-off valve is forcibly opened, and the temperature of the hot water mat rises early.

【0023】[0023]

【発明の効果】以上の説明から明らかなように、請求項
及びの手段によれば、一次温水に加える熱量が一定
であってよいから、給湯器の熱量が小さくても床暖房の
暖房作用の立上がりを早めて試運転の作業能率を高める
ことができる。
As is apparent from the above description , the claims
According to the means of 1 and 2, the amount of heat applied to the primary hot water may be constant, so that even if the amount of heat of the water heater is small, it is possible to accelerate the rise of the heating action of the floor heating and improve the work efficiency of the trial operation.

【図面の簡単な説明】[Brief description of drawings]

【図1】 給湯器と周辺機器との接続状態を示す図FIG. 1 is a diagram showing a connection state between a water heater and peripheral devices.

【図2】 給湯器内の配管状態を示す図FIG. 2 is a diagram showing a pipe state in the water heater.

【図3】 温水マットに早期に温水を供給する試運転モ
ードのフローチャート
[Fig. 3] Flow chart of trial operation mode for supplying hot water to the hot water mat early

【符号の説明】[Explanation of symbols]

1 ガス給湯器 2 ポンプ 3 シスターン 4 (液−液式の)熱交換器 5H (一次温水側の)温度センサ 5L (二次温水側の)温度センサ 6 制御装置 A エアコン B 浴槽 D 室温センサ Fa,Fb 温水マット(床暖房器) S セパレータ Va,Vb 開閉弁 1 gas water heater 2 pumps 3 cistern 4 (Liquid-Liquid) Heat Exchanger 5H (primary hot water side) temperature sensor 5L (secondary hot water side) temperature sensor 6 control device A air conditioner B bathtub D Room temperature sensor Fa, Fb hot water mat (floor heater) S separator Va, Vb open / close valve

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F24D 3/00 F24D 3/10 Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) F24D 3/00 F24D 3/10

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 温水装置で加熱した高温の温水を一次温
水として温風暖房機に往路及び復路を介して循環させ、
前記復路の温水中に往路の一次温水をバイパスさせてや
や低温の二次温水を調整し、該二次温水を床暖房器に循
環させるものであって、暖房作用の立ち上がり時間が温
風暖房機より床暖房器が長い温水式暖房装置で温風暖房
機と床暖房器を同時運転し、且つ通常運転の始動時に温
風暖房機の始動から一定時間経過した後に二次温水通路
の開閉弁を開くものにおいて、試運転時に、二次温水の
通路を開閉する弁の開弁時期を通常運転の開弁時期より
強制的に早めて床暖房器の温度上昇を早め、その暖房作
用の立ち上がりを早期に検知可能にすることを特徴とす
る温水式暖房装置の試運転方法。
1. A high-temperature hot water heated by a hot water device is circulated as a primary hot water to a warm air heater through an outward path and a return path,
By bypassing the primary hot water of the outward route in the hot water of the return route to adjust the secondary hot water of a slightly lower temperature and circulating the secondary hot water to the floor heater, the rising time of the heating action is a warm air heater. The floor heater is a longer hot water heater, and the hot air heater and the floor heater are operated at the same time, and the opening / closing valve of the secondary hot water passage is opened after a certain time has elapsed from the start of the warm air heater at the start of normal operation. In the open type, during the trial operation, the opening timing of the valve that opens and closes the passage of the secondary hot water is forced to be earlier than the opening timing of the normal operation to speed up the temperature rise of the floor heater and accelerate the rise of its heating action. A method for commissioning a hot water heating system characterized by enabling detection.
【請求項2】 温水装置で加熱した高温の温水を一次温
水として温風暖房機に往路及び復路を介して循環させ、
前記復路の温水中に往路の一次温水をバイパスさせてや
や低温の二次温水を調整し、該二次温水を床暖房器に循
環させるものであって、暖房作用の立ち上がり時間が温
風暖房機より床暖房器が長い温水式暖房装置で温風暖房
機と床暖房器を同時運転し、且つ通常運転の始動時に温
風暖房機の始動から一定時間経過した後に二次温水通路
の開閉弁を開くものにおいて、二次温水の通路を開閉す
る弁に、通常運転時の開弁時期より早期に開閉する、試
運転用の強制開弁手段を設けたことを特徴とする温水式
暖房装置の試運転装置。
2. High-temperature hot water heated by a hot water device is circulated as a primary hot water to a warm air heater through a forward path and a return path,
By bypassing the primary hot water of the outward route in the hot water of the return route to adjust the secondary hot water of a slightly lower temperature and circulating the secondary hot water to the floor heater, the rising time of the heating action is a warm air heater. The floor heater is a longer hot water heater , and the hot air heater and the floor heater are operated at the same time, and the opening / closing valve of the secondary hot water passage is opened after a certain time has elapsed from the start of the warm air heater at the start of normal operation. In the open type, the valve for opening and closing the passage of the secondary hot water is provided with a forced valve opening means for trial operation that opens and closes earlier than the valve opening time during normal operation. .
JP04521897A 1997-02-28 1997-02-28 Test run method and test run device for hot water heating system Expired - Fee Related JP3483722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04521897A JP3483722B2 (en) 1997-02-28 1997-02-28 Test run method and test run device for hot water heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04521897A JP3483722B2 (en) 1997-02-28 1997-02-28 Test run method and test run device for hot water heating system

Publications (2)

Publication Number Publication Date
JPH10238791A JPH10238791A (en) 1998-09-08
JP3483722B2 true JP3483722B2 (en) 2004-01-06

Family

ID=12713139

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04521897A Expired - Fee Related JP3483722B2 (en) 1997-02-28 1997-02-28 Test run method and test run device for hot water heating system

Country Status (1)

Country Link
JP (1) JP3483722B2 (en)

Also Published As

Publication number Publication date
JPH10238791A (en) 1998-09-08

Similar Documents

Publication Publication Date Title
US4136731A (en) Heat transfer apparatus
JP6153328B2 (en) Cogeneration system and heating equipment
JP6429851B2 (en) Cogeneration system and heating equipment
JP3483722B2 (en) Test run method and test run device for hot water heating system
JP4363612B2 (en) Path temperature measuring method and exhaust heat recovery device
JPH08152193A (en) Hot water supplying device
KR100230127B1 (en) Method and apparatus for preventing freezing of a warm-water heater
JP3385873B2 (en) Operation control method of two-temperature hot water circulation device
KR0174226B1 (en) Control device for hot water temperature of hot water circulation type heating machine
JP3163435B2 (en) Hot water circulation type heater
JP6429850B2 (en) Cogeneration system
JP4093521B2 (en) Hot water storage heating system
JP4710436B2 (en) Hot water supply control method for hot water circulation heater
JP3850653B2 (en) Heat pump type water heater
JP2002333192A (en) Heating system
KR0174227B1 (en) Hot water circulation type heating device
JP3676062B2 (en) Hot water heater
JPH09273761A (en) Heat-feeding system
JP3266510B2 (en) Antifreezing method and antifreezing device for gas hot water heater
JP7475297B2 (en) Fluid circulation heating system
JPH02217746A (en) Instantaneous hot water heater
JP4340969B2 (en) Floor heating system
JP2001004157A (en) Floor heating control method and floor heating apparatus
JP2004085112A (en) Space heating apparatus
JP2932421B2 (en) Freezing prevention device in hot water circulation type heating system

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071017

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081017

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081017

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091017

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101017

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101017

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111017

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121017

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121017

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131017

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees