JP3461109B2 - Excavation method - Google Patents

Excavation method

Info

Publication number
JP3461109B2
JP3461109B2 JP20272197A JP20272197A JP3461109B2 JP 3461109 B2 JP3461109 B2 JP 3461109B2 JP 20272197 A JP20272197 A JP 20272197A JP 20272197 A JP20272197 A JP 20272197A JP 3461109 B2 JP3461109 B2 JP 3461109B2
Authority
JP
Japan
Prior art keywords
excavation
hole
machine
attached
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP20272197A
Other languages
Japanese (ja)
Other versions
JPH1144173A (en
Inventor
崎 亘 外
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittoc Constructions Co Ltd
Original Assignee
Nittoc Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nittoc Constructions Co Ltd filed Critical Nittoc Constructions Co Ltd
Priority to JP20272197A priority Critical patent/JP3461109B2/en
Publication of JPH1144173A publication Critical patent/JPH1144173A/en
Application granted granted Critical
Publication of JP3461109B2 publication Critical patent/JP3461109B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、バックホー、クレ
ーン等の作業機械を用いて地盤に垂直穴を掘削する掘削
工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an excavation method for excavating a vertical hole in the ground by using a working machine such as a backhoe or a crane.

【0002】[0002]

【従来の技術】例えば、直径が2.5〜4.5メートル
程度の垂直穴を掘削する場合、図8に示すように、作業
者Sによる手堀や小型のバックホーでバケット10を用
いて垂直穴を掘削し、ある程度掘進したらライナプレー
ト7を挿入して土留めし、さらに掘進したらライナプレ
ート7を挿入して穴を掘削する技術は知られている。
2. Description of the Related Art For example, in the case of excavating a vertical hole having a diameter of about 2.5 to 4.5 meters, as shown in FIG. BACKGROUND ART A technique is known in which a hole is excavated, the liner plate 7 is inserted and earthed when the hole is dug to some extent, and the liner plate 7 is inserted when the hole is further dug to excavate the hole.

【0003】また、図9において、ライナプレートに換
えて穴19の内壁にコンクリート18を吹き付け、長さ
4〜6メートル程度の鉄筋で構成されているロックボル
ト21を地山Gに半径方向外方に多数挿入して土留めす
るNATM工法(NewAusutrian Tunn
el Method)もまた知られている。
Further, in FIG. 9, concrete 18 is sprayed on the inner wall of the hole 19 instead of the liner plate, and a lock bolt 21 made of a reinforcing bar having a length of about 4 to 6 meters is radially outwardly applied to the natural ground G. NATM construction method (New Autun Tun
el Method) is also known.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記の
技術においては掘削、ライナプレートの挿入、或はコン
クリートの吹き付け、ロックボルト(鉄筋)の挿入等工
程が変わるたびに、作業機械を準備することが必要であ
り、面倒で厄介な作業であり、かつ時間を要する仕事で
あった。
However, in the above technique, it is necessary to prepare the working machine every time the processes such as excavation, insertion of the liner plate, spraying of concrete, insertion of the lock bolt (rebar) are changed. It was a necessary, tedious and cumbersome task and a time consuming task.

【0005】したがって、本発明は、工程が変わるたび
に作業機械を取り替えることなく、継続して容易に作業
が出来る効率の良い掘削工法を提供することを目的とし
ている。
SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide an efficient excavation method capable of continuously and easily working without replacing the working machine every time the process changes.

【0006】[0006]

【課題を解決するための手段】本発明によれば、 作業
機械を用いて地盤に垂直穴を掘削する掘削工法におい
て、作業機械に垂直に支持したケリーバー(2)又はブ
ーム(31)の先端にアースドリル(6)を取付けて、
そのアースドリル(6)で孔口を初期切削してその孔口
にライナープレートを挿入固定し、ケリーバー(2)又
はブーム(31)の先端のアースドリル(6)を掘削バ
ケット(10)に取り換えて掘削を進め、一定深さ掘削
したならば掘削バケットをコンクリート吹き付け機(1
2)に取り換えてコンクリートを掘削した孔の内壁に吹
き付け、吹き付け作業が終了した後、ケリーバー(2)
又はブーム(31)に穿孔機(20)を取り付けて吹き
付けられたコンクリートを穿孔し、棒状の補強材を打ち
込んで孔を補強し、その補強作業が終了後、穿孔機(2
0)を取り外して掘削バケット(10)を取り付けて所
定の深さを掘削するようになっている。
According to the present invention, in the excavation method for excavating a vertical hole in the ground using a work machine, the tip of the kerry bar (2) or boom (31) vertically supported by the work machine is provided. Attach the ground drill (6),
Initially cut the hole opening with the earth drill (6), insert and fix the liner plate into the hole opening, and replace the earth drill (6) at the tip of the kerry bar (2) or boom (31) with the excavation bucket (10). When the excavation is advanced to a certain depth, the excavation bucket is moved to the concrete spraying machine (1
Replaced with 2) and sprayed concrete on the inner wall of the excavated hole, and after the spraying work was completed, kelly bar (2)
Alternatively, the perforator (20) is attached to the boom (31) to perforate the sprayed concrete, and a rod-shaped reinforcing material is driven to reinforce the hole. After the reinforcing work is completed, the perforator (2
0) is removed and an excavation bucket (10) is attached to excavate a predetermined depth.

【0007】また本発明によれば、掘削バケットを取り
付ける取り付け部材に複数の半径方向外方に延びるガイ
ド部材を設けて掘削方向をガイドして掘削し、また棒状
の補強材を挿入する孔の掘削と補強材挿入とが同時に行
われるのが好ましい。
Further, according to the present invention, a plurality of guide members extending outward in the radial direction are provided on the attachment member for attaching the excavation bucket, the excavation direction is guided and the excavation is performed, and the hole for inserting the rod-shaped reinforcing material is excavated. It is preferable that and the reinforcement material are inserted at the same time.

【0008】[0008]

【発明の実施の形態】以下、図面を参照して、本発明の
実施の形態を説明する。図において、従来技術と同じ機
能を有する部材には同じ符号を付して、重複説明は省略
している。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. In the drawings, members having the same functions as those in the conventional technique are designated by the same reference numerals, and duplicate description is omitted.

【0009】図1は本発明にかかる掘削工法の工程全体
のフローチャート図を示しており、掘削に際し図2を参
照して、先ず全体を符号1で示す自走式クレーンを準備
し、そのクレーン1には、公知技術であるケリーバー2
が懸吊され、クレーン1に設けられたアーム4にはガイ
ド3が取り付けられてケリーバー2が垂直に支持されて
おり、そのケリーバー2の先端にはアースドリル6が設
けられている。ここで、符号5は詳細は図示しないワイ
ヤやホース等の巻き取り装置、5aはドラムをそれぞれ
示している。
FIG. 1 shows a flow chart of the whole process of the excavation method according to the present invention. At the time of excavation, referring to FIG. 2, first, a self-propelled crane generally designated by reference numeral 1 is prepared, and the crane 1 is provided. The known technology is Kelly bar 2
Is suspended, a guide 3 is attached to an arm 4 provided on the crane 1 to vertically support the kelly bar 2, and an earth drill 6 is provided at the tip of the kerry bar 2. Here, reference numeral 5 is a winding device such as a wire or hose which is not shown in detail, and 5a is a drum, respectively.

【0010】そして、アースドリル6で孔口を初期切削
し、その孔口にライナープレート7を挿入して孔口固定
コンクリート8で固定して孔口が位置決めされる(工程
S1、S2、S3)。なお、安全のためにその周囲には
防護柵9が設けられている。以上で孔口が完成したの
で、ついで図3を参照して、ケリーバー2をクレーン1
で吊り上げ先端のアースドリル6を掘削バケット10に
取り換え掘削を進め(工程S4)、一定深さ掘削したら
バケット10をケリーバー2から図示しない連結手段を
解除して脱却し(工程S5)、コンクリートを吹き付け
る公知の技術である吹き付け機12を取り付け、掘削し
た孔の内壁にコンクリートを吹き付ける(工程S6、S
7)。
Then, the hole mouth is initially cut by the earth drill 6, the liner plate 7 is inserted into the hole mouth, and the hole mouth is fixed by the concrete for fixing the hole mouth 8 to position the hole mouth (steps S1, S2, S3). . For safety, a protective fence 9 is provided around it. Now that the hole has been completed, refer to FIG. 3 and install the kelly bar 2 on the crane 1
The earth drill 6 at the end of lifting is replaced with the excavation bucket 10 by advancing the excavation (step S4). After excavating to a certain depth, the bucket 10 is released from the kelly bar 2 by releasing the connecting means (not shown) (step S5), and concrete is sprayed. A spraying machine 12, which is a known technique, is attached to spray concrete on the inner wall of the excavated hole (steps S6 and S).
7).

【0011】吹き付け機12は、図4を参照して、スイ
ーベルジョイント13でケリーバー2に連結されてお
り、3重管14を介して設けられている先端のターンテ
ーブル15に取り付けられた伸縮自在のノズル16によ
り、図示しない駆動手段によりターンテーブル15を回
転させながらコンクリートを内壁に吹き付けるよう構成
されている。ここで、吹き付け機の取り付け手段は上記
に限定されるものでなく、公知の別の手段によってもよ
く、駆動手段は任意の装置を用いればよい。
Referring to FIG. 4, the spraying machine 12 is connected to the kelly bar 2 by a swivel joint 13 and is attached to a turntable 15 at the end provided through a triple tube 14 so that the spraying machine 12 can expand and contract. The nozzle 16 is configured to spray concrete onto the inner wall while rotating the turntable 15 by a driving means (not shown). Here, the attachment means of the spraying machine is not limited to the above, other known means may be used, and the drive means may be any device.

【0012】吹き付けが終了したら、吹き付け機12を
スイーベルジョイント13で脱却し、穿孔機20を取り
付けて棒状の補強材である鉄筋で形成されたロックボル
ト21を穿孔と同時に吹き付けられたコンクリートを貫
通して打ち込んで掘削した孔を補強する(工程S8、S
9、S10)。
When the spraying is completed, the spraying machine 12 is removed by the swivel joint 13, the drilling machine 20 is attached, and the rock bolt 21 formed of the reinforcing bar, which is a rod-like reinforcing material, is penetrated through the concrete sprayed simultaneously with the drilling. To reinforce the drilled hole (Steps S8, S
9, S10).

【0013】穿孔機20は、図5を参照して、スイーベ
ルジョイント13でケリーバー2に連結されており、ク
レーンでケリーバー2を昇降させ、図示しない駆動手段
で穿孔機を回動させて上下方向に一定のピッチで放射状
にロックボルト21を孔19の内壁から周囲に穿孔と同
時に打ち込んでいる。
Referring to FIG. 5, the punching machine 20 is connected to the kelly bar 2 by a swivel joint 13, and the kerry bar 2 is moved up and down by a crane, and the punching machine is rotated by a driving means (not shown) to move the punching machine up and down. The lock bolts 21 are radially driven at a constant pitch from the inner wall of the hole 19 to the periphery thereof at the same time as the drilling.

【0014】なお、ロックボルト21は穿孔と同時に打
ち込むと説明したが、穿孔してからロックボルト21を
打ち込むよう2段階の工程としてもよく、使用する穿孔
機により異なる工程となる。
Although it has been described that the lock bolt 21 is driven at the same time as the drilling, the lock bolt 21 may be driven after the drilling in two steps, which is different depending on the drilling machine used.

【0015】ロックボルト21による補強が終わった
ら、穿孔機20を脱却し、掘削バケット10をケリーバ
ー2に取り付け(工程S11、S12)、さらに掘削を
開始するという工程を繰り返して所定の深さを掘削し、
完了すれば検尺する(工程S13)。
After the reinforcement with the lock bolts 21 is completed, the boring machine 20 is removed, the excavation bucket 10 is attached to the kelly bar 2 (steps S11 and S12), and the excavation is started again to repeat excavation to a predetermined depth. Then
When completed, the scale is measured (step S13).

【0016】本発明によれば、以上説明した通り先端に
取り付けられる各工程ごとの装置を取り換えるだけで、
孔の掘削が可能であり、工程間の待時間もないので効率
のよい掘削作業が可能である。
According to the present invention, as described above, by simply replacing the device attached to the tip for each step,
Holes can be excavated, and there is no waiting time between processes, so efficient excavation work is possible.

【0017】また、図7は本発明の別の実施の形態を示
すケリーバー2の先端に緩衝部材36を有するガイド部
材35を取り付け、各工程で掘削方向が曲がらないよう
にしたものである。
FIG. 7 shows another embodiment of the present invention in which a guide member 35 having a cushioning member 36 is attached to the tip of the kelly bar 2 so that the excavation direction does not bend in each step.

【0018】以上の掘削作業はクレーンを用いて行われ
ているが、作業機械はクレーンに限定されるものでな
く、図6に示すように、バックホー30等のブーム31
の先端に先ず掘削バケット10aを取り付け、クレーン
と同様の工程で吹き付け機、穿孔機と順次先端部の機械
を取り換えることで同様に孔を掘削することが出来る。
さらに、掘削機、吹き付け機、穿孔機等は取り付け可能
な機械であれば、従来公知の何れの機械であってもよ
く、同様の作用効果を得ることができる。
Although the above excavation work is performed using a crane, the working machine is not limited to a crane, and as shown in FIG. 6, a boom 31 such as a backhoe 30 is used.
It is possible to similarly excavate a hole by first attaching the excavation bucket 10a to the tip of the machine and replacing the spraying machine and the boring machine with the machine at the tip order in the same process as the crane.
Further, as long as the excavator, the spraying machine, the punching machine, and the like can be attached, any conventionally known machine may be used, and the same effect can be obtained.

【0019】[0019]

【発明の効果】本発明は上記のように構成されており、
公知の作業機械を用いて垂直孔を効率よく掘削でき、補
強施工までを一環作業として行なうことが可能であり、
専用機械が不要であると共に施工期間が短くなり、した
がって、費用も安くすることが出来る。
The present invention is configured as described above,
Vertical holes can be efficiently drilled using a known work machine, and it is possible to perform reinforcement work as a part of work,
A dedicated machine is not required and the construction period is shortened, so the cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施の形態を示す作業工程の全体フ
ローチャート図。
FIG. 1 is an overall flowchart of a work process showing an embodiment of the present invention.

【図2】自走式クレーンを用いた場合の図1の初期掘削
工程を示す図。
FIG. 2 is a diagram showing an initial excavation process of FIG. 1 when a self-propelled crane is used.

【図3】自走式クレーンを用いた場合の図1の掘削工程
を示す図。
FIG. 3 is a diagram showing the excavation process of FIG. 1 when a self-propelled crane is used.

【図4】自走式クレーンを用いた場合の図1のコンクリ
ート吹き付け工程を示す図。
FIG. 4 is a diagram showing the concrete spraying process of FIG. 1 when a self-propelled crane is used.

【図5】自走式クレーンを用いた場合の図1のロックボ
ルトによる補強工程を示す図。
FIG. 5 is a diagram showing a reinforcing process using the lock bolt of FIG. 1 when a self-propelled crane is used.

【図6】本発明にかかる掘削工法を別の作業機械である
バックホーを用いた場合を示す図。
FIG. 6 is a view showing a case where a backhoe which is another working machine is used in the excavation method according to the present invention.

【図7】本発明の別の実施の形態を示すガイド部材を示
す図。
FIG. 7 is a diagram showing a guide member according to another embodiment of the present invention.

【図8】従来の技術の例を示す図。FIG. 8 is a diagram showing an example of a conventional technique.

【図9】従来の技術の別の例を示す図。FIG. 9 is a diagram showing another example of the conventional technique.

【符号の説明】[Explanation of symbols]

1・・・自走式クレーン 2・・・ケリーバー 3・・・ガイド 4・・・アーム 5・・・巻き取り装置 6・・・アースドリル 7・・・ライナープレート 8・・・孔口固定コンクリート 10、10a・・・掘削バケット 12・・・吹き付け機 13・・・スイーベルジョイント 30・・・バックホー 31・・・ブーム S・・・作業者 G・・・地山 1 ... Self-propelled crane 2 ... Kelly Bar 3 ... Guide 4 ... arm 5 ... Winding device 6 ... Earth drill 7: Liner plate 8: Hole fixed concrete 10, 10a ... Excavation bucket 12 ... Spraying machine 13 ... Swivel joint 30 ... Backhoe 31 ... Boom S: Worker G ... Ground

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E21D 1/03 - 1/08 E21B 7/00 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) E21D 1/03-1/08 E21B 7/00

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 作業機械を用いて地盤に垂直穴を掘削す
る掘削工法において、作業機械に垂直に支持したケリー
バー(2)又はブーム(31)の先端にアースドリル
(6)を取付けて、そのアースドリル(6)で孔口を初
期切削してその孔口にライナープレートを挿入固定し、
ケリーバー(2)又はブーム(31)の先端のアースド
リル(6)を掘削バケット(10)に取り換えて掘削を
進め、一定深さ掘削したならば掘削バケットをコンクリ
ート吹き付け機(12)に取り換えてコンクリートを掘
削した孔の内壁に吹き付け、吹き付け作業が終了した
後、ケリーバー(2)又はブーム(31)に穿孔機(2
0)を取り付けて吹き付けられたコンクリートを穿孔
し、棒状の補強材を打ち込んで孔を補強し、その補強作
業が終了後、穿孔機(20)を取り外して掘削バケット
(10)を取り付けて所定の深さを掘削することを特徴
とする掘削工法。
1. In an excavation method for excavating a vertical hole in the ground using a work machine, an earth drill (6) is attached to the tip of a kerry bar (2) or a boom (31) vertically supported by the work machine, Initially cut the hole with an earth drill (6), insert and fix the liner plate into the hole,
The earth drill (6) at the tip of the kelly bar (2) or boom (31) is replaced with the excavation bucket (10) to proceed with excavation, and when excavating to a certain depth, the excavation bucket is replaced with the concrete spraying machine (12) for concrete. Is blown onto the inner wall of the excavated hole, and after the blowing work is completed, the punching machine (2) is attached to the kelly bar (2) or boom (31).
0) is attached to perforate the sprayed concrete, the rod-shaped reinforcing material is driven in to reinforce the hole, and after the reinforcement work is completed, the perforator (20) is removed, the excavation bucket (10) is attached, and the predetermined An excavation method characterized by excavating a depth.
【請求項2】 掘削バケットを取り付ける取り付け部材
に複数の半径方向外方に延びるガイド部材を設けて掘削
方向をガイドする請求項1に記載の掘削工法。
2. The excavation method according to claim 1, wherein the attachment member for attaching the excavation bucket is provided with a plurality of guide members extending outward in the radial direction to guide the excavation direction.
JP20272197A 1997-07-29 1997-07-29 Excavation method Expired - Fee Related JP3461109B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20272197A JP3461109B2 (en) 1997-07-29 1997-07-29 Excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20272197A JP3461109B2 (en) 1997-07-29 1997-07-29 Excavation method

Publications (2)

Publication Number Publication Date
JPH1144173A JPH1144173A (en) 1999-02-16
JP3461109B2 true JP3461109B2 (en) 2003-10-27

Family

ID=16462071

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20272197A Expired - Fee Related JP3461109B2 (en) 1997-07-29 1997-07-29 Excavation method

Country Status (1)

Country Link
JP (1) JP3461109B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7053402B2 (en) * 2018-08-07 2022-04-12 鹿島建設株式会社 Rectangular shaft and its construction method
JP7074609B2 (en) * 2018-08-07 2022-05-24 鹿島建設株式会社 Shafts for underground structures and their construction methods

Also Published As

Publication number Publication date
JPH1144173A (en) 1999-02-16

Similar Documents

Publication Publication Date Title
JP3211673B2 (en) Simple temporary bridge temporary pier construction method
KR20190023619A (en) Tunnel Reinforcement structure and Tunnel Reinforcement methods using the same
JP3461109B2 (en) Excavation method
JP2009263966A (en) Removal method of existing pile
JP4478348B2 (en) Steel pipe pile driving method and apparatus
JP3361776B2 (en) Crushing equipment for underground piles
JPH07145616A (en) Cast-in-place concrete piling method
JP3451275B2 (en) Deep foundation excavator
JP4113305B2 (en) Ground obstruction removal method
JP2561971B2 (en) Construction method of earth retaining wall for underground structure
JP3450639B2 (en) Rock bolt driving method and rock bolt driving machine
JP3681817B2 (en) Support structure and support method for existing underground structures
JP2981164B2 (en) Drilling rig
JPH0534475B2 (en)
JP2875338B2 (en) Excavation method by screw auger and its equipment
JP2002138474A (en) Method and device for cutting and pulling out existing pile
JP2023077243A (en) Installation method for core material
JP3001783B2 (en) Drilling equipment and drilling method using the same
JPH06221077A (en) Method and device for preventing deflection of rotary excavating device
JPH07158389A (en) Working face independence method in collapse bedrock tunnel
JP2000145354A (en) Deep foundation excavation method in bedrock
JP2540639Y2 (en) Utility pole installation tool
JP2553986B2 (en) Deep foundation foundation construction machine
JPS59145821A (en) Method and apparatus for construction of pillar-row pile
JPH07166785A (en) Boring method