JP3403535B2 - Control equipment for construction machinery - Google Patents

Control equipment for construction machinery

Info

Publication number
JP3403535B2
JP3403535B2 JP03554795A JP3554795A JP3403535B2 JP 3403535 B2 JP3403535 B2 JP 3403535B2 JP 03554795 A JP03554795 A JP 03554795A JP 3554795 A JP3554795 A JP 3554795A JP 3403535 B2 JP3403535 B2 JP 3403535B2
Authority
JP
Japan
Prior art keywords
bleed
control valve
pilot
actuator
flow rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP03554795A
Other languages
Japanese (ja)
Other versions
JPH08232299A (en
Inventor
和則 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP03554795A priority Critical patent/JP3403535B2/en
Publication of JPH08232299A publication Critical patent/JPH08232299A/en
Application granted granted Critical
Publication of JP3403535B2 publication Critical patent/JP3403535B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、油圧ショベル等の建設
機械の制御装置に係り、特に、ブリードオフ絞りを内蔵
する流量制御弁の切換え操作に伴って、アクチュエータ
の最大駆動圧を制御することができる建設機械の制御装
置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a control device for construction machines such as hydraulic excavators, and more particularly to controlling the maximum drive pressure of an actuator in accordance with a switching operation of a flow rate control valve having a bleed-off throttle. The present invention relates to a control device for a construction machine capable of performing.

【0002】[0002]

【従来の技術】図5は従来の建設機械の制御装置を示す
回路図である。この従来技術は、例えば油圧ショベルに
備えられる制御装置であって、同図5に示すように、原
動機1と、この原動機1によって駆動する主ポンプすな
わち可変容量型油圧ポンプ3、及びパイロットポンプ1
16と、油圧ポンプ3の吐出流量を制御するポンプレギ
ュレータ2と、油圧ポンプ3の吐出管路101に接続し
たアンロード弁11、及びメインリリーフ弁10とを備
えている。
2. Description of the Related Art FIG. 5 is a circuit diagram showing a conventional controller for a construction machine. This prior art is, for example, a control device provided in a hydraulic excavator, and as shown in FIG. 5, a prime mover 1, a main pump driven by the prime mover 1, that is, a variable displacement hydraulic pump 3, and a pilot pump 1.
16, a pump regulator 2 for controlling the discharge flow rate of the hydraulic pump 3, an unload valve 11 connected to the discharge pipe line 101 of the hydraulic pump 3, and a main relief valve 10.

【0003】また、油圧ポンプ3に対して並列に、すな
わち吐出管路101に並列に、ブームシリンダ81、ア
ームシリンダ82、旋回モータ83等のアクチュエータ
を配置してある。油圧ショベルでは、通常、他のアクチ
ュエータとして、バケットシリンダ、左右走行モータな
どを有するが、これらのアクチュエータは説明を簡単に
するために図示を省略してある。
Further, actuators such as a boom cylinder 81, an arm cylinder 82, and a swing motor 83 are arranged in parallel with the hydraulic pump 3, that is, in parallel with the discharge pipe line 101. A hydraulic excavator usually has a bucket cylinder, a left and right traveling motor, and the like as other actuators, but these actuators are omitted in the drawing for simplification of description.

【0004】油圧ポンプ3と、ブームシリンダ81、ア
ームシリンダ82、旋回モータ83のそれぞれを連絡す
る主管路81A,81B等には、ブームシリンダ81、
アームシリンダ82、旋回モータ83のそれぞれに供給
される圧油の流れを制御する流量制御弁41,42,4
3を配置してある。流量制御弁41は、例えばパイロッ
ト操作式の流量制御弁であり、両端にばね41I,41
Hを備えるとともに、メータイン絞り41A、メータア
ウト絞り41C、及び、これらのメータイン絞り41
A、メータアウト絞り41Cのそれぞれの下流を接続す
るブリードオフ管路81Cに設けたブリードオフ絞り4
1Bを内蔵している。同様に、流量制御弁42,43
も、パイロット操作式の流量制御弁であり、両端にそれ
ぞればね42I,42H、ばね43I,43Hを備える
とともに、メータイン絞り42A,43A、メータアウ
ト絞り42C,43C、及び、ブリードオフ絞り42
B,43Bを内蔵している。なお、流量制御弁41,4
2,43のそれぞれの戻り側通路とタンクとは、タンク
連通管路100で接続されている。したがって上述した
ブリードオフ管路81C等も、実質的にタンク連通管路
100に接続された状態にある。
The boom cylinder 81, the main cylinders 81A, 81B connecting the hydraulic pump 3, the boom cylinder 81, the arm cylinder 82, and the swing motor 83, respectively, are connected to the boom cylinder 81,
Flow control valves 41, 42, 4 for controlling the flow of pressure oil supplied to the arm cylinder 82 and the swing motor 83, respectively.
3 are arranged. The flow rate control valve 41 is, for example, a pilot-operated type flow rate control valve, and has springs 41I and 41 at both ends.
In addition to H, the meter-in diaphragm 41A, the meter-out diaphragm 41C, and the meter-in diaphragm 41
A, bleed-off throttle 4 provided in a bleed-off pipe 81C connecting the respective downstreams of the meter-out throttle 41C
Built-in 1B. Similarly, the flow control valves 42 and 43
Is a pilot-operated flow control valve having springs 42I and 42H and springs 43I and 43H at both ends, and meter-in throttles 42A and 43A, meter-out throttles 42C and 43C, and a bleed-off throttle 42.
B and 43B are built in. The flow control valves 41, 4
Each of the return passages 2 and 43 and the tank are connected by a tank communication pipe 100. Therefore, the bleed-off conduit 81C and the like described above are also substantially connected to the tank communication conduit 100.

【0005】上述した流量制御弁41,42,43のそ
れぞれは、パイロット操作弁91,92,93から出力
されるパイロット圧91A,92A,93Aにより切換
え操作される。これらのパイロット操作弁91,92,
93には、パイロットリリーフ弁119によって規定さ
れる前述したパイロットポンプ116からの圧油が、パ
イロット管路117を介して供給される。
Each of the flow rate control valves 41, 42, 43 described above is switched and operated by pilot pressures 91A, 92A, 93A output from pilot operation valves 91, 92, 93. These pilot operated valves 91, 92,
The pressure oil from the above-described pilot pump 116, which is defined by the pilot relief valve 119, is supplied to 93 via the pilot pipe line 117.

【0006】また、上述した流量制御弁41,42,4
3のそれぞれには、ブームシリンダ81、アームシリン
ダ82、旋回モータ83のそれぞれの負荷圧を検出する
負荷圧検出管路61,62,63を接続してある。これ
らの負荷圧検出管路61,62,63で検出される負荷
圧のうちの最大負荷圧Lmaxが、最大負荷圧検出管路
7を介してポンプレギュレータ2の一方のパイロット室
に与えられる。このポンプレギュレータ2の他方のパイ
ロット室には、ポンプ吐出圧検出管路5を介して検出さ
れるポンプ吐出圧Pdが与えられる。すなわち、ポンプ
レギュレータ2は、ポンプ吐出圧Pdと最大負荷圧Lm
axとの差圧であるロードセンシング差圧によって制御
され、このロードセンシング差圧が一定(目標差圧ΔP
LS)となるように油圧ポンプ3の吐出量を決定する。
Further, the above-mentioned flow rate control valves 41, 42, 4
Load pressure detection pipe lines 61, 62, 63 for detecting the load pressures of the boom cylinder 81, the arm cylinder 82, and the swing motor 83 are connected to each of the three. The maximum load pressure Lmax of the load pressures detected by these load pressure detection pipe lines 61, 62, 63 is given to one pilot chamber of the pump regulator 2 via the maximum load pressure detection pipe line 7. The pump discharge pressure Pd detected via the pump discharge pressure detection conduit 5 is applied to the other pilot chamber of the pump regulator 2. That is, the pump regulator 2 has the pump discharge pressure Pd and the maximum load pressure Lm.
It is controlled by a load sensing differential pressure which is a differential pressure with respect to ax, and this load sensing differential pressure is constant (target differential pressure ΔP
The discharge amount of the hydraulic pump 3 is determined so as to be LS ).

【0007】この従来技術は、ブームシリンダ81、ア
ームシリンダ82、旋回モータ83のそれぞれに供給さ
れる流量は、基本的には互いに他のアクチュエータの負
荷圧の変動の影響を受けず、自己の流量制御弁41,4
2,43の開口面積に基づいて決められる。これによ
り、ブームシリンダ81、アームシリンダ82等の複合
操作が可能なロードセンシングシステムが形成される。
In this conventional technique, the flow rates supplied to the boom cylinder 81, the arm cylinder 82, and the swing motor 83 are basically not influenced by the fluctuations in the load pressures of the other actuators, and the flow rates of their own are eliminated. Control valves 41, 4
It is determined based on the opening areas of 2,43. As a result, a load sensing system capable of performing a combined operation of the boom cylinder 81, the arm cylinder 82 and the like is formed.

【0008】また、各流量制御弁41,42,43に
は、ブリードオフ絞り41B,42B,43Bを内蔵さ
せてあることから、パイロット操作弁91,92,93
の操作量に応じて、各アクチュエータの最大駆動圧を制
御することができる。
Further, since the bleed-off throttles 41B, 42B and 43B are built in the flow control valves 41, 42 and 43, the pilot operated valves 91, 92 and 93 are provided.
The maximum drive pressure of each actuator can be controlled according to the operation amount of.

【0009】例えば、ブームシリンダ81において説明
すれば、 ・流量制御弁41のメータイン絞り41Aの開口面積を
A1, ・流量制御弁41のブリードオフ絞り41Bの開口面積
をB1, ・ロードセンシング目標差圧を前述のようにΔPLS, ・粘性、重力を含む圧油の流量係数をC, ・油圧ポンプ3から流量制御弁41のメータイン絞り4
1Aに供給されるメータインの流量をQA1, ・流量制御弁41のブリードオフ絞り41B,ブリード
オフ管路81Cを介してタンクに流れるブリードオフ流
量をQB1, ・ブームシリンダ81の負荷圧をPL1, ・ブームシリンダ81に供給される流量をQI1とする
と、 QA1=C・A1√(ΔPLS) QB1=C・B1√(ΔPL1) QI1=QA1−QB1=C・A1√(ΔPLS)−C・B1√
(ΔPL1) の式が成り立つ。
For example, in the boom cylinder 81, the opening area of the meter-in throttle 41A of the flow control valve 41 is A1, the opening area of the bleed-off throttle 41B of the flow control valve 41 is B1, the load sensing target differential pressure. As described above, ΔP LS , the flow rate coefficient of pressure oil including viscosity and gravity is C, and the meter-in throttle 4 of the flow rate control valve 41 from the hydraulic pump 3.
The flow rate of meter-in supplied to 1A is Q A1 , the bleed-off flow rate flowing into the tank through the bleed-off throttle 41B of the flow control valve 41 and the bleed-off conduit 81C is Q B1 , and the load pressure of the boom cylinder 81 is P. L1 , ・ Assuming that the flow rate supplied to the boom cylinder 81 is Q I1 , Q A1 = C · A1√ (ΔP LS ) Q B1 = C ・ B1√ (ΔP L1 ) Q I1 = Q A1 −Q B1 = C ・A1√ (ΔP LS ) -C ・ B1√
The expression of (ΔP L1 ) is established.

【0010】流量制御弁41の操作量とメータイン絞り
41Aの開口面積A1との関係は、図6に示すように操
作量の増加に伴って開口面積が増大し、フル操作位置で
最大となる関係となっており、流量制御弁41の操作量
とブリードオフ絞り41Bの開口面積B1との関係は、
図7に示すように、操作量の増加に伴って開口面積が減
少し、フル操作位置で開口面積がゼロ、すなわちブリー
ドオフ流量がゼロとなる関係となっている。
As shown in FIG. 6, the relationship between the operation amount of the flow control valve 41 and the opening area A1 of the meter-in throttle 41A is such that the opening area increases as the operation amount increases, and becomes the maximum at the full operation position. The relationship between the operation amount of the flow control valve 41 and the opening area B1 of the bleed-off throttle 41B is as follows.
As shown in FIG. 7, the opening area decreases as the operation amount increases, and the opening area is zero at the full operation position, that is, the bleed-off flow rate is zero.

【0011】ブームシリンダ81の駆動圧は、上述の式
で示すメータイン流量QA1とブリードオフ流量QB1とを
バランスさせるように流量制御弁41を操作することに
より、図8に示すように、操作量の増加に伴って増大
し、フル操作位置で最大駆動圧となり、オペレータが制
御することができる。
The drive pressure of the boom cylinder 81 is manipulated as shown in FIG. 8 by operating the flow control valve 41 so as to balance the meter-in flow rate Q A1 and the bleed-off flow rate Q B1 shown in the above equation. It increases with an increase in the amount and reaches the maximum drive pressure at the full operating position, which can be controlled by the operator.

【0012】以上の式、及び図6,7,8に示す関係
は、アームシリンダ82等の他のアクチュエータであっ
ても同様に成り立つ。
The above equations and the relationships shown in FIGS. 6, 7 and 8 hold for other actuators such as the arm cylinder 82.

【0013】上述のように、図5に示す従来技術では、
ブリードオフ絞り41B,42B,43Bを流量制御弁
41,42,43のそれぞれに内蔵させたことにより、
ブームシリンダ81、アームシリンダ82、旋回モータ
83等の駆動圧も、パイロット弁91,92,93等の
操作により制御でき、慣性の大きな旋回体をゆっくりと
旋回させる微操作(ハーフ操作)や、慣性の大きなブー
ムの振動を生じさせない微操作(ハーフ操作)を実現さ
せることができ、これに伴って旋回体を介しておこなわ
れるつり荷作業の作業精度の向上、ブームの回動を介し
ておこなわれる掘削作業の作業精度の向上など、良好な
作業性を得ることができる。
As described above, in the conventional technique shown in FIG.
By incorporating the bleed-off throttles 41B, 42B, 43B in the flow control valves 41, 42, 43, respectively,
The drive pressures of the boom cylinder 81, the arm cylinder 82, the turning motor 83, etc. can also be controlled by operating the pilot valves 91, 92, 93, etc., and a fine operation (half operation) for slowly turning a swinging body having a large inertia and an inertia It is possible to realize a fine operation (half operation) that does not cause a large boom vibration, and along with this, improve the work accuracy of the hanging work performed through the revolving structure and perform the boom rotation. Good workability can be obtained such as improvement in work accuracy of excavation work.

【0014】なお、この種の建設機械の制御装置に相当
する公知技術としては、特開昭61−88002号公
報、特開平1−274866号公報、特開平3−524
02号公報に記載のものがある。
Known techniques corresponding to this type of construction machine control device are Japanese Patent Laid-Open Nos. 61-88002, 1-274866, and 3-524.
There is one described in Japanese Patent Publication No. 02.

【0015】[0015]

【発明が解決しようとする課題】ところで、上述した図
5に示す従来技術では、油圧ポンプ3の吐出可能流量と
ブームシリンダ81、アームシリンダ82、旋回モータ
等のアクチュエータの複合操作時の要求流量との関係、
及び微操作(ハーフ操作)とフル操作の複合操作に伴う
問題がある。
In the prior art shown in FIG. 5 described above, the dischargeable flow rate of the hydraulic pump 3 and the required flow rate during the combined operation of the actuators such as the boom cylinder 81, the arm cylinder 82, and the swing motor are shown. connection of,
Also, there is a problem associated with a combined operation of fine operation (half operation) and full operation.

【0016】2つのアクチュエータ、例えばブームシリ
ンダ81、アームシリンダ82の複合操作にあって、共
に微操作(ハーフ操作)である場合には、これらのブー
ムシリンダ81、アームシリンダ82の要求流量が少な
く、したがつてアクチュエータ要求流量よりも油圧ポン
プ3の吐出可能流量の方が大きいのが普通であり、良好
な微操作(ハーフ操作)性を確保し得る。
In the combined operation of the two actuators, for example, the boom cylinder 81 and the arm cylinder 82, when both are fine operations (half operation), the required flow rate of these boom cylinder 81 and arm cylinder 82 is small, Therefore, the dischargeable flow rate of the hydraulic pump 3 is usually larger than the actuator required flow rate, and good fine operability (half operability) can be secured.

【0017】しかしながら、アクチュエータの中でフル
操作させるものと微操作(ハーフ操作)させるものとが
混在するような複合操作が実施されるとき、例えば掘削
作業に際して、負荷圧が高くなるアームシリンダ82を
フル操作し、負荷圧が比較的低くなるブームシリンダ8
1を微操作(ハーフ操作)する複合操作が実施されるよ
うなときには、アクチュエータ要求流量の方が油圧ポン
プ3の吐出可能流量よりも大きくなることが起り得る。
このような場合、ブームシリンダ81の微操作に伴って
ブリードオフ流量分だけ、油圧ポンプ3から吐出される
流量を既に無駄に捨てている状況にもかかわらず、相対
的に油圧ポンプ吐出可能流量が不足することになること
から、特に高負荷圧側となるアームシリンダ81への供
給流量が減少し、このアームシリンダ81の作動速度が
低下し、これにより作業能率の低下を招いてしまう。
However, when a complex operation in which some of the actuators are to be fully operated and some of which are to be finely operated (half operation) is performed, for example, during excavation work, the arm cylinder 82 that has a high load pressure is used. Boom cylinder 8 with full operation and relatively low load pressure
When a complex operation of performing fine operation (half operation) of 1 is performed, the actuator required flow rate may become larger than the dischargeable flow rate of the hydraulic pump 3.
In such a case, the dischargeable flow rate of the hydraulic pump is relatively high in spite of the situation where the flow rate discharged from the hydraulic pump 3 has already been wasted by the bleed-off flow rate due to the fine operation of the boom cylinder 81. Since it will be insufficient, the supply flow rate to the arm cylinder 81, which is on the high load pressure side in particular, decreases, and the operating speed of this arm cylinder 81 decreases, which leads to a decrease in work efficiency.

【0018】このようなことは、例えばブームを上げる
ようにブームシリンダ81をフル操作するとともに、ア
ームをわずかに動かすためにアームシリンダ82を微操
作する複合操作を実施する場合にも生じ、このとき高負
荷圧側を形成するブームシリンダ81への流量が減少
し、ブームの上がり量の低下による作業能率の低下を招
いてしまう。
Such a phenomenon occurs when the boom cylinder 81 is fully operated so as to raise the boom and the combined operation of finely operating the arm cylinder 82 to slightly move the arm is performed. The flow rate to the boom cylinder 81 forming the high load pressure side decreases, and the work efficiency decreases due to the decrease in the boom lift amount.

【0019】このように、図5に示す従来技術では、フ
ル操作されるアクチュエータと微操作(ハーフ操作)さ
れるアクチュエータとの複合操作に際して、駆動圧制御
のためにはやむおえないが、微操作に伴うブリードオフ
流量分だけタンクに捨てており、その一方、特に、高負
荷側となるフル操作されるアクチュエータへの供給流量
の不足を生じ、このため作業能率が低下する問題があっ
た。
As described above, in the prior art shown in FIG. 5, it is unavoidable for the drive pressure control in the combined operation of the fully operated actuator and the finely operated (half operated) actuator, but the fine operation is unavoidable. The amount of bleed-off flow was discarded in the tank due to the above, and on the other hand, there was a problem in that the supply flow rate to the fully operated actuator, which is on the high load side, became insufficient, resulting in a decrease in work efficiency.

【0020】本発明は、上記した従来技術における実情
に鑑みてなされたもので、その目的は、フル操作される
アクチュエータと微操作(ハーフ操作)されるアクチュ
エータとの複合操作に際して、微操作に伴うブリードオ
フ流量を少なくすることができる建設機械の制御装置を
提供することにある。
The present invention has been made in view of the above-mentioned actual situation in the prior art, and an object thereof is to perform a fine operation in a combined operation of an actuator to be fully operated and an actuator to be finely operated (half operation). It is an object of the present invention to provide a control device for a construction machine capable of reducing the bleed-off flow rate.

【0021】[0021]

【課題を解決するための手段】この目的を達成するため
に、本発明の請求項1に係る発明は、原動機と、この原
動機によって駆動する主油圧ポンプと、この主油圧ポン
プから吐出される圧油により駆動する複数のアクチュエ
ータと、これらのアクチュエータのそれぞれに対応して
設けられ、上記主油圧ポンプから上記アクチュエータに
供給される圧油の流れを制御するとともに、内部にブリ
ードオフ絞りを有する流量制御弁とを備え、これらの流
量制御弁の切換え操作に伴って上記アクチュエータの最
大駆動圧の制御が可能な建設機械の制御装置において、
上記ブリードオフ絞りとタンクとを接続する管路に、上
記アクチュエータの操作量の増加に相応して開口面積を
小さく変化させるブリードオフ制御弁を設けた構成にし
てある。
To achieve this object, the invention according to claim 1 of the present invention provides a prime mover, a main hydraulic pump driven by the prime mover, and a pressure discharged from the main hydraulic pump. A plurality of actuators driven by oil, and a flow rate control that is provided corresponding to each of these actuators, controls the flow of pressure oil supplied from the main hydraulic pump to the actuators, and has an internal bleed-off throttle In a control device for a construction machine, which is provided with a valve, and is capable of controlling the maximum drive pressure of the actuator according to a switching operation of these flow control valves,
A bleed-off control valve for changing the opening area to a small value in accordance with an increase in the operation amount of the actuator is provided in a pipe line connecting the bleed-off throttle and the tank.

【0022】[0022]

【作用】本発明の請求項1に係る発明は、上記の構成に
してあることから、フル操作されるアクチュエータと、
微操作(ハーフ操作)されるアクチュエータとの複合操
作がおこなわれるときは、操作量が最大となるフル操作
されるアクチュエータに係る流量制御弁のブリードオフ
絞りは、開口面積がゼロとなり、そのブリードオフ絞り
からタンクに流れるブリードオフ流量はなくなる。この
点については、従来技術と同じである。
In the invention according to claim 1 of the present invention, since it has the above-mentioned configuration, an actuator that is fully operated,
When a combined operation with a finely operated (half-operated) actuator is performed, the bleed-off throttle of the flow control valve for the fully-operated actuator that maximizes the operation amount has an opening area of zero and the bleed-off There is no bleed-off flow from the throttle to the tank. This point is the same as the conventional technique.

【0023】そしてこのとき、フル操作されるアクチュ
エータの操作量が最大となることに伴って、ブリードオ
フ制御弁の開口面積が小さく変化する。これにより、微
操作されるアクチュエータに係る流量制御弁に内蔵され
るブリードオフ絞りは、所定の開口面積に保持され、微
操作に係るアクチュエータの駆動圧の制御を実施できる
とともに、その微操作に係るアクチュエータのブリード
オフ絞りからタンクに流れるブリードオフ流量は、開口
面積の小さく変化したブリードオフ制御弁により規制さ
れる。
At this time, the opening area of the bleed-off control valve changes to a small value as the operation amount of the fully operated actuator becomes maximum. As a result, the bleed-off throttle built in the flow rate control valve for the finely operated actuator is held in a predetermined opening area, and the drive pressure of the actuator for the fine operation can be controlled, and The bleed-off flow rate flowing from the bleed-off throttle of the actuator to the tank is regulated by the bleed-off control valve having a small opening area.

【0024】したがって、フル操作されるアクチュエー
タと、微操作(ハーフ操作)されるアクチュエータとの
複合操作に際し、アクチュエータ要求流量が油圧ポンプ
の吐出可能流量よりも大きくなる場合には、ブリードオ
フ制御弁の駆動によりそれぞれの流量制御弁からタンク
に流れるブリードオフ流量は少なくなり、その少なくし
得た流量に相応してアクチュエータ、特に高負荷側とな
るフル操作されるアクチュエータへの供給流量を、従来
技術よりも増加させることができる。
Therefore, in the combined operation of the fully operated actuator and the finely operated (half operated) actuator, when the required flow rate of the actuator becomes larger than the dischargeable flow rate of the hydraulic pump, the bleed-off control valve The bleed-off flow rate flowing from each flow rate control valve to the tank is reduced by driving, and the supply flow rate to the actuator, especially the fully operated actuator on the high load side, is reduced from that of the conventional technology according to the reduced flow rate. Can also be increased.

【0025】なお、微操作(ハーフ操作)されるアクチ
ュエータどうしの複合操作がおこなわれるときは、それ
ぞれの流量制御弁に内臓されるブリードオフ絞りは所定
の開口面積に保持され、それぞれのアクチュエータの操
作量が小さいことに伴って、ブリードオフ制御弁の開口
面積も開き気味の所定の開口面積に保持される。
When a composite operation is performed between actuators that are finely operated (half operation), the bleed-off throttles incorporated in the respective flow rate control valves are held in a predetermined opening area, and the operation of each actuator is performed. Due to the small amount, the opening area of the bleed-off control valve is also maintained at a slightly opened predetermined opening area.

【0026】したがって、それぞれのアクチュエータに
係る流量制御弁のブリードオフ絞りからブリードオフ制
御弁を経てタンクに、従来技術と同様に所定のブリード
オフ流量が流れ、これらのアクチュエータの駆動圧の制
御を実施できる。
Therefore, as in the prior art, a predetermined bleed-off flow rate flows from the bleed-off throttle of the flow control valve for each actuator to the tank through the bleed-off control valve, and the drive pressure of these actuators is controlled. it can.

【0027】[0027]

【実施例】以下、本発明の建設機械の制御装置の実施例
を図に基づいて説明する。図1は本発明の請求項1,
2,4,5に対応する第1の実施例を示す回路図、図2
は図1に示す第1の実施例に備えられるブリードオフ制
御弁の特性を示す図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of a control device for a construction machine according to the present invention will be described below with reference to the drawings. FIG. 1 shows claim 1 of the present invention.
2 and 4 are circuit diagrams showing a first embodiment corresponding to FIGS.
FIG. 3 is a diagram showing characteristics of a bleed-off control valve provided in the first embodiment shown in FIG. 1.

【0028】図1は前述した図5に対応させて描いたも
ので、例えば油圧ショベルに備えられる制御装置を示し
ている。また、この図1にあって前述した図5に示した
ものと同等のものは、同じ符号で示してある。
FIG. 1 is drawn corresponding to FIG. 5 described above, and shows a control device provided in, for example, a hydraulic excavator. Also, in FIG. 1, the same components as those shown in FIG. 5 described above are designated by the same reference numerals.

【0029】すなわち、この図1に示す第1の実施例に
あっても、原動機1と、この原動機1によって駆動する
主ポンプすなわち可変容量型油圧ポンプ3、及びパイロ
ットポンプ116と、ポンプレギュレータ2と、油圧ポ
ンプ3の吐出管路101に接続したアンロード弁11、
及びメインリリーフ弁10とを備え、油圧ポンプ3に対
して並列に、ブームシリンダ81、アームシリンダ8
2、旋回モータ83等のアクチュエータを配置してあ
る。他のアクチュエータを形成するバケットシリンダ、
左右走行モータなどは、説明を簡単にするために図示を
省略してある。
That is, also in the first embodiment shown in FIG. 1, a prime mover 1, a main pump driven by the prime mover 1, ie, a variable displacement hydraulic pump 3, a pilot pump 116, and a pump regulator 2. , An unloading valve 11 connected to the discharge line 101 of the hydraulic pump 3,
And a main relief valve 10, and the boom cylinder 81 and the arm cylinder 8 are provided in parallel with the hydraulic pump 3.
2. An actuator such as a turning motor 83 is arranged. Bucket cylinder forming another actuator,
The left and right traveling motors and the like are omitted from the drawing for the sake of simplicity.

【0030】また、油圧ポンプ3と、ブームシリンダ8
1、アームシリンダ82、旋回モータ83のそれぞれを
連絡する主管路81A,81B等には、ブームシリンダ
81、アームシリンダ82、旋回モータ83のそれぞれ
に供給される圧油の流れを制御する流量制御弁41,4
2,43を配置してある。流量制御弁41,42,43
は、例えばパイロット操作式の流量制御弁であり、それ
ぞれ両端にばね41I,41H、ばね42I,42H、
ばね43I,43Hを備えるとともに、メータイン絞り
41A,42A,43A、メータアウト絞り41C、4
2C,43C、及び、ブリードオフ管路81C,82,
83Cに設けたブリードオフ絞り41B,42B,43
Bを内蔵している。
Further, the hydraulic pump 3 and the boom cylinder 8
A flow control valve for controlling the flow of pressure oil supplied to each of the boom cylinder 81, the arm cylinder 82, and the swing motor 83 in the main pipe lines 81A and 81B that connect the arm cylinder 82, the swing motor 83, and the like. 41,4
2 and 43 are arranged. Flow control valves 41, 42, 43
Is, for example, a pilot-operated flow control valve, and has springs 41I, 41H, springs 42I, 42H at both ends, respectively.
The springs 43I and 43H are provided, and the meter-in diaphragms 41A, 42A, 43A, and the meter-out diaphragms 41C, 4C are provided.
2C, 43C and bleed-off conduits 81C, 82,
Bleed-off diaphragms 41B, 42B, 43 provided at 83C
Built-in B.

【0031】上述した流量制御弁41,42,43のそ
れぞれは、パイロット操作弁91,92,93から出力
されるパイロット圧91A,92A,93Aにより切換
え操作され、パイロット操作弁91,92,93には、
パイロットリリーフ弁119によって規定されるパイロ
ットポンプ116からの圧油が、パイロット管路117
を介して供給される。
The flow rate control valves 41, 42, 43 described above are switched by pilot pressures 91A, 92A, 93A output from the pilot operation valves 91, 92, 93, respectively. Is
The pressure oil from the pilot pump 116 defined by the pilot relief valve 119 is supplied to the pilot line 117.
Is supplied via.

【0032】また、流量制御弁41,42,43のそれ
ぞれには、ブームシリンダ81、アームシリンダ82、
旋回モータ83のそれぞれの負荷圧を検出する負荷圧検
出管路61,62,63を接続してある。負荷圧検出管
路61,62,63で検出される負荷圧のうちの最大負
荷圧Lmaxが、最大負荷圧検出管路7を介してポンプ
レギュレータ2の一方のパイロット室に与えられ、この
ポンプレギュレータ2の他方のパイロット室には、ポン
プ吐出圧検出管路5を介して検出されるポンプ吐出圧P
dが与えられ、ポンプレギュレータ2は、ポンプ吐出圧
Pdと最大負荷圧Lmaxとの差圧であるロードセンシ
ング差圧によって制御され、このロードセンシング差圧
が一定(目標差圧ΔPLS)となるように油圧ポンプ3の
吐出量を決定する構成となっている。以上の構成につい
ては、前述した図5に示すものと同等である。
Further, each of the flow rate control valves 41, 42, 43 has a boom cylinder 81, an arm cylinder 82,
Load pressure detection pipe lines 61, 62, 63 for detecting the respective load pressures of the swing motor 83 are connected. The maximum load pressure Lmax among the load pressures detected by the load pressure detection pipe lines 61, 62, 63 is given to one pilot chamber of the pump regulator 2 via the maximum load pressure detection pipe line 7, and this pump regulator In the other pilot chamber of No. 2, the pump discharge pressure P detected via the pump discharge pressure detection pipe line 5 is detected.
d is given, and the pump regulator 2 is controlled by the load sensing differential pressure which is the differential pressure between the pump discharge pressure Pd and the maximum load pressure Lmax, so that this load sensing differential pressure becomes constant (target differential pressure ΔP LS ). In addition, the discharge amount of the hydraulic pump 3 is determined. The above configuration is equivalent to that shown in FIG. 5 described above.

【0033】この第1の実施例では特に、流量制御弁4
1,42,43のそれぞれに内蔵されるブリードオフ管
路81C,82,83Cを、チェック弁45,46,4
7を介してブリードオフ接続管路111に接続してあ
る。チェック弁45,46,47のそれぞれは、ブリー
ドオフ管路81C,82,83Cからブリードオフ接続
管路111への圧油の流れが許容され、ブリードオフ接
続管路111からブリードオフ管路81C,82,83
Cへの圧油の逆流が阻止される配置にしてある。また、
ブリードオフ接続管路111の下流とタンクとを接続す
る管路部分には、開口面積を所定の最大開口からゼロま
で変化し得るブリードオフ制御弁112を設けてある。
このブリードオフ制御弁112は、中立状態では、ばね
の力により最大開口となる位置を保持する。
Particularly in this first embodiment, the flow control valve 4
The bleed-off pipes 81C, 82, 83C built in 1, 42, 43 are respectively provided with check valves 45, 46, 4
7 to the bleed-off connection line 111. Each of the check valves 45, 46, 47 allows the flow of the pressure oil from the bleed-off connecting lines 81C, 82, 83C to the bleed-off connecting line 111, and allows the bleed-off connecting line 111 to bleed-off connecting line 81C, 82,83
The arrangement is such that backflow of pressure oil to C is prevented. Also,
A bleed-off control valve 112 that can change the opening area from a predetermined maximum opening to zero is provided in the pipeline connecting the downstream side of the bleed-off connection pipeline 111 and the tank.
In the neutral state, the bleed-off control valve 112 holds the position where it is maximized by the force of the spring.

【0034】そして、パイロット操作弁91,92,9
3から出力されるパイロット圧91A,92A,93A
のうちの最大パイロット圧を検出するシャトル弁120
と、このシャトル弁120で取り出された最大パイロッ
ト圧を前述のブリードオフ制御弁112のパイロット室
に導く最大パイロット圧検出管路115とを設けてあ
る。
The pilot operated valves 91, 92, 9
3 pilot pressure 91A, 92A, 93A
Valve 120 for detecting the maximum pilot pressure of the
And a maximum pilot pressure detection conduit 115 for guiding the maximum pilot pressure taken out by the shuttle valve 120 to the pilot chamber of the bleed-off control valve 112 described above.

【0035】前述のブリードオフ制御弁112は、図2
に示すように、パイロット操作弁91,92,93の全
てが中立に保持される場合などのように、最大パイロッ
ト圧検出管路115によって導かれるパイロット圧が小
さい一定値のときは、ばねの力により最大開口面積に保
持され、パイロット操作弁91,92,93のそれぞれ
が微操作(ハーフ操作)されるような場合は、それらの
操作量に応じて徐々に小さな開口面積に変化し、パイロ
ット操作弁91,92,93のうちの少なくとも1つが
フル操作される場合は、開口面積がゼロとなる閉状態に
保持されるように、例えばあらかじめ設定してある。
The bleed-off control valve 112 described above is shown in FIG.
When the pilot pressure guided by the maximum pilot pressure detection conduit 115 has a small constant value, as in the case where all of the pilot operated valves 91, 92, 93 are kept neutral, as shown in FIG. When the pilot operation valves 91, 92, and 93 are slightly operated (half operation), the opening area is gradually changed to a small opening area according to the operation amount of the pilot operation valves 91, 92, and 93, and the pilot operation valve is operated. For example, when at least one of the valves 91, 92, 93 is fully operated, it is preset so as to be held in a closed state where the opening area is zero.

【0036】このように構成した第1の実施例では、微
操作(ハーフ操作)どうしのアクチュエータの複合操
作、例えば微操作のブームシリンダ81と微操作のアー
ムシリンダ82との複合操作の場合には、パイロット操
作弁91,92から出力されるパイロット圧91A,9
2Aは共に比較的小さく、したがって、その比較的小さ
なパイロット圧が最大パイロット圧検出管路115によ
って導かれ、ブリードオフ制御弁のパイロット室に与え
られる。これにより、図2に示すように、ブリードオフ
制御弁112は半開状態に保持される。
In the first embodiment constructed as described above, in the case of a combined operation of actuators for fine operation (half operation), for example, a combined operation of a boom cylinder 81 for fine operation and an arm cylinder 82 for fine operation, , Pilot pressure 91A, 9 output from the pilot operated valves 91, 92
Both 2A are relatively small, and therefore their relatively small pilot pressure is guided by the maximum pilot pressure detection line 115 and is provided to the pilot chamber of the bleed-off control valve. As a result, as shown in FIG. 2, the bleed-off control valve 112 is held in the half open state.

【0037】その一方、前述したパイロット操作弁9
1,92から出力されるパイロット圧91A,92Aに
応じて流量制御弁41,42が切換え操作され、図6,
7に示すように、それぞれのメータイン絞り41A,4
2A、及びブリードオフ絞り41B,42Bも半開状態
に保持される。
On the other hand, the pilot operated valve 9 described above
The flow rate control valves 41, 42 are switched according to the pilot pressures 91A, 92A output from the motors 1, 92, as shown in FIG.
As shown in FIG. 7, each meter-in diaphragm 41A, 4A
2A and the bleed-off diaphragms 41B and 42B are also held in the half-opened state.

【0038】油圧ポンプ3から吐出される圧油は、吐出
管路101、流量制御弁41,42のメータイン絞り4
1A,42A、主管路81A等を経てブームシリンダ8
1、アームシリンダ82のそれぞれに供給され、戻り油
は主管路81B等、流量制御弁41,42のメータアウ
ト絞り41C,42Cを介してタンクに戻される。ま
た、流量制御弁41,42のメータイン絞り41A,4
2Aの下流の圧油の一部は、この流量制御弁41,42
に内蔵されるブリードオフ絞り41B,42B、チエッ
ク弁45,46、ブリードオフ接続管路111、ブリー
ドオフ制御弁112を介して、ブリードオフ流量として
タンクに戻される。
The pressure oil discharged from the hydraulic pump 3 is supplied to the discharge pipe 101 and the meter-in throttle 4 of the flow control valves 41 and 42.
Boom cylinder 8 through 1A, 42A, main pipe 81A, etc.
1. The return oil supplied to each of the arm cylinders 82 is returned to the tank through the meter-out throttles 41C and 42C of the flow rate control valves 41 and 42 such as the main pipe 81B. Further, the meter-in throttles 41A, 4 of the flow control valves 41, 42
A part of the pressure oil on the downstream side of 2A is part of the flow control valves 41, 42.
A bleed-off flow rate is returned to the tank via the bleed-off throttles 41B and 42B, the check valves 45 and 46, the bleed-off connection conduit 111, and the bleed-off control valve 112 which are built into the tank.

【0039】このような微操作どうしのアクチュエータ
の複合操作では、アクチュエータ要求流量は比較的小さ
く、したがって油圧ポンプ3の吐出可能流量の方がアク
チュエータ要求流量よりも大きいのが普通であり、ブリ
ードオフ流量を生じるもののブームシリンダ81,アー
ムシリンダ82には、流量制御弁41,42のメータイ
ン絞り41A,42Aの開口面積に相応した比較的少な
い流量が供給され、これによりブームシリンダ81,ア
ームシリンダ82を微小速度で作動させることができ、
また、ブリードオフ流量を生じさせるにより、前述した
図8で示す比較的小さな駆動圧に、これらのブームシリ
ンダ81,アームシリンダ82を制御することができ
る。
In such a combined operation of the actuators between the fine operations, the required flow rate of the actuator is relatively small, and therefore, the dischargeable flow rate of the hydraulic pump 3 is usually larger than the required flow rate of the actuator, and the bleed-off flow rate is large. However, the boom cylinder 81 and the arm cylinder 82 are supplied with a relatively small flow rate corresponding to the opening areas of the meter-in throttles 41A and 42A of the flow rate control valves 41 and 42. Can be operated at speed,
Further, by generating the bleed-off flow rate, the boom cylinder 81 and the arm cylinder 82 can be controlled to the relatively small drive pressure shown in FIG. 8 described above.

【0040】また例えば、フル操作のアクチュエータと
微操作(ハーフ操作)のアクチュエータの複合操作が実
施されるとき、例えば掘削作業に際して、負荷圧が高く
なるアームシリンダ82をフル操作し、負荷圧が比較的
低くなるブームシリンダ81を微操作するような複合操
作が実施されるときには、油圧ポンプ3の吐出可能流量
よりもアクチュエータ要求流量の方が大きくなることが
ある。この第1の実施例では、このようなフル操作と微
操作の複合操作時には以下のように動作する。
Further, for example, when a combined operation of a fully operated actuator and a finely operated (half operated) actuator is carried out, for example, during excavation work, the arm cylinder 82, which has a high load pressure, is fully operated and the load pressures are compared. When a complex operation such as a fine operation of the boom cylinder 81, which is extremely low, is performed, the actuator required flow rate may be larger than the dischargeable flow rate of the hydraulic pump 3. In the first embodiment, the following operation is performed during such a combined operation of full operation and fine operation.

【0041】すなわち、パイロット操作弁91を微操
作、パイロット操作弁92をフル操作することにより、
比較的小さなパイロット圧91Aが流量制御弁41に与
えられて、この流量制御弁41がハーフストローク切換
え操作され、メータイン絞り41A及びブリードオフ絞
り41Bがそれぞれ半開状態の開口面積に保持され、ま
た、大きなパイロット圧92Aが流量制御弁42に与え
られて、この流量制御弁42がフルストローク切換え操
作され、メータイン絞り42Aが最大開口面積に保持さ
れ、ブリードオフ絞り42Bが開口面積ゼロに保持され
る。
That is, by finely operating the pilot operating valve 91 and fully operating the pilot operating valve 92,
A relatively small pilot pressure 91A is applied to the flow rate control valve 41, the flow rate control valve 41 is half-stroke switched, and the meter-in throttle 41A and the bleed-off throttle 41B are each held in a half-opened opening area. The pilot pressure 92A is applied to the flow rate control valve 42, the flow rate control valve 42 is subjected to full stroke switching operation, the meter-in throttle 42A is held at the maximum opening area, and the bleed-off throttle 42B is held at zero opening area.

【0042】その一方、パイロット操作弁91のパイロ
ット圧91Aと、パイロット操作弁92のパイロット圧
92Aのうちの大きい方のパイロット圧、すなわち、パ
イロット圧92Aがシャトル弁120を介して取り出さ
れ、最大パイロット圧検出管路115を介してブリード
オフ制御弁112のパイロット室に与えられる。このと
き、ブリードオフ制御弁112は図2に示す関係から、
フル操作に伴って出力される大きなパイロット圧92A
に対応して開口面積がゼロとなるように切換えられる。
On the other hand, the larger pilot pressure of the pilot pressure 91A of the pilot operation valve 91 and the pilot pressure 92A of the pilot operation valve 92, that is, the pilot pressure 92A is taken out via the shuttle valve 120, and the maximum pilot pressure is obtained. It is given to the pilot chamber of the bleed-off control valve 112 via the pressure detection pipe line 115. At this time, the bleed-off control valve 112 has the relationship shown in FIG.
Large pilot pressure 92A output with full operation
The opening area is switched to zero corresponding to

【0043】したがって、流量制御弁41の制御によ
り、ブームシリンダ81の微操作を実施できるととも
に、この流量制御弁41のブリードオフ絞り41Bが開
いているにもかかわらず、ブリードオフ制御弁112が
閉じていることにより、ブリードオフ絞り41Bからタ
ンクへのブリードオフ流量は生じることがなく、そのブ
リードオフ流量に相当する流量が、特に、高負荷圧側を
形成するフル操作されるアームシリンダ82への増量分
として供給される。これにより、アームシリンダ82の
作動速度の低下を抑制することができる。
Therefore, the boom cylinder 81 can be finely controlled by controlling the flow control valve 41, and the bleed-off control valve 112 is closed even though the bleed-off throttle 41B of the flow control valve 41 is open. As a result, the bleed-off flow rate from the bleed-off throttle 41B to the tank does not occur, and the flow rate corresponding to the bleed-off flow rate is increased especially to the fully operated arm cylinder 82 forming the high load pressure side. Supplied as a minute. As a result, it is possible to suppress a decrease in the operating speed of the arm cylinder 82.

【0044】このように、第1の実施例にあっては、従
来技術と同様に微操作時のアクチュエータの駆動圧の制
御機能を有するとともに、フル操作と微操作(ハーフ操
作)が混在するアクチュエータの複合操作にあって、油
圧ポンプ3の吐出可能流量よりもアクチュエータ要求流
量の方が大きくなるときに、アクチュエータのフル操作
に伴ってブリードオフ制御弁112が開口面積をゼロに
変化させるように切換えられ、ブリードオフ流量をなく
し、そのブリードオフ流量に相当する流量を高負荷側の
アクチュエータに増量させることができ、このフル操作
と微操作が混在するアクチュエータの複合操作時の作業
能率の向上を実現させることができる。
As described above, in the first embodiment, the actuator having the control function of the driving pressure of the actuator at the time of the fine operation as in the prior art and having the full operation and the fine operation (half operation) coexist. In the combined operation of the above, when the actuator required flow rate becomes larger than the dischargeable flow rate of the hydraulic pump 3, the bleed-off control valve 112 is switched so as to change the opening area to zero in accordance with the full operation of the actuator. Therefore, the bleed-off flow rate can be eliminated and the flow rate corresponding to the bleed-off flow rate can be increased to the actuator on the high load side, improving work efficiency during combined operation of actuators that include both full operation and fine operation. Can be made.

【0045】なお、上記第1の実施例では、ブームシリ
ンダ81の微操作とアームシリンダ82のフル操作の複
合操作時に、開口面積がゼロとなるブリードオフ制御弁
112を設けたが、図3に示すように、アクチュエータ
の操作量の増加に応じて開口面積が徐々に小さくなるも
のの、アクチュエータのフル操作時でも、小さな開口面
積は確保されるようなブリードオフ制御弁113を設け
る構成にしてもよい。このようなブリードオフ制御弁1
13を設けた場合でも、微操作とフル操作の混在するア
クチュエータの複合操作時には、タンクへのブリードオ
フ流量を少なくすることができ、少なくし得た流量に相
当する流量を高負荷側のアクチュエータへの増量に活用
させることができ、前述した第1の実施例と同様に、フ
ル操作と微操作が混在するアクチュエータの複合操作時
の作業能率を向上させることができる。
In the first embodiment described above, the bleed-off control valve 112 having an opening area of zero is provided in the combined operation of the fine operation of the boom cylinder 81 and the full operation of the arm cylinder 82. As shown, although the opening area gradually decreases as the operation amount of the actuator increases, the bleed-off control valve 113 may be provided so that the small opening area is secured even when the actuator is fully operated. . Such a bleed-off control valve 1
Even when the number 13 is provided, it is possible to reduce the bleed-off flow rate to the tank during the combined operation of the actuator in which the fine operation and the full operation are mixed, and the flow rate corresponding to the reduced flow rate can be applied to the actuator on the high load side. Can be utilized for increasing the amount of the actuator, and the work efficiency at the time of compound operation of the actuator in which full operation and fine operation are mixed can be improved as in the first embodiment described above.

【0046】図4は本発明の請求項1〜5に対応する第
2の実施例を示す回路図である。この第2の実施例で
は、主油圧ポンプとして2つの可変容量型油圧ポンプ3
A,3Bを設けてあり、油圧ポンプ3Aの吐出管路10
1Aにブームシリンダ81、アームシリンダ82等のア
クチュエータを並列に接続し、油圧ポンプ3Bの吐出管
路101Bに旋回モータ83、走行モータ84等のアク
チュエータを並列に接続してある。走行モータ84を制
御する流量制御弁44も、他の流量制御弁41,42,
43等と同様のパイロット操作式の流量制御弁であり、
それぞれ両端にばね44I,44Hを備えるとともに、
メータイン絞り44A、メータアウト絞り44C、及び
ブリードオフ管路84C、ブリードオフ絞り44Bを内
蔵している。 流量制御弁41,42,43,44のそ
れぞれには、負荷圧検出管路61,62,63,64を
接続してあり、これらの負荷圧のうちの最大負荷圧Lm
axが最大負荷圧検出管路7を介して、油圧ポンプ3A
の吐出量を制御するポンプレギュレータ2Aの一方のパ
イロット室と、油圧ポンプ3Bの吐出量を制御するポン
プレギュレータ2Bの一方のパイロット室に与えられ
る。ポンプレギュレータ2A,2Bのそれぞれの他方の
パイロット室には、ポンプ吐出圧検出管路5A,5Bを
介してポンプ吐出圧Pdが与えられる。すなわち、この
第2の実施例にあっても、ポンプ吐出圧Pdと最大負荷
圧Lmaxとの差圧に応じたロードセンシング制御が実
施される。
FIG. 4 is a circuit diagram showing a second embodiment corresponding to claims 1 to 5 of the present invention. In this second embodiment, two variable displacement hydraulic pumps 3 are used as main hydraulic pumps.
A and 3B are provided, and the discharge line 10 of the hydraulic pump 3A is provided.
An actuator such as a boom cylinder 81 and an arm cylinder 82 is connected in parallel to 1A, and an actuator such as a swing motor 83 and a traveling motor 84 is connected in parallel to the discharge pipe line 101B of the hydraulic pump 3B. The flow control valve 44 for controlling the traveling motor 84 is also the other flow control valves 41, 42,
It is a pilot operated flow control valve similar to 43,
With springs 44I and 44H at both ends,
It incorporates a meter-in diaphragm 44A, a meter-out diaphragm 44C, a bleed-off conduit 84C, and a bleed-off diaphragm 44B. Load pressure detection conduits 61, 62, 63, 64 are connected to the flow rate control valves 41, 42, 43, 44, respectively, and the maximum load pressure Lm of these load pressures is Lm.
ax is connected to the hydraulic pump 3A via the maximum load pressure detection line 7.
Is supplied to one pilot chamber of the pump regulator 2A that controls the discharge amount of the hydraulic pump 3B and one pilot chamber of the pump regulator 2B that controls the discharge amount of the hydraulic pump 3B. The pump discharge pressure Pd is applied to the other pilot chamber of each of the pump regulators 2A and 2B via the pump discharge pressure detection lines 5A and 5B. That is, also in the second embodiment, the load sensing control is executed according to the differential pressure between the pump discharge pressure Pd and the maximum load pressure Lmax.

【0047】ブームシリンダ81を制御する流量制御弁
41のブリードオフ絞り41Bが配置されるブリードオ
フ管路81Cと、アームシリンダ82を制御する流量制
御弁42のブリードオフ絞り42Bが配置されるブリー
ドオフ管路82Cとは、それぞれチェック弁45,46
を介してブリードオフ接続管路111Aに接続してあ
る。また、旋回モータ83を制御する流量制御弁43の
ブリードオフ絞り43Bが配置されるブリードオフ管路
83Cと、走行モータ84を制御する流量制御弁44の
ブリードオフ絞り44Bが配置されるブリードオフ管路
84Cとは、それぞれチェック弁47,48を介してブ
リードオフ接続管路111Bに接続してある。また、ブ
リードオフ接続管路111Aと、ブリードオフ接続管路
111Bとは、ブリードオフ接続管路111Cを介して
タンクに接続してある。このブリードオフ接続管路11
1Cに、ブリードオフ制御弁112を配置してある。流
量制御弁41,42,43,44のそれぞれを切換え操
作するパイロット操作弁91,92,93,94の操作
に伴って出力されるパイロット圧91A,92A,93
A,94Aのうちの最大のパイロット圧が、シャトル弁
120を介して取り出され、最大パイロット圧検出管路
115を介して、ブリードオフ制御弁112のパイロッ
ト室に与えられるようになっている。その他の構成につ
いては、前述した第1の実施例と同等である。
Bleed-off conduit 81C in which the bleed-off throttle 41B of the flow control valve 41 for controlling the boom cylinder 81 is arranged, and bleed-off in which the bleed-off throttle 42B of the flow control valve 42 for controlling the arm cylinder 82 is arranged. The conduit 82C is a check valve 45, 46, respectively.
Is connected to the bleed-off connection pipe line 111A via. Further, a bleed-off pipe 83C in which the bleed-off throttle 43B of the flow control valve 43 for controlling the swing motor 83 is arranged, and a bleed-off pipe in which the bleed-off throttle 44B of the flow control valve 44 for controlling the traveling motor 84 is arranged. The line 84C is connected to the bleed-off connection line 111B via check valves 47 and 48, respectively. Further, the bleed-off connection conduit 111A and the bleed-off connection conduit 111B are connected to the tank via the bleed-off connection conduit 111C. This bleed-off connection line 11
The bleed-off control valve 112 is arranged at 1C. Pilot pressures 91A, 92A, 93 output in accordance with the operation of pilot operation valves 91, 92, 93, 94 for switching the flow control valves 41, 42, 43, 44 respectively.
The maximum pilot pressure of A and 94A is taken out through the shuttle valve 120 and is given to the pilot chamber of the bleed-off control valve 112 through the maximum pilot pressure detection pipe line 115. Other configurations are the same as those in the first embodiment described above.

【0048】このように構成した第2の実施例でも、パ
イロット操作弁91,92,93,94のいずれかが微
操作のみされるときには、ブリードオフ制御弁112は
半開状態となってブリードオフ流量をタンクに流し、所
望の微操作をおこなうことができ、パイロット操作弁9
1,92,93,94のいずれかが微操作され、少なく
とも他の1つがフル操作される複合操作時には、ブリー
ドオフ制御弁112は全閉状態となってブリードオフ流
量がなくなり、そのブリードオフ流量に相当する流量を
フル操作される高負荷圧のアクチュエータに増量させて
供給することができ、第1の実施例と同様に作業能率を
向上させることができる。
Also in the second embodiment constructed as above, when any one of the pilot operated valves 91, 92, 93 and 94 is only slightly operated, the bleed-off control valve 112 is in a half-open state and the bleed-off flow rate. Flow into the tank, and the desired fine operation can be performed.
During a combined operation in which any one of 1, 92, 93, and 94 is finely operated and at least the other one is fully operated, the bleed-off control valve 112 is fully closed and the bleed-off flow rate disappears. It is possible to increase and supply a flow rate corresponding to the above to the fully operated high load pressure actuator, and it is possible to improve the work efficiency as in the first embodiment.

【0049】なお、上記第1,第2の実施例では、油圧
ポンプ3,3A,3Bの吐出量を、ポンプ吐出圧Pdと
最大負荷圧Lmaxとのロードセンシング差圧により制
御する構成にしてあるが、このポンプ制御はロードセン
シングシステムによらなくてもよく、例えばパイロット
操作弁91〜94の操作量に応じてポンプ吐出量を増加
させる制御、すなわちポジコン制御により構成してもよ
い。
In the first and second embodiments, the discharge amounts of the hydraulic pumps 3, 3A, 3B are controlled by the load sensing differential pressure between the pump discharge pressure Pd and the maximum load pressure Lmax. However, this pump control does not have to be based on the load sensing system, and may be configured by, for example, control for increasing the pump discharge amount according to the operation amount of the pilot operated valves 91 to 94, that is, positive control.

【0050】また、上記実施例では、全ての流量制御弁
41〜44にブリードオフ絞り41B〜44Bを設けて
あるが、アクチュエータの種類に応じて選択的にブリー
ドオフ絞りを設ける構成にしてもよい。
Further, in the above embodiment, the bleed-off throttles 41B to 44B are provided in all the flow rate control valves 41 to 44, but the bleed-off throttles may be selectively provided according to the type of actuator. .

【0051】また、上記実施例では、全てのアクチュエ
ータに対して1つのブリードオフ制御弁112を設けて
あるが、1つのアクチュエータに対して1つのブリード
オフ制御弁112を設けてもよく、また、複数のアクチ
ュエータごとに別々のブリードオフ制御弁112を設け
る構成にしてもよい。
Further, in the above embodiment, one bleed-off control valve 112 is provided for all the actuators, but one bleed-off control valve 112 may be provided for one actuator. The bleed-off control valve 112 may be separately provided for each of the plurality of actuators.

【0052】[0052]

【発明の効果】本発明は以上の構成にしてあることか
ら、微操作とフル操作の混在するアクチュエータの複合
操作時には、タンクへのブリードオフ流量を少なくする
ことができ、少なくし得た流量に相当する流量をアクチ
ュエータへの増量に活用させることができ、これにより
従来に比べて作業能率を向上させることができる。
Since the present invention has the above-described structure, the bleed-off flow rate to the tank can be reduced during the combined operation of the actuator in which the fine operation and the full operation are mixed, and the flow rate can be reduced. A corresponding flow rate can be utilized for increasing the amount of the actuator, and thus work efficiency can be improved as compared with the conventional case.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の建設機械の制御装置の第1の実施例を
示す回路図である。
FIG. 1 is a circuit diagram showing a first embodiment of a control device for a construction machine according to the present invention.

【図2】図1に示す第1の実施例に備えられるブリード
オフ制御弁の特性を示す図である。
FIG. 2 is a diagram showing characteristics of a bleed-off control valve provided in the first embodiment shown in FIG.

【図3】ブリードオフ制御弁の別の例を示す図である。FIG. 3 is a diagram showing another example of a bleed-off control valve.

【図4】本発明の第2の実施例を示す回路図である。FIG. 4 is a circuit diagram showing a second embodiment of the present invention.

【図5】従来の建設機械の制御装置を示す回路図であ
る。
FIG. 5 is a circuit diagram showing a control device for a conventional construction machine.

【図6】図5に示す従来の建設機械の制御装置に備えら
れる流量制御弁に設けられるメータイン絞りの特性を示
す図である。
FIG. 6 is a diagram showing characteristics of a meter-in throttle provided in a flow control valve provided in the control device for the conventional construction machine shown in FIG.

【図7】図5に示す従来の建設機械の制御装置に備えら
れる流量制御弁に設けられるブリードオフ絞りの特性を
示す図である。
FIG. 7 is a diagram showing characteristics of a bleed-off throttle provided in a flow control valve provided in the control device for the conventional construction machine shown in FIG.

【図8】図5に示す従来の建設機械の制御装置で得られ
る圧力制御特性を示す図である。
FIG. 8 is a diagram showing pressure control characteristics obtained by the control device for the conventional construction machine shown in FIG.

【符号の説明】[Explanation of symbols]

1 原動機 2 ポンプレギュレータ 3 可変容量型油圧ポンプ 3A 可変容量型油圧ポンプ 3B 可変容量型油圧ポンプ 41 流量制御弁 41A メータイン絞り 41B ブリードオフ絞り 42 流量制御弁 42A メータイン絞り 42B ブリードオフ絞り 43 流量制御弁 43A メータイン絞り 43B ブリードオフ絞り 44 流量制御弁 44A メータイン絞り 44B ブリードオフ絞り 45 チェック弁 46 チェック弁 47 チェック弁 48 チェック弁 81 ブームシリンダ(アクチュエータ) 81A 主管路 81B 主管路 81C ブリードオフ管路 82 アームシリンダ(アクチュエータ) 82C ブリードオフ管路 83 旋回モータ(アクチュエータ) 83C ブリードオフ管路 84 走行モータ(アクチュエータ) 84C ブリードオフ管路 91 パイロット操作弁 91A パイロット圧 92 パイロット操作弁 92A パイロット圧 93 パイロット操作弁 93A パイロット圧 94 パイロット操作弁 94A パイロット圧 101 吐出管路 101A 吐出管路 101B 吐出管路 111 ブリードオフ接続管路 111A ブリードオフ接続管路 111B ブリードオフ接続管路 111C ブリードオフ接続管路 112 ブリードオフ制御弁 113 ブリードオフ制御弁 115 最大パイロット圧検出管路 116 パイロットポンプ 117 パイロット管路 120 シャトル弁 1 prime mover 2 pump regulator 3 Variable displacement hydraulic pump 3A variable displacement hydraulic pump 3B variable displacement hydraulic pump 41 Flow control valve 41A meter-in diaphragm 41B bleed-off diaphragm 42 Flow control valve 42A meter-in diaphragm 42B bleed-off diaphragm 43 Flow control valve 43A meter-in diaphragm 43B Bleed-off diaphragm 44 Flow control valve 44A meter-in diaphragm 44B bleed-off diaphragm 45 check valve 46 check valve 47 check valve 48 check valve 81 Boom cylinder (actuator) 81A Main pipeline 81B Main pipeline 81C bleed-off conduit 82 Arm cylinder (actuator) 82C bleed-off conduit 83 Swing motor (actuator) 83C bleed-off conduit 84 Traveling motor (actuator) 84C bleed-off conduit 91 Pilot operated valve 91A Pilot pressure 92 Pilot operated valve 92A Pilot pressure 93 Pilot operated valve 93A Pilot pressure 94 Pilot operated valve 94A Pilot pressure 101 discharge line 101A discharge line 101B discharge line 111 Bleed-off connection line 111A bleed-off connection line 111B bleed-off connection line 111C bleed-off connection line 112 Bleed-off control valve 113 Bleed-off control valve 115 Maximum pilot pressure detection line 116 Pilot pump 117 Pilot line 120 shuttle valve

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02F 9/22 F15B 11/08 F15B 11/16 F15B 11/17 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) E02F 9/22 F15B 11/08 F15B 11/16 F15B 11/17

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 原動機と、この原動機によって駆動する
主油圧ポンプと、この主油圧ポンプから吐出される圧油
により駆動する複数のアクチュエータと、これらのアク
チュエータのそれぞれに対応して設けられ、上記主油圧
ポンプから上記アクチュエータに供給される圧油の流れ
を制御するとともに、内部にブリードオフ絞りを有する
流量制御弁とを備え、これらの流量制御弁の切換え操作
に伴って上記アクチュエータの最大駆動圧の制御が可能
な建設機械の制御装置において、 上記ブリードオフ絞
りとタンクとを接続する管路に、上記アクチュエータの
操作量の増加に相応して開口面積を小さく変化させるブ
リードオフ制御弁を設けたことを特徴とする建設機械の
制御装置。
1. A prime mover, a main hydraulic pump driven by the prime mover, a plurality of actuators driven by pressure oil discharged from the main hydraulic pump, and a plurality of actuators provided corresponding to each of the actuators. While controlling the flow of pressure oil supplied from the hydraulic pump to the actuator, a flow control valve having a bleed-off throttle inside is provided, and the maximum drive pressure of the actuator is changed according to the switching operation of these flow control valves. In a controllable control device for a construction machine, a bleed-off control valve for changing the opening area to a small value is provided in a pipe line connecting the bleed-off throttle and the tank in accordance with an increase in the operation amount of the actuator. A control device for construction machinery.
【請求項2】 上記流量制御弁のブリードオフ絞りのう
ちの複数に連通するブリードオフ接続管路を設け、この
ブリードオフ接続管路の下流に上記ブリードオフ制御弁
を配置したことを特徴とする請求項1記載の建設機械の
制御装置。
2. A bleed-off connection pipe communicating with a plurality of bleed-off throttles of the flow control valve is provided, and the bleed-off control valve is arranged downstream of the bleed-off connection pipe. The control device for a construction machine according to claim 1.
【請求項3】 上記主油圧ポンプが複数の油圧ポンプか
らなることを特徴とする請求項1または2記載の建設機
械の制御装置。
3. The construction machine control device according to claim 1, wherein the main hydraulic pump comprises a plurality of hydraulic pumps.
【請求項4】 上記流量制御弁がパイロット操作式の流
量制御弁からなり、これらの流量制御弁を切換え操作す
るパイロット操作弁を備えるとともに、 これらのパイロット操作弁から出力されるパイロット圧
のうちの最大のパイロット圧を、上記ブリードオフ制御
弁の駆動信号として導く最大パイロット圧検出管路を設
けたことを特徴とする請求項1〜3のいずれかに記載の
建設機械の制御装置。
4. The flow control valve comprises a pilot-operated flow control valve, is equipped with a pilot control valve for switching operation of these flow control valves, and controls the pilot pressure output from these pilot control valves. The control device for a construction machine according to any one of claims 1 to 3, further comprising: a maximum pilot pressure detection pipe line that guides a maximum pilot pressure as a drive signal for the bleed-off control valve.
【請求項5】 建設機械が油圧ショベルであることを特
徴とする請求項1〜4のいずれかに記載の建設機械の制
御装置。
5. The construction machine control device according to claim 1, wherein the construction machine is a hydraulic excavator.
JP03554795A 1995-02-23 1995-02-23 Control equipment for construction machinery Expired - Fee Related JP3403535B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03554795A JP3403535B2 (en) 1995-02-23 1995-02-23 Control equipment for construction machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03554795A JP3403535B2 (en) 1995-02-23 1995-02-23 Control equipment for construction machinery

Publications (2)

Publication Number Publication Date
JPH08232299A JPH08232299A (en) 1996-09-10
JP3403535B2 true JP3403535B2 (en) 2003-05-06

Family

ID=12444762

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03554795A Expired - Fee Related JP3403535B2 (en) 1995-02-23 1995-02-23 Control equipment for construction machinery

Country Status (1)

Country Link
JP (1) JP3403535B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2022190491A1 (en) * 2021-03-09 2022-09-15

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5622563B2 (en) * 2010-12-28 2014-11-12 株式会社クボタ Working machine hydraulic system
CN104959662B (en) * 2015-07-16 2017-05-31 河北工程大学 Universal drive shaft flange jaw end-tooth secondary process system and processing method
CN105041746B (en) * 2015-07-16 2017-05-31 河北工程大学 Universal drive shaft flange jaw end-face coupling auxiliary equipment hydraulic control device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2022190491A1 (en) * 2021-03-09 2022-09-15
WO2022190491A1 (en) 2021-03-09 2022-09-15 日立建機株式会社 Work machine
KR20230048132A (en) 2021-03-09 2023-04-10 히다치 겡키 가부시키 가이샤 work machine
JP7340122B2 (en) 2021-03-09 2023-09-06 日立建機株式会社 working machine
US11965315B2 (en) 2021-03-09 2024-04-23 Hitachi Construction Machinery Co., Ltd. Work machine
EP4194619A4 (en) * 2021-03-09 2024-09-18 Hitachi Construction Mach Co Work machine

Also Published As

Publication number Publication date
JPH08232299A (en) 1996-09-10

Similar Documents

Publication Publication Date Title
US5829252A (en) Hydraulic system having tandem hydraulic function
US5277027A (en) Hydraulic drive system with pressure compensting valve
KR101876590B1 (en) Hydraulic drive device for hydraulic work machine
JP2702646B2 (en) Hydraulic circuit structure of backhoe device
JPH11303809A (en) Pump control device for hydraulic drive machine
US6378302B1 (en) Hydraulic circuit system
JP3403538B2 (en) Control equipment for construction machinery
JP3403535B2 (en) Control equipment for construction machinery
JP4933299B2 (en) Hydraulic control equipment for construction machinery
JP3403536B2 (en) Control equipment for construction machinery
JP3692009B2 (en) Control device for work machine
JP2948065B2 (en) Hydraulic drive for construction machinery
JP3097973B2 (en) Hydraulic working machine hydraulic circuit
JP2002005109A (en) Operation control device
JP3522959B2 (en) Hydraulic drive
JP2592502B2 (en) Hydraulic drive and hydraulic construction machinery
JP2889250B2 (en) Hydraulic drive
JPH109415A (en) Control valve with flow control valve and control valve with pressure control valve
JP2866238B2 (en) Hydraulic drive for construction machinery
JP2622445B2 (en) Hydraulic circuit for civil engineering and construction machinery
JPH0637091Y2 (en) Hydraulic drive for civil engineering and construction machinery
JP2749317B2 (en) Hydraulic drive
JP3321551B2 (en) Construction machine hydraulic circuit
JP3286147B2 (en) Construction machine hydraulic circuit
JP2941876B2 (en) Directional switching valve

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080229

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090228

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090228

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100228

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140228

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees