JP3396534B2 - Elevator guide rail fixing device - Google Patents

Elevator guide rail fixing device

Info

Publication number
JP3396534B2
JP3396534B2 JP08814994A JP8814994A JP3396534B2 JP 3396534 B2 JP3396534 B2 JP 3396534B2 JP 08814994 A JP08814994 A JP 08814994A JP 8814994 A JP8814994 A JP 8814994A JP 3396534 B2 JP3396534 B2 JP 3396534B2
Authority
JP
Japan
Prior art keywords
guide rail
mounting plate
bracket
rail mounting
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08814994A
Other languages
Japanese (ja)
Other versions
JPH07291549A (en
Inventor
昭彦 平田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP08814994A priority Critical patent/JP3396534B2/en
Publication of JPH07291549A publication Critical patent/JPH07291549A/en
Application granted granted Critical
Publication of JP3396534B2 publication Critical patent/JP3396534B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、エレベータガイドレ
ールの固定装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator guide rail fixing device.

【0002】[0002]

【従来の技術】一般にエレベータは図9に示す機械的な
構成である。すなわち、エレベータ設置ビルの昇降路1
の両側壁各々に乗りかご用のガイドレール2と釣合重り
用のガイドレール3とが垂直に設置され、両側のガイド
レール2間に、巻上げロープ4によって昇降する乗りか
ご5が昇降自在に配置されている。巻上げロープ4の反
対の端部には釣合重り6が取付けられていて、この釣合
重り6は乗りかご5と釣瓶式に互いに昇降する。これら
の乗りかご5と釣合重り6のそれぞれの両側には案内装
置7が設けられており、この案内装置7が各ガイドレー
ル2,3に沿って昇降することにより乗りかご5および
釣合重り6の昇降を安定させるようになっている。
2. Description of the Related Art Generally, an elevator has a mechanical structure shown in FIG. That is, hoistway 1 of the elevator installation building
A guide rail 2 for a car and a guide rail 3 for a counterweight are vertically installed on each of both side walls of the car, and a car 5 that is moved up and down by a hoisting rope 4 is vertically arranged between the guide rails 2 on both sides. Has been done. A counterweight 6 is attached to the opposite end of the hoisting rope 4, and the counterweight 6 moves up and down with the car 5 in a fishing bottle manner. Guide devices 7 are provided on both sides of each of the car 5 and the counterweight 6, and the car 5 and the counterweight are lifted by moving the guide devices 7 along the respective guide rails 2 and 3. It is designed to stabilize the lifting and lowering of 6.

【0003】エレベータ機械室8には、エレベータ駆動
装置9がマシンビーム10上に固定され、この駆動装置
9でシーブ11を正逆回転駆動することよってシーブ1
1に巻付けられた巻上げロープ4を乗りかご5側に繰出
したり、釣合重り6側に繰出したりして乗りかご5およ
び釣合重り6を釣瓶式に昇降動作させるようになってい
る。12は巻上げロープ4の反らせシーブである。
In the elevator machine room 8, an elevator drive device 9 is fixed on a machine beam 10, and the drive device 9 drives the sheave 11 to rotate forward and backward to rotate the sheave 1.
The hoisting rope 4 wound around 1 is paid out to the car 5 side or to the counterweight 6 side so that the car 5 and the counterweight 6 are moved up and down like a fishing bottle. Reference numeral 12 is a sheave for bending the hoisting rope 4.

【0004】このようなエレベータ装置において、エレ
ベータガイドレール2,3を側壁に固定するためのエレ
ベータガイドレールの固定装置として従来、図10〜図
12の構成のものが知られている。ガイドレール2,3
それぞれは図10に示すように必要本数のレール分割体
13を上下に直列に連結して昇降路1の最上部から最下
部まで左右に2列ずつ敷設されている。そして各レール
分割体13の固定方法は次のとおりである。図11およ
び図12に示すように、昇降路壁14にアンカーボルト
15が埋込まれ、このアンカーボルト15にナット16
を締付けることによって基部固定ブラケット17が昇降
路壁14に固定されている。
[0004] In such an elevator apparatus, conventionally, an elevator guide rail fixing apparatus for fixing the elevator guide rails 2 and 3 to the side wall has a structure shown in FIGS. 10 to 12. Guide rails 2 and 3
As shown in FIG. 10, a required number of rail divided bodies 13 are vertically connected in series, and two rows are laid from the top to the bottom of the hoistway 1 to the left and right. The method of fixing each rail divided body 13 is as follows. As shown in FIGS. 11 and 12, the anchor bolt 15 is embedded in the hoistway wall 14, and the anchor bolt 15 has a nut 16
The base fixing bracket 17 is fixed to the hoistway wall 14 by tightening.

【0005】この基部固定ブラケット17には他の連結
ブラケット18とガイドレール取付ブラケット19が一
体に溶接されていて、ブラケット17の昇降路壁14へ
のアンカーボルト15による固定によって他のブラケッ
ト18,19も一定の位置に固定される。
Another connecting bracket 18 and a guide rail mounting bracket 19 are integrally welded to the base fixing bracket 17, and the other brackets 18, 19 are fixed by anchor bolts 15 to the hoistway wall 14 of the bracket 17. Is also fixed in a fixed position.

【0006】そしてガイドレール取付ブラケット19に
対してガイドレール分割体13がその両側でレールクリ
ップ20によって止められ、このレールクリップ20が
ボルト21とナット22によってガイドレール取付ブラ
ケット19に固定されることによってガイドレール分割
体13各々が固定されている。
The guide rail divided body 13 is fixed to the guide rail mounting bracket 19 by rail clips 20 on both sides thereof, and the rail clips 20 are fixed to the guide rail mounting bracket 19 by bolts 21 and nuts 22. Each of the guide rail divided bodies 13 is fixed.

【0007】[0007]

【発明が解決しようとする課題】ところが、このような
従来のエレベータガイドレールの固定装置では、次のよ
うな問題点があった。すなわち、乗りかご5、釣合重り
6はガイドレール2,3によってガイドされて昇降する
が、ガイドレール2,3は可能な限り垂直に敷設しなけ
れば少しの曲りやねじれによって乗りかご5が揺れて乗
り心地を悪化させる。このため、エレベータの据付け工
事時にガイドレールの芯出し作業を行う必要がある。こ
の芯出し作業は、図11および図12に示すように、左
右X方向の芯出しはブラケット17に明けられている長
穴23によって行い、前後Y方向およびねじれR方向の
芯出しは厚さの異なる両目シム24、片目シム25をガ
イドレール分割体13とガイドレール取付ブラケット1
9との間に必要枚数挟み込むことによって行っている。
However, such a conventional elevator guide rail fixing device has the following problems. That is, the car 5 and the counterweight 6 are guided by the guide rails 2 and 3 to ascend and descend, but if the guide rails 2 and 3 are not laid vertically as much as possible, the car 5 sways due to a slight bend or twist. Reduce the ride comfort. Therefore, it is necessary to perform the centering work of the guide rail during the installation work of the elevator. As shown in FIGS. 11 and 12, the centering work is performed in the left-right X direction by the elongated hole 23 formed in the bracket 17, and the centering in the front-rear Y direction and the twist R direction is performed by the thickness. Separate the two-sided shims 24 and the one-sided shims 25 from the guide rail division body 13 and the guide rail mounting bracket 1.
This is done by sandwiching the required number of sheets with 9

【0008】このような芯出し作業では、左右X方向の
芯出し作業の後にアンカーボルト15にナット16を本
締めし、その後、両目シム24と片目シム25を必要枚
数だけガイドレール分割体13とガイドレール取付ブラ
ケット19との間に挟み込んでボルト21とナット22
によってガイドレール分割体13をガイドレール取付ブ
ラケット19に固定することによって前後Y方向とねじ
れR方向の芯出しを行う手順をとっている。
In such centering work, after the centering work in the left and right X direction, the anchor bolts 15 are fully tightened with the nuts 16 and then the required number of both-eye shims 24 and one-eye shims 25 are formed on the guide rail divided body 13. It is inserted between the guide rail mounting bracket 19 and the bolt 21 and nut 22.
The guide rail divided body 13 is fixed to the guide rail mounting bracket 19 to perform centering in the front-rear Y direction and the twist R direction.

【0009】この芯出し作業の場合、ボルト21とナッ
ト22の締め具合によってガイドレール分割体13の前
後Y方向と左右X方向の芯が変ってしまうために、調整
時にもナット22をいったん本締めし、ガイドレール分
割体13をガイドレール取付ブラケット19に固定して
芯が出ているかどうか確かめ、芯が出ていなければもう
一度ナット22を緩めてシム24,25の枚数を増減さ
せて再びナット22を本締して芯の出具合を見るという
手間のかかる作業が必要であり、これをエレベータ昇降
路内のレールブラケットすべてについて1つ1つ作業し
なければならない。
In this centering work, the center of the guide rail divided body 13 in the front-rear Y direction and the left-right X direction changes depending on how tight the bolts 21 and the nuts 22 are tightened. Then, the guide rail divided body 13 is fixed to the guide rail mounting bracket 19 and it is confirmed whether or not the core is out. If the core is not out, the nut 22 is loosened again to increase or decrease the number of the shims 24 and 25 and the nut 22 again. It is necessary to perform a troublesome work such as fully tightening and checking the lead-out condition, and this must be done one by one for all the rail brackets in the elevator hoistway.

【0010】このため、ガイドレールの芯出し作業に細
心の注意と多くの時間、労力が必要とされ、さらに高所
での作業のために危険も伴う問題点があった。さらに、
芯出しの精度を上げるために厚さの異なるシムを何種類
か用意しているが、シムの使用枚数が作業現場によって
異なるために特定できず、現場ごとに常に多めの枚数を
用意して持込む必要があり、無駄も多い問題点があっ
た。
For this reason, the work of centering the guide rail requires a great deal of attention, a lot of time, and labor, and there is a problem in that work is required at a high place and is dangerous. further,
Several types of shims with different thicknesses are prepared to improve the accuracy of centering, but it is not possible to specify because the number of shims used differs depending on the work site, so always prepare a large number of shims for each site. There was a problem that it was necessary to put in and there was much waste.

【0011】この発明はこのような従来の問題点に鑑み
てなされたもので、シムを用いず、またエレベータ昇降
路内の側壁にブラケットを本固定した状態でガイドレー
ルの芯出し作業を行うことができ、芯出し作業が容易で
少ない労力で行うことができ、無駄も少なくできるエレ
ベータガイドレールの固定装置を提供することを目的と
する。
The present invention has been made in view of the above-mentioned problems of the prior art. Centering of a guide rail is performed without using a shim and with a bracket permanently fixed to a side wall in an elevator hoistway. It is an object of the present invention to provide a fixing device for an elevator guide rail, which is capable of performing the centering work, can be easily performed with a small labor, and can reduce waste.

【0012】[0012]

【課題を解決するための手段】請求項1の発明のエレベ
ータガイドレールの固定装置は、昇降路の側壁に固定さ
れるブラケットに対して対向するように配置された、ガ
イドレールを固定するレール取付板と、前記ガイドレー
ルの両側において前記レール取付板に首部分が挿通さ
れ、先端のねじ部分が前記ブラケットに螺入された複数
本のボルトと、前記ボルト各々の頭部と前記レール取付
板を介して対向する位置に取り付けられ、前記ボルトの
首部分各々を回転可能にかつ長さ方向にはスライドでき
ないように支持する複数個の止め輪とを備えたのであ
る。
According to a first aspect of the present invention, there is provided an elevator guide rail fixing device which is arranged so as to face a bracket fixed to a side wall of a hoistway and which is fixed to the guide rail. A plate, a plurality of bolts whose neck portions are inserted into the rail mounting plate on both sides of the guide rail, and screw parts of the tip of which are screwed into the bracket, and heads of the bolts and the rail mounting plate. through mounted in a position facing, the rotatable and longitudinally neck portion wherein each of the bolts is of also a plurality of retaining ring for supporting so that it can not slide.

【0013】請求項2の発明のエレベータガイドレール
の固定装置は、昇降路の側壁に固定されるブラケットに
対して対向するように配置された、ガイドレールを固定
するレール取付板と、前記ガイドレールの両側において
前記レール取付板に頭部が固定され、前記ブラケットに
形成された穴に先端部が圧入貫通された複数本のピンと
を備えたものである。
According to a second aspect of the present invention, there is provided an elevator guide rail fixing device, wherein a rail mounting plate for fixing the guide rail is provided so as to face a bracket fixed to a side wall of the hoistway, and the guide rail. Heads are fixed to the rail mounting plate on both sides of the bracket, and a plurality of pins each having a tip portion press-fitted through a hole formed in the bracket are provided.

【0014】請求項3の発明のエレベータガイドレール
の固定装置は、昇降路の側壁に固定されるブラケットに
対して対向するように配置された、ガイドレールを固定
するレール取付板と、前記ガイドレールの両側において
前記レール取付板に首部分が挿通され、先端のねじ部分
が前記ブラケットに螺入された複数本のボルトと、前記
ブラケットとレール取付板との対向面間にそれらの間隔
を保持するために介挿された弾性体とを備えたものであ
る。
According to a third aspect of the present invention, there is provided an elevator guide rail fixing device, which is arranged so as to face a bracket fixed to a side wall of a hoistway, the rail mounting plate fixing the guide rail, and the guide rail. A plurality of bolts whose neck portions are inserted into the rail mounting plate on both sides of the bracket and screwed at the tip of the bracket into the bracket, and between the facing surfaces of the bracket and the rail mounting plate. And an elastic body inserted to hold the gap.

【0015】[0015]

【作用】請求項1の発明のエレベータガイドレールの固
定装置では、ガイドレールの前後方向およびねじれ方向
の芯出しを行う場合に、ガイドレールの両側においてレ
ール取付板に挿通したボルトの先端部をブラケットにね
じ込むそのねじ込み量を同じだけ増減させることによっ
て前後方向の芯出しを行い、また左右で必要量だけ異な
らせることによってねじれ方向の芯出しを行う。そして
芯出しができれば、ボルトをブラケットおよびレール取
付板に溶接固定する。こうして、シムを用いずにボルト
のねじ込み量の増減だけでガイドレールの前後、ねじれ
方向の芯出し作業を行う。
According to the elevator guide rail fixing device of the first aspect of the invention, when centering the guide rail in the front-rear direction and in the twisting direction, the tips of the bolts inserted into the rail mounting plates on both sides of the guide rail are bracketed. The centering in the front-rear direction is performed by increasing or decreasing the screwing amount by the same amount, and the centering in the twisting direction is performed by making the right and left different amounts. After centering, the bolts are welded and fixed to the bracket and rail mounting plate. In this way, centering work in the front-rear direction and the twisting direction of the guide rail is performed only by increasing or decreasing the screw-in amount of the bolt without using a shim.

【0016】請求項2の発明のエレベータガイドレール
の固定装置では、ガイドレールの前後方向およびねじれ
方向の芯出しを行う場合に、ガイドレールの両側におい
てレール取付板に固定したピンの頭部を打つことによっ
て、ブラケットに明けられた穴に圧入するピンの先端部
の圧入量を左右で同じだけ増減させることによって前後
方向の芯出しを行い、また左右で必要量だけ異ならせる
ことによってねじれ方向の芯出しを行う。そして芯出し
ができれば、ピンをブラケットおよびレール取付板に溶
接固定する。こうして、シムを用いずにピンの圧入量の
増減だけでガイドレールの前後、ねじれ方向の芯出し作
業を行う。
In the elevator guide rail fixing device according to the second aspect of the present invention, when centering the guide rail in the front-rear direction and the twisting direction, the heads of the pins fixed to the rail mounting plates are struck on both sides of the guide rail. This allows the front and rear to be centered by increasing or decreasing the amount of press-fitting of the tip of the pin that is press-fitted into the hole formed in the bracket by the same amount on the left and right, and the center of the twisting direction by making the required amount different on the left and right. Send out. When the centering is completed, the pins are welded and fixed to the bracket and the rail mounting plate. In this way, centering work in the front-rear direction and the twisting direction of the guide rail is performed only by increasing / decreasing the press-fitting amount of the pin without using a shim.

【0017】請求項3の発明のエレベータガイドレール
の固定装置では、ガイドレールの前後方向およびねじれ
方向の芯出しを行う場合に、ガイドレールの両側におい
てレール取付板に挿通したボルトの先端部をブラケット
に螺合し、このボルトのブラケットに対する螺合量を同
じだけ増減させることによって前後方向の芯出しを行
い、また左右で螺合量を必要量だけ異ならせることによ
ってねじれ方向の芯出しを行う。この場合、ブラケット
とレール取付板との間に挿入されている弾性体がレール
取付板を一定の位置に保持する。そして芯出しができれ
ば、ボルトをブラケットおよびレール取付板に溶接固定
する。こうして、シムを用いずにボルトとナットとの螺
合量の増減だけでガイドレールの前後、ねじれ方向の芯
出し作業を行う。
In the elevator guide rail fixing device according to the third aspect of the present invention, when centering the guide rail in the front-rear direction and the twisting direction, the tips of the bolts inserted into the rail mounting plates on both sides of the guide rail are bracketed. The bolts are screwed together and the amount of screwing of the bolt with respect to the bracket is increased / decreased by the same amount to perform centering in the front-rear direction, and the required amount of screwing is changed between left and right to perform centering in the twisting direction. In this case, the elastic body inserted between the bracket and the rail mounting plate holds the rail mounting plate at a fixed position. After centering, the bolts are welded and fixed to the bracket and rail mounting plate. Thus, centering work in the front-rear direction and the twisting direction of the guide rail is performed only by increasing or decreasing the screwing amount of the bolt and the nut without using a shim.

【0018】[0018]

【実施例】以下、この発明の実施例を図に基づいて詳説
する。図1および図2は請求項1の発明の一実施例を示
している。この実施例のエレベータガイドレールの固定
装置は、図9および図10に示したエレベータ昇降路1
の内の側壁14に対して、ガイドレール2,3それぞれ
のガイドレール分割体13を固定するもので、側壁14
にアンカーボルト15が埋込まれ、基部固定ブラケット
17がその長穴23を利用して左右X方向のだいたいの
位置調整をした後、ナット16によって固定されてい
る。この基部固定ブラケット17には連結ブラケット1
8とレール取付ブラケット31が溶接で固定され一体構
造になっている。
Embodiments of the present invention will now be described in detail with reference to the drawings. 1 and 2 show an embodiment of the invention of claim 1. The elevator guide rail fixing device of this embodiment is the elevator hoistway 1 shown in FIGS. 9 and 10.
The guide rail divided body 13 of each of the guide rails 2 and 3 is fixed to the side wall 14 inside the side wall.
The anchor bolt 15 is embedded in the base fixing bracket 17, and the base fixing bracket 17 is adjusted by using the elongated hole 23 to adjust the position in the left-right X direction, and then fixed by the nut 16. The base fixing bracket 17 includes a connecting bracket 1
8 and the rail mounting bracket 31 are fixed by welding to form an integral structure.

【0019】一方、ガイドレール分割体13はレール取
付板32上に置かれ、レールクリップ20とこれをレー
ル取付板32に固定するクリップ止ボルト33によって
レール取付板32に固定されている。
On the other hand, the guide rail divided body 13 is placed on the rail mounting plate 32, and is fixed to the rail mounting plate 32 by the rail clip 20 and a clip stop bolt 33 for fixing the rail clip 20 to the rail mounting plate 32.

【0020】このレール取付板32の四隅それぞれにね
じの切られていないボルト挿通穴34が形成されてい
て、ここに固定用ボルト35の首部36が挿通され、こ
の固定用ボルト35の頭部37の座金38と首部36に
取付けられた止め輪39とによって固定用ボルト35を
各々は回転できるがレール取付板32に対して左右X方
向、前後Y方向のいずれの位置関係も変えることができ
ないようにされている。
A non-threaded bolt insertion hole 34 is formed in each of the four corners of the rail mounting plate 32, and a neck portion 36 of a fixing bolt 35 is inserted therein, and a head portion 37 of the fixing bolt 35. Each of the fixing bolts 35 can be rotated by the washer 38 and the retaining ring 39 attached to the neck portion 36, but the positional relationship in the left-right X direction and the front-rear Y direction with respect to the rail mounting plate 32 cannot be changed. Has been

【0021】この固定用ボルト35各々の先端ねじ部4
0はレール取付ブラケット31の四隅それぞれに形成さ
れているねじ穴41にねじ込まれていて、レール取付ブ
ラケット31とレール取付板32をほぼ平行な位置関係
を保たせている。
The tip screw portion 4 of each of the fixing bolts 35
0 is screwed into the screw holes 41 formed at each of the four corners of the rail mounting bracket 31 to keep the rail mounting bracket 31 and the rail mounting plate 32 in a substantially parallel positional relationship.

【0022】上記の構成のエレベータガイドレールの固
定装置によって各ガイドレール分割体13を昇降路側壁
14に固定した状態で、各ガイドレール分割体13の芯
出し作業を行う場合、次の手順によって行う。まず、左
右X方向の芯出し作業は、ナット16を緩めて長穴23
を利用して基部固定ブラケット17を所要量だけ左右に
移動させ、必要量だけ移動した後、ナット16をアンカ
ーボルト15に本締めする。
When the guide rail divisions 13 are fixed to the hoistway side wall 14 by the elevator guide rail fixing device having the above-described structure, the centering operation of the guide rail divisions 13 is performed by the following procedure. . First, for the centering work in the left and right X direction, loosen the nut 16 and
Is used to move the base fixing bracket 17 to the right and left by a required amount, and after the required amount is moved, the nut 16 is finally tightened to the anchor bolt 15.

【0023】次に、ガイドレール分割体13の前後Y方
向およびねじれR方向の芯出し作業を行うが、前後Y方
向の芯出し作業は、レール取付板32の四隅の固定用ボ
ルト35それぞれを同じ量だけ回転させることによって
先端ねじ部40のレール取付ブラケット31へのねじ込
み量を増減させ、レール取付ブラケット31に対するレ
ール取付板32の間隔を調整することによって行う。
Next, centering work in the front-rear Y direction and twist R direction of the guide rail divided body 13 is performed. The centering work in the front-rear Y direction uses the same fixing bolts 35 at the four corners of the rail mounting plate 32. The amount of screwing the tip screw portion 40 into the rail mounting bracket 31 is increased or decreased by rotating the tip screw portion 40 to adjust the distance between the rail mounting plate 32 and the rail mounting bracket 31.

【0024】またねじれR方向の芯出し作業は、四隅の
固定用ボルト35のうち、必要な位置のボルトを個別に
適当量だけ回転させることによって先端ねじ部40のレ
ール取付ブラケット31へのねじ込み量を必要量だけ増
減させ、レール取付ブラケット31に対するレール取付
板32の四隅それぞれの間隔を個別に調整することによ
って行う。
Further, in the centering work in the direction of the twist R, by rotating the bolts at the required positions among the fixing bolts 35 at the four corners individually by an appropriate amount, the screwing amount of the tip screw portion 40 into the rail mounting bracket 31 is increased. Is increased or decreased by a necessary amount, and the intervals of the four corners of the rail mounting plate 32 with respect to the rail mounting bracket 31 are individually adjusted.

【0025】こうして、この実施例のエレベータガイド
レールの固定装置では、レール取付板32にガイドレー
ル分割体13を固定した状態でその芯出し作業が行える
ことになる。この芯出し作業の後、緩みが発生しないよ
うに固定用ボルト35の頭部37、先端ねじ部40それ
ぞれをレール取付板32、レール取付ブラケット31に
溶接して固定する。図中、42は溶接部分を示してい
る。
In this way, in the elevator guide rail fixing device of this embodiment, the centering operation can be performed with the guide rail divided body 13 fixed to the rail mounting plate 32. After the centering work, the head portion 37 of the fixing bolt 35 and the tip screw portion 40 are welded and fixed to the rail mounting plate 32 and the rail mounting bracket 31 so that the loosening does not occur. In the figure, 42 indicates a welded portion.

【0026】次に、請求項2の発明の一実施例について
図3および図4に基づいて説明する。この実施例のエレ
ベータガイドレールの固定装置は、側壁14にアンカー
ボルト15が埋込まれ、基部固定ブラケット17がその
長穴23を利用して左右X方向のだいたいの位置調整を
した後、ナット16によって固定されている。この基部
固定ブラケット17には連結ブラケット18とレール取
付ブラケット43が溶接で固定され一体構造になってい
る。
Next, an embodiment of the invention of claim 2 will be described with reference to FIGS. 3 and 4. In the elevator guide rail fixing device of this embodiment, the anchor bolt 15 is embedded in the side wall 14, the base fixing bracket 17 uses the elongated hole 23 to adjust the position in the left and right X direction, and then the nut 16 is provided. Is fixed by. A connecting bracket 18 and a rail mounting bracket 43 are fixed to the base fixing bracket 17 by welding to form an integral structure.

【0027】一方、ガイドレール分割体13はレール取
付板44上に置かれ、レールクリップ20とこれをレー
ル取付板44に固定するクリップ止ボルト33によって
レール取付板44に固定されている。
On the other hand, the guide rail divided body 13 is placed on the rail mounting plate 44, and is fixed to the rail mounting plate 44 by the rail clip 20 and a clip stop bolt 33 for fixing the rail clip 20 to the rail mounting plate 44.

【0028】このレール取付板44の四隅それぞれにピ
ン通し穴45が形成されていて、半径方向に膨張する弾
性を有する固定用ピン46の一端部がこのピン通し穴4
5それぞれに圧入されている。そして、この固定用ピン
46各々の先端部がレール取付ブラケット43の四隅そ
れぞれに形成されているピン通し穴47に圧入されてい
て、レール取付ブラケット43とレール取付板44をほ
ぼ平行な位置関係に保たせている。
Pin insertion holes 45 are formed at each of the four corners of the rail mounting plate 44, and one end of a fixing pin 46 having elasticity that expands in the radial direction is formed in the pin insertion hole 4.
5 are pressed into each. The tip end of each of the fixing pins 46 is press-fitted into the pin through holes 47 formed at each of the four corners of the rail mounting bracket 43, so that the rail mounting bracket 43 and the rail mounting plate 44 have a substantially parallel positional relationship. I keep it.

【0029】上記の構成のエレベータガイドレールの固
定装置によって各ガイドレール分割体13を昇降路側壁
14に固定した状態で、各ガイドレール分割体13の芯
出し作業を行う場合、次の手順によって行う。まず、左
右X方向の芯出し作業は、ナット16を緩めて長穴23
を利用して基部固定ブラケット17を所要量だけ左右に
移動させ、必要量だけ移動した後、ナット16をアンカ
ーボルト15に本締めする。
When performing the centering operation of each guide rail divided body 13 in a state where each guide rail divided body 13 is fixed to the hoistway side wall 14 by the elevator guide rail fixing device having the above-described structure, the following procedure is performed. . First, for the centering work in the left and right X direction, loosen the nut 16 and
Is used to move the base fixing bracket 17 to the right and left by a required amount, and after the required amount is moved, the nut 16 is finally tightened to the anchor bolt 15.

【0030】次に、ガイドレール分割体13の前後Y方
向およびねじれR方向の芯出し作業を行うが、前後Y方
向の芯出し作業は、レール取付板44の四隅の固定用ピ
ン46それぞれの頭部を同じ量だけハンマーなどで打込
むことによって先端部のレール取付ブラケット43への
圧入量を微調整し、レール取付ブラケット43に対する
レール取付板44の間隔を調整することによって行う。
Next, centering work in the front-rear Y direction and twist R direction of the guide rail divided body 13 is performed. The centering work in the front-rear Y direction is performed by the heads of the fixing pins 46 at the four corners of the rail mounting plate 44. This is performed by finely adjusting the press-fitting amount of the tip portion into the rail mounting bracket 43 by hammering the same amount with a hammer or the like, and adjusting the distance between the rail mounting plate 44 and the rail mounting bracket 43.

【0031】またねじれR方向の芯出し作業は、四隅の
固定用ピン46のうち、必要な位置のピンを個別に適当
量だけ打込むことによって先端部のレール取付ブラケッ
ト43への圧入量を微調整し、レール取付ブラケット4
3に対するレール取付板44の四隅それぞれの間隔を個
別に調整することによって行う。
Further, in the centering work in the twist R direction, the pin at the required position among the fixing pins 46 at the four corners is individually driven by an appropriate amount to slightly press fit the rail mounting bracket 43 at the tip end. Adjust and rail mounting bracket 4
It is carried out by individually adjusting the intervals of the four corners of the rail mounting plate 44 with respect to 3.

【0032】こうして、この実施例のエレベータガイド
レールの固定装置でも、レール取付板44にガイドレー
ル分割体13を固定した状態でその芯出し作業が行える
ことになる。この芯出し作業の後、緩みが発生しないよ
うに固定用ピン46の頭部と先端部それぞれをレール取
付板44、レール取付ブラケット43に溶接して固定す
る。図中、62は溶接部分を示している。
Thus, also in the elevator guide rail fixing device of this embodiment, the centering operation can be performed with the guide rail divided body 13 fixed to the rail mounting plate 44. After the centering work, the head and the tip of the fixing pin 46 are welded and fixed to the rail mounting plate 44 and the rail mounting bracket 43 so as to prevent loosening. In the figure, 62 indicates a welded portion.

【0033】次に、請求項3の発明の一実施例について
図5および図6に基づいて説明する。この実施例のエレ
ベータガイドレールの固定装置は、側壁14にアンカー
ボルト15が埋込まれ、基部固定ブラケット17がその
長穴23を利用して左右X方向のだいたいの位置調整を
した後、ナット16によって固定されている。この基部
固定ブラケット17には連結ブラケット18とレール取
付ブラケット48が溶接で固定され一体構造になってい
る。
Next, an embodiment of the invention of claim 3 will be described with reference to FIGS. 5 and 6. In the elevator guide rail fixing device of this embodiment, the anchor bolt 15 is embedded in the side wall 14, the base fixing bracket 17 uses the elongated hole 23 to adjust the position in the left and right X direction, and then the nut 16 is provided. Is fixed by. A connecting bracket 18 and a rail mounting bracket 48 are fixed to the base fixing bracket 17 by welding to form an integral structure.

【0034】一方、ガイドレール分割体13はレール取
付板49上に置かれ、レールクリップ20とこれをレー
ル取付板49に固定するクリップ止ボルト33によって
レール取付板49に固定されている。
On the other hand, the guide rail divided body 13 is placed on the rail mounting plate 49, and is fixed to the rail mounting plate 49 by the rail clip 20 and a clip stop bolt 33 for fixing the rail clip 20 to the rail mounting plate 49.

【0035】このレール取付板49の四隅それぞれにね
じの切られていないボルト挿通穴50が形成されてい
て、ここに固定用ボルト51の首部52が挿通され、固
定用ボルト51の先端ねじ部53がレール取付ブラケッ
ト48の四隅それぞれに形成されているねじ通し穴54
にぴったり嵌る形で挿通され、さらにナット55に螺合
されている。そしてレール取付ブラケット48とレール
取付板49との間に圧縮バネ56が固定用ボルト51に
套装された形で挿入されていて、この圧縮バネ56の拡
張弾性力でレール取付ブラケット48をナット55に押
しつけ、同時にレール取付板49を固定用ボルト51の
頭部57に押しつけることにより両者間を所定の間隔を
維持しながら固定している。こうして、固定用ボルト5
1各々は回転できるがレール取付板48に対して左右X
方向、前後Y方向のいずれの位置関係も変えることがで
きないようにされている。なお、図中、58,59,6
0は平座金である。
A non-threaded bolt insertion hole 50 is formed at each of the four corners of the rail mounting plate 49, and the neck portion 52 of the fixing bolt 51 is inserted therein, and the tip screw portion 53 of the fixing bolt 51 is inserted. Are threaded holes 54 formed at the four corners of the rail mounting bracket 48.
It is inserted so that it fits snugly in, and is further screwed into the nut 55. A compression spring 56 is inserted between the rail mounting bracket 48 and the rail mounting plate 49 in such a manner that it is mounted on the fixing bolt 51, and the expansion elastic force of the compression spring 56 causes the rail mounting bracket 48 to move to the nut 55. By pressing and simultaneously pressing the rail mounting plate 49 against the head portion 57 of the fixing bolt 51, the two are fixed while maintaining a predetermined space therebetween. Thus, the fixing bolt 5
1 Each can rotate, but left and right X relative to the rail mounting plate 48
The positional relationship between the direction and the front-back Y direction cannot be changed. In the figure, 58, 59, 6
0 is a flat washer.

【0036】上記の構成のエレベータガイドレールの固
定装置によって各ガイドレール分割体13を昇降路側壁
14に固定した状態で、各ガイドレール分割体13の芯
出し作業を行う場合、次の手順によって行う。まず、左
右X方向の芯出し作業は、ナット16を緩めて長穴23
を利用して基部固定ブラケット17を所要量だけ左右に
移動させ、必要量だけ移動した後、ナット16をアンカ
ーボルト15に本締めする。
When the guide rail divisions 13 are fixed to the hoistway side wall 14 by the elevator guide rail fixing device having the above-mentioned structure, the guide rail divisions 13 are centered by the following procedure. . First, for the centering work in the left and right X direction, loosen the nut 16 and
Is used to move the base fixing bracket 17 to the right and left by a required amount, and after the required amount is moved, the nut 16 is finally tightened to the anchor bolt 15.

【0037】次に、ガイドレール分割体13の前後Y方
向およびねじれR方向の芯出し作業を行うが、前後Y方
向の芯出し作業は、レール取付板49の四隅の固定用ボ
ルト51それぞれを同じ量だけ回転させ、あるいはナッ
ト55各々を同じ量だけ回転させることによってそれら
の間の螺合量を増減させ、両者間の間隔を調整すること
によって行う。
Next, centering work in the front-rear Y direction and twist R direction of the guide rail divided body 13 is performed. The centering work in the front-rear Y direction uses the same fixing bolts 51 at the four corners of the rail mounting plate 49. This is done by rotating the nuts 55 by the same amount or by rotating each of the nuts 55 by the same amount to increase or decrease the screwing amount between them and adjust the distance between them.

【0038】またねじれR方向の芯出し作業は、四隅の
固定用ボルト51のうち、必要な位置のボルトを個別に
適当量だけ回転させ、あるいはナットを適当量だけ回転
させることによってそれらの間の螺合量を必要量だけ増
減させ、レール取付ブラケット48に対するレール取付
板49の四隅それぞれの間隔を個別に調整することによ
って行う。
The centering work in the twist R direction is performed by individually rotating the bolts at the necessary positions among the fixing bolts 51 at the four corners by an appropriate amount, or by rotating the nut by an appropriate amount. This is performed by increasing or decreasing the screwing amount by a necessary amount and individually adjusting the intervals of the four corners of the rail mounting plate 49 with respect to the rail mounting bracket 48.

【0039】こうして、この実施例のエレベータガイド
レールの固定装置でも、レール取付板49にガイドレー
ル分割体13を固定した状態でその芯出し作業が行える
ことになる。この芯出し作業の後、緩みが発生しないよ
うに固定用ボルト51の頭部57とレール取付板49と
の間、また固定用ボルト51の先端ねじ部53とナット
55との間、ナット55とレール取付ブラケット48と
の間それぞれを溶接して固定する。図中、63は溶接部
分を示している。
Thus, also in the elevator guide rail fixing device of this embodiment, the centering operation can be performed with the guide rail divided body 13 fixed to the rail mounting plate 49. After this centering operation, between the head portion 57 of the fixing bolt 51 and the rail mounting plate 49, between the tip screw portion 53 and the nut 55 of the fixing bolt 51, and the nut 55 so that loosening does not occur. The rail mounting bracket 48 and the rail mounting bracket 48 are welded and fixed together. In the figure, 63 indicates a welded portion.

【0040】次に、請求項3の発明の他の実施例につい
て図7および図8に基づいて説明する。この実施例の特
徴はレール取付ブラケット48とレール取付板49との
間隔を保持する弾性体として図8に示すようなくの字形
のバネ61を用いたところにある。したがって、その他
の構成要素は図5および図6に示した実施例と共通であ
り、同じ符号を付して示してある。なお、請求項3の発
明における弾性体の形状、構成は上記のバネ56または
バネ61に限定されず、レール取付ブラケット48とレ
ール取付板49との間隔を常に一定に保持するために両
者間に拡張力を与えることができる任意の形状、構造の
ものを用いることができる。
Next, another embodiment of the invention of claim 3 will be described with reference to FIGS. 7 and 8. The feature of this embodiment resides in that a square-shaped spring 61 as shown in FIG. 8 is used as an elastic body for holding the space between the rail mounting bracket 48 and the rail mounting plate 49. Therefore, the other components are the same as those in the embodiment shown in FIGS. 5 and 6, and are designated by the same reference numerals. The shape and configuration of the elastic body in the third aspect of the invention is not limited to the spring 56 or the spring 61, and in order to always keep the distance between the rail mounting bracket 48 and the rail mounting plate 49 constant, the elastic body and the spring mounting plate 49 should be fixed between them. Any shape and structure capable of giving expansion force can be used.

【0041】さらに請求項3の発明における固定用ボル
ト51の先端ねじ部53はナット55と螺合させるので
はなく、図1に示した実施例と同じように、レール取付
ブラケット48側にねじ穴を形成し、そのねじ穴に螺合
させる構成であってもよい。
Further, the tip screw portion 53 of the fixing bolt 51 in the invention of claim 3 is not screwed with the nut 55, but is screwed to the rail mounting bracket 48 side as in the embodiment shown in FIG. May be formed and screwed into the screw hole.

【0042】[0042]

【発明の効果】以上のように請求項1の発明によれば、
ガイドレールの前後方向およびねじれ方向の芯出しを行
う場合に、ガイドレールの両側においてレール取付板に
挿通したボルトの先端部をブラケットにねじ込むそのね
じ込み量を同じだけ増減させることによって前後方向の
芯出しを行い、また左右で必要量だけ異ならせることに
よってねじれ方向の芯出しを行い、この芯出しができれ
ば、ボルトをブラケットおよびレール取付板に溶接固定
するようにしているので、従来のようなシムを用いずに
ボルトのねじ込み量の増減だけでガイドレールの前後、
ねじれ方向の芯出し作業を行うことができ、芯出し作業
を短時間のうちに簡単に行うことができる。
As described above, according to the invention of claim 1,
When centering the guide rail in the front-rear direction and in the twist direction, screw the tip of the bolt inserted into the rail mounting plate into the bracket on both sides of the guide rail, and center it in the front-rear direction by increasing or decreasing the amount of screwing. Centering in the twisting direction by making the right and left sides different by the required amount, and if this centering is possible, the bolts are welded and fixed to the bracket and rail mounting plate. Without using it, just increase or decrease the screwed amount of the bolt, before and after the guide rail,
The centering work in the twist direction can be performed, and the centering work can be easily performed in a short time.

【0043】請求項2の発明によれば、ガイドレールの
前後方向およびねじれ方向の芯出しを行う場合に、ガイ
ドレールの両側においてレール取付板に固定したピンの
頭部を打つことによって、ブラケットに明けられた穴に
圧入するピンの先端部の圧入量を左右で同じだけ増減さ
せることによって前後方向の芯出しを行い、また左右で
必要量だけ異ならせることによってねじれ方向の芯出し
を行い、この芯出しができれば、ピンをブラケットおよ
びレール取付板に溶接固定するようにしているので、従
来のようなシムを用いずにピンの圧入量の増減だけでガ
イドレールの前後、ねじれ方向の芯出し作業を行うこと
ができ、芯出し作業を短時間のうちに簡単に行うことが
できる。
According to the second aspect of the present invention, when the guide rail is centered in the front-rear direction and in the twisting direction, the heads of the pins fixed to the rail mounting plates are struck on both sides of the guide rail, so that the bracket is attached to the bracket. Centering in the front-back direction is performed by increasing or decreasing the press-fitting amount of the tip of the pin that is press-fitted in the opened hole by the same amount on the left and right, and centering in the twisting direction by making the required amount different on the left and right. If the centering is possible, the pins are welded and fixed to the bracket and rail mounting plate.Therefore, centering work in the front-rear direction of the guide rail and in the twisting direction can be done simply by increasing or decreasing the press-fitting amount of the pins without using a shim. The centering work can be easily performed in a short time.

【0044】請求項3の発明によれば、ガイドレールの
前後方向およびねじれ方向の芯出しを行う場合に、ガイ
ドレールの両側においてレール取付板に挿通したボルト
の先端部とブラケットとの螺合量を同じだけ増減させる
ことによって前後方向の芯出しを行い、また左右で必要
量だけ異ならせることによってねじれ方向の芯出しを行
い、ブラケットとレール取付板との間に挿入されている
弾性体によってレール取付板を一定の位置に保持させ、
この芯出しができれば、ボルトをブラケットおよびレー
ル取付板に溶接固定するようにしているので、従来のよ
うなシムを用いずにボルトの螺合量の増減だけでガイド
レールの前後、ねじれ方向の芯出し作業を行うことがで
き、芯出し作業を短時間のうちに簡単に行うことができ
る。
According to the third aspect of the present invention, when centering the guide rail in the front-rear direction and the twisting direction, the amount of screw engagement between the tip of the bolt inserted into the rail mounting plate and the bracket on both sides of the guide rail. Is increased or decreased by the same amount to perform the centering in the front-rear direction, and the left and right are different by the required amount to perform centering in the twisting direction, and the elastic body inserted between the bracket and the rail mounting plate Hold the mounting plate in a certain position,
If this centering is possible, the bolts are welded and fixed to the bracket and the rail mounting plate.Therefore, simply by increasing or decreasing the screwing amount of the bolts without using a conventional shim, the center of the guide rail in the front-rear direction and the twist direction can be adjusted. The centering work can be performed, and the centering work can be easily performed in a short time.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項1の発明の一実施例の水平断面図。FIG. 1 is a horizontal sectional view of an embodiment of the invention of claim 1;

【図2】上記実施例の正面図。FIG. 2 is a front view of the above embodiment.

【図3】請求項2の発明の一実施例の水平断面図。FIG. 3 is a horizontal sectional view of an embodiment of the invention of claim 2;

【図4】上記実施例の正面図。FIG. 4 is a front view of the above embodiment.

【図5】請求項3の発明の一実施例の水平断面図。FIG. 5 is a horizontal sectional view of an embodiment of the invention of claim 3;

【図6】上記実施例の正面図。FIG. 6 is a front view of the above embodiment.

【図7】請求項3の発明の他の実施例の水平断面図。FIG. 7 is a horizontal sectional view of another embodiment of the invention of claim 3;

【図8】上記実施例で用いるバネの形状を示す側面図。FIG. 8 is a side view showing the shape of a spring used in the above embodiment.

【図9】一般的なエレベータの構造図。FIG. 9 is a structural diagram of a general elevator.

【図10】従来例の正面図。FIG. 10 is a front view of a conventional example.

【図11】従来例の拡大水平断面図。FIG. 11 is an enlarged horizontal sectional view of a conventional example.

【図12】従来例の拡大正面図。FIG. 12 is an enlarged front view of a conventional example.

【符号の説明】[Explanation of symbols]

1 昇降路 2 ガイドレール 3 ガイドレール 13 ガイドレール分割体 14 側壁 15 アンカーボルト 16 ナット 23 長穴 17 基部固定ブラケット 18 連結ブラケット 20 レールクリップ 31 レール取付ブラケット 32 レール取付板 33 レール止ボルト 34 挿通穴 35 固定用ボルト 39 止め輪 40 先端ねじ部 41 ねじ穴 42 溶接部分 43 レール取付ブラケット 44 レール取付板 45 ピン通し穴 46 ピン 47 ピン通し穴 48 レール取付ブラケット 49 レール取付板 50 ボルト挿通穴 51 固定用ボルト 53 先端ねじ部 54 ねじ挿通穴 55 ナット 56 圧縮バネ 61 バネ 1 hoistway 2 Guide rail 3 guide rails 13 Guide rail division 14 Side wall 15 Anchor bolt 16 nuts 23 slot 17 Base fixing bracket 18 Connection bracket 20 rail clip 31 Rail mounting bracket 32 Rail mounting plate 33 Rail stop bolt 34 insertion hole 35 Fixing bolt 39 retaining ring 40 Tip screw part 41 screw holes 42 Welded part 43 Rail mounting bracket 44 Rail mounting plate 45 pin through hole 46 pin 47 pin through hole 48 rail mounting bracket 49 Rail mounting plate 50 bolt insertion hole 51 Fixing bolt 53 Tip screw part 54 screw insertion hole 55 nuts 56 compression spring 61 spring

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66B 7/02 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) B66B 7/02

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 昇降路の側壁に固定されるブラケットに
対して対向するように配置された、ガイドレールを固定
するレール取付板と、 前記ガイドレールの両側において前記レール取付板に首
部分が挿通され、先端のねじ部分が前記ブラケットに螺
入された複数本のボルトと、 前記ボルト各々の頭部と前記レール取付板を介して対向
する位置に取り付けられ、前記ボルトの首部分各々を回
転可能にかつ長さ方向にはスライドできないように支持
する複数個の止め輪とを備えて成るエレベータガイドレ
ールの固定装置。
1. A rail mounting plate for fixing a guide rail, which is arranged so as to face a bracket fixed to a side wall of a hoistway, and a neck portion is inserted into the rail mounting plate on both sides of the guide rail. The screw portion of the tip is attached to a plurality of bolts screwed into the bracket, and the heads of the bolts are attached at positions facing each other via the rail mounting plate, and each neck portion of the bolts can be rotated. And a plurality of retaining rings that support the rail so that it cannot slide in the lengthwise direction, and an elevator guide rail fixing device.
【請求項2】 昇降路の側壁に固定されるブラケットに
対して対向するように配置された、ガイドレールを固定
するレール取付板と、 前記ガイドレールの両側において前記レール取付板に頭
部が固定され、前記ブラケットに形成された穴に先端部
が圧入貫通された複数本のピンとを備えて成るエレベー
タガイドレールの固定装置。
2. A rail mounting plate for fixing the guide rail, which is arranged so as to face a bracket fixed to the side wall of the hoistway, and a head is fixed to the rail mounting plate on both sides of the guide rail. And a plurality of pins each having a tip portion press-fitted and penetrated into a hole formed in the bracket.
【請求項3】 昇降路の側壁に固定されるブラケットに
対して対向するように配置された、ガイドレールを固定
するレール取付板と、 前記ガイドレールの両側において前記レール取付板に首
部分が挿通され、先端のねじ部分が前記ブラケットに螺
入された複数本のボルトと、 前記ブラケットとレール取付板との対向面間にそれらの
間隔を保持するために介挿された弾性体とを備えて成る
エレベータガイドレールの固定装置。
3. A rail mounting plate for fixing the guide rail, which is arranged so as to face a bracket fixed to the side wall of the hoistway, and a neck portion is inserted into the rail mounting plate on both sides of the guide rail. And a plurality of bolts whose threaded portions are screwed into the bracket, and an elastic body interposed between the opposing surfaces of the bracket and the rail mounting plate so as to maintain a distance therebetween. Fixing device for elevator guide rails.
JP08814994A 1994-04-26 1994-04-26 Elevator guide rail fixing device Expired - Fee Related JP3396534B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08814994A JP3396534B2 (en) 1994-04-26 1994-04-26 Elevator guide rail fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08814994A JP3396534B2 (en) 1994-04-26 1994-04-26 Elevator guide rail fixing device

Publications (2)

Publication Number Publication Date
JPH07291549A JPH07291549A (en) 1995-11-07
JP3396534B2 true JP3396534B2 (en) 2003-04-14

Family

ID=13934884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08814994A Expired - Fee Related JP3396534B2 (en) 1994-04-26 1994-04-26 Elevator guide rail fixing device

Country Status (1)

Country Link
JP (1) JP3396534B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015001183A1 (en) * 2013-07-03 2015-01-08 Kone Corporation Guide rail alignment system for elevators

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4702661B2 (en) * 2004-08-18 2011-06-15 清水建設株式会社 How to connect elevator walls
CN102344074A (en) * 2011-06-28 2012-02-08 苏州新达电扶梯部件有限公司 Guide rail support frame for elevator car
JP2013193857A (en) * 2012-03-22 2013-09-30 Hitachi Ltd Adjustment type locking device of elevator guide rail and elevator system equipped therewith
SE1250496A1 (en) * 2012-05-15 2013-11-16 Bergteamet Ab Device for attaching an elevator shaft fittings to a single wall of a mining shaft
CN102745571A (en) * 2012-06-07 2012-10-24 苏州汾湖电梯有限公司 Elevator track
WO2015165806A1 (en) * 2014-05-01 2015-11-05 Inventio Ag Rail securing devices for an elevator installation
CN103964278A (en) * 2014-05-23 2014-08-06 南通天雅电梯部件有限公司 Novel elevator guide rail support assembly
CN109632174A (en) * 2018-12-20 2019-04-16 天津市捷威动力工业有限公司 A kind of power battery bolt torsion intelligent monitor system
CN113460833A (en) * 2021-06-30 2021-10-01 赵霄雯 Multi-degree-of-freedom weak connection node additionally provided with elevator steel shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015001183A1 (en) * 2013-07-03 2015-01-08 Kone Corporation Guide rail alignment system for elevators

Also Published As

Publication number Publication date
JPH07291549A (en) 1995-11-07

Similar Documents

Publication Publication Date Title
JP3396534B2 (en) Elevator guide rail fixing device
US8302740B2 (en) Integrated support for elevator machine, sheaves and terminations
JPH1072179A (en) Balance weight of elevator
JP2001171954A (en) Means of supporting hoisting machine of elevator
JPWO2010106641A1 (en) Elevator clip device and elevator support device
JP2013193857A (en) Adjustment type locking device of elevator guide rail and elevator system equipped therewith
JP3961916B2 (en) Elevator guide rail fixing device
WO2021070362A1 (en) Hoist adjustment device and hoist installation method for machine-room-less elevator
JP4698805B2 (en) Elevator car equipment
CN201737557U (en) Guide rail fixing seat of elevator
JPH0525795B2 (en)
JP2004535345A (en) Assembly structure of elevator drive device in elevator shaft
JPH06322987A (en) Mounting method for pre-stress fixture-device
CN220033711U (en) Rope gripper mounting device
JP2004059233A (en) Guide rail fixing device for elevator
JP2003104653A (en) Method for setting rail position and tool exclusively used for the same
JPH0395086A (en) Buffer device for elevator
CN218538898U (en) Mounting structure of host driving system of elevator without machine room
KR20150000448U (en) Apparatus of preventing welding distortion
JPH06329371A (en) Elevator car
CN108547921A (en) A kind of chain stretching device
JP2001180880A (en) Counterweight
JPH0757676B2 (en) Elevator guide rail mounting device
CN110914184B (en) Counterweight device of elevator
JP2005126217A (en) Pit base device for elevator

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090207

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100207

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees