JP3380718B2 - Cable laying method, tow rope hanging tool used therefor, and utility pole detour device - Google Patents

Cable laying method, tow rope hanging tool used therefor, and utility pole detour device

Info

Publication number
JP3380718B2
JP3380718B2 JP24294897A JP24294897A JP3380718B2 JP 3380718 B2 JP3380718 B2 JP 3380718B2 JP 24294897 A JP24294897 A JP 24294897A JP 24294897 A JP24294897 A JP 24294897A JP 3380718 B2 JP3380718 B2 JP 3380718B2
Authority
JP
Japan
Prior art keywords
cable
rope
suspending
tow rope
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24294897A
Other languages
Japanese (ja)
Other versions
JPH1189032A (en
Inventor
渉 森尻
Original Assignee
日本コムシス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本コムシス株式会社 filed Critical 日本コムシス株式会社
Priority to JP24294897A priority Critical patent/JP3380718B2/en
Publication of JPH1189032A publication Critical patent/JPH1189032A/en
Application granted granted Critical
Publication of JP3380718B2 publication Critical patent/JP3380718B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、各種ケーブルを架
空で電柱等に敷設するケーブル敷設方法及びこれに用い
る牽引ロープ吊り下げ具並びに電柱迂回装置に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cable laying method for laying various cables aerially on a utility pole or the like, a tow rope suspending tool and a utility pole detouring device used therefor.

【0002】[0002]

【従来の技術】送電用ケーブル、信号用ケーブル等の各
種ケーブルを架空で電柱、支柱等に敷設する作業は以下
のように行っている。吊り線や既設のケーブルが敷設さ
れていない場合で、自己保持機能(ケーブルを保持する
部分が連設されている)のない一般のケーブルを敷設す
る場合は、図13、図14に示すように先ず横方向荷重
を地中に伝達させて安定させる支線50が張設された電
柱間に、高所作業車52を介して吊り線(鋼撚り線)5
3を緊結する(図13A)。なお、この吊り線53は、
ケーブル敷設時及び敷設後のケーブルを支持するための
ものである。
2. Description of the Related Art The work of laying various cables such as power transmission cables and signal cables on utility poles, poles and the like is performed as follows. When suspending wires or existing cables are not laid, and when laying general cables that do not have the self-holding function (the parts that hold the cables are connected), as shown in Figs. 13 and 14. First, a suspension wire (steel stranded wire) 5 is installed between utility poles on which a branch line 50 for transmitting a lateral load to the ground and stabilizing the same is installed via an aerial work vehicle 52.
Tighten 3 (FIG. 13A). The suspension line 53 is
It is intended to support the cables during and after cable installation.

【0003】次に、高所作業車52を介して所定の電柱
51a,51dに端末滑車(金車)54を、吊り線53
と中間の電柱51cに滑車(金車)55を取り付けると
ともに、これら滑車54,55に牽引ロープ56を通す
(図13B)。なお端末滑車54は、後述するロープ繰
り出し機及び牽引機作動時のそれぞれの力が作用する角
度が異なることによる不具合を解消するためのものであ
る。
Next, a terminal pulley (gold wheel) 54 and a suspension line 53 are attached to predetermined utility poles 51a and 51d via an aerial work vehicle 52.
A pulley (gold wheel) 55 is attached to the middle utility pole 51c, and a tow rope 56 is passed through these pulleys 54, 55 (FIG. 13B). The terminal pulley 54 is for eliminating a problem caused by different angles at which the respective forces are applied when the rope unwinder and the traction machine are operated, which will be described later.

【0004】次に、牽引ロープ54の後端部にケーブル
繰り出し機57から繰り出される新設ケーブル58を結
合し、牽引機59により牽引ロープ56を牽引すること
によって、新設ケーブル58を滑車54,55に通しな
がら電柱51の間に敷設する(図14A)。その後、高
所作業車52を介してケーブルハンガ60を吊り線53
と新設ケーブル58をくくるように取り付けるととも
に、端末滑車54、滑車55を取り外していく(図14
B)。すると、新設ケーブル58は吊り線53に対し平
行状態で電柱51a,51dの間に敷設される。
Next, a new cable 58 fed from the cable feeding device 57 is connected to the rear end of the tow rope 54, and the tow rope 56 is towed by the tow machine 59, whereby the new cable 58 is made into pulleys 54 and 55. It is laid between the electric poles 51 while passing (FIG. 14A). After that, the cable hanger 60 is attached to the suspension line 53 via the aerial work vehicle 52.
And the new cable 58 are attached so as to wrap around, and the terminal pulley 54 and the pulley 55 are removed (FIG. 14).
B). Then, the new cable 58 is laid between the electric poles 51a and 51d in parallel with the suspension line 53.

【0005】吊り線や既設のケーブルが敷設されていな
い場合で、自己保持型ケーブルを敷設する場合について
説明する。先ず、図15に示すように、横方向荷重を地
中に伝達させ安定させるための支線50が張設された電
柱51a,51dに高所作業車52を介して端末滑車
(金車)54を、中間の電柱51cに滑車(金車)55
を取り付けこれら滑車54,55に牽引ロープ56を通
す(図15A)。
A case where a self-holding type cable is laid when the suspension wire or the existing cable is not laid will be described. First, as shown in FIG. 15, a terminal pulley (gold wheel) 54 is attached to an electric pole 51a, 51d on which a branch line 50 for transmitting and stabilizing a lateral load to the ground is stretched via an aerial work vehicle 52. , Pulley (gold car) 55 on the utility pole 51c in the middle
And pulling rope 56 through these pulleys 54, 55 (FIG. 15A).

【0006】次に、牽引ロープ56の後端部に繰り出し
機57から繰り出される自己保持型ケーブル61を結合
し、牽引機59により牽引ロープ56を牽引することに
よって、自己保持型ケーブル61を滑車54,55に通
しながら敷設する(図15B)。次に、高所作業車52
を介して自己保持型ケーブル61の通信ケーブル(図示
していない)を保持する部分を緊張させながら、通信ケ
ーブルを各電柱51に緊結していくとともに、端末滑車
54、滑車55を取り外す。こうして、自己保持型ケー
ブル61は電柱51a,51dの間に敷設される。
Next, the self-holding type cable 61 fed out from the feeding machine 57 is connected to the rear end of the pulling rope 56, and the pulling rope 59 is pulled by the pulling machine 59 to pull the self-holding type cable 61 from the pulley 54. , 55 while laying (Fig. 15B). Next, the aerial work vehicle 52
While tightening the portion of the self-holding type cable 61 that holds the communication cable (not shown) via, the communication cable is tightly connected to each utility pole 51, and the terminal pulley 54 and the pulley 55 are removed. In this way, the self-supporting cable 61 is laid between the electric poles 51a and 51d.

【0007】既設のケーブルがある場合で、自己保持機
能のない一般のケーブルを敷設する場合は、先ず高所作
業車を介して所定の電柱に端末滑車(金車)を、さらに
既設ケーブルと他の電柱に滑車(金車)を取り付けると
ともに、滑車に吊り線と牽引ロープを通す。これは図1
4Aにおける吊り線を既設のケーブルと置き換えた場合
に相当する。次に、吊り線を各電柱に緊結する。
In the case where there is an existing cable and a general cable having no self-holding function is to be laid, first, a terminal pulley (gold wheel) is attached to a predetermined electric pole through an aerial work vehicle, and further the existing cable and other cables are installed. Attach the pulley (gold wheel) to the telephone pole of, and pass the suspension line and tow rope through the pulley. This is Figure 1
This corresponds to the case where the suspension wire in 4A is replaced with an existing cable. Next, the suspension wire is tightly connected to each power pole.

【0008】次に、牽引ロープの後端部にケーブル繰り
出し機から繰り出された新設するケーブルを結合し、牽
引機により牽引ロープを牽引することにより新設するケ
ーブルを滑車に通しながら敷設する。これは図14Aの
場合と同様である。次に、高所作業車を介してケーブル
ハンガを吊り線と新設するケーブルをくくるように取り
付けるとともに、端末滑車、他の滑車を取り外してい
く。これは図14Bの場合と同様である。こうして、ケ
ーブルが電柱の間に敷設される。
Next, a new cable fed from the cable feeding machine is connected to the rear end of the tow rope, and the tow rope is towed by the tow machine to lay the new cable through the pulley. This is similar to the case of FIG. 14A. Next, through the aerial work vehicle, the cable hanger is attached so as to wrap the suspension wire and the newly installed cable, and the terminal pulley and other pulleys are removed. This is similar to the case of FIG. 14B. Thus, the cable is laid between the utility poles.

【0009】既設のケーブルがある場合で、自己保持型
のケーブルを敷設する場合は、先ず高所作業車を介して
所定の電柱に端末滑車(金車)を、さらに既設ケーブル
と他の電柱に滑車(金車)を取り付けるとともに滑車に
吊り線と牽引ロープを通す。これは図14Aにおける吊
り線を既設のケーブルと置き換えた場合に相当する。
If there is an existing cable and a self-holding type cable is to be laid, first, a terminal pulley (gold wheel) is attached to a predetermined electric pole through an aerial work vehicle, and then the existing cable and another electric pole are connected. Attach the pulley (gold wheel) and pass the suspension line and tow rope through the pulley. This corresponds to the case where the suspension line in FIG. 14A is replaced with an existing cable.

【0010】次に、牽引ロープの後端部に繰り出し機か
ら繰り出された新設する自己保持型ケーブルを結合し、
牽引機により牽引ロープを牽引することにより新設する
自己保持型ケーブルを滑車に通しながら敷設する。これ
は図14Aの場合における吊り線を既設のケーブルと、
敷設中のケーブルを新設する自己保持型ケーブルと置き
換えた場合に相当する。次に、高所作業車を介して自己
保持型ケーブルの保持する部分を緊張させながら、通信
ケーブルを各電柱に緊結していくとともに、端末滑車、
他の滑車を取り外していく。こうして、自己保持型ケー
ブルが所定の電柱の間に敷設される。
Next, a new self-holding type cable that is unwound from the unwinder is connected to the rear end of the tow rope,
A new self-holding cable is installed by pulling a tow rope with a towing machine, passing through a pulley. In this case, the suspension wire in the case of FIG.
This is equivalent to replacing the existing cable with a new self-supporting cable. Next, while tightening the holding part of the self-supporting cable via the aerial work vehicle, while tightly connecting the communication cable to each utility pole, the terminal pulley,
Remove the other pulleys. Thus, the self-supporting cable is laid between the predetermined electric poles.

【0011】[0011]

【発明が解決しようとする課題】ところが、上記従来の
ケーブル敷設方法は、高所作業車を介して電柱や吊り線
等に滑車(金車)を事前に取り付ける危険な作業を強い
られる。また、滑車に新設ケーブルを通し牽引ロープを
牽引することによってケーブルを敷設する方法をとって
いたため、ケーブルに200kg 以上の張力がかかる場合は
中間牽引機等で補助する必要があった。しかも、牽引力
によりケーブルの損傷を招くおそれもあった。また、従
来のケーブル敷設方法では、ケーブルを1本づつしか敷
設できないという非効率性があった。
However, in the above-mentioned conventional cable laying method, a dangerous work of previously attaching a pulley (gold wheel) to an electric pole, a suspension line or the like via a work vehicle at high places is forced. Also, because the cable was laid by pulling the tow rope through the new cable through the pulley, it was necessary to assist with an intermediate tractor when the cable was to be tensioned more than 200 kg. Moreover, the pulling force may cause damage to the cable. Moreover, the conventional cable laying method has an inefficiency that only one cable can be laid.

【0012】本発明は、上記不具合を解決すべく提案さ
れるもので、高所作業による危険を回避し、ケーブルに
強い張力を与えることなく、多条数のケーブルを同時に
簡便な方法で敷設することができるケーブル敷設方法及
びこれに用いる牽引ロープ吊り下げ具並びに電柱迂回装
置を提供することを目的とする。
The present invention has been proposed to solve the above-mentioned problems, and avoids the danger of working at height, and lays a large number of cables at the same time by a simple method without giving a strong tension to the cables. It is an object of the present invention to provide a cable laying method, a tow rope suspending tool used for the method, and a utility pole bypass device.

【0013】[0013]

【課題を解決するための手段】本発明では上記目的を達
成するため、請求項1記載のケーブル敷設方法は、電柱
間に張設した吊り線又はこれに代わるケーブルを利用し
かつ補助手段を介して新設ケーブルを所要の電柱間に敷
設するケーブル敷設方法において、牽引ロープ繰り出し
機から繰り出された牽引ロープを前記補助手段であって
各々一部を開閉可能とされた複数の牽引ロープ吊り下げ
具に把持させるとともに、ケーブル繰り出し機から繰り
出された前記新設ケーブルをこれも前記補助手段であっ
て各々牽引ロープへの係止部と新設ケーブルを把持する
ケーブル把持部とを有する複数の新設ケーブル吊り下げ
具で前記牽引ロープに懸垂させる第1段階の作業を行
い、次に、前記牽引ロープ吊り下げ具を前記吊り線又は
これに代わるケーブルに移動可能に跨設させる第2段階
の作業を行い、次に、前記牽引ロープをケーブル敷設方
向に牽引して、相互に連結ロープで連結した前記複数の
牽引ロープ吊り下げ具を連続的に前記吊り線又はこれに
代わるケーブル上を移動させ、前記牽引ロープ吊り下げ
具から前記牽引ロープを外して前記電柱に前記新設ケー
ブルを固定し敷設する第3段階の作業を行い、最後に、
前記連結ロープを牽引して前記複数の牽引ロープ吊り下
げ具を回収する第4段階の作業を行うこととした。
In order to achieve the above-mentioned object in the present invention, the method of laying a cable according to claim 1 uses a suspension wire stretched between utility poles or a cable instead of the suspension wire and through an auxiliary means. In the cable laying method of laying a new cable between required electric poles, the tow ropes drawn out from the tow rope unwinder are the auxiliary means and are used as a plurality of tow rope suspending devices that can be partially opened and closed. A plurality of new cable suspenders for holding the new cable that has been unwound from the cable unwinding machine and also has a portion for locking the new cable as the auxiliary means and a cable grip portion for gripping the new cable. Perform the first step of suspending the tow rope with the tow rope, and then attach the tow rope suspending tool to the suspension line or a cable in place of it. A second step of movably straddling the tow rope, and then pulling the tow rope in the cable laying direction to continuously connect the plurality of tow rope suspenders connected to each other by connecting ropes. Perform a third stage work of moving the suspension cable or a cable in place of it, removing the tow rope from the tow rope suspending tool and fixing and laying the new cable on the telephone pole, and finally,
It was decided to perform the fourth stage work of towing the connecting rope and collecting the plurality of tow rope suspending tools.

【0014】また請求項2記載のケーブル敷設方法は、
請求項1記載のケーブル敷設方法において、前記第1段
階の作業、第2段階の作業、及び第4段階の作業を、前
記電柱間に張設した吊り線又はこれに代わるケーブルに
連続し電柱を地上に安定的に起立させる支線を利用して
地上で行うこととした。
The cable laying method according to claim 2 is
The cable laying method according to claim 1, wherein the first-stage work, the second-stage work, and the fourth-stage work are connected to a suspension wire stretched between the electric poles or a cable replacing the electric poles. We decided to do it on the ground using a branch line that stably stands on the ground.

【0015】さらに、請求項3記載のケーブル敷設方法
は、請求項1記載のケーブル敷設方法において、前記第
1段階の作業及び第2段階の作業を、前記支線に支持台
を介して略水平に付設したセット用ワイヤ上で行うこと
とした。
Further, in the cable laying method according to claim 3, in the cable laying method according to claim 1, the work of the first stage and the work of the second stage are made substantially horizontal to the branch line via a support base. It was decided to do it on the attached set wire.

【0016】さらに、請求項4記載のケーブル敷設方法
は、請求項1記載のケーブル敷設方法において、前記第
3段階の作業にて前記牽引ロープをケーブル敷設方向に
牽引する手段を、人力牽引、機械的牽引機、電動牽引機
を選択的に用いたものとすることとした。
Further, in the cable laying method according to claim 4, in the cable laying method according to claim 1, means for pulling the tow rope in the cable laying direction in the work of the third step is manually pulled by a machine. It was decided to selectively use the electric traction machine and the electric traction machine.

【0017】一方、請求項5記載の牽引ロープ吊り下げ
具は、請求項1から4までの何れか記載のケーブル敷設
方法に用いる牽引ロープ吊り下げ具において、前記吊り
線又はこれに代わるケーブル上を移動可能とする回転体
と、この回転体を保持する枠体と、この枠体に連結され
るとともに一部を開閉可能とされた吊り下げ部と、この
吊り下げ部の下部に位置するとともに牽引ロープを把持
解放自在とされたロープ把持部と、このロープ把持部に
よって把持された牽引ロープを前記吊り線又はこれに代
わるケーブルに仮吊りする仮吊り具と、この仮吊り具を
操作し前記牽引ロープを前記吊り下げ部外に出す操作具
と、を有するものとした。
On the other hand, the tow rope suspending device according to claim 5 is the tow rope suspending device used in the cable laying method according to any one of claims 1 to 4, wherein the suspending wire or a cable replacing the suspending wire is used. A rotating body that is movable, a frame body that holds the rotating body, a hanging portion that is connected to the frame body and that can be partially opened and closed, and a traction member that is located under the hanging portion and is pulled. A rope gripping portion that is capable of gripping and releasing the rope, a temporary suspending tool that temporarily suspends the tow rope gripped by the rope gripping portion on the suspension line or a cable that replaces the suspending wire, and the temporary suspending tool is operated to pull the rope. An operation tool for pulling the rope out of the hanging portion.

【0018】また請求項6記載の牽引ロープ吊り下げ具
は、請求項5記載の牽引ロープ吊り下げ具において、前
記牽引ロープ吊り下げ具相互が連結ロープで連結されて
いるものとした。
According to a sixth aspect of the present invention, in the tow rope suspending tool according to the fifth aspect, the tow rope suspending tools are connected to each other by a connecting rope.

【0019】さらに、請求項7記載の牽引ロープ吊り下
げ具は、請求項5記載の牽引ロープ吊り下げ具におい
て、先端の前記牽引ロープ吊り下げ部を遠隔操作可能な
自走式装置とするものとした。
Further, the tow rope suspending device according to claim 7 is the tow rope suspending device according to claim 5, wherein the tow rope suspending portion at the tip is a self-propelled device that can be remotely controlled. did.

【0020】そして、請求項8記載の電柱迂回装置は、
請求項2から4までの何れか記載の牽引ロープ吊り下げ
具に用いる電柱迂回装置において、前記吊り線又はこれ
に代わるケーブル及び、電柱を地上に安定的に起立させ
る支線に設けられた、分岐部材を有するケーブル軌道変
更装置と、このケーブル軌道変更装置を介して張設さ
れ、前記牽引ロープ吊り下げ具を前記分岐部材により一
時的に導かれる軌道変更用ケーブルと、を具えるものと
した。
The utility pole detour device according to claim 8 is
The utility pole detouring device used for the tow rope suspending device according to any one of claims 2 to 4, wherein the branching member is provided on the suspension line or a cable replacing the suspension line and a branch line that stably erects the utility pole on the ground. And a cable changing cable that is stretched through the cable changing device and that temporarily guides the tow rope suspending tool by the branching member.

【0021】また請求項9記載の電柱迂回装置は、請求
項8記載の電柱迂回装置において、前記軌道変更用部材
を介して張設される前記軌道変更用ケーブルを電柱から
離隔させる複数のアーム部材を具えるものとした。
[0021] The utility pole bypass device according to claim 9 is the utility pole bypass device according to claim 8, wherein a plurality of arm members for separating the track changing cable stretched through the track changing member from the utility pole. It was equipped with.

【0022】さらに、請求項10記載の電柱迂回装置
は、請求項9記載の電柱迂回装置において、電柱外周に
設けられ、前記牽引ロープ吊り下げ具の移動を円滑にす
る複数の回転体を有するケーブル懸垂装置移動助成具を
具えるものとした。
Further, the utility pole detouring device according to claim 10 is the utility pole detouring device according to claim 9, wherein the cable is provided on the outer circumference of the utility pole and has a plurality of rotating bodies for smoothly moving the tow rope suspending device. A suspension device movement aid was provided.

【0023】[0023]

【発明の実施の形態】以下図面を参照しながら、本発明
の実施の形態を詳細に説明してゆく。図1、図2はケー
ブル敷設作業中の状態を示したもので、ケーブル牽引開
始箇所とケーブル牽引終端箇所の概略図である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described in detail below with reference to the drawings. 1 and 2 show a state during cable laying work, and are schematic views of a cable pulling start point and a cable pulling end point.

【0024】ケーブル牽引開始箇所(図1Aは側面図、
Bは平面図)には、ケーブル繰り出し機1、牽引ロープ
繰り出し機2が設置されている。ケーブル繰り出し機1
が2機設置されているのは、新設ケーブル3の数が2本
であることによる。牽引ロープ繰り出し機2から繰り出
された1本の牽引ロープ4は後述するように牽引ロープ
吊り下げ具5に通され、その牽引ロープ4に装着した新
設ケーブル吊り下げ具34を介し牽引ロープ4に、図1
0に示すようにして前記2本の新設ケーブル3を懸垂さ
せる(第1段階の作業)。
Starting point of cable pulling (FIG. 1A is a side view,
A cable feeding machine 1 and a tow rope feeding machine 2 are installed in (B is a plan view). Cable feeding machine 1
Is installed because the number of new cables 3 is two. One tow rope 4 unwound from the tow rope unwinder 2 is passed through a tow rope suspending tool 5 as described later, and to the tow rope 4 via a new cable suspending tool 34 attached to the tow rope 4. Figure 1
The two new cables 3 are suspended as shown in 0 (first stage work).

【0025】次に、2本の新設ケーブル3を牽引ロープ
4に懸垂させた状態で牽引ロープ吊り下げ具5を、予め
張設されている吊り線8に跨設させる(第2段階の作
業)。この状態を示したのが図3であるが(図3では新
設ケーブル3は3本になっている)、地上から電柱間に
張設されている吊り線8に至るまで、及び吊り線8から
地上に至るまでの牽引ロープ吊り下げ具5の移動には、
電柱6を安定させるために張設されている支線7を利用
する。図1、図2では、この支線7を利用して牽引ロー
プ吊り下げ具5を移動させている状態を示している。
Next, with the two new cables 3 suspended from the tow rope 4, the tow rope suspending tool 5 is laid over the suspension line 8 stretched in advance (second step work). . Although this state is shown in FIG. 3 (in FIG. 3, the number of new cables 3 is three), from the ground to the suspension line 8 stretched between utility poles, and from the suspension line 8 To move the tow rope suspending tool 5 to the ground,
A branch line 7 stretched to stabilize the power pole 6 is used. 1 and 2 show a state in which the tow rope suspending tool 5 is moved using the branch line 7.

【0026】これらの作業を、電柱6を安定させるため
に張設されている支線7に支持台32を介して付設した
セット用ワイヤ33上で行うようにすると、作業性が一
層向上することとなろう。このように、第1段階の作業
及び第2段階の作業は地上で行うことができ、安全かつ
効率よい作業となる。なお、第1段階の作業及び第2段
階の作業を行う場所は、カラーコーン等で囲んだ作業帯
とし、周辺へ危険を及ぼさないようにしている。
If these operations are performed on the set wire 33 attached to the branch line 7 stretched for stabilizing the electric pole 6 via the support base 32, the workability is further improved. Become. As described above, the first stage work and the second stage work can be performed on the ground, and the work is safe and efficient. In addition, the place where the first stage work and the second stage work are performed is a work zone surrounded by a color cone or the like so as not to pose a danger to the surroundings.

【0027】こうして1つの牽引ロープ吊り下げ具5を
セット用ワイヤ33から吊り線8に跨設させた後、牽引
ロープ4をワイヤ敷設方向(矢印方向)に牽引し、1つ
の牽引ロープ吊り下げ具5を所定距離移動させ次の牽引
ロープ吊り下げ具5を吊り線8に跨設させ同様に移動さ
せる。図1では3個の牽引ロープ吊り下げ具5が新設ケ
ーブル3を懸垂しながら移動している状態を示している
(他の1個は未だセット用ワイヤ33上にある)。この
場合、牽引ロープ4を牽引する手段は、人力による牽
引、機械的牽引機を用いた牽引、電動牽引機を用いた牽
引等任意の手段であってよい。また、牽引ロープ吊り下
げ具5のうち先端のものを遠隔操作可能な自走式装置と
し、前記のような牽引する手段を用いることなく先端の
牽引ロープ吊り下げ具5を遠隔操作しながら牽引ロープ
4を牽引させるようにしてもよい。
In this way, one tow rope suspending tool 5 is laid over the suspending wire 8 from the setting wire 33, and then the tow rope 4 is towed in the wire laying direction (arrow direction), so that one tow rope suspending tool is provided. 5 is moved by a predetermined distance, and the next tow rope suspending tool 5 is laid over the suspension line 8 and moved in the same manner. FIG. 1 shows a state in which three tow rope suspenders 5 are moving while suspending the new cable 3 (the other one is still on the setting wire 33). In this case, the means for pulling the tow rope 4 may be any means such as tow by human power, tow using a mechanical tow, or tow using an electric tow. In addition, the tip of the tow rope suspending tool 5 is a self-propelled device that can be remotely operated, and the tow rope suspending tool 5 at the tip is remotely operated without using the above-described tow means. 4 may be pulled.

【0028】また、複数の牽引ロープ吊り下げ具5は牽
引ロープ4を把持しているので、牽引ロープ4上を移動
することなく牽引ロープ吊り下げ具5相互の間隔を保っ
たまま吊り線8上を移動するようになっているが、図2
の回収時を考慮し、図3に示すように牽引ロープ吊り下
げ具5相互を連結ロープ9で連結させておく。このよう
に牽引ロープ吊り下げ具5相互を連結することは、先端
の牽引ロープ吊り下げ具5を遠隔操作可能な自走式装置
とした場合に後続の牽引ロープ吊り下げ具5を誘導する
際特に必要である。
Further, since the plurality of tow rope suspending tools 5 hold the tow rope 4, the tow rope suspending tools 5 do not move on the tow rope 4 and remain on the suspending line 8 while maintaining a distance between them. It is designed to move, but Fig. 2
In consideration of the time of collection, the tow rope suspending tools 5 are connected by the connecting rope 9 as shown in FIG. In this way, connecting the tow rope suspenders 5 to each other is particularly useful when guiding the following tow rope suspenders 5 when the tip tow rope suspenders 5 are self-propelled devices that can be operated remotely. is necessary.

【0029】前記の作業を反復することによって、2本
の新設ケーブル3を敷設したところで、新設ケーブル3
の先端を電柱6bに固定する(第3段階の作業)。な
お、図示していないが、新設ケーブル3は所定の電柱6
a,6bの間にある各電柱にも固定される。こうして新
設ケーブル3を敷設した後、後述の如くして図4Bに示
すように牽引ロープ4を牽引ロープ吊り下げ具5の吊り
下げ部12から外して仮吊り具15を介し吊り線8に仮
吊りし、牽引ロープ吊り下げ具5を先端のものから順次
回収する作業を行う(第4段階の作業)。したがって、
新設ケーブル懸垂装置の内、新設ケーブル吊り下げ具3
4はそのまま残しておき、その後、図10に示すように
牽引ロープ4から吊り線8に付け替え、必要に応じその
新設ケーブル吊り下げ具34にカバーを付設する等の手
段をとればよいであろう。図2は、連結ロープ9を牽引
することにより牽引ロープ吊り下げ具5を回収している
状態を示している。この場合も新設ケーブル3の敷設開
始時と同様、吊り線8から地上に至るまでのは電柱6を
安定させるために張設されている支線7を利用する。
When the two new cables 3 are laid by repeating the above-mentioned work, the new cables 3
The tip of the is fixed to the utility pole 6b (work of the third stage). Although not shown, the new cable 3 has a predetermined utility pole 6
It is also fixed to each power pole between a and 6b. After laying the new cable 3 in this manner, the tow rope 4 is removed from the hanging portion 12 of the tow rope suspending tool 5 and temporarily suspended on the suspending wire 8 via the temporary suspending tool 15 as shown in FIG. 4B as described later. Then, the operation of recovering the tow rope suspending tool 5 from the tip end is performed in sequence (operation of the fourth stage). Therefore,
Of the new cable suspension devices, the new cable suspension device 3
4 may be left as it is, and then, as shown in FIG. 10, the pulling rope 4 may be replaced with the suspension line 8 and a cover may be attached to the new cable suspending tool 34 as necessary. FIG. 2 shows a state in which the tow rope suspending tool 5 is recovered by towing the connecting rope 9. Also in this case, similarly to the start of laying the new cable 3, the suspension line 8 extending from the suspension line 8 to the ground uses the branch line 7 stretched to stabilize the electric pole 6.

【0030】以上のようにして行うケーブル敷設方法に
よれば、牽引ロープ吊り下げ具5の吊り線8および牽引
ロープ4を取り付ける作業、新設ケーブル3の把持作
業、さらに牽引ロープ吊り下げ具5の回収作業を地上で
行うことができ作業の安全性を向上させることができ
る。また、新設ケーブル3の敷設の際、新設ケーブル3
自体に牽引張力を作用させないため牽引張力の管理の必
要がなくなる。また、新設ケーブル3は単に懸垂させる
構成であるので、多条数を同時に懸垂し敷設していくこ
とが可能である。
According to the cable laying method performed as described above, the work of attaching the suspension line 8 and the tow rope 4 of the tow rope suspending device 5, the work of gripping the new cable 3, and the recovery of the tow rope suspending device 5 are performed. Work can be performed on the ground, and work safety can be improved. In addition, when laying the new cable 3,
Since the traction tension does not act on itself, there is no need to manage the traction tension. Also, since the new cable 3 is simply suspended, it is possible to suspend and lay a large number of multiple cables at the same time.

【0031】そして、従来のケーブル敷設作業と比較す
ると高所作業は電柱へのケーブル固定作業、後述するケ
ーブル軌道変更装置の取り付け等のごく一部であり、大
幅に逓減させることができる。また、金車を吊り線等に
事前に取り付ける作業の必要もなくなる。また、後述す
るように牽引ロープ吊り下げ具5の回転体5aの径を大
きく構成しているので、小さな牽引力で牽引作業を実施
できる。
In comparison with the conventional cable laying work, the work at a high place is only a part of the work of fixing the cable to the electric pole and the installation of a cable track changing device which will be described later, and can be greatly reduced. Further, it is not necessary to previously attach the gold wheel to the suspension line or the like. Further, since the diameter of the rotating body 5a of the tow rope suspending tool 5 is configured to be large as will be described later, it is possible to carry out the towing operation with a small towing force.

【0032】図4は、前記ケーブル敷設方法に用いる新
設ケーブル懸垂装置の牽引ロープ吊り下げ具5を示した
ものである。図4Aは正面図、Bは側面図、Cは背面図
である。図5は牽引ロープ吊り下げ具5の動作を示す概
略斜視図である。図示のように、大径の回転体5aは、
枠体10に軸芯11を支点に回転可能に保持されてい
る。枠体10は表側枠体10aと背面側枠体10bを有
し、吊り線8は両枠体10a,10b間を通り回転体5
aの受け溝に接合するようになっている。
FIG. 4 shows a tow rope suspending tool 5 of the new cable suspending device used in the above-mentioned cable laying method. 4A is a front view, B is a side view, and C is a rear view. FIG. 5 is a schematic perspective view showing the operation of the tow rope suspending tool 5. As shown, the large-diameter rotating body 5a is
The frame body 10 is rotatably held around a shaft center 11. The frame body 10 has a front frame body 10a and a rear frame body 10b, and the suspension wire 8 passes between both frame bodies 10a and 10b, and the rotating body 5 is provided.
It is designed to be joined to the receiving groove of a.

【0033】また、枠体10の下部中央に吊り下げ部1
2が取り付けられている。この吊り下げ部12もフック
状の表側吊り下げ部(牽引ロープ受け部)12aと略L
字状の背面側吊り下げ部(回動部)12bを有し、この
うち背面側吊り下げ部12bは、図4Cに示すように支
軸13を支点に回動自在であり、牽引ロープ4を吊り下
げ部12内に出し入れする際に動作するようになってい
る。図5は背面側吊り下げ部12bの回動状態を示した
ものである。また、図4Bに示すように吊り下げ部12
の内部に、ロープ把持部14と、把持された牽引ロープ
4を吊り線8に仮吊りする仮吊り具15が設けられ、さ
らに仮吊り具15を操作する操作具16が吊り下げ部1
2の内部から外部に突設されている。
Further, the hanging portion 1 is provided at the center of the lower portion of the frame body 10.
2 is attached. This hanging part 12 is also substantially L with a hook-shaped front side hanging part (tow rope receiving part) 12a.
It has a character-shaped rear side suspending portion (rotating portion) 12b, of which the rear side suspending portion 12b is rotatable about a support shaft 13 as a fulcrum, as shown in FIG. 4C. It is designed to operate when being put in and taken out from the hanging portion 12. FIG. 5 shows a rotating state of the back side hanging portion 12b. Also, as shown in FIG.
A rope gripping portion 14 and a temporary suspending tool 15 for temporarily suspending the gripped tow rope 4 on a suspending wire 8 are provided inside, and an operating tool 16 for operating the temporary suspending tool 15 is further provided in the suspending portion 1.
2 is projected from the inside to the outside.

【0034】そこで牽引ロープ4を吊り下げ部12に把
持させるには、図4C、図5Bに示すように背面側吊り
下げ部12bを回動させて解放状態にし、表側吊り下げ
部12aに牽引ロープ4を導き入れる。その後背面側吊
り下げ部12bを回動させ、図4A、図5Aに示すよう
な元の状態にし、ロープ把持部14で牽引ロープ4を把
持する。この場合、牽引ロープ4はロープ把持部14に
連結されている仮吊り具15によって図4Bに示すよう
な仮吊り状態となっている。
Therefore, in order to hold the tow rope 4 on the suspending portion 12, the back side suspending portion 12b is rotated to the released state as shown in FIGS. 4C and 5B, and the front side suspending portion 12a is moved to the suspending portion 12. Introduce 4. After that, the back side suspending portion 12b is rotated to return to the original state as shown in FIGS. 4A and 5A, and the tow rope 4 is held by the rope holding portion 14. In this case, the tow rope 4 is in a temporarily suspended state as shown in FIG. 4B by the temporary suspending tool 15 connected to the rope gripping portion 14.

【0035】牽引ロープ4を吊り下げ部12から外す場
合は、図4C、図5Bに仮想線で示すように背面側吊り
下げ部12bを回動させて解放状態にし、図4Bに示す
ように操作具16を介して仮吊り具15を実線位置から
仮想線位置へ動かして、牽引ロープ4を吊り下げ部12
外に出す。ケーブル牽引開始時における牽引ロープ吊り
下げ具5へ牽引ロープ4を把持させる場合、及びケーブ
ル敷設後に牽引ロープ4を外し牽引ロープ吊り下げ部5
を電柱用支線へ導く場合には、前記のように吊り下げ部
12の背面側吊り下げ部12bを動作させて解放状態に
する。
When removing the tow rope 4 from the suspending portion 12, the back side suspending portion 12b is turned to the released state as shown by phantom lines in FIGS. 4C and 5B, and operated as shown in FIG. 4B. The temporary suspending tool 15 is moved from the solid line position to the imaginary line position via the tool 16 to suspend the tow rope 4 from the suspending section 12.
Go outside. When the tow rope suspending tool 5 grips the tow rope 4 at the start of cable tow, and after the cable is laid, the tow rope 4 is removed and the tow rope suspending portion 5
In order to guide the wire to the utility pole branch line, the back side hanging portion 12b of the hanging portion 12 is operated to be in the released state as described above.

【0036】図6は、ロープ把持部14の斜視図であ
り、仮想線で表示してあるように本体14a,14bが
2分割され開閉するようになっている。そして、本体が
閉じた時に形成される孔14cに牽引ロープ4が挿通さ
れ、その後バンド14dで孔14c内の牽引ロープ4が
締めつけられるように締結するようになっている。した
がって、本体14a,14bは弾性を有する素材で形成
することとなろう。図7A,Bは、吊り下げ部12の表
側吊り下げ部(牽引ロープ受け部)12aの正面図と斜
視図である。下部中央の切り欠き部に前記ロープ把持部
14が位置することとなる。
FIG. 6 is a perspective view of the rope grip portion 14, in which the main bodies 14a and 14b are divided into two and opened and closed as indicated by phantom lines. Then, the tow rope 4 is inserted into the hole 14c formed when the main body is closed, and then the tow rope 4 in the hole 14c is fastened by the band 14d so as to be tightened. Therefore, the main bodies 14a and 14b will be made of an elastic material. 7A and 7B are a front view and a perspective view of a front side suspension portion (traction rope receiving portion) 12a of the suspension portion 12. The rope gripping portion 14 is located in the cutout portion at the center of the lower portion.

【0037】図8Aは仮吊り具15とロープ把持部14
及び操作具16との関係を示す斜視図であり、図8Bは
仮吊り具15とロープ把持部14の関係を示した斜視図
である。図9Aは操作具16を示した正面図であり、図
9Bは操作具16と表側吊り下げ部12aの一部との関
係を示した斜視図である。
FIG. 8A shows a temporary suspender 15 and a rope grip portion 14.
8B is a perspective view showing a relationship between the temporary suspending tool 15 and the rope gripping portion 14, and FIG. FIG. 9A is a front view showing the operation tool 16, and FIG. 9B is a perspective view showing the relationship between the operation tool 16 and a part of the front side hanging portion 12a.

【0038】図10は新設ケーブル吊り下げ具34の使
用状態を示したもので、Aは新設ケーブル3を吊り下げ
た状態の正面図である。Bは側面図であるが、新設ケー
ブル吊り下げ具34を吊り線8に緊結する直前、及び新
設ケーブル3に緊結する直前を示し、それぞれ新設ケー
ブル吊り下げ具34a,34bの鍵部を係合させて緊結
するようになっている。
FIG. 10 shows the use state of the new cable suspending tool 34, and A is a front view of the state where the new cable 3 is suspended. Although B is a side view, it shows just before connecting the new cable suspending tool 34 to the suspension line 8 and just before connecting it to the new cable 3, and the key portions of the new cable suspending tools 34a and 34b are engaged with each other. Have become tightly connected.

【0039】Cは新設ケーブル3を2本以上懸垂する場
合の実施例を示したものである。新設ケーブル3の懸垂
方法はこれに限定されるものではなく、例えば複数のケ
ーブルを一つの保持部に束にするとともにケーブルの自
重により緊結されるような構成としてもよい。なお、図
示のように新設ケーブル3を保護するため保持部に保護
部材35を介在させるようにすれば、特に新設されるも
のが光通信用ケーブル等である場合の保護を図れる。
C shows an embodiment in which two or more new cables 3 are suspended. The method of suspending the new cable 3 is not limited to this. For example, a plurality of cables may be bundled in one holding portion and the cables may be tightly connected by their own weight. Incidentally, as shown in the figure, if the protective member 35 is interposed in the holding portion in order to protect the newly installed cable 3, it is possible to protect especially when the newly installed one is an optical communication cable or the like.

【0040】図11はケーブル軌道変更装置(軌道変更
用部材)17を示したもので、電柱箇所を迂回させる際
に一時的に牽引ロープ4の軌道を変更させるものであ
る。ケーブル軌道変更装置17は、牽引ロープ挿通部材
18と分岐部材19と延設部材20を有している。牽引
ロープ挿通部材18は、図11Bに示すように牽引ロー
プ挿通パイプ21に固定金具22が一体的に設けられて
いる。分岐部材19は、図11Cに示すように接続用棒
23を有する軌道部24に固定金具25が一体的に設け
られている。延設部材20は、図11Dに示すように迂
回用ロープ(軌道変更用ケーブル)26を有する軌道部
27に固定金具28が一体的に設けられている。これら
の部材を結合させ、各固定金具にボルト29を螺入し固
定する。図11Aは結合固定後のケーブル軌道変更装置
を示したもので、図12に示すように電柱6のケーブル
敷設方向両側2箇所に配設されることとなろう。
FIG. 11 shows a cable track changing device (track changing member) 17, which temporarily changes the track of the tow rope 4 when circumventing a utility pole. The cable track changing device 17 includes a tow rope insertion member 18, a branch member 19, and an extension member 20. As for the tow rope insertion member 18, as shown in FIG. 11B, the tow rope insertion pipe 21 and the fixing fitting 22 are integrally provided. In the branch member 19, as shown in FIG. 11C, a fixing member 25 is integrally provided on a track portion 24 having a connecting rod 23. As shown in FIG. 11D, the extension member 20 has a fixing fitting 28 integrally provided on a track portion 27 having a detouring rope (track changing cable) 26. These members are joined together, and bolts 29 are screwed into the fixing fittings to fix them. FIG. 11A shows the cable track changing device after connection and fixation, and as shown in FIG. 12, it will be arranged at two positions on both sides of the electric pole 6 in the cable laying direction.

【0041】このように構成されているケーブル軌道変
更装置17は、吊り線8を図12に示すような電柱6を
迂回させる場合に、予めケーブル軌道変更装置17を介
して迂回用ロープ26を張設し、吊り線8上を移動して
きた牽引ロープ吊り下げ具5を迂回用ロープ26に一時
的に導いた後、再び吊り線8に戻すようにする。なおケ
ーブル軌道変更装置17の取り付けは、高所作業車を用
いて作業することとなろう。
The cable track changing device 17 having the above-described structure stretches the detouring rope 26 through the cable track changing device 17 in advance when the suspension line 8 bypasses the utility pole 6 as shown in FIG. The traction rope suspending tool 5 that has been installed and has moved on the suspension line 8 is temporarily guided to the detour rope 26, and then returned to the suspension line 8 again. It should be noted that the cable track changing device 17 will be installed using a work vehicle at high altitude.

【0042】吊り線8を電柱6回りに迂回させる場合
に、迂回用ロープ26を電柱6から離隔させておくため
の複数のアーム部材30が必要である。さらに、迂回用
ロープ26上を移動させる際に牽引ロープ吊り下げ具5
が電柱6の周囲を円滑に移動できるように、ケーブル懸
垂装置移動助成具31を設けておくと効果的である。図
12Bは複数の回転体を連設してなるケーブル懸垂装置
移動助成具31を示している。ケーブル懸垂装置移動助
成具31の構成はこれに限定されるものでなく、複数の
ベアリングを所定域に設けたもの等任意の構成であって
よい。いずれにしてもケーブル懸垂装置移動助成具31
を設けると迂回経路の曲率半径を小さくできるという効
果が生じる。
When the suspension line 8 is detoured around the electric pole 6, a plurality of arm members 30 are required to keep the detouring rope 26 away from the electric pole 6. Furthermore, when moving on the detour rope 26, the tow rope suspending tool 5
It is effective to provide a cable suspension device movement assisting tool 31 so that the user can smoothly move around the telephone pole 6. FIG. 12B shows a cable suspension device movement assisting tool 31 formed by connecting a plurality of rotating bodies in series. The configuration of the cable suspension device movement assisting tool 31 is not limited to this, and may be any configuration such as a plurality of bearings provided in a predetermined area. In any case, the cable suspension device movement aid 31
The provision of is effective in reducing the radius of curvature of the bypass route.

【0043】[0043]

【発明の効果】以上のごとく本発明によれば、ケーブル
敷設時に高所作業によらなければならないのはごく一部
であり安全性が飛躍的に向上した。また、ケーブル自体
を牽引せず敷設するのでケーブルに強い張力を与えるこ
とがない。また、新設ケーブル吊り下げ具はケーブルを
まとめて把持しているので多条数のケーブルを同時に敷
設することができる。
As described above, according to the present invention, only a part of work at a high place is required when laying a cable, and safety is dramatically improved. Moreover, since the cable itself is laid without being pulled, a strong tension is not applied to the cable. Also, since the new cable suspending tool holds the cables together, a large number of cables can be laid simultaneously.

【図面の簡単な説明】[Brief description of drawings]

【図1】ケーブル牽引開始箇所の側面図及び平面図であ
る。
FIG. 1 is a side view and a plan view of a cable pulling start point.

【図2】ケーブル牽引終端箇所の側面図である。FIG. 2 is a side view of a cable towing end portion.

【図3】ケーブル懸垂状態を示した斜視図である。FIG. 3 is a perspective view showing a cable suspended state.

【図4】牽引ロープ吊り下げ具(新設ケーブル懸垂装
置)の正面図、側面図、背面図である。
FIG. 4 is a front view, a side view, and a rear view of a tow rope suspending device (new cable suspending device).

【図5】背面側吊り下げ部の回動状態を示した説明図で
ある。
FIG. 5 is an explanatory view showing a rotating state of a back side hanging portion.

【図6】ロープ把持部の斜視図である。FIG. 6 is a perspective view of a rope grip portion.

【図7】表側吊り下げ部の正面図と斜視図である。FIG. 7 is a front view and a perspective view of a front suspension unit.

【図8】仮吊り具とロープ把持部及び操作具との関係を
示す斜視図である。
FIG. 8 is a perspective view showing a relationship among a temporary suspending tool, a rope gripping portion, and an operating tool.

【図9】 操作具と表側吊り下げ部との関係を示した正
面図、及び斜視図である。
9A and 9B are a front view and a perspective view showing a relationship between an operation tool and a front suspension portion.

【図10】新設ケーブル吊り下げ具(新設ケーブル懸垂
装置)の使用状態を示した正面図、及び側面図である。
10A and 10B are a front view and a side view showing a usage state of a new cable suspending tool (new cable suspending device).

【図11】ケーブル軌道変更装置の構成部材の平面図及
びとこの構成部材を結合固定した状態の平面図である。
11A and 11B are a plan view of a component member of the cable track changing device and a plan view of a state in which the component member is fixedly coupled.

【図12】ケーブル軌道変更装置及びアーム部材の使用
状態を示した斜視図である。
FIG. 12 is a perspective view showing a usage state of a cable track changing device and an arm member.

【図13】従来の作業状態を示した説明図である。FIG. 13 is an explanatory diagram showing a conventional working state.

【図14】他の従来の作業状態を示した説明図である。FIG. 14 is an explanatory diagram showing another conventional working state.

【図15】他の従来の作業状態を示した説明図である。FIG. 15 is an explanatory diagram showing another conventional working state.

【符号の説明】[Explanation of symbols]

1 ケーブル繰り出し機 2 牽引ロープ繰り出し機 3 ケーブル 4 牽引ロープ 5 牽引ロープ吊り下げ具 6a 電柱 7 支線 8 吊り線 1 cable feeding machine 2 Tow rope unwinder 3 cables 4 tow rope 5 Tow rope suspension 6a utility pole 7 branch lines 8 suspension lines

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) H02G 1/02 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) H02G 1/02

Claims (10)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 電柱間に張設した吊り線又はこれに代わ
るケーブルを利用しかつ補助手段を介して新設ケーブル
を所要の電柱間に敷設するケーブル敷設方法において、 牽引ロープ繰り出し機から繰り出された牽引ロープを前
記補助手段であって各々一部を開閉可能とされた複数の
牽引ロープ吊り下げ具に把持させるとともに、ケーブル
繰り出し機から繰り出された前記新設ケーブルをこれも
前記補助手段であって各々牽引ロープへの係止部と新設
ケーブルを把持するケーブル把持部とを有する複数の新
設ケーブル吊り下げ具で前記牽引ロープに懸垂させる第
1段階の作業を行い、 次に、前記牽引ロープ吊り下げ具を前記吊り線又はこれ
に代わるケーブルに移動可能に跨設させる第2段階の作
業を行い、 次に、前記牽引ロープをケーブル敷設方向に牽引して
相互に連結ロープで連結した前記複数の牽引ロープ吊り
下げ具を連続的に前記吊り線又はこれに代わるケーブル
上を移動させ、前記牽引ロープ吊り下げ具から前記牽引
ロープを外して前記電柱に前記新設ケーブルを固定し敷
設する第3段階の作業を行い、 最後に、前記連結ロープを牽引して前記複数の牽引ロー
プ吊り下げ具を回収する第4段階の作業を行うことを特
徴とする、ケーブル敷設方法。
Claim: What is claimed is: 1. In a cable laying method in which a suspension line stretched between utility poles or a cable replacing the cable is used and a new cable is laid between required utility poles through auxiliary means, the cable is fed from a tow rope unwinder. a plurality of the pulling rope is openable part each said auxiliary means der
While holding the tow rope suspending tool , also use the new cable unwound from the cable unwinder.
Each of the above-mentioned auxiliary means includes a lock portion for a tow rope and a new installation.
A plurality of new cables having a cable grip for gripping the cable
Performing the first step of suspending the tow rope with the installed cable suspending tool, and then performing the second step of suspending the tow rope suspending tool over the suspending wire or a cable replacing it. Then, pull the tow rope in the cable laying direction ,
Suspension of a plurality of tow ropes connected to each other by connecting ropes
The suspending device is continuously moved on the suspension line or a cable replacing the suspension, and the suspending device is pulled from the suspending rope suspending device.
Remove the rope complete the third step of laying and fixing the new cable to the utility pole, finally, the plurality of traction rows towing the connecting rope
A cable laying method, characterized by performing a fourth stage of work for collecting the hanging device .
【請求項2】 前記第1段階の作業、第2段階の作業、
及び第4段階の作業は、前記電柱間に張設した吊り線又
はこれに代わるケーブルに連続し電柱を地上に安定的に
起立させる支線を利用して地上で行うことを特徴とす
る、請求項1記載のケーブル敷設方法。
2. The first stage work, the second stage work,
And the work in the fourth stage is performed on the ground by using a suspension line stretched between the utility poles or a branch line which is continuous with a cable instead of the suspension line and stably stands the utility pole on the ground. The cable laying method described in 1.
【請求項3】 前記第1段階の作業及び第2段階の作業
は、前記支線に支持台を介して略水平に付設したセット
用ワイヤ上で行うことを特徴とする、請求項2記載のケ
ーブル敷設方法。
3. The cable according to claim 2, wherein the work of the first stage and the work of the second stage are performed on a set wire attached to the branch line substantially horizontally via a support base. Laying method.
【請求項4】 前記第3段階の作業に前記牽引ロープ
をケーブル敷設方向に牽引する手段は、人力牽引、機械
的牽引機、電動牽引機を選択的に用いたものであること
を特徴とする、請求項1記載のケーブル敷設方法。
Wherein means for pulling the pulling rope similar operations in the third step in the cable laying direction, and wherein the manual traction, mechanical traction machine, in which using an electric traction motor selectively The cable laying method according to claim 1.
【請求項5】 前記吊り線又はこれに代わるケーブル上
を移動可能とする回転体と、 この回転体を保持する枠体と、 この枠体に連結されるとともに一部を開閉可能とされ
吊り下げ部と、 この吊り下げ部の下部に位置するとともに牽引ロープを
把持解放自在とされたロープ把持部と、 このロープ把持部によって把持された牽引ロープを前記
吊り線又はこれに代わるケーブルに仮吊りする仮吊り具
と、 この仮吊り具を操作し前記牽引ロープを前記吊り下げ部
外に出す操作具と、 を有することを特徴とする、請求項1から4までの何れ
か記載のケーブル敷設方法に用いる牽引ロープ吊り下げ
5. A rotary member to be movable on the suspension wire or cable in place of this, a frame body for holding the rotating member, hanging is openable part Rutotomoni connected to the frame and lowering unit, and the rope gripping portion that is freely grip release the tow rope with located at the bottom of this hanging element, the traction rope is gripped by the rope gripping portion the
Temporary suspending tool for temporarily suspending the suspension wire or a cable replacing it
And operating this temporary suspender to attach the tow rope to the suspending section.
And having a an operation tool let out, any of claims 1 to 4
Suspension of tow rope used for cable laying method
Ingredient
【請求項6】 前記牽引ロープ吊り下げ相互は連結ロ
ープで連結されていることを特徴とする、請求項記載
牽引ロープ吊り下げ具
Wherein said traction rope hanger each other characterized that you have been connected by a connecting rope, pulling rope hanger according to claim 5, wherein.
【請求項7】 先端の前記牽引ロープ吊り下げは遠隔
操作可能な自走式装置であることを特徴とする、請求項
記載の牽引ロープ吊り下げ具
7. The tow rope suspending device at the tip is a self-propelled device that can be remotely controlled.
5 tow rope hanging instrument described.
【請求項8】 前記吊り線又はこれに代わるケーブル
び、電柱を地上に安定的に起立させる支線に設けられ
た、分岐部材を有するケーブル軌道変更装置と、 このケーブル軌道変更装置を介して張設され、前記牽引
ロープ吊り下げ具を前記分岐部材により一時的に導かれ
軌道変更用ケーブルと、 を具える ことを特徴とする、請求項2から4までの何れ
か記載のケーブル敷設方法に用いる電柱迂回装置。
Wherein said catenary or cable the alternative
And a pole installed on the branch line that stably erects the pole on the ground.
Also, a cable track changing device having a branching member, and the cable pulling device stretched through the cable track changing device.
The rope suspension is temporarily guided by the branch member.
Characterized in that it comprises a track change cable that, the, one of claims 2 to 4
A utility pole detouring device used in the cable laying method as described above .
【請求項9】 前記軌道変更用部材を介して張設され
前記軌道変更用ケーブル電柱から離隔させる複数のア
ーム部材を具えることを特徴とする、請求項8記載の電
柱迂回装置
9. via the track change member Ru is stretched
9. The electric wire according to claim 8, further comprising a plurality of arm members for separating the track changing cable from the electric pole.
Pillar detour device .
【請求項10】 電柱外周に設けられ、前記牽引ロープ
吊り下げ具の移動を円滑にする複数の回転体を有する
ーブル懸垂装置移動助成具を具えることを特徴とする
請求項9記載の電柱迂回装置
10. The tow rope provided on the outer periphery of a power pole.
Characterized in that it comprises the Quai <br/> Buru suspension device moving subsidy tool having a plurality of rotating bodies to facilitate the movement of the hanger,
The utility pole bypass device according to claim 9 .
JP24294897A 1997-09-08 1997-09-08 Cable laying method, tow rope hanging tool used therefor, and utility pole detour device Expired - Fee Related JP3380718B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24294897A JP3380718B2 (en) 1997-09-08 1997-09-08 Cable laying method, tow rope hanging tool used therefor, and utility pole detour device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24294897A JP3380718B2 (en) 1997-09-08 1997-09-08 Cable laying method, tow rope hanging tool used therefor, and utility pole detour device

Publications (2)

Publication Number Publication Date
JPH1189032A JPH1189032A (en) 1999-03-30
JP3380718B2 true JP3380718B2 (en) 2003-02-24

Family

ID=17096614

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24294897A Expired - Fee Related JP3380718B2 (en) 1997-09-08 1997-09-08 Cable laying method, tow rope hanging tool used therefor, and utility pole detour device

Country Status (1)

Country Link
JP (1) JP3380718B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4043936A4 (en) * 2019-10-08 2023-11-01 Fujikura Ltd. Cable wiring method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4597743B2 (en) * 2005-04-05 2010-12-15 中部電力株式会社 Cable wiring method
CN105226574B (en) * 2015-11-05 2018-02-16 山西省工业设备安装集团有限公司 Cable laying method and laying part
CN111898226B (en) * 2020-07-15 2024-02-13 广东电网有限责任公司清远供电局 Method, device, equipment and storage medium for determining potential dangerous point of wiring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4043936A4 (en) * 2019-10-08 2023-11-01 Fujikura Ltd. Cable wiring method

Also Published As

Publication number Publication date
JPH1189032A (en) 1999-03-30

Similar Documents

Publication Publication Date Title
US20120199799A1 (en) Apparatus and method for stringing aerial cables using aircraft
JP3380718B2 (en) Cable laying method, tow rope hanging tool used therefor, and utility pole detour device
JP3401751B2 (en) How to transfer electric wires from wire-drawing wheel to suspension clamp at the time of work on tight line
JP4299654B2 (en) Cable erection method and cable tie and cable set
JP2859367B2 (en) Cable laying vehicle
JP2755332B2 (en) Drum movable manipulator cable trolley
JP3176886B2 (en) Hanging wheel and cable replacement method using it
US3185444A (en) Method of installing cable on existing messenger
JP2007215361A (en) Method of laying aerial cable
JPH0412609A (en) Underground cable removing device
JPH10285735A (en) Wire tension for overhead wire to steel tower
JPH0419763B2 (en)
JP5944361B2 (en) Method for constructing bundled pipelines and method for laying overhead cables
JP3479666B2 (en) Tensile device and overhead wire work method
JP2002017011A (en) Aerial line stringing method
RU2091944C1 (en) Method of wire mounting with use of flying vehicles
JP2774660B2 (en) Winding grip positioning tool
JPH0697804B2 (en) Wire drawing method and its equipment
JPH0538011A (en) Method for removing aerial line
JP3350663B2 (en) Moving gold car
JP3597301B2 (en) Aerial cable laying method
RU2209141C2 (en) Method of and device for evacuation of machine by means of retriever
JPS6233476Y2 (en)
JPH10313514A (en) Cable stringing device
JP2969432B2 (en) Overhead wiring clamp device and overhead wiring method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20021112

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071213

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081213

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081213

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091213

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101213

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101213

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111213

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111213

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121213

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees