JP3377945B2 - Suspension device for temporary construction - Google Patents

Suspension device for temporary construction

Info

Publication number
JP3377945B2
JP3377945B2 JP11013998A JP11013998A JP3377945B2 JP 3377945 B2 JP3377945 B2 JP 3377945B2 JP 11013998 A JP11013998 A JP 11013998A JP 11013998 A JP11013998 A JP 11013998A JP 3377945 B2 JP3377945 B2 JP 3377945B2
Authority
JP
Japan
Prior art keywords
chain
clamp
shaped body
suspension device
length adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11013998A
Other languages
Japanese (ja)
Other versions
JPH11293910A (en
Inventor
節郎 小林
直之 柴山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sugiko Co Ltd
Original Assignee
Sugiko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sugiko Co Ltd filed Critical Sugiko Co Ltd
Priority to JP11013998A priority Critical patent/JP3377945B2/en
Publication of JPH11293910A publication Critical patent/JPH11293910A/en
Application granted granted Critical
Publication of JP3377945B2 publication Critical patent/JP3377945B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁下に補修作業
用の吊り足場を仮設する場合などに便利に使用すること
のできる仮設工事用吊下げ装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a suspending device for temporary construction which can be conveniently used when temporarily constructing a suspending scaffold for repair work under a bridge.

【0002】[0002]

【従来の技術】橋梁下に補修作業用の吊り足場を仮設す
る場合、橋梁のエッジ部に適当間隔おきにコ形クランプ
などを介してチェン吊下げ具を取り付け、この各チェン
吊下げ具に吊り下げたチェンにより鋼管を水平向きに吊
り下げる方法で、複数本の鋼管を同一高さに並列状に吊
り下げ、これら並列状の鋼管で足場板を支持する方法が
採られる。この場合、並列状に吊り下げられる各鋼管が
同一レベルになるように各吊下げチェンの吊下げ長さを
調整する必要があるが、チェンの吊下げ長さ調整は、チ
ェンの端部に取り付けられたフックのチェンリンクに対
する係止位置を変えて行うしか方法がなかった。
2. Description of the Related Art When suspending scaffolding for repair work is temporarily installed under a bridge, chain suspenders are attached to the edge of the bridge at appropriate intervals via U-shaped clamps, and suspended on each chain suspender. A method of suspending a steel pipe in a horizontal direction by a chain that has been lowered is used to suspend a plurality of steel pipes in parallel at the same height and to support the scaffolding plate with these parallel steel pipes. In this case, it is necessary to adjust the suspension length of each suspension chain so that the steel pipes suspended in parallel are at the same level. The only way to do this is to change the locking position of the hook to the chain link.

【0003】[0003]

【発明が解決しようとする課題】上記のように、チェン
の端部に取り付けられたフックのチェンリンクに対する
係止位置を変えて行うチェンの吊下げ長さ調整では、チ
ェンリンクのピッチより細かくチェンの吊下げ長さを調
整することができないので、仮に複数本のチェンで鋼管
を略水平に吊り下げることができたとしても、1本の鋼
管を吊り下げている複数本のチェンに、負荷のかかるチ
ェンと負荷のかからないチェンとが混在する結果とな
り、全てのチェンに負荷を分散させた安全性の高い足場
を仮設することができなくなる。
As described above, in adjusting the hanging length of the chain by changing the locking position of the hook attached to the end of the chain with respect to the chain link, the chain length is finer than the pitch of the chain link. Since it is not possible to adjust the suspending length of the steel pipe, even if it is possible to suspend the steel pipes in a substantially horizontal manner with a plurality of chains, it is possible to load a load on the chains that suspend one steel pipe. As a result, such chains and unloaded chains are mixed, and it becomes impossible to temporarily install scaffolds with high safety in which loads are distributed to all chains.

【0004】[0004]

【課題を解決するための手段】本発明は上記のような従
来の問題点を解消し得る仮設工事用吊下げ装置を提供す
ることを目的とするものであって、その手段を後述する
実施形態の参照符号を付して示すと、クランプ1と、長
さ調整吊り具2と、チェン吊下げ具3とから成り、クラ
ンプ1は、コ形本体4と、このコ形本体4に嵌合した水
平板部(桁梁28のエッジ部28a)を前記コ形本体4
の下辺部9上に締結する締結ねじ5とから成り、長さ調
整吊り具2は、前記クランプ1のコ形本体下辺部9に前
記チェン吊下げ具3を吊り下げるもので、螺軸部17と
これに相対回転自在に螺嵌する長さ調整用の長ナット1
8とを備えた仮設工事用吊下げ装置であって、前記長さ
調整吊り具2が、前記クランプ1のコ形本体下辺部9に
結合された軸杆16と、当該軸杆16の下端球面状膨出
頭部13に上端部が首振り及び自転可能に吊り下げられ
た長ナット18と、当該長ナット18に螺嵌し且つ下端
部が前記チェン吊下げ具3に結合された螺軸17とから
成る構成となっている。
SUMMARY OF THE INVENTION An object of the present invention is to provide a suspending device for temporary construction which can solve the above-mentioned conventional problems, and its means will be described later. The clamp 1 is composed of a clamp 1, a length adjusting suspender 2 and a chain suspender 3, and the clamp 1 is fitted to the U-shaped body 4 and the U-shaped body 4. The horizontal plate portion (edge portion 28a of the girder beam 28) is formed into the U-shaped main body 4
And a fastening screw 5 fastened on the lower side portion 9 of the clamp 1, and the length adjusting suspending tool 2 suspends the chain suspending tool 3 on the lower side portion 9 of the C-shaped body of the clamp 1, and the screw shaft portion 17 And a long nut 1 for adjusting the length that is screwed into this so as to be relatively rotatable.
8 is a suspending device for temporary construction, comprising:
The adjusting sling 2 is attached to the lower side 9 of the C-shaped body of the clamp 1.
The coupled rod 16 and the lower end spherical bulge of the rod 16.
The upper end is suspended from the head 13 so that it can swing and rotate.
Long nut 18 and a lower end that is screwed into the long nut 18
Part from the screw shaft 17 connected to the chain suspension 3
It is composed of

【0005】[0005]

【0006】上記構成の本発明装置を実施するに際し、
前記チェン吊下げ具3は、U字形に曲げた帯状板の両端
板部23a,23bを内側に折曲して互いに重ね合わせ
るとともに、U字形部分24の断面を、内側が凸曲面と
なる円弧形としたものとし、前記両端板部23a,23
bを前記長さ調整吊り具2の下端に結合することができ
る。
In carrying out the apparatus of the present invention having the above structure,
The chain suspending tool 3 is configured such that both end plate portions 23a and 23b of a U-shaped band-shaped plate are bent inward and overlapped with each other, and the cross section of the U-shaped portion 24 is an arc having a convex curved surface on the inside. The both end plate portions 23a, 23
b can be connected to the lower end of the length adjusting hanger 2.

【0007】[0007]

【発明の実施の形態】以下に本発明の好適実施形態を添
付図に基づいて説明すると、図1において、1はコ形ク
ランプ、2は長さ調整吊り具、3はチェン吊下げ具であ
る。コ形クランプ1は、コ形本体4と締結ねじ5とから
成り、コ形本体4は、その全周縁に張出部6を残してコ
字形に連続する凸曲リブ7をプレス加工により形成した
ものであり、その上辺部8と下辺部9とにそれぞれ貫通
ねじ孔10,11を略同心状に形成したものである。締
結ねじ5は、前記コ形本体上辺部8の貫通ねじ孔10を
螺合貫通するもので、内端には皿ばね状の押圧盤12が
自転可能に取り付けられている。
BEST MODE FOR CARRYING OUT THE INVENTION A preferred embodiment of the present invention will be described below with reference to the accompanying drawings. In FIG. 1, 1 is a U-shaped clamp, 2 is a length adjusting suspending tool, and 3 is a chain suspending tool. . The U-shaped clamp 1 is composed of a U-shaped body 4 and a fastening screw 5, and the U-shaped body 4 has a convex rib 7 continuous in a U-shape formed by pressing, leaving an overhanging portion 6 on the entire periphery thereof. The upper side portion 8 and the lower side portion 9 are formed with through screw holes 10 and 11 substantially concentrically. The fastening screw 5 is screwed through the through-screw hole 10 of the upper side 8 of the U-shaped body, and a disc spring-shaped pressing plate 12 is rotatably attached to the inner end thereof.

【0008】長さ調整吊り具2は、下端に球面状膨出頭
部13が一体成形された螺軸部14とロックナット15
とを備えた軸杆16と、螺軸17と、長ナット18とか
ら構成されたもので、長ナット18は、円筒体の上端部
18aを前記軸杆16の球面状膨出頭部13に面接触す
るように絞って、当該球面状膨出頭部13に対し首振り
及び自転可能に吊り下げたもので、下端部にはねじ孔部
19が同心状に形成されている。螺軸17は、前記長ナ
ット18のねじ孔部19に螺合するもので、下端の六角
状頭部17aに、当該頭部17aの端面に開口するねじ
孔20が同心状に形成されている。
The length adjusting sling 2 has a screw shaft portion 14 having a spherical bulging head 13 integrally formed at the lower end and a lock nut 15.
And a screw shaft 17 and a long nut 18. The long nut 18 has a cylindrical upper end portion 18a on which the spherical bulging head 13 of the shaft rod 16 is attached. It is squeezed so as to come into contact with the spherical bulging head 13, and is suspended so as to swing and rotate about its axis, and a screw hole portion 19 is concentrically formed at the lower end portion. The screw shaft 17 is screwed into the screw hole portion 19 of the long nut 18, and the hexagonal head portion 17a at the lower end is concentrically formed with a screw hole 20 opening to the end face of the head portion 17a. .

【0009】上記長さ調整吊り具2は、その軸杆16の
螺軸部14を、前記コ形クランプ1におけるコ形本体下
辺部9の貫通ねじ孔11に螺合させ、ロックナット15
を締結することにより、コ形クランプ1の下辺部9に結
合されるが、この長さ調整吊り具2の取り付けに際し、
コ形本体4に対し軸杆16を回転操作しなければならな
い。この軸杆16の回転操作のために、軸杆16の球面
状膨出頭部13と螺軸部14との間の軸部分16aに回
転操作用角軸部を形成できない場合は、図示のように、
球面状膨出頭部13の下端面に2つの突起13a,13
bを突設しておき、当該両突起13a,13b間に嵌合
するように回転操作用棒状体を直径方向に挿通させる貫
通孔21を前記長ナット18に設けておくことができ
る。また、この貫通孔21とは別に、長ナット18を回
転操作するときに回転操作用棒状体を直径方向に挿通さ
せるための貫通孔22を長ナット18に設けておくこと
もできる。
In the length adjusting suspension 2, the screw shaft portion 14 of the shaft rod 16 is screwed into the through screw hole 11 of the lower side portion 9 of the U-shaped main body of the U-shaped clamp 1 to lock the lock nut 15.
When the length adjusting sling 2 is attached, it is joined to the lower side 9 of the U-shaped clamp 1 by fastening.
The shaft rod 16 must be rotated with respect to the U-shaped body 4. When the rotation operation angular shaft portion cannot be formed in the shaft portion 16a between the spherical bulging head 13 of the shaft rod 16 and the screw shaft portion 14 due to the rotation operation of the shaft rod 16, as shown in the drawing. ,
Two protrusions 13a, 13 are provided on the lower end surface of the spherical bulging head 13.
It is possible to provide the long nut 18 with a through hole 21 through which the rod for rotational operation is inserted in the diametrical direction so as to fit between the protrusions 13a and 13b. In addition to the through hole 21, the long nut 18 may be provided with a through hole 22 for inserting the rotation operating rod in the diametrical direction when the long nut 18 is rotationally operated.

【0010】チェン吊下げ具3は、U字形に曲げた帯状
板の両端板部23a,23bを内側に折曲して互いに重
ね合わせるとともに、U字形部分24の断面を、U字形
の内側が凸曲面となる円弧形としたもので、前記両端板
部23a,23bを内側から外向きに貫通させたボルト
25を前記螺軸17のねじ孔20に螺合締結することに
より、前記螺軸17の下端に結合されている。
In the chain hanging device 3, both end plate portions 23a and 23b of a U-shaped strip plate are bent inward and overlapped with each other, and the cross section of the U-shaped portion 24 has a convex U-shaped inside. The screw shaft 17 has a curved arc shape, and a bolt 25, which penetrates the both end plate portions 23a and 23b from the inside to the outside, is screwed into the screw hole 20 of the screw shaft 17 so that the screw shaft 17 Is attached to the bottom edge of.

【0011】図2及び図3に示すように、以上のように
構成された吊下げ装置26は、例えば橋梁下に補修作業
用吊り足場27を仮設する場合、橋梁の桁梁28のエッ
ジ部28aに取り付けられる。即ち、コ形クランプ1の
コ形本体4を前記桁梁28のエッジ部28aに横向きに
外嵌させ、上から締結ねじ5を締め付けて、その下端の
押圧盤12とコ形本体下辺部9との間で前記桁梁28の
エッジ部28aを挟み付け、コ形クランプ1を固定す
る。そしてチェン吊下げ具3のU字形部分24に吊下げ
用チェン29を挿通し、当該チェン29により従来周知
の方法で鋼管30を吊り下げる。この方法で、鋼管30
の長さ方向複数箇所を吊下げ装置26と吊下げ用チェン
29とで略水平状に吊り下げ、当該鋼管30と、同様に
他の桁梁28に略水平状に吊り下げた鋼管30とで足場
板31を略水平状に支持させ、補修作業用吊り足場27
が仮設される。
As shown in FIGS. 2 and 3, the suspension device 26 configured as described above has an edge portion 28a of a girder 28 of a bridge, for example, when a suspension scaffold 27 for repair work is temporarily installed under the bridge. Attached to. That is, the U-shaped body 4 of the U-shaped clamp 1 is laterally externally fitted to the edge portion 28a of the beam girder 28, and the fastening screw 5 is tightened from above, so that the pressing plate 12 at the lower end and the lower side portion 9 of the U-shaped body are connected. The edge portion 28a of the girder beam 28 is sandwiched between them to fix the U-shaped clamp 1. Then, the suspending chain 29 is inserted into the U-shaped portion 24 of the chain suspending tool 3, and the steel pipe 30 is suspended by the chain 29 by a conventionally known method. In this way, the steel pipe 30
A plurality of positions in the length direction of the steel pipe 30 suspended by the suspension device 26 and the suspending chain 29 in a substantially horizontal manner, and the steel pipe 30 suspended in a substantially horizontal manner on the other girder beam 28 in the same manner. The scaffolding plate 31 is supported in a substantially horizontal shape, and the suspended scaffolding 27 for repair work is used.
Is temporarily installed.

【0012】上記の吊り足場27の仮設作業に際して、
各鋼管30が略同一高さで略水平状に吊り下げられるよ
うに、各吊下げ装置26に吊り下げられた吊下げ用チェ
ン29の吊下げ長さの調整が従来周知の通り行われる
が、さらに、1本の鋼管30を吊り下げる複数本の吊下
げ用チェン29に負荷が略均等に作用するように、各吊
下げ装置26における長さ調整吊り具2の吊下げ長さを
調整する。即ち、長ナット18を回転操作して、チェン
吊下げ具3を吊り下げている螺軸17を当該長ナット1
8に対し昇降移動させることにより、コ形クランプ1と
チェン吊下げ具3との間の吊下げ長さを微調整すること
ができるのである。勿論、吊り足場27に水平方向の力
が作用したとき、吊下げ装置26のコ形クランプ1(コ
形本体4)に対し長さ調整吊り具2とチェン吊下げ具3
とが、吊下げ用チェン29とともに、コ形クランプ1
(コ形本体4)の直下に位置する軸杆16の球面状膨出
頭部13に対しその外力の作用方向に自由に揺動し得る
ので、吊下げ装置26に無理な曲げ力で作用することは
ない。
During the temporary work of the suspension scaffold 27,
The suspension length of the suspending chains 29 suspended by the suspension devices 26 is adjusted as is conventionally known so that the steel pipes 30 can be suspended substantially horizontally at substantially the same height. Furthermore, the hanging length of the length adjusting hanger 2 in each hanging device 26 is adjusted so that the load acts on the plurality of hanging chains 29 for hanging one steel pipe 30 substantially evenly. That is, by rotating the long nut 18, the screw shaft 17 that suspends the chain suspending tool 3 is attached to the long nut 1.
By vertically moving with respect to 8, the suspension length between the U-shaped clamp 1 and the chain suspension 3 can be finely adjusted. Of course, when a horizontal force is applied to the suspension scaffold 27, the length adjustment suspension 2 and the chain suspension 3 are attached to the U-shaped clamp 1 (U-shaped body 4) of the suspension device 26.
Together with the hanging chain 29 together with the U-shaped clamp 1
Since it is possible to freely swing in the acting direction of the external force with respect to the spherical bulging head 13 of the shaft rod 16 located directly below the (U-shaped body 4), it is necessary to exert an unreasonable bending force on the suspension device 26. There is no.

【0013】なお、長さ調整吊り具2は、コ形クランプ
1側に結合された固定螺軸と、チェン吊下げ具3側に結
合された螺軸と、両螺軸に両端ねじ孔部が同時に螺嵌す
る長ナットとから成る、ターンバックル形式のものであ
っても良い。
The length adjusting suspension 2 has a fixed screw shaft connected to the U-shaped clamp 1 side, a screw shaft connected to the chain suspending device 3 side, and screw holes at both ends of both screw shafts. It may be of a turnbuckle type, which is composed of a long nut screwed at the same time.

【0014】[0014]

【発明の効果】以上のように本発明の吊下げ装置によれ
ば、クランプに吊り下げられたチェン吊り具と前記クラ
ンプとの間の吊下げ長さを、両者間に介装された長さ調
整吊り具の長ナットを螺軸に対して相対回転操作するこ
とにより、微調整することができる。換言すれば、この
吊下げ装置と吊下げ用チェンとを介して足場支持用鋼管
などの長さ方向複数箇所を吊り下げるとき、各吊下げ装
置の長さ調整吊り具の吊下げ長さを前記のように微調整
して、各吊下げ装置が吊り下げるチェンに負荷が同じよ
うに作用するようにすることができるので、全ての吊下
げ用チェンを有効に作用させて、安全性の高い吊り足場
を容易に仮設することができるのである。
As described above, according to the suspending device of the present invention, the suspending length between the chain suspender suspended by the clamp and the clamp is the length interposed between the two. Fine adjustment can be performed by relatively rotating the long nut of the adjusting sling with respect to the screw shaft. In other words, when suspending a plurality of scaffold-supporting steel pipes in the length direction through the suspending device and the suspending chain, the suspending length of the suspending device for adjusting the length of each suspending device is set as described above. You can make fine adjustments like this so that each hanging device acts on the hanging chains in the same way, so that all hanging chains can work effectively and a highly safe lifting chain can be used. The scaffold can be easily installed temporarily.

【0015】更に、本発明の構成によれば、長さ調整吊
り具の上端部に位置する球面状膨出頭部において、当該
長さ調整吊り具とチェン吊下げ具とを一体に任意の方向
に首振り運動させることができるので、吊り下げている
足場などに水平方向の外力が作用したときに吊下げ装置
の中間に無理な曲げ力を作用させないで済み、より安全
性を高めることができる。
Further, according to the structure of the present invention, in the spherical bulging head located at the upper end portion of the length adjusting hanging device, the length adjusting hanging device and the chain hanging device are integrated in any direction. Since the swinging motion can be performed, it is not necessary to apply an unreasonable bending force to the middle of the suspension device when an external force in the horizontal direction is applied to the suspended scaffolding, and the safety can be further enhanced.

【0016】なお、請求項2に記載の構成によれば、チ
ェン吊下げ具を鉄板から安価に構成することができ、し
かも吊り下げるチェンに無理をかけることがなく、安全
性も向上する。
According to the second aspect of the invention, the chain suspending tool can be constructed of an iron plate at a low cost, and the suspending chain is not overloaded and the safety is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】 A図は吊下げ装置の正面図であり、B図は同
吊下げ装置の縦断側面図である。
FIG. 1 is a front view of the suspension device, and FIG. 1B is a vertical side view of the suspension device.

【図2】 吊下げ装置の使用例を示す側面図である。FIG. 2 is a side view showing a usage example of the suspension device.

【図3】 同使用例を示す正面図である。FIG. 3 is a front view showing the same usage example.

【符号の説明】[Explanation of symbols]

1 コ形クランプ 2 長さ調整吊り具 3 チェン吊下げ具 4 コ形本体 5 締結ねじ 13 球面状膨出頭部 14 螺軸部 15 ロックナット 16 軸杆 17 螺軸 18 長ナット 19 ねじ孔部 20 ねじ孔 24 U字形部分 26 吊下げ装置 27 補修作業用吊り足場 28 橋梁の桁梁 28a 桁梁のエッジ部 29 吊下げ用チェン 30 鋼管 31 足場板 1 U-shaped clamp 2 Length adjustment suspenders 3 Chain suspension 4 U-shaped body 5 fastening screws 13 Spherical bulging head 14 Spiral shaft 15 Lock nut 16 Axle 17 screw shaft 18 long nuts 19 Screw hole 20 screw holes 24 U-shaped part 26 Suspension device 27 Suspension scaffolding for repair work 28 Bridge girders 28a Edge part of girder beam 29 Hanging chain 30 steel pipe 31 scaffolding board

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04G 3/10 F16B 7/06 F16G 11/12 Front page continued (58) Fields surveyed (Int.Cl. 7 , DB name) E04G 3/10 F16B 7/06 F16G 11/12

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】クランプと、長さ調整吊り具と、チェン吊
下げ具とから成り、クランプは、コ形本体と、このコ形
本体に嵌合した水平板部を前記コ形本体の下辺部上に締
結する締結ねじとから成り、長さ調整吊り具は、前記ク
ランプのコ形本体下辺部に前記チェン吊下げ具を吊り下
げるもので、螺軸部とこれに相対回転自在に螺嵌する長
さ調整用の長ナットとを備えている仮設工事用吊下げ装
置であって、 前記長さ調整吊り具が、前記クランプのコ形本体下辺部
に結合された軸杆と、当該軸杆の下端球面状膨出頭部に
上端部が首振り及び自転可能に吊り下げられた長ナット
と、当該長ナットに螺嵌し且つ下端部が前記チェン吊下
げ具に結合された螺軸とから成る、 仮設工事用吊下げ装
置。
1. A clamp comprises a clamp, a length adjusting suspender, and a chain suspender, wherein the clamp has a U-shaped body and a horizontal plate portion fitted to the U-shaped body at a lower side portion of the U-shaped body. The length adjusting suspending tool is configured to suspend the chain suspending tool on the lower side portion of the U-shaped body of the clamp, and is screwed so as to be rotatable relative to the screw shaft portion. Suspension device for temporary work with long nut for length adjustment
And the length adjusting hanger is the lower side of the U-shaped body of the clamp.
The shaft rod connected to the shaft rod and the lower end spherical bulging head of the shaft rod.
A long nut whose upper end is oscillated and can be rotated.
And the lower nut is threaded into the long nut
Suspension device for temporary work, consisting of a screw shaft connected to a barb .
【請求項2】前記チェン吊下げ具が、U字形に曲げた帯
状板の両端板部を内側に折曲して互いに重ね合わせると
ともに、U字形部分の断面を、内側が凸曲面となる円弧
形としたもので、前記両端板部を前記長さ調整吊り具の
下端に結合して成る、請求項1に記載の仮設工事用吊下
げ装置。
2. The chain hanging tool is a band bent in a U shape.
If both end plates of the plate are bent inward and overlapped with each other
In both cases, the U-shaped section has an arc with a convex curved surface on the inside.
The end plate portions of the length adjusting sling
The suspension device for temporary construction according to claim 1, wherein the suspension device is connected to a lower end .
JP11013998A 1998-04-06 1998-04-06 Suspension device for temporary construction Expired - Lifetime JP3377945B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11013998A JP3377945B2 (en) 1998-04-06 1998-04-06 Suspension device for temporary construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11013998A JP3377945B2 (en) 1998-04-06 1998-04-06 Suspension device for temporary construction

Publications (2)

Publication Number Publication Date
JPH11293910A JPH11293910A (en) 1999-10-26
JP3377945B2 true JP3377945B2 (en) 2003-02-17

Family

ID=14528030

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11013998A Expired - Lifetime JP3377945B2 (en) 1998-04-06 1998-04-06 Suspension device for temporary construction

Country Status (1)

Country Link
JP (1) JP3377945B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353269A (en) * 2011-07-29 2012-02-15 中冶长天国际工程有限责任公司 Lifting frame device and circular cooler with same

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200451928Y1 (en) * 2008-05-28 2011-01-19 현대제철 주식회사 Apparatus for hanging Wire of Hoist
JP2011127391A (en) * 2009-12-21 2011-06-30 Tokyo Electric Power Co Inc:The Suspended frame apparatus and suspended frame method in container such as suppression chamber
CN102561669B (en) * 2012-01-20 2014-04-16 浙江欣捷建设有限公司 Cantilever scaffold and construction method thereof
JP5828856B2 (en) * 2013-04-01 2015-12-09 株式会社国元商会 Scaffolding bracket
JP2016079584A (en) * 2014-10-10 2016-05-16 株式会社杉孝 Chain hanging metal fitting
JP6679047B2 (en) * 2017-01-10 2020-04-15 有限会社サム Mobile scaffolding equipment
CN107263360A (en) * 2017-07-31 2017-10-20 天津吉森机电设备工程有限公司 A kind of oil transfer arm swivel seal circle sliding and replacing device and its application

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353269A (en) * 2011-07-29 2012-02-15 中冶长天国际工程有限责任公司 Lifting frame device and circular cooler with same
CN102353269B (en) * 2011-07-29 2013-04-24 中冶长天国际工程有限责任公司 Lifting frame device and circular cooler with same

Also Published As

Publication number Publication date
JPH11293910A (en) 1999-10-26

Similar Documents

Publication Publication Date Title
US5011106A (en) Roof safety anchor
JP3377945B2 (en) Suspension device for temporary construction
US4749310A (en) Mine roof truss
US6381907B1 (en) Adjustable support system for premanufactured building
EP0001341B1 (en) Improvements in girder roller fittings
JPH0448087Y2 (en)
JP2676684B2 (en) Hanging frame device
EP1050687B1 (en) Safety line anchorage assemblies
JP2747667B2 (en) Seismic aids for hanging brackets
US6217270B1 (en) Bracing rod washer assembly and clamping washer
CN218715366U (en) Suspension device of steel structure engineering safety belt for construction
KR200367019Y1 (en) Wire clamp for a falling rock preventing net
US20240151032A1 (en) Trapeze hanger brace assembly
JPH0640267Y2 (en) Mechanism for attaching hanging materials to existing material flanges
JP2833430B2 (en) Beam holding structure in column-beam installation structure
CN218324003U (en) Corrector for installation of steel structure steel column
CN117398627A (en) Safety rope device for tied arch bridge operation and safety protection method
KR200213705Y1 (en) Counterweight mounting structure of tower crane
JPH0644970Y2 (en) Ceiling hanging hardware
GB2175341A (en) Clamps
JPH058740Y2 (en)
JPH0637158Y2 (en) Clamp hanger
JPH0448275Y2 (en)
JPH08128191A (en) Stopper construction of suspension device, etc., of scaffolding
JPH0428366Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20021105

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081206

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081206

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081206

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091206

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121206

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121206

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131206

Year of fee payment: 11

EXPY Cancellation because of completion of term