JP3377485B2 - Framework binding hardware and framework binding structure - Google Patents

Framework binding hardware and framework binding structure

Info

Publication number
JP3377485B2
JP3377485B2 JP2000020853A JP2000020853A JP3377485B2 JP 3377485 B2 JP3377485 B2 JP 3377485B2 JP 2000020853 A JP2000020853 A JP 2000020853A JP 2000020853 A JP2000020853 A JP 2000020853A JP 3377485 B2 JP3377485 B2 JP 3377485B2
Authority
JP
Japan
Prior art keywords
bolt
hole
joist
fastening
integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000020853A
Other languages
Japanese (ja)
Other versions
JP2001207536A (en
Inventor
泰介 長島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Forestry Co Ltd
Original Assignee
Sumitomo Forestry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Forestry Co Ltd filed Critical Sumitomo Forestry Co Ltd
Priority to JP2000020853A priority Critical patent/JP3377485B2/en
Publication of JP2001207536A publication Critical patent/JP2001207536A/en
Application granted granted Critical
Publication of JP3377485B2 publication Critical patent/JP3377485B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、枠組緊結金物及び
枠組緊結構造に関し、特に水平枠部材から上方に突出す
るボルト部材と根太の上方に設置される垂直部材に取り
付けたホールダウン金物とを連結して、垂直部材を緊結
固定するために用いる枠組緊結金物及び枠組緊結構造に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a frame binding structure and a frame binding structure, and in particular, a bolt member protruding upward from a horizontal frame member and a hole-down fitting attached to a vertical member installed above a joist. Then, the present invention relates to a frame binding material and a frame binding structure used for tightly fixing the vertical member.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】枠組壁
工法は、北米で最も一般的な木造住宅工法であるプラッ
トフォーム工法が日本に伝わったもので、接合方法に複
雑な仕口や継手を用いる在来工法とは異なり、建物を構
成する木材の断面寸法の種類がわずかであって、基本的
に釘打ち施工によって建物を構築する。すなわち、ディ
メンションランバーで組まれた枠組に構造用合板を釘打
ちした床や壁によって建物を構築する工法である。
[Prior Art and Problems to be Solved by the Invention] The framed wall construction method was introduced to Japan by the platform construction method, which is the most common wooden house construction method in North America. It uses complicated joints and joints for the joining method. Unlike conventional construction methods, there are few types of cross-sectional dimensions of the wood that composes the building, and basically the building is constructed by nailing construction. In other words, it is a method of constructing a building with floors and walls in which structural plywood is nailed to a frame made up of dimension lumber.

【0003】より具体的には、図5に示すように、布基
礎50の上に土台51を設け、根太52,53を並べて
床組を作り、合板54を貼り、この床(プラットフォー
ム)上で竪枠55の取付作業等を行ってゆく。また上階
部分の建物を構築するには、竪枠55の上端に取り付け
た上枠56の上に頭つなぎ57を設け、根太52,53
を並べて床組を作り、合板54を貼り、この床上で上階
部分の竪枠55の取付作業等を行ってゆく。
More specifically, as shown in FIG. 5, a base 51 is provided on a cloth foundation 50, joists 52 and 53 are arranged side by side to form a floor set, and a plywood 54 is pasted on the floor (platform). The attachment work of the vertical frame 55 is performed. In addition, in order to build a building on the upper floor part, a head joint 57 is provided on the upper frame 56 attached to the upper end of the vertical frame 55, and joists 52, 53 are provided.
Are arranged to form a floor set, a plywood 54 is attached, and the vertical frame 55 of the upper floor portion is attached on this floor.

【0004】かかる枠組壁工法において、竪枠や柱等の
垂直部材を緊結固定するために当該垂直部材に取り付け
たホールダウン金物に締結されるアンカーボルトやその
他のボルト部材は、垂直部材の材心に沿って配置される
場合が多い。一方、例えば建物の中間部における耐力壁
の下方に位置する根太は、モジュールの中心線に沿って
配置されることがあり、このような場合には、アンカー
ボルトの軸心と根太の材心が一致するため、根太を貫通
させてアンカーボルトを設置させたり、アンカーボルト
が突出する位置において根太を切断分割して取り付ける
方法が採用されていた。
In such a framed wall construction method, anchor bolts and other bolt members which are fastened to hole down fittings attached to vertical members such as vertical frames and columns are tightly fixed, and the cores of the vertical members are the cores of the vertical members. Often arranged along the. On the other hand, for example, joists located below the bearing wall in the middle part of the building may be arranged along the center line of the module.In such a case, the axial center of the anchor bolt and the core of the joists are Since they coincide with each other, a method has been adopted in which the anchor bolt is installed by penetrating the joist, or the joist is cut and divided and attached at a position where the anchor bolt projects.

【0005】しかしながら、アンカーボルトを貫通させ
たり根太を切断分割する方法は手間がかかり、特に建物
のプレハブ化を図る場合には、効率の良い施工を行うこ
とができないという課題があった。また、根太が載置さ
れる土台や頭つなぎ等の水平枠部材から根太の上方に至
る、長さの長いアンカーボルト等のボルト部材は、位置
精度が出しにくく、また傾き精度が悪いと床部材に設け
た孔の位置と合わなくなるなど、施工に困難さが伴うと
いう課題があった。
However, the method of penetrating the anchor bolts or cutting and dividing the joists takes time and labor, and particularly when prefabricating a building, there is a problem that efficient construction cannot be performed. In addition, a bolt member such as a long anchor bolt that extends from the horizontal frame member such as the foundation or head tie on which the joist is placed to above the joist is difficult to obtain the positional accuracy, and when the inclination accuracy is poor, the floor member is difficult. There was a problem that the construction was difficult, such as the position of the holes provided in the building did not match.

【0006】本発明は、このような従来の課題に着目し
てなされたもので、根太を貫通してボルト部材を設ける
ことなく、かつボルト部材の長さを長くすることなく、
垂直部材に取り付けたホールダウン金物にボルト部材を
容易に締結することを可能にする枠組緊結金物及び枠組
緊結構造を提供することを目的とする。
The present invention has been made in view of such conventional problems, and does not need to provide a bolt member penetrating a joist and to increase the length of the bolt member.
An object of the present invention is to provide a frame-bonded metal product and a frame-bonded structure capable of easily fastening a bolt member to a hole-down metal product attached to a vertical member.

【0007】[0007]

【課題を解決するための手段】本発明は、枠組壁工法に
おいて水平枠部材上に設置される根太に取り付けられ、
前記水平枠部材から上方に突出するボルト部材と前記根
太の上方に設置される垂直部材に取り付けたホールダウ
ン金物(引き寄せ金物)とを連結して、前記垂直部材を
緊結固定するために用いる枠組緊結金物であって、上方
に突出して前記ホールダウン金物に締結される連結ボル
トを有する上部金物と、前記ボルト部材が締結される締
結孔を有する下部金物とからなり、前記上部金物は、天
面部と一対の側面部とからなるコの字プレートと、前記
天面部から上方に突出して前記ホールダウン金物に締結
される前記連結ボルトとからなると共に、前記一対の側
面部に第1一体化ボルト孔が各々形成されており、前記
下部金物は、前記ボルト部材が締結される締結孔を有す
るベースプレ−ト部と、垂直プレート部とからなる断面
L字形状を有すると共に、前記垂直プレート部には、締
結開口及び第2一体化ボルト孔が設けられ、前記上部金
物は、前記コの字プレートの側面部によって前記根太を
両側から挟み込むようにしつつ前記天面部により前記根
太の上端面を覆って配設され、前記下部金物は、前記根
太の下端縁部に設けた切り欠き開口に前記ベースプレ−
ト部を挿入し、前記垂直プレート部を前記コの字プレー
トの側面部に沿わせつつ前記上部金物の下方に配設さ
れ、前記第1一体化ボルト孔及び前記第2一体化ボルト
孔を合致させて前記一体化ボルトを挿通締結することに
より、前記上部金物と前記下部金物とを一体化した際
に、前記連結ボルトの軸心と前記締結孔の中心とが一致
することを特徴とする枠組緊結金物を提供することによ
り、上記目的を達成したものである(請求項1記載の発
明)。
The present invention is attached to a joist installed on a horizontal frame member in a frame wall construction method,
A frame binding used to bind and fix the vertical member by connecting a bolt member protruding upward from the horizontal frame member and a hole-down hardware (pulling hardware) attached to a vertical member installed above the joist. a hardware consists of a lower hardware having an upper fittings having a connecting bolt which projects upwardly is fastened to the hold-down hardware, a fastening hole into which the bolt member is fastened, the upper hardware is heaven
A U-shaped plate including a surface portion and a pair of side surface portions, and
Projected upward from the top surface and fastened to the hole down hardware
And the pair of sides.
First integrated bolt holes are formed in the surface portion, respectively.
The lower hardware has a fastening hole for fastening the bolt member.
Cross section consisting of a base plate part and a vertical plate part
It has an L shape and the vertical plate is
A connection opening and a second integrated bolt hole are provided, and the upper metal
The thing is the joist by the side part of the U-shaped plate.
While sandwiching from both sides, the root surface is
It is arranged to cover the upper end surface of the thick,
The base plate is provided in a notch opening provided at the lower end edge of the thick
The vertical plate portion and the U-shaped plate.
Is placed below the upper metal fitting along the side surface of the
The first integrated bolt hole and the second integrated bolt
By matching the holes and inserting and fastening the integrated bolt
More, when integrating the said lower hardware and the upper hardware by providing a framework Tightened hardware, characterized in that the center of axis and the engagement hole of the connecting bolt are matched, the above object This has been achieved (the invention of claim 1).

【0008】[0008]

【0009】そして、本実施形態の枠組緊結金物は、前
記ベースプレ−ト部は、これの両側縁部から立設する補
強プレートを備えたコの字断面を有することが好ましい
(請求項記載の発明)。
Further, in the frame binding material of this embodiment, it is preferable that the base plate portion has a U-shaped cross section provided with reinforcing plates standing from both side edge portions of the base plate portion (claim 2 ). invention).

【0010】そして、本発明は、上記枠組緊結金物を用
いた枠組緊結構造であって、前記ボルト部材の突出部位
における前記根太の下端縁部に切り欠き開口を形成して
当該切り欠き開口において前記ボルト部材を前記水平枠
部材から突出させ、該切り欠き開口に前記下部金物の締
結開口を合致させつつ前記ベースプレ−ト部を前記切り
欠き開口に挿入配置し、前記ボルト部材を前記ベースプ
レートの締結孔に締結すると共に、前記根太の上端面を
覆って配設された前記上部金物の連結ボルトを前記ホー
ルダウン金物に締結し、かつ前記切り欠き開口の上方に
おいて前記根太を貫通して形成したボルト挿通孔を介し
て前記第1一体化ボルト孔及び前記第2一体化ボルト孔
に一体化ボルトを挿通締結し、これらを締め上げること
によって、前記垂直部材を前記ボルト部材に緊結するこ
とを特徴とする枠組緊結構造を提供することにより、上
記目的を達成したものである(請求項記載の発明)。
Further, the present invention is a frame tightening structure using the above frame tightening metal, wherein a cutout opening is formed in a lower end edge portion of the joist at a protruding portion of the bolt member, and the cutout opening is formed at the cutout opening. A bolt member is projected from the horizontal frame member, the base plate portion is inserted into the cutout opening while the fastening opening of the lower metal fitting is aligned with the cutout opening, and the bolt member is fastened to the base plate. Bolts formed by penetrating the joist above the notch opening and fastening the connecting bolt of the upper metal object, which is arranged so as to cover the upper end surface of the joist, to the hole down metal object. By inserting and fastening an integrated bolt through the hole into the first integrated bolt hole and the second integrated bolt hole, and tightening these, By providing a framework Tightened structure characterized by Tightened the member to the bolt member, in which to achieve the above object (invention described in claim 3).

【0011】[0011]

【発明の実施の形態】本発明の好ましい実施形態を添付
図面を参照しつつ詳細に説明する。本発明の一実施形態
に係る枠組緊結金物10は、図1に示すように、枠組壁
工法において、布基礎11の天端面に敷設された水平枠
部材としての土台12の上に設置される根太13に取り
付けられ、土台12から上方に突出するボルト部材とし
てのアンカーボルト15を、根太13の上方に設置され
る垂直部材としての竪枠14に取り付けたホールダウン
金物16と連結して、竪枠14を緊結固定するために使
用される。
Preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. As shown in FIG. 1, a frame binding material 10 according to an embodiment of the present invention is a joist installed on a base 12 as a horizontal frame member laid on the top end surface of the cloth foundation 11 in the frame wall construction method. Anchor bolt 15 as a bolt member that is attached to No. 13 and projects upward from base 12 is connected to hole down hardware 16 attached to vertical frame 14 as a vertical member installed above joist 13 to form vertical frame. Used to secure 14 together.

【0012】すなわち、本実施形態によれば、根太13
は、例えば建物の中間部における耐力壁の下方に位置
し、根太13の材心とアンカーボルト15の軸心とが一
致しており、根太13を貫通させることなくアンカーボ
ルト15をホールダウン金物16に連結することを目的
として、枠組緊結金物10が使用される。ここで、アン
カーボルト15は、布基礎11に埋設固定されており、
その先端雄ネジ部は、土台12を貫通し、根太13の下
端縁部に形成した切り欠き開口35において、土台12
の上方に突出している。また、ホールダウン金物16
は、竪枠14の下端部側面に固定され、後述する連結ボ
ルト19を締結して竪枠14が引き抜けないように引き
寄せた状態で固定するものである。さらに、根太13の
上端面には、床下地17が敷設されると共に、これの上
に載置された下枠18から立設して竪枠14が設置され
る。
That is, according to this embodiment, the joists 13
Is located below the bearing wall in the middle part of the building, for example, the core of the joist 13 and the axial center of the anchor bolt 15 coincide with each other, and the anchor bolt 15 does not pass through the joist 13 and the hole-down hardware 16 The framework binding 10 is used for the purpose of connecting to. Here, the anchor bolt 15 is embedded and fixed in the cloth foundation 11,
The male thread portion at the tip penetrates the base 12, and at the cutout opening 35 formed at the lower end edge of the joist 13, the base 12
Protruding above. Also, the hole down hardware 16
Is fixed to the side surface of the lower end portion of the vertical frame 14, and is fixed in a state in which the vertical frame 14 is pulled up so as to prevent the vertical frame 14 from pulling out by fastening a connecting bolt 19 described later. Further, a floor base 17 is laid on the upper end surface of the joist 13, and a vertical frame 14 is installed upright from a lower frame 18 placed on the floor base 17.

【0013】そして、本実施形態の枠組緊結金物10
は、図2にも示すように、上方に突出してホールダウン
金物16に締結される連結ボルト19を有する上部金物
20と、アンカーボルト15が締結される締結孔21を
有する下部金物22とからなり、上部金物20と下部金
物22とを一体化した際に、連結ボルト19の軸心と締
結孔21の中心とが一致するようになっている。
Then, the frame binding material 10 of the present embodiment.
As shown in FIG. 2, is composed of an upper metal member 20 having a connecting bolt 19 protruding upward and fastened to the hole-down hardware 16 and a lower metal member 22 having a fastening hole 21 to which the anchor bolt 15 is fastened. When the upper metal piece 20 and the lower metal piece 22 are integrated, the axial center of the connecting bolt 19 and the center of the fastening hole 21 are aligned with each other.

【0014】また、上部金物20は、天面部23と一対
の側面部24とからなるコの字プレート36と、天面部
23から上方に突出してホールダウン金物16に締結さ
れる連結ボルト19とからなると共に、一対の側面部2
4に第1一体化ボルト孔25が各々形成されている。一
方、下部金物22は、アンカーボルト15が締結される
締結孔21を有するベースプレ−ト部26と、垂直プレ
ート部27とからなる断面L字形状を有すると共に、垂
直プレート部27には、締結開口28及び第2一体化ボ
ルト孔29が設けられている。
The upper hardware 20 is composed of a U-shaped plate 36 having a top surface portion 23 and a pair of side surface portions 24, and a connecting bolt 19 protruding upward from the top surface portion 23 and fastened to the hole-down hardware 16. In addition, the pair of side surfaces 2
First integrated bolt holes 25 are formed in each of the holes 4. On the other hand, the lower metal piece 22 has an L-shaped cross section composed of a base plate portion 26 having a fastening hole 21 for fastening the anchor bolt 15 and a vertical plate portion 27, and has a fastening opening in the vertical plate portion 27. 28 and a second integrated bolt hole 29 are provided.

【0015】ここで、上部金物20を構成するコの字プ
レート36は、3mm程度の厚さの鋼製プレートを折り
曲げ加工して形成され、下側が開放された幅40mm程
度、長さ200mm程度のコの字断面を備え、根太13
の上部側から、一対の側面部24によって根太13を両
側から挟み込むようにしつつ、天面部23により根太1
3の上端面を覆った状態で配設される(図3(b)参
照)。また、天面部23の中央には、連結ボルト取り付
け孔が形成されていると共に、天面部23の裏側には、
取り付けナット(図示せず。)が溶着固定され、連結ボ
ルト19は、この取り付けナットに下端部を螺合するこ
とによって、天面部23から上方に突出した状態で固定
される。一対の側面部24の下端部中央には、互いに合
致する位置に各々φ13程度の大きさの第1一体化ボル
ト孔25が形成されていると共に、これの上方には、上
部金物20を根太13に仮固定しておくための釘孔30
が各々2箇所ずつ設けられている。ここで、上部金物2
0は、根太13を両側から挟み込むコの字形状備えてい
るので、その剛性を高めて、連結ボルト19を介した引
っ張り力を支持するのに十分な構造を備えることにな
る。
Here, the U-shaped plate 36 constituting the upper metal 20 is formed by bending a steel plate having a thickness of about 3 mm, and has a width of about 40 mm and a length of about 200 mm opened at the lower side. With a U-shaped cross section, joists 13
While the joist 13 is sandwiched from both sides by the pair of side surface portions 24 from the upper side of the
It is arranged in a state of covering the upper end surface of 3 (see FIG. 3B). In addition, a connecting bolt mounting hole is formed in the center of the top surface portion 23, and on the back side of the top surface portion 23,
A mounting nut (not shown) is welded and fixed, and the connecting bolt 19 is fixed in a state of protruding upward from the top surface portion 23 by screwing the lower end portion to the mounting nut. In the center of the lower end portions of the pair of side surface portions 24, first integrated bolt holes 25 each having a size of about φ13 are formed at positions where they coincide with each other, and the upper metal fitting 20 is provided with a joist 13 above the bolt holes 25. Hole 30 for temporary fixing to
Are provided in two places each. Where the upper hardware 2
Since 0 has a U-shape that sandwiches the joist 13 from both sides, it has a structure sufficient to increase its rigidity and to support the pulling force via the connecting bolt 19.

【0016】また、下部金物22を構成する垂直プレー
ト部27は、3mm程度の厚さの鋼製プレートからなる
一対の対称形状の鉤形片31を一部重ね合わせて形成さ
れ、下端の両側角部が斜めに切り欠かれた全体として縦
90mm程度、横100mm程度の大きさの矩形形状を
有すると共に、下半中央部分には、縦50mm程度、横
55mm程度の大きさの、根太13の下端縁部に形成し
た切り欠き開口35と合致する大きさの矩形形状の締結
開口28が開口形成されている。一対の鉤形片31は、
締結開口28の上方において40mm程度の幅で重ね合
わされており、この重ね合わせ部の中央にφ13程度の
大きさの第2一体化ボルト孔29が形成されている。第
2一体化ボルト孔29が重ね合わせ部に形成されている
ことにより、後述するように、一体化ボルト32を介し
て上部金物20と下部金物22とを一体化する際に、強
固な一体化構造とすることが可能になる。なお、第2一
体化ボルト孔29の両側には、重ね合わせ部の外側に位
置して、下部金物22を根太13に仮固定しておくため
の釘孔33が一対設けられている。
Further, the vertical plate portion 27 which constitutes the lower metal member 22 is formed by partially overlapping a pair of symmetrical hook-shaped pieces 31 made of steel plates having a thickness of about 3 mm. The bottom part of the joist 13 has a rectangular shape with a length of about 90 mm and a width of about 100 mm, and has a length of about 50 mm and a width of about 55 mm at the center of the lower half. A rectangular fastening opening 28 having a size matching the cutout opening 35 formed in the edge portion is formed. The pair of hook-shaped pieces 31
They are overlapped with each other with a width of about 40 mm above the fastening opening 28, and a second integrated bolt hole 29 with a size of about φ13 is formed at the center of this overlapped portion. Since the second integrated bolt hole 29 is formed in the overlapping portion, as described later, when the upper metal piece 20 and the lower metal piece 22 are integrated with each other through the integrated bolt 32, a strong integration is achieved. Can be structured. A pair of nail holes 33 for temporarily fixing the lower metal member 22 to the joist 13 are provided on both sides of the second integrated bolt hole 29, outside the overlapping portion.

【0017】下部金物22を構成するベースプレ−ト部
26は、3mm程度の厚さの鋼製プレートからなり、幅
50mm程度、長さ60mm程度の大きさの矩形形状を
有すると共に、垂直プレート部27に近接する中央部分
にはφ30程度の大きさの締結孔21が形成されてい
る。このベースプレ−ト部26は、これの両側縁部に溶
着されて各々立設固定される補強プレート34を有し、
これによってコの字断面を備えると共に、垂直に立設す
る補強プレート34の各後側縁部を、垂直プレート部2
7の締結開口28の両側縁部に各々溶着することによっ
て、ベースプレ−ト部26は垂直プレート部27に対し
て垂直に延設して強固に固定される。
The base plate portion 26 constituting the lower metal member 22 is made of a steel plate having a thickness of about 3 mm, has a rectangular shape with a width of about 50 mm and a length of about 60 mm, and has a vertical plate portion 27. A fastening hole 21 having a size of about φ30 is formed in the central portion close to. The base plate portion 26 has a reinforcing plate 34 which is welded to both side edges of the base plate portion 26 and vertically fixed.
As a result, each of the rear side edges of the reinforcing plate 34 that is vertically erected while having a U-shaped cross section
The base plate portion 26 extends vertically with respect to the vertical plate portion 27 and is firmly fixed by welding to both side edges of the fastening opening 28 of No. 7.

【0018】そして、下部金物22は、図3(a)〜
(c)に示すように、根太13の下端縁部に設けた切り
欠き開口35にベースプレ−ト部26を挿入し、且つ先
に根太13に取り付けられた上部金物20のコの字プレ
ート36の一方の側面部24に垂直プレート部27を沿
わせつつ、上部金物20の下方に配設される。またこれ
によって第1一体化ボルト孔25及び第2一体化ボルト
孔29は合致し、一体化ボルト32を挿通締結すること
により上部金物20と下部金物22とを一体化すること
が可能な状態となる。
The lower metal piece 22 is shown in FIG.
As shown in (c), the base plate portion 26 is inserted into the cutout opening 35 provided in the lower end edge portion of the joist 13, and the U-shaped plate 36 of the upper metal fitting 20 previously attached to the joist 13 is inserted. The vertical plate portion 27 is arranged along the one side surface portion 24, and is disposed below the upper metal member 20. As a result, the first integrated bolt hole 25 and the second integrated bolt hole 29 are aligned with each other, and the upper bolt 20 and the lower bolt 22 can be integrated by inserting and fastening the integrated bolt 32. Become.

【0019】ここで、アンカーボルト15は、当該アン
カーボルト15の突出部位における根太13の下端縁部
に形成された切り欠き開口35において、土台12から
突出していると共に、切り欠き開口35の上方に位置し
て、根太13には、一体化ボルト32を挿通するための
ボルト挿通孔37が予め貫通形成されている(図3
(a)参照)。
Here, the anchor bolt 15 projects from the base 12 at a notch opening 35 formed at the lower end edge of the joist 13 at the projecting portion of the anchor bolt 15, and above the notch opening 35. The bolt insertion hole 37 for inserting the integrated bolt 32 is formed in the joist 13 in advance (FIG. 3).
(See (a)).

【0020】したがって、切り欠き開口35に下部金物
22の締結開口28を合致させつつベースプレ−ト部2
6を切り欠き開口35に挿入配置し、アンカーボルト1
5をベースプレート部26の締結孔21に締結すると共
に、根太13の上端面を覆って配設された上部金物20
の連結ボルト19をホールダウン金物16に締結し(図
1参照)、且つ切り欠き開口35の上方において貫通形
成したボルト挿通孔37を介して合致させた第1一体化
ボルト孔25及び第2一体化ボルト孔29に一体化ボル
ト32を挿通締結し、これらを締め上げることによっ
て、図1に示すように、竪枠14をアンカーボルト15
に強固に緊結することが可能になる。
Therefore, the base plate portion 2 is made to match the fastening opening 28 of the lower metal piece 22 with the cutout opening 35.
6 is inserted and arranged in the notch opening 35, and the anchor bolt 1
5 is fastened to the fastening hole 21 of the base plate portion 26, and the upper metal fitting 20 is provided so as to cover the upper end surface of the joist 13.
The first integrated bolt hole 25 and the second integrated bolt hole 25 which are fastened to the hole-down hardware 16 (see FIG. 1) and are fitted through the bolt insertion hole 37 formed above the cutout opening 35. As shown in FIG. 1, the vertical frame 14 is anchored to the anchor bolts 15 by inserting and fastening the integrated bolts 32 into the bolt holes 29 and tightening them.
It is possible to firmly bond to.

【0021】すなわち、本実施形態によれば、根太13
を貫通してアンカーボルト15を設けることなく、かつ
アンカーボルト15の長さを長くすることなく、竪枠1
4に取り付けたホールダウン金物16にアンカーボルト
15を容易に締結して行くことができる。
That is, according to the present embodiment, the joists 13
The vertical frame 1 without penetrating the anchor bolt 15 and without increasing the length of the anchor bolt 15.
The anchor bolt 15 can be easily fastened to the hole-down hardware 16 attached to the No. 4 connector.

【0022】また、ホールダウン金物16への連結部に
おけるアンカーボルト15と、一般のアンカーボルトと
の長さを統一することが可能になる。さらに、根太13
の切り欠き開口35に合わせて下部金物22の締結開口
28が形成されているので、根太13の側面からアンカ
ーボルト15の締結作業を容易に行うことができる。さ
らにまた、枠組緊結金物10は、上部金物20と下部金
物22との2部品で構成されていることにより、根太1
3への取付作業が容易になる。
Further, the lengths of the anchor bolt 15 and the general anchor bolt at the connecting portion to the hole-down hardware 16 can be unified. Furthermore, joists 13
Since the fastening opening 28 of the lower metal member 22 is formed in accordance with the notch opening 35 of the above, the fastening work of the anchor bolt 15 can be easily performed from the side surface of the joist 13. Furthermore, since the frame binding material 10 is composed of two parts, the upper metal piece 20 and the lower metal piece 22, the joist 1
Installation work to 3 becomes easy.

【0023】図4は、本発明の他の実施形態を示すもの
で、根太13’は上階部分の建物に設けられたものであ
って、下階部分の竪枠40の上端に取り付けた上枠41
の上には水平枠部材として頭つなぎ42が設けられ、根
太13’は、この頭つなぎ42の上に設置されている。
そして、この実施形態によれば、下階部分の竪枠40の
上端側面に取り付けられ上部ホールダウン金物43に
は、上階用アンカーボルト44が接合固定され、この上
階用アンカーボルト44は、ボルト部材として頭つなぎ
42から上方に突出している。そして、本発明の枠組緊
結金物10は、上階用アンカーボルト44と、根太1
3’の上方に設置される上階部分の竪枠14’に取り付
けたホールダウン金物16’とを連結して、竪枠14を
緊結固定するために、上階部分の根太13’に取り付け
て用いられる。かかる実施形態によっても、上記実施形
態と同様の作用効果が奏される。
FIG. 4 shows another embodiment of the present invention, in which the joists 13 'are provided in the building on the upper floor, and are attached to the upper end of the vertical frame 40 on the lower floor. Frame 41
A head tie 42 is provided as a horizontal frame member on the upper part, and the joists 13 ′ are installed on the head tie 42.
Then, according to this embodiment, the upper floor anchor bolt 44 is joined and fixed to the upper hole down hardware 43 attached to the upper end side surface of the vertical frame 40 of the lower floor portion, and the upper floor anchor bolt 44 is It protrudes upward from the head tie 42 as a bolt member. And the framework binding material 10 of this invention is the anchor bolt 44 for upper floors, and the joist 1
To connect the hole-down hardware 16 'attached to the vertical frame 14' of the upper floor installed above 3 ', and to fix the vertical frame 14 tightly, attach it to the joist 13' of the upper floor. Used. Also in this embodiment, the same operational effects as those of the above-described embodiment can be obtained.

【0024】なお、本発明は上記各実施形態に限定され
ることなく種々の変更が可能である。例えば、本発明
は、竪枠に限定されることなく、柱その他の垂直部材を
緊結固定するべく採用することもできる。また、枠組緊
結金物を構成する上部金物及び下部金物は、上記実施形
態の形状のものに限定されるものではない。
The present invention is not limited to the above-mentioned embodiments, and various modifications can be made. For example, the present invention is not limited to a vertical frame, and can be adopted to tightly fix a column or other vertical member. Further, the upper metal member and the lower metal member that form the frame binding metal product are not limited to the shapes of the above-described embodiment.

【0025】[0025]

【発明の効果】以上詳細に説明したように、本発明の枠
組緊結金物及び枠組緊結構造によれば、根太を貫通して
ボルト部材を設けることなく、かつボルト部材の長さを
長くすることなく、垂直部材に取り付けたホールダウン
金物にボルト部材を容易に締結することができる。
As described in detail above, according to the framework binding and the framework binding structure of the present invention, the bolt member does not penetrate the joist and the length of the bolt member does not increase. The bolt member can be easily fastened to the hole-down hardware attached to the vertical member.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施形態に係る枠組緊結金物を用い
た枠組緊結構造を示す斜視図である。
FIG. 1 is a perspective view showing a framework binding structure using a framework binding metal according to an embodiment of the present invention.

【図2】本発明の一実施形態に係る枠組緊結金物を示す
分解斜視図である。
FIG. 2 is an exploded perspective view showing a framework binding according to one embodiment of the present invention.

【図3】(a)〜(c)は、枠組緊結金物の根太への取
付状況を示す斜視図である。
3 (a) to 3 (c) are perspective views showing a mounting state of a frame binding material to a joist.

【図4】本発明の他の実施形態に係る枠組緊結金物を用
いた枠組緊結構造を示す斜視図である。
FIG. 4 is a perspective view showing a framework fastening structure using a framework fastening metal according to another embodiment of the present invention.

【図5】枠組壁工法を説明する部分破断斜視図である。FIG. 5 is a partially cutaway perspective view illustrating a framed wall construction method.

【符号の説明】 10 枠組緊結金物 12 土台(水平枠部材) 13,13’ 根太 14,14’ 竪枠(垂直部材) 15 アンカーボルト(ボルト部材) 16,16’ ホールダウン金物 19 連結ボルト 20 上部金物 21 締結孔 22 下部金物 23 天面部 24 側面部 25 第1一体化ボルト孔 26 ベースプレ−ト部 27 垂直プレート部 28 締結開口 29 第2一体化ボルト孔 31 鉤形片 32 一体化ボルト 33 釘孔 34 補強プレート 35 切り欠き開口 36 コの字プレート 37 ボルト挿通孔 40 竪枠 41 上枠 42 頭つなぎ(水平枠部材) 43 上部ホールダウン金物 44 上階用アンカーボルト[Explanation of symbols] 10 framework bond 12 Base (horizontal frame member) 13,13 'joist 14,14 'Vertical frame (vertical member) 15 Anchor bolt (bolt member) 16,16 'hole down hardware 19 Connection bolt 20 Upper hardware 21 Fastening hole 22 Lower hardware 23 Top 24 Side 25 1st integrated bolt hole 26 Base plate part 27 Vertical plate part 28 Fastening opening 29 Second integrated bolt hole 31 hook-shaped pieces 32 integrated bolt 33 nail holes 34 Reinforcement plate 35 Notch opening 36 U-shaped plate 37 Bolt insertion hole 40 vertical frame 41 Upper frame 42 head connection (horizontal frame member) 43 Upper hole down hardware 44 Upper floor anchor bolt

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04B 1/26 E04B 1/10 E04B 1/38 - 1/61 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) E04B 1/26 E04B 1/10 E04B 1/38-1/61

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 枠組壁工法において水平枠部材上に設置
される根太に取り付けられ、前記水平枠部材から上方に
突出するボルト部材と前記根太の上方に設置される垂直
部材に取り付けたホールダウン金物とを連結して、前記
垂直部材を緊結固定するために用いる枠組緊結金物であ
って、 上方に突出して前記ホールダウン金物に締結される連結
ボルトを有する上部金物と、前記ボルト部材が締結され
る締結孔を有する下部金物とからなり、前記上部金物は、天面部と一対の側面部とからなるコの
字プレートと、前記天面部から上方に突出して前記ホー
ルダウン金物に締結される前記連結ボルトとからなると
共に、前記一対の側面部に第1一体化ボルト孔が各々形
成されており、 前記下部金物は、前記ボルト部材が締結される締結孔を
有するベースプレ−ト部と、垂直プレート部とからなる
断面L字形状を有すると共に、前記垂直プレート部に
は、締結開口及び第2一体化ボルト孔が設けられ、 前記上部金物は、前記コの字プレートの側面部によって
前記根太を両側から挟み込むようにしつつ前記天面部に
より前記根太の上端面を覆って配設され、前記下部金物
は、前記根太の下端縁部に設けた切り欠き開口に前記ベ
ースプレ−ト部を挿入し、前記垂直プレート部を前記コ
の字プレートの側面部に沿わせつつ前記上部金物の下方
に配設され、前記第1一体化ボルト孔及び前記第2一体
化ボルト孔を合致させて前記一体化ボルトを挿通締結す
ることにより、 前記上部金物と前記下部金物とを一体化
した際に、前記連結ボルトの軸心と前記締結孔の中心と
が一致することを特徴とする枠組緊結金物。
1. A hole-down hardware attached to a joist installed on a horizontal frame member in a frame wall construction method, and a bolt member protruding upward from the horizontal frame member and a vertical member installed above the joist. A frame-type tight fitting used to fasten and fix the vertical member by fastening the bolt member and an upper fitting having a connecting bolt protruding upward and fastened to the hole-down fitting. The upper metal member has a fastening hole, and the upper metal member has a top surface portion and a pair of side surface portions.
Character plate and the ho
And the connecting bolt that is fastened to the hardware.
Both have first integrated bolt holes formed on the pair of side surfaces.
The lower hardware has a fastening hole for fastening the bolt member.
It has a base plate part and a vertical plate part.
It has an L-shaped cross section and
Is provided with a fastening opening and a second integrated bolt hole, and the upper metal part is formed by a side surface of the U-shaped plate.
While sandwiching the joist from both sides,
Is disposed so as to cover the upper end surface of the joist,
Is the notch opening provided at the lower edge of the joist.
Insert the spray plate part and insert the vertical plate part
Below the upper metal fitting along the side of the square plate
Disposed in the first integrated bolt hole and the second integrated bolt hole.
Align the bolt holes and insert and tighten the integrated bolt
As a result, when the upper metal member and the lower metal member are integrated with each other, the axial center of the connecting bolt and the center of the fastening hole are aligned with each other.
【請求項2】 前記ベースプレ−ト部は、これの両側縁
部から立設する補強プレートを備えたコの字断面を有す
ることを特徴とする請求項記載の枠組緊結金物。
Wherein said Besupure - DOO unit framework Tightened hardware according to claim 1, characterized in that it has a U-shaped cross section with a reinforcing plate provided upright from this the side edges.
【請求項3】 請求項1又は2に記載の枠組緊結金物を
用いた枠組緊結構造であって、 前記ボルト部材の突出部位における前記根太の下端縁部
に切り欠き開口を形成して当該切り欠き開口において前
記ボルト部材を前記水平枠部材から突出させ、該切り欠
き開口に前記下部金物の締結開口を合致させつつ前記ベ
ースプレ−ト部を前記切り欠き開口に挿入配置し、前記
ボルト部材を前記ベースプレートの締結孔に締結すると
共に、前記根太の上端面を覆って配設された前記上部金
物の連結ボルトを前記ホールダウン金物に締結し、かつ
前記切り欠き開口の上方において前記根太を貫通して形
成したボルト挿通孔を介して前記第1一体化ボルト孔及
び前記第2一体化ボルト孔に一体化ボルトを挿通締結
し、これらを締め上げることによって、前記垂直部材を
前記ボルト部材に緊結することを特徴とする枠組緊結構
造。
3. A frame tightening structure using the frame tightening metal according to claim 1 or 2 , wherein a notch opening is formed in a lower end edge portion of the joist at a protruding portion of the bolt member. The bolt member is projected from the horizontal frame member at the opening, the base plate portion is inserted and arranged in the cutout opening while the fastening opening of the lower metal fitting is aligned with the cutout opening, and the bolt member is arranged at the base plate. Is fastened to the hole-down metal fitting, and is formed so as to penetrate the joist above the cutout opening. By inserting and fastening an integrated bolt into the first integrated bolt hole and the second integrated bolt hole through the bolt insertion hole, and tightening these, Framework Tightened structure characterized by Tightened straight member to said bolt member.
JP2000020853A 2000-01-28 2000-01-28 Framework binding hardware and framework binding structure Expired - Fee Related JP3377485B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000020853A JP3377485B2 (en) 2000-01-28 2000-01-28 Framework binding hardware and framework binding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000020853A JP3377485B2 (en) 2000-01-28 2000-01-28 Framework binding hardware and framework binding structure

Publications (2)

Publication Number Publication Date
JP2001207536A JP2001207536A (en) 2001-08-03
JP3377485B2 true JP3377485B2 (en) 2003-02-17

Family

ID=18547349

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000020853A Expired - Fee Related JP3377485B2 (en) 2000-01-28 2000-01-28 Framework binding hardware and framework binding structure

Country Status (1)

Country Link
JP (1) JP3377485B2 (en)

Also Published As

Publication number Publication date
JP2001207536A (en) 2001-08-03

Similar Documents

Publication Publication Date Title
JPH08260618A (en) Structural material of wooden building and floor structure and roof structure and construction method based on their application
JP3377485B2 (en) Framework binding hardware and framework binding structure
JP3477074B2 (en) Connection structure of horizontal members and vertical members on upper and lower floors
JPS5844167Y2 (en) Connection member for fastening frame fittings in wooden buildings
JPH08260604A (en) Floor panel connection structure and construction method for woodeen building based on the structure
JPH0967862A (en) Binding reinforcing metal fitting
JP3393642B2 (en) Vertical frame binding structure and vertical frame binding hardware in framed wall construction method
JP3022169U (en) Joining hardware for wooden construction
JP3028999U (en) Housing joint hardware
JP3130864B2 (en) Wooden building
JP3292710B2 (en) Joist crossing joint reinforcement metal and reinforcement structure
JP3396702B2 (en) Joint structure of base and column base in wooden building
JP4338880B2 (en) Mounting fixture for building accessories and mounting structure for building accessories
JP2642839B2 (en) Column fixed structure in wooden prefabricated building
JP3355552B2 (en) Architectural joint metal assembly and method of joining the architectural joint with the assembly
JP2503800Y2 (en) Panel joint structure
JP2024035048A (en) building
JP2807525B2 (en) Panel mounting structure
JP2597952Y2 (en) Assembly panel
JP3390535B2 (en) Wall panel for skip floor and construction method of skip floor
JPH1181465A (en) Connecting structure between groundsill and column, between columns, and between column and beam
JP2514769B2 (en) Beam receiving method and beam receiving bracket
JP2000226897A (en) Gate-shaped frame
JPS63233136A (en) Joint apparatus for building member
JP2001262701A (en) Junction hardware, and wooden framework

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees