JP3365106B2 - Extraction processing device for train operation interval - Google Patents
Extraction processing device for train operation intervalInfo
- Publication number
- JP3365106B2 JP3365106B2 JP32416094A JP32416094A JP3365106B2 JP 3365106 B2 JP3365106 B2 JP 3365106B2 JP 32416094 A JP32416094 A JP 32416094A JP 32416094 A JP32416094 A JP 32416094A JP 3365106 B2 JP3365106 B2 JP 3365106B2
- Authority
- JP
- Japan
- Prior art keywords
- train
- station
- time
- section
- extracting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000605 extraction Methods 0.000 title claims description 18
- 239000000284 extract Substances 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 6
- 238000010586 diagram Methods 0.000 claims description 4
- 101100022176 Mus musculus Gstz1 gene Proteins 0.000 claims 1
- 229910003460 diamond Inorganic materials 0.000 description 3
- 239000010432 diamond Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【発明の詳細な説明】
【0001】
【産業上の利用分野】本発明は、鉄道における列車運転
間合いの抽出処理装置に関する。
【0002】
【従来の技術】鉄道において、線路や架線等の線路に沿
った設備の工事・保守・点検作業には列車の運転に支障
を起こすことなく、また作業員の安全を確保するため、
作業区間を列車が通過しない時間帯を予め調べておく必
要がある。
【0003】この安全な時間帯の抽出は、従来では専門
的な知識をもつ人が列車ダイヤから列車が作業区間に侵
入してくるおよその時刻を調べておくという手作業で行
われている。
【0004】
【発明が解決しようとする課題】従来の手法では、手作
業のため、安全な時間帯の抽出には複雑な列車ダイヤで
は多大な時間がかかるし、抽出ミスを避けるためには精
神的な負担が大きくなる。
【0005】本発明の目的は、列車運転間合いの抽出を
確実、容易にする抽出処理装置を提供することにある。
【0006】
【課題を解決するための手段】本発明は、前記課題の解
決を図るため、鉄道における指定区間に列車が位置しな
い列車運転間合いの時間帯を抽出する装置であって、列
車が運転される線区・線別に各駅を含む列車ダイヤを保
存し、かつ終着・始発等の列車の運転条件を保存するダ
イヤ記憶部と、列車の間合いを抽出する指定区間に含ま
れる各駅及び列車ダイヤを前記ダイヤ記憶部から読み出
し、該区間の基準駅から隣接駅について列車が位置する
時間帯及び駅間を走行中の時間帯をビットデータ列とし
て抽出する処理を基準駅から区間端までの各駅別に行
い、該抽出した時間帯の論理和処理結果に含まれない時
間帯を列車運転の間合い時間帯として抽出する間合い抽
出部と、前記間合い抽出部が抽出した間合い時間帯を指
定区間別に保存・出力する間合い記憶部と、を備えたこ
とを特徴とする。
【0007】
【作用】各駅及び駅間に列車が位置する時間帯を列車ダ
イヤ等から自動的に抽出し、この時間帯に含まれない時
間帯を保守作業等が可能な間合い時間帯として自動的に
抽出する。
【0008】この時間帯の抽出には、指定区間の各駅に
ついて基準駅とそれに隣接する駅について個別にビット
データ列として抽出し、隣接駅を基準駅として次の隣接
駅についての抽出という処理を繰り返す。
【0009】列車が位置する時間帯とそうでない時間帯
を論理”1”と”0”で区別したデータ列とし、それら
の論理和から指定区間についての列車が位置する時間帯
とそうでない間合い時間帯を求める。
【0010】
【実施例】図1は、本発明の一実施例を示すコンピュー
タ構成の装置構成図である。
【0011】ダイヤ記憶部1には各線の区間毎の列車ダ
イヤが保存され、その属性入力として列車の終着条件、
始発条件、分岐条件及び合算条件などの列車の各種運転
条件が入力される。なお、列車の分岐とは、列車が、あ
る駅から、これまで走行してきた線区とは別の線区に入
線することである。また、列車の合算とは列車ダイヤ上
では別線区でも、実際の列車は同じ線路上を走る場合、
または、同じ線路でなくても、別線区を並行して走って
いるような箇所は、隣接線路を合算線区と言う。例え
ば、図3の例では、E駅からB駅を経てA駅まで走行す
る列車はB駅で分岐し、A駅で折り返して再びB駅、さ
らにE駅まで走行する列車はB駅で分岐する。この場
合、駅AとB間が駅Eの合算線区となる。
【0012】ダイヤ記憶部2にはダイヤ記憶部1に記憶
される列車ダイヤの各線とは合算線区になる列車ダイヤ
が保存され、その属性入力として列車の終着条件、始発
条件及び分岐条件等の各種運転条件が入力される。
【0013】間合い抽出部3は、列車運転間合いを作成
する区間が指定されたときに、当該区間についての間合
いを自動抽出し、この抽出にはダイヤ記憶部1、2から
当該区間を含む列車ダイヤを読み込み、これら列車ダイ
ヤから列車運転間合いを自動抽出する。
【0014】表示部4は、間合い抽出部3の作成に必要
な入出力データを表示する。
【0015】間合い記憶部5は、間合い抽出部3で抽出
したデータを保存し、指定される区間の間合いデータを
一覧表として出力する。
【0016】図2は、間合い抽出部3の抽出処理フロー
チャートを示す。以下、各処理を詳細に説明する。
【0017】まず、間合い抽出対象となる線及び合算す
る線も含めた線区・線別を選択し、また間合い抽出区間
を入力し(S1)、入力区間に含まれる駅の抽出と区間
の始点駅をセットし(S2)、これら区間を含む列車ダ
イヤをダイヤ記憶部1、2から取り出す。
【0018】次に、区間の外側になる適当な基準駅を選
択する(S3)。選択された基準駅が区間に含まれてい
る駅か否かをチェックし(S4)、含まれている場合に
は列車の停車時間や移動時間、入線時間、折返し時間、
分岐時間等に当該駅を走行中と同じことを意味するビッ
トを立てる(S5)。
【0019】このビット立ては、図3に上りと下り線別
のビットデータ列として例示するように、区間に含まれ
る駅A〜D及び駅AとB間が駅Eに合算線区となる場
合、各駅A〜Dには分単位で各時刻毎にビット”1”が
書込まれる。
【0020】基準駅でのビット立てが終了した後、線別
に従って基準駅の隣接駅を自動セットし(S6)、当該
隣接駅が入力区間に含まれている駅か否かをチェックし
(S7)、含まれているときは処理S5と同様に、停車
時間等に走行中を意味するビットを立てる(S8)。
【0021】次に、基準駅と隣接駅とに共通する列車を
抽出し、列車ダイヤから両駅間の走行時間帯に走行中の
ビットを立てる。このビット立ては、例えば、図3にお
ける駅AとB間の走行中データ(上りと下り別)にビッ
ト”1”を書込む。
【0022】以上までの処理S4〜S9により基準駅と
隣接駅及びその駅間に列車が走行中を意味するビット立
てを得る。
【0023】以下、同様にして隣接駅が区間端の駅でな
い限り(S10)、隣接駅を基準駅として(S11)、
列車が走行中を意味するビット立てを行う。そして、隣
接駅が区間端の駅になるとき、例えば、図3中のA駅が
区間端になるとき、指定された区間に含まれる駅及び駅
間の列車走行中ビットの論理和を求める(S12)。
【0024】さらに、合算線区があるとき(S13)、
合算線区を線別にセットし(S14)、合算線区につい
ても処理S2から処理S12までを行う。図3の例では
駅AとB間が合算線区になり、E駅からの列車が駅Aと
Bで分岐や折返しのために位置する時間及び駅A、B間
を走行中の時間にそれぞれビットを立てる。
【0025】以上までの処理により、処理S12では列
車が走行中の時間帯がビット”1”の論理和としたデー
タが得られる。図3の例には駅AとBを走行中の論理和
データを示す。そして、論理和データのうち、ビットが
立てられていない時間帯が作業を行うことができる間合
い時間になる。
【0026】このデータは、分単位の時刻別のテキスト
データに変換し(S15)、間合い記憶部5に登録・保
存され、作業区間に応じて一覧表としても取り出され
る。
【0027】
【発明の効果】以上のとおり、本発明によれば、各駅及
び駅間に列車が位置する時間帯を列車ダイヤ等から自動
的に抽出し、この時間帯に含まれない時間帯を保守作業
等が可能な間合い時間帯として自動的に抽出するように
したため、従来では専門的な知識をもつ人の手作業を不
要にし、また抽出ミスを無くした確実な抽出ができる効
果がある。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for extracting train trains between trains. 2. Description of the Related Art In a railway, construction, maintenance, and inspection work of facilities along a track such as a track and an overhead line do not hinder the operation of the train and ensure the safety of workers.
It is necessary to check in advance the time period during which the train does not pass through the work section. Conventionally, the extraction of the safe time zone is manually performed by a person having specialized knowledge to check an approximate time when a train enters a work section from a train schedule. [0004] In the conventional method, the extraction of a safe time zone takes a great deal of time in a complicated train schedule due to manual work, and it takes a lot of time to avoid an extraction error. Burden increases. [0005] It is an object of the present invention to provide an extraction processing device which reliably and easily extracts a train operation interval. [0006] In order to solve the above-mentioned problems, the present invention is an apparatus for extracting a time period between train operations when a train is not located in a designated section of a railway, wherein the train is operated. A train storage unit that stores train schedules including each station for each line section and line to be stored, and saves train operating conditions such as the last and first trains, and stores each station and train diagram included in a designated section to extract train intervals. The process of reading out from the diamond storage unit and extracting the time zone in which the train is located from the reference station in the section to the adjacent station and the time zone running between the stations as a bit data string is performed for each station from the reference station to the end of the section. A time extracting unit that extracts a time period that is not included in the result of the logical sum processing of the extracted time periods as a time period for train operation, and a time interval that the time extracting unit extracts is a designated section. And a time storage unit for separately storing and outputting. [0007] A time zone in which a train is located between stations and between stations is automatically extracted from a train schedule or the like, and a time zone not included in the time zone is automatically set as a time zone in which maintenance work or the like can be performed. To extract. [0008] In the extraction of the time zone, a process of individually extracting a reference station and a station adjacent thereto as a bit data string for each station in a designated section, and extracting the next adjacent station using the adjacent station as a reference station is repeated. . The time zone where the train is located and the time zone where it is not are defined as data strings distinguished by logic "1" and "0". Ask for the obi. FIG. 1 is an apparatus configuration diagram of a computer showing an embodiment of the present invention. The train storage unit 1 stores a train schedule for each section of each line.
Various operating conditions of the train, such as starting conditions, branching conditions, and summing conditions, are input. In addition, the branch of the train means that the train
From the station, enter a line that is different from the line
It is to line. Also, the sum of the trains is on the train schedule
Then, even in a separate line, if the actual train runs on the same track,
Or, even if they are not on the same track,
Where there is, the adjacent line is called the sum line section. example
For example, in the example of FIG. 3, the vehicle travels from station E to station A via station B.
Train branches off at station B, turns back at station A, and returns to station B.
Furthermore, the train traveling to station E branches at station B. This place
In this case, the area between the stations A and B is the total line section of the station E. The train storage unit 2 stores train schedules which are added to the respective train schedule lines stored in the train storage unit 1, and their attribute inputs, such as train termination conditions, starting conditions, and branching conditions, are stored as attribute inputs. Various operating conditions are input. The interval extracting unit 3 automatically extracts the interval for the section when the interval for creating the train operation interval is specified, and extracts the train schedule including the interval from the diamond storage units 1 and 2 for this extraction. And automatically extract the train operation interval from these train schedules. The display unit 4 displays input / output data necessary for creating the interval extracting unit 3. The interval storage unit 5 stores the data extracted by the interval extracting unit 3 and outputs the interval data of the designated section as a list. FIG. 2 shows a flow chart of the extraction processing of the interval extraction unit 3. Hereinafter, each process will be described in detail. First, a line and a line including a line to be subjected to interval extraction and a line to be added are selected, and an interval extraction interval is input (S1). Stations included in the input interval are extracted and a start point of the interval is extracted. The station is set (S2), and the train schedule including these sections is taken out from the schedule storage units 1 and 2. Next, an appropriate reference station outside the section is selected (S3). It is checked whether the selected reference station is a station included in the section (S4), and if it is included, the train stop time, travel time, entry time, turn-back time,
A bit is set at the branch time or the like, which means the same as running the station (S5). This bit setting is a case where the stations A to D and the stations A and B included in the section are combined with the station E as shown in FIG. A bit "1" is written to each of the stations A to D at the time of each minute. After the bit setting at the reference station is completed, the station adjacent to the reference station is automatically set according to the line (S6), and it is checked whether or not the adjacent station is a station included in the input section (S7). If it is included, a bit indicating that the vehicle is running is set at a stop time or the like (S8), similarly to the process S5. Next, a train common to the reference station and the adjacent station is extracted, and a running bit is set from the train schedule in a running time zone between both stations. For this bit setting, for example, a bit “1” is written in the traveling data (up and down) between the stations A and B in FIG. By the above-described processes S4 to S9, a bit standing indicating that the train is running between the reference station and the adjacent station and between the stations is obtained. Hereinafter, similarly, unless the adjacent station is a station at the end of the section (S10), the adjacent station is set as a reference station (S11).
A bit is set to indicate that the train is running. Then, when the adjacent station is a station at the end of the section, for example, when the station A in FIG. 3 is at the end of the section, the logical sum of the stations included in the designated section and the train running bit between the stations is obtained ( S12). Further, when there is a total line section (S13),
The total line section is set for each line (S14), and the processing from step S2 to step S12 is performed for the total line section. In the example of FIG. 3, the total line section is between the stations A and B, and the time from when the train from the station E is located at the stations A and B for branching and returning, and the time when the train is traveling between the stations A and B, respectively. Make a bit. By the above processing, in processing S12, data in which the time zone during which the train is running is the logical sum of the bit "1" is obtained. The example of FIG. 3 shows the logical OR data while traveling at stations A and B. Then, in the logical sum data, a time zone in which no bit is set is a time interval during which work can be performed. This data is converted into text data by time in minutes (S15), registered and stored in the interval storage unit 5, and taken out as a list according to the work section. As described above, according to the present invention, a time zone in which a train is located between stations and between stations is automatically extracted from a train schedule or the like, and a time zone not included in this time zone is extracted. Since the automatic extraction is performed as a time interval in which maintenance work or the like is possible, conventionally, there is an effect that a manual operation by a person having specialized knowledge is unnecessary and an extraction can be surely performed without an extraction error.
【図面の簡単な説明】 【図1】本発明の一実施例を示す装置構成図。 【図2】実施例における間合い抽出のフローチャート。 【図3】実施例における間合い抽出データ例。 【符号の説明】 1、2…ダイヤ記憶部 3…間合い抽出部 4…表示部 5…間合い記憶部[Brief description of the drawings] FIG. 1 is an apparatus configuration diagram showing one embodiment of the present invention. FIG. 2 is a flowchart of interval extraction in the embodiment. FIG. 3 is an example of interval extraction data in the embodiment. [Explanation of symbols] 1, 2, ... diamond storage unit 3 ... interval extraction unit 4 Display unit 5… Time storage unit
Claims (1)
い列車運転間合いの時間帯を抽出する装置であって、 列車が運転される線区・線別に各駅を含む列車ダイヤを
保存し、かつ終着・始発等の列車の運転条件を保存する
ダイヤ記憶部と、 列車の間合いを抽出する指定区間に含まれる各駅及び列
車ダイヤを前記ダイヤ記憶部から読み出し、該区間の基
準駅から隣接駅について列車が位置する時間帯及び駅間
を走行中の時間帯をビットデータ列として抽出する処理
を基準駅から区間端までの各駅別に行い、該抽出した時
間帯の論理和処理結果に含まれない時間帯を列車運転の
間合い時間帯として抽出する間合い抽出部と、 前記間合い抽出部が抽出した間合い時間帯を指定区間別
に保存・出力する間合い記憶部と、を備えたことを特徴
とする列車運転間合いの抽出処理装置。(57) [Claims] [Claim 1] A device for extracting a time zone of a train operation in which a train is not located in a designated section of a railway, including each station for each line section and line in which the train is operated A train storage unit that stores train schedules and saves train operating conditions such as the last and first trains, and reads out stations and train schedules included in a designated section for extracting train intervals from the diagram storage unit, The process of extracting the time zone where the train is located from the reference station to the adjacent station and the time zone running between the stations as a bit data string is performed for each station from the reference station to the end of the section, and the OR processing of the extracted time zone is performed. A time extracting unit that extracts a time period not included in the result as a time period for train operation, and a time storage unit that saves and outputs the time period extracted by the time extracting unit for each designated section. Extraction processing unit train operation Maai, characterized in that.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32416094A JP3365106B2 (en) | 1994-12-27 | 1994-12-27 | Extraction processing device for train operation interval |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32416094A JP3365106B2 (en) | 1994-12-27 | 1994-12-27 | Extraction processing device for train operation interval |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08175387A JPH08175387A (en) | 1996-07-09 |
JP3365106B2 true JP3365106B2 (en) | 2003-01-08 |
Family
ID=18162793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP32416094A Expired - Fee Related JP3365106B2 (en) | 1994-12-27 | 1994-12-27 | Extraction processing device for train operation interval |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3365106B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4863933B2 (en) * | 2007-06-08 | 2012-01-25 | 株式会社日立製作所 | Maintenance work planning system and maintenance work plan creation method |
JP5813428B2 (en) * | 2011-09-12 | 2015-11-17 | 株式会社日立システムズ | Route search system, route search method, and route search program |
CN109649439B (en) * | 2018-12-28 | 2021-07-23 | 广州华微明天软件技术有限公司 | Train approach early warning method, device, equipment and computer readable storage medium |
-
1994
- 1994-12-27 JP JP32416094A patent/JP3365106B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH08175387A (en) | 1996-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104537913B (en) | Training and practicing simulation method for high speed railway driving command dispatching | |
US5390880A (en) | Train traffic control system with diagram preparation | |
CN107672628B (en) | Automatic interlocking table generation method and automatic interlocking table generation device | |
CN108773395B (en) | Automatic selection method and device for continuation route | |
CA3055221C (en) | Radio blocking in a train control system | |
EP2821314A2 (en) | Train operation control system, train operation simulation device, and train operation simulation method | |
JP3365106B2 (en) | Extraction processing device for train operation interval | |
CN107380211A (en) | The method and apparatus that a kind of station track number automatically enters | |
JP7237712B2 (en) | Vehicle Operation Planning Device, Vehicle Operation Planning Method, and Vehicle Operation Planning Program | |
JP3705481B2 (en) | Track maintenance work support system | |
JP3422182B2 (en) | Extraction processing unit for power outage during power outage | |
JP2018062249A (en) | Vehicle operation business assistance system | |
JPH0764257B2 (en) | Train rescheduling plan creation device | |
JP3244879B2 (en) | Train diagram automatic creation device | |
JP3437888B2 (en) | Train schedule creation support device | |
JP2001206224A (en) | Automatic course control device | |
JPH1178892A (en) | Train diagram preparation assisting device | |
JP2814865B2 (en) | Diamond creation support system | |
JPH08253153A (en) | Rationality judging method of train diagram, train course control method and operation control system of railway | |
JPH08230673A (en) | Train schedule drawing up device | |
CN114932929A (en) | Train control method, apparatus, device, storage medium, and program product | |
CN115195817A (en) | Locomotive turnover data display method and device | |
CN117775084A (en) | Method, equipment and medium for processing rail transit fault emergency event | |
Wigger et al. | Safety Assessment of Copenhagen driverless automatic mass transit system | |
JPH07237547A (en) | Train diagram preparation assisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081101 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091101 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101101 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101101 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111101 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111101 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121101 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131101 Year of fee payment: 11 |
|
LAPS | Cancellation because of no payment of annual fees |