JP3303192B2 - Door frame retrofitting method and door frame used for door frame retrofitting method - Google Patents
Door frame retrofitting method and door frame used for door frame retrofitting methodInfo
- Publication number
- JP3303192B2 JP3303192B2 JP19504598A JP19504598A JP3303192B2 JP 3303192 B2 JP3303192 B2 JP 3303192B2 JP 19504598 A JP19504598 A JP 19504598A JP 19504598 A JP19504598 A JP 19504598A JP 3303192 B2 JP3303192 B2 JP 3303192B2
- Authority
- JP
- Japan
- Prior art keywords
- frame
- door frame
- right vertical
- door
- opening base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、ドア枠の施工方法
及びドア枠に係り、さらに詳しくは、壁クロス施工後に
ドア枠の施工を行うことができるドア枠の後付け工法及
びドア枠の後付け工法に用いるドア枠に関する。TECHNICAL FIELD The present invention relates to a method for constructing a door frame.
And relates to a door frame, more particularly, retrofit door frame which can be carried out construction of the door frame after the wall cross construction method 及
The present invention relates to a door frame used for a retrofitting method of a door frame .
【0002】[0002]
【従来の技術】周知の通り、建物にはドア等の建具が設
けられており、これらは、建物の壁に開口部を設け、こ
の開口部に形成されたドア枠等に取り付けられているも
のであり、以前においては、上記ドア枠等の施工を大工
が壁の施工と同時に行っており、さらに、このドア枠等
に合わせて建具屋がドア等を製造し、その吊り込みを行
っていた。2. Description of the Related Art As is well known, a building is provided with a fitting such as a door, which is provided with an opening in a wall of the building and attached to a door frame or the like formed in the opening. In the past, the construction of the door frame and the like was done by the carpenter at the same time as the construction of the wall, and furthermore, a fitting shop manufactured doors and the like according to the door frame and the like, and hanged the door. .
【0003】しかしながら、上記の大工がドア枠等の施
工を行い、建具屋がそれに合わせてドア等を製造し、そ
の吊り込みを行う方法では、ドア枠等の施工後に採寸を
し、それからドア等の製造に取り掛かるため、建物の建
築工期が長期化し、また、多くの人手を要するため、建
築費用が高価になってしまうという不具合が生じてい
た。However, in the method in which the carpenter constructs a door frame and the like, and a fitting shop manufactures the door and the like in accordance with the construction, and hangs the door, the measuring is performed after the construction of the door frame and the like, and then the door is constructed. The construction of the building is prolonged, and the construction period of the building is prolonged. Further, since a large amount of manpower is required, the construction cost increases.
【0004】そこで、上記の不具合を解消するために、
ドアとドアに対するドア枠がユニット化されたユニット
建具が広く用いられるようになり、このユニット建具
は、ドアに対するドア枠があらかじめ形成されているた
め、大工が壁の施工と同時にこのドア枠の施工を行い、
その後、ドアを吊り込むだけで良いので、建具屋による
採寸やドアの製造を必要とせず、建築工期の短縮と建築
費用の削減を図ることができる。Therefore, in order to solve the above-mentioned problems,
Unit fittings in which doors and door frames for doors are unitized have become widely used. In this unit fitting, since a door frame for a door is formed in advance, a carpenter can construct the door frame simultaneously with the wall. Do
After that, since it is only necessary to hang the door, there is no need for a fitting shop to measure and manufacture the door, thereby shortening the construction period and reducing the construction cost.
【0005】[0005]
【発明が解決しようとする課題】上記従来の技術、即
ち、ユニット建具の使用によって、建築工期の短縮と建
築費用の削減を図ることができるものの、ユニット建具
におけるドア枠の施工が大工による壁の施工と同時に行
われているため、ドア枠の施工後に壁クロスの施工が行
われることとなり、その結果、壁クロス施工時等にドア
枠が傷付く心配があり、さらに、壁クロス施工時等にド
ア枠から外されているドアについても、現場に長く保管
されることとなるので、その保管中に傷付く心配があ
り、建物を施主や顧客へ引き渡す前に、傷の有無のチェ
ックと傷の補修が必要となる。Although the prior art described above, that is, the use of unit fittings can shorten the construction period and reduce the construction cost, the construction of the door frames in the unit fittings requires the wallwork by the carpenter. Because it is performed simultaneously with the construction, the construction of the wall cloth will be performed after the construction of the door frame, and as a result, there is a risk that the door frame will be damaged at the time of construction of the wall cloth, etc. Doors that have been removed from the door frame will also be stored at the site for a long time, so there is a risk of damage during storage.Before handing over the building to the owner or customer, check for damage and check for scratches. Repair is required.
【0006】特に、建物を施主や顧客へ引き渡す際のク
レームの多くは、このドアやドア枠に生じた傷によるも
のであり、これを防止するためには、ドア枠等に防傷対
策を施したり、ドア枠から外したドアを傷の付きにくい
場所に保管しておく必要があり、これら養生費用が新た
に必要となる。また、ドアの保管中の傷を防止するため
にドア等の梱包を厳重にすることも考慮されるが、ごみ
が大量に発生することとなるので、これを実際に行うこ
とは現実的でない。[0006] In particular, many complaints when a building is handed over to the owner or a customer are caused by scratches on the door or door frame. To prevent this, a door frame or the like is provided with anti-scratch measures. In addition, the door removed from the door frame needs to be stored in a place that is not easily scratched, and these curing costs are newly required. In order to prevent the door from being damaged during storage, strict packing of the door and the like is considered. However, since a large amount of dust is generated, it is not realistic to actually perform this.
【0007】さらに、上記ユニット建具は、ドアとドア
枠がユニット化されているため、大きく、且つ、重いも
のであり、しかも、サイズやデザインが多様であるの
で、その施工を行う際の各部屋毎への間配りに多くの時
間が必要となるという不具合も生じていた。Further, the unit fittings are large and heavy because the door and the door frame are unitized, and have various sizes and designs. There was also a problem that a lot of time was required for handing out each time.
【0008】よって、本発明は、上記従来のドア枠の施
工方法及びドア枠における不具合を解消し、より一層の
建築工期の短縮と建築費用の削減を実現できるドア枠の
施工方法及びドア枠の提供を目的とする。[0008] Accordingly, the present invention is the eliminate the problem in the construction methods and door frame of a conventional door frame, construction methods and door frame of the door frame which can realize a reduction in shortening the building costs further building construction period For the purpose of providing.
【0009】[0009]
【課題を解決する為の手段】上記目的を達成する為に本
発明は次の技術的手段を有する。即ち、建物の壁1に形
成された開口下地枠4の左右に取り付けられる左右の縦
枠10,11と、上記左右の縦枠10,11の間の上方
に取り付けられる上方枠12とで構成されたドア枠5
を、壁クロス施工後に壁1の開口下地枠4に施工するド
ア枠の後付け工法であって、上記壁クロス施工後の壁1
の開口下地枠4の左右に対して左右の縦枠10,11を
取り付ける第1工程と、上記開口下地枠4の左右に取り
付けられた左右の縦枠10,11の間に上方枠12を位
置させると共に、これを上方に向かって押し上げ、左右
の縦枠10,11の間の上方に上方枠12を仮止めする
第2工程と、上記左右の縦枠10,11の各々の鉛直度
及び直線度を調整する第3工程と、上記左右の縦枠1
0,11の間の上方に仮止めされた上方枠12を固定す
る第4工程と、上記左右の縦枠10,11と上方枠12
によって構成されたドア枠5内にドア20を吊り込むと
共に、ドア枠5とドア20との間のチリの調整を行う第
5工程よりなり、しかも、上記第1工程及び第3工程に
おける左右の縦枠10,11の取り付け及びその調整
と、上記第5工程におけるチリの調整は、上記左右の縦
枠10,11の各々の開口下地枠4側の側面に配設され
ていると共に、その反対側の側面から開口下地枠4への
取り付けと開口下地枠4との間の隙間を調整することが
できる取付部材6によって行われ、さらに、上記取付部
材6は、上記左右の縦枠10,11と開口下地枠4との
間の隙間を調整した後、調整された隙間の状態を固定で
きるように構成され、上記第5工程におけるチリの調整
が行われた後、調整されたチリの固定を行うことがで
き、さらに、上記第2工程における上方枠12の仮止め
は、上記左右の縦枠10,11の上方に設けられた保持
部材7によって行われることを特徴とするドア枠の後付
け工法である。In order to achieve the above object, the present invention has the following technical means. That is, left and right vertical frames 10 and 11 attached to the left and right of the opening base frame 4 formed on the wall 1 of the building, and an upper frame 12 attached above between the left and right vertical frames 10 and 11. Door frame 5
Is a method of retrofitting a door frame to be installed on the opening base frame 4 of the wall 1 after the wall cloth is constructed, and the wall 1 after the wall cloth is constructed.
A first step of attaching the left and right vertical frames 10 and 11 to the left and right of the opening base frame 4 and the upper frame 12 between the left and right vertical frames 10 and 11 attached to the left and right of the opening base frame 4. And a second step of temporarily lifting the upper frame 12 upwardly between the left and right vertical frames 10 and 11, and a verticality and a straight line of each of the left and right vertical frames 10 and 11. A third step of adjusting the degree, and the left and right vertical frames 1
A fourth step of fixing the upper frame 12 temporarily fixed at an upper position between 0, 11 and the left and right vertical frames 10, 11 and the upper frame 12;
A fifth step of suspending the door 20 in the door frame 5 and adjusting the dust between the door frame 5 and the door 20 is performed. In addition, the fifth step is performed in the first step and the third step. The mounting and adjustment of the vertical frames 10 and 11 and the adjustment of the dust in the fifth step are arranged on the side surfaces of the left and right vertical frames 10 and 11 on the side of the opening base frame 4 and opposite thereto. It is performed by a mounting member 6 that can adjust the gap between the opening base frame 4 and the opening base frame 4 from the side surface on the side, and further includes the mounting portion.
The material 6 is formed between the left and right vertical frames 10 and 11 and the opening base frame 4.
After adjusting the gap between them, fix the adjusted gap
Adjustment of dust in the fifth step
After the adjustment has been made, the adjusted
Can further temporarily fixed upper frame 12 in the second step is put method after the door frame, characterized in that it is carried out by the holding member 7 disposed above the left and right vertical frame 10, 11.
【0010】さらに、建物の壁1に形成された開口下地
枠4の一側に取り付けられるドア枠5の一側を成す一方
のドア枠形成部材13と、上記一方のドア枠形成部材1
3と接合し、ドア枠5の他側を成す他方のドア枠形成部
材14とで構成されたドア枠5を、壁クロス施工後に壁
1の開口下地枠4に施工するドア枠の後付け工法であっ
て、上記壁クロス施工後の壁1の開口下地枠4に対して
その一側から一方のドア枠形成部材13を差し込むと共
に、上記開口下地枠4の一側から差し込まれた一方のド
ア枠形成部材13を成す左右の縦枠形成部材15,16
を開口下地枠4の左右に取り付ける第1工程と、上記開
口下地枠4の左右に取り付けられた左右の縦枠形成部材
15,16の各々の鉛直度及び直線度を調整する第2工
程と、上記開口下地枠4の他側から上記他方のドア枠形
成部材14を差し込むと共に、開口下地枠4に取り付け
られた一方のドア枠形成部材13に接合させる第3工程
と、上記一方のドア枠形成部材13と他方のドア枠形成
部材14によって構成されたドア枠5内にドア20を吊
り込むと共に、ドア枠5とドア20との間のチリの調整
を行う第4工程よりなり、しかも、上記第1工程及び第
2工程における一方のドア枠形成部材13を成す左右の
縦枠形成部材15,16の取り付け及びその調整と、上
記第4工程におけるチリの調整は、上記一方のドア枠形
成部材13を成す左右の縦枠形成部材15,16の各々
の開口下地枠4側の側面に配設されていると共に、その
反対側の側面から開口下地枠4への取り付けと開口下地
枠4との間の隙間を調整することができる取付部材6に
よって行われ、さらに、上記取付部材6は、上記一方の
ドア枠形成部材13を成す左右の縦枠形成部材15,1
6と開口下地枠4との間の隙間を調整した後、調整され
た隙間の状態を固定できるように構成され、上記第4工
程におけるチリの調整が行われた後、調整されたチリの
固定を行うことができることを特徴とするドア枠の後付
け工法である。Further, one door frame forming member 13 forming one side of the door frame 5 attached to one side of the opening base frame 4 formed on the wall 1 of the building, and the one door frame forming member 1
The door frame 5, which is joined to the door frame 3 and the other door frame forming member 14 on the other side of the door frame 5, is attached to the opening base frame 4 of the wall 1 after the wall cross construction by a retrofitting method of the door frame. there are, from the one side to write no co <br/> pointing to one of the door frame forming member 13 relative to the aperture base frame 4 of the wall 1 after the wall cross construction, one side of the aperture base frame 4 Left and right vertical frame forming members 15 and 16 forming one door frame forming member 13 inserted from
A first step of attaching the right and left vertical frame forming members 15 and 16 attached to the left and right of the opening base frame 4, and a second step of adjusting the verticality and linearity of each of the left and right vertical frame forming members 15 and 16 attached to the left and right of the opening base frame 4. A third step of inserting the other door frame forming member 14 from the other side of the opening base frame 4 and joining the other door frame forming member 13 to the one door frame forming member 13 attached to the opening base frame 4; A fourth step of suspending the door 20 in the door frame 5 constituted by the member 13 and the other door frame forming member 14 and adjusting the dust between the door frame 5 and the door 20; The attachment and adjustment of the left and right vertical frame forming members 15 and 16 forming the one door frame forming member 13 in the first step and the second step, and the adjustment of the dust in the fourth step are performed by the one door frame forming member. Make 13 The right vertical frame forming members 15, 16 are disposed on the side surfaces on the side of the opening base frame 4, respectively, and are attached to the opening base frame 4 from the opposite side surfaces and the gaps between the opening base frames 4. The adjustment is performed by a mounting member 6 that can be adjusted.
Left and right vertical frame forming members 15 and 1 forming door frame forming member 13
After adjusting the gap between the opening base frame 4 and the opening
The fourth step is configured so that the state of the
After the Chilean adjustments have been made in the process, the adjusted Chilean
Fixing a retrofit method for a door frame, characterized in Rukoto can do.
【0011】そして、建物の壁1に形成された開口下地
枠4に対して壁クロス施工後にドア枠5を施工するドア
枠の後付け工法に用いるドア枠において、 上記ドア枠の
後付け工法に用いるドア枠5は、建物の壁1に形成され
た開口下地枠4の左右に取り付けられる左右の縦枠1
0,11と、左右の縦枠10,11の間の上方に取り付
けられる上方枠12より成り、上記左右の縦枠10,1
1は、左右の縦枠10,11の各々の開口下地枠4側の
側面に配設され、左右の縦枠10,11の各々の開口下
地枠4側の側面とは反対側の側面から開口下地枠4への
取り付けと開口下地枠4との間の隙間を調整することが
できるように構成された取付部材6を備えていると共
に、左右の縦枠10,11の各々の上方に配設され、左
右の縦枠10,11の間の上方に取り付けられる上方枠
12を保持する保持部材7を備え、しかも、上記取付部
材6は、開口下地枠4に取り付けられる固定部21と、
固定部21に螺合すると共に、左右の縦枠10,11の
開口下地枠4側の側面に回転可能に取り付けられる回転
部22と、固定部21に螺合した回転部22を固定部2
1に対して固定するロックプレート24を備え、上記固
定部 21に螺合した回転部22を回転させることによっ
て、左右の縦枠10,11と開口下地枠4との間の隙間
の調整を行うと共に、上記ロックプレート24によっ
て、左右の縦枠10,11と開口下地枠4との間の調整
された隙間の固定を行うことを特徴とするドア枠の後付
け工法に用いるドア枠である。 [0011] Then, an opening base formed on the wall 1 of the building
A door for installing a door frame 5 after a wall cloth is applied to the frame 4
In the door frame used for the retrofitting method of the frame,
The door frame 5 used in the retrofitting method is formed on the wall 1 of the building.
Left and right vertical frames 1 attached to the left and right sides of the open base frame 4
0, 11 and the upper part between the left and right vertical frames 10, 11
Left and right vertical frames 10, 1
1 is an opening base frame 4 side of each of the left and right vertical frames 10 and 11.
It is disposed on the side and under the opening of each of the left and right vertical frames 10 and 11.
From the side opposite to the side of the ground frame 4 to the opening base frame 4
Adjusting the gap between the mounting and the opening base frame 4
The mounting member 6 configured to be capable of
Are disposed above each of the left and right vertical frames 10 and 11,
Upper frame attached above between right vertical frames 10 and 11
And a holding member 7 for holding the mounting member 12.
The material 6 includes a fixing portion 21 attached to the opening base frame 4,
While being screwed into the fixing part 21, the left and right vertical frames 10, 11
Rotation that is rotatably attached to the side of the opening base frame 4
The fixing part 2 and the rotating part 22 screwed to the fixing part 21
1 and a lock plate 24 fixed to the
By rotating the rotating part 22 screwed to the fixed part 21
Between the left and right vertical frames 10 and 11 and the opening base frame 4
Adjustment and the lock plate 24
Adjustment between the left and right vertical frames 10 and 11 and the opening base frame 4
Door frame characterized by fixing the gap
This is a door frame used for the cladding method.
【0012】さらに、建物の壁1に形成された開口下地
枠4に対して壁クロス施工後にドア枠5を施工するドア
枠の後付け工法に用いるドア枠において、 上記ドア枠の
後付け工法に用いるドア枠5は、建物の壁1に形成され
た開口下地枠4の一側に取り付けられるドア枠5の一側
を成す一方のドア枠形成部材13と、上記一方のドア枠
形成部材13に接合され、ドア枠5の他側を成す他方の
ドア枠形成部材14より成り、上記一方のドア枠形成部
材13は、左右の縦枠形成部材15,16と上方枠形成
部材17より成り、上記他方のドア枠形成部材14は、
左右の縦枠形成部材15’,16’と上方枠形成部材1
7’より成り、さらに、上記左右の縦枠形成部材15,
16は、左右の縦枠形成部材15,16の各々の開口下
地枠4側の側面に配設され、左右の縦枠形成部材15,
16の各々の開口下地枠4側の側面とは反対側の側面か
ら開口下地枠4への取り付けと開口下地枠4との間の隙
間を調整することができるように構成された取付部材6
を備え、しかも、上記取付部材6は、開口下地枠4に取
り付けられる固定部21と、固定部21に螺合すると共
に、左右の縦枠形成部材15,16の開口下地枠4側の
側面に回転可能に取り付けられる回転部22と、固定部
21に螺合した回転部22を固定部21に対して固定す
るロックプレート24を備え、上記固定部21に螺合し
た回転部22を回転させることによって、左右の縦枠形
成部材15,16と開口下地枠4との間の隙間の調整を
行うと共に、上記ロックプレート24によって、左右の
縦枠形成部材15,16と開口下地枠4との間の調整さ
れた隙間の固定を行うことを特徴とするドア枠の後付け
工法に用いるドア枠である。 Further, an opening foundation formed on the wall 1 of the building
A door for installing a door frame 5 after a wall cloth is applied to the frame 4
In the door frame used for the retrofitting method of the frame,
The door frame 5 used in the retrofitting method is formed on the wall 1 of the building.
Side of door frame 5 attached to one side of open base frame 4
The one door frame forming member 13 and the one door frame
The other side which is joined to the forming member 13 and forms the other side of the door frame 5
The one door frame forming portion, which is made up of a door frame forming member 14;
The material 13 includes left and right vertical frame forming members 15 and 16 and an upper frame forming member.
The other door frame forming member 14 includes a member 17,
Left and right vertical frame forming members 15 ', 16' and upper frame forming member 1
7 ', and the left and right vertical frame forming members 15,
16 is below each opening of the left and right vertical frame forming members 15 and 16.
The left and right vertical frame forming members 15 are disposed on the side surface on the ground frame 4 side.
16 is the side surface opposite to the side surface on the side of the opening base frame 4
Between the opening base frame 4 and the opening base frame 4
Mounting member 6 configured to be able to adjust the distance
The mounting member 6 is attached to the opening base frame 4.
When the fixing portion 21 is screwed to the fixing portion 21
The left and right vertical frame forming members 15 and 16
A rotating part 22 rotatably attached to the side surface, and a fixed part
The rotating part 22 screwed to the fixing part 21 is fixed to the fixing part 21.
And a lock plate 24 which is screwed to the fixing portion 21.
By rotating the rotating part 22, the left and right vertical frame shape
Adjustment of the gap between the component members 15 and 16 and the opening base frame 4
At the same time, the lock plate 24
Adjustment between the vertical frame forming members 15 and 16 and the opening base frame 4
Retrofitting door frames characterized by fixing gaps
This is a door frame used for the construction method.
【0013】本発明は、上記技術的手段より成り、ドア
枠5を壁クロス施工後に施工することができるので、ド
ア枠5の傷によるクレームの発生を解消できると共に、
その養生費用を削減でき、しかも、その施工が非常に容
易であるので、建築工期を短縮できると同時に、建築費
用を低減することができる。The present invention comprises the above technical means, and since the door frame 5 can be constructed after the wall cloth is constructed, it is possible to eliminate the occurrence of a complaint due to the damage of the door frame 5 and
Since the curing cost can be reduced and the construction is very easy, the construction period can be shortened and the construction cost can be reduced.
【0014】[0014]
【発明の実施の形態】以下、本発明のドア枠の後付け工
法及びドア枠の後付け工法に用いるドア枠の実施の形態
を添付図面に基づき詳細に説明する。図1〜図9は、本
発明のドア枠の後付け工法及びドア枠の後付け工法に用
いるドア枠の第1の実施の形態を示しており、図10〜
図15は、本発明のドア枠の後付け工法及びドア枠の後
付け工法に用いるドア枠の第2の実施の形態を示してい
る。 BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, description of the embodiments of the door frame used for attaching method after retrofit method and door frame of the door frame on the basis of the accompanying drawings the present invention. 1 to 9 show the book
Used for the door frame retrofitting method of the invention and the door frame retrofitting method
Fig. 10 shows a first embodiment of a door frame that is
FIG. 15 is a retrofitting method of the door frame of the present invention and the rear of the door frame.
Fig. 9 shows a second embodiment of a door frame used in the attaching method.
You.
【0015】第1の実施の形態では、図1に示した壁ク
ロス施工後に建物の壁1に形成された開口下地枠4に対
してドア枠5を施工するドア枠の後付け工法において、
上記開口下地枠4に対して施工されるドア枠5を、上記
開口下地枠4の左右に取り付けられる左右の縦枠10,
11と、上記左右の縦枠10,11の間の上方に取り付
けられる上方枠12とで構成した場合を示している。In the first embodiment, in a method of retrofitting a door frame, in which a door frame 5 is constructed on an opening base frame 4 formed on a wall 1 of a building after construction of a wall cloth shown in FIG.
The left and right vertical frames 10 attached to the left and right of the opening base frame 4,
11 shows a case in which an upper frame 12 is attached above the left and right vertical frames 10 and 11.
【0016】そして、上記ドア枠5を構成する左右の縦
枠10,11は、ドア枠5の開口下地枠4への施工を、
壁クロス施工後に行うことを可能にするための取付部材
6及び保持部材7を備えているものであり、これら取付
部材6及び保持部材7の具体的な例については、以下に
示すドア枠の後付け工法の中で順次説明する。The left and right vertical frames 10 and 11 constituting the door frame 5 are used for mounting the door frame 5 on the opening base frame 4.
It is provided with a mounting member 6 and a holding member 7 for enabling the mounting after the wall cloth is constructed. Specific examples of the mounting member 6 and the holding member 7 are retrofitting door frames shown below. The method will be described sequentially.
【0017】先ず、ドア枠の後付け工法の第1工程で
は、壁クロス施工後の壁1の開口下地枠4の左右(枠材
40)に左右の縦枠10,11を取り付けるものであ
り、上記左右の縦枠10,11の枠材40への取り付け
は、左右の縦枠10,11の各々における開口下地枠4
側の側面に配設(本実施の形態では、左右各3か所)さ
れた取付部材6によって行われる。First, in the first step of the retrofitting method of the door frame, the left and right vertical frames 10 and 11 are attached to the left and right (frame member 40) of the opening base frame 4 of the wall 1 after the wall cloth is constructed. The attachment of the left and right vertical frames 10 and 11 to the frame member 40 is performed by opening the base frame 4 in each of the left and right vertical frames 10 and 11.
This is performed by mounting members 6 arranged on the side surface (in this embodiment, three places on each side).
【0018】そして、上記取付部材6は、取付部材6が
取り付けられている上記左右の縦枠10,11の各々の
開口下地枠4側の側面とは反対側の側面から開口下地枠
4への取り付けと開口下地枠4との間の隙間を調整する
ことができるように構成され、図2,図3に示したよう
に、外周面にネジ部25が形成された筒状部分を有する
開口下地枠4を構成する枠材40に取り付けられる固定
部21と、固定部21のネジ部25に螺合するネジ部が
内面に形成されたフランジ27を有する円筒状の回転部
22と、上記回転部22に外嵌しフランジ27を介して
回転部22を上記左右の縦枠10,11の開口下地枠4
側の側面に回転可能に取り付ける取付リング23より成
るものであり、しかも、上記固定部21の筒状部分に
は、ロックプレート24が配設され、このロックプレー
ト24によって、ネジ部25及び切欠26が形成された
筒状部分を押し広げることができるように成されてい
る。The mounting member 6 is connected to the opening base frame 4 from the side opposite to the side of the opening base frame 4 of each of the left and right vertical frames 10 and 11 to which the mounting member 6 is mounted. An opening base having a cylindrical portion with a threaded portion 25 formed on the outer peripheral surface as shown in FIGS. 2 and 3 is configured so that a gap between the mounting and the opening base frame 4 can be adjusted. A fixing part 21 attached to a frame member 40 constituting the frame 4, a cylindrical rotating part 22 having a flange 27 formed on the inner surface with a screw part screwed into a screw part 25 of the fixing part 21, 22 and the rotating part 22 via the flange 27 and the opening base frame 4 of the left and right vertical frames 10 and 11.
A lock plate 24 is disposed on the cylindrical portion of the fixed portion 21. The lock plate 24 is provided with a screw portion 25 and a notch 26. Is formed so as to be able to push and expand the cylindrical portion formed with.
【0019】さらに、上記取付部材6は、取付部材6を
成す固定部21と回転部22が螺合した状態で取付リン
グ23にて左右の縦枠10,11にあらかじめ取り付け
られており、回転部22を回転させるための六角レンチ
Rの嵌合穴29からビス28を挿入し、このビス28に
よって固定部21を開口下地枠4の左右の枠材40に固
定することで取付部材6の固定が行われ、これにより、
左右の縦枠10,11が、開口下地枠4の左右に取り付
けられることとなる。Further, the mounting member 6 is mounted in advance on the left and right vertical frames 10 and 11 by the mounting ring 23 in a state where the fixing portion 21 and the rotating portion 22 forming the mounting member 6 are screwed together. A screw 28 is inserted from a fitting hole 29 of a hexagon wrench R for rotating the 22, and the fixing member 21 is fixed to the left and right frame members 40 of the opening base frame 4 by the screw 28, thereby fixing the mounting member 6. Done,
The left and right vertical frames 10 and 11 are attached to the left and right of the opening base frame 4.
【0020】次いで、第2工程では、上記開口下地枠4
の左右の枠材40に取り付けられた左右の縦枠10,1
1の間に上方枠12を位置させると共に、これを上方に
向かって押し上げ(図4)、左右の縦枠10,11の間
の上方に上方枠12を仮止めするものであり、上記左右
の縦枠10,11の間の上方への上方枠12の仮止め
は、左右の縦枠10,11の上方に設けられた保持部材
7によって行われる。Next, in a second step, the opening base frame 4
Vertical frame of left and right left and right attached to the frame member 40 of the 10,1
1, the upper frame 12 is pushed upwards (FIG. 4), and the upper frame 12 is temporarily fixed above the left and right vertical frames 10, 11. Temporarily fixing the upper frame 12 upward between the vertical frames 10 and 11 is performed by a holding member 7 provided above the left and right vertical frames 10 and 11.
【0021】そして、上記保持部材7は、略コ字状に形
成されており、その一端が左右の縦枠10,11の上方
の外側に固定される固定端31、その他端が左右の縦枠
10,11の内側に突出し、左右の縦枠10,11の上
方端部を跨ぐようにして上方枠12を保持する係合保持
端32を構成している(図4,図5)。The holding member 7 is formed in a substantially U-shape. One end of the holding member 7 is fixed to the outer side above the left and right vertical frames 10 and 11, and the other end is the left and right vertical frames. An engagement holding end 32 that projects into the inside of the upper and lower vertical frames 10 and 11 and holds the upper frame 12 so as to straddle the upper ends of the left and right vertical frames 10 and 11 (FIGS. 4 and 5).
【0022】さらに、上記上方枠12の左右には、上記
保持部材7の係合保持端32が係合する係合溝33が形
成されており、この係合溝33を上記保持部材7の係合
保持端32に係合させることで、上方枠12の仮止めが
行われるものであり、しかも、上記係合保持端32の左
右の縦枠10,11側の側面と左右の縦枠10,11の
内側面との間隔Mを、上方枠12の左右の端面から係合
溝33の端面側の側面との間隔Nより若干小さくするこ
とによって、上方枠12を保持部材7の弾性によって弾
性的に保持することが可能となり、左右の縦枠10,1
1の間の上方への上方枠12の仮止めがより確実に行わ
れる。Further, on the left and right sides of the upper frame 12, there are formed engagement grooves 33 with which the engagement holding ends 32 of the holding members 7 are engaged. By engaging the engagement holding end 32, the upper frame 12 is temporarily fixed, and moreover, the side surfaces of the engagement holding end 32 on the left and right vertical frames 10, 11 side and the left and right vertical frames 10, 11 is slightly smaller than the distance N between the left and right end surfaces of the upper frame 12 and the side surface of the engagement groove 33 on the end surface side, so that the upper frame 12 is elastically moved by the elasticity of the holding member 7. And the left and right vertical frames 10, 1
The temporary fixing of the upper frame 12 upward during the period 1 is more reliably performed.
【0023】加えて、上記上方枠12に形成された係合
溝33の左右の縦枠10,11側の側面の上部を面取り
部あるいはアール部(図6中では面取り部35)とする
ことにより、係合溝33への係合保持端32の係合、即
ち、左右の縦枠10,11への上方枠12の仮止めをス
ムーズに行うことができる。In addition, the upper portions of the side surfaces of the engagement grooves 33 formed in the upper frame 12 on the side of the left and right vertical frames 10 and 11 are formed as chamfered portions or round portions (chamfered portions 35 in FIG. 6). The engagement of the engagement holding end 32 with the engagement groove 33, that is, the temporary fixing of the upper frame 12 to the left and right vertical frames 10, 11 can be performed smoothly.
【0024】次いで、第3工程では、上記左右の縦枠1
0,11の各々の鉛直度及び直線度を調整するものであ
り、この調整は、上述した取付部材6の回転部22を、
開口下地枠4の左右の枠材40に取り付け固定された固
定部21に対して回転させることによって行うものであ
り、上記回転部22の回転は、回転部22に設けられた
嵌合穴29に六角レンチRを嵌合させ、これを回転させ
ることによって行われ、しかも、上記回転部22は、上
記固定部21のネジ部25に螺合しているものであるの
で、微妙な調整も容易に行うことができ、左右の縦枠1
0,11の各々の鉛直度及び直線度の調整を正確に行う
ことができる。Next, in a third step, the left and right vertical frames 1
The verticality and the linearity of each of 0 and 11 are adjusted, and the adjustment is performed by rotating the rotating portion 22 of the mounting member 6 described above.
And performs by rotating with respect to the opening underlying frame 4 of the left and right of the frame member 40 to the mounting fixed stationary unit 21, the rotation of the rotating portion 22, the fitting hole 29 provided in the rotating portion 22 This is performed by fitting a hexagon wrench R and rotating it. Further, since the rotating part 22 is screwed to the screw part 25 of the fixed part 21, fine adjustment can be easily performed. Can be done, left and right vertical frame 1
The adjustment of the verticality and linearity of each of 0 and 11 can be accurately performed.
【0025】次いで、第4工程では、上記左右の縦枠の
間の上方に仮止めされた上方枠12を固定するものであ
り、図示はしていないが、上方枠12の左右の端部に貫
通穴を予め形成しておき、この貫通穴を介して、上方枠
12の上方に位置する開口下地枠4の枠材にネジ止めす
ることが考慮され、ネジ止め後には、この貫通穴をキャ
ップ等で塞ぐものであり、さらに、上方枠12の左右端
部に位置することとなる上記保持部材7には、上記貫通
穴を貫通するネジとの干渉を防止するために開口部36
が設けられている。Next, in a fourth step, the upper frame 12 temporarily fixed above the left and right vertical frames is fixed. Although not shown, the upper frame 12 is fixed to the left and right ends. It is considered that a through hole is formed in advance, and the through hole is screwed to the frame material of the opening base frame 4 located above the upper frame 12. The holding member 7, which is located at the left and right ends of the upper frame 12, has openings 36 to prevent interference with screws passing through the through holes.
Is provided.
【0026】次いで、第5工程では、上記左右の縦枠1
0,11と上方枠12によって構成されたドア枠5内に
ドア20の吊り込みを行い、さらに、ドア枠5とドア2
0との間のチリ(隙間)の確認を行い、その調整を行う
ものであり、このチリの調整も、上記第3工程で示した
左右の縦枠10,11の鉛直度及び直線度の調整と同様
の手順で行うことができる。Next, in a fifth step, the left and right vertical frames 1
The door 20 is suspended in the door frame 5 formed by the upper frame 12 and the upper frame 12.
The dust (gap) between 0 and 0 is checked and adjusted. This dust adjustment is also performed by adjusting the verticality and linearity of the left and right vertical frames 10 and 11 shown in the third step. Can be performed in the same procedure as described above.
【0027】さらに、上記ドア枠5とドア20との間の
チリの調整を終えた後、上記取付部材6の固定部21内
に配設されたロックプレート24を回転させ、固定部2
1の切欠26が形成されたネジ部25を押し広げ、回転
部22が固定部21に対して回転しないように固定する
ことによって、ドア枠5の施工及びドア20の吊り込み
が完了するものであり、この時、必要に応じて戸当りや
下方枠の施工も行われる。Further, after the adjustment of the dust between the door frame 5 and the door 20 is completed, the lock plate 24 disposed in the fixing portion 21 of the mounting member 6 is rotated to
The screw portion 25 having the one notch 26 is pushed open, and the rotating portion 22 is fixed so as not to rotate with respect to the fixed portion 21, thereby completing the construction of the door frame 5 and the hanging of the door 20. Yes, at this time, a door stop and a lower frame are constructed as necessary.
【0028】また、上記ドア枠5を構成する左右の縦枠
10,11及び上方枠12には、カブリ18が一体的に
形成されており、このカブリ18によって壁1に形成さ
れた開口下地枠4とドア枠5との間の隙間が覆われるの
で、ドア枠5の施工後の外観が良好に保たれる。A fog 18 is formed integrally with the left and right vertical frames 10 and 11 and the upper frame 12 which constitute the door frame 5, and an opening base frame formed on the wall 1 by the fog 18. Since the gap between the door frame 4 and the door frame 5 is covered, the appearance of the door frame 5 after the construction is kept good.
【0029】そして、上述したように、本発明のドア枠
の後付け工法は、ドア枠5を構成する左右の縦枠10,
11に取り付けられる取付部材6及び保持部材7を用い
ることによって、ドア枠5の開口下地枠4への施工を壁
クロス施工後に行うことが可能となるので、ドア枠5の
傷防止対策やドア20の保管等の養生費用が不要とな
り、しかも、その施工が非常に容易であるので、建築工
期の短縮と、建築費用の低減(特に人件費の削減)を実
現できる。As described above, the retrofitting method of the door frame according to the present invention employs the left and right vertical frames 10,
By using the attachment member 6 and the holding member 7 attached to the door 11, the door frame 5 can be applied to the opening base frame 4 after the wall cloth is applied. Curing costs such as storage are unnecessary, and the construction is very easy. Therefore, it is possible to shorten the construction period and reduce construction costs (especially, labor costs).
【0030】さらに、壁クロス施工後にドア枠5の施工
及びドア20の吊り込みが行えるので、施主や顧客に建
物を引き渡す直前にドア枠5の施工とドア20の吊り込
みを行うことで、ドア枠5やドア20の傷によるクレー
ムが解消され、加えて、その施工が容易であることか
ら、大工のみならず、このドア枠5及びドア20の搬入
者がその施工と吊り込みを行うことが可能となるので、
間配りも効率良く行われることとなる。Further, since the door frame 5 can be installed and the door 20 can be hung after the wall cloth is installed, the door frame 5 can be installed and the door 20 can be hung immediately before the building is handed over to the owner or the customer. Since the complaint due to the damage of the frame 5 and the door 20 is eliminated and the construction is easy, not only the carpenter but also the person who carries in the door frame 5 and the door 20 can carry out the construction and the hanging. It will be possible,
The distribution is also performed efficiently.
【0031】また、上記ドア枠5を左右の縦枠10,1
1と上方枠12及びその取付部品より成るノックダウン
製品として提供することができるので、その施工がより
一層容易となり、しかも、上記ドア枠5は、上記の工法
の逆の手順によって容易に取り外すことができるので、
ドア枠5及びドア20の交換を、壁1を壊したり、壁ク
ロスを剥すことなく行うことができ、リフォーム費用の
低減も実現される。The door frame 5 is connected to the left and right vertical frames 10 and 1.
Since it can be provided as a knockdown product composed of the upper frame 1 and the upper frame 12 and its mounting parts, the installation is further facilitated, and the door frame 5 can be easily removed by the reverse procedure of the above-described method. So you can
The replacement of the door frame 5 and the door 20 can be performed without breaking the wall 1 or peeling off the wall cloth, and the cost of renovation can be reduced.
【0032】そして、図7,図8は、上記保持部材7の
他の例を示しており、ドア枠5を構成する左右の縦枠1
0,11の上方に配設される保持部材7を、左右の縦枠
10,11の間の上方に配設される連結部材37と、上
方枠12の左右に配設される締付部材42とで構成した
ものであって、上記連結部材37は、一端に左右の縦枠
10,11の上方に形成された穴47に固定される基部
39、他端に上記締付部材42に係合する係合部38を
備えて成り、上記締付部材42は、一端を開口部、他端
を閉口部とする筒状部材によって構成され、その筒状部
分には上記連結部材37の係合部38と係合する係合溝
43と、上記係合溝43に係合部38を導くための切欠
44が形成されており、上記閉口部には締付部材42を
回動させるためのドライバーDの嵌合穴45が設けられ
ている。FIGS. 7 and 8 show another example of the holding member 7, and the left and right vertical frames 1 constituting the door frame 5 are shown.
The holding member 7 disposed above the right and left vertical frames 10 and 11 is connected to the connecting member 37 disposed above the right and left vertical frames 10 and 11 and the fastening members 42 disposed right and left of the upper frame 12. The connecting member 37 has a base 39 fixed at one end to a hole 47 formed above the left and right vertical frames 10 and 11, and an engagement with the fastening member 42 at the other end. The fastening member 42 is formed of a cylindrical member having an opening at one end and a closing portion at the other end, and the engaging portion of the connecting member 37 is provided at the cylindrical portion. 38, a notch 44 for guiding the engaging portion 38 to the engaging groove 43, and a driver D for rotating the tightening member 42 in the closing portion. fitting hole 45 is provided for.
【0033】さらに、上記締付部材42は、係合溝43
に連結部材37の係合部38を導いた後、所定の方向に
回動させることによって、係合部38を左右の縦枠1
0,11を上方枠12に向かって引きつけるものであ
り、この回動量によって、左右の縦枠10,11に対す
る上方枠12の仮止めとその後の固定を行うように構成
されている。Further, the fastening member 42 has an engagement groove 43
After the engaging portion 38 of the connecting member 37 is guided to the vertical frame 1 by rotating the engaging portion 38 in a predetermined direction.
The upper frame 12 is attracted toward the upper frame 12, and the amount of rotation is used to temporarily fix the upper frame 12 to the left and right vertical frames 10 and 11 and to fix the upper frame 12 thereafter.
【0034】そして、上記連結部材37が配設された左
右の縦枠10,11の上方には、上記連結部材37を挟
むようにしてダボ49が配設され、左右の縦枠10,1
1の間の上方に保持固定される上方枠12のガタ付きを
防止している。A dowel 49 is disposed above the left and right vertical frames 10 and 11 on which the connecting members 37 are disposed so as to sandwich the connecting member 37 therebetween.
This prevents rattling of the upper frame 12 which is held and fixed between the upper frames 1 and 2.
【0035】また、上記上方枠12の左右には、上記連
結部材37及びダボ49を所定の位置に案内するガイド
溝46が形成されていると共に、上記連結部材37の係
合部38と係合する締付部材42の収容穴48が設けら
れ、この収容穴48は、上方枠12の締付部材12によ
る固定が完了した際にキャップ50によって塞ぐもので
ある。A guide groove 46 for guiding the connecting member 37 and the dowel 49 to a predetermined position is formed on the left and right sides of the upper frame 12, and is engaged with the engaging portion 38 of the connecting member 37. An accommodating hole 48 for the tightening member 42 is provided, and the accommodating hole 48 is closed by the cap 50 when the fixing of the upper frame 12 by the tightening member 12 is completed.
【0036】尚、上記第1の実施の形態では、ドア枠5
を構成する左右の縦枠10,11及び上方枠12に対し
てカブリ18を一体的に形成した場合を示したが、この
カブリ18を図9に示したように左右の縦枠10,11
及び上方枠12とは別部材とすることも考慮され、この
場合には、使用する壁クロスの厚みや壁1の施工誤差等
によって多少の変動がある壁1の厚みに対応することが
できる。In the first embodiment, the door frame 5
Although the fog 18 is formed integrally with the left and right vertical frames 10 and 11 and the upper frame 12 which constitute the above, the fog 18 is formed as shown in FIG.
In addition, it is considered that the upper frame 12 is a separate member. In this case, it is possible to cope with the thickness of the wall 1 having a slight variation due to the thickness of the wall cloth to be used, a construction error of the wall 1, and the like.
【0037】次に、本発明の第2の実施の形態について
説明する。本実施の形態では、図1に示した壁クロス施
工後に建物の壁1に形成された開口下地枠4に対してド
ア枠5施工するドア枠の後付け工法において、上記開口
下地枠4に対して施工されるドア枠5を、ドア枠5の一
側を成す一方のドア枠形成部材13と、上記一方のドア
枠形成部材13と接合し、ドア枠5の他側を成す他方の
ドア枠形成部材14とで構成した場合(図10)を示し
ている。Next, a second embodiment of the present invention will be described. In the present embodiment, in the method of retrofitting a door frame to be applied to the opening base frame 4 formed on the wall 1 of the building after the wall cloth shown in FIG. The door frame 5 to be constructed is joined to one door frame forming member 13 forming one side of the door frame 5 and the one door frame forming member 13 to form the other door frame forming the other side of the door frame 5. FIG. 10 shows a case in which the member 14 is used.
【0038】そして、上記ドア枠5を構成する一方のド
ア枠形成部材13は、左右の縦枠形成部材15,16と
上方枠形成部材17より成り、上記他方のドア枠形成部
材14も同様に、左右の縦枠形成部材15’,16’と
上方枠形成部材17’より成るものであって、上記一方
のドア枠形成部材13及び他方のドア枠形成部材14の
各々には、カブリ18及び18’が一体的に形成されて
いる。The one door frame forming member 13 constituting the door frame 5 includes left and right vertical frame forming members 15 and 16 and an upper frame forming member 17, and the other door frame forming member 14 similarly. , The left and right vertical frame forming members 15 'and 16' and the upper frame forming member 17 '. And 18 'are integrally formed.
【0039】さらに、上記一方のドア枠形成部材13の
左右の縦枠形成部材15,16は、ドア枠5の開口下地
枠4への施工を、壁クロス施工後に行うことを可能にす
るための取付部材6を備えているものであり、この取付
部材6は、上述した第1の実施の形態で示したものと同
様であるのでその説明は省略する。Further, the left and right vertical frame forming members 15 and 16 of the one door frame forming member 13 are provided to enable the door frame 5 to be formed on the opening base frame 4 after the wall cloth is formed. The mounting member 6 is provided, and the description of the mounting member 6 is omitted since it is the same as that shown in the first embodiment.
【0040】先ず、本実施の形態のドア枠の後付け工法
の第1工程では、壁クロス施工後の壁1に形成された開
口下地枠4の一側から一方のドア枠形成部材13を差し
込み、これを上記開口下地枠4に取り付けるものであ
り、上記開口下地枠4への一方のドア枠形成部材13の
取り付けは、第1の実施の形態と同様に、一方のドア枠
形成部材13を成す左右の縦枠形成部材15,16を開
口下地枠4の左右に取付部材6を介して取り付けること
によって行われる。First, in the first step of the retrofitting method of the door frame of the present embodiment, one door frame forming member 13 is inserted from one side of the opening base frame 4 formed on the wall 1 after the wall cloth is constructed. This is attached to the opening base frame 4, and the attachment of the one door frame forming member 13 to the opening base frame 4 forms one door frame forming member 13, as in the first embodiment. This is performed by attaching the left and right vertical frame forming members 15 and 16 to the left and right sides of the opening base frame 4 via the mounting member 6.
【0041】次いで、第2工程では、上記開口下地枠4
の左右に取り付けられた左右の縦枠形成部材15,16
の各々の鉛直度及び直線度を調整するものであり、この
調整も第1の実施の形態と同様に行われ、さらに、第3
工程では、上記開口下地枠4の他側から上記他方のドア
枠形成部材14を差し込むと共に、上記の工程ですでに
開口下地枠4に取り付けられている一方のドア枠形成部
材13に接合させる。Next, in the second step, the opening base frame 4
Left and right vertical frame forming members 15 and 16 attached to the left and right
Are adjusted in the same manner as in the first embodiment, and the verticality and the linearity are adjusted in the same manner as in the first embodiment.
In the step, the other door frame forming member 14 is inserted from the other side of the opening base frame 4 and is joined to the one door frame forming member 13 already attached to the opening base frame 4 in the above step.
【0042】そして、上記一方のドア枠形成部材13と
他方のドア枠形成部材14との接合は、一方のドア枠形
成部材13に形成された凹部51に対して他方のドア枠
形成部材14に形成された凸部52を嵌合させることに
よって行われるものであり、上記凹部51に対する凸部
52の嵌合量を調整することによって、使用される壁ク
ロスの厚みや壁1の施工誤差等によって多少の変動があ
る壁1の厚みに対応することができる。Then, the above-mentioned one door frame forming member 13 and the other door frame forming member 14 are joined to the other door frame forming member 14 with respect to the concave portion 51 formed in the one door frame forming member 13. This is performed by fitting the formed convex portion 52, and by adjusting the fitting amount of the convex portion 52 to the concave portion 51, the thickness of the wall cloth to be used, the construction error of the wall 1, etc. It is possible to cope with the thickness of the wall 1 having some fluctuation.
【0043】次いで、第4工程では、上記一方のドア枠
形成部材13と他方のドア枠形成部材14によって構成
されたドア枠5内にドア20を吊り込むと共に、ドア枠
5とドア20との間のチリの調整を行うものであり、こ
の調整も第1の実施の形態と同様に行われ、この時、必
要に応じて下方枠や戸当りの施工を行うものであり、本
実施の形態においても、上述の第1の実施の形態と同様
の利点が得られる。Next, in a fourth step, the door 20 is suspended in the door frame 5 constituted by the one door frame forming member 13 and the other door frame forming member 14, and the door frame 5 and the door 20 are connected to each other. In this case, adjustment of dust is performed, and this adjustment is also performed in the same manner as in the first embodiment. At this time, construction of the lower frame and door stop is performed as necessary. In this case, the same advantages as in the first embodiment can be obtained.
【0044】そして、図12,図13及び図14,図1
5は、本実施の形態におけるその他の例を示したもので
あって、ドア枠5を構成する一方のドア枠形成部材13
と他方のドア枠形成部材14との接合部分をドア枠5の
戸当り41の部分とした場合を示し、戸当り41が別部
材によって形成されたものと、戸当り41が一方のドア
枠形成部材13と一体的に形成されたものとを示してお
り、これらの場合も、上記と同様、一方のドア枠形成部
材13に形成された凹部51に対する他方のドア枠形成
部材14に形成された凸部52の嵌合量を調整すること
によって、使用される壁クロスの厚みや壁1の施工誤差
等によって多少の変動がある壁1の厚みに対応すること
ができる。FIGS. 12, 13 and 14, FIGS.
5 shows another example of the present embodiment, in which one door frame forming member 13 constituting the door frame 5 is provided.
And the other part of the door frame forming member 14 is a door stop 41 of the door frame 5. The door stop 41 is formed by another member, and the door stop 41 is formed by one door frame. In this case, as in the above case, it is formed on the other door frame forming member 14 with respect to the concave portion 51 formed on the one door frame forming member 13. By adjusting the fitting amount of the convex portion 52, it is possible to cope with the thickness of the wall 1 having a slight variation due to the thickness of the wall cloth used or the construction error of the wall 1.
【0045】[0045]
【発明の効果】以上詳述した如く、本発明によると次の
様な効果を奏する。即ち、請求項1、請求項2、請求項
3、請求項4に示した発明によると、ドア枠の施工を壁
クロス施工後に行うことができるドア枠の後付け工法及
びドア枠の後付け工法に用いるドア枠が提供され、ドア
枠の傷によるクレームの発生が解消されることに加え
て、その施工が非常に容易であるので、建築工期の短縮
と、建築費用の低減を実現できる。As described in detail above, the present invention has the following effects. That is, according to claim 1, claim 2, claim 3, according to the invention shown in claim 4, method 及 retrofit door frame which can be carried out construction of the door frame after the wall cross construction
Door frames for the retrofitting of door frames and doors are provided, eliminating the occurrence of complaints due to scratches on the door frames.In addition, the construction is extremely easy, which shortens the construction period and reduces construction costs. Reduction can be realized.
【0046】さらに、壁クロス施工後にドア枠の施工及
びドアの吊り込みが行えると共に、その施工が容易であ
ることから、大工のみならず、ドア枠の搬入者がその施
工と吊り込みを行うことが可能となるので、より一層、
建築工期の短縮と、建築費用の低減を図ることができ
る。Further, since the door frame can be installed and the doors can be hung after the wall cloth is installed and the installation is easy, not only the carpenter but also the person who carries in the door frame must perform the installation and the hanging. Is possible,
The construction period can be shortened and the construction cost can be reduced.
【図1】本発明のドア枠の後付け工法によってドア枠が
施工された建物の壁を示す図である。FIG. 1 is a view showing a wall of a building on which a door frame is constructed by a retrofitting method of the door frame of the present invention.
【図2】取付部材の構成を示す図である。FIG. 2 is a diagram showing a configuration of a mounting member.
【図3】取付部材の使用状態を示す図である。FIG. 3 is a diagram illustrating a use state of an attachment member.
【図4】第1の実施の形態における第2工程を示す図で
ある。FIG. 4 is a view showing a second step in the first embodiment.
【図5】左右の縦枠の間の上方に上方枠が仮止めされた
状態を示す斜視図である。FIG. 5 is a perspective view showing a state in which an upper frame is temporarily fixed above the left and right vertical frames.
【図6】図5におけるX−X’線に沿う断面図である。FIG. 6 is a sectional view taken along line X-X 'in FIG.
【図7】保持部材の他の例を示す上方からの斜視図であ
る。FIG. 7 is a perspective view from above showing another example of the holding member.
【図8】保持部材の他の例を示す下方からの斜視図であ
る。FIG. 8 is a perspective view from below showing another example of the holding member.
【図9】第1の実施の形態の他の例におけるドア枠の断
面を示す図である。FIG. 9 is a diagram showing a cross section of a door frame in another example of the first embodiment.
【図10】第2の実施の形態におけるドア枠の構成を示
す斜視図である。FIG. 10 is a perspective view illustrating a configuration of a door frame according to the second embodiment.
【図11】第2の実施の形態におけるドア枠の構成を示
す断面図である。FIG. 11 is a cross-sectional view illustrating a configuration of a door frame according to a second embodiment.
【図12】第2の実施の形態の他の例(戸当りが別部材
で形成されている場合)の施工前の状態を示す断面図で
ある。FIG. 12 is a cross-sectional view showing a state before construction in another example of the second embodiment (when the door stop is formed of a separate member).
【図13】第2の実施の形態の他の例(戸当りが別部材
で形成されている場合)の施工後の状態を示す断面図で
ある。FIG. 13 is a cross-sectional view showing a state after construction of another example (when the door stop is formed of a separate member) of the second embodiment.
【図14】第2の実施の形態の他の例(戸当りが一体的
に形成されている場合)の施工前の状態を示す断面図で
ある。FIG. 14 is a cross-sectional view showing a state before construction in another example of the second embodiment (when a door stop is integrally formed).
【図15】第2の実施の形態の他の例(戸当りが一体的
に形成されている場合)の施工後の状態を示す断面図で
ある。FIG. 15 is a cross-sectional view showing a state after construction in another example of the second embodiment (when a door stop is integrally formed).
1 壁 4 開口下地枠 5 ドア枠 6 取付部材 7 保持部材 10,11 左右の縦枠 12 上方枠 13 一方のドア枠形成部材 14 他方のドア枠形成部材 15,16 左右の縦枠形成部材 17 上方枠形成部材 18 カブリ 20 ドア DESCRIPTION OF SYMBOLS 1 Wall 4 Opening base frame 5 Door frame 6 Mounting member 7 Holding member 10, 11 Left and right vertical frame 12 Upper frame 13 One door frame forming member 14 The other door frame forming member 15, 16 Left and right vertical frame forming member 17 Above Frame forming member 18 Fog 20 Door
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E06B 1/56 - 1/62 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) E06B 1/56-1/62
Claims (4)
左右に取り付けられる左右の縦枠10,11と、上記左
右の縦枠10,11の間の上方に取り付けられる上方枠
12とで構成されたドア枠5を、壁クロス施工後に壁1
の開口下地枠4に施工するドア枠の後付け工法であっ
て、 上記壁クロス施工後の壁1の開口下地枠4の左右に対し
て左右の縦枠10,11を取り付ける第1工程と、上記
開口下地枠4の左右に取り付けられた左右の縦枠10,
11の間に上方枠12を位置させると共に、これを上方
に向かって押し上げ、左右の縦枠10,11の間の上方
に上方枠12を仮止めする第2工程と、上記左右の縦枠
10,11の各々の鉛直度及び直線度を調整する第3工
程と、上記左右の縦枠10,11の間の上方に仮止めさ
れた上方枠12を固定する第4工程と、上記左右の縦枠
10,11と上方枠12によって構成されたドア枠5内
にドア20を吊り込むと共に、ドア枠5とドア20との
間のチリの調整を行う第5工程よりなり、しかも、上記
第1工程及び第3工程における左右の縦枠10,11の
取り付け及びその調整と、上記第5工程におけるチリの
調整は、上記左右の縦枠10,11の各々の開口下地枠
4側の側面に配設されていると共に、その反対側の側面
から開口下地枠4への取り付けと開口下地枠4との間の
隙間を調整することができる取付部材6によって行わ
れ、さらに、上記取付部材6は、上記左右の縦枠10,
11と開口下地枠4との間の隙間を調整した後、調整さ
れた隙間の状態を固定できるように構成され、上記第5
工程におけるチリの調整が行われた後、調整されたチリ
の固定を行うことができ、さらに、上記第2工程におけ
る上方枠12の仮止めは、上記左右の縦枠10,11の
上方に設けられた保持部材7によって行われることを特
徴とするドア枠の後付け工法。1. Left and right vertical frames 10, 11 attached to the left and right of an opening base frame 4 formed in a wall 1 of a building, and an upper frame 12 attached above between the left and right vertical frames 10, 11. The door frame 5 composed of
A first step of attaching left and right vertical frames 10 and 11 to the left and right sides of the opening base frame 4 of the wall 1 after the wall cloth has been applied; Left and right vertical frames 10 attached to the left and right of the opening base frame 4,
11 and a second step of temporarily lifting the upper frame 12 between the left and right vertical frames 10 and 11 while pushing the upper frame 12 upward, and , 11; a fourth step of adjusting the verticality and linearity of each of the vertical frames; a fourth step of fixing an upper frame 12 temporarily fixed above the left and right vertical frames 10, 11; A fifth step of suspending the door 20 in the door frame 5 constituted by the frames 10 and 11 and the upper frame 12 and adjusting the dust between the door frame 5 and the door 20; The attachment and adjustment of the left and right vertical frames 10 and 11 in the step and the third step, and the adjustment of the dust in the fifth step are arranged on the side surfaces of the left and right vertical frames 10 and 11 on the side of the opening base frame 4. And an opening base frame 4 from the opposite side. Done of the attachment member 6 which can be adjusted gap between the attachment and the opening underlying frame 4, In addition, the mounting member 6, the vertical frame 10 of the right and left,
After adjusting the gap between 11 and the opening base frame 4,
The state of the gap is fixed so that the fifth
Adjusted Chile after Chile adjustment in process
And the temporary fixing of the upper frame 12 in the second step is performed by the holding member 7 provided above the left and right vertical frames 10 and 11. Retrofit method.
一側に取り付けられるドア枠5の一側を成す一方のドア
枠形成部材13と、上記一方のドア枠形成部材13と接
合し、ドア枠5の他側を成す他方のドア枠形成部材14
とで構成されたドア枠5を、壁クロス施工後に壁1の開
口下地枠4に施工するドア枠の後付け工法であって、 上記壁クロス施工後の壁1の開口下地枠4に対してその
一側から一方のドア枠形成部材13を差し込むと共に、
上記開口下地枠4の一側から差し込まれた一方のドア枠
形成部材13を成す左右の縦枠形成部材15,16を開
口下地枠4の左右に取り付ける第1工程と、上記開口下
地枠4の左右に取り付けられた左右の縦枠形成部材1
5,16の各々の鉛直度及び直線度を調整する第2工程
と、上記開口下地枠4の他側から上記他方のドア枠形成
部材14を差し込むと共に、開口下地枠4に取り付けら
れた一方のドア枠形成部材13に接合させる第3工程
と、上記一方のドア枠形成部材13と他方のドア枠形成
部材14によって構成されたドア枠5内にドア20を吊
り込むと共に、ドア枠5とドア20との間のチリの調整
を行う第4工程よりなり、しかも、上記第1工程及び第
2工程における一方のドア枠形成部材13を成す左右の
縦枠形成部材15,16の取り付け及びその調整と、上
記第4工程におけるチリの調整は、上記一方のドア枠形
成部材13を成す左右の縦枠形成部材15,16の各々
の開口下地枠4側の側面に配設されていると共に、その
反対側の側面から開口下地枠4への取り付けと開口下地
枠4との間の隙間を調整することができる取付部材6に
よって行われ、さらに、上記取付部材6は、上記一方の
ドア枠形成部材13を成す左右の縦枠形成部材15,1
6と開口下地枠4との間の隙間を調整した後、調整され
た隙間の状態を固定できるように構成され、上記第4工
程におけるチリの調整が行われた後、調整されたチリの
固定を行うことができることを特徴とするドア枠の後付
け工法。2. An open base frame 4 formed in a wall 1 of a building .
One door frame forming member 13 forming one side of the door frame 5 attached to one side, and the other door frame forming member 14 joining the one door frame forming member 13 and forming the other side of the door frame 5
Is a retrofitting method for constructing the door frame 5 composed of the following in the opening foundation frame 4 of the wall 1 after the wall cloth is constructed. with write-free insert one of the door frame forming member 13 from one side,
A first step of attaching left and right vertical frame forming members 15 and 16 forming one door frame forming member 13 inserted from one side of the opening base frame 4 to the left and right of the opening base frame 4; Left and right vertical frame forming members 1 attached to left and right
A second step of adjusting the verticality and linearity of each of the openings 5 and 16; inserting the other door frame forming member 14 from the other side of the opening base frame 4; A third step of joining to the door frame forming member 13; hanging the door 20 into the door frame 5 formed by the one door frame forming member 13 and the other door frame forming member 14; A fourth step for adjusting the dust between the first and second steps 20 is performed. In addition, the right and left vertical frame forming members 15 and 16 constituting the one door frame forming member 13 in the first and second steps are attached and adjusted. The adjustment of the dust in the fourth step is performed by disposing the left and right vertical frame forming members 15 and 16 constituting the one door frame forming member 13 on the side of the opening base frame 4 side. Open from opposite side Made by mounting members 6 can be adjusted the gap between the attachment and the opening underlying frame 4 to the underlying frame 4, In addition, the attachment member 6, one of the
Left and right vertical frame forming members 15 and 1 forming door frame forming member 13
After adjusting the gap between the opening base frame 4 and the opening
The fourth step is configured so that the state of the
After the Chilean adjustments have been made in the process, the adjusted Chilean
Method retrofit door frame, characterized in Rukoto can perform fixing.
対して壁クロス施工後にドア枠5を施工するドア枠の後
付け工法に用いるドア枠において、 上記ドア枠の後付け工法に用いるドア枠5は、建物の壁
1に形成された開口下地枠4の左右に取り付けられる左
右の縦枠10,11と、左右の縦枠10,11の間の上
方に取り付けられる上方枠12より成り、上記左右の縦
枠10,11は、左右の縦枠10,11の各々の開口下
地枠4側の側面に配設され、左右の縦枠10,11の各
々の開口下地枠4側の側面とは反対側の側面から開口下
地枠4への取り付けと開口下地枠4との間の隙間を調整
することができるように構成された取付部材6を備えて
いると共に、左右の縦枠10,11の各々の上方に配設
さ れ、左右の縦枠10,11の間の上方に取り付けられ
る上方枠12を保持する保持部材7を備え、しかも、上
記取付部材6は、開口下地枠4に取り付けられる固定部
21と、固定部21に螺合すると共に、左右の縦枠1
0,11の開口下地枠4側の側面に回転可能に取り付け
られる回転部22と、固定部21に螺合した回転部22
を固定部21に対して固定するロックプレート24を備
え、上記固定部21に螺合した回転部22を回転させる
ことによって、左右の縦枠10,11と開口下地枠4と
の間の隙間の調整を行うと共に、上記ロックプレート2
4によって、左右の縦枠10,11と開口下地枠4との
間の調整された隙間の固定を行うことを特徴とするドア
枠の後付け工法に用いるドア枠。 3. An opening base frame 4 formed in a wall 1 of a building.
On the other hand, after the door frame where the door frame 5 is installed after the wall cloth is installed
In the door frame used in the attaching method, the door frame 5 used in the retrofitting method of the door frame is a wall of a building.
Left attached to the left and right of the opening base frame 4 formed in 1
Above the right vertical frame 10, 11 and the left and right vertical frame 10, 11
The upper frame 12 attached to the
The frames 10 and 11 are located below the openings of the left and right vertical frames 10 and 11 respectively.
Each of the left and right vertical frames 10 and 11 is disposed on the side of the ground frame 4 side.
Opening from the side opposite to the side on the base frame 4 side
Adjust the gap between the attachment to the ground frame 4 and the opening base frame 4
With a mounting member 6 configured to
And above each of the left and right vertical frames 10 and 11
And is mounted above the left and right vertical frames 10 and 11
Holding member 7 for holding the upper frame 12
The attachment member 6 is a fixing portion attached to the opening base frame 4.
21 and the right and left vertical frames 1
Rotatably attached to the side of the opening base frame 4 side of the openings 0 and 11
Rotating part 22 and rotating part 22 screwed to fixed part 21
A lock plate 24 for fixing the
Then, the rotating part 22 screwed to the fixed part 21 is rotated.
By doing so, the left and right vertical frames 10 and 11 and the opening
Between the lock plate 2 and the lock plate 2
4, the vertical frames 10 and 11 on the left and right
Doors with fixed gaps between them
Door frame used for retrofitting frames.
対して壁クロス施工後にドア枠5を施工するドア枠の後
付け工法に用いるドア枠において、 上記ドア枠の後付け工法に用いるドア枠5は、建物の壁
1に形成された開口下地枠4の一側に取り付けられるド
ア枠5の一側を成す一方のドア枠形成部材13と、上記
一方のドア枠形成部材13に接合され、ドア枠5の他側
を成す他方のドア枠形成部材14より成り、上記一方の
ドア枠形成部材13は、左右の縦枠形成部材15,16
と上方枠形成部材17より成り、上記他方のドア枠形成
部材14は、左右の縦枠形成部材15’,16’と上方
枠形成部材17’より成り、さらに、上記左右の縦枠形
成部材15,16は、左右の縦枠形成部材15,16の
各々の開口下地枠4側の側面に配設され、左右の縦枠形
成部材15,16の各々の開口下地枠4側の側面とは反
対側の側面から開口下地枠4への取り付けと開口下地枠
4との間の隙間を調整することができるように構成され
た取付部材6を備え、しかも、上記取付部材6は、開口
下地枠4に取り付けられる固定部21と、固定部21に
螺合すると共に、左右の縦枠形成部材15,16の開口
下地枠4側の側面に回転可能に取り付けられる回転部2
2と、固定部21に螺合した回転部22を固定部21に
対して固定するロックプレート24を備え、上記固定部
21に螺合した回転部22を回転させることによって、
左右の縦枠形成部材15,16と開口下地枠4との間の
隙間の調整を行うと共に、上記ロックプレート24によ
って、左右の縦枠形成部材15,16と開口下地枠4と
の間の調整された隙間の固定を行うことを特徴とするド
ア枠の後付け工法に用いるドア枠。 4. An opening base frame 4 formed in a wall 1 of a building.
On the other hand, after the door frame where the door frame 5 is installed after the wall cloth is installed
In the door frame used in the attaching method, the door frame 5 used in the retrofitting method of the door frame is a wall of a building.
1 attached to one side of the opening base frame 4 formed in
A door frame forming member 13 forming one side of the frame 5;
The other side of the door frame 5 is joined to one door frame forming member 13.
And the other door frame forming member 14,
The door frame forming member 13 includes left and right vertical frame forming members 15 and 16.
And the upper frame forming member 17 to form the other door frame.
The member 14 is connected to the left and right vertical frame forming members 15 'and 16'
A left and right vertical frame shape
The forming members 15 and 16 are formed by the left and right vertical frame forming members 15 and 16.
The left and right vertical frames are arranged on the side of each opening base frame 4 side.
Each of the members 15 and 16 is opposite to the side surface of the opening base frame 4 side.
Mounting to Opening Base Frame 4 from Opposite Side and Opening Base Frame
4 so that the gap between them can be adjusted.
The mounting member 6 has an opening.
The fixing part 21 attached to the base frame 4 and the fixing part 21
At the same time as screwing, the openings of the left and right vertical frame forming members 15 and 16
Rotating part 2 rotatably attached to the side of base frame 4
2 and the rotating part 22 screwed to the fixed part 21
A lock plate 24 for fixing the fixing portion,
By rotating the rotating part 22 screwed to the
Between the left and right vertical frame forming members 15 and 16 and the opening base frame 4
While adjusting the gap, the lock plate 24
The left and right vertical frame forming members 15 and 16 and the opening base frame 4
Characterized in that the adjusted gap is fixed between
A Door frame used in the retrofitting method of the frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19504598A JP3303192B2 (en) | 1998-06-24 | 1998-06-24 | Door frame retrofitting method and door frame used for door frame retrofitting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19504598A JP3303192B2 (en) | 1998-06-24 | 1998-06-24 | Door frame retrofitting method and door frame used for door frame retrofitting method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000008713A JP2000008713A (en) | 2000-01-11 |
JP3303192B2 true JP3303192B2 (en) | 2002-07-15 |
Family
ID=16334636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19504598A Expired - Fee Related JP3303192B2 (en) | 1998-06-24 | 1998-06-24 | Door frame retrofitting method and door frame used for door frame retrofitting method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3303192B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007043175A1 (en) * | 2005-10-06 | 2007-04-19 | Kamiya Corporation | Door and method of installing the door |
-
1998
- 1998-06-24 JP JP19504598A patent/JP3303192B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007043175A1 (en) * | 2005-10-06 | 2007-04-19 | Kamiya Corporation | Door and method of installing the door |
Also Published As
Publication number | Publication date |
---|---|
JP2000008713A (en) | 2000-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8109053B2 (en) | Door frame assembly | |
US6550193B2 (en) | Split jamb for doors and windows | |
US4718195A (en) | Apparatus for maintaining a door in alignment with frame during shipping and installation | |
US20060032162A1 (en) | Molding system and method for installation | |
US20080127564A1 (en) | Pre-hung door assembly and method of installation | |
US6981301B2 (en) | Device for installing a pre-hung door | |
JP3303192B2 (en) | Door frame retrofitting method and door frame used for door frame retrofitting method | |
US7836644B2 (en) | Alternative molding system and method of installation | |
JP7553270B2 (en) | Door and window installation structure and construction method thereof | |
JP7075284B2 (en) | How to repair the door and the door | |
JPH0245433Y2 (en) | ||
US11891851B2 (en) | Door-ready molding | |
JP7498615B2 (en) | Fittings | |
JPH0747578Y2 (en) | Hinge | |
JPS5823910Y2 (en) | Small window satsushi for door ↓− | |
JP5200293B2 (en) | Refurbished door | |
JPS588860Y2 (en) | Additional sash for aluminum sash installation | |
JP2007197986A (en) | Door mounting method available in case of reforming | |
JPS6029584Y2 (en) | Renovated satsushi mounting device | |
JP2931142B2 (en) | Gate door | |
JPH0319586Y2 (en) | ||
JP2000034865A (en) | Mounting structure for fitting frame, fitting-frame connecting fitting, and mounting method for fitting frame | |
JP3262942B2 (en) | How to attach a metal door frame | |
JPS5846215Y2 (en) | Installation equipment for new and old renovated window frames | |
FR2613412A1 (en) | Framing and closing system for an opening in a building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090510 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100510 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110510 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110510 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120510 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120510 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130510 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130510 Year of fee payment: 11 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |