JP3262827B2 - Construction method of hollow pile - Google Patents

Construction method of hollow pile

Info

Publication number
JP3262827B2
JP3262827B2 JP03322892A JP3322892A JP3262827B2 JP 3262827 B2 JP3262827 B2 JP 3262827B2 JP 03322892 A JP03322892 A JP 03322892A JP 3322892 A JP3322892 A JP 3322892A JP 3262827 B2 JP3262827 B2 JP 3262827B2
Authority
JP
Japan
Prior art keywords
pile
hollow pile
tip
spiral
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP03322892A
Other languages
Japanese (ja)
Other versions
JPH05230830A (en
Inventor
茂 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tenox Corp
Original Assignee
Tenox Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tenox Corp filed Critical Tenox Corp
Priority to JP03322892A priority Critical patent/JP3262827B2/en
Publication of JPH05230830A publication Critical patent/JPH05230830A/en
Application granted granted Critical
Publication of JP3262827B2 publication Critical patent/JP3262827B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は中空の既製杭の施工方
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a hollow ready-made pile.

【0002】[0002]

【従来技術とこの発明が解決しようとする課題】近年、
建設残土の廃棄場所の確保が困難なことから、建設残土
の発生量の少ない杭基礎工法の開発が要求されており、
ソイルセメント柱と既製杭を合成した工法が発明されて
いる。この合成杭の施工方法には、ソイルセメント柱造
成後に既製杭を挿入するプレボーリング施工法と、ソイ
ルセメント柱造成と同時に既製杭を回転させながら挿入
する中掘り施工法とがある。
2. Description of the Related Art In recent years,
Because it is difficult to secure a disposal site for construction surplus soil, the development of a pile foundation method that generates less construction surplus soil is required.
A construction method combining a soil cement column and a ready-made pile has been invented. As a method of constructing the composite pile, there are a pre-boring construction method in which a ready-made pile is inserted after soil cement column formation, and a middle digging construction method in which the ready-made pile is inserted while rotating the soil cement column while forming the soil cement column.

【0003】前記プレボーリング施工法はソイルセメン
ト柱と既製杭の芯ずれが大きくかつ施工長が短いという
欠点がある。中掘り施工法は施工時にソイルセメント等
の排土が既製杭の中空部を通して杭頭部から排出される
ため、排土が飛散し、現場や施工機械を汚すとともに施
工機械の故障原因となり、施工能率の低下を来し、さら
に排土の落下により現場作業員に対する人身事故が発生
する可能性が高くなるという欠点がある。
[0003] The pre-boring construction method has the disadvantage that the center deviation between the soil cement column and the ready-made pile is large and the construction length is short. Underground digging is a method in which soil cement and other soil is discharged from the pile head through the hollow part of the ready-made pile at the time of construction, which scatters the soil and soils the construction site and construction machinery and causes failure of the construction machinery. There is a drawback that the efficiency is reduced and the possibility of a physical injury to the on-site worker due to the fall of the discharged soil is increased.

【0004】この発明は前記事情に鑑み開発したもので
ある。
The present invention has been developed in view of the above circumstances.

【0005】[0005]

【課題を解決するための手段】この発明は、地盤中にソ
イルセメント柱を造成しつつ、外径がソイルセメント柱
の径と略同一である一葉、または複数のスパイラル状の
翼を外周部先端に取り付けた中空杭を回転挿入し、スパ
イラル状の翼によって排土を中空杭外周部に沿って地上
へ排出することを特徴とする中空杭の施工方法である。
この施工工法における好ましい施工法は、スパイラル状
の翼の先端が中空杭の先端部よりも下方へ突出している
中空杭の施工方法であり、先端根固め部に中空杭先端部
のスパイラル翼を埋設する中空杭の施工方法である。
Means for Solving the Problems] The present invention, source in the ground
The outside diameter is soil cement column while creating the il cement column
One leaf or multiple spirals that are approximately the same diameter as
Rotate and insert a hollow pile with wings attached to the tip of
Earth removal along the outer periphery of hollow pile
It is a method of constructing hollow piles, characterized by discharging to a pile.
The preferred construction method in this construction method is spiral
Tip of wing protrudes below tip of hollow pile
This is a method of constructing a hollow pile, and the tip of the hollow pile is
This is a method for constructing a hollow pile in which spiral wings are embedded.

【0006】[0006]

【実施例】埋設する中空杭、特に鋼管杭A先端部外周に
は2枚のスパイラル翼1,1を突設して取付けてある。
掘削機Bの掘削ロッド2には先端の拡翼が固定された掘
削ビット3と共回り防止翼4と撹拌翼5が突設されてい
る。また、掘削機Bの先端部にはセメントミルク等の固
化材液の噴出口が設けてあり、固化材液を噴出しながら
掘削機Bをオーガモータで回転、掘進することによりソ
イルセメント柱を造成しつつ、鋼管杭Aを掘削機Bとは
逆方向に回転させてソイルセメント柱に挿入・埋設さ
れ、鋼管杭Aの先端のスパイラル翼1は根固め部b内に
位置させる。なお、掘削機Bは引上げて回収する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Two spiral blades 1 and 1 are protrudingly mounted on a hollow pile to be buried, particularly on the outer periphery of the tip of a steel pipe pile A.
The excavating rod 2 of the excavator B is provided with an excavating bit 3 to which a widening wing is fixed, a co-rotation prevention wing 4 and a stirring wing 5. The excavator B is provided with an outlet for solidified material liquid such as cement milk at the tip thereof. The excavator B is rotated by an auger motor while extruding the solidified material liquid, and excavated to form a soil cement column. While rotating the steel pipe pile A in the opposite direction to the excavator B, the steel pipe pile A is inserted and buried in the soil cement column, and the spiral wing 1 at the tip of the steel pipe pile A is placed in the rooting portion b.
Position. The excavator B is pulled up and collected.

【0007】前記スパイラル翼1は一葉、または二葉以
上の複数でなり、その外径はソイルセメント柱と略同一
である。スパイラル翼1の枚数は傾斜角との関係がある
が、できれば2枚以上の複数がよい。このスパイラル翼
1により鋼管杭Aより先行している掘削部で地盤と固化
材液とが混合・撹拌されてできるソイルセメントを鋼管
杭Aの外周部に呼び込み、押し上げることにより地上へ
排出する働きをさせる。そしてスパイラル翼1は杭の全
長に断続的、または連続的に設けることにより排土効果
を向上させることができる。このとき、スパイラル翼1
の先端部が鋼管杭Aより若干下方へ突出しているとソイ
ルセメントを鋼管杭A外周部へ呼び込む働きがさらに向
上する。また、スパイラル翼1の外径がソイルセメント
柱の外径より大きければ鋼管杭Aの挿入が困難になり、
外径より小さければ芯ずれが発生しやすくなり、鋼管杭
Aの外周部のソイルセメント柱体との一体性が低下し、
先端支持力が低下する。
[0007] The spiral blade 1 has a single leaf or a plurality of two or more leaves, the outer diameter of which is substantially the same as that of a soil cement column. The number of spiral blades 1 has a relationship with the inclination angle, but preferably two or more spiral blades. The spiral wing 1 brings the soil cement formed by mixing and agitation of the ground and the solidifying material liquid in the excavation section preceding the steel pipe pile A into the outer peripheral part of the steel pipe pile A, and discharges it to the ground by pushing it up. Let it. The spiral wing 1 can be provided intermittently or continuously over the entire length of the pile to improve the soil discharging effect. At this time, spiral wing 1
When the tip of the steel pipe pile projects a little below the steel pipe pile A, the function of bringing the soil cement into the outer peripheral part of the steel pipe pile A is further improved. Further, if the outer diameter of the spiral blade 1 is larger than the outer diameter of the soil cement column, it becomes difficult to insert the steel pipe pile A,
If the diameter is smaller than the outer diameter, misalignment is likely to occur, and the integrity of the outer periphery of the steel pipe pile A with the soil cement column is reduced,
Tip support force decreases.

【0008】[0008]

【発明の効果】この発明は以上の構成からなり、中掘り
方式によってソイルセメント柱を造成しつつ、同時に鋼
管杭等中空杭を挿入・埋設するが、排土は中空杭の外周
部先端のスパイラル翼の呼び込み効果で、主として中空
杭の外周のソイルセメント柱部を通って地上へ排出され
るため、中空杭頭部からの排土がなくなり、飛散による
現場の汚れがない。また、スパイラル翼の外径がソイル
セメント柱の外径と略同一であるため、上記のように排
土機能が発揮できると共に、ソイルセメント柱と中空杭
との芯ずれが生じない。
According to the present invention, the present invention has the above-described structure, and a hollow pile such as a steel pipe pile is inserted and buried at the same time as a soil cement column is formed by a middle digging method. Due to the effect of attracting the wings, it is mainly discharged to the ground through the soil cement column on the outer periphery of the hollow pile, so that no soil is discharged from the head of the hollow pile and there is no dirt on the site due to scattering. Further, since the outer diameter of the spiral blade is substantially equal to the outer diameter of the soil cement pillar, discharge as described above
The soil function can be exhibited, and there is no misalignment between the soil cement column and the hollow pile.

【0009】更に、スパイラル翼1の先端部が鋼管杭A
より若干下方へ突出しているとソイルセメントを鋼管杭
A外周部へ呼び込む働きがさらに向上し、排土機能が更
向上する。
Furthermore, the tip of the spiral blade 1 is a steel pipe pile A
If it protrudes slightly downward, the function of attracting soil cement to the outer periphery of the steel pipe pile A is further improved, and the soil discharging function is further improved.
To improve.

【0010】また、高強度化したソイルセメント柱先端
部と中空杭先端部がスパイラル翼により、より強固に一
体化すると杭の先端支持力が大きく向上するという効果
が施工時の排土効果と共に得られる
Further, the effect of soil cement pillar tip and a hollow pile tip and high strength is the spiral vanes, more firmly integrated Then tip bearing capacity of piles is significantly improved
Is obtained together with the soil removal effect during construction .

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の施工過程の断面図で、(a)(b)は施工
順序を示している。
FIG. 1 is a cross-sectional view of a construction process according to the present invention, wherein (a) and (b) show the construction sequence.

【図2】この発明の施工過程の断面図で、(a)(b)は図1
の次の施工順序を示している。
FIGS. 2A and 2B are cross-sectional views of a construction process according to the present invention, wherein FIGS.
The following construction order is shown.

【図3】この発明の施工過程の断面図で、(a)(b)は図2
の次の施工順序を示している。
FIG. 3 is a sectional view of a construction process according to the present invention.
The following construction order is shown.

【符号の説明】[Explanation of symbols]

A…鋼管杭、B…掘削機、C…土砂、D…根固め 1…スパイラル翼、2…掘削ロッド、3…掘削ビット、
4…共回り防止翼、5…撹拌翼。
A: steel pipe pile, B: excavator, C: earth and sand, D: consolidation 1 ... spiral wing, 2 ... drill rod, 3 ... drill bit,
4 ... anti-rotation blade, 5 ... stirring blade.

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地盤中にソイルセメント柱を造成しつ
つ、外径がソイルセメント柱の径と略同一である一葉、
または複数のスパイラル状の翼を外周先端に取り付けた
中空杭を回転挿入し、スパイラル状の翼によって排土を
中空杭外周部に沿って地上へ排出することを特徴とする
中空杭の施工方法。
1. A leaf having an outer diameter substantially equal to the diameter of the soil cement column while forming the soil cement column in the ground.
Alternatively, rotate and insert a hollow pile with multiple spiral wings attached to the tip of the outer circumference, and use the spiral wings to remove soil
A method for constructing a hollow pile, wherein the pile is discharged to the ground along the outer periphery of the hollow pile.
【請求項2】 スパイラル状の翼の先端が中空杭の先端
部よりも下方へ突出していることを特徴とする請求項1
の中空杭の施工方法。
2. The spiral wing has a tip protruding downward from a tip of the hollow pile.
Construction method of hollow pile.
【請求項3】 先端根固め部に中空杭先端部のスパイラ
ル翼を埋設することを特徴とする請求項1または2記載
の中空杭の施工方法。
3. Spiral at the tip of the hollow pile at the tip root fixing part
3. The wings are buried.
Construction method of hollow pile.
JP03322892A 1992-02-20 1992-02-20 Construction method of hollow pile Expired - Fee Related JP3262827B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03322892A JP3262827B2 (en) 1992-02-20 1992-02-20 Construction method of hollow pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03322892A JP3262827B2 (en) 1992-02-20 1992-02-20 Construction method of hollow pile

Publications (2)

Publication Number Publication Date
JPH05230830A JPH05230830A (en) 1993-09-07
JP3262827B2 true JP3262827B2 (en) 2002-03-04

Family

ID=12380605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03322892A Expired - Fee Related JP3262827B2 (en) 1992-02-20 1992-02-20 Construction method of hollow pile

Country Status (1)

Country Link
JP (1) JP3262827B2 (en)

Also Published As

Publication number Publication date
JPH05230830A (en) 1993-09-07

Similar Documents

Publication Publication Date Title
JPH11140869A (en) Screwed-in type steel pipe pile with wing
JPH0542524B2 (en)
JP3262827B2 (en) Construction method of hollow pile
JP2004316411A (en) Assembling type steel pipe pile
JPS6325130B2 (en)
JP4197074B2 (en) Embedded pile construction equipment
JPH03447B2 (en)
JPH0421013B2 (en)
GB2137678A (en) Method and apparatus for pile construction
KR20190126538A (en) Non- displacement excavating and mixing apparatus and non- displacement excavating and mixing method using drill bit of screw-type
JP4179949B2 (en) Pile rotation method
JP2866248B2 (en) Construction method of hollow pipe pile
JP2003232035A (en) Base-enlarged plate for rotary buried steel pipe pile, and method for mounting the base-enlarged plate on rotary buried steel pipe pile
JP3019988B2 (en) Auger for hard ground excavation
JP2005240395A (en) Rotary embedding method for pile
JP2003155743A (en) Structure for attaching pile tip having longitudinal tooth and propeller-like tooth
JPS6131246B2 (en)
JP2811038B2 (en) Large-diameter bending tensile reinforcement and its construction method
JP2920622B2 (en) Drilling equipment for connecting holes
JPS6139445B2 (en)
JPH0354176Y2 (en)
JP2002038469A (en) Execution method of precast pile
JPH08319616A (en) Burying method of pile
JPH0627405B2 (en) Ready-made pile burying method
JPS60133189A (en) Casing auger construction method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111221

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees