Gabion

Info

Publication number
JP3250176B2
JP3250176B2 JP21238797A JP21238797A JP3250176B2 JP 3250176 B2 JP3250176 B2 JP 3250176B2 JP 21238797 A JP21238797 A JP 21238797A JP 21238797 A JP21238797 A JP 21238797A JP 3250176 B2 JP3250176 B2 JP 3250176B2
Authority
JP
Japan
Prior art keywords
basket
gabion
ground
filling
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21238797A
Other languages
Japanese (ja)
Other versions
JPH1121848A (en
Inventor
富雄 安田
Original Assignee
日本ギャビオン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本ギャビオン株式会社 filed Critical 日本ギャビオン株式会社
Priority to JP21238797A priority Critical patent/JP3250176B2/en
Publication of JPH1121848A publication Critical patent/JPH1121848A/en
Application granted granted Critical
Publication of JP3250176B2 publication Critical patent/JP3250176B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は蛇籠の組立・施工に
関するものである。
The present invention relates to the assembly and construction of gabions.

【0002】[0002]

【従来の技術】従来より菱形金網を地網とする蛇籠工が
行われて来た。石詰後、蛇籠をクレーン等機械で吊り上
げると膨出し型崩れするので、蛇龍の石詰後運搬は断念
し、設置点で籠体を組み立て人手で石詰めした。他方で
は籠体の剛性を増強するため補強枠、補強線等の工夫が
重ねられて来たが機械化施工には至っていない。
2. Description of the Related Art Gabion construction using a diamond-shaped wire net as a ground net has been conventionally performed. When the gabion is lifted by a machine such as a crane after the stone packing, the swelling type collapses. Therefore, the transportation after the packing of the dragon was abandoned, and the cage was assembled at the installation point and packed manually. On the other hand, various measures such as reinforcing frames and reinforcing wires have been used in order to increase the rigidity of the cage, but they have not been mechanized.

【0003】[0003]

【発明が解決しようとする課題】本発明の課題とすると
ころは石詰作業と石詰後蛇籠の荷役作業を機械化した蛇
籠工法を提供しようとするものである。
SUMMARY OF THE INVENTION An object of the present invention is to provide a gabion construction method in which a stone filling operation and a cargo handling operation of a gabion after the stone filling are mechanized.

【0004】[0004]

【問題を解決するための手段】上記課題を解決するため
本発明の蛇籠工は次の手段を採った。 (イ)籠体(4)を菱形金網に代えて亀甲金網(1)を
地網として形成した。籠体(4)は中空円柱形で垂直に
自立し、石詰後も円柱形状を保持し、これをクレーン等
で懸吊しても膨出、型崩れしない。又部分欠損が波及し
ない。 (ロ)石詰装置(8)を設けた。石詰装置(8)は上記
籠体(4)が挿脱自在の適宜大きさの管材を支持管
(5)とし、上端を地上に突出して地中に鉛直に建て込
み、その上端を跨いで架台(7)を設けホッパー(6)
を滑動可能に装備したものである。 (ハ)建設機械を使用して石詰作業と石詰後蛇籠(9)
の設置作業を実施する。即ち籠体(4)を上記支持管
(5)に吊り込んで保持し、バックホウ等の機械を使用
してホッパー(6)に詰石を投入し籠体(4)に充填す
る。支持管(5)は籠体(4)を垂直に保持して石詰作
業を円滑化し、また、詰石の投入に伴う衝撃力や押圧力
を抑止し籠体(4)が円柱形状を保持するのを支援し詰
石充填度を高める。石詰後クレーン等の機械を使用して
吊り上げて支持管(5)からら抜脱し、所定場所に運
搬、設置する。
In order to solve the above problems, the gabion work of the present invention employs the following means. (A) The cage body (4) was replaced with a diamond-shaped wire mesh to form a turtle wire mesh (1) as a ground mesh. The basket body (4) is a hollow cylinder and is vertically self-supporting, retains a cylindrical shape even after filling with stones, and does not protrude or lose its shape even when suspended by a crane or the like. Also, partial defects do not spread. (B) A stone filling device (8) was provided. The stone filling device (8) has a support pipe (5) made of a suitably sized pipe material into which the basket body (4) can be inserted and removed, protrudes the upper end to the ground, vertically erected in the ground, and straddles the upper end. Mounting frame (7) and hopper (6)
Is slidably equipped. (C) Stone filling work and gabions after stone filling using construction equipment (9)
Carry out installation work. That is, the basket (4) is suspended and held in the support pipe (5), and a stuffing stone is put into the hopper (6) using a machine such as a backhoe to fill the basket (4). The support pipe (5) holds the basket (4) vertically to facilitate the work of filling stones, and also suppresses the impact force and pressing force associated with the insertion of the filling stones and keeps the cage (4) cylindrical. And increase the degree of filling. After the stone is packed, it is lifted up using a machine such as a crane, pulled out of the support pipe (5), and transported and installed at a predetermined place.

【0005】[0005]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。 (イ)図1は地網とする亀甲金網(1)を示すものであ
る。網を構成する列線(12)は線径4mmの鋼線で耐
久性を高める適宜な表面処理が施されている。網目(1
3)は5cm乃至10cmで略正六角形である。長さは
2乃至4mであり、幅は製作する籠体(4)の径から決
定される。亀甲金網は列線(12)を捩り合わせて編成
されているので菱形金網に比べて格段に「強い」網であ
り外力に対して変形が少ない。又、部分欠損が全体に及
ぶことは無い。 (ロ)図2は鋼製の螺旋形状の閉じ線(2)である。 (ハ)図3は上記亀甲金網(1)を地網とした籠体
(4)である。亀甲金網(1)を横方向に中空円柱形状
に巻き、両側縁部を当接し耳線(11)に上記螺旋形状
の閉じ線(2)を蔓巻きして縫合する。次に中空円柱形
状の上端及び下端においては鋼線を円周方向に網目に挿
通して円環(3)を形成し、上端は開放状態とし、下端
は巾着締めして下底とした籠体(4)を形成する。籠体
(4)の径は45乃至90cm長さは2乃至4mであ
る。なお本発明の籠体(4)は菱形金網蛇籠の場合の上
・下端を閉鎖した蓋網を必要としない。 (ニ)図4は石詰装置(8)である。石詰装置(8)は
支持管(5)とホッパー(6)を装備した架台(7)か
らなる。支持管(5)は鋼管または塩化ビニール管で、
径は籠体(4)の径より一回り大きくして、支持管
(5)の中に籠体(4)が挿脱自在とする。長さは籠体
(4)よりやや短めとして籠体(4)の上端が支持管
(5)から突出する様にする。この支持管(5)を地中
に鉛直に建て込むには所定場所の例えば略1mを支持
管(5)の長さよりやや浅くい。掘削し敷板(10)を
敷き支持管(5)を戴上する。従って支持管(5)の上
端は地上に突出している。支持管(5)の外周壁と掘削
孔壁の間隙に掘削土その他適当な充填材をつめれば、支
持管(5)の安定はさらに高まる。支持管(5)の上端
を跨いで架台(7)を設置し、架台(7)の桟上にホッ
パー(6)を滑動可能に装備する。 (ホ)図5は支持管(5)を2本設けた石詰装置(8)
である。地面には床板(15)を並べて支持管(5)を
挟着し安定性を高めている。
Embodiments of the present invention will be described below with reference to the drawings. (A) FIG. 1 shows a turtle net (1) as a ground net. The column line (12) constituting the net is a steel wire having a wire diameter of 4 mm, and has been subjected to an appropriate surface treatment for enhancing durability. Mesh (1
3) is approximately a regular hexagon of 5 cm to 10 cm. The length is 2 to 4 m, and the width is determined by the diameter of the basket (4) to be manufactured. Since the turtle shell wire mesh is knitted by twisting the column lines (12), it is much stronger than the diamond wire wire mesh and has less deformation against external force. Also, partial defects do not extend to the whole. (B) FIG. 2 is a spiral closed line (2) made of steel. (C) FIG. 3 shows a cage body (4) using the turtle net (1) as a ground net. The tortoise shell wire mesh (1) is wound in a hollow cylindrical shape in the lateral direction, and the spiral closing wire (2) is wrapped around the ear wire (11) with the side edges abutting and sewn. Next, at the upper end and lower end of the hollow cylindrical shape, a steel wire is inserted in a mesh in the circumferential direction to form a ring (3), the upper end is opened, and the lower end is closed with a drawstring to form a cage. Form (4). The diameter of the cage (4) is 45 to 90 cm and the length is 2 to 4 m. The basket (4) of the present invention does not require a lid net with closed upper and lower ends in the case of a diamond-shaped wire gabion. (D) FIG. 4 shows a stone filling device (8). The stone filling device (8) consists of a gantry (7) equipped with a support tube (5) and a hopper (6). The support pipe (5) is a steel pipe or a PVC pipe,
The diameter is slightly larger than the diameter of the cage (4) so that the cage (4) can be inserted into and removed from the support tube (5). The length is slightly shorter than the cage (4) so that the upper end of the cage (4) projects from the support tube (5). In order to vertically lay the support tube (5) in the ground, for example, approximately 1 m 2 of a predetermined place is slightly shallower than the length of the support tube (5). Excavate, lay a floor plate (10), and mount a support tube (5). Therefore, the upper end of the support pipe (5) protrudes above the ground. If the gap between the outer peripheral wall of the support pipe (5) and the borehole wall is filled with excavated soil or other suitable filler, the stability of the support pipe (5) is further enhanced. A gantry (7) is installed across the upper end of the support pipe (5), and a hopper (6) is slidably mounted on a beam of the gantry (7). (E) FIG. 5 shows a stone filling device (8) provided with two support tubes (5).
It is. Floor plates (15) are arranged on the ground and support tubes (5) are sandwiched between them to enhance stability.

【0006】籠体(4)と石詰装置(8)の構成は上記
の通りでありこれを使用する施工方法は以下の通りであ
る。籠体(4)を上記石詰装置(8)の支持管(5)の
中に吊り込んで垂直に保持し、バックホウ等を使用して
ホッパー(6)に詰石を投入し籠体(4)に充填する。
石詰終了後、籠体(4)上端の円環(3)を縮径して巾
着締めし蛇籠(9)の製作は完了する。本発明の蛇籠
(9)は懸吊しても膨出、型崩れしないのでトラックク
レーン等で吊り上げて管材(5)から抜脱し、所定の設
置点に運搬、設置して蛇籠工は完了する。〔図5〕は支
持管(5)を2本設けて一層の効率化を図ったもので一
方の支持管(5)ではバックホウが詰石の投入を、他方
ではトラッククレーンが蛇籠(9)の抜脱作業を行って
いる。
The structures of the basket (4) and the stone filling device (8) are as described above, and the construction method using them is as follows. The basket (4) is suspended vertically in the support tube (5) of the stone filling device (8) and held vertically. ).
After completion of the stone packing, the ring (3) at the upper end of the basket (4) is reduced in diameter and tightened with a drawstring, thereby completing the production of the gabion (9). Since the gabion (9) of the present invention does not swell and lose its shape even when suspended, it is lifted up with a truck crane or the like, pulled out of the tube (5), transported to a predetermined installation point, and installed, thereby completing the gabion work. [FIG. 5] shows two supporting pipes (5) provided to further improve the efficiency. In one supporting pipe (5), the backhoe inserts the filling stone, and in the other, the truck crane connects the gabion (9). A pull-out operation is being performed.

【0007】[0007]

【発明の効果】本発明の蛇籠工は亀甲金網を地網として
籠体を形成し、石詰装置を適宜場所に設けて機械化石詰
作業を集中して行い、製作した蛇籠をトラッククレーン
等を使用して設置点へ運搬・設置することを特徴とする
画期的工法である。 (イ)蛇籠工の能率は著しく向上した。従って施工費は
大幅に低減した。 (ロ)工期の短縮が実現し河川工事特有の乾期集中工事
に対応出来る。 (ハ)蛇籠の大量生産を可能にし大規模工事に対応出来
ることになる。 (ニ)亀甲金網は部分欠損が全体に拡大しないので工事
の信頼性が高まった。 なお、透水性に関しては亀甲金網を地網とする蛇籠は菱
形金網を地網とするものと変わる所はないこと及び設置
面の小さな起伏に馴染む屈撓性に関しても問題のないこ
とを付言しておきたい。
The gabion mechanic of the present invention forms a basket body by using a turtle shell wire mesh as a ground net, and performs an intensive work of mechanized stone filling by installing a stone filling device at an appropriate place. This is an epoch-making method characterized in that it is used and transported and installed to an installation point. (B) The efficiency of gabion work has improved significantly. Accordingly, construction costs have been significantly reduced. (B) The construction period can be shortened, and it is possible to cope with intensive construction work in the dry season, which is unique to river construction. (C) Mass production of gabions is possible and large scale construction can be handled. (D) The reliability of the construction has been improved because the partial loss of the turtle shell wire mesh does not extend to the whole. With regard to water permeability, add that there is no difference between a gabion that uses a turtle shell wire mesh as a ground mesh and one that uses a diamond-shaped wire mesh as a ground mesh, and that there is no problem with the flexibility that adapts to small undulations on the installation surface. I want to go.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の蛇籠工に係る亀甲金網を示す正面図FIG. 1 is a front view showing a tortoiseshell wire mesh relating to a gabion work of the present invention.

【図2】本発明の蛇籠工に係る螺旋形状の閉じ線を示す
正面図
FIG. 2 is a front view showing a spiral closed line according to the gabion work of the present invention.

【図3】本発明の蛇籠工に係る籠体を示す正面図FIG. 3 is a front view showing a basket body according to the gabion work of the present invention.

【図4】本発明の蛇籠工に係る石詰装置の説明図FIG. 4 is an explanatory view of a stone filling device according to the gabion work of the present invention.

【図5】本発明の蛇籠工に係る石詰装置および石詰作業
の説明図
FIG. 5 is an explanatory view of a stone filling device and a stone filling operation according to the gabion work of the present invention.

【符号の説明】[Explanation of symbols]

1 亀甲金網 11 耳線 12 列線 13 網目 2 螺旋形状の閉じ線 3 円環 4 籠体 5 支持管 6 ホッパー 7 架台 8 石詰め装置 9 蛇籠 10 敷板 DESCRIPTION OF SYMBOLS 1 Tortoise shell wire net 11 Ear wire 12 Row line 13 Mesh 2 Spiral closed line 3 Ring 4 Basket 5 Support tube 6 Hopper 7 Mount 8 Stone stuffing device 9 Gabion 10 Floor plate

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】(イ)所定幅、所定長さの亀甲金網(1)
を横方向に中空円柱形状に巻き、両側縁部を当接して、
螺旋形状の閉じ線(2)を介して縫合し、円柱形状の上
端及び下端に於いては鋼線を円周方向に網目に挿通して
円環(3)を形成し、上端は開放状態で下端は巾着締め
して下底とした籠体(4)を形成し、 (ロ)上記籠体(4)が挿脱自在の適宜大きさの支持管
(5)を、上端を地上に突出して地中に鉛直に建て込
み、支持管(5)の上端を跨いで架台(7)を設けホッ
パー(6)を滑動可能に装備してなる石詰装置(8)を
設け、 (ハ)籠体(4)を上記石詰装置(8)の支持管(5)
の中に吊り込み、ホッパー(6)に詰石を投入して籠体
(4)に充填し、籠体(4)の上端の円環(3)を縮径
して巾着締めし、籠体(4)を吊り上げて支持管(5)
から抜脱し、所定場所に運搬、設置する、以上を特徴と
する蛇籠工。
(1) A wire mesh having a predetermined width and a predetermined length (1)
Is wound in the shape of a hollow cylinder in the lateral direction,
Stitching is performed via a spiral closing line (2), and at the upper and lower ends of the columnar shape, a steel wire is inserted into the mesh in the circumferential direction to form a ring (3), and the upper end is open. The lower end is closed with a drawstring to form a cage body (4) with a lower bottom. (B) A suitable size support tube (5) into which the cage body (4) can be inserted and removed, and an upper end protruding above the ground. (C) a basket-packing device (8), which is vertically built in the ground, provided with a gantry (7) over the upper end of the support pipe (5), and slidably equipped with a hopper (6); (4) The supporting pipe (5) of the stone filling device (8)
The basket (4) is filled by filling the hopper (6) with filling stones, and the ring (3) at the upper end of the basket (4) is reduced in diameter and tightened with a drawstring. Lift (4) and support tube (5)
A gabion mechanic, characterized by the fact that it is pulled out of, and transported and installed to a predetermined place.
JP21238797A 1997-07-03 1997-07-03 Gabion Expired - Fee Related JP3250176B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21238797A JP3250176B2 (en) 1997-07-03 1997-07-03 Gabion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21238797A JP3250176B2 (en) 1997-07-03 1997-07-03 Gabion

Publications (2)

Publication Number Publication Date
JPH1121848A JPH1121848A (en) 1999-01-26
JP3250176B2 true JP3250176B2 (en) 2002-01-28

Family

ID=16621747

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21238797A Expired - Fee Related JP3250176B2 (en) 1997-07-03 1997-07-03 Gabion

Country Status (1)

Country Link
JP (1) JP3250176B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101217876B1 (en) * 2010-07-16 2013-01-03 문용식 The gabion of dividing line and establishment method
WO2018163303A1 (en) * 2017-03-07 2018-09-13 前田工繊株式会社 Bag body for civil engineering work

Also Published As

Publication number Publication date
JPH1121848A (en) 1999-01-26

Similar Documents

Publication Publication Date Title
CN105672250B (en) A kind of diaphram wall and underwater concrete tongue and groove bindiny mechanism and construction method
JP3250176B2 (en) Gabion
JP2001064937A (en) Gabion work for civil engineering work, protection work using the same, and filling method for filler
JP3963921B2 (en) Reinforcement fence for concrete pile
JP3271951B2 (en) Construction stone for civil engineering structures, method of manufacturing construction stone for civil engineering structures, method of using construction stone for civil engineering structures, construction stone unit for civil engineering structures and civil construction
CN213390159U (en) Foundation pit construction supports reinforced structure
CN212714911U (en) Excessive filling device is prevented to boulder geology drilling bored concrete pile
JP2000319842A (en) Scour preventive material
JP3621362B2 (en) Construction stone for civil engineering structures
KR20120084542A (en) Environment-affinitive artificial reef in undersea
JP3435465B2 (en) Rolled vegetation for greening revetment
JP3650050B2 (en) Construction stone for civil engineering structures
JP6469918B1 (en) Retaining wall structure
JP2000192437A (en) Stone-filling work for hexagonal net gabion, and conveying method
JPS6149452B2 (en)
CN113430964B (en) In-situ suspension protection construction method for box culvert spanning foundation pit in long distance
CN218090881U (en) Building construction foundation encloses fender
JPH08193304A (en) Temporary burying method for hole excavated for laying burying pipe
CN216108512U (en) Synchronous hoisting structure for multiple lengthened sounding pipes of foundation pit reverse construction method cast-in-place pile
CN211257907U (en) Loess cave dwelling earthquake-resistant reinforcing structure adopting replacement of vault sheared area earth covering
CN211200395U (en) Pit-in-pit supporting structure
JP5951088B1 (en) Sandbag manufacturing equipment
KR200283292Y1 (en) Artificial Reef Molding Device
JPH0531605B2 (en)
JP2002180439A (en) Construction stone for civil engineering work structure, manufacturing method and application for construction stone for civil engineering work structure, construction stone unit for civil engineering work structure, and civil engineering work structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111116

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131116

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees