JP3249979B2 - Construction method and construction equipment of spiral support for hanging long span cable - Google Patents

Construction method and construction equipment of spiral support for hanging long span cable

Info

Publication number
JP3249979B2
JP3249979B2 JP37528798A JP37528798A JP3249979B2 JP 3249979 B2 JP3249979 B2 JP 3249979B2 JP 37528798 A JP37528798 A JP 37528798A JP 37528798 A JP37528798 A JP 37528798A JP 3249979 B2 JP3249979 B2 JP 3249979B2
Authority
JP
Japan
Prior art keywords
spiral support
messenger wire
cable
wire
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP37528798A
Other languages
Japanese (ja)
Other versions
JP2000184533A (en
Inventor
一芳 千桐
達二郎 東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hien Electric Industries Ltd
Original Assignee
Hien Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hien Electric Industries Ltd filed Critical Hien Electric Industries Ltd
Priority to JP37528798A priority Critical patent/JP3249979B2/en
Publication of JP2000184533A publication Critical patent/JP2000184533A/en
Application granted granted Critical
Publication of JP3249979B2 publication Critical patent/JP3249979B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、長スパンの電柱間
に張設したメッセンジャワイヤーにケーブルを吊り下げ
るための螺旋状支持具の施工方法及び施工装置に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for installing a spiral support for suspending a cable on a messenger wire stretched between long-span utility poles.

【0002】[0002]

【従来の技術】従来、メッセンジャワイヤーにケーブル
を吊り下げ固定する方法として、図9に示すようなハン
ガー方式200によるものが多く使用されている。その
手順は、図10に示すように、電柱201a,201b
間に予め張設されたメッセンジャワイヤー202に、先
ず金車228を取り付ける。その後、引綱206を金車
228に通してウインチ203に接続した後、引綱20
6に連結したケーブル219を巻き上げて電柱間に引き
入れる。その後、金車228を外しながら、図9のハン
ガー208…208を50〜60cm毎に取り付ける。
しかしこれ等の作業は、全て電柱201a〜201b間
に作業員204が宙吊りなって行う(宙乗り作業とい
う)ものであるため、作業員の熟練度を要し、危険な時
間のかかる工事となっていた。また作業中、金車228
が落下して通行人を傷付ける事故も発生しており、これ
に対する改善が強く望まれていた。
2. Description of the Related Art Conventionally, as a method of suspending and fixing a cable to a messenger wire, a method using a hanger system 200 as shown in FIG. 9 is often used. The procedure is, as shown in FIG.
First, the wheel & pinion 228 is attached to the messenger wire 202 stretched in advance. After that, the towing line 206 is connected to the winch 203 through the wheel & pinion 228,
The cable 219 connected to 6 is wound up and drawn between utility poles. Thereafter, the hangers 208... 208 of FIG. 9 are attached every 50 to 60 cm while removing the wheel 228.
However, since all of these operations are performed by suspending the worker 204 between the utility poles 201a and 201b (called suspension riding work), the worker's skill is required and the construction takes a dangerous time. Was. Also during work, the wheel 228
There have been accidents that have fallen and injured pedestrians, and improvements to this have been strongly desired.

【0003】また、このハンガーによるケーブルの取り
付けは、外的要因が作用して脱落や横ずれが発生し、ケ
ーブルの適正な支持が損なわれて、ケーブルの特性に悪
影響を及ぼす場合もあった。
[0003] In addition, when the cable is attached by the hanger, an external factor acts to cause the cable to fall off or to be displaced, thereby impairing proper support of the cable and adversely affecting the characteristics of the cable in some cases.

【0004】本発明は、先に出願した特開平9−701
17号公報の施工方法が短スパンを対象にしたものであ
ったので、これを改良して長スパンの電柱間に張設した
メッセンジャワイヤーにケーブルを吊り下げるための螺
旋状支持具の施工方法及び施工装置に関するものであ
る。
The present invention is based on Japanese Patent Application Laid-Open No. 9-701, filed earlier.
Since the construction method of Japanese Patent Publication No. 17 was directed to a short span, the construction method of a helical support for suspending a cable on a messenger wire stretched between long-span utility poles by improving this construction method and It relates to a construction device.

【0005】[0005]

【発明が解決しようとする課題】上記の事情に鑑み、本
発明は、宙吊り作業をする必要のない安全工法で、しか
も脱落や横ずれがなく、螺旋状支持具施工時の反転や、
引綱とメッセンジャワイヤーのクロス現象を完全に防止
できて安定した施工が行えるようになり、通電用電線を
内装した引綱及び螺旋状支持具の先端の結合作業も従来
より簡素化することができる200m程度の長スパンの
ケーブル吊り下げ用螺旋状支持具の施工方法及び施工装
置の提供を目的とする。
SUMMARY OF THE INVENTION In view of the above circumstances, the present invention is a safety method that does not require hanging work, has no drop-off or lateral displacement, and can be used for reversing a spiral support at the time of construction.
The crossing phenomenon between the rope and the messenger wire can be completely prevented, so that stable construction can be performed, and the joining work of the tip of the rope and the spiral support with the electric wire inside can be simplified about 200m. It is an object of the present invention to provide a method and an apparatus for constructing a spiral support for hanging a long span cable.

【0006】[0006]

【課題を解決するための手段】本発明は、上記目的を達
成するために、200m程度の長スパンの電柱間に張設
したメッセンジャワイヤーにケーブルを吊り下げるため
の螺旋状支持具の施工方法において、一方の電柱付近で
ケーブル吊り下げ用螺旋状支持具の一端と引綱の先端を
下部に錘を吊着した先導滑車に結合する手順と、前記メ
ッセンジャワイヤーの外径とケーブルの外径の和より大
きい内径を持つ螺旋状支持具をメッセンジャワイヤーと
引綱に巻回しながら前記引綱の先端を下部にウエイトを
内在し前記メッセンジャワイヤーの上方と下方からロー
ラーにより前記メッセンジャワイヤーを挟持した電動自
送機で引張リ他方の電柱側に移送する手順と、前記螺旋
状支持具の他端とこれに連接する次の螺旋状支持具の一
端にジョイントスリーブを形成した雄雌端子付きコネク
ターにて連結を繰り返す手順と、前記電動自送機と先導
滑車が他方の電柱に達した時点で固定具にて螺旋状支持
具をメッセンジャワイヤーに固定する手順と、通電用電
線を内装した引綱を引いてその先に繋いだケーブルを螺
旋状支持具内に引き込む手順とからなり、電柱付近だけ
でケーブルの布設工事が行えるようにした長スパンのケ
ーブル吊り下げ用螺旋支持具の施工方法及びその装置を
構成するものである。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides a method for constructing a spiral support for suspending a cable on a messenger wire stretched between utility poles having a long span of about 200 m. A procedure in which one end of the spiral support for hanging the cable and one end of the tow rope are connected to a leading pulley having a weight suspended below at one of the power poles, and the sum of the outer diameter of the messenger wire and the outer diameter of the cable. While winding a helical support having a large inner diameter around the messenger wire and the pulling line, a weight is provided below the tip of the pulling line, and tension is applied to the electric self-transporter holding the messenger wire from above and below the messenger wire by rollers. (I) a procedure for transferring the spiral support to the other telephone pole, and a joint between the other end of the spiral support and one end of the next spiral support connected to the other. And a step of fixing the helical support to the messenger wire with the fixing device when the electric self-transporter and the leading pulley reach the other power pole. And a procedure of pulling a cable attached to the tip of the cable with the current carrying wire inside, and pulling the cable into the spiral support, so that the cable can be laid only near the power pole. And a device for constructing a spiral support for the same.

【0007】[0007]

【発明の実施の態様】以下、本発明の実施例を図面に基
づいて詳しく説明する。図1は本発明のケーブル吊り下
げ用螺旋状支持具の施工方法の一実施例を示す略示側面
図であり、図2は螺旋状支持具の結合と接続状態の一実
施例を示す略示分解側面図である。また図3(イ)は本
発明の施工方法に使用する螺旋状支持具の一実施例を示
す側面図であり、図3(ロ)は図3(イ)をA〜A線で
切断した断面図である。さらに図4は本発明の雄端子付
きコネクターと雌端子付きコネクターの一実施例を示す
斜視図であり、さらにまた図5は本発明の施工方法によ
る螺旋状支持具でメッセンジャワイヤーとケーブルを巻
き付けた状態の一実施例を示す断面図である。そして図
6(イ)は本発明の雄雌端子付きコネクターの一実施例
を示す分解断面図であり、図6(ロ)は図6(イ)の雄
雌端子付きコネクターを連結した状態を示す断面図であ
る。そしてまた図7は本発明の施工方法による固定具の
一実施例を取り付けた状態を示す略示側面図であり、そ
してさらに図8(イ)は図1のCの先導滑車と電動自送
機部分を拡大した側面図であり、図8(ロ)は図8
(イ)の先導滑車を左側からみた引綱と螺旋状支持具の
嵌挿されていない状態を示す正面図であり、図8(ハ)
は図8(イ)の電動自送機をB−B線で切断した縦断面
図である。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a schematic side view showing an embodiment of a method for installing a spiral support for hanging a cable according to the present invention, and FIG. 2 is a schematic view showing an embodiment of the connection and connection of the spiral support. It is an exploded side view. FIG. 3A is a side view showing one embodiment of the spiral support used in the construction method of the present invention, and FIG. 3B is a cross-section of FIG. 3A taken along line A-A. FIG. FIG. 4 is a perspective view showing an embodiment of the connector with a male terminal and the connector with a female terminal of the present invention, and FIG. 5 further shows a helical support around the messenger wire and the cable wound by the method of the present invention. It is sectional drawing which shows one Example of a state. FIG. 6A is an exploded sectional view showing an embodiment of the connector with male and female terminals of the present invention, and FIG. 6B shows a state where the connector with male and female terminals of FIG. It is sectional drawing. FIG. 7 is a schematic side view showing a state where an embodiment of the fixture according to the construction method of the present invention is mounted, and FIG. 8 (a) is a leading pulley and an electric self-sending machine of FIG. FIG. 8B is an enlarged side view of the portion, and FIG.
FIG. 8 (c) is a front view showing the leading pulley of FIG. 8 (a) as viewed from the left side, showing a state in which the tow rope and the spiral support are not inserted.
FIG. 9 is a longitudinal sectional view of the electric self-transporter of FIG. 8A taken along a line BB.

【0008】図1、図2に示すように、電柱1a,1b
間には、予めメッセンジャワイヤー2がウインチ3にて
張設されている。作業員4は、一方の電柱1a付近に設
置したバケット5内に乗って螺旋状支持具の施工作業を
行う。先ず、図2の引綱6の先端7とケーブル吊り下げ
用の一本目の螺旋状支持具8aの一端9aとを、先導滑
車10に結合し、その後電動自送機11の後述する端子
に通電用電線を結線する。この先導滑車10と電動自送
機11は、予めメッセンジャワイヤー2に転動自在に取
り着けられている。
As shown in FIGS. 1 and 2, utility poles 1a, 1b
A messenger wire 2 is stretched between the winches 3 in advance. The worker 4 rides on the inside of the bucket 5 installed near one of the utility poles 1a to perform the work of installing the spiral support. First, the tip 7 of the tow rope 6 shown in FIG. 2 and one end 9a of the first spiral support 8a for hanging a cable are connected to a leading pulley 10, and then a terminal to be described later of the electric self-transporter 11 is connected to a terminal. Connect the wires. The leading pulley 10 and the electric self-transporter 11 are rotatably mounted on the messenger wire 2 in advance.

【0009】 次に図3(イ)(ロ)に示すように、本
発明の螺旋状支持具8は、心線12の回りを合成樹脂材
料で被覆13しており、長手方向は螺旋形状14に曲成
した100cmまたは150cmの規定長に切断したも
のである。この螺旋状支持具8の一端9の方は何も嵌挿
していないが、螺旋状支持具の他端15の方には予めジ
ョイントスリーブ16を介して雌端子付きコネクター1
7bを付設している。しかも次からの螺旋状支持具8
は、図4に示すように他端には雌端子付きコネクター1
7bを、一端には雄端子付きコネクター17aを付設
し、容易に連結可能にし現場での手間を省くようにして
いる。またこの螺旋状支持具8の図3の螺旋内径Dは、
図5に示すようにメッセンジャワイヤー2の外径dとケ
ーブル19の外径d´の和より大きくしており、例えば
200%以上であることが好ましい。
Next, as shown in FIGS. 3 (a) and 3 (b), the spiral support 8 of the present invention is covered with a synthetic resin material 13 around a core wire 12 and has a spiral shape 14 in the longitudinal direction. And cut to a prescribed length of 100 cm or 150 cm. Nothing is inserted into one end 9 of the helical support 8, but the connector 1 with female terminals is previously inserted into the other end 15 of the helical support via a joint sleeve 16.
7b is attached. Moreover, the next spiral support 8
Is a connector 1 with a female terminal at the other end as shown in FIG.
7b is provided with a connector 17a with a male terminal at one end so that it can be easily connected to save labor on site. The spiral inner diameter D of the spiral support 8 in FIG.
As shown in FIG. 5, it is larger than the sum of the outer diameter d of the messenger wire 2 and the outer diameter d 'of the cable 19, and is preferably, for example, 200% or more.

【0010】 次に本発明の雄端子付きコネクター17
aと雌端子付きコネクター17bの一例を、図6(イ)
及び(ロ)について説明する。雄端子付きコネクター1
7aの端部にはジョイントスリーブ16aが形成され、
図示してない螺旋状支持具8の一端が付設される。ジョ
イントスリーブ16aに連接して外面に突起171aを
有する二股雄端子172aが形成されている。雌端子付
きコネクター17bはその端部にジョイントスリーブ1
6bが形成され、図示してない螺旋状支持具8の他端が
付設される。ジョイントスリーブ16bに連接して前記
二股状雄端子172aが挿入嵌合し、前記突起171a
に係合する係合孔171bを有する管状雌端子172b
が形成されている。本実施例の場合は、螺旋状支持具8
の一端をジョイントスリーブ16aに挿入し、熱を加え
て圧縮し固定する。同じく螺旋状支持具8の他端をジョ
イントスリーブ16bに挿入し、熱を加えて圧縮し固定
する。次いで、ジョイントスリーブ16aに連接して外
面に突起171aを有する二股状雄端子172aを雌端
子付きコネクター17bに挿入し、前記二股状雄端子1
72aの突起171aを雌端子付きコネクター17bの
係合孔171bに係合する。雄端子付きコネクター17
aと雌端子付きコネクター17bの材質は、アセタール
コポリマーが好適であるが、エンジニアリングプラスチ
ック等の弾性力のあるものも使用することができる。
Next, the connector 17 with a male terminal of the present invention
a and an example of the connector 17b with female terminals are shown in FIG.
And (b) will be described. Connector 1 with male terminal
A joint sleeve 16a is formed at the end of 7a,
One end of a spiral support 8 (not shown) is provided. A forked male terminal 172a having a projection 171a on the outer surface is formed in connection with the joint sleeve 16a. The connector 17b with a female terminal has a joint sleeve 1 at its end.
6b is formed, and the other end of the spiral support 8 (not shown) is attached. The bifurcated male terminal 172a is inserted and fitted in connection with the joint sleeve 16b, and the protrusion 171a
Female terminal 172b having an engagement hole 171b that engages with
Are formed. In the case of the present embodiment, the spiral support 8
Is inserted into the joint sleeve 16a and is compressed and fixed by applying heat. Similarly, the other end of the spiral support 8 is inserted into the joint sleeve 16b, and is heated and compressed to be fixed. Next, a forked male terminal 172a having a protrusion 171a on the outer surface connected to the joint sleeve 16a is inserted into the connector 17b with a female terminal.
The projection 171a of the 72a is engaged with the engagement hole 171b of the connector 17b with a female terminal. Connector 17 with male terminal
The material of the connector 17a and the female terminal-equipped connector 17b is preferably an acetal copolymer, but an elastic material such as an engineering plastic can also be used.

【0011】次の図7は螺旋状支持具8の装着状態を、
また図8は先導滑車10と電動自送機11の詳細を示し
ている。通電用電線111を内装した引綱6の先端7
と、螺旋状支持具8の一端9を先導滑車10に結合し、
その後、電動自送機11の端子112に通電用電線11
1を結線する。次の手順としては、螺旋状支持具8をメ
ッセンジャワイヤー2と引き綱6に巻回しながら装着
し、他方の電柱1b側に電動自送機11の電源をベタル
式スイッチ(図示せず)でON・OFFしながら移送す
る。この時の螺旋状支持具8の螺旋内径Dは、前述のよ
うに、大径にしているので、電動自送機11と先導滑車
10との作用で、200mの長スパンでもスム−スに移
送することができる。
FIG. 7 shows a state in which the spiral support 8 is mounted.
FIG. 8 shows details of the leading pulley 10 and the electric self-transporter 11. The tip 7 of the towing line 6 in which the electric wire 111 is provided.
And one end 9 of the spiral support 8 is connected to the leading pulley 10,
Then, the electric wire 11 is connected to the terminal 112 of the electric self-transporter 11.
1 is connected. As the next procedure, the spiral support 8 is attached while being wound around the messenger wire 2 and the drawstring 6, and the power supply of the electric self-transporter 11 is turned on to the other electric pole 1b by a veterinary switch (not shown).・ Transfer while turning off. At this time, the spiral inner diameter D of the spiral supporting member 8 is made large as described above, so that the electric self-transporter 11 and the leading pulley 10 allow smooth transfer even with a long span of 200 m. can do.

【0012】この移送は図2に示すように、やがて一本
目の螺旋状支持具8aの他端15aに達する。この一本
目の螺旋状支持具8aの他端15aには、ジョイントス
リーブ16を介して雌端子付きコネクター17bを付設
している。而も次から螺旋状支持具8bを付設するとと
もに、螺旋状支持具8bの一端には、雄端子付きコネク
ター17aを付設している。この接続による連結を繰り
返す手順と、先の移送手順とを繰り返して、螺旋状支持
具8の装着を進めてゆく。
This transfer eventually reaches the other end 15a of the first spiral support 8a, as shown in FIG. A connector 17b with female terminals is attached to the other end 15a of the first spiral support 8a via a joint sleeve 16. Further, a spiral support 8b is additionally provided, and a connector 17a with a male terminal is provided at one end of the spiral support 8b. The procedure of repeating the connection by this connection and the previous transfer procedure are repeated, and the mounting of the spiral support 8 is advanced.

【0013】この作業をすすめると、やがて一本目の螺
旋状支持具8aの一端9aと引綱6の先端7を結合した
先導滑車10が、図2のように他方の電柱1bの位置に
到達し、電柱1aと電柱1b間には、全ての螺旋状支持
具8a〜8i(図7)の装着が完了する。この時点で最
初の螺旋支持具8aと、最後の螺旋支持具8iを、メッ
センジャワイヤー2に、図7に示すような固定具18…
18を使用して固定させる。
When this work is advanced, the leading pulley 10 that connects the one end 9a of the first spiral support 8a and the tip 7 of the tow rope 6 eventually reaches the position of the other utility pole 1b as shown in FIG. The mounting of all the spiral supports 8a to 8i (FIG. 7) is completed between the electric pole 1a and the electric pole 1b. At this time, the first spiral support 8a and the last spiral support 8i are connected to the messenger wire 2 by the fixtures 18 shown in FIG.
Secure using 18.

【0014】固定具18は、1個だけではなく、2〜3
個取り付けて固定することが望ましい。この固定具18
は詳細を図示してないが、本実施例の場合、金属製の巻
バンド形式のものを使用した。しかし、メッセンジャワ
イヤー2と螺旋場支持具8に嵌合する、コの字状からな
るスプリング形式のものを使用してもよい。
The fixture 18 is not limited to one piece, but may be a few pieces.
It is desirable to fix them individually. This fixture 18
Although not shown in detail, in the case of the present embodiment, a metal wound band type was used. However, a U-shaped spring type fitting that fits into the messenger wire 2 and the spiral field support 8 may be used.

【0015】この状態で、図2の電柱1b側付近で先導
滑車10から通電用電線111を内装した引綱6の先端
7と螺旋状支持具8aの一端9aを外した後、電動自送
機11の電源を切って端子部から電線を外し、電動自送
機11と先導滑車10をメッセンジャワイヤー2から外
して、通電用電線111を内装した引綱6の先端7を図
1のウインチ3に連結する。次に図1に示すように電柱
1a側で、引綱6にケーブル19を連結する。そこでウ
インチ3の力を借りて引綱6を巻き上げると、ケーブル
19が螺旋状支持具8の中へ引き込まれる。以上のよう
な手順によって、本発明の施工方法を完了させることが
できる。
In this state, after removing the tip 7 of the tow rope 6 containing the conducting wire 111 and one end 9a of the spiral support 8a from the leading pulley 10 near the utility pole 1b in FIG. Is turned off, the electric wire is removed from the terminal part, the electric self-transporter 11 and the leading pulley 10 are detached from the messenger wire 2, and the tip 7 of the tow rope 6 containing the electric wire 111 is connected to the winch 3 in FIG. . Next, as shown in FIG. 1, the cable 19 is connected to the tow rope 6 on the side of the utility pole 1a. Then, when the rope 6 is wound up with the help of the winch 3, the cable 19 is drawn into the spiral support 8. The construction method of the present invention can be completed by the above procedure.

【0016】ここで本発明の先導滑車10の構造につい
て、詳しく説明する。図8の(ロ)に示すように、箱体
20とその下部連結棒21にて吊着した錘22とからな
っている。箱体20の右側にある外側面20aには、図
8の(イ)に示す通電用電線111を内装した引綱6の
先端7を嵌挿把持するサドル23と、ケーブル吊り下げ
用螺旋状支持具8の一端9を嵌挿把持するホルダー24
とを搭載している。サドル23の方はリング状で、ホル
ダー24の方は、螺旋状支持具8の断面形状に合わせた
形状の筒体からなっている。
Here, the structure of the leading pulley 10 of the present invention will be described in detail. As shown in FIG. 8B, the box 20 includes a box 20 and a weight 22 suspended by a lower connecting rod 21. On the outer surface 20a on the right side of the box 20, a saddle 23 for inserting and grasping the tip 7 of the towing line 6 containing the electric wire 111 shown in FIG. 8A and a spiral support for hanging the cable are provided. Holder 24 for inserting and holding one end 9 of 8
It is equipped with. The saddle 23 is formed in a ring shape, and the holder 24 is formed of a cylindrical body having a shape corresponding to the cross-sectional shape of the spiral support 8.

【0017】箱体20には、図8の(ロ)に示すよう
に、メッセンジャワイヤー2上を転動するローラ滑車2
5が設けられているが、箱体20の左側にある側板20
bは、取り外し式になっているので、ローラ滑車25
は、軸に螺合させた蝶ナット26によって、メッセンジ
ャワイヤー2に着脱自在な構造となっている。
As shown in FIG. 8B, a roller pulley 2 rolling on the messenger wire 2 is provided in the box 20.
5 is provided, but the side plate 20 on the left side of the box 20 is provided.
b is a removable type, so that the roller pulley 25
Has a structure detachable from the messenger wire 2 by a wing nut 26 screwed to a shaft.

【0018】また箱体20の下部連結棒21には、錘2
2が吊着されているので、先導滑車10は安定して反転
しないように保たれる構造となっている。この錘22
は、上下にナット27a,27bが螺合され、錘22は
ナット27bを取り外せば、容易に交換できるようにな
っている。本実施例の場合は、85gの錘を使用してい
るが、数種用意した錘の中から、風等の外的要因に対応
して最適な錘がその都度選択される。
The lower connecting rod 21 of the box 20 has a weight 2
Since the second pulley 2 is suspended, the leading pulley 10 is stably held so as not to be inverted. This weight 22
The nuts 27a and 27b are screwed up and down, and the weight 22 can be easily replaced by removing the nut 27b. In the case of the present embodiment, a weight of 85 g is used, but an optimum weight is selected from several kinds of prepared weights in response to external factors such as wind.

【0019】 電動自送機11は、メッセンジャワイヤ
ー2に着脱するための側面に切り込みのあるボディ11
3と、ボディ113の内には小型電動機114と減速機
115と下部(図8参照)にウエイトWが内在されてい
る。一対の上部ローラ116と一対の下部ローラ118
がボディ113に取り付けられている。上部ローラ11
6間にベルト117が懸架されており、一対の下部ロー
ラ118はメッセンジャワイヤー2を下から支承してい
る。そしてメッセンジャワイヤー2の上方からは上部ロ
ーラ116とベルト117を、またメッセンジャワイヤ
ー2の下からは下部ローラ118でメッセンジャワイヤ
ー2を挟持して、ローラ116,118が転動しうるよ
うにしている。ボディ113の外には先導滑車10と接
続する連結ワイヤー119が設けられ、通電用電線11
1を結線する端子112が小型電動機114に備えられ
ている。電動自送機11により、200m程度の長スパ
ンの電柱間を電柱付近だけで安定した移送を行なうこと
ができる。
The electric self-transporter 11 has a body 11 with a notch on a side surface for attaching to and detaching from the messenger wire 2.
3, a small electric motor 114, a speed reducer 115, and a weight W at its lower part (see FIG. 8). A pair of upper rollers 116 and a pair of lower rollers 118
Is attached to the body 113. Upper roller 11
A belt 117 is suspended between the rollers 6, and a pair of lower rollers 118 supports the messenger wire 2 from below. The upper roller 116 and the belt 117 are held from above the messenger wire 2, and the messenger wire 2 is held from below the messenger wire 2 by the lower roller 118 so that the rollers 116 and 118 can roll. Outside the body 113, a connecting wire 119 for connecting to the leading pulley 10 is provided.
A terminal 112 for connecting 1 is provided on the small motor 114. The electric self-transporter 11 enables stable transfer between power poles having a long span of about 200 m only near the power poles.

【0020】以上のような構造をもつ電動自送機11と
先導滑車10は、通電用電線111を内装した引綱6と
ケーブル吊り下げ用螺旋状支持具8の結合作業を簡素化
し、安定した移送を行うことができるので、200mの
長スパンに対しても、本施工方法は役立つものとなって
いる。
The electric self-transporter 11 and the leading pulley 10 having the above-mentioned structures simplify the operation of connecting the pulling rope 6 with the electric wire 111 and the spiral support 8 for suspending the cable, and provide a stable transfer. Therefore, this construction method is useful even for a long span of 200 m.

【0021】[0021]

【発明の効果】本発明の施工方法によると、200mも
あるような長スパンに対しても、危険な宙吊り作業をす
る必要がなくなり、電柱付近で一切の作業が出来るよう
になったので、ケーブル支持具としての螺旋状支持具の
取付け施工は、安全に楽に行えるようになった。
According to the construction method of the present invention, it is no longer necessary to perform a dangerous suspension work even for a long span as long as 200 m, and all work can be performed near a utility pole. Attachment of the spiral support as a support has become safe and easy.

【0022】また本発明の施工方法によると、金車等の
布設治具を高所で取り付け・取り外しの作業がなくな
り、通行人に対する部品落下の危険がなくなった。
Further, according to the construction method of the present invention, there is no need to mount and remove a laying jig such as a gold wheel at a high place, and there is no danger of parts falling to passers-by.

【0023】本発明の施工方法によると、螺旋状支持具
とジョイントスリーブの圧着固定法によって、また固定
具による螺旋状支持具とメッセンジャワイヤーの固定に
よって、横ずれや、脱落の欠点が解消された。
According to the construction method of the present invention, the disadvantages of lateral displacement and falling off are eliminated by the crimp fixing method of the spiral support and the joint sleeve, and by the fixing of the spiral support and the messenger wire by the fixture.

【0024】さらに、電動自送機や先導滑車を使用する
ことで、螺旋状支持具施工時の反転や、引綱とメッセン
ジャワイヤーのクロス現象を完全に防止できる。そし
て、安定した施工が行えるようになり、通電用電線を内
装した引綱及び螺旋状支持具の先端の結合作業も従来よ
り簡素化することができる。
Further, by using the electric self-transporter or the leading pulley, it is possible to completely prevent reversal during construction of the spiral support and crossing of the tow rope and the messenger wire. Then, stable work can be performed, and the joining operation of the tip of the tow rope and the helical support having the conducting wire therein can be simplified as compared with the related art.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のケーブル吊り下げ用螺旋状支持具の施
工方法の一実施例を示す略示側面図である。
FIG. 1 is a schematic side view showing one embodiment of a method for installing a spiral support for hanging a cable according to the present invention.

【図2】本発明の螺旋状支持具の結合と接続状態の一実
施例を示す略示分解側面図である。
FIG. 2 is a schematic exploded side view showing one embodiment of the connection and connection of the spiral support of the present invention.

【図3】(イ)は本発明の施工方法に使用する螺旋状支
持具の一実施例を示す側面図であり、(ロ)は図3
(イ)をA−A線で切断した断面図である。
FIG. 3A is a side view showing an embodiment of a spiral support used in the construction method of the present invention, and FIG.
It is sectional drawing which cut | disconnected (A) by AA line.

【図4】本発明の雄端子付きコネクターと雌端子付きコ
ネクターの一実施例を示す斜視図である。
FIG. 4 is a perspective view showing one embodiment of a connector with a male terminal and a connector with a female terminal of the present invention.

【図5】本発明の施工方法による螺旋状支持具でメッセ
ンジャワイヤーとケーブルを巻き付けた状態の一実施例
を示す断面図である。
FIG. 5 is a sectional view showing an embodiment in which a messenger wire and a cable are wound by a spiral support according to the construction method of the present invention.

【図6】(イ)は本発明の雄雌端子付きコネクターの一
実施例を示す分解断面図であり、(ロ)は図6(イ)の
雄雌端子付きコネクターを連結した状態を示す断面図で
ある。
6A is an exploded cross-sectional view showing one embodiment of a connector with male and female terminals of the present invention, and FIG. 6B is a cross-sectional view showing a state where the connectors with male and female terminals of FIG. FIG.

【図7】本発明の施工方法による固定具の一実施例を取
り付けた状態を示す略示側面図である。
FIG. 7 is a schematic side view showing a state in which an embodiment of the fixture according to the construction method of the present invention is attached.

【図8】(イ)は図1のCの先導滑車と電動自送機部分
を拡大した側面図であり、(ロ)は図8(イ)の先導滑
車を左側からみた引綱と螺旋状支持具の嵌挿されていな
い状態を示す正面図であり、(ハ)は図8(イ)の電動
自送機をB−B線で切断した縦断面図である。
8 (a) is an enlarged side view of the leading pulley and the electric self-transporter portion of FIG. 1C, and (b) is a pulling line and spiral support of the leading pulley of FIG. 8 (a) viewed from the left side. It is a front view which shows the state in which the tool is not inserted, (c) is the longitudinal cross-sectional view which cut | disconnected the electric self-transporter of FIG.8 (a) along the BB line.

【図9】従来のケーブル吊り下げ用ハンガー方式の施工
状態の一例を示す略示分解側面図である。
FIG. 9 is a schematic exploded side view showing an example of a construction state of a conventional cable hanging hanger system.

【図10】従来のケーブル吊り下げ用ハンガー方式によ
る施工方法の一例を示す略示側面図である。
FIG. 10 is a schematic side view showing an example of a construction method using a conventional cable hanging hanger system.

【符号の説明】[Explanation of symbols]

2 メッセンジャワイヤー 6 通電用電線を内装した引綱 8 螺旋状支持具 10 先導滑車 11 電動自送機 16 ジョイントスリーブ 17a 雄端子付きコネクター 17b 雌端子付きコネクター 18 固定具 19 ケーブル 20 先導滑車の箱体 111 通電用電線 112 電動自送機の端子 113 電動自送機のボデー 114 電動自送機の小型電動機 115 電動自送機の減速機 116 電動自送機の上部ローラ 117 電動自送機の上のベルト 118 電動自送機の下部ローラ 119 先導滑車と電動自送機の連結ワイヤー D 螺旋状支持具の螺旋内径 d メッセンジャワイヤーの外径 d´ ケーブルの外径 W 電動自送機のウエイト 2 Messenger wire 6 Tow line with electric wire for conduction 8 Spiral support 10 Lead pulley 11 Electric self-transporter 16 Joint sleeve 17a Connector with male terminal 17b Connector with female terminal 18 Fixture 19 Cable 20 Lead pulley box 111 Electric conduction Electric wire 112 Terminal of electric self-transporter 113 Body of electric self-transporter 114 Small electric motor of electric self-transporter 115 Reducer of electric self-transporter 116 Upper roller of electric self-transporter 117 Belt on electric self-transporter 118 Lower roller of electric self-conveyor 119 Connecting wire between leading pulley and electric self-conveyor D Spiral inside diameter of spiral support d Outside diameter of messenger wire d 'Outside diameter of cable W Weight of electric self-conveyor

フロントページの続き (56)参考文献 特開 平9−271122(JP,A) 特開 平10−178716(JP,A) 特開 平9−70117(JP,A) (58)調査した分野(Int.Cl.7,DB名) H02G 1/02 H02G 7/10 Continuation of the front page (56) References JP-A-9-271122 (JP, A) JP-A-10-178716 (JP, A) JP-A-9-70117 (JP, A) (58) Fields studied (Int .Cl. 7 , DB name) H02G 1/02 H02G 7/10

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 200m程度の長スパンの電柱間に張設
したメッセンジャワイヤーにケーブルを吊り下げるため
の螺旋状支持具の施工方法において、一方の電柱付近で
ケーブル吊り下げ用螺旋状支持具の一端と引綱の先端を
下部に錘を吊着した先導滑車に結合する手順と、前記メ
ッセンジャワイヤーの外径とケーブルの外径の和より大
きい内径を持つ螺旋状支持具をメッセンジャワイヤーと
引綱に巻回しながら前記引綱の先端を下部にウエイトを
内在し前記メッセンジャワイヤーの上方と下方からロー
ラーにより前記メッセンジャワイヤーを挟持した電動自
送機で引張リ他方の電柱側に移送する手順と、前記螺旋
状支持具の他端とこれに連接する次の螺旋状支持具の一
端にジョイントスリーブを形成した雄雌端子付きコネク
ターにて連結を繰り返す手順と、前記電動自送機と先導
滑車が他方の電柱に達した時点で固定具にて螺旋状支持
具をメッセンジャワイヤーに固定する手順と、通電用電
線を内装した引綱を引いてその先に繋いだケーブルを螺
旋状支持具内に引き込む手順とからなることを特徴とす
る長スパンのケーブル吊り下げ用螺旋状支持具の施工方
法。
1. A method for installing a spiral support for suspending a cable on a messenger wire stretched between utility poles having a long span of about 200 m, wherein one end of the spiral support for suspending the cable near one of the utility poles. And a step of coupling the tip of the pulling line to a leading pulley having a weight suspended below, and winding a spiral support having an inner diameter larger than the sum of the outer diameter of the messenger wire and the outer diameter of the cable around the messenger wire and the pulling line. A procedure in which the tip of the tow rope is provided with a weight at a lower portion, and the messenger wire is transferred from the upper and lower sides of the messenger wire to the other power pole side by an electric self-conveying device that holds the messenger wire by a roller; The connection is repeated with a connector with male and female terminals that forms a joint sleeve at the other end of the Returning the electric motor, the step of fixing the spiral support to the messenger wire by the fixture when the electric self-transporter and the leading pulley reach the other electric pole, And drawing the cable connected to the spiral support into the spiral support.
【請求項2】 200m程度の長スパンの電柱間に張設
したメッセンジャワイヤーにケーブルを吊り下げるため
の螺旋状支持具の施工装置において、吊り下げ用螺旋状
支持具の一端と引綱の先端を結合し下部に錘を吊着した
先導滑車と、前記引綱の先端に取り付けられた下部にウ
エイトを内在し前記メッセンジャワイヤーの上方と下方
からローラーにより前記メッセンジャワイヤーを挟持し
た電動自送機と、前記螺旋状支持具の他端とこれに連接
する次の螺旋状支持具の一端とを連結するジョイントス
リーブを形成した雄雌端子付きコネクターと、螺旋状支
持具をメッセンジャワイヤーに固定する固定具とからな
ることを特徴とする長スパンのケーブル吊り下げ用螺旋
状支持具の施工装置。
2. An apparatus for installing a helical support for hanging a cable on a messenger wire stretched between utility poles having a long span of about 200 m, wherein one end of the helical support for hanging and the tip of a tow rope are connected. A lead pulley having a weight suspended at the lower part thereof; an electric self-transporter having a weight attached to a lower part attached to the tip of the tow line and holding the messenger wire by rollers from above and below the messenger wire; A connector with male and female terminals forming a joint sleeve that connects the other end of the spiral support and one end of the next spiral support connected to the same, and a fixture for fixing the spiral support to the messenger wire An apparatus for constructing a spiral support for hanging a long span cable.
【請求項3】 先導滑車は、メッセンジャワイヤー上を
転動する着脱自在のローラー滑車と、通電用電線を内装
した引綱の一端を嵌挿するサドルと、螺旋状支持具の一
端を嵌挿把持するホルダーとを搭載し、下部にウエイト
を吊着したものからなる請求項2記載の長スパンのケー
ブル吊り下げ用螺旋状支持具の施工装置。
3. The leading pulley includes a detachable roller pulley that rolls on a messenger wire, a saddle into which one end of a pulling wire containing an electric wire is inserted, and one end of a spiral support. 3. The apparatus according to claim 2, further comprising a holder and a weight suspended from a lower portion thereof.
【請求項4】 電動自送機は、先導滑車に接続する連結
ワイヤーと、端子を備えた通電用電線を結線した小型電
動機と、メッセンジャワイヤーを上下から挟持するロー
ラーと下部に内在したウエイトからなる請求項2又は請
求項3記載の長スパンのケーブル吊り下げ用螺旋状支持
具の施工装置。
4. An electric self-transporter comprises a connecting wire connected to a leading pulley, a small electric motor connected to a current-carrying electric wire having terminals, a roller for holding a messenger wire from above and below, and a weight inside the lower part. The construction device for a spiral support for hanging a long span cable according to claim 2 or 3.
JP37528798A 1998-12-15 1998-12-15 Construction method and construction equipment of spiral support for hanging long span cable Expired - Fee Related JP3249979B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP37528798A JP3249979B2 (en) 1998-12-15 1998-12-15 Construction method and construction equipment of spiral support for hanging long span cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP37528798A JP3249979B2 (en) 1998-12-15 1998-12-15 Construction method and construction equipment of spiral support for hanging long span cable

Publications (2)

Publication Number Publication Date
JP2000184533A JP2000184533A (en) 2000-06-30
JP3249979B2 true JP3249979B2 (en) 2002-01-28

Family

ID=18505269

Family Applications (1)

Application Number Title Priority Date Filing Date
JP37528798A Expired - Fee Related JP3249979B2 (en) 1998-12-15 1998-12-15 Construction method and construction equipment of spiral support for hanging long span cable

Country Status (1)

Country Link
JP (1) JP3249979B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6446746B1 (en) * 2018-08-31 2019-01-09 株式会社ダイワ製作所 Overhead laying equipment
CN113852007A (en) * 2021-09-26 2021-12-28 广东电网有限责任公司 Pay-off crossing frame

Also Published As

Publication number Publication date
JP2000184533A (en) 2000-06-30

Similar Documents

Publication Publication Date Title
JP3035620B2 (en) Construction method of spiral support for cable suspension
JP3002869B2 (en) Construction method and construction tool of spiral support for cable suspension
JP3249979B2 (en) Construction method and construction equipment of spiral support for hanging long span cable
JP3203556B2 (en) Spiral support for cable suspension and method of construction
CN207765888U (en) A kind of power equipment cord holder
JP3196024B2 (en) Spiral support for cable suspension
CN214046942U (en) Portable tree inversion control tool
JP3025767B2 (en) Construction method of spiral support for cable suspension
KR200412783Y1 (en) Insulators for single phase two wire type service line
JP3018675U (en) Leading pulley for lashing rod construction
JP2004032835A (en) Hanging method for cable or the like using spiral support, and fixture used for the same
JP3380718B2 (en) Cable laying method, tow rope hanging tool used therefor, and utility pole detour device
JPH0970128A (en) Spiral support for cable suspension
JP3069725U (en) Wire-coil
CN213818249U (en) Internet-based network control equipment for intelligent household LED lamp
JP2774660B2 (en) Winding grip positioning tool
JP2755474B2 (en) Twisting method of self-supporting cable
JP2755473B2 (en) Twisting method of self-supporting cable
JP2004120816A (en) Laying method of helical cable hanger for suspending cable
JPH0458708A (en) Method for stretching cable with twist and cable twisting device
JPH0347378Y2 (en)
JPH07118854B2 (en) Tip traction type manipulator cable
SE456959B (en) DON BE SUSPENDED FOR CABLES OR SIMILAR IN A MULTIPLE-SIDE BETWEEN Separate Elements
JP2002142343A (en) Stringing device for spiral cable support
JP2000295726A (en) Overhead cable installation method and spiral wire pay- off device used for the method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111116

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131116

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees