JP3238179B2 - Power system operation training simulator - Google Patents

Power system operation training simulator

Info

Publication number
JP3238179B2
JP3238179B2 JP35107591A JP35107591A JP3238179B2 JP 3238179 B2 JP3238179 B2 JP 3238179B2 JP 35107591 A JP35107591 A JP 35107591A JP 35107591 A JP35107591 A JP 35107591A JP 3238179 B2 JP3238179 B2 JP 3238179B2
Authority
JP
Japan
Prior art keywords
power system
data
recovery operation
accident recovery
operation procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP35107591A
Other languages
Japanese (ja)
Other versions
JPH05165396A (en
Inventor
善文 葛上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP35107591A priority Critical patent/JP3238179B2/en
Publication of JPH05165396A publication Critical patent/JPH05165396A/en
Application granted granted Critical
Publication of JP3238179B2 publication Critical patent/JP3238179B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は電力系統を実時間で模擬
し、運用者(以下、トレーニと言う)の系統運用の訓練
を行なう電力系統運用訓練シミュレータに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a power system operation training simulator that simulates a power system in real time and trains an operator (hereinafter referred to as trainee) in system operation.

【0002】[0002]

【従来の技術】電力系統運用訓練シミュレータは訓練対
象システム、即ち、給電所や総合制御所計算機システム
の運用者の訓練を行なうことを目的としたものである。
訓練指導者(以下、トレーナと言う)によるデータ設定
及び操作やトレーニによるデータ設定及び操作に対して
電力系統の応動を模擬し、トレーニが恰も実系統で訓練
対象システムを運用しているような状況を作り出し、ト
レーニの訓練を行なうものである。従来の電力系統訓練
シミュレータは、トレーナとトレーニにより訓練を行な
い、訓練後トレーナが事故復旧に対する系統操作を実演
したり、又は机上で示したりしてトレーニの教育を行な
っていた。以下従来から用いられている方式につき図面
を用いて説明する。
2. Description of the Related Art A power system operation training simulator is intended to provide training for an operator of a system to be trained, that is, a power supply station or a general control station computer system.
The situation where the trainer simulates the response of the electric power system to the data setting and operation by the trainer (hereinafter referred to as trainer) and the data setting and operation by the trainee, and the trainee operates the system to be trained in the real system. And train trainees. The conventional electric power system training simulator performs training using a trainer and a trainee, and after the training, the trainer performs system operation for accident recovery or shows on a desk to train the trainee. Hereinafter, a conventionally used method will be described with reference to the drawings.

【0003】図3は従来の電力系統運用訓練シミュレー
タの構成を示した機能ブロック図であり、5はトレーニ
用マンマシン装置、6はトレーナ用マンマシン装置、7
は入出力処理手段、8は操作・設定データ保存手段、9
は電力系統応動模擬手段、10は電力系統模擬データ保存
手段である。トレーニはトレーニ用マンマシン装置5を
介し恰も実電力系統に対しているかのように模擬される
電力系統に対し監視を行ない、必要なしゃ断器や開閉器
等の開閉器の投入・開放操作や43SWの入・切操作及びデ
ータの設定を行なう。トレーナもトレーニと同様にトレ
ーナ用マンマシン装置6を介し模擬される系統に対し監
視を行ない、必要な操作やデータの設定を行なうと共
に、トレーニによる電力系統の運用状況や事故時の復旧
操作の手順を監視する。又、トレーナはトレーナ用マン
マシン装置6を介し訓練のための事故設定データを設定
する。入出力処理手段7はトレーニ及びトレーナにより
行なわれた操作及びデータ設定を処理し、そのデータを
操作・設定データ保存手段8に保存する。
FIG. 3 is a functional block diagram showing a configuration of a conventional power system operation training simulator. 5 is a man-machine device for trainee, 6 is a man-machine device for trainer, 7
Denotes input / output processing means, 8 denotes operation / setting data storage means, 9
Denotes power system response simulation means, and 10 denotes power system simulation data storage means. The trainee monitors the power system simulated as if it were to the real power system via the trainee man-machine device 5, and turns on and off the switches, such as the necessary circuit breakers and switches, and 43SW. On / off operation and data setting. The trainer also monitors the simulated system via the trainer man-machine device 6 in the same manner as the trainee, performs necessary operations and sets data, and also performs the operation of the power system by the trainee and the recovery operation procedure in the event of an accident. To monitor. The trainer sets accident setting data for training via the trainer man-machine device 6. The input / output processing means 7 processes the operation and data setting performed by the trainee and the trainer, and stores the data in the operation / setting data storage means 8.

【0004】又、操作・設定データ保存手段8に保存さ
れたデータは、入出力処理手段7を介しトレーニ用マン
マシニ装置5及びトレーナ用マンマシン装置6に表示又
は出力されてトレーニ及びトレーナに提供される。電力
系統応動模擬手段9は操作・設定データ保存手段8によ
りトレーニ及びトレーナによる操作及び設定データを入
力し、電力系統模擬データ保存手段10より開閉器の投入
・開放状態データや43SWの入・切状態データ及び発電機
出力値,負荷の値,母線電圧,送電線潮流(以後TMデ
ータと言う)等の系統状態データを入力する。電力系統
応動模擬手段9はこれら入力データを基にトレーニ及び
トレーナの操作に対する電力系統の応動を模擬し、電力
系統模擬データ保存手段10に保存されている開閉器の開
・閉状態データや43SWの入・切状態データ及びTMデー
タを更新する。更に、電力系統応動模擬手段9はトレー
ナにより設定された事故設定データを操作・設定データ
保存手段8より入力し、事故発生時の保護リレー動作を
模擬し、リレー動作状態データを電力系統模擬データ保
存手段10に保存する。又、リレー動作により開放又は投
入された開閉器の開・閉状態を作成し、電力系統模擬デ
ータ保存手段10の開・閉状態データを更新する。
The data stored in the operation / setting data storage means 8 is displayed or output to the trainee man-machining device 5 and the trainer man-machine device 6 via the input / output processing means 7 and provided to the trainee and the trainer. You. The power system response simulating means 9 inputs the operation and setting data by the trainee and the trainer by the operation / setting data storing means 8, and the switch ON / OFF state data and 43SW ON / OFF state from the power system simulating data storing means 10. Data and system status data such as generator output value, load value, bus voltage, transmission line power flow (hereinafter referred to as TM data), etc. are input. The power system response simulating means 9 simulates the response of the power system to the operation of the trainee and the trainer based on these input data, and the open / closed state data of the switch and the 43SW of 43SW stored in the power system simulated data storage means 10. Update ON / OFF state data and TM data. Further, the power system response simulating means 9 inputs the fault setting data set by the trainer from the operation / setting data storing means 8, simulates a protection relay operation in the event of a fault, and stores the relay operation state data in the power system simulating data. Store in means 10. Further, the open / closed state of the switch opened or closed by the relay operation is created, and the open / closed state data of the power system simulation data storage unit 10 is updated.

【0005】電力系統模擬データ保存手段10に保存され
た開閉器の開・閉状態データ及び43SWの入・切状態及び
リレーの動作状態データ(以後SVデータと言う)及び
TMデータは、入出力処理手段7を介しトレーニ用マン
マシン装置5及びトレーナ用マンマシン装置6に表示又
は出力され、トレーニ及びトレーナに提供される。トレ
ーニはトレーニ用マンマシン装置5に表示又は出力され
たデータを監視し、恰も実電力系統に対する運用を行な
っているかのように必要な操作やデータ設定を行なった
り、事故発生時の事故復旧操作を行ない訓練を行なう。
トレーナはトレーナ用マンマシン装置6に表示又は出力
されたデータにより、トレーニの行なった操作やデータ
設定や事故復旧操作の手順を監視及び評価する。訓練終
了後、トレーナは訓練中のトレーニの操作やデータ設定
や事故復旧操作に対する評価をトレーニに示し、より適
切な事故復旧操作を電力系統運用訓練シミュレータ上で
実演したり机上で示したりしてトレーニの教育を行なっ
ていた。
The open / closed state data of the switch, the ON / OFF state of the 43SW, the operation state data of the relay (hereinafter referred to as SV data) and the TM data stored in the power system simulation data storage means 10 are input / output processing. The information is displayed or output on the man-machine device 5 for trainee and the man-machine device 6 for trainer via the means 7, and provided to the trainee and the trainer. The trainee monitors the data displayed or output on the trainee man-machine device 5 and performs necessary operations and data settings as if operating the actual power system, and performs an accident recovery operation in the event of an accident. Conduct training.
The trainer monitors and evaluates the operation performed by the trainee, the data setting, and the procedure of the accident recovery operation based on the data displayed or output on the trainer man-machine device 6. After the training, the trainer showed the trainee operation during training, the data setting and the evaluation of the accident recovery operation to the trainee, and demonstrated the more appropriate accident recovery operation on the power system operation training simulator or showed it on the desk. Education.

【0006】[0006]

【発明が解決しようとする課題】上記従来の電力系統運
用訓練シミュレータによる訓練では、訓練中トレーナが
トレーニの操作やデータ設定及び事故復旧操作の手順を
監視し、訓練終了後、事故復旧操作の模範手順を実演し
たり机上で示したりしていた。このため、訓練を行なう
ためにはトレーニの他にトレーナが常に参加することが
必要であった。又、トレーナは模範手順等を示さねばな
らないため熟練の運用者がトレーナとならなくてはなら
なかった。このため、電力系統運用訓練シミュレータを
利用し、多数のトレーニに対し年間を通して訓練を行な
うには熟練した運用者を専任のトレーナとして割り当て
る必要があった。本発明は上記課題を解決するためにな
されたものであり、自動的に事故発生時の模範となる復
旧操作手順を作成し入力することにより、トレーナ不在
でも模範となる事故復旧操作手順の確認を可能とするも
のである。これにより、トレーニのみの自習による訓練
を可能とし、トレーニがトレーナ不在でも自分の事故復
旧操作手順が正しかったか否かを確認できる電力系統運
用訓練シミュレータを提供することを目的としている。
In the training using the conventional power system operation training simulator, the trainer monitors the operation of the trainee, sets data, and recovers from the accident during the training. He demonstrated the procedure and showed it on the desk. For this reason, it was necessary for trainers to always participate in addition to trainees in order to conduct training. In addition, the trainer had to show a model procedure or the like, so a skilled operator had to become a trainer. Therefore, in order to use a power system operation training simulator to train a large number of trainees throughout the year, a skilled operator had to be assigned as a dedicated trainer. The present invention has been made to solve the above problems, and automatically creates and inputs a model recovery operation procedure in the event of an accident, thereby confirming a model accident recovery operation procedure even in the absence of a trainer. It is possible. Accordingly, it is an object of the present invention to provide a power system operation training simulator that enables self-training of only a trainee and that can confirm whether or not his / her accident recovery operation procedure was correct even when the trainee was absent.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するた
め、本発明では電力系統の応動を模擬し、電力系統運用
者の操作訓練を行なう電力系統運用訓練シミュレータに
おいて、訓練指導者及び運用者によって行なわれた操作
及びデータ設定を入力する入出力処理手段と、前記入出
力処理手段からのデータを保存する操作・設定データ保
存手段と、開閉器の投入・開放状態データやその他のS
Wの入・切状態データ及びTMデータからなる系統状態
データを保存する電力系統模擬データ保存手段と、前記
操作・設定データ保存手段及び電力系統模擬データ保存
手段の内容をもとに訓練指導者及び運用者の操作に対す
る電力系統の応動を模擬すると共に、事故発生時のリレ
ー動作により開放又は投入された開閉器の開・閉状態を
作成し、前記電力系統模擬データ保存手段の開・閉状態
データを更新する電力系統応動模擬手段と、事故復旧操
作手順を作成するための知識が格納された事故復旧操作
手順作成知識ベースと、前記事故復旧操作手順作成知識
ベースからの知識と電力系統模擬データ保存手段からの
データと事故復旧操作手順作成手段からの起動データと
を入力し、その時点の状況に適した事故復旧操作手順を
推論する事故復旧操作手順作成手段と、前記作成された
事故復旧操作手順を保存する事故復旧操作手順保存手段
とを備えた。
In order to achieve the above object, the present invention provides a power system operation training simulator which simulates the response of a power system and performs operation training for a power system operator. Input / output processing means for inputting the performed operation and data setting; operation / setting data storage means for storing data from the input / output processing means;
A power system simulation data storage unit for storing system state data including W on / off state data and TM data; and a training instructor based on the contents of the operation / setting data storage unit and the power system simulation data storage unit. Simulates the response of the electric power system to the operation of the operator, creates the open / closed state of the switch opened or closed by the relay operation at the time of occurrence of an accident, and creates the open / closed state data of the power system simulated data storage means. A power system response simulation means for updating the data, an accident recovery operation procedure creation knowledge base storing knowledge for creating an accident recovery operation procedure, and knowledge and power system simulation data storage from the accident recovery operation procedure creation knowledge base Accident recovery that inputs data from the means and startup data from the accident recovery operation procedure creation means, and infers an accident recovery operation procedure appropriate to the situation at that time With the work procedure creating means, and accident recovery operation procedure storage means for storing the accident recovery operation procedure in which the have been created.

【作用】事故発生時の開閉器の投入・開放状態や保護リ
レー動作状態等のSVデータ及びTMデータを入力し、
その時の系統状態に従い自動的に事故復旧操作手順を作
成し保存しておき、トレーニの要求により作成された事
故復旧操作手順をトレーニ又はトレーナの操作と同様に
入力し、これに対する系統の応動を模擬する。従って、
トレーナ不在でも事故復旧に対する模範手順が自動的に
示され、トレーニは自分の事故復旧操作手順と示された
模範手順との差を比較し、自分の事故復旧操作手順が正
しかったか否かを確認することができる。
[Function] Input SV data and TM data such as switch ON / OFF state and protection relay operation state when an accident occurs,
Automatically create and save an accident recovery operation procedure according to the system status at that time, and input the accident recovery operation procedure created at the request of the trainee in the same way as trainee or trainer operation, and simulate the system response to this I do. Therefore,
The model procedure for accident recovery is automatically indicated even in the absence of a trainer, and the trainee compares the difference between his accident recovery operation procedure and the indicated model procedure to check whether his accident recovery operation procedure was correct. be able to.

【0008】[0008]

【実施例】以下図面を参照して実施例を説明する。図1
は本発明による電力系統運用訓練シミュレータを説明す
る一実施例の機能ブロック図である。図1において図3
と同一部分については同一符号を付して説明を省略す
る。図1において、1は事故復旧操作手順作成知識ベー
ス、2は事故復旧操作手順作成手段、3は事故復旧操作
手順保存手段、4は事故復旧操作手順入力手段である。
事故復旧操作手順作成手段2は電力系統応動模擬手段9
より起動されるようになっている。又、事故復旧操作手
順作成手段2は事故復旧操作手順作成知識ベース1及び
電力系統模擬データ保存手段10及び事故復旧操作手順保
存手段3に接続している。事故復旧操作手順出力手段4
は入出力処理手段7より起動されるようになっている。
又、事故復旧操作手順入力手段4は事故復旧操作手順保
存手段3及び操作・設定データ保存手段8に接続されて
いる。その他の構成は図3と同様である。
An embodiment will be described below with reference to the drawings. FIG.
FIG. 1 is a functional block diagram of an embodiment for explaining a power system operation training simulator according to the present invention. In FIG. 1, FIG.
The same parts as those described above are denoted by the same reference numerals and description thereof is omitted. In FIG. 1, 1 is an accident recovery operation procedure creation knowledge base, 2 is an accident recovery operation procedure creation means, 3 is an accident recovery operation procedure storage means, and 4 is an accident recovery operation procedure input means.
The accident recovery operation procedure creation means 2 is a power system response simulation means 9
It is more activated. Further, the accident recovery operation procedure creation means 2 is connected to the accident recovery operation procedure creation knowledge base 1, the power system simulation data storage means 10 and the accident recovery operation procedure storage means 3. Accident recovery operation procedure output means 4
Are started by the input / output processing means 7.
The accident recovery operation procedure input means 4 is connected to the accident recovery operation procedure storage means 3 and the operation / setting data storage means 8. Other configurations are the same as those in FIG.

【0009】以下新たに追加された構成部分の機能説明
をする。電力系統応動模擬手段9は図3を用いて説明し
たと同様に電力系統の応動を模擬し、事故発生時の保護
リレー動作及び開閉器の開・閉動作を模擬する。そし
て、保護リレー動作時、即ち、事故発生時には、事故復
旧操作手順作成手段2を起動する。事故復旧操作手順作
成手段(推論エンジン)2は、事故復旧操作手順作成知
識ベース1より事故復旧の知識を入力し、電力系統模擬
データ保存手段10より事故発生状況把握のため保護リレ
ー動作状態データ及び開閉器開・閉状態データ等のSV
データ及びTMデータを入力する。事故復旧操作手順作
成手段2はこれら入力より事故発生状況を把握し、事故
復旧の知識を利用し推論を行ない、自動的にその時点の
電力系統の状況に適した事故復旧操作手順を作成する。
そして、事故復旧操作手順作成手段2は作成した事故復
旧操作手順を事故復旧操作手順保存手段3に保存する。
ここで、事故復旧操作手順作成知識ベース1には以下の
ような事故復旧操作手順作成の知識が登録されている。
The function of the newly added component will be described below. The power system response simulating means 9 simulates the response of the power system in the same manner as described with reference to FIG. 3, and simulates the protection relay operation and the opening / closing operation of the switch when an accident occurs. When the protection relay operates, that is, when an accident occurs, the accident recovery operation procedure creating means 2 is activated. The accident recovery operation procedure creating means (inference engine) 2 inputs the knowledge of the accident recovery from the accident recovery operation procedure creation knowledge base 1 and the protection relay operating state data and the power system simulated data storage means 10 for grasping the accident occurrence situation. SV of switch open / close status data etc.
Input data and TM data. The accident recovery operation procedure creation means 2 grasps the accident occurrence status from these inputs, makes an inference using the knowledge of the accident recovery, and automatically creates an accident recovery operation procedure suitable for the current state of the power system.
Then, the accident recovery operation procedure creating means 2 stores the created accident recovery operation procedure in the accident recovery operation procedure storage means 3.
Here, the following knowledge of accident recovery operation procedure creation is registered in the accident recovery operation procedure creation knowledge base 1.

【0010】(1) 優先順位の高い連系点から故障回避ル
ートの探索を行なう。 (2) 故障回避ルートが複数の場合、連系点の数が最小の
ルートから選択する。 (3) 各ルートの健全系統と接続する連系点の電圧が高い
ルートとする。 (4) 各ルートを健全系統から見て昇圧の少ないルートと
する。 (5) 単独系統容量の大きいものから復旧する。 (6) 発電機の復旧は事故後緊急再立上げ可能発電機,原
子力発電機,水力発電機,一般火力の優先順位とする。 (7) 復旧ルートで接続した系統において、需給バランス
を考えた発電機出力,負荷を設定する。 (8) 新たな過負荷を発生させない。 (9) 過負荷対策を必要とする設備以外の過負荷も増大さ
せない。 (10)投入開閉器両端の位相差が15度以内ならループ切替
とし、それ以外は停電切替とする。 (11)他電力からの融通電力は3000MW以内とする。 事故復旧操作手順作成手段(推論エンジン)2では、上
記の例に示したような知識を事故復旧操作手順作成知識
ベース1より入力し、電力系統の状況に適した事故復旧
操作手順を推論し作成する。次に、事故復旧操作手順作
成手段2にて事故復旧操作手順を作成するアルゴリズム
を図2のフローチャートを用いて説明する。
(1) A search for a failure avoidance route is performed from a connection point having a higher priority. (2) If there are multiple failure avoidance routes, select the route with the smallest number of interconnection points. (3) Routes with high voltage at interconnection points connected to healthy systems of each route. (4) Each route shall be a route with low pressure increase from the viewpoint of a healthy system. (5) Restore from the one with larger single system capacity. (6) Restoration of generators shall be prioritized for emergency restartable generators after the accident, nuclear power generators, hydroelectric generators, and general thermal power. (7) Set the generator output and load considering the supply and demand balance in the system connected by the restoration route. (8) No new overload occurs. (9) Do not increase the overload of equipment other than those requiring overload measures. (10) If the phase difference between both ends of the closing switch is within 15 degrees, loop switching is performed; otherwise, power failure switching is performed. (11) The interchange power from other power shall be within 3000MW. The accident recovery operation procedure creation means (inference engine) 2 inputs the knowledge shown in the above example from the accident recovery operation procedure creation knowledge base 1 and infers and creates an accident recovery operation procedure suitable for the state of the power system. I do. Next, an algorithm for creating an accident recovery operation procedure by the accident recovery operation procedure creation means 2 will be described with reference to the flowchart of FIG.

【0011】図2において、ステップS1は電力系統模擬
データ保存手段10より電力系統の状態データを入力し、
事故発生状況を把握し、事故直後の系統に対する連系点
の認識を行なう。ステップS2では単独系統,発電機,負
荷の順で優先順位に従って復旧ルートを探索する。ステ
ップS3ではステップS2にて求めた復旧ルートで接続した
系統の発電機出力及び負荷の値を決定する。ステップS4
では過負荷が存在する場合の対策及び過負荷対策による
復旧ルートの見直しを行なう。ステップS5では単独系統
の並列に必要な操作手順を作成する。ステップS6では投
入する開閉器両端の位相差からループ切替か停電切替か
を判定し、健全系統内の切替操作手順を作成する。ステ
ップS7ではステップS1からS6までで求めた復旧操作手順
をとりまとめ、需給バランスを考慮した最終的な事故復
旧操作手順を作成し処理を終了する。上記例のようにし
て求めた事故復旧操作手順は事故復旧操作手順保存手段
3に保存される。
In FIG. 2, step S1 is to input state data of the power system from the power system simulation data storage means 10,
Grasp the accident occurrence situation and recognize the interconnection point for the system immediately after the accident. In step S2, a restoration route is searched for in the order of the single system, the generator, and the load in order of priority. In step S3, the generator output and load values of the system connected by the restoration route determined in step S2 are determined. Step S4
Then, a countermeasure in the case where an overload exists and a review of the restoration route based on the overload countermeasure are performed. In step S5, an operation procedure necessary for the single system in parallel is created. In step S6, it is determined from the phase difference between both ends of the switch to be switched whether loop switching or power failure switching, and a switching operation procedure in a healthy system is created. In step S7, the recovery operation procedures obtained in steps S1 to S6 are compiled, a final accident recovery operation procedure taking into account the supply and demand balance is created, and the process is terminated. The accident recovery operation procedure obtained as in the above example is stored in the accident recovery operation procedure storage means 3.

【0012】訓練終了後、トレーニはトレーニ用マンマ
シン装置5より模範手順提示の要求を行なう。この要求
を受けた入出力処理手段7は事故復旧操作手順入力手段
4を起動する。事故復旧操作手順入力手段4は事故復旧
操作手順保存手段3に保存されている事故復旧操作手順
を取り出し、トレーニ又はトレーナからの操作と同じデ
ータ形式に変換し、操作・設定データ保存手段8に入力
する。電力系統応動模擬手段9は事故復旧操作手順入力
手段4により操作・設定データ保存手段8に入力された
事故復旧操作手順データを取り出し、トレーニ又はトレ
ーナからの操作に対すると同様に電力系統の応動を模擬
し、その結果であるSVデータ及びTMデータを電力系
統模擬データ保存手段10に保存する。ここに保存された
SVデータ及びTMデータは入出力処理手段7により取
り出され、トレーニ用マンマシン装置5に表示又は出力
される。これにより、事故復旧操作手順作成手段2によ
り作成された模範手順がトレーニ用マンマシン装置5を
介しトレーニに提示される。なお、上記実施例における
事故復旧操作手順作成の知識及び事故復旧操作手順作成
のアルゴリズムは一例であり、各電力系統に合わせ知識
を変更すると共にアルゴリズムを変更すれば良い。又、
上記実施例では事故復旧操作手順の作成を知識ベースを
用いたエキスパートシステムを用いて作成すると説明し
たが、これに限定されるものではなく、事故発生時の電
力系統の状態に適した事故復旧操作手順が作成される方
法であればいかなる方法であっても良い。
After the training is completed, the trainee requests a model procedure presentation from the trainee man-machine device 5. Upon receiving this request, the input / output processing means 7 activates the accident recovery operation procedure input means 4. The accident recovery operation procedure input means 4 retrieves the accident recovery operation procedure stored in the accident recovery operation procedure storage means 3, converts it into the same data format as the operation from the trainee or trainer, and inputs it to the operation / setting data storage means 8. I do. The power system response simulation means 9 extracts the accident recovery operation procedure data input to the operation / setting data storage means 8 by the accident recovery operation procedure input means 4 and simulates the response of the power system in the same manner as the operation from the trainee or trainer. Then, the resulting SV data and TM data are stored in the power system simulation data storage unit 10. The SV data and TM data stored here are taken out by the input / output processing means 7 and displayed or output on the training-man machine 5. Thus, the exemplary procedure created by the accident recovery operation procedure creating means 2 is presented to the trainee via the trainee man-machine device 5. The knowledge of the accident recovery operation procedure creation and the algorithm of the accident recovery operation procedure creation in the above embodiment are merely examples, and the knowledge and algorithm may be changed according to each power system. or,
In the above embodiment, the description has been made that the accident recovery operation procedure is created using the expert system using the knowledge base, but the present invention is not limited to this, and the accident recovery operation procedure suitable for the state of the power system at the time of the accident occurs. Any method may be used as long as the procedure is created.

【0013】[0013]

【発明の効果】以上説明したように、本発明によればト
レーナ不在であっても模範となる事故復旧操作手順が自
動的に作成され、トレーニの要求により提示される。こ
れにより、トレーニのみの自習による訓練が可能とな
り、トレーニがトレーナ不在でも提示された模範手順と
自分の事故復旧操作手順を比較し、自分の事故復旧操作
手順が正しかったか否かを確認できる電力系統運用訓練
シミュレータを提供することができる。
As described above, according to the present invention, a model accident recovery operation procedure is automatically created even when a trainer is not present, and presented at the request of the trainee. This makes it possible for the trainee to conduct self-study training, and to compare the model procedure presented in the absence of the trainer with his own accident recovery operation procedure, and to confirm whether his own accident recovery operation procedure was correct. An operation training simulator can be provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による電力系統運用訓練シミュレータを
説明する一実施例の機能ブロック図。
FIG. 1 is a functional block diagram of an embodiment for explaining a power system operation training simulator according to the present invention.

【図2】本発明による事故復旧操作手順を作成する方法
を説明するフローチャート。
FIG. 2 is a flowchart illustrating a method for creating an accident recovery operation procedure according to the present invention.

【図3】従来の電力系統運用訓練シミュレータを説明す
る機能ブロック図。
FIG. 3 is a functional block diagram illustrating a conventional power system operation training simulator.

【符号の説明】[Explanation of symbols]

1 事故復旧操作手順作成知識ベース 2 事故復旧操作手順作成手段 3 事故復旧操作手順保存手段 4 事故復旧操作手順入力手段 5 トレーニ用マンマシン装置 6 トレーナ用マンマシン装置 7 入出力処理手段 8 操作・設定データ保存手段 9 電力系統応動模擬手段 10 電力系統模擬データ保存手段 1 Knowledge base for creating accident recovery operation procedures 2 Accident recovery operation procedure creation means 3 Accident recovery operation procedure storage means 4 Accident recovery operation procedure input means 5 Man-machine device for trainee 6 Man-machine device for trainer 7 Input / output processing means 8 Operation / setting Data storage means 9 Power system response simulation means 10 Power system simulation data storage means

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G09B 9/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) G09B 9/00

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 電力系統の応動を模擬し、電力系統運用
者の操作訓練を行なう電力系統運用訓練シミュレータに
おいて、訓練指導者及び運用者によって行なわれた操作
及びデータ設定を入力する入出力処理手段と、前記入出
力処理手段からのデータを保存する操作・設定データ保
存手段と、開閉器の投入・開放状態データやその他のS
Wの入・切状態データ及びTMデータからなる系統状態
データを保存する電力系統模擬データ保存手段と、前記
操作・設定データ保存手段及び電力系統模擬データ保存
手段の内容をもとに訓練指導者及び運用者の操作に対す
る電力系統の応動を模擬すると共に、事故発生時のリレ
ー動作により開放又は投入された開閉器の開・閉状態を
作成し、前記電力系統模擬データ保存手段の開・閉状態
データを更新する電力系統応動模擬手段と、事故復旧操
作手順を作成するための知識が格納された事故復旧操作
手順作成知識ベースと、前記事故復旧操作手順作成知識
ベースからの知識と電力系統模擬データ保存手段からの
データと事故復旧操作手順作成手段からの起動データと
を入力し、その時点の状況に適した事故復旧操作手順を
推論する事故復旧操作手順作成手段と、前記作成された
事故復旧操作手順を保存する事故復旧操作手順保存手段
を備えたことを特徴とする電力系統運用訓練シミュレ
ータ。
An operation performed by a training instructor and an operator in a power system operation training simulator that simulates power system response and performs operation training for a power system operator.
Input / output processing means for inputting data and data settings;
Operation / setting data storage to save data from force processing means
Means, switch on / off status data and other S
System status consisting of W on / off status data and TM data
Power system simulation data storage means for storing data,
Operation / setting data storage means and power system simulation data storage
Operation of training instructor and operator based on contents of means
Simulate the response of the power system
-The open / closed state of the switch opened or closed by the operation
Create and open / close the power system simulation data storage means
Power system response simulation means for updating data and accident recovery operation
Accident recovery operation that stores knowledge for creating operation procedures
Procedure creation knowledge base and the knowledge on accident recovery operation procedure creation
Knowledge from the base and power system simulation data storage means
Data and start-up data from the accident recovery operation procedure creation means
Enter the accident recovery operation procedure appropriate for the current situation.
Means for creating an accident recovery operation procedure to be inferred;
Accident recovery operation procedure storage means for storing accident recovery operation procedures
Power system operation training simulator, characterized in that it was equipped with a door.
JP35107591A 1991-12-11 1991-12-11 Power system operation training simulator Expired - Fee Related JP3238179B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35107591A JP3238179B2 (en) 1991-12-11 1991-12-11 Power system operation training simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35107591A JP3238179B2 (en) 1991-12-11 1991-12-11 Power system operation training simulator

Publications (2)

Publication Number Publication Date
JPH05165396A JPH05165396A (en) 1993-07-02
JP3238179B2 true JP3238179B2 (en) 2001-12-10

Family

ID=18414874

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35107591A Expired - Fee Related JP3238179B2 (en) 1991-12-11 1991-12-11 Power system operation training simulator

Country Status (1)

Country Link
JP (1) JP3238179B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3703190B2 (en) * 1996-01-10 2005-10-05 富士通株式会社 Distance education system and distance learning processor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
「蒸留塔運転知的訓練システムとその構築法」富田昭司他3名著,電気学会論文誌C 電子・情報・システム部門誌 第110巻第11号,p.691−698,平成2年11月20日社団法人電気学会発行

Also Published As

Publication number Publication date
JPH05165396A (en) 1993-07-02

Similar Documents

Publication Publication Date Title
Miller et al. Experiences using the dispatcher training simulator as a training tool
JP3238179B2 (en) Power system operation training simulator
DyLiacco et al. Considerations in developing and utilizing operator training simulators
Susumago et al. Development of a large-scale dispatcher training simulator and training results
JP3080795B2 (en) Power system frequency simulation method and power system training simulator
JP3121647B2 (en) Power system operation training simulator
JPH09114358A (en) Power system training simulator
JP2000175357A (en) Power system operation training simulator and recording medium in which program has bun recorded
JPH0715861A (en) Training simulator for operating electric power system
Shinohara et al. Knowledge-based behavior interface: its application to power network restoration support system
JP2736133B2 (en) Power system training simulator
JPH10240113A (en) Training simulator for electric power system
Vadari et al. An online implementation of transient stability in a dispatcher training simulator
JPH08317559A (en) Training simulator for power system operation
Shiota et al. Development of training simulator for power system operators
Subramanian Development of enhanced power system simulator with multi-area dispatch capability
JPH05146071A (en) Simulator for training operation of power system
JPH08340636A (en) Power system monitor controller, and its training device
Bramer et al. FAUST: an expert system for diagnosing faults in an electricity supply system
JP2645200B2 (en) Power system operation training simulator
JPS60144116A (en) Power system simulator
JPH08110809A (en) Electric power system simulation device
JPH0619386A (en) Training simulator for electric power system operation
Rafian et al. Evaluating a restoration tool using consolidated Edison's training simulator
Demjén et al. An integrated dispatcher training simulator for use in a regional electricity distribution centre

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees