JP3229936B2 - Control method of total power consumption of power equipment - Google Patents

Control method of total power consumption of power equipment

Info

Publication number
JP3229936B2
JP3229936B2 JP8694698A JP8694698A JP3229936B2 JP 3229936 B2 JP3229936 B2 JP 3229936B2 JP 8694698 A JP8694698 A JP 8694698A JP 8694698 A JP8694698 A JP 8694698A JP 3229936 B2 JP3229936 B2 JP 3229936B2
Authority
JP
Japan
Prior art keywords
minutes
power
air conditioner
compressor
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8694698A
Other languages
Japanese (ja)
Other versions
JPH11287496A (en
Inventor
秀夫 落合
Original Assignee
株式会社キャリバー電工
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社キャリバー電工 filed Critical 株式会社キャリバー電工
Priority to JP8694698A priority Critical patent/JP3229936B2/en
Publication of JPH11287496A publication Critical patent/JPH11287496A/en
Application granted granted Critical
Publication of JP3229936B2 publication Critical patent/JP3229936B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/221General power management systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Air Conditioning Control Device (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、複数の空調機およ
びその他の負荷を有する電力設備の総使用電力量を制御
する方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for controlling the total power consumption of power equipment having a plurality of air conditioners and other loads.

【0002】[0002]

【従来の技術】近年、生活環境の向上やコンピューター
をはじめとする電化製品等の大幅な普及によって電気エ
ネルギーの使用が大幅に増え、電気を作り出す際に使用
する化石燃料の消費量が年々増加している。これは限り
ある天然資源の有効利用及び地球環境への配慮という観
点からも好ましくない。
2. Description of the Related Art In recent years, the use of electric energy has greatly increased due to the improvement of living environment and the widespread use of electric appliances such as computers, and the consumption of fossil fuels used in producing electricity has been increasing year by year. ing. This is not preferable from the viewpoint of effective use of limited natural resources and consideration of the global environment.

【0003】また、作り出した電気エネルギーは備蓄す
るのが困難であり、そのため夏・冬場に起きる最大使用
時の電力総量に合わせて発電所等の設備を作る必要があ
り、その設備投資費用等が反映されて電気料金も高くな
っている。
Also, it is difficult to store the generated electric energy, and it is necessary to make facilities such as a power plant in accordance with the total amount of electric power at the time of maximum use occurring in summer and winter. Reflecting on this, electricity rates are also rising.

【0004】この様な事を鑑み、また昨今の国際環境の
変化に対応して、電力業界では様々な対策、例えば、電
気をあまり使わないように奨める広告や、賢い省エネ方
法の告知を行っている。
[0004] In view of such circumstances, and in response to the recent changes in the international environment, the electric power industry has implemented various measures, for example, advertisements that recommend the use of less electricity and announcements of wise energy saving methods. I have.

【0005】電力会社は、このような省エネ・省電力告
知といったものに加えて、実際に電気使用量の多い電気
需要家(例えば、工場やオフィスビル)に対しては、使
用電力の削減や電気使用に関する意識の改変を目的とし
て、実量制と呼ばれるデマンド数値によって電気料金の
契約をする制度(以下、デマンド契約制度という)を導
入している。
[0005] In addition to such energy-saving / power-saving announcements, the electric power company has reduced power consumption and reduced electricity consumption for electric consumers (for example, factories and office buildings) that actually use a large amount of electricity. For the purpose of changing the awareness of usage, a system called the actual meter system for contracting electricity rates based on demand figures (hereinafter referred to as a demand contract system) has been introduced.

【0006】このデマンド契約制度は、需要場所におけ
る30分単位での総使用電力量を1ヶ月間測定し(1日
を48に細分化して毎月約1,440回測定する)、そ
のうちの最大値がその月の最大電力として記録され、こ
の月を含めた過去1年間での任意の30分間に使用した
電力の最大値を今後1年間の契約電力として基本料金を
設定するシステムである。
This demand contract system measures the total power consumption in 30-minute units at a demand location for one month (one day is subdivided into 48, and is measured about 1,440 times per month), and the maximum value is measured. Is recorded as the maximum power for the month, and the maximum value of the power used for any 30 minutes in the past year including this month is set as the contract power for the next one year, and the basic charge is set.

【0007】すなわち、30分の単位において一度でも
最大電力値を記録した場合、これをもとに電気基本料金
を算出し、向こう1年間の電気代の請求をするものであ
る。現実には、どうしても夏・冬に空調機(エアコン)
をフル稼動させることが多く、その結果この時期に最大
電力値(ピーク)を記録することが多い。
That is, when the maximum power value is recorded even once in a unit of 30 minutes, a basic electricity charge is calculated based on the maximum power value, and the electricity bill is charged for the next one year. Actually, air conditioners (air conditioners) are inevitable in summer and winter
Is often operated at full capacity, and as a result, the maximum power value (peak) is often recorded at this time.

【0008】それに対し、電力業界としてはこの最大ピ
ーク時の電力量を賄えるだけの発電設備を建てる必要が
あるので、これを押さえたいという願望があり、この時
期に電気を大量に消費する需要家から相応する料金を徴
収するべく、デマンド契約制度が導入された。
[0008] On the other hand, the electric power industry needs to build a power generation facility capable of covering the maximum amount of power at the peak time, and there is a desire to suppress the power generation. A demand contract system has been introduced to collect the appropriate fees from.

【0009】図1は、ある電力需要家の使用電力の最大
値の月毎の推移を表すグラフである。図1の例では空調
機をあまり稼働させない3月から6月、11月及び12
月の使用電力最大値は300kw以下であるが、空調機を
使用する時間の多い1月、2月及び7月から10月の使
用電力最大値は300kw以上であり、冷房をフル稼動さ
せた8月中に使用電力の最大値として450kwを記録し
ている。図1に示すような場合、基本料金は最大値であ
る450kwを基準として算出される。
FIG. 1 is a graph showing the monthly transition of the maximum value of the power consumption of a certain power consumer. In the example of FIG. 1, from March to June, November and December when the air conditioner is not operated much.
The maximum power consumption per month is 300 kw or less, but the maximum power consumption in January, February, and July to October, when the air conditioner is used for a long time, is 300 kw or more, and the cooling system was fully operated. During the month, 450kW is recorded as the maximum value of power consumption. In the case as shown in FIG. 1, the basic fee is calculated based on the maximum value of 450 kw.

【0010】このデマンド契約制度は、一度使用電力最
大値を記録するとそれに伴い今後一年間の基本料金が更
新されるので、実際に電気を使用している電気需要家か
らは様々な不満が出ている。しかしながら、電気基本料
金を少なくするためには、料金算出の基となる最大需要
電力値(デマンド値)のピークを落とす必要がある。
[0010] In this demand contract system, once the maximum power consumption is recorded, the basic fee for the next one year is renewed accordingly, and various complaints are generated by the electric consumers who actually use the electricity. I have. However, in order to reduce the basic electricity charge, it is necessary to lower the peak of the maximum demand power value (demand value) on which the charge calculation is based.

【0011】このような電気需要家からの要望にこたえ
るべく、夏もしくは冬に記録される最大需要電力値(デ
マンド値)を、その需要家内にある負荷設備(空調機・
工作機械・照明等)の電源を特定の時間に限って切るこ
とによって制御し、これにより電気基本料金の引き下げ
が可能になる装置としてデマンドコントローラーがあ
る。
[0011] In order to respond to such demands from electric consumers, the maximum demand power value (demand value) recorded in summer or winter is calculated based on the load equipment (air conditioner / air conditioner) in the customer.
There is a demand controller as a device that controls by turning off a power supply of a machine tool, lighting, and the like only for a specific time, thereby reducing a basic electricity charge.

【0012】デマンドコントローラには、人が実際にそ
の需要家内における負荷設備の電源を切るように、最大
需要電力値(デマンド値)が出そうなときに、ブザー等
によってその場所で働いている従業員に通知するもの
や、接続された数台の負荷設備に電気信号を送り、強制
的にその負荷設備の電源を切るものがある。
The demand controller includes an employee who works at the location by a buzzer or the like when a maximum demand power value (demand value) is likely to be output so that a person actually turns off the load equipment in the customer. Some of them notify a worker, and others send an electric signal to several connected load facilities and forcibly turn off the load facilities.

【0013】[0013]

【発明が解決しようとする課題】しかしながら、人が実
際にその需要家内における負荷設備の電源を切るタイプ
のデマンドコントローラを使用した場合、その限られた
時間(デマンド値発生時)に人が実際に需要家内を移動
して負荷設備の電源を遮断する必要があるので、必ずし
も意図した通りに制御できないという問題があり、接続
された負荷設備の電源を強制的に切るタイプのデマンド
コントローラには、その瞬間に設備自体が止まってしま
う為、作業に必要な設備を接続できないという問題があ
る。
However, when a person actually uses a type of demand controller that turns off the load equipment in the customer, the person actually uses the demand controller for a limited time (when a demand value is generated). Since it is necessary to move inside the customer and cut off the power supply of the load equipment, there is a problem that the control cannot always be performed as intended.The demand controller of the type that forcibly turns off the power supply of the connected load equipment has a problem. There is a problem that equipment necessary for work cannot be connected because the equipment itself stops instantly.

【0014】これらの問題をどうしても解決出来ないと
いったジレンマから、デマンドコントローラーの導入を
検討の段階で中止したり、実際にデマンドコントローラ
ーを導入したにも関わらず、上記のような問題やその場
所で働いている従業員からの苦情により、結果としてデ
マンドコントローラーを使用しない場合が多数ある。
Due to the dilemma that these problems cannot be solved, the introduction of the demand controller was stopped at the stage of study, or even though the demand controller was actually introduced, In many cases, the complaints from employees who do not use the demand controller as a result.

【0015】現在、夏場・冬場の最大需要電力を生じさ
せ、電気発電設備等を建築する必要性を生じさせる直接
的原因となっているのは、工場やオフィス等のあらゆる
職場に設置された空調機(エアコン)である。
At present, the direct cause of the generation of the maximum power demand in summer and winter and the necessity of constructing electric power generation facilities and the like is the air conditioners installed in all workplaces such as factories and offices. Machine (air conditioner).

【0016】上述のデマンドコントローラーで空調機の
電源を強制的に切る場合、最大需要電力値(デマンドピ
ーク値)がでる時期が、前述のように夏の一番暑い時や
冬の一番寒い時期であるため、仮に導入しても、最も空
調の必要なときに空調機の電源が切れて動かなくなって
しまう為、室内温度の急激な上昇・下降が起こり、作業
環境が悪化し従業員の反感を買う事となり、導入後1年
以上きちんと稼動させているところは皆無に等しい。
When the power supply of the air conditioner is forcibly turned off by the demand controller described above, the maximum demand power value (demand peak value) occurs at the hottest time in summer and the coldest time in winter as described above. Therefore, even if the air conditioner is installed, the air conditioner will be turned off when it is needed most, and it will not work. And there is almost no place that has been operating properly for over a year since its introduction.

【0017】本願発明はこのような課題を解決するべく
なされたものであり、現場で働く人間に不快感を与えず
に複数の空調機を制御して最大需要電力を押えることが
出来る複数の空調機の使用電力制御方法を提供すること
を目的とする。
The present invention has been made to solve such a problem, and a plurality of air conditioners capable of controlling a plurality of air conditioners and suppressing the maximum power demand without causing discomfort to a person working on site. It is an object of the present invention to provide a method of controlling power consumption of a machine.

【0018】また、地球環境への配慮という観点から、
最大需要電力(デマンド値)予測時だけでなく、空調機
のすべての稼働時間、すなわち通常使用状態においても
省エネ・省電力を達成することが出来る複数の空調機の
使用電力制御方法を提供することを目的とする。
From the viewpoint of consideration for the global environment,
To provide a power control method for a plurality of air conditioners capable of achieving energy saving and power saving not only at the time of estimating a maximum demand power (demand value) but also in all operation times of the air conditioners, that is, in a normal use state. With the goal.

【0019】上述の目的は、共通の電力供給線に接続さ
れた複数の空調機を有する電力設備全体の総使用電力量
制御方法であって、電力設備全体の合計使用電力量を測
定し、該測定された総使用電力量から所定の時間内の予
想電力消費量を求め、該予想電力消費量に応じて、各空
調機の圧縮機を停止させるべき停止時間を求め、各空調
機の圧縮機を、周期的に所定の順序で停止時間だけ停止
させることを特徴とする、本発明による電力設備の総使
用電力量制御方法によって解決される。
The object described above is a method for controlling the total power consumption of the entire power equipment having a plurality of air conditioners connected to a common power supply line, and measuring the total power consumption of the entire power equipment. An expected power consumption within a predetermined time is obtained from the measured total power consumption, and a stop time for stopping the compressor of each air conditioner is obtained according to the expected power consumption, and a compressor of each air conditioner is obtained. Are periodically stopped for a stop time in a predetermined order, and the method for controlling the total power consumption of the power equipment according to the present invention is characterized in that:

【0020】従来主として使われていた空調機の制御方
法は、空調機の電源自体をオン・オフして制御する方法
であるが、本願に係る使用電力制御方法ではこの方法を
とらずに、空調機の圧縮機の動作を制御して使用電力を
制御する。
Conventionally, an air conditioner control method mainly used is a method of controlling by turning on / off the power supply of the air conditioner itself. The operation of the compressor of the compressor is controlled to control the power consumption.

【0021】空調機における圧縮機(コンプレッサー)
は、空調機の中心的役割を担っており、冷房の際の冷気
や暖房の際の暖気を作る場所であると同時に、空調機の
総電力使用量の約9割を消費している。
Compressor in air conditioner (compressor)
Plays a central role in the air conditioner, and is a place that creates cool air for cooling and warm air for heating, and also consumes about 90% of the total power consumption of the air conditioner.

【0022】また、空調機の構造は、電源が入ると温度
センサーによって圧縮機(コンプレッサー)の稼動を制
御するようになっており、圧縮機自体は本来機械的に動
作を制御できるように構成されている。
The structure of the air conditioner is such that when the power is turned on, the operation of the compressor (compressor) is controlled by a temperature sensor, and the compressor itself is configured so that the operation itself can be mechanically controlled. ing.

【0023】更に、空調機の中にある圧縮機(コンプレ
ッサー)のみを制御する事により、デマンドピーク時に
おける制御を外部からは解りずらくすることができる。
Further, by controlling only the compressor (compressor) in the air conditioner, the control during the demand peak can be hardly understood from the outside.

【0024】以上のように、圧縮機の動作を制御すると
いう方法は、空調機の寿命的な部分から考えても一番効
率が良く、本来の空調機の運転と同様の状況が作り出
せ、その空調機の設置された職場で働いている人々は、
空調機が強制的に制御されていることを意識することな
く通常通り快適に作業できる。
As described above, the method of controlling the operation of the compressor is the most efficient in view of the life of the air conditioner, and can create the same situation as the original operation of the air conditioner. People working in air-conditioned workplaces,
You can work comfortably as usual without being aware that the air conditioner is being forcibly controlled.

【0025】また、通常運転時においてもデマンド値の
かわりに電力削減率に基づいて空調機を制御することに
より、実際に圧縮機を停止させて、確実に省エネ・省電
力が可能になる。
Further, even during normal operation, by controlling the air conditioner based on the power reduction rate instead of the demand value, the compressor is actually stopped, and energy saving and power saving can be surely achieved.

【0026】圧縮機の停止時間においても空調機からの
送風が行われることが好ましい。このようにすると、室
内機からの送風は止まることが無いので、圧縮機の強制
停止による室温への影響を最小限に食い止められる。
It is preferable that air is blown from the air conditioner even when the compressor is stopped. In this case, the air blowing from the indoor unit does not stop, so that the influence on the room temperature due to the forced stop of the compressor can be minimized.

【0027】各空調機の圧縮機の運転スケジュールを規
定した複数の運転パターンの中から停止時間に基づいて
一つの運転パターンを選択して各圧縮機の動作を制御す
るようにしてもよい。
The operation of each compressor may be controlled by selecting one operation pattern from a plurality of operation patterns defining the operation schedule of the compressor of each air conditioner based on the stop time.

【0028】この場合、複数の空調機が複数のフロア又
は棟内に配置されているとき、各フロア又は棟毎に異な
った運転パターンを使用できるように構成すると、作業
環境に合わせて各階・各棟等に最適な制御ができる。
In this case, when a plurality of air conditioners are arranged in a plurality of floors or buildings, different operation patterns can be used for each floor or building. Optimal control for buildings, etc.

【0029】隣接して設置されていない空調機の圧縮機
を順番に停止させるようにすると、フロア又は棟内にお
ける室温のバラツキをなくすことができる。
By sequentially stopping the compressors of the air conditioners that are not installed adjacent to each other, it is possible to eliminate variations in the room temperature on the floor or in the building.

【0030】各圧縮機を連続して停止させる時間が、3
分から5分の間であるのが好ましい。この3〜5分とい
う強制停止時間は、その前に圧縮機が作り出していた冷
気(暖気)が残っている時間であり、この冷気(暖気)
を有効利用して循環させて室内を冷房(暖房)すること
ができるので、室温の上昇(下降)を最小限で食い止め
る事が出来る。
The time required to stop each compressor continuously is 3
Preferably between 5 and 5 minutes. The forced stop time of 3 to 5 minutes is a time in which the cool air (warm air) created by the compressor remains before the forced air stop time.
The air can be effectively circulated to cool (heat) the room, so that the rise (fall) of the room temperature can be minimized.

【0031】更に、少なくとも一つの空調機を非制御と
することができるように構成されていることが好まし
い。
Furthermore, it is preferable that at least one air conditioner is configured to be uncontrolled.

【0032】[0032]

【発明の実施の形態】以下図面を参照しながら、本願の
複数の空調機の使用電力制御方法の実施の形態を詳細に
説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing an embodiment of a method for controlling power consumption of a plurality of air conditioners according to the present invention.

【0033】本実施の形態においては、通常使用状態に
おける電力削減率を制御する部分と、最大需要電力値と
して設定されたデマンド値を制御する部分とを組み合わ
せたプログラムを使用することによって、各電力需要家
の電力使用状況・削減状況に合わせたカスタムメイドの
制御が出来るようなシステムとした。
In the present embodiment, each power is reduced by using a program in which a part for controlling the power reduction rate in the normal use state and a part for controlling the demand value set as the maximum demand power value are used. The system was designed to allow custom-made control in accordance with the power usage and reduction status of customers.

【0034】空調機はフロアや棟毎にグループ分けさ
れ、それぞれの作業環境に合わせてグループ毎に異なっ
た通常電力削減率を設定できるように構成されている。
The air conditioners are grouped by floor or building, and are configured so that different normal power reduction rates can be set for each group in accordance with the respective working environments.

【0035】以下において、このように各空調機をフロ
アや棟毎のグループに分けて制御し、かつデマンド値
(需要ピーク値)によってそのグループにおける制御率
をプログラムによって変更する事ができるシステムを、
グループサイクリック・デマンドコントロールシステム
と定義する。
In the following, a system capable of controlling each air conditioner by dividing it into groups for each floor or building and changing the control rate in that group by a demand value (peak demand value) by a program is described below.
Defined as a group cyclic demand control system.

【0036】最初に、通常使用状態における電力削減率
(省エネ率)の制御部分の動作を詳述する。
First, the operation of the control part of the power reduction rate (energy saving rate) in the normal use state will be described in detail.

【0037】電力削減率は、30分を基準単位とし、ユ
ーザによる平常時制御パーセント入力に応じて、 0%…省エネなし(従来どおり制御なしの稼動) 10%…省エネ率10%(1空調機あたり30分中3分
停止) 20%…省エネ率20%(1空調機あたり15分中3分
・30分中6分停止) 30%…省エネ率30%(1空調機あたり10分中3分
・30分中9分停止) 40%…省エネ率40%(1空調機あたり10分中4分
・30分中12分停止) 50%…省エネ率50%(1空調機あたり10分中5分
・30分中15分停止) の5つの制御パターンから各グループ毎に選択され、ユ
ーザは目的・用途に応じて設定の変更を容易に行える。
The power reduction rate is set to 30 minutes as a reference unit, and 0%: no energy saving (operation without control as before) 10%: energy saving rate 10% (1 air conditioner) 20% ... energy saving rate 20% (3 minutes out of 15 minutes per air conditioner, 6 minutes out of 30 minutes) 30% ... Energy saving rate 30% (3 out of 10 minutes per air conditioner)・ 9 minutes out of 30 minutes) 40%… 40% energy saving rate (4 minutes out of 10 minutes per air conditioner, 12 minutes out of 30 minutes) 50%… 50% energy saving rate (5 out of 10 minutes per air conditioner) (15 minutes out of 30 minutes) is selected for each group from the five control patterns, and the user can easily change the settings according to the purpose and application.

【0038】具体的には、図3のフローチャートに示さ
れているように、最初にユーザが平常時制御パーセント
を入力し(S301)、入力された値が0%設定である
か否かを確認し(S302)、入力された設定が0%設
定である場合には空調機は従来通り非制御にて運転する
(S308)。
More specifically, as shown in the flowchart of FIG. 3, first, the user inputs a normal control percentage (S301), and confirms whether or not the input value is a 0% setting. If the input setting is the 0% setting (S302), the air conditioner is operated without control as before (S308).

【0039】入力された設定が0%設定でない場合には
10%制御であるか否かを確認し(S303)、入力さ
れた設定が10%制御である場合には各空調機の圧縮機
は30分間中3分間強制的に停止されるようにグループ
毎にサイクリック制御される(S309)。
If the input setting is not the 0% setting, it is checked whether or not the control is 10% (S303). If the input setting is the 10% control, the compressor of each air conditioner is turned off. Cyclic control is performed for each group so as to be forcibly stopped for 3 minutes out of 30 minutes (S309).

【0040】入力された設定が10%設定でない場合に
は20%制御であるか否かを確認し(S304)、入力
された設定が20%制御である場合には各空調機の圧縮
機は15分間中3分間強制的に停止されるようにグルー
プ毎にサイクリック制御される(S310)。
If the input setting is not the 10% setting, it is checked whether or not the input is 20% control (S304). If the input setting is the 20% control, the compressor of each air conditioner is turned off. Cyclic control is performed for each group so as to be forcibly stopped for 3 minutes out of 15 minutes (S310).

【0041】入力された設定が20%設定でない場合に
は30%制御であるか否かを確認し(S305)、入力
された設定が30%制御である場合には各空調機の圧縮
機は10分間中3分間強制的に停止されるようにグルー
プ毎にサイクリック制御される(S311)。
If the input setting is not the 20% setting, it is confirmed whether or not the control is 30% control (S305). If the input setting is the 30% control, the compressor of each air conditioner is turned off. Cyclic control is performed for each group so as to be forcibly stopped for 3 minutes out of 10 minutes (S311).

【0042】入力された設定が30%設定でない場合に
は40%制御であるか否かを確認し(S306)、入力
された設定が40%制御である場合には各空調機の圧縮
機は10分間中4分間強制的に停止されるようにグルー
プ毎にサイクリック制御される(S312)。
If the input setting is not the 30% setting, it is checked whether or not the control is 40% control (S306). If the input setting is the 40% control, the compressor of each air conditioner is turned off. Cyclic control is performed for each group so as to be forcibly stopped for 4 minutes out of 10 minutes (S312).

【0043】入力された設定が40%制御でない場合に
は50%制御であるか否かを確認し(S307)、入力
された設定が50%制御である場合には各空調機の圧縮
機は10分間中5分間強制的に停止されるようにグルー
プ毎にサイクリック制御される(S313)。
If the input setting is not 40% control, it is checked whether or not it is 50% control (S307). If the input setting is 50% control, the compressor of each air conditioner is Cyclic control is performed for each group so as to be forcibly stopped for 5 minutes out of 10 minutes (S313).

【0044】平常時制御パーセントは0%から50%ま
での10%刻みの6段階のいずれかを選択するように構
成されているので、入力された設定が0%から50%の
いずれでもない場合についてはフローチャートを示して
いないが、このような場合にはエラーとして再度ユーザ
に入力を促すようにすること等が考えられる。
Since the normal control percentage is configured to select any one of six steps of 10% from 0% to 50%, the input setting is not any of 0% to 50%. Is not shown in the flowchart, but in such a case, it may be considered to prompt the user to input again as an error.

【0045】図5から図9はそれぞれ、空調機10台か
らなるグループを、上記10%から50%の電力削減率
(省エネ率)にて制御する際の各空調機の圧縮機の動作
パターンを示す図である。各図において、黒い太線で示
された部分(及び白地にドットで示された部分)は、空
調機の圧縮機を停止させる時間を示している。以下、各
図を参照してそれぞれの動作パターンを詳述する。
FIGS. 5 to 9 show the operation patterns of the compressors of each air conditioner when the group consisting of 10 air conditioners is controlled at the power reduction rate (energy saving rate) of 10% to 50%. FIG. In each figure, a portion indicated by a thick black line (and a portion indicated by a dot on a white background) indicates a time during which the compressor of the air conditioner is stopped. Hereinafter, each operation pattern will be described in detail with reference to the drawings.

【0046】図5に示された10%制御による30分間
の動作パターンを詳述する。空調機1の圧縮機は0〜3
分までの最初の3分間を停止時間とし他の27分間は運
転するように制御され、空調機2の圧縮機は3〜6分ま
での3分間を停止時間とし他の27分間は運転するよう
に制御され、空調機3の圧縮機は6〜9分までの3分間
を停止時間とし他の27分間は運転するように制御さ
れ、空調機4の圧縮機は9〜12分までの3分間を停止
時間とし他の27分間は運転するように制御され、以下
同様にして3分経過する毎に停止させていた空調機を運
転させると共に次の番号の空調機を停止させるパターン
を繰り返して、空調機10は最後の3分間(27〜30
分まで)を停止時間とし他の27分間は運転するように
制御される。
The operation pattern for 30 minutes by the 10% control shown in FIG. 5 will be described in detail. The compressor of the air conditioner 1 is 0-3
The first three minutes until the stop time is controlled to be the stop time for the other three minutes, and the compressor of the air conditioner 2 is controlled to be the stop time for three to six minutes and the other 27 minutes. , And the compressor of the air conditioner 3 is controlled to be stopped for 3 minutes from 6 to 9 minutes and to be operated for another 27 minutes, and the compressor of the air conditioner 4 is controlled for 3 minutes from 9 to 12 minutes. Is set to the stop time, and is controlled so as to operate for the other 27 minutes, and thereafter, in the same manner, a pattern in which the stopped air conditioner is operated every three minutes and the next air conditioner is stopped is repeated. The air conditioner 10 is operated for the last three minutes (27 to 30).
) Is controlled to be a stop time and run for another 27 minutes.

【0047】次の30分間も同じ順序で1台ずつ空調機
を3分間づつ停止させる。このようにすると、各時刻に
おいては1台の空調機の圧縮機が停止させられているこ
ととなり、空調機10台の合計使用電力を10%削減す
ることができる。
In the next 30 minutes, the air conditioners are stopped one by one in the same order for three minutes. In this case, the compressor of one air conditioner is stopped at each time, and the total power consumption of the ten air conditioners can be reduced by 10%.

【0048】図6に示された20%制御による30分間
の動作パターンを詳述する。空調機1の圧縮機は0〜3
分までの最初の3分間と15〜18分までの3分間との
合計6分間を停止時間とし他の24分間は運転するよう
に制御され、空調機2の圧縮機は1.5〜4.5分まで
の3分間と16.5〜19.5分までの3分間との合計
6分間を停止時間とし他の24分間は運転するように制
御され、空調機3の圧縮機は3〜6分までの3分間と1
8〜21分までの3分間との合計6分間を停止時間とし
他の24分間は運転するように制御され、空調機4の圧
縮機は4.5〜7.5分までの3分間と19.5〜2
2.5分までの3分間との合計6分間を停止時間とし他
の24分間は運転するように制御され、以下同様にして
空調機10は13.5〜16.5分までの3分間と2
8.5〜30分までの1.5分と引き続く次の30分間
の0〜1.5分までの1.5分間(図中白地にドットで
示された部分)との合計6分間を停止時間とし他の24
分間は運転するように制御される。
The operation pattern for 30 minutes by the 20% control shown in FIG. 6 will be described in detail. The compressor of the air conditioner 1 is 0-3
The stop time is a total of 6 minutes, the first 3 minutes up to 15 minutes and the 3 minutes from 15 to 18 minutes, and the operation is controlled to operate for the other 24 minutes, and the compressor of the air conditioner 2 is 1.5 to 4. The stop time is set to a total of 6 minutes of 3 minutes up to 5 minutes and 3 minutes from 16.5 to 19.5 minutes, and the operation is controlled so as to be operated for another 24 minutes. 3 minutes up to 1 minute and 1
The air conditioner 4 is controlled so that the stop time is a total of 6 minutes including 3 minutes from 8 to 21 minutes, and the other 24 minutes, and the compressor of the air conditioner 4 is 3 minutes from 4.5 to 7.5 minutes and 19 minutes. 0.5-2
The air conditioner 10 is controlled to operate for the remaining 24 minutes with the stop time being a total of 6 minutes including 3 minutes up to 2.5 minutes. 2
Stop for 1.5 minutes from 8.5 to 30 minutes and 1.5 minutes to 0 to 1.5 minutes of the next 30 minutes (the portion indicated by a dot on the white background in the figure) for a total of 6 minutes Time and the other 24
It is controlled to run for minutes.

【0049】次の30分間も同様なパターンで各空調機
を30分間の内6分間づつ停止させる。このようにする
と、各時刻においては2台の空調機の圧縮機が停止させ
られていることとなり、空調機10台の合計使用電力を
20%削減することができる。
For the next 30 minutes, each air conditioner is stopped for 6 minutes out of 30 minutes in the same pattern. In this way, the compressors of the two air conditioners are stopped at each time, and the total power consumption of the ten air conditioners can be reduced by 20%.

【0050】図7に示された30%制御による30分間
の動作パターンを詳述する。空調機1の圧縮機は0〜3
分までの最初の3分間と10〜13分までの3分間と2
0〜23分までの3分間との合計9分間を停止時間とし
他の21分間は運転するように制御され、空調機2の圧
縮機は1〜4分までの3分間と11〜14分までの3分
間と21〜24分間での3分間との合計9分間を停止時
間とし他の21分間は運転するように制御され、空調機
3の圧縮機は2〜5分までの3分間と12〜15分まで
の3分間と22〜25分までの3分間との合計9分間を
停止時間とし他の21分間は運転するように制御され、
空調機4の圧縮機は3〜6分までの3分間と13〜16
分までの3分間と23〜26分までの3分間との合計9
分間を停止時間とし他の21分間は運転するように制御
され、以下同様にして空調機10は9〜12分までの3
分間と19〜22分までの3分間と29〜30分までの
1分間と引き続く次の30分間の0〜2分までの2分間
(図中白地にドットで示された部分)との合計9分間を
停止時間とし他の21分間は運転するように制御され
る。
The operation pattern for 30 minutes under the 30% control shown in FIG. 7 will be described in detail. The compressor of the air conditioner 1 is 0-3
First 3 minutes to 10 minutes, 3 minutes to 10-13 minutes and 2
A total of 9 minutes, 3 minutes from 0 to 23 minutes, is controlled to be stopped for a total of 9 minutes, and the other 21 minutes are operated. The compressor of the air conditioner 2 is 3 minutes from 1 to 4 minutes and from 11 to 14 minutes. The air conditioner 3 is controlled to operate for a total of 9 minutes of 3 minutes and 3 to 21 to 24 minutes, and is operated for another 21 minutes. The stop time is a total of 9 minutes of 3 minutes to 15 minutes and 3 minutes to 22 to 25 minutes, and the other 21 minutes are controlled to operate,
The compressor of the air conditioner 4 is 3 minutes up to 3 to 6 minutes and 13 to 16 minutes.
3 minutes up to 3 minutes and 3 minutes up to 23-26 minutes, total 9
The air conditioner 10 is controlled to operate for the remaining 21 minutes, and the air conditioner 10 operates in the same manner for 9 to 12 minutes.
A total of 9 minutes, 3 minutes from 19 to 22 minutes, 1 minute from 29 to 30 minutes, and 2 minutes from 0 to 2 minutes of the next 30 minutes (a portion indicated by a dot on a white background in the figure). The control is performed such that the minute is a stop time and the other 21 minutes are operated.

【0051】次の30分間も同様なパターンで各空調機
を30分間の内9分間づつ停止させる。このようにする
と、各時刻においては3台の空調機の圧縮機が停止させ
られていることとなり、空調機10台の合計使用電力を
30%削減することができる。
For the next 30 minutes, each air conditioner is stopped for 9 minutes out of 30 minutes in the same pattern. In this way, the compressors of the three air conditioners are stopped at each time, and the total power consumption of the ten air conditioners can be reduced by 30%.

【0052】図8に示された40%制御による30分間
の動作パターンを詳述する。空調機1の圧縮機は0〜4
分までの最初の4分間と10〜14分までの4分間と2
0〜24分までの4分間との合計12分間を停止時間と
し他の18分間は運転するように制御され、空調機2の
圧縮機は1〜5分までの4分間と11〜15分までの4
分間と21〜25分間での4分間との合計12分間を停
止時間とし他の18分間は運転するように制御され、空
調機3の圧縮機は2〜6分までの4分間と12〜16分
までの4分間と22〜26分までの4分間との合計12
分間を停止時間とし他の18分間は運転するように制御
され、空調機4の圧縮機は3〜7分までの4分間と13
〜17分までの4分間と23〜27分までの4分間との
合計12分間を停止時間とし他の18分間は運転するよ
うに制御され、以下同様にして空調機10は9〜13分
までの4分間と19〜23分までの4分間と29〜30
分までの1分間と引き続く次の30分間の0〜3分まで
の3分間(図中白地にドットで示された部分)との合計
12分間を停止時間とし他の18分間は運転するように
制御される。
The operation pattern for 30 minutes under the 40% control shown in FIG. 8 will be described in detail. The compressor of the air conditioner 1 is 0-4
First 4 minutes up to 10 minutes, 4 minutes up to 10-14 minutes and 2
A total of 12 minutes, 4 minutes from 0 to 24 minutes, is controlled as a stop time, and the other 18 minutes are controlled to operate. The compressor of the air conditioner 2 is 4 minutes from 1 to 5 minutes and from 11 to 15 minutes. Of 4
And the compressor of the air conditioner 3 is controlled to operate for the remaining 18 minutes, ie, 4 minutes from 2 to 6 minutes and 12 to 16 minutes. 4 minutes up to 2 minutes and 4 minutes up to 22-26 minutes, total 12
And the compressor of the air conditioner 4 is operated for 4 minutes from 3 to 7 minutes and 13 minutes.
The air conditioner 10 is controlled so as to operate for a total of 12 minutes, that is, 4 minutes up to 17 minutes and 4 minutes up to 23 to 27 minutes, and to operate for another 18 minutes. 4 minutes and 4 to 19 to 23 minutes and 29 to 30
Stop for a total of 12 minutes of 1 minute to the next minute and 3 minutes to 0 to 3 minutes of the next 30 minutes (the part indicated by a dot on the white background in the figure), and drive for the other 18 minutes. Controlled.

【0053】次の30分間も同様なパターンで各空調機
を30分間の内12分間づつ停止させる。このようにす
ると、各時刻においては4台の空調機の圧縮機が停止さ
せられていることとなり、空調機10台の合計使用電力
を40%削減することができる。
In the next 30 minutes, each air conditioner is stopped for 12 minutes out of 30 minutes in the same pattern. In this way, the compressors of the four air conditioners are stopped at each time, and the total power consumption of the ten air conditioners can be reduced by 40%.

【0054】図9に示された50%制御による30分間
の動作パターンを詳述する。空調機1の圧縮機は0〜5
分までの最初の5分間と10〜15分までの5分間と2
0〜25分までの5分間との合計15分間を停止時間と
し他の15分間は運転するように制御され、空調機2の
圧縮機は1〜6分までの5分間と11〜16分までの5
分間と21〜26分間での5分間との合計15分間を停
止時間とし他の15分間は運転するように制御され、空
調機3の圧縮機は2〜7分までの5分間と12〜17分
までの5分間と22〜27分までの5分間との合計15
分間を停止時間とし他の15分間は運転するように制御
され、空調機4の圧縮機は3〜8分までの5分間と13
〜18分までの5分間と23〜28分までの5分間との
合計15分間を停止時間とし他の15分間は運転するよ
うに制御され、以下同様にして空調機10は9〜14分
までの5分間と19〜24分までの5分間と29〜30
分までの1分間と引き続く次の30分間の0〜4分まで
の4分間(図中白地にドットで示された部分)との合計
15分間を停止時間とし他の15分間は運転するように
制御される。
The operation pattern for 30 minutes under the 50% control shown in FIG. 9 will be described in detail. The compressor of the air conditioner 1 is 0 to 5
First 5 minutes up to 10 minutes, 5 minutes up to 10-15 minutes and 2
A total of 15 minutes of 0 to 25 minutes and a total of 15 minutes are controlled as a stop time, and the other 15 minutes are controlled to operate. The compressor of the air conditioner 2 is operated for 5 minutes to 1 to 6 minutes and for 11 to 16 minutes. Of 5
The air conditioner 3 is controlled so as to operate for 15 minutes, a total of 15 minutes including 21 minutes to 21 minutes, and to operate for another 15 minutes. 15 minutes for 5 minutes to 22 minutes and 5 minutes to 22-27 minutes
And the compressor of the air conditioner 4 is operated for 5 minutes from 3 to 8 minutes and 13 minutes.
The air conditioner 10 is controlled to operate for 15 minutes, a total of 15 minutes of 5 minutes to 18 minutes and 5 minutes to 23 to 28 minutes, for the other 15 minutes. 5 minutes and 5 to 19 to 24 minutes and 29 to 30
Stop for a total of 15 minutes of 1 minute to the next minute and 4 minutes to the next 30 minutes of the next 30 minutes (the portion indicated by a dot on a white background in the figure), and drive for another 15 minutes. Controlled.

【0055】次の30分間も同様なパターンで各空調機
を30分間の内15分間づつ停止させる。このようにす
ると、各時刻においては5台の空調機の圧縮機が停止さ
せられていることとなり、空調機10台の合計使用電力
を50%削減することができる。
For the next 30 minutes, each air conditioner is stopped for 15 minutes out of 30 minutes in the same pattern. In this way, the compressors of the five air conditioners are stopped at each time, and the total power consumption of the ten air conditioners can be reduced by 50%.

【0056】以上、図5から図9を参照して10%から
50%の電力削減率(省エネ率)にて制御する際の各空
調機の圧縮機の動作パターンを、各グループが10台の
空調機からなる場合を例として示したが、各グループの
空調機の台数は10台に限られるものではなく、各グル
ープに含まれる空調機の台数及び設定された電力削減率
に応じて、動作パターンを適宜変更して電力削減率を達
成するように各空調機の圧縮機を制御する。
As described above, with reference to FIGS. 5 to 9, the operation pattern of the compressor of each air conditioner at the time of controlling at a power reduction rate (energy saving rate) of 10% to 50% is shown in FIG. Although the case of air conditioners is shown as an example, the number of air conditioners in each group is not limited to 10, and the operation according to the number of air conditioners included in each group and the set power reduction rate is performed. The compressor of each air conditioner is controlled so as to achieve a power reduction rate by appropriately changing the pattern.

【0057】いずれの動作パターンにおいても、圧縮機
の停止時間にも空調機からの送風は行われる。このよう
にすると、室内機からの送風は止まることが無いので、
圧縮機の強制停止による室温への影響を最小限に食い止
められる。
In any of the operation patterns, air is blown from the air conditioner even when the compressor is stopped. In this way, the air from the indoor unit does not stop,
The impact on the room temperature due to the forced shutdown of the compressor can be minimized.

【0058】また、各圧縮機を連続して停止させる時間
は、3分から5分の間となっているが、これは3分から
5分程度の時間であると、その前に圧縮機が作り出して
いた冷気(暖気)が残っているので、この冷気(暖気)
を有効利用して循環させて室内を冷房(暖房)すること
ができるので、室温の上昇(下降)を最小限で食い止め
る事が出来るからである。
The time during which each compressor is continuously stopped is between 3 minutes and 5 minutes. If the time is between 3 minutes and 5 minutes, the compressor has been producing before that time. Because the cold air (warm air) remains, this cold air (warm air)
It is possible to effectively use and circulate to cool (heat) the room, thereby minimizing the rise (fall) of room temperature.

【0059】また、グループ分けされた空調機の中の1
台もしくは数台をどうしても制御したくないといった状
況が生じた場合、この空調機はグループよりはずして個
別的に非制御とすることができる。
Also, one of the grouped air conditioners is
If a situation arises in which it is not desired to control one or several units, this air conditioner can be removed from the group and individually uncontrolled.

【0060】次に、本実施の形態におけるデマンド値制
御部分の動作を図2のフローチャートを参照して詳述す
る。
Next, the operation of the demand value control section in the present embodiment will be described in detail with reference to the flowchart of FIG.

【0061】まず、電力会社の設置している実量制(デ
マンド)メーターに接続して使用電力を測定するべくパ
ルスの取り込みを開始し(S201)、従来から用いら
れているデマンドコントロールシステム内のデマンド値
予測部分と同様に、デマンドコントロールシステム部分
にて電力会社設置のメーターと同様の時限・方法により
デマンド数値の計測を開始する。
First, connection with an actual meter (demand) meter installed by a power company is started to capture pulses to measure power consumption (S201). As in the demand value prediction section, the demand control system section starts measuring the demand value by the same time limit and method as the meter installed by the power company.

【0062】30分という時限内において、サンプリン
グ時間を1秒程度として、その時限終了時における電力
量推移(予測電力)を算出し(S202)、その予測電
力と設定電力(デマンド上限設定電力)とを比較して予
測電力が設定電力を超過しているか否かを確認し(S2
03)、超過していればその超過度合に応じて第1〜5
段階の制御を行う(S210〜S214)、もしくは制
御不能の信号を発信し(S215)、制御を促す。予測
電力が設定電力以内である場合には再度予測電力を算出
するステップS202にループする。
Within the time period of 30 minutes, the sampling time is set to about 1 second, and the transition of the power amount (predicted power) at the end of the time period is calculated (S202), and the predicted power and the set power (demand upper limit set power) are calculated. To determine whether the predicted power exceeds the set power (S2).
03), if exceeded, first to fifth according to the degree of excess
Step control is performed (S210 to S214), or a signal indicating that control is impossible is transmitted (S215), and control is prompted. If the predicted power is within the set power, the process loops to step S202 for calculating the predicted power again.

【0063】予測電力が設定電力を超過している場合の
具体的な処理は、以下の通りである。現在の電力削減率
を10%(1段階)上昇させれば予測電力が設定電力以
内となるか否かを確認し(S204)、電力削減率を1
段階上昇させれば設定電力以内となる場合には電力削減
率を1段階上昇させる+1段制御信号を発信する(S2
10)。
The specific processing when the predicted power exceeds the set power is as follows. If the current power reduction rate is increased by 10% (one step), it is confirmed whether or not the predicted power is within the set power (S204), and the power reduction rate is set to 1
If the power is within the set power by increasing the level, a + 1-stage control signal for increasing the power reduction rate by one level is transmitted (S2).
10).

【0064】電力削減率を1段階上昇させても設定電力
以内とならない場合には現在の電力削減率を20%(2
段階)上昇させれば予測電力が設定電力以内となるか否
かを確認し(S205)、電力削減率を2段階上昇させ
れば設定電力以内となる場合には電力削減率を2段階上
昇させる+2段制御信号を発信する(S211)。
If the power reduction rate does not fall within the set power level even if the power reduction rate is increased by one level, the current power reduction rate is set to 20% (2
(Step) It is confirmed whether the predicted power is within the set power if the power is increased (S205), and if the power reduction rate is within the set power if the power reduction rate is increased by two steps, the power reduction rate is increased by two steps. A +2 stage control signal is transmitted (S211).

【0065】電力削減率を2段階上昇させても設定電力
以内とならない場合には現在の電力削減率を30%(3
段階)上昇させれば予測電力が設定電力以内となるか否
かを確認し(S206)、電力削減率を3段階上昇させ
れば設定電力以内となる場合には電力削減率を3段階上
昇させる+3段制御信号を発信する(S212)。
If the power reduction rate does not fall within the set power even if the power reduction rate is increased by two steps, the current power reduction rate is increased by 30% (3
(Step) It is confirmed whether the predicted power is within the set power by increasing the power (S206), and if the power reduction rate is increased by three steps, the power reduction rate is increased by three steps if the power reduction is within the set power. A +3 stage control signal is transmitted (S212).

【0066】電力削減率を3段階上昇させても設定電力
以内とならない場合には現在の電力削減率を40%(4
段階)上昇させれば予測電力が設定電力以内となるか否
かを確認し(S207)、電力削減率を4段階上昇させ
れば設定電力以内となる場合には電力削減率を4段階上
昇させる+4段制御信号を発信する(S213)。
When the power reduction rate does not fall within the set power even if the power reduction rate is increased by three steps, the current power reduction rate is increased by 40% (4
(Step) It is checked whether the predicted power is within the set power by increasing the power (S207), and if the power reduction rate is increased by four steps, the power reduction rate is increased by four steps if the power reduction is within the set power. A +4 stage control signal is transmitted (S213).

【0067】電力削減率を4段階上昇させても設定電力
以内とならない場合には現在の電力削減率を50%(5
段階)上昇させれば予測電力が設定電力以内となるか否
かを確認し(S208)、電力削減率を5段階上昇させ
れば設定電力以内となる場合には電力削減率を5段階上
昇させる+5段制御信号を発信する(S214)。
If the power reduction rate does not fall within the set power even if the power reduction rate is increased by four steps, the current power reduction rate is increased by 50% (5
(Step) It is checked whether the predicted power is within the set power if the power is increased (S208), and if the power reduction rate is increased within five steps, the power reduction rate is increased by five steps if the power reduction rate is within the set power. A +5 stage control signal is transmitted (S214).

【0068】電力削減率を5段階上昇させても設定電力
以内とならない場合には制御不能であると判断し(S2
09)、全空調機の圧縮機を同時に所定時間停止させる
全停止信号を発信して(S215)ユーザに制御を促
す。
If the power reduction rate does not fall within the set power level even if the power reduction rate is increased by five steps, it is determined that control is impossible (S2).
09), a full stop signal for simultaneously stopping the compressors of all air conditioners for a predetermined time is transmitted (S215), and the user is prompted for control.

【0069】以下、上述の通常使用状態における電力削
減率の制御部分とデマンド値制御部分とを有するグルー
プサイクリック・デマンドコントロールシステム全体の
動作を図4a及び図4bのフローチャートを参照しなが
ら詳述する。
Hereinafter, the operation of the entire group cyclic demand control system having the power reduction rate control part and the demand value control part in the above-mentioned normal use state will be described in detail with reference to the flowcharts of FIGS. 4A and 4B. .

【0070】図において、S401からS415は、主
として図2に示したフローチャートに対応しており、デ
マンド値に応じて制御する部分である。
In the figure, steps S401 to S415 mainly correspond to the flowchart shown in FIG. 2, and are sections that control according to the demand value.

【0071】具体的には、電力会社の設置している実量
制(デマンド)メーターに接続して使用電力を測定する
べくパルスの取り込みを開始し(S401)、30分と
いう時間内における予測電力を算出し(S402)、予
測電力と設定電力とを比較して予測電力が設定電力を超
過しているか否かを確認する(S403)。
More specifically, connection with an actual meter (demand) meter installed by a power company is started to capture pulses in order to measure power consumption (S401), and the predicted power within 30 minutes is measured. Is calculated (S402), and it is confirmed whether the predicted power exceeds the set power by comparing the predicted power with the set power (S403).

【0072】超過電力量が設定電力の10%(1段階)
以内であるか否かを確認し(S404)、超過電力量が
設定電力の10%以内である場合には電力削減率を10
%上昇させる+10%制御信号を発信する(S41
0)。
Excess power is 10% of the set power (one step)
(S404), and when the excess power amount is within 10% of the set power, the power reduction rate is set to 10 or less.
% Control signal is transmitted (S41).
0).

【0073】超過電力量が設定電力の10%を超える場
合には超過電力量が設定電力の20%(2段階)以内で
あるか否かを確認し(S405)、超過電力量が設定電
力の20%以内である場合には電力削減率を20%上昇
させる+20%制御信号を発信する(S411)。
If the excess power exceeds 10% of the set power, it is checked whether the excess power is within 20% (two steps) of the set power (S405), and the excess power is determined to be less than the set power. If it is within 20%, a + 20% control signal for raising the power reduction rate by 20% is transmitted (S411).

【0074】超過電力量が設定電力の20%を超える場
合には超過電力量が設定電力の30%(3段階)以内で
あるか否かを確認し(S406)、超過電力量が設定電
力の30%以内である場合には電力削減率を30%上昇
させる+30%制御信号を発信する(S412)。
If the excess power exceeds 20% of the set power, it is checked whether the excess power is within 30% (three steps) of the set power (S406), and the excess power is calculated based on the set power. If it is within 30%, a + 30% control signal for raising the power reduction rate by 30% is transmitted (S412).

【0075】超過電力量が設定電力の30%を超える場
合には超過電力量が設定電力の40%(4段階)以内で
あるか否かを確認し(S407)、超過電力量が設定電
力の40%以内である場合には電力削減率を40%上昇
させる+40%制御信号を発信する(S413)。
If the excess power exceeds 30% of the set power, it is checked whether the excess power is within 40% (four steps) of the set power (S407), and the excess power is determined to be less than the set power. If it is within 40%, a + 40% control signal for increasing the power reduction rate by 40% is transmitted (S413).

【0076】超過電力量が設定電力の40%を超える場
合には超過電力量が設定電力の50%(5段階)以内で
あるか否かを確認し(S408)、超過電力量が設定電
力の50%以内である場合には電力削減率を50%上昇
させる+50%制御信号を発信する(S414)。
If the excess power exceeds 40% of the set power, it is checked whether the excess power is within 50% (5 steps) of the set power (S408), and the excess power is compared with the set power. If it is within 50%, a + 50% control signal for raising the power reduction rate by 50% is transmitted (S414).

【0077】超過電力量が設定電力の50%を超える場
合には(S409)、電力削減率を60%上昇させる+
60%制御信号を発信する(S415)。ステップS4
03において予測電力が設定電力を超えていない場合に
は、0%制御信号を発信する。
If the excess power exceeds 50% of the set power (S409), the power reduction rate is increased by 60% +
A 60% control signal is transmitted (S415). Step S4
If the predicted power does not exceed the set power in 03, a 0% control signal is transmitted.

【0078】図において、S417からS431は、主
として図3に示したフローチャートに対応しており、設
定された通常の電力削減率に応じて制御する部分であ
る。
In the figure, steps S417 to S431 mainly correspond to the flowchart shown in FIG. 3, and are sections for controlling according to the set normal power reduction rate.

【0079】具体的には、ユーザによる平常時制御パー
セントの入力(S417)があると、該入力に応じて入
力された値を平常時制御率として記憶する(S41
8)。
More specifically, when the normal control percentage is input by the user (S417), the value input according to the input is stored as the normal control rate (S41).
8).

【0080】記憶された平常時制御率を読み出し(S4
19)、読み出した平常時制御率が0%であるか否かを
確認し(S420)、平常時制御率が0%である場合に
は通常0%制御(非制御)信号を発信する(S42
6)。
The stored normal control rate is read out (S4).
19) It is checked whether the read normal control rate is 0% (S420). If the normal control rate is 0%, a normal 0% control (non-control) signal is transmitted (S42).
6).

【0081】読み出した平常時制御率が0%でない場合
には10%であるか否かを確認し(S421)、平常時
制御率が10%である場合には通常10%制御信号を発
信する(S427)。
If the read normal control rate is not 0%, it is checked whether it is 10% (S421). If the normal control rate is 10%, a normal 10% control signal is transmitted. (S427).

【0082】読み出した平常時制御率が10%でない場
合には20%であるか否かを確認し(S422)、平常
時制御率が20%である場合には通常20%制御信号を
発信する(S428)。
If the read normal control rate is not 10%, it is checked whether it is 20% (S422). If the read normal control rate is 20%, a normal 20% control signal is transmitted. (S428).

【0083】読み出した平常時制御率が20%でない場
合には30%であるか否かを確認し(S423)、平常
時制御率が30%である場合には通常30%制御信号を
発信する(S429)。
If the read normal control rate is not 20%, it is checked whether it is 30% (S423). If the normal control rate is 30%, a normal 30% control signal is transmitted. (S429).

【0084】読み出した平常時制御率が30%でない場
合には40%であるか否かを確認し(S424)、平常
時制御率が40%である場合には通常40%制御信号を
発信する(S430)。
If the read normal control rate is not 30%, it is checked whether it is 40% (S424), and if the normal control rate is 40%, a normal 40% control signal is transmitted. (S430).

【0085】読み出した平常時制御率が40%でない場
合には50%であるか否かを確認し(S425)、平常
時制御率が50%である場合には通常50%制御信号を
発信する(S431)。
If the read normal control rate is not 40%, it is checked whether it is 50% (S425). If the read normal control rate is 50%, a normal 50% control signal is transmitted. (S431).

【0086】以上の処理が終了すると、上記ステップS
410からS416において発信された制御信号を読み
込んでデマンド値制御率を取り込み(S432)、上記
ステップS426からS431で発信された通常制御信
号を読み込んで通常制御率を取り込み(S433)、両
者を合計した制御率が0から50の10%刻みのいずれ
かに該当するか否かを確認し(S434〜S439)、
空調機の制御%を強制的に変更させ各空調機の圧縮機を
制御する(S441〜S446)。
When the above processing is completed, step S
The control signal transmitted from 410 to S416 is read to take in the demand value control rate (S432), and the normal control signal transmitted from S426 to S431 is read to take in the normal control rate (S433). It is checked whether the control rate corresponds to any of the 10% steps from 0 to 50 (S434 to S439),
The control% of the air conditioner is forcibly changed to control the compressor of each air conditioner (S441 to S446).

【0087】具体的には、合計した制御率が0%である
か否かを確認し(S434)合計した制御率が0%であ
る場合には各空調機は通常運転させる(S441)。
Specifically, it is confirmed whether or not the total control rate is 0% (S434). If the total control rate is 0%, each air conditioner is operated normally (S441).

【0088】合計した制御率が0%でない場合には10
%であるか否かを確認し(S435)合計した制御率が
10%である場合には各空調機の圧縮機を10%制御に
て運転させる(S442)。
If the total control rate is not 0%, 10
% (S435), and when the total control rate is 10%, the compressor of each air conditioner is operated by 10% control (S442).

【0089】合計した制御率が10%でない場合には2
0%であるか否かを確認し(S436)合計した制御率
が20%である場合には各空調機の圧縮機を20%制御
にて運転させる(S443)。
If the total control rate is not 10%, 2
It is confirmed whether or not it is 0% (S436), and when the total control rate is 20%, the compressor of each air conditioner is operated by 20% control (S443).

【0090】合計した制御率が20%でない場合には3
0%であるか否かを確認し(S437)合計した制御率
が30%である場合には各空調機の圧縮機を30%制御
にて運転させる(S444)。
If the total control rate is not 20%, 3
It is checked whether it is 0% or not (S437), and when the total control rate is 30%, the compressor of each air conditioner is operated by 30% control (S444).

【0091】合計した制御率が30%でない場合には4
0%であるか否かを確認し(S438)合計した制御率
が40%である場合には各空調機の圧縮機を40%制御
にて運転させる(S445)。
If the total control rate is not 30%, 4
It is checked whether it is 0% or not (S438), and when the total control rate is 40%, the compressor of each air conditioner is operated by 40% control (S445).

【0092】合計した制御率が40%でない場合には5
0%であるか否かを確認し(S439)合計した制御率
が50%である場合には各空調機の圧縮機を50%制御
にて運転させる(S446)。
If the total control rate is not 40%, 5
It is confirmed whether or not it is 0% (S439), and if the total control rate is 50%, the compressor of each air conditioner is operated by 50% control (S446).

【0093】合計した制御率が50%を超えた場合(S
440)には、制御不能の信号を発信し5分間全空調機
の圧縮機を停止させる(S447)。
When the total control rate exceeds 50% (S
In step 440), an uncontrollable signal is transmitted, and the compressors of all air conditioners are stopped for 5 minutes (S447).

【0094】このようにして通常制御率とデマンド値超
過部分に対応する制御率とを合計した制御率に従って各
空調機の圧縮機は0%(制御なし)から50%制御まで
の10%刻みのいずれかの動作パターンに従って制御さ
れる。
According to the control rate obtained by adding the normal control rate and the control rate corresponding to the demand value excess portion in this way, the compressor of each air conditioner is controlled in 10% steps from 0% (no control) to 50% control. Control is performed according to one of the operation patterns.

【0095】以上の本実施の形態においては、制御率を
10%刻みの段階的なものとしたが、これは制御率は連
続的に変化するものとしてもよく、その場合には各空調
機の圧縮機の30分間における運転時間と停止時間との
比率を求められた制御率に応じた比率とすればよい。た
だし、この場合においても各空調機の圧縮機を連続して
停止させる時間は3分から5分程度とするのが、室温を
一定に保つ上で好ましい。
In the above-described embodiment, the control rate is set in steps of 10%. However, the control rate may be changed continuously. What is necessary is just to make the ratio of the operation time and the stop time for 30 minutes of the compressor a ratio according to the obtained control rate. However, also in this case, it is preferable to keep the compressor of each air conditioner continuously stopped for about 3 to 5 minutes in order to keep the room temperature constant.

【0096】以下、本実施の形態のグループサイクリッ
ク・デマンドコントロールシステムの適用例を示す。
Hereinafter, an application example of the group cyclic demand control system of the present embodiment will be described.

【0097】第1の適用例は、5つの棟からなる工場で
あり、各棟の空調機は図10(a)から図10(e)に
示すように配置されている。図中黒く塗った部分が空調
機を表し、入力された電力削減率に応じて、各棟毎グル
ープ分けされて独立的に制御され、各グループにおい
て、空調機に付された(ハイフン以下の)番号の順に各
空調機の圧縮機を周期的に停止させる。
The first application example is a factory having five buildings, and the air conditioners in each building are arranged as shown in FIGS. 10 (a) to 10 (e). In the figure, the black portions represent air conditioners, and each building is divided into groups according to the input power reduction rate and independently controlled, and each group is provided with an air conditioner (below a hyphen). The compressor of each air conditioner is periodically stopped in the order of the numbers.

【0098】具体的に説明すると、第1工場には、図1
0(a)に示されたように上下それぞれの壁に沿って5
台ずつ、計10台の空調機が設置されている。各空調機
の圧縮機を制御する順番は、各空調機に付されたハイフ
ン以下の番号の順であり、図中左上の空調機(1−1)
が最初に制御され、続いて下側中心の空調機(1−2)
が制御され、次に右上の空調機(1−3)が制御され、
というように空調機(1−1)から空調機(1−10)
の順番で周期的に制御される。
More specifically, FIG.
5 along the upper and lower walls as shown in FIG.
A total of 10 air conditioners are installed for each unit. The order in which the compressors of each air conditioner are controlled is the order of the numbers after the hyphen attached to each air conditioner.
Is controlled first, followed by the lower center air conditioner (1-2)
Is controlled, and then the upper right air conditioner (1-3) is controlled,
From the air conditioner (1-1) to the air conditioner (1-10)
Are controlled periodically in the following order.

【0099】第2工場には、図10(b)に示されたよ
うに左右それぞれの壁に沿って4台ずつ、計8台の空調
機が設置されている。各空調機の圧縮機を制御する順番
は、各空調機に付されたハイフン以下の番号の順であ
り、図中左上の空調機(2−1)が最初に制御され、続
いて右側の上から3番目の空調機(2−2)が制御さ
れ、次に右上の空調機(2−3)が制御され、というよ
うに空調機(2−1)から空調機(2−8)の順番で周
期的に制御される。
As shown in FIG. 10B, eight air conditioners are installed in the second factory along the right and left walls, four by four. The order in which the compressors of each air conditioner are controlled is the order of the numbers after the hyphen attached to each air conditioner, and the air conditioner (2-1) in the upper left of the figure is controlled first, and then the upper right. , The third air conditioner (2-2) is controlled, then the upper right air conditioner (2-3) is controlled, and so on from the air conditioner (2-1) to the air conditioner (2-8). Is controlled periodically.

【0100】第3工場には、図10(c)に示されたよ
うに上下と間に設けられた仕切壁の3つの壁に沿ってそ
れぞれ5台ずつ、計15台の空調機が設置されている。
各空調機の圧縮機を制御する順番は、各空調機に付され
たハイフン以下の番号の順であり、図中左上の空調機
(3−1)が最初に制御され、続いて仕切壁の右側の空
調機(3−2)が制御され、次に左下の空調機(3−
3)が制御され、というように空調機(3−1)から空
調機(3−15)の順番で周期的に制御される。
In the third factory, as shown in FIG. 10 (c), 15 air conditioners are installed along the three walls of the upper and lower partitions, five in each case. ing.
The order in which the compressors of each air conditioner are controlled is the order of the numbers after the hyphen attached to each air conditioner. The air conditioner (3-1) at the upper left in the figure is controlled first, and then the partition wall is controlled. The right air conditioner (3-2) is controlled, and then the lower left air conditioner (3-2).
3) is controlled, and so on, and is controlled periodically in the order from the air conditioner (3-1) to the air conditioner (3-15).

【0101】第4工場には、図10(d)に示されたよ
うに上下の壁に沿ってそれぞれ2台ずつ、計4台の空調
機が設置されている。各空調機の圧縮機を制御する順番
は、各空調機に付されたハイフン以下の番号の順であ
り、図中左上の空調機(4−1)が最初に制御され、続
いて右下の空調機(4−2)が制御され、次に左下の空
調機(4−3)が制御され、最後に右上の空調機(4−
4)の順番で周期的に制御される。
In the fourth factory, as shown in FIG. 10 (d), two air conditioners are installed along the upper and lower walls, respectively, for a total of four air conditioners. The order in which the compressors of the air conditioners are controlled is the order of the numbers following the hyphens assigned to the air conditioners. The air conditioner (4-1) at the upper left in the figure is controlled first, and then the lower right. The air conditioner (4-2) is controlled, then the lower left air conditioner (4-3) is controlled, and finally the upper right air conditioner (4-3).
It is controlled periodically in the order of 4).

【0102】第5工場には、図10(e)に示されたよ
うに左右の壁それぞれに沿って4台ずつと間に設けられ
た2つの仕切壁の両側それぞれに3台ずつ、計20台の
空調機が設置されている。各空調機の圧縮機を制御する
順番は、各空調機に付されたハイフン以下の番号の順で
あり、図中左上の空調機(5−1)が最初に制御され、
続いて左側仕切壁の左下の空調機(5−2)が制御さ
れ、次に右側仕切壁の左上の空調機(5−3)が制御さ
れ、というように空調機(5−1)から空調機(5−2
0)の順番で周期的に制御される。
In the fifth factory, as shown in FIG. 10 (e), four units are provided along each of the right and left walls, and three units are provided on both sides of two partition walls provided therebetween, for a total of 20 units. Two air conditioners are installed. The order in which the compressors of each air conditioner are controlled is the order of the numbers after the hyphen attached to each air conditioner, and the air conditioner (5-1) at the upper left in the figure is controlled first,
Subsequently, the air conditioner (5-2) at the lower left of the left partition is controlled, then the air conditioner (5-3) at the upper left of the right partition is controlled, and so on from the air conditioner (5-1). Machine (5-2
It is controlled periodically in the order of 0).

【0103】このように各工場には4台から20台の空
調機が設置されており、それぞれの工場毎に各空調機に
付されたハイフン以下の番号の順番で周期的に制御され
る。この空調機を制御する順番は、図からも解るよう
に、隣接して設置された空調機を右回りや左回りで順次
制御するのではなく、なるべく異なった壁に沿って設置
された空調機を順次制御するようなジグザグな順番とな
っている。このような順番で空調機の圧縮機を制御する
と、フロア又は棟内において室温のバラツキをなくすこ
とができる。
As described above, four to twenty air conditioners are installed in each factory, and the air conditioners are periodically controlled in the order of the numbers after the hyphen attached to each air conditioner in each factory. As can be seen from the figure, the order in which the air conditioners are controlled is not to control the adjacent air conditioners clockwise or counterclockwise sequentially, but to install the air conditioners along different walls as much as possible. Are controlled in a zigzag order. By controlling the compressor of the air conditioner in such an order, it is possible to eliminate variations in room temperature on the floor or in the building.

【0104】以下に示す表1は、この工場にグループサ
イクリック・デマンドコントロールシステムを導入した
結果の概略である。
Table 1 below outlines the results of introducing a group cyclic demand control system into this factory.

【0105】[0105]

【表1】 [Table 1]

【0106】この工場は、毎年夏の8月に空調機の使用
により最大需要電力のピーク値(デマンド数値)として
600kwを記録しており、電力会社との契約電力は60
0kwとなっていた。空調機を使用しない時期の最大使用
電力は300kw程度であった。
This factory records 600 kw as the peak value (demand numerical value) of the maximum demand power by using the air conditioner every summer in August, and the contract power with the power company is 60 kW.
It was 0kw. The maximum power consumption when the air conditioner was not used was about 300 kw.

【0107】この工場にグループサイクリック・デマン
ドコントロールシステムを導入し、ピーク時における空
調機の制御率を30%(稼働率30%削減)として運転
した結果、最大需要電力値(デマンド値)を圧縮機(空
調機)の容量である300kwの約30%にあたる100
kw減少させ、契約電力を500kwとすることができた。
A group cyclic demand control system was introduced in this factory, and the air conditioner was operated at a peak control rate of 30% (operation rate reduced by 30%). As a result, the maximum demand power value (demand value) was reduced. 100, which is about 30% of the capacity of the air conditioner (300kw)
kW was reduced, and the contract power was reduced to 500 kW.

【0108】またこの工場では、通常の電力削減率をい
ずれの工場でも30%としてグループサイクリック制御
を行っており、空調の使用電力の30%にあたる電力が
削減されている。
In this factory, the group cyclic control is performed by setting the normal power reduction rate to 30% in each factory, and the power equivalent to 30% of the power used for air conditioning is reduced.

【0109】夏の最盛期や冬の極寒期には、予測電力値
がまれにデマンド値を超えるときもあるが、そのような
場合にはデマンド制御部分の制御信号により、制御率を
通常より1段(10%)又は2段(20%)アップさせ
て制御することにより、設定デマンド値の500kwを超
えないように制御している。
In the peak season of summer and the extreme cold season of winter, the predicted power value may rarely exceed the demand value. In such a case, the control rate is increased by 1 from the control signal of the demand control portion. The control is performed by increasing the stage (10%) or two stages (20%) so as not to exceed the set demand value of 500 kw.

【0110】第2の適用例は、図11(a)に示すよう
な6階建てのオフィスビルであり、各階の空調機は図1
1(b)〜図2(g)に示すように配置されている。図
中黒く塗った部分が空調機を表し、入力された電力削減
率に応じて、各棟毎に空調機に付された(ハイフン以下
の)番号の順に図5から図9に示したように各空調機の
圧縮機を周期的に停止させる。
The second application example is an office building having six floors as shown in FIG. 11A, and the air conditioner on each floor is shown in FIG.
1 (b) to 2 (g). In the figure, the black portions represent the air conditioners, and as shown in FIGS. 5 to 9 in the order of the numbers (lower hyphens) assigned to the air conditioners for each building according to the input power reduction rate. The compressor of each air conditioner is periodically stopped.

【0111】各フロアについて具体的に説明すると、1
Fには、図11(b)に示されたように上下の壁それぞ
れに沿って3台ずつ、計6台の空調機が設置されてい
る。各空調機の圧縮機を制御する順番は、各空調機に付
されたハイフン以下の番号の順であり、図中左上の空調
機(1−1)が最初に制御され、続いて下側中央の空調
機(1−2)が制御され、次に右上の空調機(1−3)
が制御され、次に左下の空調機(1−4)、上側中央の
空調機(1−5)、最後に右下の空調機(1−6)の順
番で周期的に制御される。
[0111] Each floor will be described specifically.
In F, three air conditioners are installed along the upper and lower walls, respectively, as shown in FIG. The order in which the compressors of each air conditioner are controlled is the order of the numbers following the hyphen attached to each air conditioner. The air conditioner (1-1) in the upper left of the figure is controlled first, and then the lower center Of the air conditioner (1-2) is controlled, and then the air conditioner (1-3) at the upper right
Is controlled, then the lower left air conditioner (1-4), the upper center air conditioner (1-5), and finally the lower right air conditioner (1-6) are controlled periodically.

【0112】2Fから5Fまでは、図11(c)から図
11(f)に示されたように、1Fと同じく上下の壁そ
れぞれに沿って3台ずつ、計6台の空調機が設置されて
おり、各空調機の圧縮機は、各空調機に付されたハイフ
ン以下の番号の順で周期的に制御される。
As shown in FIGS. 11 (c) to 11 (f), a total of six air conditioners are installed along the upper and lower walls from 2F to 5F, as shown in FIGS. 11 (c) to 11 (f). The compressor of each air conditioner is controlled periodically in the order of the numbers following the hyphen attached to each air conditioner.

【0113】6Fには、図11(g)に示されたように
上下の壁それぞれに沿って2台ずつ、計4台の空調機が
設置されている。各空調機の圧縮機を制御する順番は、
各空調機に付されたハイフン以下の番号の順であり、図
中左上の空調機(6−1)が最初に制御され、続いて右
下の空調機(6−2)が制御され、次に左下の空調機
(6−3)が制御され、最後に右上の空調機(1−6)
の順番で周期的に制御される。
As shown in FIG. 11 (g), a total of four air conditioners are provided on the 6F, two each along the upper and lower walls. The order of controlling the compressor of each air conditioner is
The air conditioners (6-1) in the upper left of the figure are controlled first, the air conditioners (6-2) in the lower right are controlled first, and the numbers in the order of the numbers after the hyphen attached to each air conditioner are controlled. The lower left air conditioner (6-3) is controlled, and finally the upper right air conditioner (1-6)
Are controlled periodically in the following order.

【0114】このように各フロアには6台又は4台の空
調機が設置されており、それぞれのフロア毎に各空調機
に付されたハイフン以下の番号の順番で周期的に制御さ
れる。この空調機を制御する順番は、上記第1の適用例
と同様に、フロア又は棟内において室温のバラツキをな
くすべく、隣接して設置された空調機を右回りや左回り
で順次制御するのではなく、なるべく異なった壁に沿っ
て設置された空調機を順次制御するようなジグザグな順
番となっている。
As described above, six or four air conditioners are installed on each floor, and the air conditioners are controlled on a per-floor basis in the order of the numbers following the hyphens. In order to control the air conditioners, the air conditioners installed adjacently are sequentially controlled clockwise or counterclockwise in order to eliminate the variation in the room temperature in the floor or the building, as in the first application example. Rather, the order is such that the air conditioners installed along different walls are sequentially controlled as much as possible.

【0115】以下に示す表2は、このオフィスビルにグ
ループサイクリック・デマンドコントロールシステムを
導入した結果の概略である。
Table 2 below outlines the results of introducing a group cyclic demand control system into this office building.

【0116】[0116]

【表2】 [Table 2]

【0117】このオフィスビルは、毎年夏の8月に空調
機の使用により最大需要電力のピーク値(デマンド数
値)として400kwを記録しており、電力会社との契約
電力は400kwとなっていた。空調機を使用しない時期
の最大使用電力は200kw程度であった。
This office building records 400 kw as the peak value (demand numerical value) of the maximum demand power by using the air conditioner every summer in August, and the contract power with the power company is 400 kw. The maximum power consumption when the air conditioner was not used was about 200 kW.

【0118】このオフィスビルにグループサイクリック
・デマンドコントロールシステムを導入し、デマンド値
335kw、通常の空調機の制御率をグループ1〜5につ
いては20%、グループ6については10%として運転
した結果、最大需要電力値(デマンド値)を圧縮機(空
調機)の容量である200kwの30%以上の65kw減少
させ、契約電力を335kwとすることができた。
A group cyclic demand control system was introduced into this office building, and the demand value was 335 kw, and the control rate of the ordinary air conditioners was 20% for groups 1 to 5 and 10% for group 6, resulting in operation. The maximum demand power value (demand value) was reduced by 65 kW, which is 30% or more of the capacity of the compressor (air conditioner) of 200 kw, and the contract power was reduced to 335 kw.

【0119】夏の最盛期や冬の極寒期には、予測電力値
がまれにデマンド値を超えるときもあるが、デマンド制
御部分の制御信号により、制御率を通常より1段(10
%)又は2段(20%)アップさせて制御することによ
り、設定デマンド値の335kwを超えないように制御し
ている。
In the summer's peak season and the winter's extremely cold season, the predicted power value may rarely exceed the demand value.
%) Or by increasing by two steps (20%), so as not to exceed the set demand value of 335 kw.

【0120】[0120]

【発明の効果】本発明の複数の空調機を有する電力設備
の総使用電力量制御方法によれば、本来の空調機の運転
と同様の状況で空調機の寿命を縮めることなく最大使用
電力値を減少させることが可能であり、通常運転時にお
いても空調機の消費電力量を削減することができる。加
えて、空調機の設置された職場で働いている人々は、各
空調機の個別制御も可能なので、空調機が強制的に制御
されていることを意識することなく通常通り快適に作業
できる。
According to the total power consumption control method for power equipment having a plurality of air conditioners of the present invention, the maximum power consumption value can be obtained without shortening the life of the air conditioners under the same conditions as the original operation of the air conditioners. Can be reduced, and the power consumption of the air conditioner can be reduced even during normal operation. In addition, people working in the workplace where the air conditioner is installed can also control each air conditioner individually, so that they can work comfortably as usual without being aware that the air conditioner is forcibly controlled.

【0121】停止時間においても空調機からの送風が行
われるようにすると、圧縮機の強制停止による室温への
影響を最小限に食い止められる。
When air is blown from the air conditioner even during the stop time, the influence on the room temperature due to the forced stop of the compressor can be minimized.

【0122】また、空調機を、例えば、各階・各棟等の
グループに予め分けて、各グループ毎に異なった運転パ
ターンを使用できるように構成すると、作業環境に合わ
せて各階・各棟等に最適な制御ができる。
Further, if the air conditioners are divided into groups such as floors / buildings in advance so that different operation patterns can be used for each group, the air conditioners can be arranged on floors / buildings etc. according to the working environment. Optimal control is possible.

【0123】隣接して設置されていない空調機の圧縮機
を順番に停止させるようにすると、フロア又は棟内にお
ける温度の変化をなくすことができる。
When the compressors of the air conditioners that are not installed adjacent to each other are stopped in order, it is possible to eliminate a change in temperature on the floor or in the building.

【0124】各圧縮機を連続して停止させる時間が、3
分から5分の間であると、その前に圧縮機が作り出して
いた冷気(暖気)が残っているので、この冷気(暖気)
を有効利用して循環させて室内を冷房(暖房)すること
ができるので、室温の上昇(下降)を最小限で食い止め
る事が出来る。
The time to stop each compressor continuously is 3
If it is between 5 minutes and 5 minutes, the cool air (warm air) created by the compressor before that remains, so this cold air (warm air)
The air can be effectively circulated to cool (heat) the room, so that the rise (fall) of the room temperature can be minimized.

【図面の簡単な説明】[Brief description of the drawings]

【図1】月毎の使用電力量の例を示す図である。FIG. 1 is a diagram showing an example of monthly power consumption.

【図2】本願のデマンド値制御部分のフローチャートを
示す図である。
FIG. 2 is a diagram showing a flowchart of a demand value control part of the present application.

【図3】本願の通常電力削減率制御部分のフローチャー
トを示す図である。
FIG. 3 is a diagram showing a flowchart of a normal power reduction rate control portion of the present application.

【図4a】本願のグループサイクリック・デマンドコン
トロールシステムの制御フローチャートを示す第1の図
である。
FIG. 4a is a first diagram showing a control flowchart of the group cyclic demand control system of the present application.

【図4b】本願のグループサイクリック・デマンドコン
トロールシステムの制御フローチャートを示す第2の図
である。
FIG. 4b is a second diagram illustrating a control flowchart of the group cyclic demand control system of the present application.

【図5】電力削減率10%のときの各空調機の圧縮機の
運転パターンを示す図である。
FIG. 5 is a diagram showing an operation pattern of the compressor of each air conditioner when the power reduction rate is 10%.

【図6】電力削減率20%のときの各空調機の圧縮機の
運転パターンを示す図である。
FIG. 6 is a diagram showing an operation pattern of the compressor of each air conditioner when the power reduction rate is 20%.

【図7】電力削減率30%のときの各空調機の圧縮機の
運転パターンを示す図である。
FIG. 7 is a diagram showing an operation pattern of the compressor of each air conditioner when the power reduction rate is 30%.

【図8】電力削減率40%のときの各空調機の圧縮機の
運転パターンを示す図である。
FIG. 8 is a diagram showing an operation pattern of the compressor of each air conditioner when the power reduction rate is 40%.

【図9】電力削減率50%のときの各空調機の圧縮機の
運転パターンを示す図である。
FIG. 9 is a diagram showing an operation pattern of the compressor of each air conditioner when the power reduction rate is 50%.

【図10】本願のグループサイクリック・デマンドコン
トロールシステムを適用した工場の空調機の配置を示す
図である。
FIG. 10 is a diagram showing an arrangement of air conditioners in a factory to which the group cyclic demand control system of the present application is applied.

【図11】本願のグループサイクリック・デマンドコン
トロールシステムを適用したオフィスビルの空調機の配
置を示す図である。
FIG. 11 is a diagram showing an arrangement of air conditioners in an office building to which the group cyclic demand control system of the present application is applied.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F24F 11/02 H02J 13/00 311 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) F24F 11/02 H02J 13/00 311

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数の空調機を有する電力設備における
総使用電力を測定し、その測定値から所定時間内にお
ける予想総電力消費量を求め、この予想総電力消費量の
増減に応じて、該電力設備における空調機の圧縮機
停止させる時間を求め、空調機の圧縮機を周期的に所
定の順序で前記停止時間だけ停止させることより成る電
力設備の総使用電力量の制御方法であり、各空調機の圧
縮機毎の運転スケジュールを規定した複数の運転パター
ンの中から前記停止時間に基づいて一つの運転パターン
を選択して各圧縮機の動作を制御することを特徴とする
前記方法
[Claim 1] to measure the total electric power consumption in the electric power facilities having a plurality of air conditioners to obtain the expected total power consumption within a predetermined time from the measured values, in accordance with the increase or decrease of the predicted total power consumption, seek time for stopping the compressor of the air conditioner in the electric power facilities, consists in stopping by the stopping time in the order the compressor periodically predetermined in each of the air conditioners electrostatic
This is a method for controlling the total amount of power used by
Multiple operation putters that specify the operation schedule for each compressor
One operation pattern based on the stop time
Select to control the operation of each compressor
The method .
【請求項2】 前記複数の空調機が複数のフロア又は棟
内に配置されているとき、各フロア又は棟毎に異なった
運転パターンを使用できることを特徴とする請求項
記載の方法
Wherein when said plurality of air conditioners are arranged in a plurality of floors or buildings, The method according to claim 1, characterized in that each floor or building for each different operation pattern can be used.
【請求項3】 隣接して配置されていない空調機の圧縮
機を順番に停止させることを特徴とする請求項1または
2に記載の方法
3. The compressor according to claim 1, wherein the compressors of the air conditioners that are not arranged adjacently are stopped in order.
3. The method according to 2 .
【請求項4】 各圧縮機を連続して停止させる時間が、
3分から5分の間であることを特徴とする請求項1から
のいずれか一項に記載の方法
4. The time for continuously stopping each compressor is as follows:
Be between 3 to 5 minutes from claim 1, wherein 3
The method according to any one of the preceding claims .
【請求項5】 少なくとも一つの空調機を非制御とする
ことを特徴とする請求項1からのいずれか一項に記載
方法
5. At least method according to any one of claims 1 to 4, characterized in that one of the air conditioners and uncontrolled.
JP8694698A 1998-03-31 1998-03-31 Control method of total power consumption of power equipment Expired - Fee Related JP3229936B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8694698A JP3229936B2 (en) 1998-03-31 1998-03-31 Control method of total power consumption of power equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8694698A JP3229936B2 (en) 1998-03-31 1998-03-31 Control method of total power consumption of power equipment

Publications (2)

Publication Number Publication Date
JPH11287496A JPH11287496A (en) 1999-10-19
JP3229936B2 true JP3229936B2 (en) 2001-11-19

Family

ID=13901046

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8694698A Expired - Fee Related JP3229936B2 (en) 1998-03-31 1998-03-31 Control method of total power consumption of power equipment

Country Status (1)

Country Link
JP (1) JP3229936B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008241231A (en) * 2007-02-26 2008-10-09 Shimizu Corp Energy-saving air-conditioning control system
KR101447659B1 (en) * 2007-11-22 2014-10-06 엘지전자 주식회사 Demand Controller of an electric system

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3290644B2 (en) * 2000-05-29 2002-06-10 株式会社ビィワンファクトリー Power control device
KR100565486B1 (en) * 2003-06-11 2006-03-30 엘지전자 주식회사 Air conditioner's central controlling system and its operating method
JP2006340461A (en) * 2005-05-31 2006-12-14 Tokyo Electric Power Co Inc:The Green power controlling system and computer program
JP2007085030A (en) * 2005-09-20 2007-04-05 Ishimic:Kk Energy saving system for building
US8527108B2 (en) * 2006-07-11 2013-09-03 Regen Energy Inc. Method and apparatus for managing an energy consuming load
JP4399674B2 (en) * 2007-04-16 2010-01-20 圭一 大田 Compressor operation control apparatus and operation control method
KR101376769B1 (en) * 2007-10-24 2014-04-01 엘지전자 주식회사 Demand Controller of an electric system
KR101286596B1 (en) * 2007-10-24 2013-07-22 엘지전자 주식회사 Demand Controller of an electric system
JP4710982B2 (en) * 2009-01-26 2011-06-29 ダイキン工業株式会社 Demand control apparatus, demand control system, and demand control program
EP2477308A4 (en) * 2009-09-09 2013-12-04 Panasonic Corp Power control system
JP4442915B1 (en) * 2009-10-13 2010-03-31 日本テクノ株式会社 Energy saving system
JP5473619B2 (en) * 2010-01-12 2014-04-16 三菱電機株式会社 Air conditioner control device
EP2607804B1 (en) * 2010-08-18 2019-08-28 Mitsubishi Electric Corporation Air conditioning control device, air conditioning control method and program
JP5595507B2 (en) * 2010-09-13 2014-09-24 三菱電機株式会社 Air conditioning control device, air conditioning control method, and program
EP2631552B1 (en) * 2010-10-18 2021-03-31 Mitsubishi Electric Corporation Air conditioner control device, air conditioner control method, and program
JP4989801B1 (en) * 2011-05-30 2012-08-01 株式会社ユビテック Energy-saving equipment, energy-saving system and energy-saving program
JP5818089B2 (en) * 2011-11-10 2015-11-18 清水建設株式会社 Demand power control apparatus and power demand control method
JP5849717B2 (en) * 2012-01-18 2016-02-03 オムロン株式会社 Electric energy monitoring device, electric energy monitoring system, electric energy monitoring method, control program, and recording medium
JP5930803B2 (en) 2012-03-30 2016-06-08 日立アプライアンス株式会社 Air conditioning control system and air conditioning control method
JP2014236579A (en) * 2013-05-31 2014-12-15 パナソニック デバイスSunx竜野株式会社 Demand controller
JPWO2015045156A1 (en) * 2013-09-30 2017-03-02 株式会社ENeL Electric energy control device, electric energy control method, electric energy control system, and electric equipment control device
JP2015154595A (en) * 2014-02-14 2015-08-24 アズビル株式会社 Energy management device and energy management method
JP2016008738A (en) * 2014-06-23 2016-01-18 京セラ株式会社 Energy management device, energy management system and energy management method
CN106322688B (en) * 2016-09-30 2019-07-26 广东美的制冷设备有限公司 Control method, controller, smart machine and air-conditioning is arranged in electricity
JP6536969B2 (en) * 2017-08-10 2019-07-03 木下 新子 Power controller

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008241231A (en) * 2007-02-26 2008-10-09 Shimizu Corp Energy-saving air-conditioning control system
KR101447659B1 (en) * 2007-11-22 2014-10-06 엘지전자 주식회사 Demand Controller of an electric system

Also Published As

Publication number Publication date
JPH11287496A (en) 1999-10-19

Similar Documents

Publication Publication Date Title
JP3229936B2 (en) Control method of total power consumption of power equipment
KR100529907B1 (en) Air conditioner's central controlling system and its operating method
JP4151727B2 (en) Air conditioning management device
EP2420750B1 (en) HVAC System
Chu et al. A direct load control of air-conditioning loads with thermal comfort control
JP2014236605A (en) Management system of air-conditioner
KR20090095452A (en) Power demand control system for air conditioning equipment
JP2004301505A (en) Air-conditioning controller
JP2003065588A (en) Air conditioning apparatus
JP2009041801A (en) Electricity/gas mixed-air conditioning control system
JP2002349929A (en) Controller for air conditioner
JPH05164376A (en) Electric power demand control system
JP5503424B2 (en) Setting value management method and apparatus
JPH0850501A (en) Method and system for dynamic energy management
JP2003116219A (en) System and method for controlling quantity of working power, and computer-readable storage medium recording control program for quantity of working power
JP3442037B2 (en) Secondary system for district cooling and heating
JP4321683B2 (en) Air conditioner control device and air conditioner control method
KR102183942B1 (en) Building heating control device and method for improving the efficiency of floor heating
JPS63302237A (en) Demand control device of air conditioner
JP2003083588A (en) Power budget management device and air conditioner using it
JPH1089744A (en) Number of operating set control method of air conditioner and device for the same
KR20050074825A (en) Air conditioner's peak power controlling system and its operating method
JP5491987B2 (en) Air conditioning controller
JPH02187554A (en) Airconditioning control system based on building monitor and control device
KR20160009117A (en) System for auto building control

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees