JP3224435B2 - Construction method of underground continuous wall - Google Patents

Construction method of underground continuous wall

Info

Publication number
JP3224435B2
JP3224435B2 JP31183192A JP31183192A JP3224435B2 JP 3224435 B2 JP3224435 B2 JP 3224435B2 JP 31183192 A JP31183192 A JP 31183192A JP 31183192 A JP31183192 A JP 31183192A JP 3224435 B2 JP3224435 B2 JP 3224435B2
Authority
JP
Japan
Prior art keywords
drilling
section
constructed
sections
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31183192A
Other languages
Japanese (ja)
Other versions
JPH06158647A (en
Inventor
孝豊 藤田
Original Assignee
孝豊 藤田
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孝豊 藤田 filed Critical 孝豊 藤田
Priority to JP31183192A priority Critical patent/JP3224435B2/en
Publication of JPH06158647A publication Critical patent/JPH06158647A/en
Application granted granted Critical
Publication of JP3224435B2 publication Critical patent/JP3224435B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は複数本の掘削ロッドを
持つ多軸掘削機により地下連続壁を構築する、地下連続
壁の施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an underground continuous wall by using a multi-axial excavator having a plurality of drilling rods.

【0002】[0002]

【従来技術及び発明が解決しようとする課題】同一線上
の一方向に並列する複数本の掘削ロッドを持つ多軸掘削
機を使用して地下連続壁を構築する方法では、隣接する
施工区間での固結体を均質化する目的から一部の削孔が
重複して施工され、通常は1箇所の削孔を飛ばして隣接
する区間を施工した後に両区間に跨って中間の削孔の掘
削と両区間の削孔内の混合が行われるが、この方法では
施工区間の両端の削孔が2度混合されるのに対し、中間
部の削孔が1度しか混合されないため隣接する施工区間
の混合状態が不均質となり、硬化した固結体の強度にも
差が生じる可能性がある。
2. Description of the Related Art A method of constructing an underground continuous wall using a multi-axis excavator having a plurality of excavating rods arranged in parallel in one direction on the same line involves a method of constructing an underground continuous wall. Some holes are duplicated for the purpose of homogenizing the consolidated body. Usually, one hole is skipped and the adjacent section is constructed. Mixing is performed in the drilling holes in both sections. In this method, the drilling at both ends of the working section is mixed twice, whereas the drilling in the middle part is mixed only once, so the adjacent working section is mixed. The mixed state becomes inhomogeneous, and there is a possibility that a difference occurs in the strength of the cured compact.

【0003】この発明は削孔を重複して施工する場合の
従来方法の問題に着目してなされたもので、全削孔を均
等に混合する施工方法を提案しようとするものである。
[0003] The present invention has been made by focusing on the problem of the conventional method in the case of performing drilling in an overlapping manner, and intends to propose a construction method in which all drilling holes are evenly mixed.

【0004】[0004]

【課題を解決するための手段】本発明では1箇所の削孔
を飛ばすことなく隣接する施工区間を連続して施工し、
その後に両施工区間に跨って施工することにより全削孔
内の混合を均等に行い、施工方向に亘って均質な連続壁
を構築する。
According to the present invention, adjacent construction sections are continuously constructed without skipping one hole,
After that, mixing is performed evenly in all drilled holes by constructing over both construction sections, and a uniform continuous wall is constructed over the construction direction.

【0005】掘削装置は軸方向に間隔をおいて周面に撹
拌翼が突設された、一方向に並列する3本の掘削ロッド
からなり、固結体は掘削ロッドの先端から吐出される固
化材と掘削土とを攪拌翼によって攪拌,混合することに
より造成される。
The excavator is composed of three excavating rods arranged in one direction and having stirring blades protruding from the peripheral surface at an interval in the axial direction. The solidified body is solidified discharged from the tip of the excavating rod. It is created by stirring and mixing the material and excavated soil with stirring blades.

【0006】施工は隣接する削孔が互いに重複する3個
の削孔からなる一施工区間を施工する毎にこれに隣接す
る施工区間を連続して施工した後、先行する施工区間と
これに隣接する施工区間の両施工区間に跨って双方の削
孔が重複して施工される。
[0006] In the construction, each time one construction section consisting of three bores in which adjacent bores overlap each other, the construction section adjacent thereto is continuously constructed, and then the preceding construction section and the adjacent construction section are continuously constructed. Both drilling holes are overlapped over both construction sections.

【0007】地下連続壁は施工区間毎に掘削ロッドで地
盤の掘削と、掘削土と固化材との混合を行った後、隣接
する施工区間に跨って削孔内の混合を行うことにより平
面的に直線状に連続する固結体から構築される。
[0007] The underground continuous wall is flat by excavating the ground with a drill rod, mixing excavated soil and solidified material for each construction section, and then mixing inside the drill hole over the adjacent construction section. It is constructed from a solid body that is linearly continuous.

【0008】施工区間を連続させ、隣接する区間の施工
後に両区間に跨って再度施工することにより各削孔は2
度ずつ混合され、連続する方向に均質な強度を持つ固結
体が造成される。
[0008] By making the construction section continuous and reconstructing across both sections after the construction of the adjacent section, each drilling is 2
The mixture is mixed step by step to form a consolidated body having a uniform strength in a continuous direction.

【0009】[0009]

【実施例】この発明は図1に示すように一方向に並列す
る複数本の掘削ロッド2を持つ掘削装置1を用いて図
2,図3に示すように掘削ロッド2の本数分の削孔4の
群からなる、隣接する施工区間を連続的に施工し、平面
的に直線状に連続する固結体よりなる地下連続壁を構築
する方法である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention uses a drilling device 1 having a plurality of drilling rods 2 arranged in one direction as shown in FIG. 1 and drills the number of drilling rods 2 as shown in FIGS. This is a method of continuously constructing adjacent construction sections consisting of the group No. 4 and constructing an underground continuous wall composed of a solidified body that is linearly continuous in a plane.

【0010】掘削ロッド2の下端には図1に示すように
掘削ビット21が接続し、本体の周面には軸方向に適当な
間隔をおいて攪拌翼22が突設される。全掘削ロッド2は
上方に接続する減速機によって同時に回転し、連結金具
3によって相互間の間隔が保持される。
A drill bit 21 is connected to the lower end of the drill rod 2 as shown in FIG. 1, and a stirring blade 22 is provided on the peripheral surface of the main body at an appropriate interval in the axial direction. All the excavating rods 2 are simultaneously rotated by the speed reducer connected upward, and the interval between them is maintained by the connecting bracket 3.

【0011】各施工区間では掘削ロッド2の先端より固
化材を吐出しながら掘削装置1を鉛直に掘進させること
により攪拌翼22によって掘削土と固化材との撹拌,混合
が行われ、この複数個の削孔4からなる一施工区間を施
工する毎にこれに隣接する施工区間の施工が連続して行
われる。隣接する施工区間の施工後に図2,図3に示す
ように両施工区間の削孔4,4が重複して施工される。
重複して施工される掘進時には必ずしも固化材を注入す
る必要はない。
In each construction section, the excavating device 1 is vertically excavated while discharging the solidified material from the tip of the excavating rod 2, whereby the excavated soil and the solidified material are stirred and mixed by the stirring blades 22. Each time one construction section consisting of the borehole 4 is constructed, the construction section adjacent to the construction section is continuously constructed. As shown in FIGS. 2 and 3, the drilling holes 4 and 4 in both the working sections are constructed after the working in the adjacent working sections.
It is not always necessary to inject the solidification material during excavation that is performed repeatedly.

【0012】図2は先行する区間の1箇所の削孔4と後
から施工された区間の2箇所の削孔4,4を重複して行
う場合を、図3は先行する区間の2箇所の削孔4,4と
後から施工された区間の1箇所の削孔4を重複して行う
場合を示している。
FIG. 2 shows a case where one hole 4 in the preceding section is overlapped with two holes 4 in the section constructed later. FIG. 3 shows two holes 4 in the preceding section. A case is shown in which the drilling holes 4 and 4 are overlapped with one of the drilling holes 4 in a section constructed later.

【0013】[0013]

【発明の効果】1箇所の削孔を飛ばすことなく隣接する
施工区間を連続して施工し、その後に両施工区間に跨っ
て双方の削孔を重複して施工するため、全削孔内の混合
が均等に行われ、施工方向に亘って均質な連続壁を構築
することができる。
According to the present invention, adjacent drilling sections are continuously constructed without skipping one drilling hole, and then both drilling holes are overlapped over both drilling sections. Mixing is performed evenly, and a continuous continuous wall can be constructed over the construction direction.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の掘進時の様子を示した立面図である。FIG. 1 is an elevational view showing a state during excavation according to the present invention.

【図2】掘削の手順を示した平面図である。FIG. 2 is a plan view showing a procedure of excavation.

【図3】掘削の他の手順を示した平面図である。FIG. 3 is a plan view showing another procedure of excavation.

【符号の説明】[Explanation of symbols]

1……掘削装置、2……掘削ロッド、21……掘削ビッ
ト、22……攪拌翼、3……連結金具、4……削孔。
Reference Signs List 1 excavating device, 2 excavating rod, 21 excavating bit, 22 stirring blade, 3 connecting metal fitting, 4 drilling

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 軸方向に間隔をおいて周面に撹拌翼が突
設された、一方向に並列する3本の掘削ロッドからなる
掘削装置を鉛直に掘進させ、掘削ロッドの先端より吐出
される固化材と掘削土を撹拌,混合し、隣接する削孔が
互いに重複する3個の削孔からなる一施工区間を施工す
る毎にこれに隣接する施工区間を連続して施工した後、
先行する施工区間とこれに隣接する施工区間に跨り、双
方の削孔を重複して施工し、平面的に直線状に連続する
固結体よりなる地下連続壁を構築する方法であり、先行
して施工された区間の1箇所の削孔と後から施工された
区間の2箇所の削孔を重複して、または先行して施工さ
れた区間の2箇所の削孔と後から施工された区間の1箇
所の削孔を重複して施工することを特徴とする地下連続
壁の施工方法。
1. A drilling device comprising three drilling rods arranged in parallel in one direction and provided with stirring blades projecting from the peripheral surface at intervals in the axial direction, is vertically excavated, and discharged from the tip of the drilling rod. After mixing and mixing the solidified material and excavated soil, and each time one construction section consisting of three drilling holes where adjacent drilling holes overlap each other, the construction section adjacent to this is continuously constructed,
It is a method of straddling the preceding construction section and the construction section adjacent to it, duplicating the drilling of both, and constructing an underground continuous wall consisting of a solid body that is continuous linearly in a plane. One of the drilled sections of the section that was constructed and the two sections of the section that was constructed later overlapped, or two sections of the section that was constructed earlier and the section that was constructed later A method for constructing an underground continuous wall, wherein one of the holes is overlapped.
JP31183192A 1992-11-20 1992-11-20 Construction method of underground continuous wall Expired - Fee Related JP3224435B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31183192A JP3224435B2 (en) 1992-11-20 1992-11-20 Construction method of underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31183192A JP3224435B2 (en) 1992-11-20 1992-11-20 Construction method of underground continuous wall

Publications (2)

Publication Number Publication Date
JPH06158647A JPH06158647A (en) 1994-06-07
JP3224435B2 true JP3224435B2 (en) 2001-10-29

Family

ID=18021932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31183192A Expired - Fee Related JP3224435B2 (en) 1992-11-20 1992-11-20 Construction method of underground continuous wall

Country Status (1)

Country Link
JP (1) JP3224435B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775422B (en) * 2015-02-28 2016-06-29 宗琪 Trapezoidal mixing pile wall telephone
CN105401574A (en) * 2015-12-31 2016-03-16 卢兴耐 H-shaped spliced pile drilling and stirring machine
CN105442587A (en) * 2015-12-31 2016-03-30 宗琪 Fillet parallelogram drilling and stirring machine

Also Published As

Publication number Publication date
JPH06158647A (en) 1994-06-07

Similar Documents

Publication Publication Date Title
EP0371463A2 (en) Method for installing an anchor and injection drill anchoring for performing the method
DE1533644C3 (en) Method and device for almost horizontal drilling through dams made of layers of earth or rock
JP3224435B2 (en) Construction method of underground continuous wall
JP4550792B2 (en) Construction method of underground wall
JPH0754334A (en) Subterranean excavator
JP2971587B2 (en) Construction method of underground continuous wall
DE2647281A1 (en) METHOD AND DEVICE FOR UNDERGROUND MINING OF ROCK AND THE LIKE.
JP2960139B2 (en) Construction method of underground continuous wall
JPS6351515A (en) Excavator for ground improvement
JPH06158646A (en) Method for constructing underground continuous wall
JP2000104245A (en) Execution method of diaphragm wall and device thereof
JPH018587Y2 (en)
JPH0734451A (en) Structure of underground wall
JP2000104246A (en) Constructing method of erath retaining wall and tree- axle auger excavator used for its method
JPH04143309A (en) Constructing method of underground continuous wall
JPH0813540A (en) Multishaft drilling machine
JPH0427012A (en) Construction of earth anchor
JPH02140323A (en) Formation of soil cement synthetic pile
JPS59145821A (en) Method and apparatus for construction of pillar-row pile
JPH0860650A (en) Excavation method
DE19940774A1 (en) Method to form sealing foundations for static constructions during tunnel building etc. uses erosion tool in combination with drilling rods and guide rods
JP3679047B2 (en) Ground improvement body construction method, ground improvement construction method and ground improvement machine
JPS6098009A (en) Method and apparatus for ground improvement
JP3086183B2 (en) Multi-axis excavator with detachable guide and underground wall construction method using it
JPH083980A (en) Method for constructing underground wall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees