JP3175380U JP2012000897U JP2012000897U JP3175380U JP 3175380 U JP3175380 U JP 3175380U JP 2012000897 U JP2012000897 U JP 2012000897U JP 2012000897 U JP2012000897 U JP 2012000897U JP 3175380 U JP3175380 U JP 3175380U
Authority
JP
Japan
Prior art keywords
fall prevention
prevention jig
auxiliary member
wall
safety belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2012000897U
Other languages
Japanese (ja)
Inventor
壽雄 仲座
Original Assignee
壽雄 仲座
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 壽雄 仲座 filed Critical 壽雄 仲座
Priority to JP2012000897U priority Critical patent/JP3175380U/en
Application granted granted Critical
Publication of JP3175380U publication Critical patent/JP3175380U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

【課題】落下防止用治具を、構築物に形成されている面に沿って広範囲に固定することが出来るようにした落下防止用治具を提供する。
【解決手段】構築物に残される補助部材5、7に取り付けられて、安全帯8が掛け止めされる落下防止用治具1であって、安全帯を構成するフック9が係脱可能に取り付けられる環状の基部2と、この基部にその周方向に間隔をおいて一体に設けられ、前記補助部材に着脱可能に止着される複数の係合部3とを備えている。使用に当たって、作業者Wは、まず、前記落下防止用治具1を携帯して、前記組み上げられた作業用足場6に登り、携帯している前記落下防止用治具1を、補助部材5、7に、これらに適合する係合部3の一つを選択して螺着することによって壁4に固定する。次に、落下防止用治具1の基部2に、前記安全帯8のフック9を掛けることによって、前記安全帯8の固定がなされる。これによって、作業者Wの落下防止が図られる。
【選択図】図2
An object of the present invention is to provide a fall prevention jig capable of fixing a fall prevention jig over a wide range along a surface formed on a structure.
A drop prevention jig 1 is attached to auxiliary members 5 and 7 remaining in a structure and a safety band 8 is hooked, and a hook 9 constituting the safety band is removably attached. An annular base portion 2 and a plurality of engaging portions 3 provided integrally with the base portion at intervals in the circumferential direction and detachably attached to the auxiliary member are provided. In use, the worker W first carries the fall prevention jig 1, climbs up to the assembled work scaffold 6, and uses the carried fall prevention jig 1 as an auxiliary member 5, 7 is fixed to the wall 4 by selecting and screwing one of the engaging portions 3 suitable for them. Next, the safety belt 8 is fixed by hooking the hook 9 of the safety belt 8 on the base 2 of the fall prevention jig 1. This prevents the worker W from falling.
[Selection] Figure 2

Description

本考案は、家屋等の建築工事や改装工事の現場において、作業者が高所作業を行なう際に、この作業者の落下防止に用いられる治具に関するものである。   The present invention relates to a jig used to prevent a worker from falling when the worker performs a work at a high place in a construction work or a renovation work such as a house.

家屋等の建築現場や改装現場等においては高所作業が避けられない。
そのために、作業現場に足場を組み上げて、作業者はこの足場上にて作業を行なっている。
Work at high places is unavoidable at construction sites such as houses and renovation sites.
For this purpose, a scaffold is assembled at the work site, and the worker is working on the scaffold.

そして、高所作業が2mを越える場合、作業者は、落下防止のために安全帯を装着し、かつ、この安全帯を堅固な構造物に固定して作業を行なうことが義務付けられている。   When the work at a high place exceeds 2 m, the worker is obliged to wear a safety belt to prevent the fall and to perform the work with the safety belt fixed to a solid structure.

このような安全帯を固定するための一従来例として、足場に手摺りを組み付けて、この手摺りに、前記安全帯を構成するフックを掛け止めすることが行なわれている(特許文献1)。   As a conventional example for fixing such a safety belt, a handrail is assembled to a scaffold, and a hook constituting the safety belt is hooked on the handrail (Patent Document 1). .

特開2011−127376号公報JP 2011-127376 A

しかしながら、前述した従来の技術においても、なお、次のような改善すべき問題点が残されている。   However, the above-described conventional technology still has the following problems to be improved.

すなわち、前述したように手摺りに安全帯を固定する方法であると、作業者は、手摺りを組み上げるために、手摺りがない状態の足場に上って作業を行なわなければならない。
したがって、手摺りを組み上げるまで安全帯を固定する箇所がないこととなる。
That is, as described above, in the method of fixing the safety band to the handrail, the worker must work on the scaffold without the handrail in order to assemble the handrail.
Therefore, there is no place for fixing the safety belt until the handrail is assembled.

これを避けるために、既に組み上げられている足場に前記安全帯を仮固定しておくことが考えられる。
しかしながら、その固定位置が作業者よりも下方となり、落下事故が発生した場合、作業者に加わる衝撃力が大きくなることから好ましくない。
In order to avoid this, it is conceivable to temporarily fix the safety belt to a scaffold that has already been assembled.
However, when the fixed position is below the operator and a fall accident occurs, the impact force applied to the operator increases, which is not preferable.

本考案は、前述した従来の技術において残されている問題点を解決することができる落下防止用治具を提供することを課題とする。   An object of the present invention is to provide a fall prevention jig capable of solving the problems remaining in the conventional technology described above.

本考案の請求項1に記載の落下防止用治具は、前述した課題を解決するために、構築物の構築に用いられて構築後の構築物に残される補助部材に取り付けられて、作業者の装着した安全帯が掛け止めされる落下防止用治具であって、前記安全帯を構成するフック若しくはこのフックが掛け止めされる親綱が係脱可能に取り付けられる環状の基部と、この基部にその周方向に間隔をおいて一体に設けられ、前記補助部材に着脱可能に止着される複数の係合部とを備えていることを特徴としている。   According to a first aspect of the present invention, in order to solve the above-described problem, the fall prevention jig is attached to an auxiliary member that is used for construction of a construction and is left in the construction after construction. And a safety ring to which the safety belt is hooked, an annular base portion to which a hook constituting the safety belt or a master rope to which the hook is hooked is detachably attached, and the base portion thereof. And a plurality of engaging portions that are integrally provided at intervals in the circumferential direction and are detachably secured to the auxiliary member.

請求項1に記載の落下防止用治具では、既設の構築物に残されている補助部材に、前記基部を係合部の一つを介して止着することにより、環状の基部を堅固な構築部に固定して、作業者が装着した安全帯の固定位置を確保することができる。   In the fall prevention jig according to claim 1, the annular base portion is firmly constructed by fastening the base portion to one of the auxiliary members remaining in the existing structure through one of the engaging portions. It is possible to secure the fixed position of the safety belt worn by the operator.

そして、前記補助部材は、構築物を構築する際に用いられ、構築後に構築物に残されているもので、高所にも存在しており、作業用足場を組み上げる際、若しくは、足場を解体する際に、前記安全帯の固定位置を作業者の足下よりも上方位置に、前記足場から独立して容易に確保することができる。   The auxiliary member is used when constructing the structure, and is left in the structure after the construction, and is also present at a high place, when assembling the work scaffold or when disassembling the scaffold. In addition, the fixed position of the safety belt can be easily secured above the operator's feet independently of the scaffold.

また、前記補助部材は、前記構築物に多数用いられていることから、落下防止用治具の取り付け可能位置が広く、作業位置を移動させる際にも、前記安全帯の固定位置を容易に確保することができる。   In addition, since the auxiliary member is used in a large number in the structure, the attachment position of the fall prevention jig is wide, and the fixing position of the safety belt can be easily secured even when the work position is moved. be able to.

さらに、前記係合部を複数設けていることにより、これらを前記補助部材の種類に応じた選択が可能で、落下防止用治具の固定可能な範囲を大幅に拡大することができる。   Furthermore, by providing a plurality of the engaging portions, it is possible to select them according to the type of the auxiliary member, and it is possible to greatly expand the range in which the fall prevention jig can be fixed.

本考案の請求項2に記載の落下防止用治具は、請求項1に記載の前記補助部材が前記構築物の壁に残されたセパレータであり、前記係合部の一つが、前記セパレータの端部に形成されている雄螺子に螺着される係合ナットであることを特徴としている。   The fall prevention jig according to claim 2 of the present invention is a separator in which the auxiliary member according to claim 1 is left on the wall of the structure, and one of the engaging portions is an end of the separator. The engagement nut is screwed to the male screw formed in the portion.

このような構成とすることにより、前記セパレータは、壁構築用の型枠を固定するために、壁一面に30cmないし60cmの間隔で格子状に設置されるものであるから、前記落下防止用治具の固定位置を、前記壁の全面にわたって細かく設定することができる。   With such a configuration, the separator is installed in a grid pattern at intervals of 30 cm to 60 cm on the entire wall surface in order to fix the formwork for wall construction. The fixing position of the tool can be set finely over the entire surface of the wall.

したがって、構築物の壁の内外面に沿って作業用足場を組み上げる場合や、この作業用足場を解体する場合、また、壁表面の仕上げや改修作業をする場合等において、安全帯の固定位置を、作業者の腰よりも上方で、より適切な位置に容易に確保することができる。   Therefore, when assembling the work scaffold along the inner and outer surfaces of the building wall, when disassembling the work scaffold, or when finishing or repairing the wall surface, It can be easily secured at a more appropriate position above the operator's waist.

本考案の請求項3に記載の落下防止用治具は、前記補助部材が、前記構築物の壁に設けられ、この壁に沿って組み上げられる作業用足場を固定する壁繋ぎであり、前記係合部の一つが、前記壁繋ぎに形成されている雌螺子に螺着させられる係合ボルトであることを特徴としている。   The jig for preventing fall according to claim 3 of the present invention is a wall joint for fixing the work scaffold assembled along the wall, wherein the auxiliary member is provided on the wall of the structure, and the engagement One of the parts is an engagement bolt that is screwed into a female screw formed in the wall connection.

このような構成とすることにより、前述したセパレータと同様の作用効果を期待することができる。   By adopting such a configuration, it is possible to expect the same effect as the separator described above.

本考案の請求項4に記載の落下防止用治具は、請求項1に記載の前記補助部材が前記構築物の天井に垂設される軽天を構成する吊りボルトであり、前記係合部の一つが、前記吊りボルトに螺着される係合ナットであることを特徴としている。   A fall prevention jig according to claim 4 of the present invention is a suspension bolt that constitutes a light ceiling in which the auxiliary member according to claim 1 is suspended from the ceiling of the structure, One is characterized in that the engaging nut is screwed onto the suspension bolt.

このような構成とすることにより、天井に沿った作業を行なう場合に、天井の任意の位置に安全帯の固定位置を確保することができる。   With such a configuration, when performing work along the ceiling, it is possible to secure a fixed position of the safety belt at an arbitrary position on the ceiling.

本考案の請求項5に記載の落下防止用治具は、請求項1に記載の前記補助部材が前記構築物の天井に埋め込まれたインサートであり、前記係合部の一つが、前記吊りボルトに螺着される係合ボルトであることを特徴とする。   A fall prevention jig according to claim 5 of the present invention is an insert in which the auxiliary member according to claim 1 is embedded in a ceiling of the structure, and one of the engaging portions is attached to the suspension bolt. The engagement bolt is screwed.

このような構成とすることにより、請求項4によって奏される作用効果を同様に奏することができるとともに、前記天井に沿って配設される電気設備等の先行配管の施工が行なえ、また、前記落下防止用治具を他の隣接する前記インサートに螺着しておくことにより、この落下防止用治具を用いて、前記先行配管の仮固定を行なうことができる。   By adopting such a configuration, it is possible to achieve the same effect as that of the fourth aspect, and it is possible to perform the construction of the preceding piping such as the electrical equipment arranged along the ceiling, By screwing the drop prevention jig to the other adjacent insert, the preceding pipe can be temporarily fixed using the drop prevention jig.

本考案によれば、落下防止用治具を、構築物に形成されている面に沿って広範囲に固定することができ、これによって、作業者が装着する安全帯の固定位置を広範囲に容易に確保することができる。   According to the present invention, the fall prevention jig can be fixed in a wide range along the surface formed on the structure, and thereby, the fixing position of the safety belt worn by the worker can be easily secured in a wide range. can do.

本考案の一実施形態を示すもので、落下防止用治具の正面図である。1 shows an embodiment of the present invention, and is a front view of a fall prevention jig. FIG. 本考案の一実施形態の使用例を示す縦断面図である。It is a longitudinal cross-sectional view which shows the usage example of one Embodiment of this invention. 本考案の一実施形態の使用例を示す側面図である。It is a side view which shows the usage example of one Embodiment of this invention. 本考案の一実施形態の他の使用例を示す側面図である。It is a side view which shows the other usage example of one Embodiment of this invention. 本考案の一実施形態のさらに他の使用例を示す部分縦断面図である。It is a fragmentary longitudinal cross-section which shows the other usage example of one Embodiment of this invention. 本考案の一実施形態のさらに他の使用例を示す部分縦断面図である。It is a fragmentary longitudinal cross-section which shows the other usage example of one Embodiment of this invention. 本考案の一実施形態のさらに他の使用例を示す部分縦断面図である。It is a fragmentary longitudinal cross-section which shows the other usage example of one Embodiment of this invention. 本考案の他の実施形態を示すもので、落下防止用治具の正面図である。The other embodiment of this invention is shown and it is a front view of the jig | tool for fall prevention. 本考案の他の実施形態の使用例を示す正面図である。It is a front view which shows the usage example of other embodiment of this invention. 本考案のさらに他の実施形態の使用例を示す部分縦断面図である。It is a fragmentary longitudinal cross-section which shows the usage example of further another embodiment of this invention.

以下、本考案の一実施形態を図1ないし図3を参照して説明する。
図1において符号1は、本実施形態に係わる落下防止用治具を示す。
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
In FIG. 1, reference numeral 1 denotes a drop prevention jig according to this embodiment.

この落下防止用治具1は、環状の基部2と、この基部2にその周方向に間隔をおいた位置に一体に設けられた複数(本実施形態においては第1ないし第4の4つ)の係合部3a・3b・3c・3dとを備えており、これらの第1ないし第4の係合部3a・3b・3c・3dは、相互に90度の間隔で、かつ、前記基部2の径方向に沿うように設けられている。   The dropping prevention jig 1 includes an annular base 2 and a plurality of (four in the present embodiment, first to fourth) integrally provided on the base 2 at positions spaced in the circumferential direction. Engaging portions 3a, 3b, 3c, and 3d. These first to fourth engaging portions 3a, 3b, 3c, and 3d are spaced from each other by 90 degrees, and the base 2 It is provided along the radial direction.

前記第1の係合部3a、および、第2の係合部3bは、ボルトによって構成されており、前記第1の係合部3aは、前記第2の係合部3bよりも大径に形成されている。
たとえば、前記第1の係合部3aは13φのボルト、前記第2の係合部3bは9φのボルトが用いられる。
The first engagement portion 3a and the second engagement portion 3b are configured by bolts, and the first engagement portion 3a has a larger diameter than the second engagement portion 3b. Is formed.
For example, a 13φ bolt is used for the first engaging portion 3a, and a 9φ bolt is used for the second engaging portion 3b.

前記第3の係合部3c、および、第4の係合部3dは、ナットによって構成されており、前記第3の係合部3cは、前記第4の係合部3dよりも大径に形成されている。
たとえば、前記第3の係合部3cは9φのナット、前記第4の係合部3dは6φのナットが用いられる。
The third engagement portion 3c and the fourth engagement portion 3d are configured by nuts, and the third engagement portion 3c has a larger diameter than the fourth engagement portion 3d. Is formed.
For example, a 9φ nut is used for the third engaging portion 3c, and a 6φ nut is used for the fourth engaging portion 3d.

図2は、本実施形態における補助部材を示したものであり、構築物の壁4を構築する際に用いられるセパレータ5と、作業者Wの足場となる作業用足場6を前記壁4に固定するための壁繋ぎ7とを前記補助部材として示している。   FIG. 2 shows an auxiliary member in the present embodiment, and a separator 5 used when constructing a wall 4 of a structure and a working scaffold 6 serving as a scaffold for the worker W are fixed to the wall 4. The wall connection 7 for the purpose is shown as the auxiliary member.

前記セパレータ5の両端部には雄螺子が形成されており、本実施形態においては、前記第3の係合部3c若しくは第4の係合部3dの呼び径と同様の9φ若しくは6φの螺子径となされている。   Both ends of the separator 5 are formed with male screws, and in this embodiment, a 9φ or 6φ screw diameter similar to the nominal diameter of the third engaging portion 3c or the fourth engaging portion 3d. It has been.

また、前記壁繋ぎ7内部に雌螺子が形成されており、前記第1の係合部3a若しくは第2の係合部3bの呼び径と同様の13φ若しくは9φの螺子径となされている。   A female screw is formed inside the wall joint 7 and has a screw diameter of 13φ or 9φ similar to the nominal diameter of the first engaging portion 3a or the second engaging portion 3b.

ついで、本実施形態の落下防止用治具1の使用方法について、図2を参照して説明する。   Next, a method of using the fall prevention jig 1 of the present embodiment will be described with reference to FIG.

ここで図2は、前記壁4に沿って、前記作業用足場6が組み上げられ、この作業用足場6上で、安全帯8を装着した作業者Wが作業を行なう場合を示している。   Here, FIG. 2 shows a case where the work scaffold 6 is assembled along the wall 4 and the worker W wearing the safety belt 8 performs work on the work scaffold 6.

作業者Wは、まず、前記落下防止用治具1を携帯して、前記組み上げられた作業証足場6に登り、携帯している前記落下防止用治具1を、前記セパレータ5若しくは壁繋ぎ7に、これらに適合する係合部3の一つを選択して螺着することによって前記壁4に固定する(図2は、壁繋ぎ7に固定した例を示している)。   The worker W first carries the fall prevention jig 1 and climbs the assembled work proof scaffolding 6, and the carried fall prevention jig 1 is moved to the separator 5 or the wall connection 7. In addition, one of the engaging portions 3 matching these is selected and screwed to be fixed to the wall 4 (FIG. 2 shows an example of fixing to the wall joint 7).

このように前記落下防止用治具1を固定するに際して、その基部2を回転させる動作によって固定することができるので、作業者Wの動きが最小限に抑えられるとともに、迅速に固定が行なえる。
したがって、安定した姿勢で作業が行なわれることとなり、安全性が確保される。
In this way, when the fall prevention jig 1 is fixed, it can be fixed by an operation of rotating the base 2, so that the movement of the operator W can be minimized and the fixing can be performed quickly.
Therefore, the work is performed in a stable posture, and safety is ensured.

前述したように、前記落下防止用治具1の固定を行なった後に、この落下防止用治具1の基部2に、前記安全帯8のフック9を掛けることによって、前記安全帯8の固定がなされる。
これによって、作業者Wの落下防止が図られる。
As described above, after the fall prevention jig 1 is fixed, the safety band 8 is fixed by hooking the hook 9 of the safety band 8 on the base 2 of the fall prevention jig 1. Made.
This prevents the worker W from falling.

このようなフック9の掛け止め作業中においても、作業者Wは前記固定された落下防止用治具1を掴んでおくことができ、この点からも、作業者Wの安全性が確保される。   Even during the hooking operation of the hook 9, the worker W can hold the fixed fall prevention jig 1, and from this point, the safety of the worker W is ensured. .

このように、作業者Wは作業用足場6上に上がってすぐにかつ最小限度の動きで安全帯8を固定することができる。   In this way, the worker W can fix the safety belt 8 immediately on the work scaffold 6 and with minimal movement.

そして、前記セパレータ5および壁繋ぎ7は、前記壁4のほぼ全面に残され若しくは設置されていることから、たとえば、図3に示すように、前記作業用足場6を移動しつつ作業を行なう場合にあっては、前記落下防止用治具1を水平方向に位置する別の壁繋ぎ7若しくはセパレータ5に移し替え、この移動させられた落下防止用治具1にフック9を掛け替えることにより、安全性を確保しつつ移動が可能となる。   Since the separator 5 and the wall joint 7 are left or installed on almost the entire surface of the wall 4, for example, as shown in FIG. 3, when working while moving the work scaffold 6. In that case, by transferring the fall prevention jig 1 to another wall joint 7 or separator 5 positioned in the horizontal direction, and by hooking the hook 9 to the moved fall prevention jig 1, Movement is possible while ensuring safety.

ここで、前記落下防止用治具1を2個携帯しておくと、前述した移動時に、先に固定した落下防止用治具1による落下防止機能を維持しつつ、他の落下防止用治具1の固定作業を行なうことができ、また、前記フック9の掛け替え作業も、片手で先に固定された落下防止用治具1を掴みつつ行なうことができるので、より安全性が確保される。   Here, if the two fall prevention jigs 1 are carried, other fall prevention jigs can be maintained while maintaining the fall prevention function of the fall prevention jig 1 fixed earlier during the movement described above. 1 can be carried out, and the hook 9 can be exchanged while grasping the fall-preventing jig 1 previously fixed with one hand, so that safety is further ensured.

前述した効果は、たとえば、前記作業用足場6を上方に組み足していくような作業のように、上方へ作業を進める場合であっても同様であり、また、前記作業用足場6を上方から下方へ向けて解体していく場合であっても同様である。   The above-described effects are the same even when the work is advanced upward, for example, as if the work scaffold 6 is assembled upward, and the work scaffold 6 is viewed from above. The same applies to the case of dismantling downward.

一方、前述したように、作業が水平方向に変化する場合等にあっては、図4に示すように、2個の前記落下防止用治具1を水平方向に離間して固定し、これらの間に親綱10を結び、この親綱10にフック9を掛け止めするようにしてもよい。   On the other hand, as described above, when the work changes in the horizontal direction, as shown in FIG. 4, the two anti-falling jigs 1 are fixed apart in the horizontal direction. The master rope 10 may be tied between them, and the hook 9 may be hooked on the master rope 10.

図5は、前記補助部材として、構築物の天井11に垂設される軽天を構成する吊りボルト12を示したものである。   FIG. 5 shows a suspension bolt 12 constituting a light ceiling suspended from the ceiling 11 of the structure as the auxiliary member.

この場合にあっても、前記吊りボルト12に合致した係合部3を選択して、前記吊りボルト12に前記落下防止用治具1を固定することにより前述した実施形態と同様の効果を得ることができる。   Even in this case, the same effect as that of the above-described embodiment can be obtained by selecting the engaging portion 3 that matches the suspension bolt 12 and fixing the fall prevention jig 1 to the suspension bolt 12. be able to.

図6は、図5に示す形態において水平方向へ作業を移動させる場合の前記落下防止用治具1の付け替え操作を示すものである。   FIG. 6 shows the replacement operation of the fall prevention jig 1 when the work is moved in the horizontal direction in the embodiment shown in FIG.

また、図7は、複数の落下防止用治具1を用いて、前記天井11に沿って親綱10を設置した状態を示す。   FIG. 7 shows a state in which the master rope 10 is installed along the ceiling 11 using a plurality of fall prevention jigs 1.

さらに、図8は、前記第2の係合部3bと第3の係合部3cの位置を入れ替えた変形例を示している。   Further, FIG. 8 shows a modification in which the positions of the second engaging portion 3b and the third engaging portion 3c are exchanged.

このような構成とすることにより、図9に示すように、一つの落下防止用治具1の第2の係合部3bに他の落下防止用治具1の第4の係合部3dを螺合することにより、複数の前記落下防止用治具1を連結することができる。   With such a configuration, as shown in FIG. 9, the fourth engagement portion 3 d of the other fall prevention jig 1 is connected to the second engagement portion 3 b of one fall prevention jig 1. By screwing, a plurality of the fall prevention jigs 1 can be connected.

これは、たとえば、前記安全帯8のフック9の掛け止め位置を壁4から離したい場合等に有効である。   This is effective, for example, when it is desired to separate the hook 9 of the safety belt 8 from the wall 4.

なお、前記実施形態において示した各構成部材の諸形状や寸法等は一例であって、設計要求等に基づき種々変更可能である。   Note that the shapes, dimensions, and the like of the constituent members shown in the above embodiment are merely examples, and various changes can be made based on design requirements and the like.

たとえば、図5ないし図7において、前記落下防止用治具1を天井11に垂設された吊りボルト12に取り付ける例について示したが、これに代えて、図10に示すように、前記落下防止用治具1を、前記吊りボルト12が装着される前の、前記天井11に埋め込まれたインサート13に取り付けるようにすることもできる。   For example, in FIGS. 5 to 7, an example in which the fall prevention jig 1 is attached to the suspension bolt 12 suspended from the ceiling 11 is shown. Instead, as shown in FIG. The jig 1 can be attached to the insert 13 embedded in the ceiling 11 before the suspension bolt 12 is mounted.

この場合には、前記吊りボルト12が未装着の状態で行なわれる電気設備の先行配管14の施工が可能となるとともに、隣接する他のインサート13に落下防止用治具1を装着しておくことにより、この落下防止用治具1と前記先行配管14とを、仮止めクランプ15を用いて仮止めすることもできる。   In this case, it is possible to construct the leading piping 14 of the electrical equipment performed with the suspension bolt 12 not attached, and the fall prevention jig 1 is attached to another adjacent insert 13. Thus, the fall prevention jig 1 and the preceding pipe 14 can be temporarily fixed using a temporary fixing clamp 15.

1 落下防止用治具
2 基部
3 係合部
3a 第1の係合部
3b 第2の係合部
3c 第3の係合部
3d 第4の係合部
4 壁
5 セパレータ(補助部材)
6 作業用足場
7 壁繋ぎ(補助部材)
8 安全帯
9 フック
10 親綱
11 天井
12 吊りボルト
13 インサート
14 先行配管
W 作業者

DESCRIPTION OF SYMBOLS 1 Fall prevention jig | tool 2 Base 3 Engagement part 3a 1st engagement part 3b 2nd engagement part 3c 3rd engagement part 3d 4th engagement part 4 Wall 5 Separator (auxiliary member)
6 Working scaffold 7 Wall connection (auxiliary member)
8 Safety belt 9 Hook 10 Parent rope 11 Ceiling 12 Suspension bolt 13 Insert 14 Leading pipe W Worker

Claims (5)

構築物の構築に用いられて構築後の構築物に残される補助部材に取り付けられて、作業者の装着した安全帯が掛け止めされる落下防止用治具であって、前記安全帯を構成するフック若しくはこのフックが掛け止めされる親綱が係脱可能に取り付けられる環状の基部と、この基部にその周方向に間隔をおいて一体に設けられ、前記補助部材に着脱可能に止着される複数の係合部とを備えていることを特徴とする落下防止用治具。   A fall-preventing jig that is attached to an auxiliary member that is used for construction of a structure and is attached to an auxiliary member that is left in the structure after construction, and on which a safety belt worn by an operator is hooked, the hook constituting the safety belt, or A ring-shaped base portion to which a master rope to which the hook is hooked is removably attached, and a plurality of pieces that are integrally provided on the base portion with a space in the circumferential direction and are detachably attached to the auxiliary member. An anti-falling jig comprising an engaging portion. 前記補助部材が前記構築物の壁に残されたセパレータであり、前記係合部の一つが、前記セパレータの端部に形成されている雄螺子に螺着される係合ナットであることを特徴とする請求項1に記載の落下防止用治具。   The auxiliary member is a separator left on the wall of the structure, and one of the engaging portions is an engaging nut screwed to a male screw formed at an end of the separator. The fall prevention jig according to claim 1. 前記補助部材が、前記構築物の壁に設けられ、この壁に沿って組み上げられる作業用足場を固定する壁繋ぎであり、前記係合部の一つが、前記壁繋ぎに形成されている雌螺子に螺着させられる係合ボルトであることを特徴とする請求項1又は2に記載の落下防止用治具。   The auxiliary member is provided on a wall of the structure, and is a wall joint that fixes a working scaffold assembled along the wall, and one of the engagement portions is formed on a female screw formed on the wall joint. The fall prevention jig according to claim 1 or 2, wherein the engagement bolt is screwed. 前記補助部材が前記構築物の天井に垂設される軽天を構成する吊りボルトであり、前記係合部の一つが、前記吊りボルトに螺着される係合ナットであることを特徴とする請求項1〜3の何れかに記載の落下防止用治具。   The auxiliary member is a suspension bolt that constitutes a light ceiling suspended from a ceiling of the structure, and one of the engagement portions is an engagement nut that is screwed to the suspension bolt. Item 4. The fall prevention jig according to any one of Items 1 to 3. 前記補助部材が前記構築物の天井に埋め込まれたインサートであり、前記係合部の一つが、前記吊りボルトに螺着される係合ボルトであることを特徴とする請求項1〜4の何れかに記載の落下防止用治具。

The auxiliary member is an insert embedded in the ceiling of the structure, and one of the engaging portions is an engaging bolt that is screwed to the suspension bolt. The fall prevention jig described in 1.

JP2012000897U 2012-02-20 2012-02-20 Fall prevention jig Expired - Fee Related JP3175380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012000897U JP3175380U (en) 2012-02-20 2012-02-20 Fall prevention jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012000897U JP3175380U (en) 2012-02-20 2012-02-20 Fall prevention jig

Publications (1)

Publication Number Publication Date
JP3175380U true JP3175380U (en) 2012-05-10

Family

ID=48002428

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012000897U Expired - Fee Related JP3175380U (en) 2012-02-20 2012-02-20 Fall prevention jig

Country Status (1)

Country Link
JP (1) JP3175380U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098425A (en) * 2018-09-21 2018-12-28 中国五冶集团有限公司 A kind of girder steel station connection structure
CN109364393A (en) * 2018-11-16 2019-02-22 中铁局集团有限公司 A kind of dedicated portable secured link of slideway
CN110368613A (en) * 2019-08-21 2019-10-25 广东电网有限责任公司 Suitable for climbing the anti-falling from high altitude device of 10kV steel tower
CN110812728A (en) * 2019-12-11 2020-02-21 国家电网有限公司 Safe anti-falling device for operation of hydraulic generator rotor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098425A (en) * 2018-09-21 2018-12-28 中国五冶集团有限公司 A kind of girder steel station connection structure
CN109098425B (en) * 2018-09-21 2023-10-13 中国五冶集团有限公司 Steel beam operation table connection structure
CN109364393A (en) * 2018-11-16 2019-02-22 中铁局集团有限公司 A kind of dedicated portable secured link of slideway
CN109364393B (en) * 2018-11-16 2023-08-15 中铁一局集团有限公司 Portable safety hanging ring special for slideway
CN110368613A (en) * 2019-08-21 2019-10-25 广东电网有限责任公司 Suitable for climbing the anti-falling from high altitude device of 10kV steel tower
CN110812728A (en) * 2019-12-11 2020-02-21 国家电网有限公司 Safe anti-falling device for operation of hydraulic generator rotor

Similar Documents

Publication Publication Date Title
JP3175380U (en) Fall prevention jig
KR101415915B1 (en) Supporter for concrete forms of slab
WO2014080998A1 (en) Suppot steel pipe for scaffolding or timbering
JP6312109B1 (en) Safety device for temporary scaffold
KR101426315B1 (en) Two works of rope hanging scaffolding fixture and construction method of the fixed device
JP3181041U (en) Mounting member for scaffolding for bridge
JP2016089445A (en) Device for supporting safety net and scaffolding
US20070151801A1 (en) Collapsible ladder cage
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
US20130042570A1 (en) Safety system
JP5398619B2 (en) Mobile safety belt mounting device for bridge construction
KR200413527Y1 (en) Gang form falling prevention apparatus
CN104389415B (en) Scaffold
KR200469390Y1 (en) Scaffolding For Ship
KR101253030B1 (en) inner open method safety net with pully and ball bearing
KR20090051796A (en) Adjustment debris net system
KR200477538Y1 (en) Safety rope holder
JP4079061B2 (en) Suspended scaffolding
KR200489643Y1 (en) Safety footboard structure for repair passage
JP6953091B2 (en) Engine generator
JP6388834B2 (en) Simple ladder for sloping walls
KR20160003751U (en) Lifeline mounting pole
JP6847618B2 (en) Fall prevention device mounting member and support
JP3191564U (en) Auxiliary tool
JP7122080B2 (en) temporary scaffolding

Legal Events

Date Code Title Description
R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150411

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees