JP3174938B2 - How to cast concrete on the bottom of gutter block - Google Patents

How to cast concrete on the bottom of gutter block

Info

Publication number
JP3174938B2
JP3174938B2 JP18171694A JP18171694A JP3174938B2 JP 3174938 B2 JP3174938 B2 JP 3174938B2 JP 18171694 A JP18171694 A JP 18171694A JP 18171694 A JP18171694 A JP 18171694A JP 3174938 B2 JP3174938 B2 JP 3174938B2
Authority
JP
Japan
Prior art keywords
concrete
guide
shaped
finishing
side groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP18171694A
Other languages
Japanese (ja)
Other versions
JPH0813598A (en
Inventor
広美 三上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokuetsu Corp
Original Assignee
Hokuetsu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokuetsu Corp filed Critical Hokuetsu Corp
Priority to JP18171694A priority Critical patent/JP3174938B2/en
Publication of JPH0813598A publication Critical patent/JPH0813598A/en
Application granted granted Critical
Publication of JP3174938B2 publication Critical patent/JP3174938B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F2005/0412Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps with means for adjusting their position with respect to the surrounding surface
    • E03F2005/0413Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps with means for adjusting their position with respect to the surrounding surface for height adjustment

Landscapes

  • Sewage (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、上面に蓋取付け用の開
口部を有する、門型又はU型の側溝ブロックによって構
築された側溝の底部に、排水勾配に合わせながらコンク
リートを打設する方法に関するもので、特に側溝がカー
ブしている場所や短い距離での場所において有効に用い
られるコンクリートの打設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of casting concrete at the bottom of a gutter constructed by a gate-shaped or U-shaped gutter block having an opening for mounting a lid on the upper surface while adjusting the drainage gradient. More particularly, the present invention relates to a method of placing concrete effectively used in a place where a side gutter is curved or a place at a short distance.

【0002】[0002]

【従来の技術】従来この種の側溝内でのコンクリート打
設作業は、特に幅が狭くしかも深い場合には困難であっ
た。出願人はこれを解決するために種々の自動コンクリ
ート打設機を開発している。
2. Description of the Related Art Conventionally, it has been difficult to cast concrete in a gutter of this type, particularly when the width is small and deep. The applicant has developed various automatic concrete setting machines to solve this.

【0003】[0003]

【発明が解決しようとする課題】従来打設機はコンクリ
ートを供給するためのホッパーを一体としているため大
型となり、側溝が直線部の場合は施工が容易であるが、
カーブの部分や距離の短い場合には打設機の長さが邪魔
となって不便を感じる。このためホッパーを小型にする
と供給するコンクリートの補給が度々となって作業が繁
雑となるきらいがある。
Conventionally, the casting machine is large in size because the hopper for supplying concrete is integrated, and the construction is easy when the side groove is a straight portion.
When the curve is short or the distance is short, the length of the driving machine is in the way and it is inconvenient. For this reason, when the hopper is reduced in size, the supply of concrete to be supplied becomes frequent and the work may be complicated.

【0004】[0004]

【課題を解決するための手段】本発明は、特にカーブ部
分の側溝や距離の短い場所での側溝底部にコンクリート
を打設する方法を提供するものであって、側溝ブロック
上面の蓋取付け用の開口部に排水水路勾配に合せた高さ
調整用のガイドを設けると共に、側溝ブロックの幅に合
せるための幅調整用のガイドを設けたゲージガイドAを
架設して排水勾配と幅を決め、このゲージガイドAの下
部に断面L字型のガイドプレートを左右対向して配設
し、コンクリートを投入してL字型ガイドプレートにし
たがって柄の付いた均し具およびカキ具をもちいて荒均
しした後、仕上げ機で仕上げ、側溝ブロック底面にコン
クリートを打設する方法である。
SUMMARY OF THE INVENTION The present invention provides a method for placing concrete on a gutter at a curved part or at a bottom part of a gutter at a short distance. A guide for height adjustment according to the drainage channel gradient is provided at the opening, and a gauge guide A provided with a guide for width adjustment to match the width of the gutter block is provided to determine the drainage gradient and width. A guide plate having an L-shaped cross section is disposed at the lower part of the gauge guide A so as to oppose the left and right sides. Concrete is poured, and a leveling tool having a handle and an oyster tool are used in accordance with the L-shaped guide plate to make a rough level. After finishing, it is a method of finishing with a finishing machine and placing concrete on the bottom of the gutter block.

【0005】[0005]

【作用】したがってこの施工は側溝ブロック1単位ごと
に行うことができ、カーブ部分や距離の短い場所におい
て特に有効に作業ができるばかりか、柄の付いた均し具
やカキ棒や、このカキ具に均しゴテを設けたもの、ある
いは均し板や仕上げブレードを設けた仕上げ機を用いる
ことによってコンクリートの打設締固めを迅速に行い精
度よく仕上げることができる。
Therefore, this construction can be performed for each unit of the gutter block, so that the work can be performed particularly effectively in a curved portion or a place where the distance is short, as well as a leveling tool with a handle, an oyster stick, and this oyster tool. By using a flattening iron or a finishing machine provided with a leveling plate or a finishing blade, concrete can be quickly compacted and finished with high accuracy.

【0006】[0006]

【実施例】添付図面により本発明を説明すると、図1乃
至図3は門型の側溝ブロックBの上面開口部B−1にゲ
ージガイドAを架設する実施例図を示すものであり、図
5乃至図8はコンクリートの荒均し、カキ均し、仕上げ
方法を示すものである。又図9および図10は仕上具の
別な例、図11乃至図15はU字型側溝ブロックB−3
上面開口部B−1にゲージガイドAを架設する実施例を
示すものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described with reference to the accompanying drawings. FIGS. 1 to 3 show an embodiment in which a gauge guide A is installed on an upper surface opening B-1 of a gate type side groove block B. FIG. FIG. 8 to FIG. 8 show a method of leveling, shaving and finishing concrete. 9 and 10 show another example of a finishing tool, and FIGS. 11 to 15 show U-shaped side groove blocks B-3.
This shows an embodiment in which a gauge guide A is installed in the upper opening B-1.

【0007】図1乃至図3門型側溝ブロックBの上面開
口部B−1にゲージガイドAを架設した長手方向の断面
図を示すものであり、図2は幅方向の断面図で、図3は
平面図を示し、また図4はL字型ガイドプレート(1)
をゲージガイドAの下端に排水勾配に合せて架装する一
実施例を示すものである。
FIGS. 1 to 3 are longitudinal sectional views in which a gauge guide A is erected on an upper surface opening B-1 of a gate type side groove block B, and FIG. 2 is a sectional view in a width direction. Shows a plan view, and FIG. 4 shows an L-shaped guide plate (1).
FIG. 1 shows an embodiment in which a lower end of a gauge guide A is mounted along a drainage gradient.

【0008】図1乃至図4においてゲージガイドAを説
明すると、このゲージガイドAは2本に分割されている
幅調整棒(9)を接続するパイプ状のガイド(10)に
よって接続してこの両端を図2および図3に示すように
側溝ブロックBの開口部B−1の補強梁B−2側の蓋載
置用の切欠き段部上に渡して調整ガイド(10)をスラ
イドして幅を定める。図中の(11)は固定ボルトであ
る。また、幅調整棒(9)および幅調整ガイド(10)
は図12および図15のごとくターンバックルの様なも
のを回動して幅を定める方法など、他の類した方法でも
よい。
The gauge guide A will be described with reference to FIGS. 1 to 4. The gauge guide A is connected by a pipe-shaped guide (10) connecting two divided width adjusting rods (9). As shown in FIGS. 2 and 3, the adjustment guide (10) slides over the notch step for placing the lid on the reinforcing beam B-2 side of the opening B-1 of the side groove block B and slides the width. Is determined. (11) in the figure is a fixing bolt. Also, a width adjustment rod (9) and a width adjustment guide (10)
Alternatively, other similar methods such as a method of rotating a turnbuckle or the like to determine the width as shown in FIGS. 12 and 15 may be used.

【0009】幅調整棒(9)の両端に側溝ブロックBの
側壁内面に添うように高さ調整棒(6)を垂下して設
け、この高さ調整棒(6)は高さ調整ガイド(7)によ
って螺合されていて調整ガイド(7)の中をスライドで
きるようになっており調整棒(6)は上下に移動可能と
なっている。図中の(12)は固定ネジを示していて高
さ調整棒(6)と幅調整棒(9)は側溝ブロックの開口
部B−1の両端に設けられて継ぎ材(8)によって連結
されて開口部B−1に架装されている。又、調整ガイド
(7)はネジ等のこれに類した方法で上下にスライドで
きる。
A height adjusting rod (6) is provided at both ends of the width adjusting rod (9) so as to follow the inner surface of the side wall of the side groove block B, and the height adjusting rod (6) is a height adjusting guide (7). ) So that it can slide in the adjustment guide (7), and the adjustment rod (6) can move up and down. Reference numeral (12) in the drawing denotes a fixing screw, and the height adjusting rod (6) and the width adjusting rod (9) are provided at both ends of the opening B-1 of the side groove block and are connected by the joint material (8). In the opening B-1. The adjustment guide (7) can be slid up and down by a similar method such as a screw.

【0010】そして高さ調整棒(6)の下端にL字型に
形成されたガイドプレート(1)が側溝ブロック側壁の
内方に左右に向き合うように装着される。
An L-shaped guide plate (1) is attached to the lower end of the height adjusting rod (6) so as to face left and right inside the side wall of the side groove block.

【0011】したがって側溝ブロックBの幅は幅調整棒
(9)によって調整され、ガイドプレート(1)の排水
勾配に合せた勾配の調整は高さ調整棒(6)によって調
整することができ、この下端にガイドプレート(1)が
向き合うように装着していて、ガイドプレート(1)の
L字型部の下端の面が打設するコンクリートの仕上り面
となり、ブロックの底面に排水勾配のレベルに合せたコ
ンクリート底面が形成される。
Therefore, the width of the side groove block B is adjusted by the width adjusting rod (9), and the inclination adjustment according to the drainage gradient of the guide plate (1) can be adjusted by the height adjusting rod (6). The lower end of the L-shaped part of the guide plate (1) is a concrete finished surface to be cast, and the bottom surface of the block is adjusted to the level of drainage gradient. A concrete floor is formed.

【0012】この高さ調整棒(6)に対してL字型のガ
イドプレート(1)の装着に当っては種々考えられる
が、一例をあげると図4に示すように高さ調整棒(6)
の下端に嵌合プレート(3)を固定ピン(5)によって
固定し、これに鉤型に形成した差込みプレート(2)を
差込み、L字型のガイドプレート(1)の上端を固定す
ることによって側溝ブロックBの内側下面にガイドプレ
ート(1)が架設される。そしてこの嵌合は差込みによ
るためワンタッチで装着が可能である。
There are various ways to attach the L-shaped guide plate (1) to the height adjusting rod (6). For example, as shown in FIG. )
A fixing plate (3) is fixed to the lower end of the guide plate (5), a hook-shaped insertion plate (2) is inserted into the fitting plate (3), and the upper end of the L-shaped guide plate (1) is fixed. A guide plate (1) is installed on the inner lower surface of the side groove block B. Since this fitting is performed by insertion, it can be mounted with one touch.

【0013】ガイドプレート(1)の長さは一単位の側
溝ブロックBの長さと同じにするため通常2m又は1m
であって、この対向しているガイドプレート(1),
(1)の間にコンクリートが投入され図5以下で示され
る柄の付いた均し具やカキ具で荒均しされ、その後仕上
げ機により仕上げが行われる。
The length of the guide plate (1) is usually 2 m or 1 m so as to be the same as the length of one side groove block B.
And the opposing guide plates (1),
During the period (1), concrete is put in and roughened with a leveling tool or oyster with a handle shown in FIG. 5 and thereafter, and then finishing is performed by a finishing machine.

【0014】図5は弯曲状をしたコテ(18)を柄(1
6)に対してT字状に装着させたものであって、振動機
を作動させながらコンクリートCを投入し締固めながら
荒均しを行う。この時コンクリートCはガイドプレート
(1)の上面よりはみ出るように量の調整をしながら締
固め、荒均しを行う。
FIG. 5 shows a curved iron (18) with a handle (1).
6) is mounted in a T-shape, and concrete C is charged while the vibrator is operated, and roughening is performed while compacting. At this time, the concrete C is compacted while adjusting the amount so as to protrude from the upper surface of the guide plate (1), and roughened.

【0015】図6以下で各種のコンクリートの均し方法
について説明する。図6は柄(16)に対してT字型に
固定されているカキ棒(15)からなり、柄(16)に
は振動機(17)が取付けてあって、カキ棒(15)の
左右両端をガイドプレート(1)のL字型の面上に載せ
て振動機(17)を作動させ、カキ棒(15)を前後に
移動させて余分なコンクリートをかきながら表面を荒な
らしする。(図7参照のこと)この均し具、カキ具はコ
ンクリートのスランプの状況に応じて振動機を作動させ
ない場合や取り付けない場合もありうる。
A method for leveling various types of concrete will be described with reference to FIG. FIG. 6 consists of an oyster stick (15) fixed in a T-shape to the handle (16), and a vibrator (17) is attached to the handle (16). The vibrator (17) is operated by placing both ends on the L-shaped surface of the guide plate (1), and the oyster bar (15) is moved back and forth to roughen the surface while scraping excess concrete. (See FIG. 7) Depending on the condition of the concrete slump, this leveling tool or oyster tool may not operate the vibrator or may not be mounted.

【0016】さらに図8で示す仕上機は、図示されてい
るように前記図6で示されている柄の付いたカキ具を使
用し、この先に均し板(21)と仕上げブレード(2
2)を装着してコンクリートC上を均しながら仕上げる
もので、仕上げブレード(22)を使用することによっ
てコンクリート面はより平滑に仕上がる。図中の符号
(20)はカキ棒(15)を係合するカギ状の凸起であ
り、この凸起にカキ棒を係合させながらコンクリート面
を仕上げる。又、この仕上機は必要に応じて図9のごと
く、均し板(21)に振動機を取付ることができ、柄の
付いたカキ具のかわりに、均し板(21)を図10のご
とくヒモ等で引くこともできる。
Further, the finishing machine shown in FIG. 8 uses a shaved tool having a handle shown in FIG. 6 as shown in the figure, and is followed by a leveling plate (21) and a finishing blade (2).
2) is attached to finish the concrete C while leveling it. By using the finishing blade (22), the concrete surface is finished more smoothly. Reference numeral (20) in the figure is a key-shaped protrusion for engaging the oyster bar (15), and the concrete surface is finished while the oyster bar is engaged with the protrusion. Further, as shown in FIG. 9, this finishing machine can attach a vibrator to the leveling plate (21) as shown in FIG. 9, and the leveling plate (21) is replaced with the leveling plate (21) in FIG. It can also be pulled with a string, etc.

【0017】次に図11乃至図15にU字型側溝ブロッ
クB−3にゲージガイドAを架設した実施例を示す。図
11はU字型側溝ブロックB−3の側壁上面にゲージガ
イドAを架設した実施例図であり、図12乃至図14は
それぞれ底面形状の相違したU字型側溝ブロックB−3
の断面図を示している。また図15は平面図を示してい
る。図中の符号(25)はターンバックルを示してい
る。
Next, FIGS. 11 to 15 show an embodiment in which a gauge guide A is installed on a U-shaped side groove block B-3. FIG. 11 is a view showing an embodiment in which a gauge guide A is provided on the upper surface of the side wall of the U-shaped side groove block B-3. FIGS. 12 to 14 show U-shaped side groove blocks B-3 having different bottom shapes.
FIG. FIG. 15 is a plan view. Reference numeral (25) in the figure indicates a turnbuckle.

【発明の効果】【The invention's effect】

【0018】本発明の側溝底部へのコンクリート打設方
法は、側溝ブロックBの一単位ごとにゲージガイドAを
取付けてコンクリートを投入しながら柄の付いた均し
具、カキ具によって荒均して、仕上機を用いて仕上げを
行うものであるから、側溝のカーブの部分や短い距離の
打設作業にきわめて簡便に施工することができる。
According to the method of placing concrete on the bottom of the gutter according to the present invention, a gage guide A is attached to each unit of the gutter block B, and concrete is poured in, while the concrete is poured and roughened by a leveling tool or oyster with a handle. Since the finishing is performed by using a finishing machine, it can be extremely easily applied to a curve portion of a side groove or a short-distance casting operation.

【0019】またコンクリートの打設締固め仕上げにお
いても柄の付いた均し具、カキ具と、L字型に形成され
たガイドプレート(1)によって排水勾配のレベルに合
せながら均し具およびカキ具を前後あるいは上下に押圧
しながら作業することにより施工できるため簡単で、し
かも仕上げ機により平滑面とするため正確な排水勾配を
側溝底部に形成することができる。
Further, in the concrete compaction finishing, a leveling tool and an oyster with a handle and an L-shaped guide plate (1) are adapted to the level of the drainage gradient and the leveling tool and the oyster. The tool can be constructed by working while pressing the tool back and forth or up and down, so that it is simple, and an accurate drainage gradient can be formed at the bottom of the gutter because the finishing machine makes it a smooth surface.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 側溝ブロックBの長手方向の断面図。FIG. 1 is a longitudinal sectional view of a side groove block B.

【図2】 側溝ブロックBの幅方向の断面図。FIG. 2 is a sectional view of a side groove block B in a width direction.

【図3】 平面図。FIG. 3 is a plan view.

【図4】 L字型ガイドプレートの詳細説明図。FIG. 4 is a detailed explanatory view of an L-shaped guide plate.

【図5】 柄付均し具の実施を表わす側面図。FIG. 5 is a side view showing an embodiment of a handle with a handle.

【図6】 柄付カキ具の実施を表わす側面図。FIG. 6 is a side view showing the implementation of the oyster with a handle.

【図7】 柄付カキ具の実施の状態を表わす正面図。FIG. 7 is a front view showing the state of implementation of the oyster with a handle.

【図8】 均し板、仕上げブレードの付いた仕上機の実
施例図。
FIG. 8 is an embodiment view of a finishing machine with a leveling plate and a finishing blade.

【図9】 均し板に振動機を取付けた仕上機の実施例
図。
FIG. 9 is an embodiment diagram of a finishing machine in which a vibrator is attached to a leveling plate.

【図10】振動機付きの仕上げ板をヒモ等で移動する仕
上機の実施例図。
FIG. 10 is an embodiment view of a finishing machine for moving a finishing plate with a vibrator by a string or the like.

【図11】U字型側溝ブロックB−3の実施例図。FIG. 11 is an embodiment view of a U-shaped side groove block B-3.

【図12】U字型側溝ブロックB−3の実施例断面図。FIG. 12 is a sectional view of an embodiment of a U-shaped side groove block B-3.

【図13】別な実施例断面図。FIG. 13 is a sectional view of another embodiment.

【図14】さらに別の実施例断面図。FIG. 14 is a sectional view of still another embodiment.

【図15】U字型側溝ブロックの平面図。FIG. 15 is a plan view of a U-shaped side groove block.

【符号の説明】[Explanation of symbols]

(1)…断面L字型ガイドプレート (2)…差込みプレート (3)…嵌合プレート (4)…軸受 (5)…固定ピン (6)…高さ調整棒 (7)…高さ調整用ガイド (8)…継ぎ材 (9)…幅調整棒 (10)…幅調整用ガイド (11)…セットボルト (12)…セットボルト (15)…カキ棒 (16)…柄 (17)…振動機 (18)…均しゴテ (20)…カギ状凸起 (21)…均し板 (22)…仕上げブレード (23)…ヒモ (24)…調整ネジ (25)…ターンバックル A…ゲージガイド B…側溝ブロック B−1…蓋嵌合用の開口部 B−2…補強用梁 B−3…U字型側溝ブロック C…コンクリート (1) Guide plate with L-shaped cross section (2) Insertion plate (3) Fitting plate (4) Bearing (5) Fixing pin (6) Height adjustment rod (7) Height adjustment Guide (8) ... Joint material (9) ... Width adjustment rod (10) ... Width adjustment guide (11) ... Set bolt (12) ... Set bolt (15) ... Oyster rod (16) ... Pattern (17) ... Vibration Machine (18) ... Leveling iron (20) ... Key-shaped protrusion (21) ... Leveling plate (22) ... Finishing blade (23) ... String (24) ... Adjustment screw (25) ... Turnbuckle A ... Gauge guide B: Gutter block B-1: Opening for lid fitting B-2: Reinforcement beam B-3: U-shaped gutter block C: Concrete

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】側溝ブロックの上面開口部の両側に高さ調
整棒と調整ガイドを設けると共に幅調整棒と調整ガイド
よりなるゲージガイドAを架設し、該ゲージガイドAの
下部にL字型のガイドプレートを排水勾配に従ってブロ
ックBの長手方向に向けて対向して配設し、コンクリー
トを投入後前記L字型ガイドプレートにしたがって柄の
付いた均し具およびカキ具をもちいて荒均しした後、仕
上機で仕上げ、側溝ブロック底面にコンクリートを打設
する方法。
1. A height adjusting rod and an adjusting guide are provided on both sides of an upper surface opening of a side groove block, and a gauge guide A including a width adjusting rod and an adjusting guide is erected. The guide plates were arranged facing each other in the longitudinal direction of the block B in accordance with the drainage gradient, and after the concrete was charged, the concrete was roughened using a leveling tool with a handle and an oyster according to the L-shaped guide plate. After finishing with a finishing machine, concrete is cast on the bottom of the gutter block.
JP18171694A 1994-06-28 1994-06-28 How to cast concrete on the bottom of gutter block Expired - Fee Related JP3174938B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18171694A JP3174938B2 (en) 1994-06-28 1994-06-28 How to cast concrete on the bottom of gutter block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18171694A JP3174938B2 (en) 1994-06-28 1994-06-28 How to cast concrete on the bottom of gutter block

Publications (2)

Publication Number Publication Date
JPH0813598A JPH0813598A (en) 1996-01-16
JP3174938B2 true JP3174938B2 (en) 2001-06-11

Family

ID=16105622

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18171694A Expired - Fee Related JP3174938B2 (en) 1994-06-28 1994-06-28 How to cast concrete on the bottom of gutter block

Country Status (1)

Country Link
JP (1) JP3174938B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5685745B2 (en) * 2013-02-20 2015-03-18 正剛 大嶋 Precast bottomed gutters that strike concrete with gradient adjustment on the inner bottom
JP6406515B2 (en) * 2015-01-20 2018-10-17 正剛 大嶋 Free slope U-shaped side groove
JP6406518B2 (en) * 2015-04-07 2018-10-17 正剛 大嶋 Free slope U-shaped side groove
CN107068202B (en) * 2017-05-25 2023-09-12 四川宏华石油设备有限公司 Nonlinear tube length debugging device

Also Published As

Publication number Publication date
JPH0813598A (en) 1996-01-16

Similar Documents

Publication Publication Date Title
US4861188A (en) Apparatus for levelling concrete
US2867041A (en) Screed support and method of using
US1982387A (en) Road building machine
EP0289261A2 (en) Concrete screed rails
JP3174938B2 (en) How to cast concrete on the bottom of gutter block
CN113737613B (en) Efficient construction method for plain concrete Dan Houbei of road teeth
WO1999061724A1 (en) Tool for levelling a ground surface
CN213563425U (en) Prefabricated superimposed sheet is pour with spreading device
US2708773A (en) Method for making molds
US2034942A (en) Vibrating finishing screed
JP7112635B1 (en) U-shaped throwaway formwork for rising foundations of buildings
JPH0586729A (en) Concrete tamping and leveling robot
US2112489A (en) Combination traffic line and joint installing machine
CN208534032U (en) A kind of formwork reinforcement system
GB2256380A (en) Device for plaster/mortar mix topping a prefabricated concrete slab.
JP3028636U (en) Formwork equipment for concrete pouring
JP3006102U (en) Concrete surface finisher
JP4538160B2 (en) Concrete paving machine
JP2974605B2 (en) Manufacturing method of segment for tunnel lining
CN220643756U (en) Regenerated asphalt pavement paving device
CN219973893U (en) Constructional column formwork device
JPH0718990A (en) Invert concrete leveling device in shielding work
CN220848721U (en) Device for reserved groove of shear key at bottom of steel structure column
JPS62273308A (en) Construction apparatus of water channel
JPH048573B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees