JP3172594U - Hanging tool - Google Patents

Hanging tool Download PDF

Info

Publication number
JP3172594U
JP3172594U JP2011005059U JP2011005059U JP3172594U JP 3172594 U JP3172594 U JP 3172594U JP 2011005059 U JP2011005059 U JP 2011005059U JP 2011005059 U JP2011005059 U JP 2011005059U JP 3172594 U JP3172594 U JP 3172594U
Authority
JP
Japan
Prior art keywords
portions
shaft
sliding
lifting
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2011005059U
Other languages
Japanese (ja)
Inventor
宣之 佐藤
正幸 中澤
Original Assignee
京葉ブランキング工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京葉ブランキング工業株式会社 filed Critical 京葉ブランキング工業株式会社
Priority to JP2011005059U priority Critical patent/JP3172594U/en
Application granted granted Critical
Publication of JP3172594U publication Critical patent/JP3172594U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

【課題】積載されたリング状打ち抜き板部材の移載において、挟持するときや外すときの動作を、簡易且つ迅速に行う。
【解決手段】上下摺動部31が持ち上げられると、上下摺動部31は、軸鋼管21の上方に摺動され、固定アーム33も上方に移動される。固定アーム33のこの移動に応じて回動アーム35は、第1軸部34を中心として反時計回りに回動され且つ第2軸部36を中心として反時計回りに回動する。回動アーム35のこの回動により、水平摺動部37は、閉じるようにリニアレール22の表面を摺動し、爪部39がリング材4の底部を引っ掛け、押さえ部38がリング材4の側面に当たる状態で、上下摺動部31が軸鋼管21と摺動しないように止めネジ部32のネジを締める。リング材4を、吊り具10から外すときは、止めネジ部32のネジを緩め、上下摺動部31が自重で下がるようにすると、水平摺動部37と押さえ部38が開き、爪部39もリング材4から外れる。
【選択図】図1
In transferring a loaded ring-shaped punching plate member, an operation for clamping and removing is performed easily and quickly.
When the vertical sliding portion 31 is lifted, the vertical sliding portion 31 is slid above the shaft steel pipe 21 and the fixed arm 33 is also moved upward. In response to this movement of the fixed arm 33, the rotating arm 35 is rotated counterclockwise about the first shaft portion 34 and counterclockwise about the second shaft portion 36. By this rotation of the rotation arm 35, the horizontal sliding portion 37 slides on the surface of the linear rail 22 so as to be closed, the claw portion 39 hooks the bottom of the ring material 4, and the pressing portion 38 is the ring material 4. The screw of the set screw portion 32 is tightened so that the vertical sliding portion 31 does not slide with the shaft steel pipe 21 in a state of hitting the side surface. When the ring member 4 is removed from the hanger 10, the horizontal sliding part 37 and the pressing part 38 are opened and the claw part 39 is opened by loosening the screw of the set screw part 32 so that the vertical sliding part 31 is lowered by its own weight. Is also detached from the ring material 4.
[Selection] Figure 1

Description

本考案は、板部材を、クレーンで移載するときに用いる吊り具に関する。   The present invention relates to a hanging tool used when a plate member is transferred by a crane.

従来、プレス加工により形成されたリング状の打ち抜き板が積重ねられた部材、例えば、図4に示すような板厚2.3mm、外形(直径)402mm〜681mm(14種類)、積重ね高さ300mm、積重ね最大重量520kgの積重ねられたリング材4は、載置する場所にクレーンで吊り上げられて運搬(移載)される。このようなリング材4の移載をするために、例えば、図5(A)の平面図および図5(B)の側面図に示すような吊り具が用いられていた。   Conventionally, members in which ring-shaped punched plates formed by pressing are stacked, for example, a plate thickness of 2.3 mm as shown in FIG. 4, outer shapes (diameters) of 402 mm to 681 mm (14 types), a stacking height of 300 mm, The stacked ring material 4 having a maximum stacking weight of 520 kg is lifted by a crane and transferred (transferred) to a place to be mounted. In order to transfer such a ring material 4, for example, a hanger as shown in the plan view of FIG. 5A and the side view of FIG. 5B has been used.

図5に示す従来の吊り具は、リング材4を挟みこむための3種類の大きさ(各直径に対応)からなる一対の吊りフック1と、この吊りフック1の取っ手として設けられている吊り具取っ手2から構成されている。この3種類からなる吊りフック1は、リング材4の外形に応じて使い分けされる。すなわち、この吊りフック1は、14種類全てのリング材4の外周と合わせることができるように、3種類の吊りフックで構成されている。   The conventional hanging tool shown in FIG. 5 has a pair of hanging hooks 1 having three kinds of sizes (corresponding to respective diameters) for sandwiching the ring material 4 and a hanging provided as a handle of the hanging hook 1. It consists of a tool handle 2. These three types of hanging hooks 1 are used properly according to the outer shape of the ring material 4. That is, the suspension hook 1 is composed of three types of suspension hooks so that it can be matched with the outer periphery of all 14 types of ring members 4.

この吊り具は、一対の吊りフック1のそれぞれに、クレーンの先端部から吊り下げられている吊りチェーン3が接続され、このチェーン3を介してクレーンで吊り上げられる。このときに、一人の作業者は、クレーンの操作をしながら、リング材4の両側に一対の吊りフック1のそれぞれを引っ掛けるようにして挟み込む。そして、この作業者は、クレーンがこの吊り具を巻き上げるときまで、吊り具取っ手2を持ち続けて吊りフック1を支え続けなければならない。   In this suspension tool, a suspension chain 3 suspended from the tip of the crane is connected to each of the pair of suspension hooks 1 and is lifted by the crane via this chain 3. At this time, one operator holds the pair of hanging hooks 1 on both sides of the ring member 4 while operating the crane. The operator must continue to support the suspension hook 1 by holding the suspension handle 2 until the crane winds up the suspension tool.

また、この吊り具がクレーンで運搬され載置されたとき、吊りフック1からリング材4を外すために、この一人の作業者は、クレーンでこの吊り具を少し下げる。そして、この作業者は、両手で一対の吊りフック1をリング材4から取り外し、この吊りフック1を、作業者側へ引いた状態を維持するために、手で支え続けなければならない。そして、この作業者は、手で支えている動作と同時に、クレーンの操作を行い、この吊り具をリング材4から離すようにする。   Further, when this lifting tool is transported and placed by a crane, in order to remove the ring material 4 from the hanging hook 1, the one operator slightly lowers the lifting tool with the crane. Then, the worker must continue to support the suspension hook 1 with both hands in order to remove the pair of suspension hooks 1 from the ring material 4 and maintain the suspension hook 1 pulled toward the worker side. And this operator operates a crane simultaneously with the operation | movement supported by the hand, and makes this lifting tool remove | separate from the ring material 4. FIG.

特許文献1、2に記載の吊り具には、冷延シート梱包材等の薄鋼板束および重量のある金属円盤を移載の対象とし、油圧シリンダーやクレーンによる水平分散力を利用してこの対象物を挟みこむ技術が開示されている。   The suspensions described in Patent Documents 1 and 2 are intended for transfer of thin steel sheet bundles such as cold rolled sheet packing materials and heavy metal disks, and this object is obtained by utilizing the horizontal dispersion force of a hydraulic cylinder or crane. A technique for sandwiching an object is disclosed.

特開平08−157179号公報Japanese Patent Laid-Open No. 08-157179 特開2007−31133号公報JP 2007-31133 A

上述の従来の吊り具は、3種類からなる吊りフック1のいずれかを、リング材4の外形によって選択しなければならない。このように従来の吊り具は、3種類の吊りフックを用意する必要があり、また、これらを保持するためのスペースが必要である。   In the conventional hanging tool described above, one of the three types of hanging hooks 1 must be selected according to the outer shape of the ring material 4. As described above, the conventional hanging tool needs to prepare three types of hanging hooks, and also requires a space for holding them.

さらに、従来の吊り具は、2本の吊りチェーン3のそれぞれが一対の吊りフック1のそれぞれに接続されており、このような状態の吊り具は、向きと位置が不安定である。したがって、リング材4に吊りフック1を引っ掛ける作業においては、吊りフック1の爪部をこの不安定な状態で、リング材4の方向に向け続けなければならない。すなわち、作業者は、吊り具がクレーンで巻き上げられるまで、吊り具取っ手2を持ちながら吊りフック1を支え続けなければならない。このように、従来の吊り具は、一人の作業者が、クレーンを操作しながら、吊りフック1をリング材4に引っ掛けたり、また、外したりすることにおいて、簡易な作業で行うことができず、作業に時間もかかるという問題があった。   Further, in the conventional hanging tool, each of the two hanging chains 3 is connected to each of the pair of hanging hooks 1, and the hanging tool in such a state is unstable in direction and position. Therefore, in the operation of hooking the suspension hook 1 on the ring material 4, the claw portion of the suspension hook 1 must be continuously directed toward the ring material 4 in this unstable state. That is, the operator must continue to support the suspension hook 1 while holding the suspension handle 2 until the suspension tool is wound up by the crane. As described above, the conventional hanging tool cannot be performed by a simple operation when one worker hooks or removes the hanging hook 1 from the ring member 4 while operating the crane. There was a problem that it took time to work.

本考案は、上述のような従来技術の問題点を解決するために提案されたものである。すなわち、本考案は、単一の装置で、外形の異なる積載されたリング状打ち抜き板部材などを扱うことができ、このような部材の移載において、挟持するときや外すときの作業を、簡易且つ迅速に行うことができる吊り具の提供を目的とする。   The present invention has been proposed to solve the above-described problems of the prior art. That is, the present invention can handle a ring-shaped punched plate member having a different outer shape with a single device, and can easily carry out the work of clamping and removing in the transfer of such a member. And it aims at provision of the hanging tool which can be performed rapidly.

上述の解決課題に鑑みて鋭意研究の結果、本考案者は、部材を吊り上げる吊り上げ部と部材を挟み込み持ち上げる吊りフック部を組み合わせることにより、簡易で迅速な作業が行えることに着想し、本考案をなすに至った。
すなわち、本考案の積重ねられた板部材を移載するときに用いる吊り具は、次のような特徴を有する。
(1) 吊り上げ部と吊りフック部とを有する。
(2) 前記吊り上げ部は、垂直に吊り上げられる軸鋼管と、当該軸鋼管の下方端部から水平方向に伸びるように、当該軸鋼管と一体的に形成された複数のリニアレールとを有する。
(3)前記吊りフック部は、前記軸鋼管が挿通されるように貫通孔が形成され、当該軸鋼管と摺動する上下摺動部と、前記上下摺動部の摺動を抑制させるように設けられた止めネジ部と、前記上下摺動部の外周面から水平方向に伸びるように、当該上下摺動部と一体的に形成された複数の固定アームと、前記複数の固定アームのそれぞれの端部に設けられた複数の第1軸部を介して接続され、前記上下摺動部の摺動に応じて回動する複数の回動アームと、前記複数の回動アームのそれぞれの端部に設けられた複数の第2軸部を介して接続され、前記複数の回動アームの回動に応じて水平方向に摺動する複数の水平摺動部であって、前記リニアレールが挿通されるように貫通孔が形成され、当該リニアレールと摺動する複数の水平摺動部と、前記複数の水平摺動部のそれぞれの底面から下方に伸びるように一体的に形成され、前記水平摺動部の摺動に応じて前記板部材を挟持する複数の押さえ部と、前記複数の押さえ部のそれぞれの下部先端に、前記挟持したときに前記板部材を支える複数の爪部とを有する。
As a result of diligent research in view of the above-mentioned solution problems, the present inventor has conceived that the present invention can be carried out simply and quickly by combining a lifting part for lifting a member and a hanging hook part for sandwiching and lifting the member. It came to an eggplant.
That is, the hanging tool used when transferring the stacked plate members of the present invention has the following characteristics.
(1) It has a lifting part and a hanging hook part.
(2) The lifting portion includes a shaft steel pipe that is vertically lifted and a plurality of linear rails that are integrally formed with the shaft steel pipe so as to extend in a horizontal direction from a lower end portion of the shaft steel pipe.
(3) The suspension hook portion is formed with a through-hole so that the shaft steel pipe is inserted, so that the vertical sliding portion sliding with the shaft steel tube and the sliding of the vertical sliding portion are suppressed. A set screw portion provided, a plurality of fixed arms formed integrally with the vertical sliding portion so as to extend in a horizontal direction from an outer peripheral surface of the vertical sliding portion, and a plurality of fixed arms respectively A plurality of rotating arms that are connected via a plurality of first shaft portions provided at end portions and that rotate according to the sliding of the upper and lower sliding portions, and respective end portions of the plurality of rotating arms A plurality of horizontal sliding portions that are connected to each other through a plurality of second shaft portions and that slide in the horizontal direction in accordance with the rotation of the plurality of rotating arms, and the linear rails are inserted therethrough. A plurality of horizontal sliding portions that are formed so as to slide with the linear rail, A plurality of pressing portions integrally formed so as to extend downward from the respective bottom surfaces of the plurality of horizontal sliding portions, and sandwiching the plate member according to the sliding of the horizontal sliding portions; and the plurality of pressing portions And a plurality of claw portions for supporting the plate member when sandwiched.

また、本考案は、以下の態様も包含される。
(4)前記板部材は、リング状の打ち抜き部材である。
(5)等間隔に設けられた3つのリニアレール、固定アーム、第1軸部、回動アーム、第2軸部、水平摺動部、押さえ部および爪部からなる。
The present invention also includes the following aspects.
(4) The plate member is a ring-shaped punching member.
(5) It consists of three linear rails provided at equal intervals, a fixed arm, a first shaft portion, a rotating arm, a second shaft portion, a horizontal sliding portion, a pressing portion, and a claw portion.

本考案によれば、吊り具は吊り上げ部と吊りフック部とを有し、吊りフック部が吊り上げ部に対して摺動される構成となっていることより、1種類の吊り具により、外形の異なるリング板を積重ねたリング材などに対応することができ、また、吊り具をリング材に引っ掛けるときや外すときの動作が簡易、且つ、迅速に行うことができる。   According to the present invention, the lifting tool has a lifting part and a lifting hook part, and the lifting hook part is configured to slide with respect to the lifting part. It is possible to deal with ring materials or the like in which different ring plates are stacked, and it is possible to easily and quickly perform an operation when hooking or removing the hanging tool from the ring material.

実施形態の吊り具を示す斜視図である。It is a perspective view which shows the hanging tool of embodiment. 実施形態の吊り具がリング材を挟持する前の状態を示す平面図と側面図である。It is the top view and side view which show the state before the hanging tool of embodiment clamps a ring material. 実施形態の吊り具がリング材を挟持した状態を示す平面図と側面図である。It is the top view and side view which show the state which the lifting tool of embodiment clamped the ring material. リング材の一例を示す斜視図である。It is a perspective view which shows an example of a ring material. 従来の吊り具を示す平面図と側面図である。It is the top view and side view which show the conventional lifting tool.

以下、本考案の実施形態の構成について説明する。
図1に示すように、上述のリング材4を移載するときに用いる本実施形態の吊り具10は、吊り上げ部20と吊りフック部30とから構成されている。吊り具10は、リング材4を挟持した状態においてクレーンで持ち上げられるように、例えば、上述の板部材の例で示した、520kgの重量に耐えうるように形成されている。なお、図1のリング材4は、説明の便宜のために、一枚のリング状の打ち抜き板部材を示している。
The configuration of the embodiment of the present invention will be described below.
As shown in FIG. 1, the lifting tool 10 of the present embodiment used when the above-described ring material 4 is transferred includes a lifting part 20 and a hanging hook part 30. The lifting tool 10 is formed so as to be able to withstand the weight of 520 kg shown in the above-described example of the plate member so that the lifting tool 10 can be lifted by a crane in a state where the ring material 4 is sandwiched. In addition, the ring material 4 of FIG. 1 has shown the ring-shaped punching board member of 1 sheet for the convenience of description.

吊り上げ部20は、クレーンで垂直に吊り上げられる軸鋼管21と、軸鋼管21の下方端部から水平方向に等間隔で伸びるように一体的に形成されたリニアレール22a〜22c(以下、単に22という)とを有している。軸鋼管21の上端部には、チェーン接続部21aが設けられている。このチェーン接続部には、例えば、クレーンからの吊りチェーン3が巻き込まれるように接続される。   The lifting portion 20 includes a shaft steel pipe 21 that is lifted vertically by a crane, and linear rails 22a to 22c (hereinafter simply referred to as 22) integrally formed so as to extend from the lower end portion of the shaft steel pipe 21 at equal intervals in the horizontal direction. ). A chain connection portion 21 a is provided at the upper end portion of the shaft steel pipe 21. For example, a suspension chain 3 from a crane is connected to the chain connection portion.

吊りフック部30は、リング材4を挟待する機能を有しており、吊り上げ部20と連動してクレーンで吊り上げられる。吊りフック部30の各構成について以下に説明する。   The hanging hook portion 30 has a function of holding the ring material 4 and is lifted by a crane in conjunction with the lifting portion 20. Each structure of the hanging hook part 30 is demonstrated below.

上下摺動部31は、軸鋼管21が挿通されるように貫通孔が形成され、この貫通孔に挿通された軸鋼管21と摺動する。すなわち、上下摺動部31は、作業者により、軸鋼管21の長手方向にすべるように摺動させられる構成である。   The vertical sliding portion 31 is formed with a through hole so that the shaft steel pipe 21 is inserted, and slides with the shaft steel pipe 21 inserted through the through hole. That is, the vertical sliding portion 31 is configured to be slid by an operator so as to slide in the longitudinal direction of the shaft steel pipe 21.

止めネジ部32は、上述の摺動を抑制させるように、上下摺動部31に設けられている。すなわち、止めネジ部32は、上下摺動部31に設けられたネジ穴に挿入されたネジを回転させることで、このネジが軸鋼管21に当接し、この摺動を抑制する。   The set screw portion 32 is provided in the vertical sliding portion 31 so as to suppress the above-described sliding. That is, the set screw portion 32 rotates a screw inserted in a screw hole provided in the vertical sliding portion 31, so that the screw contacts the shaft steel pipe 21 and suppresses the sliding.

固定アーム33a〜33c(以下、単に33という)は、上下摺動部31の外周面から等間隔に水平方向に伸びるように、上下摺動部31と一体的になるように形成されている。固定アーム33は、上下摺動部31の摺動とともに上下に移動する。   The fixed arms 33 a to 33 c (hereinafter simply referred to as 33) are formed so as to be integrated with the vertical sliding portion 31 so as to extend in the horizontal direction at equal intervals from the outer peripheral surface of the vertical sliding portion 31. The fixed arm 33 moves up and down as the vertical sliding portion 31 slides.

回動アーム35a〜35c(以下、単に35という)は、固定アーム33のそれぞれの端部に設けられた第1軸部34a〜34c(以下、単に34という)を介して接続されている。すなわち、回動アーム35は、上下摺動部31の摺動とともに移動する固定アーム33に応じて、第1軸部34を中心として回動する。   The rotating arms 35 a to 35 c (hereinafter simply referred to as 35) are connected via first shaft portions 34 a to 34 c (hereinafter simply referred to as 34) provided at the respective ends of the fixed arm 33. That is, the rotation arm 35 rotates around the first shaft portion 34 in accordance with the fixed arm 33 that moves as the vertical sliding portion 31 slides.

なお、固定アーム33と第1軸部34と回動アーム35との関係は、固定アーム33aには第1軸部34aが設けられ、第1軸部34aには回動アーム35aが接続されている。固定アーム33b、33cにおいても同様であり、このような関係は、他の構成においても同様である。   The relationship between the fixed arm 33, the first shaft portion 34, and the rotating arm 35 is such that the fixed arm 33a is provided with the first shaft portion 34a, and the first shaft portion 34a is connected with the rotating arm 35a. Yes. The same applies to the fixed arms 33b and 33c, and this relationship is the same in other configurations.

水平摺動部37a〜37c(以下、単に37という)は、回動アーム35のそれぞれの端部に設けられた第2軸部36a〜36c(以下、単に36という)を介して接続されている。水平摺動部37は、リニアレール22が挿通されるように貫通孔が形成され、この貫通孔に挿通されたリニアレール22と摺動する。すなわち、水平摺動部37は、回動アーム35の第1軸部34を中心とした回動と、第2軸部36を中心とした回動に応じて、リニアレール22の長手方向(水平方向)に摺動させられる構成である。   The horizontal sliding portions 37 a to 37 c (hereinafter simply referred to as 37) are connected via second shaft portions 36 a to 36 c (hereinafter simply referred to as 36) provided at the respective ends of the rotating arm 35. . The horizontal sliding portion 37 is formed with a through hole so that the linear rail 22 is inserted, and slides with the linear rail 22 inserted through the through hole. That is, the horizontal sliding portion 37 is rotated in the longitudinal direction of the linear rail 22 (horizontal) according to the rotation about the first shaft portion 34 of the rotation arm 35 and the rotation about the second shaft portion 36. Direction).

押さえ部38a〜38c(以下、単に38という)は、水平摺動部37のそれぞれの底面から下方に伸びるように一体的に形成されている。押さえ部38は、
載置されたリング材4を挟持するように配置され、水平摺動部37の摺動に応じて、リング材を挟み込んだり、外したりする。
The holding portions 38 a to 38 c (hereinafter simply referred to as 38) are integrally formed so as to extend downward from the respective bottom surfaces of the horizontal sliding portion 37. The holding part 38 is
It arrange | positions so that the mounted ring material 4 may be clamped, and a ring material may be inserted | pinched or removed according to sliding of the horizontal sliding part 37. FIG.

爪部39a〜39c(以下、単に39という)は、押さえ部38のそれぞれの下部先端に設けられている。爪部39は、押さえ部38が、リング材4を挟み込むように閉じられたときに、このリング材4の底部に入り込む。そして、クレーンにより吊り具10が持ち上げられたとき、爪部39は、リング材4を支える。   Claw portions 39 a to 39 c (hereinafter simply referred to as 39) are provided at the lower ends of the pressing portions 38. The claw portion 39 enters the bottom portion of the ring material 4 when the pressing portion 38 is closed so as to sandwich the ring material 4. When the lifting tool 10 is lifted by the crane, the claw portion 39 supports the ring material 4.

次に、本実施形態の吊り具10の作用について図2、図3を参照して説明する。図2(A)は、吊り具10が、リング材4を挟持する前の状態の平面図を示し、図2(B)はこの状態の側面図を示している。図2に示すよな状態においては、止めネジ部32のネジが緩められており、上下摺動部31が自重で軸鋼管21の下方に摺動している。   Next, the effect | action of the hanging tool 10 of this embodiment is demonstrated with reference to FIG. 2, FIG. FIG. 2 (A) shows a plan view of the state before the hanging tool 10 clamps the ring member 4, and FIG. 2 (B) shows a side view of this state. In the state shown in FIG. 2, the screw of the set screw portion 32 is loosened, and the vertical sliding portion 31 slides under the shaft steel pipe 21 by its own weight.

上下摺動部31の下方へのこの摺動とともに、固定アーム33も下方に移動する。固定アーム33のこの移動に応じて回動アーム35は、水平摺動部37を外側に開くように摺動される。すなわち、水平摺動部37は、回動アーム35が、第1軸部34を中心とした時計回りに回動し、且つ、第2軸部36を中心として時計回りに回動することで、軸鋼管21から離れるように摺動する。このように吊り具10は、図2に示すような状態となっている。なお、軸鋼管21から、3つの水平摺動部37までの距離は、同じものである。   Along with this sliding downward of the vertical sliding portion 31, the fixed arm 33 also moves downward. In response to this movement of the fixed arm 33, the turning arm 35 is slid to open the horizontal sliding portion 37 outward. That is, the horizontal sliding portion 37 is such that the rotating arm 35 rotates clockwise around the first shaft portion 34 and rotates clockwise around the second shaft portion 36. It slides away from the shaft steel pipe 21. Thus, the hanging tool 10 is in a state as shown in FIG. In addition, the distance from the shaft steel pipe 21 to the three horizontal sliding parts 37 is the same.

このような吊り具10の状態において、作業者は、クレーンを操作し、リング材4の真上から吊り具10を吊り下げる。すなわち、作業者は、3つの押さえ部38が、リング材4を囲むように、クレーンで吊り具10を吊り下げる。   In such a state of the hanger 10, the operator operates the crane and suspends the hanger 10 from directly above the ring material 4. That is, the operator suspends the lifting tool 10 with a crane so that the three pressing portions 38 surround the ring material 4.

図3(A)は、吊り具10が、リング材4を挟持している状態の平面図を示し、図3(B)はこの状態の側面図を示している。まず、上述の3つの押さえ部38が、リング材4を囲むように配置されている状態において、作業者によって、上下摺動部31が持ち上げられる。   FIG. 3A shows a plan view of the state in which the hanging tool 10 holds the ring material 4, and FIG. 3B shows a side view of this state. First, in a state where the above-described three pressing portions 38 are arranged so as to surround the ring material 4, the vertical sliding portion 31 is lifted by the operator.

上下摺動部31が持ち上げられると、上下摺動部31は、軸鋼管21の上方に摺動する。この上方への摺動とともに、固定アーム33も上方に移動する。固定アーム33のこの移動に応じて回動アーム35は、水平摺動部37を内側に閉じるように摺動させる。すなわち、水平摺動部37は、回動アーム35が、第1軸部34を中心とした反時計回りに回動し、且つ、第2軸部36を中心とした反時計回りに回動することで、軸鋼管21に近づくように摺動する。   When the vertical sliding part 31 is lifted, the vertical sliding part 31 slides above the shaft steel pipe 21. Along with this upward sliding, the fixed arm 33 also moves upward. In response to this movement of the fixed arm 33, the turning arm 35 slides so that the horizontal sliding portion 37 is closed inward. That is, in the horizontal sliding portion 37, the rotating arm 35 rotates counterclockwise around the first shaft portion 34 and rotates counterclockwise around the second shaft portion 36. By doing so, it slides so as to approach the shaft steel pipe 21.

作業者による上下摺動部31のこの持ち上げは、爪部39がリング材4の底部を引っ掛け、押さえ部38がリング材4の側面に当たる状態まで行われる。そして、図3に示すような状態において、上下摺動部31が軸鋼管21と摺動しないように止めネジ部32のネジを締める。そして、リング材4は、クレーンで持ち上げられ移載される。   This lifting of the vertical sliding portion 31 by the operator is performed until the claw portion 39 hooks the bottom portion of the ring material 4 and the pressing portion 38 hits the side surface of the ring material 4. Then, in the state shown in FIG. 3, the screw of the set screw portion 32 is tightened so that the vertical sliding portion 31 does not slide with the shaft steel pipe 21. And the ring material 4 is lifted and transferred by the crane.

クレーンで他の場所に載置されたリング材を、吊り具10から外すときは、まず、止めネジ部32のネジを緩める。そうすると、上下摺動部31が自重で軸鋼管21と摺動し下がることになる。上下摺動部31の摺動とともに固定アーム33も下方に移動する。固定アーム33のこの移動に応じて回動アーム35は、上述のとおり、水平摺動部37を外側に開くように摺動させる。   When removing the ring material placed in another place with a crane from the suspension tool 10, first, the screw of the set screw portion 32 is loosened. If it does so, the up-and-down sliding part 31 will slide with the shaft steel pipe 21 with dead weight, and will fall. The fixed arm 33 moves downward as the vertical sliding portion 31 slides. In response to this movement of the fixed arm 33, the rotating arm 35 slides so as to open the horizontal sliding portion 37 outward as described above.

水平摺動部37のこの摺動とともに、押さえ部38が開き、爪部39もリング材4から外れる。そして、吊り具10は、リング材4のない空の状態で、クレーンで持ち上げられ、例えば、他のリング材の移載に使用される。   Along with this sliding of the horizontal sliding portion 37, the pressing portion 38 is opened and the claw portion 39 is also detached from the ring material 4. And the lifting tool 10 is lifted with a crane in the empty state without the ring material 4, and is used for transfer of other ring materials, for example.

本考案は前記実施形態に限定されるものではなく、例えば、以下のような他の実施形態も含有する。   The present invention is not limited to the above embodiment, and includes other embodiments as follows, for example.

上述の実施形態では、クレーンで移載される板部材はリング材4であるがこれに限定されない。例えば、リング状ではなく、矩形の板部材であっても良い。   In the above-described embodiment, the plate member transferred by the crane is the ring material 4, but is not limited thereto. For example, a rectangular plate member may be used instead of the ring shape.

上述の実施形態では、固定アームなどの数は、3つであったがこれに限定されない。例えば、2つ、または4つ以上からなる固定アームなどであっても良い。   In the above-described embodiment, the number of fixed arms and the like is three, but is not limited thereto. For example, it may be a fixed arm composed of two or four or more.

本考案の吊り具は、積載されたリング状打ち抜き板部材などの部材を、クレーンなどで移載する産業において、利用することができるものである。   The hanger of the present invention can be used in the industry of transferring a member such as a loaded ring-shaped punching plate member with a crane or the like.

1…吊りフック
2…吊り具取っ手
3…吊りチェーン
4…リング材
10…吊り具
20…吊り上げ部
21…軸鋼管
21a…チェーン接続部
22、22a〜22c…リニアレール
30…吊りフック部
31…上下摺動部
32…止めネジ部
33、33a〜33c…固定アーム
34、34a〜34c…第1軸部
35、35a〜35c…回動アーム
36、36a〜36c…第2軸部
37、37a〜37c…水平摺動部
38、38a〜38c…押さえ部
39、39a〜39c…爪部
DESCRIPTION OF SYMBOLS 1 ... Hanging hook 2 ... Hanging tool handle 3 ... Hanging chain 4 ... Ring material 10 ... Hanging tool 20 ... Lifting part 21 ... Shaft steel pipe 21a ... Chain connection part 22, 22a-22c ... Linear rail 30 ... Hanging hook part 31 ... Up and down Sliding part 32 ... Set screw part 33, 33a to 33c ... Fixed arm 34, 34a to 34c ... First shaft part 35, 35a to 35c ... Rotating arm 36, 36a to 36c ... Second shaft part 37, 37a to 37c ... Horizontal sliding parts 38, 38a to 38c ... Holding parts 39, 39a to 39c ... Claw parts

Claims (3)

部材を移載するときに用いる吊り具において、
吊り上げ部と吊りフック部と、を有し、
前記吊り上げ部は、前記部材を吊り上げるように形成され、前記吊りフック部は、前記部材を挟持し支えるように形成され、
前記吊りフック部は、前記吊り上げ部の吊り上げとともに吊り上げられることを特徴とする吊り具。
In the hanging tool used when transferring a member,
A lifting portion and a hanging hook portion,
The lifting portion is formed to lift the member, and the hanging hook portion is formed to sandwich and support the member,
The lifting tool is characterized in that the hanging hook part is lifted together with the lifting of the lifting part.
積重ねられた板部材を移載するときに用いる吊り具において、
吊り上げ部と吊りフック部と、を有し、
前記吊り上げ部は、
垂直に吊り上げられる軸鋼管と、
当該軸鋼管の下方端部から水平方向に伸びるように、当該軸鋼管と一体的に形成された複数のリニアレールと、を有し、
前記吊りフック部は、
前記軸鋼管が挿通されるように貫通孔が形成され、当該軸鋼管と摺動する上下摺動部と、
前記上下摺動部の摺動を抑制させるように設けられた止めネジ部と、
前記上下摺動部の外周面から水平方向に伸びるように、当該上下摺動部と一体的に形成された複数の固定アームと、
前記複数の固定アームのそれぞれの端部に設けられた複数の第1軸部を介して接続され、前記上下摺動部の摺動に応じて回動する複数の回動アームと、
前記複数の回動アームのそれぞれの端部に設けられた複数の第2軸部を介して接続され、前記複数の回動アームの回動に応じて水平方向に摺動する複数の水平摺動部であって、前記リニアレールが挿通されるように貫通孔が形成され、当該リニアレールと摺動する複数の水平摺動部と、
前記複数の水平摺動部のそれぞれの底面から下方に伸びるように一体的に形成され、前記水平摺動部の摺動に応じて前記板部材を挟持する複数の押さえ部と、
前記複数の押さえ部のそれぞれの下部先端に、前記挟持したときに前記板部材を支える複数の爪部と、
を有することを特徴とする吊り具。
In the hanging tool used when transferring the stacked plate members,
A lifting portion and a hanging hook portion,
The lifting part is
A shaft steel pipe suspended vertically;
A plurality of linear rails formed integrally with the shaft steel pipe so as to extend in the horizontal direction from the lower end of the shaft steel pipe,
The hanging hook part is
A through hole is formed so that the shaft steel pipe is inserted, and a vertical sliding portion that slides with the shaft steel pipe,
A set screw portion provided to suppress sliding of the upper and lower sliding portions;
A plurality of fixed arms formed integrally with the vertical sliding portion so as to extend in the horizontal direction from the outer peripheral surface of the vertical sliding portion;
A plurality of pivot arms connected via a plurality of first shaft portions provided at respective end portions of the plurality of fixed arms, and pivoting in accordance with the sliding of the upper and lower sliding portions;
A plurality of horizontal slides that are connected via a plurality of second shaft portions provided at respective end portions of the plurality of rotating arms and slide in a horizontal direction in accordance with the rotation of the plurality of rotating arms. A through hole formed so that the linear rail is inserted therethrough, and a plurality of horizontal sliding portions that slide with the linear rail;
A plurality of pressing portions that are integrally formed so as to extend downward from the respective bottom surfaces of the plurality of horizontal sliding portions, and sandwich the plate member according to the sliding of the horizontal sliding portions;
A plurality of claw portions that support the plate member when sandwiched at the lower ends of the plurality of pressing portions,
A hanging tool characterized by comprising:
等間隔に設けられた3つのリニアレール、固定アーム、第1軸部、回動アーム、第2軸部、水平摺動部、押さえ部および爪部からなることを特徴とする請求項2に記載の吊り具。   The three linear rails provided at equal intervals, a fixed arm, a first shaft portion, a rotating arm, a second shaft portion, a horizontal sliding portion, a pressing portion, and a claw portion, according to claim 2. Hanging tool.
JP2011005059U 2011-08-30 2011-08-30 Hanging tool Expired - Lifetime JP3172594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011005059U JP3172594U (en) 2011-08-30 2011-08-30 Hanging tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011005059U JP3172594U (en) 2011-08-30 2011-08-30 Hanging tool

Publications (1)

Publication Number Publication Date
JP3172594U true JP3172594U (en) 2012-01-05

Family

ID=47999925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011005059U Expired - Lifetime JP3172594U (en) 2011-08-30 2011-08-30 Hanging tool

Country Status (1)

Country Link
JP (1) JP3172594U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103224194A (en) * 2013-04-23 2013-07-31 大连德新机电技术工程有限公司 Coiling iron core overturning and hoisting apparatus
CN104386578A (en) * 2014-11-11 2015-03-04 成都三强轧辊股份有限公司 High-temperature ring part lifting appliance
CN105460777A (en) * 2015-06-15 2016-04-06 荆门索立特热能技术有限公司 Three-jaw lifting appliance
CN107225589A (en) * 2017-07-26 2017-10-03 江苏苏高流体机械有限公司 A kind of metal casting quick-gripping device
CN109455616A (en) * 2019-01-02 2019-03-12 山西双环重工集团有限公司 Take ring machine
CN109534154A (en) * 2018-12-30 2019-03-29 中国石油集团渤海石油装备制造有限公司 A kind of bend pipe hanging device
CN111747296A (en) * 2019-03-26 2020-10-09 长城汽车股份有限公司 Hoisting device
CN113800386A (en) * 2021-08-31 2021-12-17 武汉神冶起重机械有限公司 Anti many steel bushing hoists of swing
CN115465768A (en) * 2022-10-28 2022-12-13 中国二十二冶集团有限公司 Large-scale bearing hoisting device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103224194A (en) * 2013-04-23 2013-07-31 大连德新机电技术工程有限公司 Coiling iron core overturning and hoisting apparatus
CN104386578A (en) * 2014-11-11 2015-03-04 成都三强轧辊股份有限公司 High-temperature ring part lifting appliance
CN105460777A (en) * 2015-06-15 2016-04-06 荆门索立特热能技术有限公司 Three-jaw lifting appliance
CN107225589A (en) * 2017-07-26 2017-10-03 江苏苏高流体机械有限公司 A kind of metal casting quick-gripping device
CN109534154B (en) * 2018-12-30 2024-02-13 中国石油集团渤海石油装备制造有限公司 Bent pipe hoisting equipment
CN109534154A (en) * 2018-12-30 2019-03-29 中国石油集团渤海石油装备制造有限公司 A kind of bend pipe hanging device
CN109455616A (en) * 2019-01-02 2019-03-12 山西双环重工集团有限公司 Take ring machine
CN111747296A (en) * 2019-03-26 2020-10-09 长城汽车股份有限公司 Hoisting device
CN111747296B (en) * 2019-03-26 2022-07-15 长城汽车股份有限公司 Hoisting device
CN113800386B (en) * 2021-08-31 2023-12-15 武汉神冶起重机械有限公司 Anti-swing multi-steel-sleeve lifting appliance
CN113800386A (en) * 2021-08-31 2021-12-17 武汉神冶起重机械有限公司 Anti many steel bushing hoists of swing
CN115465768A (en) * 2022-10-28 2022-12-13 中国二十二冶集团有限公司 Large-scale bearing hoisting device
CN115465768B (en) * 2022-10-28 2023-01-10 中国二十二冶集团有限公司 Large-scale bearing hoisting device

Similar Documents

Publication Publication Date Title
JP3172594U (en) Hanging tool
JP2019534793A (en) Invertable multi-finger asynchronous gripper for casting robot
JP2006508001A5 (en)
AU2010200817B2 (en) Grippers for use in palletising packaged goods
CN2897963Y (en) Clamp
CN106185313B (en) Clamping device
CN211806224U (en) Clamp apparatus
CN104246019A (en) Transfer apparatus
CN201713210U (en) Lifting appliance for plate-shaped objects in piles
JP6648908B2 (en) Structure for load test and method of manufacturing structure
CN106003124B (en) A kind of clamping jaw applied on mechanical arm
CN107618871A (en) A kind of jig rotation switching positioning handling device
CN208601366U (en) A kind of robot end's fixture
CN208980179U (en) A kind of batch lifting clamp for plate
JP2009012936A (en) Lifting tool
CN202156870U (en) Inner expansion type lifting appliance for steel tubes
JP2004269096A (en) Heavy article hoisting tool
CN215516350U (en) Hoisting clamp with good stability
CN207209376U (en) A kind of rectangle section of jurisdiction Horizontal clamp
CN102499594A (en) Hand imitating bowl lifting fixture
CN212403285U (en) Maintenance platform for machining
JP7195902B2 (en) Hanging jig
JP3201751U (en) Lifting device
KR200470615Y1 (en) Holder for welding steel plate
CN205989339U (en) A kind of pipeline handling hand

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111025

R150 Certificate of patent or registration of utility model

Ref document number: 3172594

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141207

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term