JP3144767B2 - Underground pile forming method and apparatus - Google Patents

Underground pile forming method and apparatus

Info

Publication number
JP3144767B2
JP3144767B2 JP06527197A JP6527197A JP3144767B2 JP 3144767 B2 JP3144767 B2 JP 3144767B2 JP 06527197 A JP06527197 A JP 06527197A JP 6527197 A JP6527197 A JP 6527197A JP 3144767 B2 JP3144767 B2 JP 3144767B2
Authority
JP
Japan
Prior art keywords
pile
shoe
rod
underground
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06527197A
Other languages
Japanese (ja)
Other versions
JPH10219683A (en
Inventor
正司 船越
Original Assignee
東京設計事務所有限会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京設計事務所有限会社 filed Critical 東京設計事務所有限会社
Priority to JP06527197A priority Critical patent/JP3144767B2/en
Publication of JPH10219683A publication Critical patent/JPH10219683A/en
Application granted granted Critical
Publication of JP3144767B2 publication Critical patent/JP3144767B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地中に砕石或いは
コンクリート、鉱さい等による杭を成形し構造物及び建
物基礎工、道路や鉄道及び滑走路の路盤工、堤防の基礎
工、また、土地造成や地すべり対策工等を行う地中杭の
成形方法及び装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation for structures and buildings, a foundation for roads, railways and runways, a foundation for levees, and a foundation for forming piles made of crushed stone, concrete, or mine pits in the ground. The present invention relates to a method and an apparatus for forming an underground pile for performing construction and landslide prevention work.

【0002】[0002]

【従来の技術】従来、新規に住宅や商店および工場、事
務所の土地造成をする場合、軟弱な沖積世の土地を開発
する事が多く、古来多くの軟弱地盤対策工が考えられ、
また実施されてきた。この対策工は地盤が土粒子(固
体)と地下水(液体)や空気(気体)の間隙(間隙が締
め固められる可能性を相対密度で示す)で構成されてい
る事に着目し、間隙を締め固めて土粒子同士の骨格を密
実化するか、または、固結材や接着剤を用いて間隙を固
化する2方法が各工法の基本的な考え方である。なお、
地下水位が高い軟弱地盤の間隙は主に水が占めている。
そして、各工法については建設産業調査会の発行「基礎
設計・施工ハンドブック」「軟弱地盤ハンドブック」が
機能別に分類して記載されており、それぞれの工法別特
徴は次のとおりである。
2. Description of the Related Art Conventionally, when newly constructing land for a house, a store, a factory, and an office, a lot of land in the soft alluvial world is often developed, and many soft ground countermeasures have been considered since ancient times.
It has also been implemented. This countermeasure focuses on the fact that the ground is composed of gaps between soil particles (solid) and groundwater (liquid) or air (gas) (the possibility of compaction is indicated by relative density). The basic idea of each method is two methods of solidifying the skeleton between the soil particles or solidifying the gap using a bonding material or an adhesive. In addition,
Water occupies mainly the gaps in the soft ground where the groundwater level is high.
For each method, the "Foundation Design and Construction Handbook" and "Soft Ground Handbook" issued by the Construction Industry Research Committee are classified by function and described. The features of each method are as follows.

【0003】即ち、置き換え工法は、良質の土に置換す
るので確実性が高く、古くから実績を多く有するが、排
除する建設発生土の処理に難がある。また締め固め工法
は、沈下抑制と地震時の液状化防止の効果は大きいが、
近隣に与える施工中の振動や騒音など環境の面で難があ
る。
[0003] That is, the replacement method has high reliability since it is replaced with high quality soil, and has a long track record since ancient times. In addition, the compaction method is effective in suppressing settlement and preventing liquefaction during an earthquake,
There are difficulties in the environment such as vibration and noise during construction given to the neighborhood.

【0004】また場所打ち杭工法は、機械掘削により大
孔径で支持層へ確実に到達させるので、既成品の杭工法
と同様に大きな杭支持力が得られるが、開削に伴う地山
の孔壁保護や沈澱物除去など孔底処理が煩雑となり、更
にコンクリートを充填する際に孔内の地下水や泥水によ
り材料が分離する等形状や材質の品質管理が難しい。ま
た固結工法は、硬化材注入により、限定された範囲を精
度よく施工ができ、作業も無騒音無振動で出来る事か
ら、各種工事の地盤改良として広い分野で適用されてい
るが、地盤に適した硬化材の選択や改良効果の確認が難
しく、工事費も高価であり地下水汚染にも注意が必要で
ある。
In the cast-in-place pile method, a large hole diameter is reliably reached to the support layer by mechanical excavation, so that a large pile supporting force can be obtained as in the case of the existing pile method. Hole bottom processing such as protection and removal of precipitates is complicated, and quality control of shapes and materials is difficult, such as separation of materials due to groundwater or muddy water in the holes when filling concrete. In addition, the consolidation method is applied in a wide range of fields as ground improvement for various constructions, because the hardening material injection can perform a limited range with high precision and the work can be done without noise and vibration. It is difficult to select a suitable hardening material and confirm the effect of improvement, the construction cost is high, and attention must be paid to groundwater contamination.

【0005】また強制圧密工法は、地盤を強制的に圧縮
して、圧密作用と同様に土の強度を増強させるものであ
る。この工法の載荷法には静荷重と動荷重があり、静荷
重は圧密終了までに長い期間を必要とし、動荷重は作動
時の振動や衝撃音、また、圧密効果のバラツキ等に難が
ある。また脱水工法は、地盤の圧密を促進させるため、
粘土層の土中水を脱水するものであるが、地中に於ける
ドレーン材の目詰まりや連続性など施工性の問題、理論
解析に必要な原地盤の複雑な土質条件の選定やそれに基
ずく予測と実施効果の整合性が難しい。
[0005] The forced consolidation method forcibly compresses the ground to increase the strength of the soil as well as the consolidation action. The loading method of this method has a static load and a dynamic load. The static load requires a long period of time until the end of compaction, and the dynamic load has difficulty in vibration and impact noise during operation, and variations in the compaction effect. . Also, the dewatering method promotes consolidation of the ground,
It dewaters the soil water in the clay layer, but it has problems in workability such as clogging and continuity of drainage material in the ground, selection of complicated soil conditions of the original ground necessary for theoretical analysis, and It is difficult to match the forecast and implementation effects.

【0006】そして、上記の各工法は、土質力学の重要
なCoulombの公式に基づくと、同式はせん断強さ
(τ)を τ=c+σ*tanφ で示し、cを粘着力、
φをせん断抵抗角、σを直圧力としており、粘性土はc
が大きくφは小さい、砂質土は逆でありσの影響を受け
る。この事は粘性土と砂質土の対策工の差異を単的に示
しており、前述の各工法も対象とする土質に限定した画
一的なものが多く、複雑で不均一な軟弱地盤の地層では
施工精度にバラツキが生じる事となる。
[0006] Each of the above construction methods is based on the important Coulomb formula of soil mechanics, and the same equation shows the shear strength (τ) as τ = c + σ * tanφ, where c is the adhesive strength,
φ is the shear resistance angle and σ is the direct pressure.
Is large and φ is small. Sandy soil is opposite and is affected by σ. This simply shows the difference between countermeasures for cohesive soil and sandy soil, and many of the above-mentioned construction methods are uniform and limited to the target soil, and complex and uneven soft ground In the stratum, the construction accuracy varies.

【0007】さらに、上記のものと関連する特公平03
−24925号公報には、半透水布状物を用いた地中柱
状体の造成方法の技術が示されているが、この手段では
作業工程が煩雑であり、開削孔の安定や硬化材の固化状
態の確認が難しい。 一方、住宅や小規模な構造物の基
礎工事は地盤に関する知識不足、または、基礎の不等沈
下や地盤が地震時に液状化すること等の知識を有してい
ても、作業環境である施工場所が狭隘なこと。加えて、
工事により発生する泥土や硬化材注入に伴う廃液等の建
設廃棄物の処理、施工機械の騒音や排気ガス、振動等の
規制や制約から、十分な地盤対策工を施すことなく基礎
工事が実施され、前述の建造物等は地盤の支持力不足に
より基礎の変形やすべり破壊による多くの被害が発生し
ている。
Further, Japanese Patent Publication No.
Japanese Patent Publication No. 24925 discloses a technique for forming an underground columnar body using a semi-permeable cloth. However, this method requires a complicated work process, and stabilizes a drilled hole and solidifies a hardened material. It is difficult to check the status. On the other hand, foundation work for houses and small-scale structures does not have enough knowledge about the ground, or even if it has knowledge such as uneven settlement of the foundation and the fact that the ground liquefies during an earthquake, the work environment Is narrow. in addition,
Construction work such as treatment of construction waste such as mud generated by construction work and waste liquid due to hardening material injection, and restrictions and restrictions on noise, exhaust gas, and vibration of construction machinery, etc., were implemented without sufficient ground countermeasures. However, the above-mentioned buildings and the like have suffered many damages due to deformation of foundations and breakage due to insufficient ground support capacity.

【0008】[0008]

【発明が解決しようとする課題】軟弱地盤の対策工は上
記の通り各種あるが、複雑で不均一な軟弱地盤の地層に
幅広く対応できないため、施工には予測調査や理論解
析、硬化材注入、改良効果の確認など多様な検討や施工
中のトラブル対策が必要となり、施工機械や経験豊富な
技術者が特定され、この結果、工期が長くなり工事費も
高価となる。さらに、環境の面では施工機械の振動や騒
音に加えて建設発生土の処理、廃液や泥水の処置等多く
の問題がある。一方、住宅地域で工事を施工する場合、
上記の制約に加え大型機械の運搬路や作業スペースの確
保、排気ガス等の問題があり、基礎の対策工を必要とし
ながら工事が出来ないなど多くの課題を有する。
There are various countermeasures for soft ground as described above. However, since it is not possible to cope with a complicated and uneven ground layer of soft ground widely, it is necessary to carry out prediction investigation, theoretical analysis, hardening material injection, Various examinations such as confirmation of improvement effects and countermeasures for troubles during construction are required, and construction machines and experienced technicians are specified. As a result, the construction period becomes longer and construction costs become higher. Further, in terms of the environment, there are many problems such as treatment of soil generated from construction, treatment of waste liquid and muddy water in addition to vibration and noise of construction machines. On the other hand, when constructing in a residential area,
In addition to the above-mentioned restrictions, there are problems such as securing a transportation route and work space for large machines, exhaust gas, and the like.

【0009】本発明は、工事費が安価で汎用性の高い工
法とするため、容易に原地盤の支持力を高めて、地盤沈
下や地震時の液状化を抑制する事ができること。即ち、
原地盤の相対密度に着目しこれを把握した上で、原地盤
に棒(ロッド)を介してその先端のシュー(沓)を圧入
すること。圧入により(圧密されて)生じた杭穴には地
盤強化に必要な材料を突き固めて充填し、杭を成形する
と共に原地盤を密実にすること。また、圧入により生じ
る杭穴の壁(孔壁)は直ちに杭穴へ材料を連続して隙間
なく均等に充填し、杭穴壁面に働く原地盤の土圧を充填
材料と圧力バランスさせて孔壁面の崩壊を防止するこ
と。なお、従来の場所打ち杭工法はこの工程が重要管理
項目であると同時に、このトラブルが最大の災害となる
ため経験豊富な技術者の配置を必要としたが、これらを
不要にし作業の安全と工程の簡素化を図ること。
According to the present invention, since the construction method is inexpensive and highly versatile, it is possible to easily increase the bearing capacity of the original ground and to suppress land subsidence and liquefaction during an earthquake. That is,
Focusing on the relative density of the original ground, grasping this, and then pressing the shoe (shoot) at the tip of the original ground through a rod. Pile holes created by press-fitting (consolidation) must be filled with the necessary materials for ground reinforcement, forming the pile and making the original ground solid. In addition, the hole (hole wall) of the pile hole generated by the press-fitting is immediately filled with the material into the pile hole continuously and evenly without any gap, and the soil pressure of the original ground acting on the wall surface of the pile hole is pressure-balanced with the filling material to make the hole wall surface. To prevent the collapse of In the conventional cast-in-place pile method, this process is an important control item, and at the same time, this trouble is the biggest disaster. To simplify the process.

【0010】さらに、地盤の圧密を促進するため充填材
料に砕石など高透水性材料を用いて、地中杭の透水性を
利用して地下水を容易に排除すること。また、杭先端の
シューは地中杭の形状と先端支持力を保持させると同時
に、圧入の方向性を維持させること。さらに、杭の圧入
抵抗を低減して棒の圧入力を省力化すること。土のシキ
ソトロピーを考慮して圧入作業は連続で行うこと。そし
て、本工法による成形後の地盤支持力が既存の簡便な載
荷試験などで測定が容易にできること等の利点を有する
高能率で廉価な地中杭の成形方法及び装置を提供するも
のである。
[0010] Furthermore, in order to promote the consolidation of the ground, a highly permeable material such as crushed stone is used as a filling material, and groundwater is easily removed by utilizing the permeability of an underground pile. Also, the shoe at the tip of the pile should maintain the shape of the underground pile and the bearing capacity of the tip, and at the same time maintain the direction of press-fitting. Furthermore, to reduce the press-in resistance of the stake and to reduce the press-in force of the rod. Pressing work should be performed continuously in consideration of soil thixotropy. It is another object of the present invention to provide a highly efficient and inexpensive underground pile forming method and apparatus having an advantage that the ground support force after forming by this method can be easily measured by an existing simple loading test or the like.

【0011】[0011]

【課題を解決するための手段】上記目的を達成するた
め、本発明の地中杭の成形方法は、第1に棒の先端部に
杭穴形成用のシューを装着し、該棒の押圧力によって地
中の所定の深さに圧入させながら形成される杭穴内に材
料を充填させた後、該シューを棒先端部から分離させて
杭穴内に残置させると共に、前記棒を引き抜きながら往
復動させることにより、充填材料を杭穴内の下方から順
次突き固めて、充填材料による杭柱を地中に形成するこ
とを特徴としている。
In order to achieve the above object, a method of forming an underground pile according to the present invention comprises, first, mounting a shoe for forming a pile hole at the tip of a rod, and applying a pressing force to the rod. After the material is filled into a pile hole formed while being pressed into a predetermined depth in the ground, the shoe is separated from the tip of the rod and left in the pile hole, and the shoe is reciprocated while pulling out the rod. This is characterized in that the filling material is sequentially squeezed from below in the pile hole to form a pile pillar of the filling material in the ground.

【0012】第2に棒を往復動作かつ回転力を加えて杭
穴を形成することを特徴としている。
Second, the present invention is characterized in that a pile hole is formed by reciprocating the rod and applying a rotational force.

【0013】第3にシューを棒で圧入して杭穴を形成す
る時に、該シュー又は棒に芯材を保持させて、地中杭を
形成することを特徴としている。
Third, when a shoe is press-fitted with a rod to form a pile hole, a core material is held by the shoe or the rod to form an underground pile.

【0014】第4に杭穴の成形箇所の地面に、着脱可能
に設置した充填材料供給用のホッパーによって、上記杭
穴内に材料を充填させながら地中杭を形成することを特
徴としている。
The fourth feature is that an underground pile is formed while the material is filled in the pile hole by a hopper for supplying a filling material which is detachably provided on the ground at a location where the pile hole is formed.

【0015】第5に着脱可能に地面に設けたホッパーと
シューとの間に、ガイド管を設け、該ガイド管によって
充填材料を杭穴内に連続的に注入させて、地中杭を形成
することを特徴としている。
Fifthly, a guide pipe is provided between a hopper and a shoe which are detachably provided on the ground, and a filler material is continuously injected into the pile hole by the guide pipe to form an underground pile. It is characterized by.

【0016】また、本発明の地中杭の成形装置は、第1
に先端部に杭穴成形用のシューを分離可能に備え、該シ
ューを圧入すると共に、シューを分離した状態で往復動
及び引き抜き動作をする棒と、地面に着脱可能に設置さ
れ、且つ、上記シューによって形成される杭穴内に充填
材料を供給する供給装置を設け、杭穴を形成しながら該
杭穴内に材料を供給し地中杭を成形することを特徴とし
ている。
Further, the underground pile forming apparatus of the present invention comprises:
At the tip, a shoe for forming a pile hole is detachably provided, and while the shoe is press-fitted, a bar that reciprocates and pulls out in a state where the shoe is separated, is detachably installed on the ground, and A supply device for supplying a filling material into a pile hole formed by the shoe is provided, and while forming the pile hole, the material is supplied into the pile hole to form an underground pile.

【0017】第2にシューの外周に筒状のガイドを取り
付けることを特徴としている。
Second, a cylindrical guide is attached to the outer periphery of the shoe.

【0018】第3に棒の先端部にシューを仮保持機構を
介して取り付けることを特徴としている。
Third, the shoe is attached to the tip of the rod via a temporary holding mechanism.

【0019】[0019]

【本発明の実施の形態】発明の一実施形態を図面に基づ
いて説明する。図1〜図3に示す実施形態は地中杭の成
形方法と装置を示すものである。図1に地中杭を成形す
る方法と装置の構成を示しており、地中杭1を形成する
には棒(ロッド)3に押圧力(回転力)6を加えて杭先
端部のシュー(沓)2を圧入すると共に、該棒3を引き
抜きながら往復動させ、地中杭1に充填する材料4を突
き固める。上記シュー2は地中杭1の形状を保ちながら
所要の位置まで圧入されると棒3と切り離して杭底に残
置する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described with reference to the drawings. The embodiment shown in FIGS. 1 to 3 shows a method and an apparatus for forming an underground pile. FIG. 1 shows a method and an apparatus for forming an underground pile. In order to form the underground pile 1, a pressing force (rotational force) 6 is applied to a rod (rod) 3 and a shoe ( While the shoe 2 is being pressed in, the rod 3 is reciprocated while being pulled out, and the material 4 to be filled into the underground pile 1 is compacted. When the shoe 2 is press-fitted to a required position while maintaining the shape of the underground pile 1, it is separated from the rod 3 and remains at the pile bottom.

【0020】また、該シュー2は材料4と一体となって
圧入し、この時生じた杭穴8は直ちに材料4を連続充填
し土圧バランスを図って杭穴壁9の崩壊を防止すると共
に材料4の分離を防ぐ事ができる。上記材料4を供給す
るホッパー5は材料4の流動促進と飛散防止を図ると共
に杭の位置に着脱できる構造とし地面に固定する脚5a
と供給部5bを設けている。
Further, the shoe 2 is press-fitted integrally with the material 4, and the pile hole 8 formed at this time is immediately filled with the material 4 immediately to balance the earth pressure to prevent the collapse of the pile hole wall 9 and Separation of the material 4 can be prevented. The hopper 5 for supplying the material 4 has a structure for promoting the flow of the material 4 and preventing the material 4 from scattering, and has a structure that can be attached to and detached from the pile, and is fixed to the ground.
And a supply unit 5b.

【0021】即ち、地中杭1は杭の先端にシュー2を設
け、該シュー2を棒3で圧入し、生じた杭穴8へ材料4
を注ぎかつ突き固めて成形する事ができる。これによ
り、複雑で不均一な軟弱地盤の地層或いは不規則な支持
層でも、地中に於ける杭の断面形状や長さ及び進入角度
を適正に維持させて、容易に成形できる事を特徴として
いる。この場合、上記した棒3、或いはシュー2、材料
供給装置5等の作動状態を感知し検出機構を介して地中
杭1の形成状態をチェックしながら、所望の杭を自動制
御して仕上げる装置としてもよい。
That is, the underground pile 1 is provided with a shoe 2 at the tip of the pile, the shoe 2 is press-fitted with the rod 3, and the material 4 is inserted into the formed pile hole 8.
Can be poured and compacted. The feature is that it can be easily formed even with a complicated and uneven soft ground layer or irregular support layer by properly maintaining the cross-sectional shape, length and approach angle of the pile in the ground. I have. In this case, a device for automatically controlling and finishing a desired pile while sensing the operating state of the above-mentioned bar 3, shoe 2, material supply device 5, etc., and checking the formation state of the underground pile 1 via a detection mechanism. It may be.

【0022】図示例に於いて、材料4は砕石を用いた地
中杭1を示すが、これによれば土構造のうち主に地下水
を排除して杭体の容積を確保するので、該地中杭1の成
形に伴う泥や土砂の建設発生土がなく、今まで定常的に
必要とされてきた建設発生土の処理に伴う諸々の対策工
や経費を不要にすると共に作業場も発生土に汚染されず
作業環境も衛生的になる。なお、充填する材料4は上記
の他にコンクリート、鉱さい等を施工条件によって適宜
選択して同様に行う事ができる。
In the illustrated example, the material 4 is an underground pile 1 using crushed stone. According to this, mainly the groundwater is excluded from the soil structure to secure the volume of the pile body. There is no dirt or earth and sand generated by the formation of the middle pile 1, and various countermeasures and costs associated with the treatment of the construction soil that have been required so far are not required, and the work site is also used as the generated soil. The work environment is sanitary without contamination. In addition, the material 4 to be filled can be similarly performed by appropriately selecting concrete, mining tail, or the like in addition to the above, depending on construction conditions.

【0023】図2は前記した杭先端部に装着可能な各シ
ューの構造を示すものである。図2(A)は通常の軟弱
地盤に使用するシュー2の例を示す。該シュー2は突入
部を円形で先鋭な錐形2aに形成させると共に、圧入用
の棒(ロッド)3と仮保持を含め着脱可能に支持できる
ように挿脱孔2bとフック2cを設けている。これによ
り、該シュー2は上記棒3に追従させて圧入する事が出
来るので、通常の軟弱地盤に使用する上で構成が簡単で
好適となる。図2(B)は、上記シュー2の突入部を先
鋭な角形2dにした例を示しており、該シュー2は回転
する時に錐(きり)の作用を働かせて、杭先端地盤の固
結力を低下させるので上記より硬い地盤に使用する事が
できる。
FIG. 2 shows the structure of each shoe which can be mounted on the tip of the pile. FIG. 2A shows an example of a shoe 2 used for ordinary soft ground. The shoe 2 has a protruding portion formed in a circular and sharp conical shape 2a, and is provided with an insertion / removal hole 2b and a hook 2c so as to be detachably supported including a press-fitting rod (rod) 3 and temporary holding. . This allows the shoe 2 to be pressed into the rod 3 so as to follow the rod 3, so that the structure is simple and suitable for use on ordinary soft ground. FIG. 2B shows an example in which the protruding portion of the shoe 2 is formed into a sharp square 2d. When the shoe 2 rotates, the action of a drill is used to consolidate the pile tip ground. It can be used for harder ground than the above.

【0024】図2(C)は、図2(A)、(B)に示す
シュー2に突入用の突条2e、即ちスクリューを付けて
ネジの作用をさせ地盤への進入を容易にする事ができる
例を示す。該シュー2は部分的に固い土質を含んでいる
土層、また、前記したシュー2が空回りし易い砂やシル
トの多い地盤に好適に使用する事ができる。図2(D)
は、図2(A)、(B)、(C)に示すシュー2に筒状
のガイド板2fを連接することにより、該シュー2の圧
入角度を適正に維持させて穴振れを抑制する事ができる
例を示す。これによれば、特に後述する斜杭1bに好適
に使用する事ができる。
FIG. 2 (C) shows that the shoe 2 shown in FIGS. 2 (A) and 2 (B) is provided with a ridge 2e for intrusion, that is, a screw to act as a screw to facilitate entry into the ground. Here is an example that can be done. The shoe 2 can be suitably used for a soil layer partially containing hard soil, or for a ground with a lot of sand or silt where the above-mentioned shoe 2 tends to idle. FIG. 2 (D)
Is to connect a cylindrical guide plate 2f to the shoe 2 shown in FIGS. 2 (A), 2 (B) and 2 (C) so as to appropriately maintain the press-fitting angle of the shoe 2 and suppress the hole runout. Here is an example that can be done. According to this, it can be suitably used especially for the inclined pile 1b described later.

【0025】図2(E)に示すように地中杭1に鉄筋な
ど芯材11を保持させる場合には、上記シュー2と棒3
の間に、鉄筋など芯材11が定着できる金具10を設け
るとよい。この時の棒3は該金具10が共に回転しない
様に支持部3aを遊嵌した構造とし、該金具10も棒3
が軸架できる環部10aを設けるとよい。一方、圧入に
回転を必要としない場合は該金具10をシュー2に固定
してもよい。なお、該金具10はシュー2と同様に杭穴
8内に残置させる事により、地中杭1の引張りや曲げ強
度を高めた鉄筋コンクリート杭等を簡単な工法で能率よ
く製作施工する事ができる。
As shown in FIG. 2 (E), when the underground pile 1 holds the core material 11 such as a reinforcing bar,
It is preferable to provide a metal fitting 10 on which the core material 11 such as a reinforcing bar can be fixed. At this time, the rod 3 has a structure in which the support portion 3a is loosely fitted so that the metal fitting 10 does not rotate together.
It is preferable to provide an annular portion 10a on which the shaft can be mounted. On the other hand, when rotation is not required for press-fitting, the metal fitting 10 may be fixed to the shoe 2. By leaving the metal fitting 10 in the pile hole 8 as in the case of the shoe 2, it is possible to efficiently manufacture and construct a reinforced concrete pile or the like in which the tensile strength and bending strength of the underground pile 1 are increased by a simple construction method.

【0026】以上の方法及び装置によれば、上記シュー
(沓)2は多様な土質や斜杭など施工条件に合わせて幅
広く選択する事ができ、種々の条件下で最適な穴形成に
よる地中杭1を成形し得るものである。即ち、棒3とシ
ュー2は仮保持機構により着脱可能であり、所定の深さ
でシュー2を残置して安定した後述の先端支持力7aが
確保される。そして、該シュー2は棒(ロッド)3で圧
入され材料4を一体的に注ぎ、突き固めて地中杭1を成
形するので、杭の形状や充填する材料4が設計条件に合
わせ任意に採用できるので、材料4に産業廃棄物を利用
した再生骨材や鉱さい等の使用も可能であり、再生資源
の利用促進と工事費の低減が図れる等汎用性の高い工法
とする事ができる。
According to the above method and apparatus, the shoe (shoot) 2 can be selected from a wide range according to construction conditions such as various types of soil and slant piles, and underground by optimal hole formation under various conditions. The pile 1 can be formed. That is, the rod 3 and the shoe 2 are detachable by the temporary holding mechanism, and the shoe 2 is left at a predetermined depth to secure a stable tip support force 7a described later. Then, the shoe 2 is press-fitted with a rod (rod) 3 and the material 4 is poured in one piece and squeezed to form the underground pile 1, so that the shape of the pile and the material 4 to be filled are arbitrarily adopted according to design conditions. Since it is possible to use recycled aggregate or mining tails using industrial waste as the material 4, it is possible to use a highly versatile construction method such as promoting the use of recycled resources and reducing construction costs.

【0027】更に、圧入する棒3の押圧力6は直接地盤
7と接触する杭先端シュー2の反力及び深さに伴って増
加する棒3外周面に接する材料4との摩擦抵抗で算定さ
れる。この反力及び抵抗力を上記したシュー2の効果並
びに棒3の摩擦抵抗を動摩擦抵抗にして低減させてい
る。従って、該押圧力6は棒3の径が小さいことから、
主として杭先端のシュー2の直径に左右される事にな
る。これにより、従来のケーシング工法よりも小型の動
力で施工が可能となり、低騒音、低振動かつ小型機械を
用いて能率のよい安定した押圧作業ができる。
Further, the pressing force 6 of the rod 3 to be press-fitted is calculated from the reaction force of the shoe 2 at the tip of the pile which comes into direct contact with the ground 7 and the frictional resistance between the material 4 and the outer surface of the rod 3 which increases with depth. You. The reaction force and the resistance force are reduced by using the effect of the shoe 2 and the frictional resistance of the rod 3 as dynamic frictional resistance. Therefore, the pressing force 6 is small because the diameter of the rod 3 is small.
It mainly depends on the diameter of the shoe 2 at the tip of the pile. Accordingly, the construction can be performed with smaller power than the conventional casing method, and efficient and stable pressing operation can be performed using a small machine with low noise, low vibration.

【0028】図3は材料4が粒子同士のかみ合いや粘着
性によって杭穴8内で閉塞し材料4の連続充填が不能と
なる場合これを解決する装置の例を示す。即ち、図3
(A)に示すものは、棒(ロッド)3に突起3aを付け
て杭穴8内の閉塞状態を棒3を往復動作させる事によ
り、材料4の閉塞状態を崩して材料4の注入を円滑にす
ると同時に、引き抜きから差し込み動作により上記突起
3aによって突き固めが容易にできる構造としたもので
ある。なお、この動作は圧入成形時又は棒3の引き抜き
時に適宜必要に応じて行う事ができる。
FIG. 3 shows an example of an apparatus for solving the case where the material 4 is closed in the pile hole 8 due to the intermeshing or stickiness of the particles and the material 4 cannot be continuously filled. That is, FIG.
As shown in (A), the rod (rod) 3 is provided with a projection 3a and the closed state in the pile hole 8 is reciprocated so that the closed state of the material 4 is broken and the injection of the material 4 is smoothly performed. At the same time, the structure is such that the compaction can be easily performed by the protrusions 3a by the operation of pulling out and inserting. This operation can be performed as needed at the time of press-fitting or at the time of pulling out the rod 3.

【0029】また、図3(B)に示すものは、棒3に上
下対象な突起3bを付けて、材料4の閉塞状態を崩しな
がら、前記した杭穴壁9面側に材料4を指向させて密着
させ杭穴壁9の安定を図る構造としたものである。図3
(C)は、管12aにスクリュー部12bを設けて、材
料4をかき混ぜ閉塞状態を崩す事ができるスライド管1
2の例を示す。該スライド管12は現地に備えておき、
圧入作業中に棒3の進入と注入する材料4の量に異状が
生じたときには、直ちにスライド管12を棒3に嵌通さ
せて、該スライド管12に回転等押圧動作を加えて材料
4の閉塞状態を崩して材料4の注入を促進させるもので
ある。なお、この場合注入状況を確認して該スライド管
12は取り外してもよい。
FIG. 3 (B) shows a rod 3 having projections 3b symmetrical to the top and bottom, so that the material 4 is directed toward the pile hole wall 9 while breaking the closed state of the material 4. In this structure, the pile hole wall 9 is made to adhere to stabilize. FIG.
(C) is a slide tube 1 in which a screw portion 12b is provided in a tube 12a to stir the material 4 to break a closed state.
2 shows an example. The slide tube 12 is prepared on site,
When the rod 3 enters and the amount of the material 4 to be injected is abnormal during the press-fitting operation, the slide tube 12 is immediately inserted into the rod 3 and a pressing operation such as rotation is applied to the slide tube 12 to apply the material 4. The closed state is broken to promote the injection of the material 4. In this case, the slide tube 12 may be removed after confirming the injection condition.

【0030】図4は前述した図1の装置による地中杭の
成形工程を示している。まず、杭の施工位置を決めて、
次に、位置決め及び材料の充填作業を補助する材料供給
装置のホッパー5を同図(A)に示すようにセットす
る。次に同図(B)に示すように前記のシュー2を置き
棒(ロッド)3を取り付ける。そして、同図(C)に示
すように棒3を作動させてシュー2を圧入する。この時
圧入によって形成される杭穴8内に材料4を該シュー2
の圧入に合わせ均等に連続充填し、杭穴壁9の崩壊防止
と材料4の分離を防止する。
FIG. 4 shows a process of forming an underground pile using the apparatus shown in FIG. First, decide the construction position of the pile,
Next, the hopper 5 of the material supply device for assisting the positioning and filling of the material is set as shown in FIG. Next, the shoe 2 is placed and a bar 3 is attached as shown in FIG. Then, as shown in FIG. 2C, the bar 3 is operated to press-fit the shoe 2. At this time, the material 4 is put into the pile hole 8 formed by press fitting.
To prevent the collapse of the pile hole wall 9 and the separation of the material 4.

【0031】そして、同図(D)に示すように棒3が所
定の位置(深さ)に到達、あるいは所定の圧入反力を検
出する等の手段によって所定圧入を認知し作業を終了す
る。次いで、該棒3を上昇させる事によってシュー2と
の接合は分離されるので、シュー2は杭穴8内の先端の
杭底に残置される。この状態において同図(E)に示す
ように棒3を引き抜きながら往復動させると、棒3は下
方から順次材料4を突き固めて杭穴壁9面側に材料4を
指向させて密着させ杭穴壁9の安定を図ると共に、密実
な材料4が得られる。これにより、同図(F)に示すよ
うに杭穴8内に全長にわたり材料4が密実に形成され強
固な地中杭1の成形工程が終了する。
Then, as shown in FIG. 3D, the rod 3 reaches a predetermined position (depth) or recognizes the predetermined press-fitting by means of detecting a predetermined press-in reaction force, and the operation is completed. Next, since the connection with the shoe 2 is separated by lifting the rod 3, the shoe 2 is left at the tip of the pile bottom in the pile hole 8. In this state, when the bar 3 is reciprocated while being pulled out as shown in FIG. 7 (E), the bar 3 squeezes the material 4 sequentially from below, directs the material 4 to the pile hole wall 9 side, makes the material 4 adhere to the pile hole wall 9, and makes the pile 3 The hole material 9 is stabilized, and the dense material 4 is obtained. As a result, the material 4 is densely formed over the entire length in the pile hole 8 as shown in FIG.

【0032】以上の手段によって、地中杭は断面や長さ
が高精度、高性能に成形され安定した杭の支持力と同時
に、杭の充填材料が軟弱地盤を密実にするので地盤支持
力を容易に増強する事ができる。そして、作業工程を簡
素化し連続作業とするので、工期の短縮が図れると同時
に安全かつ安価な工事費で地中杭を簡単に成形する事が
できる。
By the above means, the underground piles are formed with high precision and high performance in section and length, and have stable pile supporting force, and at the same time, the filling material of the piles makes the soft ground dense, so that the ground supporting force is improved. It can be easily increased. Since the work process is simplified and the work is performed continuously, the construction period can be shortened, and at the same time, the underground pile can be easily formed at a safe and low construction cost.

【0033】図5は地中杭を計画や設計の際の検討を容
易にするため、従来の軟弱地盤対策工に準拠した分類例
に対応させ地中杭の実施形態を分類して示したものであ
る。図5(A)は地中杭1を支持層15まで到達させ支
持杭として設計する例を示す。なお、この場合は地中杭
外周に作用する地盤沈下によるネガテブフリクション9
aを配慮しておく。また、図5(B)は地中杭1の先端
支持力7aと地中杭外周面の地盤摩擦力7bにより支持
する摩擦杭の設計例を示す。
FIG. 5 shows an example of an underground pile according to a classification example based on a conventional soft ground countermeasure, in order to facilitate the study in planning and designing the underground pile. It is. FIG. 5A shows an example in which the underground pile 1 reaches the support layer 15 and is designed as a support pile. In this case, negative friction due to land subsidence acting on the underground pile periphery 9
Consider a. FIG. 5B shows a design example of a friction pile supported by the tip support force 7a of the underground pile 1 and the ground frictional force 7b on the outer surface of the underground pile.

【0034】そして、図5(C)は地盤改良を必要とす
る範囲内に地中杭1を多数設けて、原地盤7と性質を異
にする地中杭1の充填材料4が周辺の原地盤7と人工的
に一体化させ複合地盤の領域13を形成する設計例を示
す。これによれば原地盤7が密実になり地盤支持力を高
め、地盤沈下や地震時の液状化の抑制を図ることを目的
とした複合地盤の設計が可能となる。そして、図5
(D)は原地盤7の圧密を促進するため、地中杭1に高
透水性の充填材料4を採用し、その杭頭部に排水施設4
aを設け、周辺地盤7の地下水を地中杭1より排除する
ことを目的としたドレーン杭の設計例を示す。
FIG. 5C shows that a plurality of underground piles 1 are provided in a range where ground improvement is required, and the filling material 4 of the underground piles 1 having properties different from those of the original ground 7 is used as the surrounding ground. The design example which forms the area | region 13 of the composite ground by artificially integrating with the ground 7 is shown. According to this, it is possible to design a composite ground for the purpose of making the original ground 7 dense, increasing the ground support capacity, and suppressing land subsidence and liquefaction during an earthquake. And FIG.
(D) adopts a highly permeable filling material 4 for the underground pile 1 and a drainage facility 4
a is provided, and a design example of a drain pile for the purpose of eliminating groundwater in the surrounding ground 7 from the underground pile 1 is shown.

【0035】以上の分類により、本工法の地中杭1は既
存の理論解析を利用する事ができるので基礎設計に幅広
く適用する事が可能となる。また、杭の成形後の品質管
理も簡便な載荷試験等で確認する事ができる等の利点が
ある。従って、本工法は作業環境に合わせて大規模な大
型施工機械による地盤の改良工事から小規模な一般家屋
の基礎工事及び人力施工までの適応性を有した汎用性の
高い工法となる。
According to the above classification, the underground pile 1 according to the present construction method can be widely applied to the basic design because the existing theoretical analysis can be used. In addition, there is an advantage that the quality control after the pile is formed can be confirmed by a simple loading test or the like. Therefore, this construction method is a highly versatile construction method that is adaptable from ground improvement work using a large-scale large-scale construction machine to foundation work for small-scale ordinary houses and manual construction according to the work environment.

【0036】図6は地中杭の耐力を増強する実施形態の
例を示したものである。図6(A)は鉄筋を芯材11と
して地中杭1を成形する例を示す。即ち、シュー2の上
に金具10を据え、棒(ロッド)3をセットし、金具1
0内に鉄筋の芯材11を保持させこれらを一体的に支持
させながら同時に挿入及び圧入するが、圧入に合わせて
鉄筋の芯材11はあばら筋11aを緊結しながら杭穴8
の深さ毎に順次接合し、一連の芯材11を形成させる。
この時芯材11と共にコンクリート等充填材料4を補給
しながら地中杭1を成形するとよく、これによって引っ
張り強度と曲げ強度を所望に増強することができる。
FIG. 6 shows an example of an embodiment for increasing the strength of an underground pile. FIG. 6A shows an example in which the underground pile 1 is formed using a reinforcing bar as the core material 11. That is, the metal fitting 10 is set on the shoe 2, the rod (rod) 3 is set, and the metal fitting 1 is set.
The core material 11 of the reinforcing steel is inserted and press-fitted simultaneously while holding the core material 11 of the reinforcing steel in the inside and supporting them integrally, but the core material 11 of the reinforcing steel is tightly connected to the stirrup 11a in accordance with the press-fitting.
To form a series of cores 11.
At this time, it is preferable to form the underground pile 1 while supplying the filling material 4 such as concrete together with the core material 11, whereby the tensile strength and the bending strength can be increased as desired.

【0037】図6(B)は芯材11に鋼管14類を用い
る使用例を示しており、鋼管14等の管先端部14aは
シュー2と棒3の着脱に支障がないように前述の鉄筋の
金具10と同様の構造とし、この時の棒3は前記した通
り鋼管14類を一体的に支持させながら圧入する事がで
きる支持部3aとしている。一方、鋼管14類をシュー
2に固定して棒(ロッド)3の替わりにして作業工程を
省いてもよく、また、管内は必要に応じて充填する。
FIG. 6B shows an example in which steel pipes 14 are used for the core material 11. The tip 14 a of the steel pipe 14 or the like is provided with the above-described reinforcing bar so as not to hinder the attachment and detachment of the shoe 2 and the rod 3. In this case, the rod 3 is a supporting portion 3a which can be press-fitted while integrally supporting the steel pipes 14 as described above. On the other hand, the steel pipes 14 may be fixed to the shoe 2 and the work process may be omitted instead of the rod 3, and the inside of the pipe may be filled as necessary.

【0038】図6(C)は多段の異径地中杭を形成する
例を示している。即ち、下段の地中杭1を所定の位置ま
で成形した後で、その頭部にシュー2を再圧入させて杭
の径を拡大させる。なお、上記シュー2の径は自在であ
り、また、多段階の地中杭1を成形する場合はこの工程
を繰り返せばよい。これにより、杭支持力並びに杭頭部
の曲げ強度と水平力の耐力を容易に増強する事ができ
る。
FIG. 6C shows an example of forming a multi-stage underground pile having different diameters. That is, after the lower-stage underground pile 1 is formed to a predetermined position, the shoe 2 is press-fitted into its head to enlarge the diameter of the pile. In addition, the diameter of the shoe 2 is free, and this step may be repeated when forming the underground pile 1 in multiple stages. Thereby, the pile supporting force and the bending strength of the pile head and the strength of the horizontal force can be easily enhanced.

【0039】図7は海上など水面を有する場所での作
業、また、泥炭層(ピート層)地帯やヘドロ層の超軟弱
地盤での作業など、前述の方法ではシュー(沓)が自沈
したり、安定して材料が投入出来ない場合の好適な施工
方法を示す実施形態である。即ち、上記施工手順は、ま
ず図7(A)に示すとおり棒3に対して図示する手段又
は適宜な手段からなる吊り具(仮保持機構)2gによっ
て、仮保持状態に取り付け支持されているシュー2、材
料4を収容したガイド管16を併設セットして、これら
全体をクレーン等の吊りロープ16aを介して吊り揚げ
施工位置に移動し、位置決めする。
FIG. 7 shows work in a place having a water surface such as the sea, and work in a peat layer (peat layer) zone or a very soft ground in a sludge layer. It is an embodiment showing a suitable construction method when a material cannot be stably input. That is, as shown in FIG. 7 (A), the shoe is attached and supported in a temporary holding state by a hanging tool (temporary holding mechanism) 2g comprising means shown in FIG. 2. A guide tube 16 accommodating the material 4 is set in parallel, and the whole is moved to a lifting position by a hanging rope 16a such as a crane, and positioned.

【0040】次に、図7(B)に示す如く上記の通り一
体化したガイド管16をシュー2と共に下げると、両者
の自重によって泥土中を沈下する。また、ガイド管16
は図示の通り材料4を上部より連続的に注ぐ事ができる
構造としている。次に、図7(C)に示すようにガイド
管16に取り付けてあるシュー2の吊り具2gを切断等
任意な手段によって解除し、棒(ロッド)3を作動させ
てシュー2の圧入を開始すると共に地中杭1の材料4を
連続的に供給しながら所定の深さまで到達させる。そし
て以降の作業を前述の図4(E)、(F)により、材料
4を突き固めて地中杭1を形成し、図7(D)に示す如
く棒3やガイド管16等を取り外して作業を終了する。
なお、上記シュー2の仮保持の図示例については吊り具
2gを該シュー2のフック2cを利用してロープ等によ
りガイド管16と一体的にして、クレーン等により移動
する事ができる。
Next, as shown in FIG. 7 (B), when the guide tube 16 integrated as described above is lowered together with the shoe 2, the mud soil sinks by its own weight. Also, the guide tube 16
Has a structure in which the material 4 can be continuously poured from above as shown. Next, as shown in FIG. 7C, the hanging member 2g of the shoe 2 attached to the guide tube 16 is released by any means such as cutting, and the rod (rod) 3 is operated to start press-fitting the shoe 2. At the same time, the material 4 of the underground pile 1 is made to reach a predetermined depth while being continuously supplied. 4E and 4F, the material 4 is tamped to form the underground pile 1, and the rod 3 and the guide tube 16 are removed as shown in FIG. 7D. Finish the work.
In the illustrated example of the temporary holding of the shoe 2, the hanging member 2g can be integrated with the guide tube 16 by a rope or the like using the hook 2c of the shoe 2, and can be moved by a crane or the like.

【0041】従って、本発明の工法は砕石或いはコンク
リート等による地中杭1の形成が困難とされている海中
に於いても、海上からこれら材料による地中杭1を極め
て簡単かつ高能率で低コストに形成する事を可能にする
ものである。
Therefore, the construction method of the present invention enables the underground pile 1 made of these materials to be formed extremely easily, efficiently, and at low efficiency even in the sea where it is difficult to form the underground pile 1 using crushed stone or concrete. It is possible to make it into cost.

【0042】次に、図8において、本発明の別実施形態
に係る斜杭1bを成形する際の一施工例について説明す
る。即ち、前記した図7のガイド管16に代わる杭穴口
対策の先導装置17は杭穴口の崩壊防止用のさや管17
a、材料供給口17b、圧入角度を保持し先導装置17
の安定を図る支持台17c、圧入角度を管理する斜度計
17dから構成している。
Next, with reference to FIG. 8, one working example of forming the slant pile 1b according to another embodiment of the present invention will be described. That is, the leading device 17 for the countermeasure against the pile hole at the place of the guide tube 16 of FIG.
a, the material supply port 17b, the press-fitting angle and the leading device 17
And a slope 17d for controlling the press-fitting angle.

【0043】上記先導装置17を用いた斜杭1bの施工
手順は、まず、図2(D)のシュー2を棒(ロッド)3
に連結し先導装置17のさや管17aと該シュー2を密
着させて一体にセットした後、杭の施工位置に先導装置
17を移動する。そして所定の角度に据え付けて斜度計
17dで確認をする。次に材料供給口17bより材料4
を注ぎながら先導装置17を地中に挿入し、所定の位置
で支持台17cを操作して先導装置17の安定と圧入角
度を保持する。
The procedure for constructing the inclined pile 1b using the leading device 17 is as follows. First, the shoe 2 shown in FIG.
Then, after the sheath 2 and the shoe 2 of the leading device 17 are brought into close contact with each other and set integrally, the leading device 17 is moved to the pile installation position. Then, it is installed at a predetermined angle and checked with the inclinometer 17d. Next, the material 4 is supplied from the material supply port 17b.
The leading device 17 is inserted into the ground while pouring, and the support 17c is operated at a predetermined position to maintain the stability and the press-fit angle of the leading device 17.

【0044】次に、棒3を作動させて前記のシュー2を
圧入する。以降の作業は前記した図4及び図7に示した
工程により斜杭1bを成形し、そして棒3や先導装置1
7を取り外して作業を完了する。これにより、現状の場
所打ち杭工法では困難とされる斜杭を容易に成形する事
ができる。なお、本先導装置17は直杭1aの杭穴口対
策に使用してもよい。
Next, the bar 2 is operated to press-fit the shoe 2. Subsequent work is to form the slanted pile 1b by the steps shown in FIGS.
7 is removed to complete the work. As a result, it is possible to easily form the slant pile, which is difficult with the current cast-in-place pile method. In addition, this leading device 17 may be used for the countermeasures for the hole of the straight pile 1a.

【0045】図9は予め杭穴をあけ、この穴に本発明に
よる工法で地中杭を成形する実施形態を示す。即ち、地
表付近が硬く予め開削しても穴壁が自立安定し穴崩れが
生じない地盤では、この穴を利用して地中杭を成形する
事が可能であり、その施工手順は、まず、図9(A)に
示すように杭穴8は予め別途開削し、この杭穴8の地上
部に前記したホッパー5を据え付ける。次に、図9
(B)に示すように棒(ロッド)3はシュー(沓)2が
離脱しないように吊り具(仮保持機構)2g等で両者を
連結し、施工場所に位置決めされたホッパー5の供給部
5bの口にセットする。そして、地中杭1の材料4を注
ぎながら杭穴8の底18まで到達させる。
FIG. 9 shows an embodiment in which a pile hole is formed in advance and an underground pile is formed in this hole by the method according to the present invention. That is, in the ground where the surface near the ground is hard and the hole wall is self-sustaining even if it is pre-cut and the hole collapse does not occur, it is possible to form an underground pile using this hole, and the construction procedure is, first, As shown in FIG. 9A, the pile hole 8 is separately cut in advance, and the hopper 5 described above is installed on the ground portion of the pile hole 8. Next, FIG.
As shown in (B), the rod (rod) 3 is connected to each other by a hanging tool (temporary holding mechanism) 2g or the like so that the shoe 2 does not come off, and the supply unit 5b of the hopper 5 positioned at the construction site. Set in the mouth. Then, the material 4 of the underground pile 1 is poured to reach the bottom 18 of the pile hole 8.

【0046】次に、図9(C)に示すように、上記作業
のシュー2の吊り具2gを設定深さにおいて切断等の手
段によって分離する。これにより、初期の地中杭1の成
形を促進させた後は棒3を作動しシュー2の圧入を開始
し、材料4を注ぎながら圧入すると、図9(D)に示す
ように、更に長い地中杭1を連続的に簡単かつ能率よく
延長形成する事ができる。そして、シュー2の圧入を終
了した状態に於いて、前記した棒3の往復動による突き
固め作業によって、所定の長い地中杭1が簡単に形成で
きる。
Next, as shown in FIG. 9C, the hanging member 2g of the shoe 2 in the above operation is separated at a set depth by means such as cutting. Thereby, after the initial formation of the underground pile 1 is promoted, the rod 3 is actuated to start the press-fitting of the shoe 2 and, when the material 4 is poured while being press-fitted, as shown in FIG. The underground pile 1 can be continuously and simply and efficiently extended. Then, in a state where the press-fitting of the shoe 2 is completed, a predetermined long underground pile 1 can be easily formed by the tamping operation by the reciprocating movement of the rod 3 described above.

【0047】これによれば、本工法は杭の貫入が困難と
される道路舗装や硬質の表土(凍土含む)を従来の各工
法の如く全面的に除去する事なく、穴口補強も兼ねて所
要の杭穴のみ開削する事により、地山の崩壊をより有効
に防止できる利点がある。
According to this method, the road pavement and hard topsoil (including frozen soil), for which it is difficult to penetrate the pile, are not completely removed as in the conventional methods, and the hole is also required to reinforce the hole. By drilling only the pile holes, there is an advantage that the collapse of the ground can be prevented more effectively.

【0048】図10は、盛土7cの安定を図るため地中
杭1を前記の通り成形し、円弧すべりの抵抗力19aを
高めることができる施工例を示すものである。即ち、原
地盤7の相対密度を調べこれに見合う地中杭1を連続的
に併設する。この時には該地中杭1を円弧すべり面19
の深さや盛土高さに応じた長さに成形して、地盤支持力
を増強し原地盤7の円弧すべりの抵抗力19aを高める
ことができる。なお、この場合地中杭1はせん断強度が
大きく締め固めが容易な材料4を用いるとよい。
FIG. 10 shows an example of construction in which the underground pile 1 is formed as described above in order to stabilize the embankment 7c, and the arc sliding resistance 19a can be increased. That is, the relative density of the original ground 7 is checked, and the underground pile 1 corresponding to this is continuously provided. At this time, the underground pile 1 is connected to the arc sliding surface 19.
Can be formed to have a length corresponding to the depth of the ground and the height of the embankment, thereby enhancing the ground support force and increasing the resistance 19a to the arc slide of the original ground 7. In this case, the underground pile 1 is preferably made of a material 4 having a large shear strength and easy to compact.

【0049】図11は、道路の盛土7d等周辺の原地盤
7の地下水を排除し圧密を促進するため、地中杭1を前
記の通り成形し、該地中杭1の頭部に高透水性材料4b
を層状に敷き均し、また排水を容易にするため排水施設
4aを設けて排水路へ誘導する施工例を示す。即ち、地
中杭1の施工には原地盤7の相対密度から地盤が許容で
きる杭体容積を予測し、この容積に見合う地中杭1を成
形するので、地盤の圧密沈下を早期に終了させると共
に、前記した杭の支持力と同時に杭の充填材料が軟弱地
盤を密実にするので、地盤支持力を容易に増強する事が
できる等利点がある。なお、該地中杭1には高透水性で
目詰まりしない材料4を充填するとよい。
FIG. 11 shows that the underground pile 1 is formed as described above in order to eliminate the groundwater in the original ground 7 around the embankment 7d of the road and promote the consolidation. Material 4b
In this example, a drainage facility 4a is provided for facilitating drainage and guided to a drainage channel. That is, the construction of the underground pile 1 predicts the volume of the pile body that the ground can tolerate from the relative density of the original ground 7 and forms the underground pile 1 corresponding to this volume, so that the consolidation settlement of the ground is terminated early. At the same time, since the filling material of the pile makes the soft ground dense at the same time as the above-mentioned pile supporting force, there is an advantage that the ground supporting force can be easily increased. The underground pile 1 may be filled with a material 4 having high permeability and not clogging.

【0050】図12は、橋台20a等基礎20bに水平
力20cが作用する時、地中杭1を支持杭として直杭1
aと前記した図2(D)のシュー2を使用して斜杭1b
に成形した施工例を示す。なお、斜杭1bの施工手順は
前記した図8の先導装置17を使用した作業に準拠する
ものとする。これによって、斜杭1bを簡単かつ能率よ
く成形する事ができるので、斜杭1bは構造物並びに建
物基礎に作用する地震時の水平力や土圧に抵抗できる対
策工として好適化する事ができる等の利点を創出する。
FIG. 12 shows that when the horizontal force 20c acts on the foundation 20b such as the abutment 20a, the underground pile 1 is used as a support pile and the straight pile 1 is used.
2a and the shoe 2 of FIG.
An example of the construction is shown in FIG. The procedure for constructing the inclined pile 1b is based on the operation using the leading device 17 shown in FIG. As a result, the slanted pile 1b can be formed easily and efficiently, so that the slanted pile 1b can be suitable as a countermeasure capable of resisting horizontal force and earth pressure at the time of an earthquake acting on a structure and a building foundation. And other advantages.

【0051】図13は、敷地の土留め擁壁21aの基礎
21bに地中杭1を支持杭として用い、不規則な支持層
15の高低に合わせ地中杭1を自在に長さを選択して施
工形成する例を示す。この場合の地中杭1の支持力管理
は、前記した棒(ロッド)3圧入時の軸力6をチェック
し所望の支持力が得られるものである。なお、該地中杭
1には所望の支持力に応じて前記の充填材料4ならびに
芯材11を組み合わせて用いる。なお、上記支持層の高
低差対策は、従来の杭打工では不安定なヤットコの使用
或いは杭を地上に打ち残して後日において切断する等無
駄な作業が多かった。一方、本工法の場合は高低に合わ
せ自在に長さが選択できるので、従来の作業を簡素化し
て工期の短縮が図れると同時に安全かつ安価な工事費で
地中杭を簡単に成形する事ができる等の利点がある。
FIG. 13 shows that the underground pile 1 is used as a support pile on the foundation 21b of the retaining wall 21a of the site, and the length of the underground pile 1 is freely selected according to the height of the irregular support layer 15. An example is shown in which the work is formed. In this case, the support force management of the underground pile 1 is to check the axial force 6 at the time of press-fitting the rod 3 and obtain a desired support force. The underground pile 1 is used in combination with the above-mentioned filling material 4 and core material 11 according to a desired supporting force. In order to counter the height difference of the support layer, there are many wasteful operations such as the use of an unstable yatco in a conventional pile driving method or the cutting of a pile left behind on the ground and cutting it later. On the other hand, in the case of this construction method, the length can be freely selected according to the height, so that the conventional work can be simplified and the construction period can be shortened, and at the same time, the underground pile can be easily formed with safe and low construction cost. There are advantages such as possible.

【0052】図14は、前述の機械施工による地中杭の
成形方法と装置を人力で成形する方法に応用した施工例
を示したものである。図14(A)に示すようにシュー
(沓)2に棒(ロッド)3をねじ等で連結させて、杭位
置に据え付ける。次に、図14(B)に示すように該棒
3をハンマー等で衝打6して圧入させ、この時できる杭
穴8には材料4を充填する。
FIG. 14 shows an example of application in which the method and apparatus for forming an underground pile by the above-described mechanical construction are applied to a method for manually molding. As shown in FIG. 14 (A), a bar (rod) 3 is connected to a shoe (shoot) 2 with a screw or the like, and is installed at a pile position. Next, as shown in FIG. 14 (B), the rod 3 is hit with a hammer or the like 6 and press-fitted, and the pile hole 8 formed at this time is filled with the material 4.

【0053】次に、図14(C)に示すように該棒3が
所定の位置まで到達した後、先端のシュー2と該棒3の
連結を解除し該シュー2を杭穴8に残置して、棒3を引
き抜きながら衝打6を与えて、材料4を突き固める。そ
して、図14(D)に示すように地中杭1より棒3を引
き抜き、材料4を締め固めるため杭頭部に再度衝打し
て、周辺地盤と一体になるよう成形する。なお、図14
(A)においてシュー2と棒3を固定した場合には、棒
3を残置した状態で、材料4を別途突き固めて地中杭1
を成形してもよい。
Next, as shown in FIG. 14 (C), after the rod 3 reaches a predetermined position, the tip shoe 2 is disconnected from the rod 3 and the shoe 2 is left in the pile hole 8. Then, the material 4 is compacted by giving an impact 6 while pulling out the rod 3. Then, as shown in FIG. 14 (D), the rod 3 is pulled out from the underground pile 1 and again struck against the pile head in order to compact the material 4 so as to be integrated with the surrounding ground. FIG.
In the case where the shoe 2 and the rod 3 are fixed in (A), the material 4 is separately tamped and the underground pile 1 is left in a state where the rod 3 is left.
May be molded.

【0054】[0054]

【発明の効果】本発明は以上の構成により、以下の効果
を奏する。
According to the present invention, the following effects can be obtained by the above configuration.

【0055】請求項1の発明により、先端部に設けたシ
ュー(沓)を棒(ロッド)で圧入しながら材料を充填す
る事により、杭穴の崩壊を防ぎ、且つ、杭先端のシュー
は地中杭の形状と圧入の方向性を保持すると共に、該シ
ューを残置させるようにしたので、安定した杭先端支持
力が確実に得られる。
According to the first aspect of the present invention, the material is filled while the shoe (shoot) provided at the tip is press-fitted with the rod, thereby preventing the pile hole from collapsing, and the shoe at the tip of the pile is grounded. Since the shape of the middle pile and the direction of press-fitting are maintained and the shoe is left, a stable pile tip supporting force can be reliably obtained.

【0056】さらに、シューを圧入する棒を突き固め具
として兼用させることにより、充填する材料が棒で突き
固められ密実で高品質の杭体が得られる。従って、上記
棒及びシューにより簡単な方法で所望の断面や長さの地
中杭を成形する事が可能となり、且つ、地盤強化に必要
な精度の高い地中杭を能率よく低コストに成形する事が
できる。
Further, by using the rod for press-fitting the shoe as a tamping tool, the material to be filled is tamped with the rod, and a dense and high-quality pile is obtained. Therefore, it is possible to form an underground pile having a desired cross section and length by a simple method using the rod and the shoe, and to efficiently form an underground pile having high precision required for strengthening the ground at a low cost. Can do things.

【0057】また、この際材料の選定が自由であり、地
中杭に高透水性の材料を用いた場合には、該地中杭を利
用して地下水が排除できるので、地盤の圧密が促進され
圧密沈下を早期に終了させる事ができる。また、原地盤
の間隙は材料の充填に加えて上記圧密作用によりさらに
密実化される。これにより、原地盤の支持力を増強させ
る事ができる共に、地盤沈下や地震時の液状化を抑制す
る事ができる等の効果を生ずる。
At this time, the material can be freely selected, and when a material having high water permeability is used for the underground pile, groundwater can be removed by using the underground pile, thereby promoting the compaction of the ground. The consolidation settlement can be terminated early. Further, the gap in the original ground is further densified by the consolidation action in addition to the filling of the material. As a result, it is possible to increase the supporting capacity of the original ground, and to suppress the land subsidence and the liquefaction at the time of the earthquake.

【0058】請求項2の発明により、棒を往復動作かつ
回転力を加えて、杭先端の土の固結力を低下させると共
に、棒の摩擦抵抗を動摩擦にして圧入抵抗を低減させ、
棒の圧入作業ができる。
According to the second aspect of the present invention, the rod is reciprocated and a rotational force is applied to reduce the solidification force of the soil at the tip of the pile, and the frictional resistance of the rod is reduced to dynamic friction to reduce the press-in resistance.
The rod can be press-fitted.

【0059】また、棒(ロッド)の径が杭径より小さい
ことから、押圧力は主として杭先端のシューの直径に左
右され、杭の深さによる摩擦抵抗を低減し、且つ従来の
ケーシング工法のケーシングを不要にして圧入するので
押圧力(回転力)を低減させて施工する事ができる。即
ち、従来工法より小型の動力で施工が可能となり、低騒
音、低振動且つ小型機械を用いた能率のよい安定した押
圧作業ができる。
Further, since the diameter of the rod is smaller than the diameter of the pile, the pressing force mainly depends on the diameter of the shoe at the tip of the pile, reducing the frictional resistance due to the depth of the pile, and the conventional casing method. Since the press-fitting is performed without the need for the casing, the pressing force (rotational force) can be reduced and the work can be performed. In other words, the construction can be performed with a smaller power than the conventional construction method, and a low noise, low vibration and efficient and stable pressing operation using a small machine can be performed.

【0060】請求項3の発明により、杭穴成形時にシュ
ー又は棒に鉄筋等芯材を保持させながら地中杭の成形時
に、コンクリートと鉄筋や鋼管等を組み合わせて地中杭
を成形することが可能となり、杭体に引張力と曲げ強度
を高める事ができる。また、材料は杭穴内にシューや棒
と一体的に注入されるので地中での材料分離を防ぐ事が
でき、工程も簡単になるので、精度の高い恒久的な地中
杭を簡単且つ的確に成形することができる。
According to the third aspect of the present invention, it is possible to form an underground pile by combining concrete, a reinforcing steel, a steel pipe and the like at the time of forming an underground pile while holding a core material such as a reinforcing bar on a shoe or a rod at the time of forming a pile hole. It is possible to increase the tensile force and bending strength of the pile. In addition, since the material is injected into the pile holes integrally with the shoes and rods, it is possible to prevent material separation in the ground, and the process is simplified. Can be molded into

【0061】請求項4の発明により、杭成形時のホッパ
ーは杭の施工位置に固定させると共に、シューの圧入に
合わせて材料の流動促進と飛散防止を図り、ホッパーか
ら杭穴へ均等に材料を供給する事により、従来工法の杭
成形時の杭穴壁の保護等を不要にして、地中杭の施工能
率を高めて成形する事ができる。これにより、施工を連
続的かつ円滑に行うことができ、安定した工法が工期を
大幅に短縮して得られるので工事費を大幅に低減する事
ができる。
According to the fourth aspect of the present invention, the hopper at the time of forming the pile is fixed at the construction position of the pile, the flow of the material is promoted and the scattering is prevented in accordance with the press-fitting of the shoe, and the material is uniformly distributed from the hopper to the pile hole. By supplying, it becomes unnecessary to protect the pile hole wall at the time of forming the pile by the conventional method, and it is possible to form the underground pile with high construction efficiency. Thereby, the construction can be performed continuously and smoothly, and a stable construction method can be obtained by greatly shortening the construction period, so that the construction cost can be greatly reduced.

【0062】請求項5の発明により、本工法は海上など
特殊な場所での施工でもガイド管やクレーンなどを併用
する事も可能であり、地中杭の成形を容易に行う事がで
きる。
According to the fifth aspect of the present invention, it is possible to use a guide tube, a crane, and the like in a special place such as at sea, and to easily form an underground pile.

【0063】請求項6の発明により、地中杭の先端に残
置されるシュー、該シューを圧入する棒、材料を供給す
る供給装置を設けて、地中杭を連続作業で円滑に成形す
るように構成すると共に、シューを圧入する棒を突き固
め具として兼用させる事により、装置を簡潔で廉価なも
のにする事ができる。そして、該装置により地中杭を所
望の深さに的確かつ能率よく成形すると同時に、充填す
る材料を密実で高品質の杭体にする事が可能となるの
で、海上等特殊な場所でも、ガイド管やクレーンを併用
すれば地中杭の成形作業が可能となる。
According to the sixth aspect of the present invention, a shoe left at the tip of the underground pile, a rod for press-fitting the shoe, and a supply device for supplying a material are provided so that the underground pile can be smoothly formed in a continuous operation. In addition, the device can be made simple and inexpensive by using a rod for press-fitting the shoe as a tamping tool. And, at the same time, the underground pile can be accurately and efficiently formed to a desired depth by the device, and at the same time, the material to be filled can be made into a dense and high-quality pile body. If a guide tube and a crane are used together, an underground pile can be formed.

【0064】請求項7の発明により、シューの外周に筒
状のガイドを取り付けて、棒でシューを圧入する時の穴
振れを抑制させる事により、圧入角度を適正に維持させ
る事ができる。これにより、多様な軟弱地盤並びに現状
の場所打ち杭工法では困難とされる斜杭を含め、基礎設
計に幅広く地中杭を適用する事ができる。
According to the seventh aspect of the present invention, the press-fitting angle can be properly maintained by attaching a cylindrical guide to the outer periphery of the shoe and suppressing the runout when the shoe is press-fitted with the rod. As a result, underground piles can be widely applied to foundation design, including various soft ground and slant piles, which are difficult with the current cast-in-place pile method.

【0065】請求項8の発明により、棒にシューを仮保
持させた状態で作業が可能となり、装置を簡単に移動す
る事ができる。また、シューそのものに各種の材料を支
持させることが容易になり、多様な作業を能率よく行う
事ができる。
According to the eighth aspect of the present invention, the work can be performed while the shoe is temporarily held on the bar, and the apparatus can be easily moved. In addition, various materials can be easily supported on the shoe itself, and various operations can be performed efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による地中杭の成形方法及び装置の構造
を示す断面図である。
FIG. 1 is a sectional view showing the structure of an underground pile forming method and apparatus according to the present invention.

【図2】上記の施工に使用する杭先端部に用いられるシ
ュー(沓)の実施形態を示す斜視図である。
FIG. 2 is a perspective view showing an embodiment of a shoe (a shoe) used for a tip portion of a pile used for the above construction.

【図3】充填材料が杭穴内で閉塞した場合に使用する装
置の実施形態を示す側面図である。
FIG. 3 is a side view showing an embodiment of an apparatus used when a filling material is closed in a pile hole.

【図4】地中杭を成形する施工順序の説明図である。FIG. 4 is an explanatory view of a construction order for forming an underground pile.

【図5】従来工法に準拠して本発明の地中杭を分類して
示す説明図である。
FIG. 5 is an explanatory diagram classifying and showing the underground piles of the present invention based on a conventional construction method.

【図6】本発明による地中杭の杭体を補強する場合の実
施形態を示す断面図である。
FIG. 6 is a cross-sectional view showing an embodiment in which a pile body of an underground pile according to the present invention is reinforced.

【図7】海上施工など特殊な場所での杭体の施工順序を
示す説明図である。
FIG. 7 is an explanatory diagram showing a construction order of pile bodies in a special place such as construction at sea.

【図8】斜杭の成形に必要な先導装置の構成を示す断面
図である。
FIG. 8 is a cross-sectional view showing a configuration of a leading device required for forming a slant pile.

【図9】既設の杭穴に地中杭を成形する施工手段の説明
図である。
FIG. 9 is an explanatory diagram of construction means for forming an underground pile in an existing pile hole.

【図10】本発明の杭工法を用いてすべり破壊を防止す
る施工例を示す説明図である。
FIG. 10 is an explanatory diagram showing a construction example of preventing a slip failure by using the pile method according to the present invention.

【図11】地中杭に高透水性材料を用いて地下水を排除
する施工例を示す断面図である。
FIG. 11 is a cross-sectional view showing a construction example in which groundwater is removed by using a highly permeable material for an underground pile.

【図12】基礎に水平力が作用する場合に好適な斜杭の
施工例を示す断面図である。
FIG. 12 is a cross-sectional view showing a construction example of a slanted pile suitable for a case where a horizontal force acts on a foundation.

【図13】支持層の深さに合わせて杭体を形成する施工
例を示す断面図である。
FIG. 13 is a cross-sectional view showing a construction example in which a pile body is formed in accordance with the depth of a support layer.

【図14】人力施工による杭体の施工順序を示す説明図
である。
FIG. 14 is an explanatory diagram showing a construction order of pile bodies by manual construction.

【符号の説明】 1 地中杭 2 シュー(沓) 3 棒(ロッド) 4 材料(充填材料) 5 ホッパー(材料供給装置) 6 押圧力 7 原地盤 8 杭穴(孔) 9 杭穴壁(孔壁) 11、14 芯材 12 スライド管 15 支持層 16 ガイド管 17 先導装置[Description of Signs] 1 Underground Pile 2 Shoe (Shoe) 3 Rod (Rod) 4 Material (Filling Material) 5 Hopper (Material Supply Device) 6 Pressing Force 7 Original Ground 8 Pile Hole (Hole) 9 Pile Hole Wall (Hole) Wall) 11, 14 core material 12 slide tube 15 support layer 16 guide tube 17 leading device

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 5/22 - 5/80 E02D 3/08 - 3/10 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int.Cl. 7 , DB name) E02D 5/22-5/80 E02D 3/08-3/10

Claims (8)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】棒の先端部に杭穴形成用のシューを装着
し、該棒の押圧力によって地中の所定の深さに圧入させ
ながら形成される杭穴内に材料を充填させた後、該シュ
ーを棒先端部から分離させて杭穴内に残置させると共
に、前記棒を引き抜きながら往復動させることにより、
充填材料を杭穴内の下方から順次突き固めて地中杭を形
成させる地中杭の成形方法。
1. A shoe for forming a pile hole is attached to the tip of a rod, and after a material is filled into a pile hole formed while being pressed into a predetermined depth in the ground by a pressing force of the rod, By separating the shoe from the rod tip and leaving it in the pile hole, and by reciprocating while pulling out the rod,
An underground pile forming method in which a filling material is sequentially tamped from below in a pile hole to form an underground pile.
【請求項2】棒を往復動作かつ回転力を加えて杭穴を形
成する請求項1の地中杭の成形方法。
2. The method of forming an underground pile according to claim 1, wherein the rod is reciprocated and a rotational force is applied to form a pile hole.
【請求項3】シューを棒で圧入して杭穴を形成する時
に、該シュー又は棒に芯材を保持させて、地中杭を形成
する請求項1又は2記載の地中杭の成形方法。
3. The method of forming an underground pile according to claim 1, wherein when the shoe is press-fitted with a rod to form a pile hole, a core material is held by the shoe or the rod to form an underground pile. .
【請求項4】杭穴の成形箇所の地面に、着脱可能に設置
した充填材料供給用のホッパーによって、上記杭穴内に
材料を充填させながら地中杭を形成する請求項1、2又
は3記載の地中杭の成形方法。
4. An underground pile is formed while filling a material into the pile hole by a filler material supply hopper which is detachably installed on the ground at a location where the pile hole is formed. Underground pile forming method.
【請求項5】着脱可能に地面に設けたホッパーとシュー
との間に、ガイド管を設け、該ガイド管によって充填材
料を杭穴内に連続的に注入させる請求項1、2又は3記
載の地中杭の成形方法。
5. The ground according to claim 1, 2 or 3, wherein a guide pipe is provided between the hopper and the shoe which are detachably provided on the ground, and the filling material is continuously injected into the pile hole by the guide pipe. Forming method of the middle pile.
【請求項6】先端部に杭穴成形用のシューを分離可能に
備え、該シューを圧入すると共に、シューを分離した状
態で往復動及び引き抜き動作をする棒と、地面に着脱可
能に設置され、且つ、上記シューによって形成される杭
穴内に充填材料を供給する供給装置とからなる地中杭の
成形装置。
6. A bar for forming a pile hole is detachably provided at the tip end, and a bar for press-fitting the shoe, reciprocating and pulling out with the shoe separated, and detachably mounted on the ground. And a supply device for supplying a filling material into a pile hole formed by the shoe.
【請求項7】シューの外周に筒状のガイドを取り付けて
杭穴を形成する請求項6の地中杭の成形装置。
7. The underground pile forming apparatus according to claim 6, wherein a cylindrical hole is formed by attaching a cylindrical guide to an outer periphery of the shoe.
【請求項8】棒の先端部にシューを仮保持機構を介して
取り付ける請求項6又は7記載の地中杭の成形装置。
8. The underground pile forming apparatus according to claim 6, wherein the shoe is attached to the tip of the rod via a temporary holding mechanism.
JP06527197A 1997-02-12 1997-02-12 Underground pile forming method and apparatus Expired - Fee Related JP3144767B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06527197A JP3144767B2 (en) 1997-02-12 1997-02-12 Underground pile forming method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06527197A JP3144767B2 (en) 1997-02-12 1997-02-12 Underground pile forming method and apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2000023570A Division JP2000170149A (en) 2000-01-01 2000-02-01 Forming method for underground pile and equipment therefor

Publications (2)

Publication Number Publication Date
JPH10219683A JPH10219683A (en) 1998-08-18
JP3144767B2 true JP3144767B2 (en) 2001-03-12

Family

ID=13282106

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06527197A Expired - Fee Related JP3144767B2 (en) 1997-02-12 1997-02-12 Underground pile forming method and apparatus

Country Status (1)

Country Link
JP (1) JP3144767B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012021346A (en) * 2010-07-16 2012-02-02 Nishimatsu Constr Co Ltd Friction pile foundation structure
CN102011402B (en) * 2010-11-11 2013-01-02 泛华建设集团有限公司 Construction method of long auger drilling concrete-grouted back-plugged profile steel piles
CN102127890B (en) * 2011-03-31 2013-01-16 中南大学 Reinforcing construction method of existing railway subgrade
CN106120784B (en) * 2016-07-05 2018-04-27 武汉船用机械有限责任公司 A kind of ocean platform shoe
JP7436970B2 (en) * 2019-10-25 2024-02-22 株式会社シーマコンサルタント Ground improvement method and structure
CN115030213B (en) * 2022-05-26 2023-04-11 上海勘测设计研究院有限公司 Tool suitable for offshore wind power foundation pile and application method

Also Published As

Publication number Publication date
JPH10219683A (en) 1998-08-18

Similar Documents

Publication Publication Date Title
Smoltczyk Geotechnical Engineering Handbook, Procedures
Barksdale et al. Design and construction of stone columns, vol. I.
Fleming et al. Piling engineering
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN109538246A (en) Ledge method tunneling subway station arch springing ruggedized construction and construction method
JP2008297864A (en) Construction method of cast-in-place pile
JP2000170149A (en) Forming method for underground pile and equipment therefor
JP3144767B2 (en) Underground pile forming method and apparatus
JPH11107273A (en) Construction method of cast-in-place pile
GB2154630A (en) Construction method for foundation piling
JP3361879B2 (en) Construction method of pile with drain layer and construction device used for it
KR102073630B1 (en) Sacrificial Steel Pipe Cutting Method Using Sacrificial Steel Pipe for Field Drilled Shaft and Construction Method for Stiffness Increase on the Pile
JP5300163B1 (en) Steel pile rooting method
Mangushev Pile construction technology
JP7160297B1 (en) Pile foundation with soil improvement and its construction method
JP5140515B2 (en) Installation method of underground floor pillar and construction method of underground structure
Johnson et al. Deep foundation elements installed by slurry wall techniques
JPS6221929B2 (en)
KR20030055704A (en) The tamping method which uses the vibrating hammer and that system
RU2058464C1 (en) Method for making foundation
JPH0121288B2 (en)
JPS63315721A (en) Foundation pile driving method as well as ground compaction
JPH05287736A (en) Construction method for high strength cast-in-place concrete pile
JP2838019B2 (en) Caisson blade framing method
GB2132668A (en) Concrete pile installing method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees