JP3141499U - Metal frame molding equipment - Google Patents

Metal frame molding equipment Download PDF

Info

Publication number
JP3141499U
JP3141499U JP2008000958U JP2008000958U JP3141499U JP 3141499 U JP3141499 U JP 3141499U JP 2008000958 U JP2008000958 U JP 2008000958U JP 2008000958 U JP2008000958 U JP 2008000958U JP 3141499 U JP3141499 U JP 3141499U
Authority
JP
Japan
Prior art keywords
molding
metal
welding
shaped
metal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008000958U
Other languages
Japanese (ja)
Inventor
樹山 曾
Original Assignee
勁百企業有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 勁百企業有限公司 filed Critical 勁百企業有限公司
Priority to JP2008000958U priority Critical patent/JP3141499U/en
Application granted granted Critical
Publication of JP3141499U publication Critical patent/JP3141499U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

【課題】人件費および材料コストを節約し、不良品を作製しないオートメーションによる一貫作業により迅速に作製できる金属フレーム成型装置の提供。
【解決手段】材料配置装置1、材料移動装置2、溶接装置3、自動アーム装置4および成型装置5からなる金属フレーム成型装置。前記溶接装置は前記帯状金属材料と前記四角形金属部材の両端の縁と溶接結合されて梯子状の前記帯状成型材料となることを特徴とする。また、前記溶接装置により溶接結合された梯子状の前記前記帯状成型材料が前記成型装置の前記成型金型により順番に前記四角形金属部材の中心位置で裁断され、中央に大きな開口部がある前記平面フレームに形成され、次に、前記成型装置の前記成型金型により前記金属フレームに成型されることを特徴とする。
【選択図】図1
The present invention provides a metal frame molding apparatus that saves labor costs and material costs, and can be quickly produced by an integrated operation by automation without producing defective products.
A metal frame molding apparatus comprising a material placement device, a material transfer device, a welding device, an automatic arm device, and a molding device. The welding apparatus is characterized in that the band-shaped metal material and the rectangular metal member are welded to both ends of the rectangular metal member to form the ladder-shaped band-shaped molding material. Further, the ladder-shaped band-shaped molding material welded and joined by the welding apparatus is sequentially cut at the center position of the rectangular metal member by the molding die of the molding apparatus, and the plane having a large opening at the center. It is formed in a frame, and then molded into the metal frame by the molding die of the molding apparatus.
[Selection] Figure 1

Description

本考案は、金属フレーム成型装置に関し、特に、人件費および材料コストを節約し、不良品を作製しないオートメーションによる一貫作業により迅速に作製できる金属フレーム成型装置に関する。   The present invention relates to a metal frame molding apparatus, and more particularly, to a metal frame molding apparatus that saves labor costs and material costs, and can be quickly produced by an integrated operation by automation without producing defective products.

以下、図面に基づいて従来技術を説明する。図5は、従来技術により溶接された金属フレーム成型に用いられる四角形平面フレームを示す平面図である。図6は、従来技術により幅の広い帯状金属材料から作製された多数のL字型部材を示す平面図である。図7は、従来技術により溶接された四角形平面フレームの「間違った接合」現象を示す平面図である。図8は、従来技術により溶接された四角形平面フレームの「間違った接合」現象を示すもう1つの平面である。図5〜8に示すように、特許文献1〜3に開示されるLCDまたはLEDパネル用金属フレーム成型方法は、材料コストを減少させるため、幅の広い帯状金属材料8をプレス盤上で多数のL字型部材81(図6参照)にプレスした後、2つのL字型部材81を互いに接合させる。2つの接合部分91をに溶接接合させてLCDまたはLEDパネル用金属フレーム7(図4参照)に提供する四角形平面フレーム9(図5参照)を作製する。次に、もう1つのプレス盤上に移動させ、図5中の虚線フレーム93の位置をプレス成型してLCDまたはLEDパネル用金属フレーム7がようやく完成する。   The prior art will be described below with reference to the drawings. FIG. 5 is a plan view showing a rectangular plane frame used for metal frame molding welded by a conventional technique. FIG. 6 is a plan view showing a number of L-shaped members made from a wide band-shaped metal material according to the prior art. FIG. 7 is a plan view showing the “wrong joining” phenomenon of a square planar frame welded according to the prior art. FIG. 8 is another plane showing the “wrong joining” phenomenon of a square plane frame welded according to the prior art. As shown in FIGS. 5 to 8, the metal frame molding method for LCD or LED panel disclosed in Patent Documents 1 to 3 has a large number of wide band-shaped metal materials 8 on a press board in order to reduce material costs. After pressing the L-shaped member 81 (see FIG. 6), the two L-shaped members 81 are joined to each other. The two planes 9 (see FIG. 5) to be provided to the LCD or LED panel metal frame 7 (see FIG. 4) are manufactured by welding the two joining portions 91 to each other. Next, it is moved onto another press board, and the position of the imaginary line frame 93 in FIG. 5 is press-molded to finally complete the metal frame 7 for the LCD or LED panel.

上記した従来の金属フレーム7は、多数のL字型部材81を用いる。幅の広い帯状金属材料8をプレスすると、先端の両側の2つの三角形材料片82、末端中央の大きな三角形材料片83(図6参照)、および両側縁の多数の小さな三角形材料片84が切除されるだけである。四角形平面フレーム9を溶接する際、大きな開口部92(図5参照)の面積の材料費が節約できる。以上のように、材料の無駄な浪費を減少し、材料コストを大幅に節約することができる。しかし、2つのL字型部材81を互いに接合して四角形平面フレーム9(図5参照)のように溶接する時、図7および図8に示すような2つの接合部分91が外側に突出したり、内側に凹んだり「間違った接合」現象が非常に起こりやすいため、要求を満たすLCDまたはLEDパネル用金属フレームを成型することができない。不良品を作製してしまうことは、廃棄金属をリサイクルして再利用するしかなく、大きな損失を生むことになる。   The conventional metal frame 7 described above uses a large number of L-shaped members 81. When the wide band metal material 8 is pressed, two triangular material pieces 82 on both sides of the tip, a large triangular material piece 83 in the center of the end (see FIG. 6), and a large number of small triangular material pieces 84 on both side edges are cut off. Just do. When welding the rectangular flat frame 9, the material cost of the area of the large opening 92 (see FIG. 5) can be saved. As described above, wasteful waste of materials can be reduced, and material costs can be greatly saved. However, when the two L-shaped members 81 are joined to each other and welded as in the rectangular plane frame 9 (see FIG. 5), the two joining portions 91 as shown in FIGS. A metal frame for an LCD or LED panel that meets the requirements cannot be molded because the indentation or “wrong bonding” phenomenon is very likely to occur. Producing defective products can only be done by recycling and reusing waste metal, resulting in a large loss.

最近、特許文献4において、金属フレームの比較的迅速な成型方法が開示されたが、これは、プレス装置と溶接装置とを合体させて一つにしたものに過ぎない。プレス装置のプレス台の下に溶接装置が配置されている。プレス台に開口が設けられ、プレス台上に組み合わされた2つのL字型部材の接触部分に溶接ガンが溶接を行なうのに提供される。この方法は、確かに製作加工に掛かる時間を短縮できるようであるが、依然として以下の3つの問題点を有する。   Recently, Patent Document 4 discloses a relatively quick method of forming a metal frame, but this is merely a combination of a press device and a welding device. A welding device is disposed under the press table of the press device. An opening is provided in the press table, and a welding gun is provided for welding at the contact portion of the two L-shaped members assembled on the press table. Although this method certainly seems to be able to shorten the time required for fabrication, it still has the following three problems.

第一に、プレス装置のプレス台の下に溶接装置を配置してL字型部材を溶接しなければならないため、金型の設計に大きな手間が掛かる。第二に、プレス台の下に溶接装置を配置してL字型部材を溶接した後、プレスして上記の中央に開口部92を有する四角形平面フレーム9にするしかなく、図4で示す金属フレーム7に直接プレスすることができない。金属フレーム7にプレスするには、わざわざプレス装置またはプレス台に移動させてプレスしなければならない。そのため、製作加工に掛かる時間を短縮することは困難である。第三に、プレス台上で行なう溶接は、L字型部材の接触部分に溶接するのではなく、左右両側をプレス台上のV字型の開口部を有する帯状金属材料の端部にそれぞれ溶接を行なう。プレス台上またはその周囲には、前後および左右を定位させる装置を配置していないため、溶接の際、図7および図8に示す外側に突出したり、内側に凹んだりする「間違った接合」現象がよく起きる。これ以外に、一直線にならない上下の「間違った接合」現象もさらによく起きやすい。以上のように、製作加工に掛かる時間を短縮するどころか、不良品を作ってしまうという事態を招き、実用性がなく、蛇足に過ぎない考案であると結論された。そのため、生産コストを下げるLCDまたはLEDパネル用金属フレームの成型方法が求められていた。
台湾特許第M260081号 台湾特許第M306016号 台湾特許第I252727号 台湾特許第M324588号
First, since it is necessary to weld an L-shaped member by placing a welding device under a press stand of the press device, it takes a lot of time to design the die. Secondly, a welding apparatus is placed under the press table and the L-shaped member is welded, and then pressed to form the rectangular flat frame 9 having the opening 92 in the center. The metal shown in FIG. The frame 7 cannot be pressed directly. In order to press the metal frame 7, it must be moved to the press device or press stand and pressed. For this reason, it is difficult to shorten the time required for manufacturing. Third, the welding performed on the press table is not welded to the contact portion of the L-shaped member, but the left and right sides are respectively welded to the ends of the strip-shaped metal material having V-shaped openings on the press table. To do. Since there is no front / rear and left / right positioning device on or around the press table, the "wrong joining" phenomenon that protrudes outward or dents inward during welding is shown in FIGS. Often happens. In addition to this, upper and lower “wrong joining” phenomenon is more likely to occur. As described above, it was concluded that the idea was not just practical, but merely a snake foot, which led to a situation in which defective products were made, rather than shortening the time required for manufacturing. Therefore, there has been a demand for a method for forming a metal frame for an LCD or LED panel that reduces the production cost.
Taiwan Patent No. M260081 Taiwan Patent No. M306016 Taiwan Patent No.I252727 Taiwan Patent No. M324588

本考案の目的は、人件費および材料コストを節約し、不良品を作製し難いオートメーションによる一貫作業により迅速に作製できる金属フレーム成型装置を提供することにある。   An object of the present invention is to provide a metal frame forming apparatus that can be quickly produced by an integrated operation by automation, which saves labor costs and material costs and is difficult to produce defective products.

上述の目的を達成するため、本考案は、金属フレーム成型装置を提供する。本考案の金属フレーム成型装置は、材料配置装置、材料移動装置、溶接装置、自動アーム装置および成型装置からなる。材料配置装置は、最前部に配置され、金属材料ロールを配置する材料配置棚を含む。材料移動装置は、材料配置装置から帯状金属材料が出てくる方向の一端に配置され、順番にレべリング装置、牽引装置および転送装置からなる。牽引装置により金属材料ロールの2つの帯状金属材料を牽引し、レべリング装置に送って平にされた後、溶接装置により四角形金属部材の両端の縁と溶接結合されて帯状成型材料となる。その後、転送装置により成型装置上に送られ、裁断および成型が行なわれる。溶接装置は、材料移動装置の周辺に配置され、2つの溶接ガンを有する溶接機、2つの電磁石溶接台からなる。自動アーム装置も材料移動装置の周辺に配置され、吸盤により材料を取ったり置いたりするロボットアームを有する自動アーム装置本体、および材料配置台からなる。四角形金属部材が材料配置台上にまとめて積み上げられるように配置されているが、自動アーム装置本体のロボットアームにより順番に電磁石溶接台上に配置され、溶接装置の2つの溶接ガンにより四角形金属部材の両端の縁と2つの帯状金属材料の内側の縁とが溶接結合されて帯状成型材料となる。成型装置は、材料移動装置の後部に繋がるように配置され、裁断金型および成型金型からなる連続プレス型成型装置で、材料移動装置の転送装置が送って来る「梯子状」の帯状成型材料を受取り、平面フレームのように裁断してから、帯状金属材料のように成型される。   In order to achieve the above object, the present invention provides a metal frame forming apparatus. The metal frame molding apparatus of the present invention comprises a material placement device, a material transfer device, a welding device, an automatic arm device, and a molding device. The material placement device includes a material placement shelf that is placed in the forefront and places a metal material roll. The material transfer device is arranged at one end in the direction in which the band-shaped metal material comes out of the material arrangement device, and is composed of a leveling device, a traction device, and a transfer device in order. The two band-shaped metal materials of the metal material roll are pulled by the pulling device, sent to the leveling device and flattened, and then welded to the edges at both ends of the rectangular metal member by the welding device to form the band-shaped molding material. Then, it is sent onto the molding device by the transfer device, and cutting and molding are performed. The welding device is arranged around the material transfer device, and includes a welding machine having two welding guns and two electromagnetic welding stands. The automatic arm device is also arranged around the material moving device, and includes an automatic arm device main body having a robot arm for picking up and placing material by a suction cup, and a material placement table. Although the rectangular metal members are arranged so as to be stacked together on the material arrangement table, they are arranged on the electromagnet welding table in turn by the robot arm of the automatic arm device main body, and the rectangular metal members are arranged by the two welding guns of the welding device. The edges at both ends and the inner edges of the two band-shaped metal materials are welded to form a band-shaped molding material. The molding device is a continuous press type molding device that is arranged so as to be connected to the rear part of the material transfer device, and is a “ladder-like” strip-shaped molding material sent by the transfer device of the material transfer device. After being cut and cut like a flat frame, it is shaped like a strip metal material.

本考案の金属フレーム成型装置は、従来の金属フレーム成型装置と異なり、すべての材料は、「ほとんど完全に」利用されているため、無駄がなく、材料を大幅に節約することができる。金属フレーム成型において、「間違った接合」現象が起こることがなく、不良品の作製を防ぐことができる。また、本考案の金属フレーム成型装置が帯状金属材料を成型する際、機械による一貫作業で、生産速度が迅速で、人件費を節約することができる。   The metal frame molding apparatus of the present invention is different from the conventional metal frame molding apparatus in that all materials are used “almost completely”, so there is no waste and the material can be saved greatly. In the metal frame molding, the “wrong joining” phenomenon does not occur, and the production of defective products can be prevented. In addition, when the metal frame molding apparatus of the present invention molds a belt-shaped metal material, the production speed is fast and labor costs can be saved by an integrated operation by a machine.

以下、本考案の実施形態を図面に基づいて説明する。図1は、本考案の実施形態による金属フレーム成型装置を示す平面図である。図2は、金属フレーム成型装置により溶接された帯状成型材料を示す平面図である。図3は、金属フレーム成型装置により裁断された平面フレームを示す平面図である。図4は、図3の平面フレームが直接プレスされ金属フレームに作製された状態を示す斜視図である。図1〜4に示すように、本考案の実施形態による金属フレーム成型装置は、材料配置装置1、材料移動装置2、溶接装置3、自動アーム装置4および成型装置5からなる。材料配置装置1は、最前部に配置され、金属材料ロール60a、60bを配置する材料配置棚11、12を含む。材料移動装置2は、材料配置装置1から帯状金属材料6a、6bが出てくる方向の一端に配置され、順番にレべリング装置21、牽引装置22および転送装置23からなる。牽引装置22により金属材料ロール60a、60bの2つの帯状金属材料6a、6bを牽引し、レべリング装置21に送って平にされた後、溶接装置3により四角形金属部材61の両端の縁と溶接結合されて帯状成型材料6(図2参照)となる。その後、転送装置23により成型装置5上に送られ、裁断および成型が行なわれる。溶接装置3は、材料移動装置2の周辺に配置され、2つの溶接ガンを有する溶接機30、2つの電磁石溶接台31からなる。自動アーム装置4も材料移動装置2の周辺に配置され、吸盤により材料を取ったり置いたりするロボットアーム42を有する自動アーム装置本体40、および材料配置台41からなる。四角形金属部材61が材料配置台41上にまとめて積み上げられるように配置されているが、自動アーム装置本体40のロボットアーム42により順番に電磁石溶接台31上に配置され、溶接装置3の2つの溶接ガンにより四角形金属部材61の両端の縁と2つの帯状金属材料6a、6bの内側の縁とが溶接結合されて帯状成型材料6(図2参照)となる。成型装置5は、材料移動装置2の後部に繋がるように配置され、裁断金型51および成型金型52からなる連続プレス型成型装置で、材料移動装置2の転送装置23が送って来る「梯子状」の帯状成型材料6(図2参照)を受取り、平面フレーム60のように裁断してから、帯状金属材料7(図3参照)のように成型される。   Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a plan view showing a metal frame forming apparatus according to an embodiment of the present invention. FIG. 2 is a plan view showing a strip-shaped molding material welded by a metal frame molding apparatus. FIG. 3 is a plan view showing the flat frame cut by the metal frame forming apparatus. FIG. 4 is a perspective view showing a state in which the flat frame of FIG. 3 is directly pressed and made into a metal frame. As shown in FIGS. 1 to 4, the metal frame molding apparatus according to the embodiment of the present invention includes a material placement device 1, a material transfer device 2, a welding device 3, an automatic arm device 4, and a molding device 5. The material placement apparatus 1 includes material placement shelves 11 and 12 that are placed at the forefront and on which metal material rolls 60a and 60b are placed. The material transfer device 2 is arranged at one end in the direction in which the strip-shaped metal materials 6 a and 6 b come out from the material arrangement device 1, and includes a leveling device 21, a traction device 22, and a transfer device 23 in order. The two strip-shaped metal materials 6a and 6b of the metal material rolls 60a and 60b are pulled by the traction device 22 and sent to the leveling device 21 to be flattened. The belt-shaped molding material 6 (see FIG. 2) is formed by welding. Then, it is sent onto the molding device 5 by the transfer device 23, and cutting and molding are performed. The welding device 3 is arranged around the material transfer device 2 and includes a welding machine 30 having two welding guns and two electromagnet welding stands 31. The automatic arm device 4 is also arranged around the material moving device 2 and includes an automatic arm device main body 40 having a robot arm 42 for picking up and placing material by a suction cup, and a material placement table 41. The rectangular metal members 61 are arranged so as to be stacked together on the material arrangement table 41, but are arranged on the electromagnet welding table 31 in order by the robot arm 42 of the automatic arm device main body 40, and the two of the welding devices 3 are arranged. The edges of both ends of the rectangular metal member 61 and the inner edges of the two strip-shaped metal materials 6a and 6b are welded and joined to form the strip-shaped molding material 6 (see FIG. 2). The molding device 5 is arranged so as to be connected to the rear part of the material transfer device 2, and is a continuous press mold forming device composed of a cutting die 51 and a molding die 52. The strip-shaped molding material 6 (see FIG. 2) is received and cut into a plane frame 60, and then molded into a strip-shaped metal material 7 (see FIG. 3).

本考案の金属フレーム成型装置は、成型装置5の裁断金型51が帯状成型材料6の裁断動作を行なう際、図2で示される虚線612の位置で最初の裁断が行なわれる。先端の四角形金属部材61の四角形金属部材板体610の帯状金属材料後端部611および2つの帯状金属材料6a、6bの帯状金属材料先端部62a、62b、末端の四角形金属部材61の四角形金属部材板体610の後半分(図示せず)および2つの帯状金属材料6a、6bの帯状金属材料先端部62a、62bの末端部を裁断除去する以外、他の部分は、順番に図2に示す四角形金属部材61の中心位置の虚線612の位置で裁断され、順番に図3に示す中央に大きな開口部601がある平面フレーム60が作られる。次に、成型装置5の成型金型52に直接プレスされLCDまたはLEDパネルの帯状金属材料7(図4参照)となる。すべての材料は、「ほとんど完全に」利用されているため、無駄がなく、上記の従来の金属フレーム成型装置と異なり材料の節約になる。また、2つの帯状金属材料6a、6bと各四角形金属部材61の両端の縁とを溶接結合する際、2つの帯状金属材料6a、6bは、同時に材料移動装置2に平行輸送される。各四角形金属部材61は、自動アーム装置4により正確に溶接装置3の2つの電磁石溶接台31に配置され、2つの電磁石溶接台31により吸引固定された後、溶接結合される。そのため、「間違った接合」現象が起こることがなく、従来の金属フレーム成型装置と異なり新規性を有し、実用的である。特に、本考案の金属フレーム成型装置が帯状金属材料7を成型する際、機械による一貫作業で、生産速度が迅速で、人件費を節約することができる。   In the metal frame molding apparatus of the present invention, when the cutting die 51 of the molding apparatus 5 performs the cutting operation of the strip-shaped molding material 6, the first cutting is performed at the position of the imaginary line 612 shown in FIG. The square metal member rear end 611 of the rectangular metal member plate 610 of the square metal member 61 at the tip, the band metal material leading ends 62a and 62b of the two band metal materials 6a and 6b, and the square metal member of the square metal member 61 at the end. Other than cutting and removing the rear half (not shown) of the plate body 610 and the end portions of the band-shaped metal material tips 62a and 62b of the two band-shaped metal materials 6a and 6b, the other portions are squares shown in FIG. A plane frame 60 having a large opening 601 at the center shown in FIG. 3 is formed in order by cutting at the position of the imaginary line 612 at the center of the metal member 61. Next, it is directly pressed into the molding die 52 of the molding apparatus 5 to become a strip-shaped metal material 7 (see FIG. 4) of the LCD or LED panel. All materials are used "almost completely", so there is no waste and material savings unlike the conventional metal frame forming apparatus described above. Further, when the two strip metal materials 6 a and 6 b are welded to the edges at both ends of each square metal member 61, the two strip metal materials 6 a and 6 b are simultaneously transported in parallel to the material transfer device 2. Each quadrangular metal member 61 is accurately placed on the two electromagnet welding bases 31 of the welding apparatus 3 by the automatic arm device 4, attracted and fixed by the two electromagnet welding bases 31, and then joined by welding. Therefore, the “wrong joining” phenomenon does not occur, and it is novel and practical, unlike the conventional metal frame molding apparatus. In particular, when the metal frame molding apparatus of the present invention molds the strip-shaped metal material 7, the production speed is high and labor costs can be saved by an integrated operation by a machine.

本考案では好適な実施形態を前述の通りに開示したが、これらは決して本考案を限定するものではなく、当該技術を熟知する者は誰でも、本考案の精神と領域を脱しない範囲内で各種の変更や修正を加えることができる。従って、本考案の保護の範囲は、実用新案請求の範囲で指定した内容を基準とする。   Although the present invention discloses preferred embodiments as described above, these are not intended to limit the present invention in any way, and anyone skilled in the art is within the spirit and scope of the present invention. Various changes and modifications can be made. Therefore, the scope of protection of the present invention is based on the contents specified in the claims of the utility model.

本考案の実施形態による金属フレーム成型装置を示す平面図である。It is a top view which shows the metal frame shaping | molding apparatus by embodiment of this invention. 金属フレーム成型装置により溶接された帯状成型材料を示す平面図である。It is a top view which shows the strip | belt-shaped molding material welded with the metal frame shaping | molding apparatus. 金属フレーム成型装置により裁断された平面フレームを示す平面図である。It is a top view which shows the plane frame cut | judged with the metal frame shaping | molding apparatus. 図3の平面フレームが直接プレスされ金属フレームに作製された状態を示す斜視図である。It is a perspective view which shows the state by which the plane frame of FIG. 3 was directly pressed and produced to the metal frame. 従来技術により溶接された金属フレーム成型に用いられる四角形平面フレームを示す平面図である。It is a top view which shows the square plane frame used for the metal frame shaping | molding welded by the prior art. 従来技術により幅の広い帯状金属材料から作製された多数のL字型部材を示す平面図である。It is a top view which shows many L-shaped members produced from the wide strip | belt-shaped metal material by a prior art. 従来技術により溶接された四角形平面フレームの「間違った接合」現象を示す平面図である。FIG. 6 is a plan view showing a “wrong joining” phenomenon of a square plane frame welded by the prior art. 従来技術により溶接された四角形平面フレームの「間違った接合」現象を示すもう1つの平面図である。FIG. 6 is another plan view showing the “wrong joining” phenomenon of a square planar frame welded according to the prior art.

符号の説明Explanation of symbols

1 材料配置装置
2 材料移動装置
3 溶接装置
4 自動アーム装置
5 成型装置
6 帯状成型材料
6a、6b 帯状金属材料
7 金属フレーム
11、12 材料配置棚
21 レべリング装置
22 牽引装置
23 転送装置
30 溶接機
31 電磁石溶接台
40 自動アーム装置本体
41 材料配置台
42 ロボットアーム
51 裁断金型
52 成型金型
60 平面フレーム
60a、60b 金属材料ロール
61 四角形金属部材
62a、62b 帯状金属材料先端部
601 開口部
610 四角形金属部材板体
611 帯状金属材料後端部
612 虚線
DESCRIPTION OF SYMBOLS 1 Material arrangement | positioning apparatus 2 Material moving apparatus 3 Welding apparatus 4 Automatic arm apparatus 5 Molding apparatus 6 Band-shaped molding material 6a, 6b Band-shaped metal material
7 Metal Frames 11 and 12 Material Arrangement Shelf 21 Leveling Device 22 Traction Device 23 Transfer Device 30 Welding Machine 31 Electromagnetic Welding Base 40 Automatic Arm Device Body 41 Material Arrangement Base 42 Robot Arm 51 Cutting Die 52 Molding Die 60 Plane Frame 60a, 60b Metal material roll 61 Square metal member 62a, 62b Band-shaped metal material front end 601 Opening 610 Square metal member plate 611 Band-shaped metal material rear end 612 Imaginary wire

Claims (3)

材料配置装置、材料移動装置、溶接装置、自動アーム装置および成型装置を備える金属フレーム成型装置であって、
前記材料配置装置は最前部に配置され、金属材料ロールを配置する材料配置棚を含み、
前記材料移動装置は前記材料配置装置から帯状金属材料が出てくる方向の一端に配置され、順番にレべリング装置、牽引装置および転送装置からなり、
前記溶接装置は前記材料移動装置の周辺に配置され、2つの溶接ガンを有する溶接機および2つの電磁石溶接台からなり、
前記自動アーム装置も前記材料移動装置の周辺に配置され、吸盤により材料を取ったり置いたりするロボットアームを有する自動アーム装置本体、および材料配置台からなり、
前記成型装置は前記材料移動装置の後部に繋がるように配置され、裁断金型および成型金型からなる連続プレス型成型装置であり、前記牽引装置により前記金属材料ロールの2つの前記帯状金属材料を牽引し、前記レべリング装置に送って平にされた後、前記溶接装置により順番に前記自動アーム装置本体により前記電磁石溶接台上に配置された四角形金属部材の両端の縁と溶接結合されて帯状成型材料となり、その後、前記転送装置により前記成型装置上に送られ、順番に平面フレームに裁断された後、金属フレームに成型されることを特徴とする金属フレーム成型装置。
A metal frame molding device comprising a material placement device, a material transfer device, a welding device, an automatic arm device and a molding device,
The material placement device includes a material placement shelf that is placed in the forefront and places a metal material roll,
The material moving device is arranged at one end of the direction in which the strip-shaped metal material comes out of the material arranging device, and in turn consists of a leveling device, a traction device and a transfer device,
The welding device is arranged around the material transfer device, and includes a welding machine having two welding guns and two electromagnetic welding stands,
The automatic arm device is also arranged around the material moving device, and comprises an automatic arm device main body having a robot arm for picking up and placing material by a sucker, and a material placement table.
The molding device is a continuous press-type molding device that is arranged to be connected to the rear part of the material moving device, and includes a cutting die and a molding die. The two metal strips of the metal material roll are moved by the traction device. After being pulled and sent to the leveling device and flattened by the welding device, the automatic arm device main body in turn is welded to the edges of both ends of the rectangular metal member disposed on the electromagnet welding table. A metal frame molding apparatus, which is formed into a band-shaped molding material, and thereafter sent onto the molding apparatus by the transfer device, cut into plane frames in order, and then molded into a metal frame.
前記溶接装置は前記帯状金属材料と前記四角形金属部材の両端の縁と溶接結合されて梯子状の前記帯状成型材料となることを特徴とする請求項1に記載の金属フレーム成型装置。   2. The metal frame molding apparatus according to claim 1, wherein the welding device is welded to both ends of the band-shaped metal material and the rectangular metal member to form the ladder-shaped band-shaped molding material. 前記溶接装置により溶接結合された梯子状の前記前記帯状成型材料が前記成型装置の前記成型金型により順番に前記四角形金属部材の中心位置で裁断され、中央に大きな開口部がある前記平面フレームに形成され、次に、前記成型装置の前記成型金型により前記金属フレームに成型されることを特徴とする請求項1に記載の金属フレーム成型装置。   The ladder-shaped band-shaped molding material welded and joined by the welding apparatus is cut in order at the center position of the rectangular metal member by the molding die of the molding apparatus, and the flat frame having a large opening in the center. 2. The metal frame molding apparatus according to claim 1, wherein the metal frame molding apparatus is formed and then molded into the metal frame by the molding die of the molding apparatus.
JP2008000958U 2008-02-22 2008-02-22 Metal frame molding equipment Expired - Fee Related JP3141499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008000958U JP3141499U (en) 2008-02-22 2008-02-22 Metal frame molding equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008000958U JP3141499U (en) 2008-02-22 2008-02-22 Metal frame molding equipment

Publications (1)

Publication Number Publication Date
JP3141499U true JP3141499U (en) 2008-05-08

Family

ID=43291554

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008000958U Expired - Fee Related JP3141499U (en) 2008-02-22 2008-02-22 Metal frame molding equipment

Country Status (1)

Country Link
JP (1) JP3141499U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105537813A (en) * 2016-02-04 2016-05-04 广明源光科技股份有限公司 Stem spot welding device, LED lamp automated production system and production method
CN107813082A (en) * 2017-11-28 2018-03-20 苏州索力旺新能源科技有限公司 A kind of automatic conveyor of photovoltaic junction box conducting strip

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105537813A (en) * 2016-02-04 2016-05-04 广明源光科技股份有限公司 Stem spot welding device, LED lamp automated production system and production method
CN107813082A (en) * 2017-11-28 2018-03-20 苏州索力旺新能源科技有限公司 A kind of automatic conveyor of photovoltaic junction box conducting strip
CN107813082B (en) * 2017-11-28 2024-01-12 苏州索力旺新能源科技有限公司 Automatic conveying device of conducting strip for photovoltaic junction box

Similar Documents

Publication Publication Date Title
CN204639602U (en) Contact welding fabrication automatic processing device
CN1996517B (en) A making method for fully automated small ultra-thin chip inductor
CN204376162U (en) USB female automatic assembling
JP3141499U (en) Metal frame molding equipment
CN104889931A (en) Electronic equipment dismounting device and dismounting method
CN103433387B (en) Stamping hole flanging device
US7562551B2 (en) Press die set for a multi-step press system
KR100972091B1 (en) Method of manufacturing a bezel for panel
CN204204946U (en) Disc type aluminium-to-nickel lug
CN204348802U (en) Battery pack
CN203549350U (en) Novel corrugated board
CN205661708U (en) Automatic film -laminating device
CN104816061B (en) Contact welding fabrication technique and automatic processing device
CN113275834A (en) Processing method of food showcase and showcase
CN204725132U (en) The many parts of a kind of metal material strip automatic soldering device altogether
CN203556981U (en) Electric soldering iron placing rack of industrial production line
CN206046864U (en) A kind of Quick locating structure of the progressive die and board
CN207479498U (en) Leak the anti-misoperation device that presses
CN206504100U (en) A kind of material-strap structure
CN202169328U (en) Progressive die with internal chamfer
CN220312089U (en) High-efficient continuous in-mold laser welding device
CN205798925U (en) A kind of electric automobile horn screw connects sheet feed arrangement
CN205798157U (en) A kind of bending mold for manufacturing sheet metal bending member
CN215508482U (en) Flanging ejection device
CN218083147U (en) Lace forming stamping die and stamping equipment

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110416

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees