JP3128188B2 - All-weather handling equipment - Google Patents

All-weather handling equipment

Info

Publication number
JP3128188B2
JP3128188B2 JP07089360A JP8936095A JP3128188B2 JP 3128188 B2 JP3128188 B2 JP 3128188B2 JP 07089360 A JP07089360 A JP 07089360A JP 8936095 A JP8936095 A JP 8936095A JP 3128188 B2 JP3128188 B2 JP 3128188B2
Authority
JP
Japan
Prior art keywords
overhanging roof
post
weather
building
covering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07089360A
Other languages
Japanese (ja)
Other versions
JPH08282853A (en
Inventor
成和 今中
英二 中沢
啓之 松井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Taiyo Kogyo Co Ltd
Original Assignee
Nippon Steel Corp
Taiyo Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp, Taiyo Kogyo Co Ltd filed Critical Nippon Steel Corp
Priority to JP07089360A priority Critical patent/JP3128188B2/en
Publication of JPH08282853A publication Critical patent/JPH08282853A/en
Application granted granted Critical
Publication of JP3128188B2 publication Critical patent/JP3128188B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、岸壁に接岸して荷役を
行うための船舶上を覆う全天候型荷役設備に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an all-weather cargo handling facility for covering a ship for carrying cargo while berthing on a quay.

【0002】[0002]

【従来の技術】従来、船舶上を覆う全天候型荷役設備と
しては、例えば特開平6−92465号公報に記載のも
のがある。この全天候型荷役設備1は、図5〜図7に示
すように、建屋2から水辺3側へ張り出して張出屋根4
を設けておいて、この張出屋根4下の前面及び側面を覆
うように配された覆膜5−1,5−2と、これら覆膜5
の中間部を支持する水平支持梁6とが、張出屋根4から
の吊索7によって吊下げられており、張出屋根4の前面
の覆膜5−1と側面の覆膜5−2とが境する前面の2隅
と建屋の水辺側の2隅に設置された昇降ポスト8の昇降
に伴なって開閉するように構成されたものである。
2. Description of the Related Art Conventionally, as an all-weather cargo handling facility for covering a ship, there is one described in, for example, Japanese Patent Application Laid-Open No. 6-92465. As shown in FIG. 5 to FIG. 7, the all-weather handling equipment 1 projects from the building 2 to the waterside 3 side and has an overhanging roof 4.
And covering films 5-1 and 5-2 arranged to cover the front and side surfaces under the overhanging roof 4;
And a horizontal support beam 6 supporting an intermediate portion of the overhanging roof 4 is suspended by a hanging cable 7 from the overhanging roof 4, and a covering 5-1 on a front surface and a covering 5-2 on a side surface of the overhanging roof 4 are provided. Are opened and closed as the lifting posts 8 installed at two corners on the front side and two corners on the waterside of the building border.

【0003】以上のような構造であると、昇降ポスト8
は図6に示したように、その上端のみを張出屋根4の支
持部4−1側にて支持されているのであるから、閉じら
れている覆膜5に大きな風圧が懸けられたとき、この覆
膜5の両端を支持している昇降ポスト8側に風圧が懸け
られるのであり、結果としてこの昇降ポスト8を支持し
ている張出屋根4の支持部4−1に大きな水平力及びモ
ーメントが加えられることになる。
With the above structure, the lifting post 8
As shown in FIG. 6, since only the upper end is supported by the support portion 4-1 of the overhanging roof 4, when a large wind pressure is applied to the closed covering film 5, The wind pressure is hung on the lifting post 8 supporting both ends of the covering film 5. As a result, a large horizontal force and moment are applied to the supporting portion 4-1 of the overhanging roof 4 supporting the lifting post 8. Will be added.

【0004】また、この特開平6−92465号公報の
昇降ポスト8は、張出屋根4の高さ程度の長さを有して
いて、レインシールド装置を巻き上げて各覆膜5を開放
した場合には、この昇降ポスト8の略全長が張出屋根4
の上に垂直に突出して、風圧を最も直接的に受け易い状
態となるものである。従って、この昇降ポスト8には、
風圧による大きな荷重がかかり易く、当該昇降ポスト8
にかかった風圧に基づく大きな水平力及びモーメントが
張出屋根4にもかかることになる。
The lifting post 8 disclosed in Japanese Patent Application Laid-Open No. Hei 6-92465 has a length approximately equal to the height of the overhanging roof 4. Approximately the entire length of the elevating post 8 is
Projecting vertically upwards to be most easily subjected to wind pressure. Therefore, this lifting post 8 has
A large load due to wind pressure is likely to be applied,
Large horizontal force and moment based on the wind pressure applied to the overhanging roof 4 are also applied to the overhanging roof 4.

【0005】以上のことは、特に大きな船舶を対象とす
るレインシールド装置の昇降ポストにおいて、これに接
続されている覆膜もまた昇降ポスト自体も大型化されて
いるため、風圧による大きな荷重がかかり易くなるので
あり、当該昇降ポストにかかった風圧は張出屋根側に大
きなモーメント力となってかかることになる。
[0005] The above facts indicate that, in the lifting post of the rain shield device, particularly for a large ship, the covering film connected to the post and the lifting post itself are enlarged, so that a large load due to wind pressure is applied. The wind pressure applied to the lifting post is applied to the overhanging roof side as a large moment force.

【0006】[0006]

【発明が解決しようとする課題】本発明は、以上のよう
な岸壁に接岸して荷役を行うための船舶上を覆う全天候
型荷役設備の現状に鑑みてなされたもので、その解決し
ようとする課題は、 (イ)覆膜が降ろされている場合に、覆膜にかかる風圧
を建屋水辺側支柱に水平力としてかかるようにし、建屋
張出屋根にかかる水平力及びモーメントを低減するこ
と。
SUMMARY OF THE INVENTION The present invention has been made in view of the current situation of all-weather cargo handling equipment that covers a ship for berthing and docking as described above. The issues are: (a) To reduce the horizontal force and moment applied to the overhanging roof of a building by applying the wind pressure applied to the coating as a horizontal force to the waterside support of the building when the coating is lowered.

【0007】(ロ)覆膜を絞った場合に、張出屋根の上
方に各昇降ポストが大きく突出しないようにして、昇降
ポストの上部に風圧が大きくかからないようにし、張出
屋根にかかる水平力及びモーメントを低減することであ
り、簡単な構造によって、昇降ポストやこれを支持して
いる張出屋根に大きな荷重をかけないようにすることが
でき、設備費を大きく軽減することのできる全天候型荷
役設備を提供することにある。
(B) When the covering film is squeezed, each lifting post is prevented from protruding above the overhanging roof so that wind pressure is not applied to the upper portion of the lifting post, and the horizontal force applied to the overhanging roof is prevented. All-weather type that can prevent a large load from being applied to the elevating post and the overhanging roof that supports it by a simple structure, and can greatly reduce equipment costs. To provide cargo handling equipment.

【0008】[0008]

【課題を解決するための手段】請求項1に係る本発明の
手段は、実施例において使用する符号を付して説明する
と、岸壁に設置された建屋10より水面上に張り出され
て船舶上を覆う張出屋根11と、この張出屋根11から
垂下した前面覆膜21及び左右の側面覆膜22,22
と、これらの前面覆膜21と各側面覆膜22とが境する
前面の2隅に配置されて、上端が張出屋根11の前方隅
部に昇降可能に接続されるスライド支柱30と張出屋根
を支持する建屋の水辺支柱とを有して、岸壁に接岸して
荷役を行うための船舶上を覆う全天候型荷役設備100
において、各スライド支柱30を、張出屋根11の2隅
にスライド自在に設けたメインポスト31と、このメイ
ンポスト31内に昇降可能に嵌挿される少なくとも1本
のサブポスト32とにより構成するとともに、各メイン
ポスト31の下端間及び、各メインポスト31の下端と
建屋水辺側支柱との間に水平支持梁40を掛渡すことを
特徴とする全天候型荷役設備100である。
Means of the present invention according to the first aspect of the present invention will be described with reference to the reference numerals used in the embodiments. In other words, the means protrudes above the water surface from a building 10 installed on a quay and is mounted on a ship. , A front covering film 21 and right and left side covering films 22, 22 hanging from the overhanging roof 11.
And a slide column 30 disposed at two corners of the front surface where the front cover film 21 and each side cover film 22 are bordered and having an upper end connected to the front corner of the overhanging roof 11 so as to be able to move up and down. An all-weather cargo handling facility 100 that has a waterside support of a building that supports a roof and covers a ship for berthing on a quay to perform cargo handling.
In each of the embodiments, each of the slide columns 30 is composed of a main post 31 slidably provided at two corners of the overhanging roof 11 and at least one sub post 32 inserted into the main post 31 so as to be able to move up and down. The all-weather handling equipment 100 is characterized in that a horizontal support beam 40 is bridged between the lower ends of the main posts 31 and between the lower ends of the main posts 31 and the waterside support of the building.

【0009】すなわち、この全天候型荷役設備100
は、張出屋根11の前方2隅に多段式のスライド支柱3
0を上下動可能に支持させ、スライド支柱30を構成し
ている上方のメインポスト31の下端間と、メインポス
ト31の下端と、屋根水辺側支柱12との間に水平支持
梁40を設けるもので、平面形状が略コ字状に水平支持
梁40が配されることになる。これらの各スライド支柱
30及び水平支持梁40に、前面覆膜21及び側面覆膜
22を取付けたものである。
That is, the all-weather handling equipment 100
Is a multi-stage slide post 3 at the front two corners of the overhanging roof 11.
0 is provided so as to be able to move up and down, and a horizontal support beam 40 is provided between the lower end of the upper main post 31 constituting the slide support 30, the lower end of the main post 31, and the roof waterside support 12. Thus, the horizontal support beams 40 are arranged in a substantially U-shape in plan view. The front covering film 21 and the side covering film 22 are attached to each of the slide columns 30 and the horizontal support beams 40.

【0010】また、好ましくは、請求項2に係る発明の
手段としては、上記請求項1に係る全天候型荷役設備1
00について、各サブポスト32を3段以上の複数段の
ものとして、最下段のサブポスト以外のサブポスト32
の下端間及び最下段のサブポスト32以外のサブポスト
32の下端と建屋10の水辺側支柱12との間に、水平
支持梁40を掛渡すことを特徴とするものである。
Preferably, the means of the invention according to claim 2 includes the all-weather handling equipment 1 according to claim 1.
For each of the sub-posts 32, each sub-post 32 is a plurality of sub-posts having three or more sub-posts.
The horizontal support beams 40 extend between the lower ends of the sub-posts 32 and between the lower ends of the sub-posts 32 other than the lowermost sub-post 32 and the water-side column 12 of the building 10.

【0011】[0011]

【作用】次に、各請求項に係る発明の作用について、前
面覆膜21及び側面覆膜22が図1に示したような開い
た場合と、図2に示したような絞られた場合とに分けて
説明すると、次の通りである。 (前面覆膜21及び側面覆膜22を開いた場合)この場
合には、風が前面覆膜21及び側面覆膜22に吹き付け
ることになり、その風圧が各前面覆膜21及び側面覆膜
22を介して各スライド支柱30に懸けられることにな
る。しかしながら、本発明の各スライド支柱30におい
ては、その各メインポストの下端間及び、その各メイン
ポスト31の下端と建屋10側の支柱12との間に平面
形状が略コ字状に水平支持梁40が掛渡してあって、こ
の水平支持梁40に各覆膜21,22が取付けられてお
り、水平支持梁の建屋10側端部は建屋10の水辺側支
柱12に支持されているから、風圧はこの水平支持梁4
0を介して建屋の水辺側支柱12側にかかることにな
る。
Next, the operation of the claimed invention will be described with respect to the case where the front cover film 21 and the side cover film 22 are opened as shown in FIG. 1 and the case where the front cover film 21 and the side cover film 22 are narrowed as shown in FIG. The description is as follows. (When the front cover film 21 and the side cover film 22 are opened) In this case, wind blows to the front cover film 21 and the side cover film 22, and the wind pressure is applied to each of the front cover film 21 and the side cover film 22. Through each slide column 30. However, in each of the slide posts 30 of the present invention, the horizontal support beam has a substantially U-shaped planar shape between the lower ends of the respective main posts and between the lower end of each of the main posts 31 and the column 12 on the building 10 side. 40, and each of the covering films 21 and 22 is attached to the horizontal support beam 40, and the end of the horizontal support beam on the building 10 side is supported by the water-side support 12 of the building 10. The wind pressure is
It will be applied to the water side column 12 side of the building via 0.

【0012】特に、水平支持梁40は、その2つのコー
ナー部がスライド支柱30を構成しているメインポスト
31の下端に固定してあって、各前面覆膜22の高さ方
向の中間部分を位置させることができる。この水平支持
梁40の上下において前面覆膜21及び側面覆膜22に
かかる風圧により生ずるスライド支柱30の回動モーメ
ントはこの水平支持梁40によって相殺することができ
る。
In particular, the horizontal support beam 40 has its two corners fixed to the lower end of the main post 31 constituting the slide column 30, and the intermediate portion in the height direction of each front cover film 22. Can be located. The turning moment of the slide column 30 caused by the wind pressure applied to the front cover film 21 and the side cover film 22 above and below the horizontal support beam 40 can be canceled by the horizontal support beam 40.

【0013】つまり、スライド支柱30の風圧による回
動モーメントは当該スライド支柱30を支持している張
出屋根11の2隅においては殆ど生じないのである。従
って各スライド支柱30の張出屋根11に対する取付け
構造は、簡単なものとし得るものとなっている。
That is, the turning moment due to the wind pressure of the slide column 30 hardly occurs at the two corners of the overhanging roof 11 supporting the slide column 30. Therefore, the mounting structure of each slide column 30 to the overhanging roof 11 can be simplified.

【0014】さらに、請求項1に係る全天候型荷役設備
100においては、スライド支柱30の分割を3段以上
の複数段のものとして、最下段のスライド支柱以外のス
ライド支柱の下端の間及び最下段のスライド支柱以外の
スライド支柱下端と建屋水辺側支柱12間に水平梁40
を渡すことによって各スライド支柱に作用する風圧によ
る回動モーメントを複数の水平支持梁40によって建屋
水辺側支柱12側支柱に伝達され支持される。これによ
って当該スライド支柱30を支持している張出屋根11
の2隅において水平力及びモーメントは殆ど生じなくな
る。
Further, in the all-weather handling equipment 100 according to the first aspect, the slide column 30 is divided into a plurality of stages of three or more stages, so that the distance between the lower ends of the slide columns other than the lowermost column and the lowermost column. Horizontal beam 40 between the lower end of the slide support other than the slide support and the waterside support 12 of the building
, The rotational moment due to the wind pressure acting on each slide column is transmitted to and supported by the building waterside column 12 side column by the plurality of horizontal support beams 40. Thus, the overhanging roof 11 supporting the slide support 30 is provided.
The horizontal force and moment hardly occur at the two corners.

【0015】(前面覆膜21及び側面覆膜22を絞った
場合)一方、図2に示したように、以上の状態から各覆
膜21,22を上昇端まで絞った場合には、各スライド
支柱30の張出屋根11上へ突出する量は、従来例のよ
うにその全長分に近いものではなく、2段式のものにあ
っては1/2以下と非常に少なくなっているのである。
(When the front cover film 21 and the side cover film 22 are squeezed) On the other hand, as shown in FIG. The amount of the column 30 protruding above the overhanging roof 11 is not as close to the entire length as in the conventional example, but is very small, less than 1/2 in the case of the two-stage type. .

【0016】従って、各スライド支柱30の張出屋根1
1から突出する部分にかかる風圧が小さく、当該スライ
ド支柱30の支持構造や建屋10それ自体の構造を、強
度面あるいは剛性面でも簡略化し得るものであり、結果
的に当該全天候荷役設備100の設備費を大きく軽減し
得るものとなっているのである。
Accordingly, the overhanging roof 1 of each slide column 30 is provided.
The wind pressure applied to the portion protruding from 1 is small, and the structure for supporting the slide column 30 and the structure of the building 10 itself can be simplified in terms of strength or rigidity, and as a result, the facilities of the all-weather handling equipment 100 The cost can be greatly reduced.

【0017】さらに、請求項1に係る全天候型荷役設備
100について、その各サブポスト32をさらに3段以
上の複数段のものとした場合には、張出屋根11上に突
出する各スライド支柱30の量は、従来例のようにその
全長分に近いものでなく、3段式以上の多段化した場合
さらに短小化され、各スライド支柱30の張出屋根11
から突出する部分にかかる風圧を、より一層小さくし得
るものとなる。
Further, in the all-weather cargo handling equipment 100 according to the first aspect, when each of the sub-posts 32 has three or more steps, the slide posts 30 projecting above the overhanging roof 11 can be used. The amount is not close to the full length as in the conventional example, but is further reduced when the number of stages is three or more.
The wind pressure applied to the portion protruding from the fin can be further reduced.

【0018】[0018]

【実施例】以下、各請求項に係る発明を、図面に示した
実施例である全天候型荷役設備100に従ってさらに詳
しく説明する。図1に示す全天候型荷役設備100にお
いて、建屋10は水辺13に面した岸壁14上に建設さ
れており、この建屋10の屋根11aには水辺13側に
張り出して張出屋根11が設けられている。この張出屋
根11下で貨物船等の船舶が岸壁14に接岸して荷役作
業が行われるようになっている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of an all-weather cargo handling equipment according to an embodiment of the present invention; In the all-weather cargo handling equipment 100 shown in FIG. 1, the building 10 is constructed on a quay 14 facing the waterside 13, and a roof 11 a of the building 10 is provided with an overhanging roof 11 projecting toward the waterside 13. I have. Under this overhanging roof 11, a ship such as a cargo ship comes in contact with the quay 14 to carry out cargo handling work.

【0019】この張出屋根11の下へは側方より雨風が
侵入するので、これを防ぐため、張出屋根11の下に
は、張出屋根11の下の前面を覆う前面覆膜21と両側
面を覆う側面覆膜22とが配されている。なお、本実施
例における前面覆膜21は、張出屋根11の下前面に取
付けられた第1前面覆膜21aと、この第1前面覆膜2
1aの下に配された第2前面覆膜21bとからなる。
In order to prevent rain and wind from entering the underside of the overhanging roof 11 from the side, to prevent this, under the overhanging roof 11, a front covering film 21 for covering the front under the overhanging roof 11 is provided. Side covering films 22 are provided to cover both side surfaces. The front covering film 21 in the present embodiment includes a first front covering film 21 a attached to the lower front surface of the overhanging roof 11 and a first front covering film 2.
1a and a second front cover film 21b disposed below the first front cover film 21a.

【0020】また、側面覆膜22は張出屋根11の下の
両側面に取付けられた第1側面覆膜22aと、これらの
側面覆膜22の下に配された、第2側面覆膜22bとか
らなる。これらの前面覆膜22と側面覆膜23が境する
張出屋根11の前方2隅には、上端が張出屋根11の前
方隅部に昇降可能に接続されるスライド支柱30が配置
されている。
The side covering film 22 includes a first side covering film 22a attached to both side surfaces below the overhanging roof 11, and a second side covering film 22b disposed below these side covering films 22. Consists of At two front corners of the overhanging roof 11 where the front covering film 22 and the side covering film 23 are bordered, slide columns 30 whose upper ends are connected to the front corners of the overhanging roof 11 so as to be able to move up and down are arranged. .

【0021】これら前面覆膜21、側面覆膜22には、
風圧に対して覆膜の剛性を確保するために、スライド支
柱30とこれに取付けられる水平梁40とで構造体を形
成する。さらに、各覆膜の剛性を高めるために前面覆膜
21a,21b、側面覆膜22a,22bの高さ方向の
中間部に所定の間隔で水平に芯材24を設置すると共
に、第2前面覆膜21b、第2側面覆膜22bの最下端
にも芯材24を設置している。
The front covering film 21 and the side covering film 22 include:
In order to secure the rigidity of the covering film against wind pressure, a structure is formed by the slide column 30 and the horizontal beam 40 attached thereto. Further, in order to increase the rigidity of each of the coatings, the core members 24 are horizontally disposed at predetermined intervals at intermediate portions in the height direction of the front coatings 21a and 21b and the side coatings 22a and 22b, and the second front coating is provided. A core material 24 is also provided at the lowermost ends of the film 21b and the second side cover film 22b.

【0022】覆膜21bの最下端の芯材は、覆膜21b
の剛性を高めるためにサブポスト32の下端に取付けて
いる。なお、上記第2側面覆膜22bは、必ずしも設け
なければならないものではなく、片側側面において省略
して実施することもできる。
The core material at the lowermost end of the covering film 21b is
Is attached to the lower end of the sub-post 32 in order to increase the rigidity of the sub-post. Note that the second side surface covering film 22b is not necessarily provided, and can be omitted from one side surface.

【0023】スライド支柱30は、図1及び図2に示す
ように、上端が張出屋根11の前方隅部に昇降可能に支
持されるメインポスト31と、このメインポスト31内
に嵌挿されるサブポスト32とからなり、メインポスト
31の上端は建屋10の張出屋根11前端部分に形成し
たガイド溝15内に昇降可能に嵌設されており、一方サ
ブポスト32はメインポスト31内に昇降自在に嵌設さ
れ、下降する場合はサブポスト32は、メインポスト3
1の下端から下方に延長され、また、上昇する場合は、
メインポスト31内に収容されるようになっている。
As shown in FIGS. 1 and 2, the slide post 30 has a main post 31 whose upper end is supported at the front corner of the overhanging roof 11 so as to be able to move up and down, and a sub post inserted into the main post 31. The upper end of the main post 31 is fitted in the guide groove 15 formed in the front end of the overhanging roof 11 of the building 10 so as to be able to move up and down, while the sub-post 32 is fitted in the main post 31 so as to be able to move up and down. If the sub-post 32 descends, the main post 3
If it extends downward from the lower end of 1 and rises,
It is housed in the main post 31.

【0024】複数の吊り上げ装置50が建屋10の張出
屋根11に設置されている。吊り上げ装置50のワイヤ
ー51は覆膜21b、及び覆膜22bの最下端の各芯材
と複数点で固定されており、ワイヤー51の吊り上げ装
置50により巻き上げて上昇させることにより図3に示
すように覆膜を開放あるいは絞り込む。
A plurality of lifting devices 50 are installed on the overhanging roof 11 of the building 10. The wire 51 of the lifting device 50 is fixed at a plurality of points to each of the core members at the lowermost ends of the covering film 21b and the covering film 22b, and is wound up by the lifting device 50 of the wire 51 and raised, as shown in FIG. Open or narrow the covering.

【0025】前述の吊り上げ装置50が覆膜21bの最
下端芯材を吊り上げることによって、サブポスト32を
同時に吊り上げる。さらに覆膜21bの最下端芯材と水
平支持梁40の中間にある芯材を水平支持梁40の下ま
で順次吊り上げる。
The sub-post 32 is simultaneously lifted by the lifting device 50 lifting the lowermost core of the covering film 21b. Further, the core material located between the lowermost core material of the covering film 21b and the horizontal support beam 40 is sequentially lifted up to below the horizontal support beam 40.

【0026】また、吊り上げ装置50が覆膜22bの最
下端芯材を吊り上げによって、覆膜22bと最下端芯材
と水平支持梁40の中間にある芯材を水平支持梁40の
下まで吊り上げる。前述の状態からさらに吊り上げ装置
50が、覆膜21b,22bの最下端芯材を同時に吊り
上げることによって、水平支持梁40及びメインポスト
31を吊り上げ、覆膜21a,22aの水平支持梁40
と張出屋根11の中間にある芯材も吊り上げ、張出屋根
11の下まで吊り上げられる。
Further, the lifting device 50 lifts the lowermost core of the covering film 22 b, thereby lifting the core material located between the covering film 22 b, the lowermost core material, and the horizontal supporting beam 40 to below the horizontal supporting beam 40. The lifting device 50 further raises the horizontal support beams 40 and the main post 31 by simultaneously lifting the lowermost core members of the coating films 21b and 22b from the above-described state, and the horizontal support beams 40 of the coating films 21a and 22a.
The core material in the middle of the overhanging roof 11 is also lifted, and is lifted to a position below the overhanging roof 11.

【0027】スライド支柱30は、これを張出屋根11
の高さの1/2程度の長さを有するメインポスト31
と、同じく張出屋根11までの高さの1/2程度の長さ
を有してメインポスト31内に収納されるサブポスト3
2とからなる、2段構成のものを実施例として示してい
るが、このスライド支柱30は、請求項2に係る全天候
型荷役設備100のように、3段以上の多段式のものに
構成して実施してもよいものである。
The slide column 30 is provided with the overhanging roof 11
Main post 31 having a length of about half the height of
And the sub-post 3 which is also housed in the main post 31 and having a length of about half the height up to the overhanging roof 11.
The slide column 30 is configured as a multi-stage type having three or more stages, as in the all-weather cargo handling equipment 100 according to the second embodiment. It may be carried out.

【0028】すなわち、当該全天候型荷役設備100の
スライド支柱30を例えば3段式のものとするために
は、サブポスト32内に収納されるさらに別のサブポス
トを昇降自在に設ければよいのであり、この場合には各
メインポスト31及び2本サブポスト32の長さを、張
出屋根11までの高さ1/3程度のものとなるように構
成することが好ましい。
That is, in order to make the slide column 30 of the all-weather handling equipment 100, for example, of a three-stage type, it is sufficient to provide another sub-post housed in the sub-post 32 so as to be able to move up and down. In this case, it is preferable that the length of each main post 31 and the two sub-posts 32 be about 1 / of the height to the overhanging roof 11.

【0029】水平支持梁40は、平面形状が略コ字状に
水平梁を掛渡したものであり、図4に示すように各スラ
イド支柱30が2段式のものである本実施例において
は、各メインポスト31の下端間に接合すると共に、張
出屋根の側面においては、水平支持梁の一端をメインポ
スト31の下端に接合し、他端を建屋10の水辺側支柱
12に上下動可能に設けるものである。
The horizontal support beam 40 is formed by extending a horizontal beam in a substantially U-shape in plan view. In this embodiment in which each slide column 30 is of a two-stage type as shown in FIG. , While being joined between the lower ends of the main posts 31, on the side of the overhanging roof, one end of the horizontal support beam is joined to the lower end of the main post 31, and the other end can be moved up and down to the waterside column 12 of the building 10. It is provided in.

【0030】また、各スライド支柱30が3段式のもの
である場合には、1段目の水平支持梁40を上記と同様
にし、2段目の水平支持梁40を、張出屋根の前面にお
いては中間に位置するサブポストの下端間に接合と共
に、張出屋根の側面においては、水平支持梁の一端を中
間のサブポストの下端に接合し、他端を1段目と同様
に、建屋10の水辺側支柱12に上下動可能に設けるも
のである。
When each of the slide columns 30 is of a three-stage type, the first-stage horizontal support beams 40 are set in the same manner as described above, and the second-stage horizontal support beams 40 are connected to the front surface of the overhanging roof. In the above, together with the joint between the lower ends of the sub-posts located in the middle, on the side surface of the overhanging roof, one end of the horizontal support beam is joined to the lower end of the intermediate sub-post, and the other end is the same as that of the first stage. It is provided on the waterside support 12 so as to be vertically movable.

【0031】次に、本発明の全天候型荷役設備の作用を
説明する。図1及び図2に示すように、岸壁14に接岸
された船舶から荷物を荷揚げしたり、陸上から荷物を船
積みしたりするときは、張出屋根11下の側方からの雨
風の侵入を防止するため、張出屋根11下前面及び両側
面を、前面覆膜21等で覆う。
Next, the operation of the all-weather handling equipment of the present invention will be described. As shown in FIGS. 1 and 2, when unloading cargo from a ship berthed on the quay 14 or loading cargo from land, it is possible to prevent rain and wind from entering from the side below the overhanging roof 11. To do so, the lower front surface and both side surfaces of the overhanging roof 11 are covered with a front cover film 21 or the like.

【0032】この場合、張出屋根11上に設置した複数
の昇降装置50を駆動させ、これら複数の昇降装置50
からの吊りワイヤー51を巻き出す。すると、吊りワイ
ヤー51によって張出屋根11より吊り下げ状態に設け
られている各芯材24並びに各芯材24に接合されたス
ライド支柱30が下降し、これに伴ない前面覆膜21等
も順次展張し、張出屋根11下前面及び両側面が覆われ
ることになる。こうして、荷物は雨風から保護され、か
つ荷役作業は雨風の影響を受けずに効率的に行われる。
In this case, a plurality of elevating devices 50 installed on the overhanging roof 11 are driven, and the plurality of elevating devices 50
Unwinds the hanging wire 51 from. Then, the respective core members 24 provided in a state of being suspended from the overhanging roof 11 by the suspension wires 51 and the slide columns 30 joined to the respective core members 24 are lowered, and the front covering film 21 and the like are also sequentially associated therewith. It is extended, and the lower front surface and both side surfaces of the overhanging roof 11 are covered. In this way, the luggage is protected from rain and wind, and the cargo handling operation is performed efficiently without being affected by rain and wind.

【0033】一方、接岸中の船舶が離岸したり、船舶が
岸壁に接岸するときには、張出屋根11の昇降装置50
を駆動させて吊りワイヤー51を巻き上げる。すると吊
りワイヤー51によって各芯材24並びにスライド支柱
30が上昇し、これに伴ない前面覆膜21等も順次折り
畳まれ、張出屋根11下前面及び両側面が開放されるこ
とになる。
On the other hand, when the ship berthing off the shore or when the ship berths on the quay, the lifting device 50
Is driven to wind up the suspension wire 51. Then, the respective core members 24 and the slide columns 30 are raised by the hanging wires 51, and the front covering film 21 and the like are sequentially folded along with this, and the lower front surface and both side surfaces of the overhanging roof 11 are opened.

【0034】[0034]

【発明の効果】請求項1に係る発明においては、全天候
型荷役設備によれば、簡単な構造によって、昇降ポスト
やこれを支持している張出屋根に大きな荷重をかけない
ようにすることができて、設備費を大きく軽減すること
ができ、(イ)前面覆膜21及び側面覆膜22が降ろさ
れている場合に、これらにかかる風圧を建屋柱12に伝
達し支持することによって建屋張出屋根に大きな力が作
用するのを防止できる。(ロ)前面覆膜21及び側面覆
膜22を大きく開放した場合に、張出屋根11の上方に
各スライド支柱30が大きく突出しないようにして、ス
ライド支柱30の上部に風圧が大きくかからないように
することができる。といった優れた効果を発揮すること
ができるのである。
According to the first aspect of the present invention, according to the all-weather cargo handling equipment, it is possible to prevent a large load from being applied to the lifting posts and the overhanging roof supporting the posts by a simple structure. It is possible to greatly reduce the equipment cost. (A) When the front covering film 21 and the side covering film 22 are lowered, the wind pressure applied to the front covering film 21 and the side covering film 22 is transmitted to the building pillar 12 to support the building. A large force can be prevented from acting on the roof. (B) When the front cover film 21 and the side cover film 22 are largely opened, each slide column 30 is prevented from protruding greatly above the overhanging roof 11 so that wind pressure is not applied to the upper portion of the slide column 30. can do. Such an excellent effect can be exhibited.

【0035】また、請求項2に係る全天候型荷役設備に
よれば、複数の水平支持梁40により各覆膜に係る風圧
を屋根側支柱12側にかけるようにすることができて、
各スライド支柱30の保護を確実にすることができ、し
かも各スライド支柱30の屋根側支柱12からの突出量
をより一層小さくすることができて、各スライド支柱3
0の上部に風圧が大きくかからないようにすることがで
きるのである。
Further, according to the all-weather handling equipment of claim 2, the wind pressure on each covering film can be applied to the roof-side support 12 by the plurality of horizontal support beams 40.
The protection of each slide support 30 can be ensured, and the amount of protrusion of each slide support 30 from the roof-side support 12 can be further reduced.
It is possible to prevent the wind pressure from being applied to the upper part of the zero.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の全天候型荷役設備の全体を示した斜視
図であり、覆膜を用いた状態を示す。
FIG. 1 is a perspective view showing the whole weather-type cargo handling equipment of the present invention, showing a state in which a covering film is used.

【図2】本発明の全天候型荷役設備の全体を示した斜視
図であり、覆膜を絞った状態を示す。
FIG. 2 is a perspective view showing the entire all-weather handling equipment of the present invention, showing a state in which a covering film is narrowed.

【図3】本発明の全天候型荷役設備の芯材と覆膜の動き
を示す側面図で(a)は芯材を下降させた状態、(b)
は芯材を上昇させた状態を示す。
3A and 3B are side views showing the movement of the core material and the covering film of the all-weather cargo handling equipment of the present invention, wherein FIG. 3A is a state in which the core material is lowered, and FIG.
Indicates a state where the core material is raised.

【図4】本発明の全天候型荷役設備の芯材と建屋水辺側
支柱及びスライド支柱の関係を示す平面図である。
FIG. 4 is a plan view showing the relationship between the core material of the all-weather cargo handling equipment of the present invention, the water column on the building side, and the slide column.

【図5】従来の全天候型荷役設備を示した側面図であ
る。
FIG. 5 is a side view showing a conventional all-weather handling equipment.

【図6】従来の全天候型荷役設備を示した正面図であ
る。
FIG. 6 is a front view showing a conventional all-weather cargo handling equipment.

【図7】従来の全天候型荷役設備を示した平面図であ
る。
FIG. 7 is a plan view showing a conventional all-weather cargo handling facility.

【符号の説明】[Explanation of symbols]

100 全天候型荷役設備 10 建屋 11 張出屋根 12 建屋側支柱 21 前面覆膜 22 側面覆膜 30 スライド支柱 31 メインポスト 32 サブポスト 40 水平支持梁 50 昇降装置 51 吊りワイヤー REFERENCE SIGNS LIST 100 All-weather handling equipment 10 Building 11 Overhanging roof 12 Building side support 21 Front coating 22 Side coating 30 Slide support 31 Main post 32 Subpost 40 Horizontal support beam 50 Lifting device 51 Suspension wire

フロントページの続き (72)発明者 松井 啓之 大阪市淀川区木川東4−8−4 太陽工 業株式会社内 (56)参考文献 特開 平6−92465(JP,A) 特開 平6−271087(JP,A) 特開 平7−330159(JP,A) 実開 平6−42844(JP,U) (58)調査した分野(Int.Cl.7,DB名) B65G 63/00 E04H 5/02 Continuation of the front page (72) Inventor Hiroyuki Matsui 4-8-4 Kigawa Higashi, Yodogawa-ku, Osaka Taiyo Kogyo Co., Ltd. (56) References JP-A-6-92465 (JP, A) JP-A-6-271087 (JP, A) JP-A-7-330159 (JP, A) JP-A-6-42844 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) B65G 63/00 E04H 5 / 02

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 岸壁に設置された建屋より水面上に張り
出されて船舶上を覆う張出屋根と、この張出屋根から垂
下した前面覆膜及び左右の側面覆膜と、これらの前面覆
膜と各側面覆膜とが境する前面の2隅に配置されて、上
端が張出屋根の前方隅部に昇降可能に接続されるスライ
ド支柱と張出屋根を支持する建屋の水辺側支柱とを有し
て、岸壁に接岸して荷役を行うための船舶上を覆う全天
候型荷役設備において、前記各スライド支柱を、張出屋
根の2隅にスライド自在に設けたメインポストと、この
メインポスト内に昇降可能に嵌挿される少なくとも1本
のサブポストとにより構成するとともに、前記各メイン
ポストの下端間および前記各メインポストの下端と前記
建屋側の支柱との間に水平支持梁を掛渡したことを特徴
とする全天候型荷役設備。
1. An overhanging roof that overhangs a water surface from a building installed on a quay and covers a ship, a front covering film and right and left side covering films hanging from the overhanging roof, and a front covering thereof. A sliding column, which is disposed at two corners on the front surface where the membrane and each side covering film are bordered, and whose upper end is connected to the front corner of the overhanging roof so as to be able to ascend and descend, and a waterside column of a building supporting the overhanging roof; In the all-weather cargo handling equipment for covering a ship for carrying cargo by berthing on a quay, a main post slidably provided at each of two corners of an overhanging roof; And at least one sub-post which is inserted into the lower part of each main post and between the lower ends of the main posts and between the lower ends of the main posts and the columns on the building side. All-weather cargo handling Facility.
【請求項2】 前記サブポストをさらに3段以上の複数
段として、最下段のサブポスト以外のサブポストの下端
間及び、最下段のサブポスト以外のサブポストの下端と
前記建屋の水辺側支柱との間に、水平支持梁を掛渡した
ことを特徴とする請求項1に記載の全天候型荷役設備。
2. The method according to claim 1, wherein the sub-posts are further provided in three or more stages. The all-weather handling equipment according to claim 1, wherein a horizontal support beam is bridged.
JP07089360A 1995-04-14 1995-04-14 All-weather handling equipment Expired - Fee Related JP3128188B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07089360A JP3128188B2 (en) 1995-04-14 1995-04-14 All-weather handling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07089360A JP3128188B2 (en) 1995-04-14 1995-04-14 All-weather handling equipment

Publications (2)

Publication Number Publication Date
JPH08282853A JPH08282853A (en) 1996-10-29
JP3128188B2 true JP3128188B2 (en) 2001-01-29

Family

ID=13968551

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07089360A Expired - Fee Related JP3128188B2 (en) 1995-04-14 1995-04-14 All-weather handling equipment

Country Status (1)

Country Link
JP (1) JP3128188B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0605582B1 (en) * 2006-12-20 2020-11-10 Jacobs 18 Administração De Patentes Ltda naval cover
CN111350384A (en) * 2020-03-18 2020-06-30 中交二公局第一工程有限公司 Totally-enclosed prefabricated plant shed and construction process thereof

Also Published As

Publication number Publication date
JPH08282853A (en) 1996-10-29

Similar Documents

Publication Publication Date Title
US5769105A (en) Stationary boat cover
US7353769B2 (en) Cantilever cover
US5427471A (en) Dock mounted boat hoist
JP3128188B2 (en) All-weather handling equipment
JP2753216B2 (en) Elevating safety fence device for manhole
JPH04231583A (en) Transformable sealing device for gap between building opening and rear part of vehicle approaching said building opening
GB2160174A (en) An elevator for buildings
WO1988009765A1 (en) Offshore access systems
KR102211388B1 (en) Elevating system for elevate frame type net
JP3179239B2 (en) Rain shield equipment for all-weather handling equipment
US20230322343A1 (en) Cover extension
JP2540130Y2 (en) Gate structure of lifting lift
JPS58218493A (en) Ramp for ship
JPS60128034A (en) Rear gate lifter
JP2710530B2 (en) Multi-story parking facilities
JPH0231999A (en) Tension balloon
JP3452429B2 (en) Lateral breakwater
JPH10167668A (en) Vertical and horizontal transporting device and its operation
JP2593561B2 (en) Mechanical parking equipment
JP3177905B2 (en) Installation structure and installation method of external curing coating
JPH0322436Y2 (en)
JPH0315440Y2 (en)
JP3137301B2 (en) Stacker crane
JP2712959B2 (en) Retractable roof
JPH0718845A (en) Elevating scaffold

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20001003

LAPS Cancellation because of no payment of annual fees