JP3114694B2 - Delivery date management system, delivery date management method, and recording medium - Google Patents

Delivery date management system, delivery date management method, and recording medium

Info

Publication number
JP3114694B2
JP3114694B2 JP12392698A JP12392698A JP3114694B2 JP 3114694 B2 JP3114694 B2 JP 3114694B2 JP 12392698 A JP12392698 A JP 12392698A JP 12392698 A JP12392698 A JP 12392698A JP 3114694 B2 JP3114694 B2 JP 3114694B2
Authority
JP
Japan
Prior art keywords
order
information
delivery date
stored
requirement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP12392698A
Other languages
Japanese (ja)
Other versions
JPH11306245A (en
Inventor
正行 澤永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP12392698A priority Critical patent/JP3114694B2/en
Publication of JPH11306245A publication Critical patent/JPH11306245A/en
Application granted granted Critical
Publication of JP3114694B2 publication Critical patent/JP3114694B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、納期管理システム
および納期管理方法、並びに記録媒体に関し、特に、製
品の完成納期を迅速かつ正確に算出することができるよ
うにした納期管理システムおよび納期管理方法、並びに
記録媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a delivery date management system, a delivery date management method, and a recording medium, and more particularly, to a delivery date management system and a delivery date management method capable of quickly and accurately calculating the completion delivery date of a product. And a recording medium.

【0002】[0002]

【従来の技術】従来より、ある装置を組み立てる場合に
おいては、まず、その装置を組み立てるために必要な資
材について、在庫を確認し、不足分については資材メー
カに注文する。そして、資材メーカの納期に基づいて、
その製品の完成納期を計算するようにしている。
2. Description of the Related Art Conventionally, when assembling a certain device, first, stocks of materials necessary for assembling the device are checked, and shortages are ordered from a material maker. And, based on the delivery date of the material maker,
It calculates the delivery date of the product.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、完成納
期を精度良く計算する場合においては、資材収集が最大
のネックとなる。即ち、ある製品の完成納期を判断する
際、その判断結果には、その製品に使用される資材の調
達納期が大きく影響する。
However, when calculating the completion delivery date with high accuracy, material collection is the biggest bottleneck. That is, when determining the completion delivery date of a product, the result of the determination greatly depends on the procurement delivery date of the materials used for the product.

【0004】このことから、現在の資材発注の状態で、
新規にある製品を生産しようとした場合におけるその製
品の完成納期を素早く、かつ精度良く知りたい、或い
は、資材メーカから必要な資材の納入日程が通知された
ときに、それが各製品の完成納期にどういう影響を与え
るかを、素早く、かつ精度良く知りたいというニーズは
高い。
[0004] From this, in the state of the current material order,
When a new product is to be produced, we want to know the delivery time of the product quickly and accurately, or when the material maker notifies us of the delivery schedule of the required material, that is the completion delivery time of each product. There is a strong need to quickly and accurately know what kind of impact it has.

【0005】ところが、製品の組み立てに使用する資材
の納入日程に着目し、製品の納期回答を行い、さらに、
その納期が完成希望日時より遅れた場合、その要因とな
る資材を割り出し、出力するような技術はこれまでなか
った。従って、製品の完成納期を迅速かつ精度良く回答
することができない場合がある課題があった。
[0005] However, paying attention to the delivery schedule of the materials used for assembling the product, answering the delivery date of the product,
If the delivery date is later than the desired date and time of completion, there has been no technology to determine and output the materials that cause the delay. Therefore, there has been a problem that it may not be possible to promptly and accurately answer the completion delivery date of a product.

【0006】本発明はこのような状況に鑑みてなされた
ものであり、資材の納入日程に応じて、製品の完成納期
を迅速かつ精度良く計算することができるようにするも
のである。
[0006] The present invention has been made in view of such circumstances, and it is an object of the present invention to be able to quickly and accurately calculate the completion delivery date of a product according to the delivery schedule of materials.

【0007】[0007]

【課題を解決するための手段】請求項1に記載の納期管
理システムは、多段階の資材構成を有する装置の組み立
てにおいて、装置の完成納期を管理する納期管理システ
ムであって、資材の調達リードタイムに関する資材情報
を記憶する資材情報記憶手段と、資材の親子関係を定義
した構成情報を記憶する構成情報記憶手段と、日程計算
に利用される、休日を定義したカレンダ情報を記憶する
カレンダ情報記憶手段と、資材の在庫数量に関する情報
を記憶する在庫数量情報記憶手段と、資材の所要に関す
る資材所要情報を記憶する資材所要情報記憶手段と、資
材の注文に関する資材注文情報を記憶する資材注文情報
記憶手段と、資材情報記憶手段によって記憶された資材
の調達リードタイムと、構成情報記憶手段によって記憶
された構成情報と、カレンダ情報記憶手段によって記憶
されたカレンダ情報と、在庫数量記憶手段によって記憶
された在庫数量と、資材所要情報記憶手段によって記憶
された資材所要情報と、資材注文情報記憶手段によって
記憶された資材注文情報とに基づいて、資材の所要日お
よび所要量を示す所要情報と、資材の納期日および注文
数を示す注文情報を生成するMRP計算処理手段と、M
RP計算処理手段によって生成された所要情報を記憶す
る所要情報記憶手段と、MRP計算処理手段によって生
成された注文情報を記憶する注文情報記憶手段と、資材
情報記憶手段によって記憶された資材情報と、構成情報
記憶手段によって記憶された構成情報と、カレンダ情報
記憶手段によって記憶されたカレンダ情報と、在庫数量
情報記憶手段によって記憶された資材の在庫数量と、所
要情報記憶手段によって記憶された所要情報と、注文情
報記憶手段によって記憶された注文情報とに基づいて、
多段階の資材の納期日を、下位の資材の納期日から上位
の資材の納期日の順で算出し、算出された資材の納期日
に基づいて、納期日の順に各資材の所要に対して、資材
の在庫、資材の注文を順に引き当てる引当兼納期日算出
手段と、引当兼納期日算出手段によって引き当てられた
引当結果を記憶する引当結果記憶手段と、引当結果記憶
手段によって記憶された引当結果に基づいて、納期が遅
れている資材の所要を検索し、検索した所要の情報を遅
れ製品情報として出力する遅れ資材検索手段と、引当結
果記憶手段によって記憶された引当結果に基づいて、遅
れの原因となった資材の注文を検索し、遅れ原因注文情
報として出力する遅れ原因注文検索手段とを備え、注文
情報記憶手段によって記憶された注文情報には各資材の
注文番号が含まれ、所要情報記憶手段によって記憶され
た所要情報には各資材の上位の資材の注文番号が含ま
れ、注文番号と上位の注文番号とによって、注文情報の
各資材に対応する下位の所要の有無が判断され、引当兼
納期日算出手段は、資材情報記憶手段によって記憶され
た資材情報、構成情報記憶手段によって記憶された構成
情報、カレンダ情報記憶手段によって記憶されたカレン
ダ情報、在庫数量情報記憶手段によって記憶された資材
の在庫数量を読み込み、構成情報記憶手段によって記憶
された構成情報に基づいて、資材を構成する下位の資材
から順に、資材に対応する所要情報を読み込み、資材に
対応する注文情報を読み込み、資材の下位の資材から上
位の資材の順で、資材の所要に対して資材の注文を引き
当て、所要に引き当てられた注文の納期日が、所要の所
要日より所定の遅れ日数だけ遅れているとき、遅れ日数
を記憶し、記憶された遅れ日数に基づいて、所要に対応
する上位の資材の納期日を算出し、上位の資材の注文の
納期日が、算出された納期日より前のとき、算出された
納期日を上位の資材の注文の納期日に設定し、引当結果
記憶手段は、引当兼納期日算出手段によって算出された
遅れ日数を記憶し、遅れ資材検索手段は、引当結果記憶
手段によって記憶された遅れ日数に基づいて、納期が遅
れている資材の所要を検索し、検索した所要に関する情
報を遅れ製品情報として出力し、遅れ原因注文検索手段
は、引当結果記憶手段によって記憶された遅れ日数か
ら、遅れの原因となった資材の注文を検索し、検索した
資材の注文に関する情報を遅れ原因注文情報として出力
することを特徴とする。また、資材は、2以上の段階の
資材構成をなしており、下位の資材から上位の資材に順
次処理が行われるようにすることができる。また、引当
兼納期日計算手段は、各所要を所要日の昇順でソート
し、所要日順に所要に対して注文を引き当てるようにす
ることができる。また、引当兼納期日算出手段は、各所
要を所要に設定された優先度の順にソートし、優先度の
順に所要に対して注文を引き当てるようにすることがで
きる。また、遅れ資材検索手段は、引当結果記憶手段に
記憶された遅れ日数が1以上の資材を検索し、検索され
た遅れの発生している資材に関する情報を出力するよう
にすることができる。また、遅れ資材検索手段は、引当
結果記憶手段に記憶された遅れ日数が1以上の資材を検
索し、検索された遅れ日数が1以上の所定の資材につい
て、資材の下位の資材に関する情報を出力するようにす
ることができる。請求項7に記載の納期管理方法は、多
段階の資材構成を有する装置の組み立てにおいて、装置
の完成納期を管理する納期管理システムにおける納期管
理方法であって、資材の調達リードタイムに関する資材
情報を記憶する資材情報記憶ステップと、資材の親子関
係を定義した構成情報を記憶する構成情報記憶ステップ
と、日程計算に利用される、休日を定義したカレンダ情
報を記憶するカレンダ情報記憶ステップと、資材の在庫
数量に関する情報を記憶する在庫数量情報記憶ステップ
と、資材の所要に関する資材所要情報を記憶する資材所
要情報記憶ステップと、資材の注文に関する資材注文情
報を記憶する資材注文情報記憶ステップと、資材情報記
憶ステップによって記憶された資材の調達リードタイム
と、構成情報記憶ステップによって記憶された構成情報
と、カレンダ情報記憶ステップによって記憶されたカレ
ンダ情報と、在庫数量記憶ステップによって記憶された
在庫数量と、資材所要情報記憶ステップによって記憶さ
れた資材所要情報と、資材注文情報記憶ステップによっ
て記憶された資材注文情報とに基づいて、資材の所要日
および所要量を示す所要情報と、資材の納期日および注
文数を示す注文情報を生成するMRP計算処理ステップ
と、MRP計算処理ステップによって生成された所要情
報を記憶する所要情報記憶ステップと、MRP計算処理
ステップによって生成された注文情報を記憶する注文情
報記憶ステップと、資材情報記憶ステップによって記憶
された資材情報と、構成情報記憶ステップによって記憶
された構成情報と、カレンダ情報記憶ステップによって
記憶されたカレンダ情報と、在庫数量情報記憶ステップ
によって記憶された資材の在庫数量と、所要情報記憶ス
テップによって記憶された所要情報と、注文情報記憶ス
テップによって記憶された注文情報とに基づいて、多段
階の資材の納期日を、下位の資材の納期日から上位の資
材の納期日の順で算出し、算出された資材の納期日に基
づいて、納期日の順に各資材の所要に対して、資材の在
庫、資材の注文を順に引き当てる引当兼納期日算出ステ
ップと、引当兼納期日算出ステップによって引き当てら
れた引当結果を記憶する引当結果記憶ステップと、引当
結果記憶ステップによって記憶された引当結果に基づい
て、納期が遅れている資材の所要を検索し、検索した所
要の情報を遅れ製品情報として出力する遅れ資材検索ス
テップと、引当結果記憶ステップによって記憶された引
当結果に基づいて、遅れの原因となった資材の注文を検
索し、遅れ原因注文情報として出力する遅れ原因注文検
索ステップとを備え、注文情報記憶ステップによって記
憶された注文情報には各資材の注文番号が含まれ、所要
情報記憶ステップによって記憶された所要情報には各資
材の上位の資材の注文番号が含まれ、注文番号と上位の
注文番号とによって、注文情報の各資材に対応する下位
の所要の有無が判断され、引当兼納期日算出ステップに
おいては、資材情報記憶ステップによって記憶された資
材情報、構成情報記憶ステップによって記憶された構成
情報、カレンダ情報記憶ステップによって記憶されたカ
レンダ情報、在庫数量情報記憶ステップによって記憶さ
れた資材の在庫数量を読み込み、構成情報記憶ステップ
によって記憶された構成情報に基づいて、資材を構成す
る下位の資材から順に、資材に対応する所要情報を読み
込み、資材に対応する注文情報を読み込み、資材の下位
の資材から上位の資材の順で、資材の所要に対して資材
の注文を引き当て、所要に引き当てられた注文の納期日
が、所要の所要日より所定の遅れ日数だけ遅れていると
き、遅れ日数を記憶し、記憶された遅れ日数に基づい
て、所要に対応する上位の資材の納期日を算出し、上位
の資材の注文の納期日が、算出された納期日より前のと
き、算出された納期日を上位の資材の注文の納期日に設
定し、引当結果記憶ステップにおいては、引当兼納期日
算出ステップによって算出された遅れ日数を記憶し、遅
れ資材検索ステップにおいては、引当結果記憶ステップ
によって記憶された遅れ日数に基づいて、納期が遅れて
いる資材の所要を検索し、検索した所要に関する情報を
遅れ製品情報として出力し、遅れ原因注文検索ステップ
においては、引当結果記憶ステップによって記憶された
遅れ日数から、遅れの原因となった資材の注文を検索
し、検索した資材の注文に関する情報を遅れ原因注文情
報として出力することを特徴とする。請求項8に記載の
記録媒体は、請求項7に記載の納期管理方法を実行可能
なプログラムが記録されていることを特徴とする。本発
明に係る納期管理システムおよび納期管理方法、並びに
記録媒体においては、資材の調達リードタイムに関する
資材情報を記憶し、資材の親子関係を定義した構成情報
を記憶し、日程計算に利用される、休日を定義したカレ
ンダ情報を記憶し、資材の在庫数量に関する情報を記憶
し、資材の所要に関する資材所要情報を記憶し、資材の
注文に関する資材注文情報を記憶し、資材の調達リード
タイムと、構成情報と、カレンダ情報と、在庫数量と、
資材所要情報と、資材注文情報とに基づいて、資材の所
要日および所要量を示す所要情報と、資材の納期日およ
び注文数を示す注文情報を生成し、生成された所要情報
を記憶し、生成された注文情報を記憶し、記憶された資
材情報と、記憶された構成情報と、記憶されたカレンダ
情報と、記憶された資材の在庫数量と、記憶された所要
情報と、記憶された注文情報とに基づいて、多段階の資
材の納期日を、下位の資材の納期日から上位の資材の納
期日の順で算出し、算出された資材の納期日に基づい
て、納期日の順に各資材の所要に対して、資材の在庫、
資材の注文を順に引き当て、引き当てられた引当結果を
記憶し、記憶された引当結果に基づいて、納期が遅れて
いる資材の所要を検索し、検索した所要の情報を遅れ製
品情報として出力し、記憶された引当結果に基づいて、
遅れの原因となった資材の注文を検索し、遅れ原因注文
情報として出力する。このとき、記憶された注文情報に
は各資材の注文番号が含まれ、記憶された所要情報には
各資材の上位の資材の注文番号が含まれ、注文番号と上
位の注文番号とによって、注文情報の各資材に対応する
下位の所要の有無が判断され、記憶された資材情報、記
憶された構成情報、記憶されたカレンダ情報、記憶され
た資材の在庫数量を読み込み、記憶された構成情報に基
づいて、資材を構成する下位の資材から順に、資材に対
応する所要情報を読み込み、資材に対応する注文情報を
読み込み、資材の下位の資材から上位の資材の順で、資
材の所要に対して資材の注文を引き当て、所要に引き当
てられた注文の納期日が、所要の所要日より所定の遅れ
日数だけ遅れているとき、遅れ日数を記憶し、記憶され
た遅れ日数に基づいて、所要に対応する上位の資材の納
期日を算出し、上位の資材の注文の納期日が、算出され
た納期日より前のとき、算出された納期日を上位の資材
の注文の納期日に設定し、算出された遅れ日数を記憶
し、記憶された遅れ日数に基づいて、納期が遅れている
資材の所要を検索し、検索した所要に関する情報を遅れ
製品情報として出力し、記憶された遅れ日数から、遅れ
の原因となった資材の注文を検索し、検索した資材の注
文に関する情報を遅れ原因注文情報として出力する。
According to a first aspect of the present invention, there is provided a delivery time management system for managing a completion delivery time of a device in assembling a device having a multi-stage material configuration, wherein the lead time of the material procurement is controlled. Material information storage means for storing material information relating to time, configuration information storage means for storing configuration information defining the parent-child relationship of the materials, and calendar information storage for storing calendar information defining holidays used for schedule calculation Means, stock quantity information storage means for storing information about the stock quantity of the material, material requirement information storage means for storing the material requirement information about the requirement for the material, and material order information storage for storing the material order information about the order of the material. Means, the material procurement lead time stored by the material information storage means, and the configuration information stored by the configuration information storage means. Calendar information stored by calendar information storage means, inventory quantity stored by inventory quantity storage means, material requirement information stored by material requirement information storage means, and material order information stored by material order information storage means MRP calculation processing means for generating required information indicating the required date and required amount of the material, order information indicating the delivery date of the material and the number of orders,
Required information storage means for storing required information generated by the RP calculation processing means, order information storage means for storing order information generated by the MRP calculation processing means, material information stored by the material information storage means, The configuration information stored by the configuration information storage means, the calendar information stored by the calendar information storage means, the stock quantity of the material stored by the inventory quantity information storage means, and the required information stored by the required information storage means. , Based on the order information stored by the order information storage means,
Calculate the delivery date of the multi-level materials in order from the delivery date of the lower material to the delivery date of the upper material.Based on the calculated delivery date of the material, Allocation and delivery date calculation means for sequentially allocating material inventory and material orders, allocation result storage means for storing allocation results allocated by the allocation and delivery date calculation means, and allocation results stored by the allocation result storage means. A delayed material search means for searching for the required material whose delivery date is delayed, and outputting the searched required information as delayed product information, and a delay result based on the allocation result stored by the allocation result storage means. The order information stored by the order information storage means includes a delay cause order search means for searching for the order of the material causing the cause and outputting the order as delay cause order information, and includes the order number of each material. The requirement information stored by the requirement information storage means includes the order number of the upper material of each material, and the order number and the higher order number determine whether there is a lower requirement corresponding to each material of the order information. The allocation and delivery date calculation means includes material information stored by the material information storage means, configuration information stored by the configuration information storage means, calendar information stored by the calendar information storage means, and storage by the inventory quantity information storage means. Read the stock quantity of the material, and read the required information corresponding to the material in order from the lower material constituting the material based on the configuration information stored by the configuration information storage unit, and read the order information corresponding to the material. , In order from the lower material to the higher material, the material order is allocated to the material requirement, and the order allocated to the requirement is delivered. When the date is later than the required required date by a predetermined number of delay days, the number of delay days is stored, and based on the stored number of delay days, the delivery date of the higher-order material corresponding to the requirement is calculated, and the higher-order material is calculated. When the delivery date of the order is before the calculated delivery date, the calculated delivery date is set to the delivery date of the order of the higher-order material, and the allocation result storage means is calculated by the allocation and delivery date calculation means. The delayed material search means searches for the requirement of the material whose delivery date is delayed based on the number of delay days stored by the allocation result storage means, and outputs information on the searched requirement as delayed product information. Then, the delay cause order searching means searches the order of the material causing the delay from the number of delay days stored by the allocation result storage means, and outputs information on the searched order of the material as the delay cause order information. It is characterized by the following. Further, the material has a material configuration of two or more stages, and the processing can be sequentially performed from the lower material to the higher material. Further, the allocation and delivery date calculation means can sort each requirement in ascending order of the required date and allocate an order to the requirement in the required date order. Further, the allocation / delivery date calculation means can sort the requirements in the order of the priority set as the requirement and allocate the order to the requirement in the order of the priority. Further, the delayed material search means may search for the material having the number of days of delay stored in the allocation result storage means of 1 or more, and output information on the searched material having a delay. Further, the delayed material search means searches for the material having the number of delay days of 1 or more stored in the allocation result storage means, and outputs information on the lower order material of the searched material having the number of delay days of 1 or more. You can make it. A delivery date management method according to claim 7, which is a delivery date management method in a delivery date management system that manages the completion delivery date of the device in assembling the device having a multi-stage material configuration, wherein the material information relating to the procurement lead time of the material is provided. A material information storing step of storing; a configuration information storing step of storing configuration information defining a parent-child relationship of the material; a calendar information storing step of storing calendar information defining a holiday used for schedule calculation; A stock quantity information storage step for storing information about stock quantities, a material requirement information storage step for storing material requirement information related to material requirements, a material order information storage step for storing material order information for material orders, and a material information The procurement lead time of the material stored in the storage step and the configuration information storage step The stored configuration information, the calendar information stored in the calendar information storage step, the inventory quantity stored in the inventory quantity storage step, the material requirement information stored in the material requirement information storage step, and the material order information storage step The MRP calculation processing step for generating the required information indicating the required date and required amount of the material, the order information indicating the delivery date of the material and the number of orders based on the material order information stored by A required information storing step of storing the generated required information, an order information storing step of storing the order information generated by the MRP calculation processing step, a material information stored by the material information storing step, and a configuration information storing step. The stored configuration information and the calendar information storage step Based on the stored calendar information, the stock quantity of the material stored in the stock quantity information storing step, the required information stored in the required information storing step, and the order information stored in the order information storing step, Calculate the delivery date of the material at the stage in order from the delivery date of the lower material to the delivery date of the upper material, and, based on the calculated delivery date of the material, for the requirements of each material in order of the delivery date, The allocation and delivery date calculation step of sequentially allocating material stock and material orders, the allocation result storage step of storing allocation results allocated by the allocation and delivery date calculation step, and the allocation result stored by the allocation result storage step. A delayed material search step of searching for the requirement of the material with a delayed delivery date and outputting the searched required information as delayed product information, And a delay cause order search step of searching for the order of the material causing the delay based on the allocation result stored in the result storage step, and outputting the order as delay cause order information. The order information includes the order number of each material, and the required information stored in the required information storage step includes the order number of the upper material of each material. In the allocation and delivery date calculation step, the material information stored in the material information storage step, the configuration information stored in the configuration information storage step, and the calendar information storage step are determined. The calendar information and the stock quantity of the material stored in the stock quantity information storing step are read and stored. Based on the configuration information stored in the information storage step, the necessary information corresponding to the material is read in order from the lower material constituting the material, the order information corresponding to the material is read, and the lower material to the upper material is read from the material. In the order, the material order is allocated to the material requirement, and when the delivery date of the order allocated to the requirement is later than the required time by a predetermined number of days, the number of delay days is stored and stored. Based on the number of delay days, calculate the delivery date of the higher-order material corresponding to the requirement.If the delivery date of the order of the higher-order material is earlier than the calculated delivery date, the calculated delivery date is replaced by the higher-order material. In the allocation result storage step, the number of delay days calculated by the allocation and delivery date calculation step is stored, and in the delayed material search step, the allocation result storage step is performed. Therefore, based on the stored number of days, the requirement of the material whose delivery date is delayed is searched, and the information on the searched requirement is output as the delayed product information. In the delay cause order searching step, the information is stored by the allocation result storing step. The order of the material causing the delay is searched from the number of days of delay, and information on the searched order of the material is output as the order information of the cause of the delay. A recording medium according to an eighth aspect is characterized by recording a program capable of executing the delivery date management method according to the seventh aspect. In the delivery date management system and delivery date management method according to the present invention, and in the recording medium, stores the material information on the procurement lead time of the material, stores the configuration information defining the parent-child relationship of the material, and is used for schedule calculation. Stores calendar information that defines holidays, stores information on material stock quantities, stores material requirement information on material requirements, stores material order information on material orders, procurement lead time for materials, configuration Information, calendar information, inventory quantity,
Based on the material requirement information and the material order information, generate required information indicating the required date and required amount of the material and order information indicating the delivery date and the number of the ordered materials, and store the generated required information, The generated order information is stored, the stored material information, the stored configuration information, the stored calendar information, the stored material inventory quantity, the stored required information, and the stored order are stored. Based on the information, the delivery date of the multi-stage material is calculated in order from the delivery date of the lower material to the delivery date of the upper material, and each delivery date is calculated based on the calculated delivery date of the material. For material requirements, material inventory,
Material orders are allocated in order, the allocated allocation results are stored, based on the stored allocation results, the requirements for the materials whose delivery date is delayed are retrieved, and the retrieved required information is output as delayed product information, Based on the stored allocation results
Search for the order of the material that caused the delay and output it as delay cause order information. At this time, the stored order information includes the order number of each material, and the stored required information includes the order number of the upper material of each material. The presence or absence of lower-order requirements corresponding to each material of the information is determined, and the stored material information, the stored configuration information, the stored calendar information, and the stored material inventory quantity are read. Based on the material, read the necessary information corresponding to the material in order from the lower material constituting the material, read the order information corresponding to the material, and from the lower material of the material to the higher material, If the order of the material is allocated and the delivery date of the order allocated to the requirement is later than the required date by a predetermined number of days, the number of days delayed is stored, and the requirement is responded based on the stored number of days delayed. Do Calculate the delivery date of the top material, and if the delivery date of the order of the higher-order material is earlier than the calculated delivery date, set the calculated delivery date to the delivery date of the order of the higher-order material, and calculate Based on the stored number of delay days, search for the requirement of the material whose delivery date is delayed, output the information on the searched requirement as delayed product information, and, based on the stored number of delay days, The order of the material causing the cause is searched, and information on the searched order of the material is output as delay cause order information.

【0008】[0008]

【発明の実施の形態】本発明の納期管理システムは、多
段階の資材構成を持つ装置の組み立てにおいて、各資材
メーカからの資材の納期回答に基づいて、最上位の製品
の完成納期を計算し、回答するためのものである。ま
た、設定しておいた製品の完成納期よりも実際の完成納
期が遅れた場合、どの資材に起因して遅れたのかを示す
情報を出力する機能も合わせもつ。以下、図1を参照し
て、その概要について説明する。図1は、本発明の納期
管理システムの一実施の形態の構成例を示すブロック図
である。
BEST MODE FOR CARRYING OUT THE INVENTION The delivery date management system of the present invention calculates the completion delivery date of the highest-order product based on the answer of the delivery date of the material from each material maker in assembling the device having the multi-stage material configuration. , To answer. In addition, when the actual completion delivery date is later than the set completion delivery date of the product, it also has a function of outputting information indicating which material caused the delay. The outline will be described below with reference to FIG. FIG. 1 is a block diagram showing a configuration example of an embodiment of a delivery date management system according to the present invention.

【0009】図1において、MRP(資材所要量計画(M
aterial Requirement Planning))計算処理21は、製
品所要情報15、部品メーカからの回答納期が含まれて
いる資材注文情報16など各種情報を取込み、資材所要
展開および資材発注量計算を行い、所要情報31と注文
情報32を生成する。
In FIG. 1, MRP (Material Requirements Planning (M
aterial Requirement Planning)) The calculation process 21 fetches various information such as the product requirement information 15 and the material order information 16 including the response delivery date from the parts maker, performs the material requirement development and the material order quantity calculation, and performs the required information 31. And the order information 32 are generated.

【0010】次に、引当兼納期算出処理22は、部品表
のレベル下位の品目から、所要情報31の各所要に注文
情報32の各注文を引当てる。この際、引当たった注文
の納期が所要の所要日より遅れている場合は、その遅れ
日数をセットしておく。
[0010] Next, the allocation and delivery date calculation processing 22 allocates each order of the order information 32 to each requirement of the requirement information 31 from the item lower in the level of the parts table. At this time, if the delivery date of the allocated order is later than the required required date, the number of delay days is set.

【0011】次に、その所要に対応する上位品目の注文
納期が、遅れ日数から計算した納期より前の場合には、
上位品目の注文納期を、遅れ日数から計算した納期によ
りセットしなおす。この手順を順次、最上位のレベルま
で行い、下位品目の注文納期の遅れが、その部材を使用
する製品に伝わるように引当結果情報33を作成する。
Next, when the order delivery date of the higher-order item corresponding to the requirement is earlier than the delivery date calculated from the number of delay days,
The order delivery date of the higher order item is reset by the delivery date calculated from the number of delay days. This procedure is sequentially performed up to the highest level, and the allocation result information 33 is created so that the delay in order delivery of the lower order item is transmitted to the product using the member.

【0012】さらに、遅れ製品検索処理23は、引当結
果情報33のうち、遅れが発生しており、かつ、製品所
要として登録された所要のものを抽出し、遅れ製品情報
34として出力する。また、遅れ原因注文検索処理24
は、指定された一つの遅れ製品に対して、引当結果情報
33より対応関係を探り、その製品の完成に関与してい
る資材を抽出し、さらに遅れの発生している資材を遅れ
原因注文情報35として出力する。
Further, the delayed product search processing 23 extracts, out of the allocation result information 33, those which have been delayed and which have been registered as product requirements, and output them as delayed product information 34. The delay cause order search processing 24
Searches for the correspondence of the specified one delayed product from the allocation result information 33, extracts the materials involved in the completion of the product, and further specifies the delayed material in the delay cause order information. Output as 35.

【0013】次に、図1を参照して、本発明の納期管理
システムの一実施の形態について詳細に説明する。同図
に示すように、納期管理システムは、製品所要情報1
5、資材注文情報16などをもとに、資材所要展開およ
び資材発注量計算を行い、所要情報31と注文情報32
を生成するMRP計算処理21と、MRP計算処理21
が生成した所要情報31に対して、在庫数量情報14の
在庫数量および注文情報32の注文の引当処理、及び、
引当てた所要の所要日と注文の納期の日数差から上位注
文の納期修正を行う引当兼納期算出処理22と、引当兼
納期算出処理22が出力した引当結果情報33より納期
遅れの発生した製品を検索し、遅れ製品情報34に出力
する遅れ製品検索処理23と、引当結果情報33よりあ
る製品の遅れの要因となった注文を検索し、遅れ原因注
文情報35に出力する遅れ原因注文検索処理24からな
る。
Next, an embodiment of a delivery date management system according to the present invention will be described in detail with reference to FIG. As shown in FIG.
5. Based on the material order information 16 and the like, material development and material order quantity calculation are performed, and the necessary information 31 and the order information 32 are calculated.
Calculation processing 21 for generating the
For the required information 31 generated by, the allocation processing of the inventory quantity of the inventory quantity information 14 and the order of the order information 32, and
The allocation and delivery date calculation processing 22 that corrects the delivery date of the higher order based on the difference between the allocated required date and the number of days between the delivery date of the order, and the product whose delivery date is delayed based on the allocation result information 33 output by the allocation and delivery date calculation processing 22 , And a delayed product search process 23 for outputting the delayed product information 34 to the delayed product information 34, and a delay product order search process for searching the order that caused the product delay from the allocation result information 33 and outputting the delayed product order information 35. 24.

【0014】また、情報ファイルとして、資材に関する
情報を格納した資材情報11と、資材の親子関係を定義
した構成情報12と、日程計算に利用する休日を定義し
たカレンダ情報13と、各資材の在庫数を持つ在庫数量
情報14とをさらに有している。
As information files, material information 11 storing information on the materials, configuration information 12 defining the parent-child relationship of the materials, calendar information 13 defining holidays used for schedule calculation, inventory information of each material, And inventory quantity information 14 having a number.

【0015】次に、図1及び図2のフローチャートを参
照して、本実施の形態の動作について詳細に説明する。
Next, the operation of this embodiment will be described in detail with reference to the flowcharts of FIGS.

【0016】MRP計算処理21は、資材情報11、構
成情報12、カレンダ情報13、在庫数量情報14、製
品所要情報15、及び資材注文情報16から、マルチレ
ベルの資材所要展開、発注量計算を行い、新たな所要情
報31と注文情報32を生成する。そのとき、新規発注
については、資材情報の調達リードタイムを確保した納
期とする(つまり、計算を行っている起点の日から、稼
働日上で調達リードタイム日数だけ経過した日を納期と
する)。なお、MRPの計算方法に関しては、生産管理
の教科書に書かれているため、ここではその説明は省略
する。
The MRP calculation process 21 performs multi-level material requirement development and order quantity calculation from the material information 11, the configuration information 12, the calendar information 13, the stock quantity information 14, the product requirement information 15, and the material order information 16. , New required information 31 and order information 32 are generated. At that time, for a new order, a delivery date that secures the procurement lead time for the material information is set as a delivery date (that is, a delivery date is a date that has elapsed the number of days of the procurement lead time on the working day from the start date of calculation). . Note that the method of calculating the MRP is described in a production management textbook, and a description thereof will be omitted.

【0017】次に、引当兼納期算出処理22において、
図2のフローチャートに示した手順で、引当処理および
納期算出処理が行われる。なお、以下では、説明に使用
する資材構成(資材情報11と構成情報12の組み合
せ)は図3、所要情報31は図4、注文情報32は図
5、在庫数量情報14は図6にそれぞれ示した例を用い
るものとする。また、カレンダは、土曜日、日曜日を休
日とし、週5日勤務とする。
Next, in the allocation and delivery date calculation processing 22,
The allocation process and the due date calculation process are performed according to the procedure shown in the flowchart of FIG. In the following, the material composition (combination of the material information 11 and the configuration information 12) used in the description is shown in FIG. 3, the required information 31 is shown in FIG. 4, the order information 32 is shown in FIG. 5, and the stock quantity information 14 is shown in FIG. The following example shall be used. The calendar is closed on Saturday and Sunday and five days a week.

【0018】まず、最初に、ステップS1において、資
材情報11、構成情報12、カレンダ情報13、在庫数
量情報14を読み込む。次に、ステップS2において、
構成レベルの下位の資材から順にステップS3乃至S1
3の処理を繰り返す。構成レベルの下位資材からという
のは、図3に示した資材構成の下側(下位)から処理し
ていくことを示す。
First, in step S1, material information 11, configuration information 12, calendar information 13, and stock quantity information 14 are read. Next, in step S2,
Steps S3 to S1 in order from the material at the lower level of the configuration level
Step 3 is repeated. Starting from the lower level material of the configuration level indicates that processing is performed from the lower side (lower level) of the material configuration shown in FIG.

【0019】ステップS3において、該当資材の所要情
報を読み込み、この例の場合、所要日の昇順でソートす
る。次に、ステップS4に進み、該当資材の注文情報を
読み込む。ステップS5においては、読み込んだ各注文
に対して、ステップS6乃至S9の処理を繰り返すよう
にループ制御を行う。
In step S3, the necessary information of the corresponding material is read, and in this case, the materials are sorted in ascending order of the required date. Next, the process proceeds to step S4, where order information of the material is read. In step S5, loop control is performed so that the processing of steps S6 to S9 is repeated for each read order.

【0020】即ち、ステップS6において、所要情報3
1(図4)の中に自分の注文番号(図5)と等しい「上
位の注文番号」(図4)をもつ所要があるか否かをサー
チする。自分の注文番号と等しい「上位の注文番号」を
持つ所要がある場合、ステップS7に進み、その下位の
所要の所要変更日を元にして、上位の所要の納期変更日
を算出する。複数の所要が存在する場合には、日付の一
番大きいものを元に算出する。算出方法は、納期変更日
=納期日+(所要変更日−所要日)とする。一方、自分
の注文番号と等しい「上位の注文番号」を持つ所要がな
い場合、ステップS8に進み、そのまま納期日を納期変
更日とする。ステップS7又はステップS8の処理が終
了すると、ステップS9に進む。
That is, in step S6, the required information 3
1 (FIG. 4) is searched to see if there is a requirement to have a "higher order number" (FIG. 4) equal to its own order number (FIG. 5). If there is a requirement having the “higher order number” equal to the order number of the user, the process proceeds to step S7, and the higher required delivery date change date is calculated based on the lower required requirement change date. If there is more than one requirement, it is calculated based on the largest date. The calculation method is as follows: delivery date change date = delivery date + (required change date−required date). On the other hand, if there is no need to have the “higher order number” equal to the own order number, the process proceeds to step S8, and the delivery date is set as the delivery date change date. When the processing in step S7 or step S8 ends, the process proceeds to step S9.

【0021】ステップS9においては、該当資材の注文
がまだあるか否かが判定され、該当資材の注文がまだあ
る場合、ステップS5に戻り、ステップS5乃至S9の
処理が繰り返し実行される。一方、該当資材の注文がな
い場合、ステップS10の処理へ進む。
In step S9, it is determined whether or not there is an order for the corresponding material. If there is still an order for the corresponding material, the process returns to step S5, and the processes of steps S5 to S9 are repeatedly executed. On the other hand, if there is no order for the material, the process proceeds to step S10.

【0022】ステップS10においては、注文を納期変
更日順にソートする。次に、ステップS11に進み、ス
テップS3においてソートされた所要に対して、在庫、
注文を順に引当てて行く。次に、ステップS12におい
て、引当てた結果を引当結果情報33として出力する。
In step S10, the orders are sorted in order of the delivery date change date. Next, the process proceeds to step S11, where the requirements sorted in step S3 are compared with the stock,
Assign orders sequentially. Next, in step S12, the allocation result is output as allocation result information 33.

【0023】次に、ステップS13に進み、資材がある
か否かを判定し、資材がまだある場合、ステップS2に
戻り、ステップS2乃至S13の処理をくり返し実行す
る。一方、資材がない場合、処理を終了する。
Next, the process proceeds to step S13, where it is determined whether or not there is a material. If there is still a material, the process returns to step S2, and the processes of steps S2 to S13 are repeatedly executed. On the other hand, if there is no material, the process ends.

【0024】次に、以上の処理を、図3乃至図9に示し
た具体例を参照して詳細に説明する。最初に、ステップ
S1において、資材情報11、構成情報12、カレンダ
情報13、在庫数量情報14を読み込む。その後、ステ
ップS2に進み、図3に示した資材構成の構成レベルの
下位レベルのものである資材「SHIZAI−C」から
順に処理を行う。
Next, the above processing will be described in detail with reference to specific examples shown in FIGS. First, in step S1, material information 11, configuration information 12, calendar information 13, and stock quantity information 14 are read. Thereafter, the process proceeds to step S2, and the processing is performed in order from the material “SHIZAI-C” which is a lower level of the configuration level of the material configuration shown in FIG.

【0025】まず、ステップS3において、図4に示し
た所要情報31のうち、「SHIZAI−C」の所要2
件を読み込む。その後、所要日をキーに昇順でソートす
ると、1998/3/4の所要、1998/3/6の所
要の順番となる。次に、ステップS4に進み、「SHI
ZAI−C」の注文情報1件を読み込む。
First, in step S3, the required information 31 of "SHIZAI-C" of the required information 31 shown in FIG.
Read the items. After that, when the required dates are used as keys to sort in ascending order, the required order is 1998/3/4 and the required order is 1998/3/6. Next, the process proceeds to step S4, where "SHI
One piece of order information of "ZAI-C" is read.

【0026】ステップS5においては、複数の注文があ
る場合、各注文に対して、ループして処理を行うように
制御する。ステップS6においては、対応する下位の所
要があるか否かが判定される。いまの場合、対応する下
位の所要はないので、ステップS8に進み、納期変更日
には納期日1998/3/4をそのままセットする。
In step S5, when there are a plurality of orders, control is performed so that each order is processed in a loop. In step S6, it is determined whether there is a corresponding lower level requirement. In this case, since there is no corresponding lower order requirement, the process proceeds to step S8, and the delivery date change date is set to 1998/3/4 as it is.

【0027】次に、ステップS9に進み、注文がまだあ
るか否かが判定される。いまの場合、「SHIZAI−
C」の注文は1件だけであるので、ステップS10に進
む。ステップS10においては、納期変更日順にソート
が行われる。次に、ステップS11に進み、ステップS
3においてソートされた2件の所要(デマンド)に対し
て、在庫と注文を引当てる。次に、ステップS12にお
いて、引当てた結果を引当結果情報33として出力す
る。
Next, the process proceeds to step S9, where it is determined whether or not there is an order. In this case, "SHIZAI-
Since there is only one order for "C", the process proceeds to step S10. In step S10, sorting is performed in the order of the delivery date change date. Next, the process proceeds to step S11,
Inventory and orders are allocated to the two requirements (demands) sorted in 3. Next, in step S12, the allocation result is output as allocation result information 33.

【0028】引当ての結果は、図7の引当結果情報(所
要日順)33の先頭2行となる。つまり、1件目の所要
(1998/3/4)の所要数は、80であるが、在庫
=0(図6の在庫数量情報を参照)であるため、図5の
「SHIZAI−C」の注文(注文番号FFF)の注文
数150のうちの80を引当てる。このとき、所要(1
998/3/4)の所要変更日に、注文(注文番号FF
F)の納期変更日(1998/3/4)をセットする。
The result of the allocation is the first two lines of the allocation result information (in order of required date) 33 in FIG. In other words, the required number of the first required (1998/3/4) is 80, but since the stock is 0 (see the stock quantity information in FIG. 6), the required number of “SHIZAI-C” in FIG. 80 out of the order number 150 of the order (order number FFF) is allocated. At this time, the required (1
On the required change date of 998/3/4), the order (order number FF)
The delivery date change date of F) (1998/3/4) is set.

【0029】さらに、所要変更日と所要日の差を、遅れ
にセットする。この場合、所要変更日と所要日は同一日
なので0をセットする。即ち、「引当てられる所要」の
所要日と「引当てる注文」の納期変更日の差を稼働日ベ
ースで算出したものを遅れとする。次に、2件目の所要
(1998/3/6)についても、注文(注文番号FF
F)の注文数150のうちの20を引当て、同様に所要
変更日、遅れをセットする。この場合、所要変更日には
1998/3/6をセットし、遅れには−2(=199
8/3/4−1998/3/6)をセットする。
Further, the difference between the required change date and the required date is set to delay. In this case, since the required change date and the required date are the same day, 0 is set. In other words, the difference between the required date of the "required requirement" and the delivery date change date of the "assigned order" is calculated on an operating day basis. Next, for the second requirement (1998/3/6), the order (order number FF)
F) 20 out of 150 orders are allocated, and the required change date and delay are similarly set. In this case, 1998/3/6 is set on the required change date, and -2 (= 199
8/3 / 4-1998 / 3/6) is set.

【0030】このようにして、「SHIZAI−C」の
引当てを行い、引当結果情報33へ出力する。
In this way, “SHIZAI-C” is allocated and output to the allocation result information 33.

【0031】ステップS13においては、資材がまだあ
るか否かが判定される。いまの場合、まだ、資材がある
ので、ステップS2に戻り、ステップS2乃至S13の
処理が繰り返し実行され、「SHIZAI−B」につい
ての処理が実行される。「SHIZAI−B」について
も、「SHIZAI−C」の場合と同様に処理され、図
7の引当結果情報(所要日順)33の3行目から6行目
の結果となる。
In step S13, it is determined whether or not there is any material. In this case, since there is still material, the process returns to step S2, and the processes of steps S2 to S13 are repeatedly executed, and the process for "SHIZAI-B" is executed. "SHIZAI-B" is also processed in the same manner as in the case of "SHIZAI-C", and results are shown in the third to sixth lines of the allocation result information (in order of required date) 33 in FIG.

【0032】次に、「SHIZAI−A」について処理
される。まず、ステップS3において、図4に示す所要
情報31のうち、「SHIZAI−A」の所要3件を読
み込む。その後、所要日をキーにして昇順でソートする
と、1998/3/9の所要、1998/3/11の所
要、1998/3/13の所要の順番となる。次に、ス
テップS4において、図5に示した注文情報32の中の
「SHIZAI−A」の注文3件(注文番号AAA、B
BB、CCC)を読み込む。
Next, "SHIZAI-A" is processed. First, in step S3, of the required information 31 shown in FIG. 4, three required items of "SHIZAI-A" are read. After that, when the required date is used as a key to sort in ascending order, the required order is 1998/3/9, 1998/3/11, and 1998/3/13. Next, in step S4, three orders of "SHIZAI-A" in the order information 32 shown in FIG. 5 (order numbers AAA, B
BB, CCC).

【0033】次に、ステップS5に進み、各注文に対し
て、ステップS6乃至S8の処理が実行されるようにル
ープ制御が行われる。
Next, proceeding to step S5, a loop control is performed so that the processing of steps S6 to S8 is executed for each order.

【0034】即ち、ステップS6において、対応する下
位の所要があるか否かが判定される。いまの場合、注文
(注文番号BBB)と注文(注文番号CCC)について
は対応する下位の所要があるので、ステップS7に進
み、以下のようにして、下位所要の所要変更日より納期
変更日が算出される。
That is, in step S6, it is determined whether there is a corresponding lower level requirement. In this case, since the order (order number BBB) and the order (order number CCC) have corresponding lower-level requirements, the process proceeds to step S7, and the delivery date change date is changed from the lower-level required change date as follows. Is calculated.

【0035】図7より、注文(注文番号BBB)は、対
応する下位の2件の所要とも所要日、所要変更日が19
98/3/4であるので、算出式より、 納期変更日=1998/3/11+(1998/3/4
−1998/3/4)=1998/3/11 となる。
According to FIG. 7, the order (order number BBB) has a required date and a required change date of 19 for the corresponding lower two requirements.
Since it is 98/3/4, from the calculation formula, the delivery date change date = 1998/3/11 + (1998/3/4
−1998/3/4) = 1998/3/11.

【0036】注文(注文番号CCC)は、対応する下位
の2件の所要の所要変更日が1998/3/6と199
8/3/9なので、大きい方をとり、算出式より、 納期変更日=1998/3/13+(1998/3/9
−1998/3/6)=1998/3/16 となる。
The order (order number CCC) has two corresponding lower required change dates of 1998/3/6 and 199
Since it is 8/3/9, take the larger one and use the formula to calculate the date of change of delivery date = 1998/3/13 + (1998/3/9
−1998/3/6) = 1998/3/16.

【0037】注文(注文番号AAA)は、下位の所要が
ないので、ステップS8において、納期日をそのまま納
期変更日にセットする。即ち、この例の場合、注文(注
文番号AAA)に対応する「SHIZAI−A」の製造
工程は既に着手しており、その製造に用いる「SHIZ
AI−B」、「SHIZAI−C」は既に現場に払い出
されているため、下位の所要はないものとしている。
Since the order (order number AAA) does not require a lower order, the delivery date is set as it is in step S8. That is, in the case of this example, the manufacturing process of “SHIZAI-A” corresponding to the order (order number AAA) has already been started, and “SHIZ” used for the manufacturing has been started.
Since “AI-B” and “SHIZAI-C” have already been paid out to the site, there is no need for lower ranks.

【0038】次に、ステップS9において、注文がまだ
あるか否か、即ち、すべての注文に対する処理が終了し
たか否かが判定される。そして、すべての注文に対する
処理が終了すると、ステップS10に進む。ステップS
10においては、納期変更日順にソートされる。その結
果、注文の順番は、注文番号AAA、BBB、CCCの
順となる。
Next, in step S9, it is determined whether or not there are any more orders, that is, whether or not the processing for all the orders has been completed. When the process for all the orders is completed, the process proceeds to step S10. Step S
At 10, sorting is performed in the order of the delivery date change date. As a result, the order of the order is the order of the order numbers AAA, BBB, and CCC.

【0039】次に、ステップS11において、ステップ
S3においてソートされた所要に対して、在庫と注文を
引当てる。引当ての結果は、図7の引当結果情報(所要
日順)33の7行目から11行目となる。つまり、1件
目の所要(1998/3/9)の所要数は40である
が、在庫=20であるので、その在庫の20を1件目の
所要に引当てる。在庫を引当てたときは、所要変更日=
所要日とし、遅れ=「−」とする。次に、まだ、所要数
20(40−20)が未引当てであるので、注文(AA
A)の注文数30のうち、20を引当てる。所要変更日
には、注文(AAA)の納期変更日1998/3/10
をセットし、遅れには1(1998/3/10−199
8/3/9)をセットする。
Next, in step S11, stocks and orders are allocated to the requirements sorted in step S3. The allocation result is the 7th to 11th lines of the allocation result information (in order of required date) 33 in FIG. In other words, the required number of the first requirement (March 3, 1998) is 40, but the inventory is 20, so 20 of the inventory is allocated to the first requirement. When inventory is allocated, required change date =
It is a required date, and delay = “−”. Next, since the required number 20 (40-20) has not been allocated yet, the order (AA)
20 out of 30 orders in A) are allocated. On the required change date, the date of change of the delivery date of the order (AAA)
And the delay is 1 (1998/3 / 10-199)
8/3/9) is set.

【0040】以降の所要も同様に処理し、図7の引当結
果情報(所要日順)33を得る。図7において、11行
目の所要(1998/3/13)の遅れが1となってい
るのは、上述したように、1998/3/14、199
8/3/15が休日となっているからである。
Subsequent requirements are processed in the same manner to obtain allocation result information (in order of required date) 33 in FIG. In FIG. 7, the required (1998/3/13) delay of the 11th line is 1, as described above, as described above on March 3, 1998, 199.
This is because 8/3/15 is a holiday.

【0041】次に、ステップS13に進み、処理すべき
資材がまだあるか否かが判定され、いまの場合、処理す
べき資材がもうないので、処理を終了する。
Next, the process proceeds to step S13, where it is determined whether or not there is any material to be processed. In this case, since there is no more material to be processed, the process ends.

【0042】次に、遅れ製品検索処理23の処理につい
て詳細に説明する。本処理では、図7の引当結果情報
(所要日順)33の結果のうち、製品所要として登録さ
れた所要(製品所要NOに有効な値がセットされている
所要)であり、かつ遅れ>0の所要が検索され、取り出
される。その結果は、図8のとおり、遅れ製品情報34
として出力される。
Next, the processing of the delayed product search processing 23 will be described in detail. In this processing, of the results of the allocation result information (in order of required date) 33 in FIG. 7, the result is a requirement registered as a product requirement (a requirement in which a valid value is set in the product requirement NO), and delay> 0 Are retrieved and retrieved. As a result, as shown in FIG.
Is output as

【0043】次に、遅れ原因注文検索処理24の処理に
ついて詳細に説明する。本処理では、指定された製品所
要について、遅れ原因となった資材が抽出される。その
結果は、図9のとおり、遅れ原因注文情報35として出
力される。
Next, the processing of the delay cause order search processing 24 will be described in detail. In this processing, the material causing the delay is extracted for the specified product requirement. The result is output as delay cause order information 35 as shown in FIG.

【0044】まず、図7の引当結果情報(所要日順)3
3の各行の対応から、影響する範囲を取り出す。以下、
例を上げて説明する。ここでは、製品所要NO=3の所
要が指定されているものとする。この所要に対しては、
図7の11行目より、在庫と注文(注文番号CCC)が
引当たっている。図7より、注文(注文番号CCC)
は、「SHIZAI−B」の所要(所要日=1998/
3/6)と「SHIZAI−C」の所要(所要日=19
98/3/6)が対応している。「SHIZAI−B」
の所要(所要日=1998/3/6)に対しては、注文
(注文番号DDD)および注文(注文番号EEE)が、
また、「SHIZAI−C」の所要(所要日=1998
/3/6)に対しては、注文(注文番号FFF)がそれ
ぞれ引当たっている。よって、図9に示すように、遅れ
原因注文情報35として、注文(注文番号CCC、DD
D、EEE、FFF)に関する情報を出力する。
First, allocation result information (in order of required date) 3 in FIG.
The affected range is extracted from the correspondence of each row of No. 3. Less than,
An example will be described. Here, it is assumed that the requirement of product requirement NO = 3 is specified. For this requirement,
From line 11 in FIG. 7, inventory and orders (order number CCC) are allocated. From FIG. 7, order (order number CCC)
Is required for “SHIZAI-B” (date required = 1998 /
3/6) and "SHIZAI-C" requirements (date required = 19)
98/3/6). "SHIZAI-B"
(Required date = 1998/3/6), the order (order number DDD) and order (order number EEE)
In addition, required for “SHIZAI-C” (required date = 1998)
// 3/6), an order (order number FFF) is allocated. Therefore, as shown in FIG. 9, the order (order number CCC, DD
D, EEE, and FFF).

【0045】以上説明したように、各製品所要に対し
て、現在の資材発注状況では、いつの完成納期となるか
を素早く、かつ、精度良く計算することができる。この
ことにより、営業部門などから要求される新規受注の完
成納期の問い合わせに対して、迅速に、かつ、精度よく
回答することが可能となる。
As described above, for each product requirement, it is possible to quickly and accurately calculate when the completion delivery date will be reached in the current material ordering situation. As a result, it is possible to quickly and accurately reply to an inquiry about the completion delivery date of a new order requested from a sales department or the like.

【0046】また、受注済みの製品に関して、資材メー
カからの納期変更が発生したとき、各製品の完成納期に
対する影響を素早く知ることができる。さらに、その影
響が問題となる場合、要因となる資材の割り出しも可能
となる。その結果から、資材メーカに対する納期前倒し
の要求をするべきか否かの判断も可能となる。
Further, when a delivery date is changed from a material maker for a product for which an order has been received, the influence on the completion delivery date of each product can be quickly known. Further, when the influence becomes a problem, it becomes possible to determine a material that is a factor. From the result, it is also possible to determine whether or not to request the material maker to advance the delivery date.

【0047】次に、本発明の他の実施の形態について説
明する。先にあげた実施の形態(実施の形態Aとする)
では、製品所要への引当順を所要日順としていたが、他
の実施の形態(実施の形態Bとする)では、各所要の重
要度を加味した優先度順に引当てる。その結果を図10
に示す。実施の形態Aでは、「SHIZAI−A」の所
要のうち、所要(1998/3/9)と所要(1998
/3/13)の2件に遅れが発生していたが、実施の形
態Bでは、所要(1998/3/9)のみに遅れが発生
し、その遅れが5となり、実施の形態Aの場合より大き
くなっている。
Next, another embodiment of the present invention will be described. Embodiment described above (Embodiment A)
In the above, the order of allocation to the product requirements is the order of the required date. However, in other embodiments (embodiment B), the allocation is performed in the priority order taking into account the importance of each requirement. The result is shown in FIG.
Shown in In the embodiment A, out of the requirements for “SHIZAI-A”, the required (1998/3/9) and the required (1998)
/ 3/13), there was a delay in the two cases, but in the embodiment B, the delay occurred only in the required (3/9/1998), and the delay was 5, and in the case of the embodiment A It is getting bigger.

【0048】このように、実施の形態Bを使用すること
により、早い所要日を飛び超えての引当てが可能にな
り、どうしても遅らせたくない製品所要が存在する際に
有効となる。
As described above, by using the embodiment B, it is possible to make assignments beyond the earliest required date, and this is effective when there is a product requirement that one does not want to delay.

【0049】[0049]

【発明の効果】以上の如く、本発明に係る納期管理シス
テムおよび納期管理方法、並びに記録媒体によれば、資
材の調達リードタイムに関する資材情報を記憶し、資材
の親子関係を定義した構成情報を記憶し、日程計算に利
用される、休日を定義したカレンダ情報を記憶し、資材
の在庫数量に関する情報を記憶し、資材の所要に関する
資材所要情報を記憶し、資材の注文に関する資材注文情
報を記憶し、資材の調達リードタイムと、構成情報と、
カレンダ情報と、在庫数量と、資材所要情報と、資材注
文情報とに基づいて、資材の所要日および所要量を示す
所要情報と、資材の納期日および注文数を示す注文情報
を生成し、生成された所要情報を記憶し、生成された注
文情報を記憶し、記憶された資材情報と、記憶された構
成情報と、記憶されたカレンダ情報と、記憶された資材
の在庫数量と、記憶された所要情報と、記憶された注文
情報とに基づいて、多段階の資材の納期日を、下位の資
材の納期日から上位の資材の納期日の順で算出し、算出
された資材の納期日に基づいて、納期日の順に各資材の
所要に対して、資材の在庫、資材の注文を順に引き当
て、引き当てられた引当結果を記憶し、記憶された引当
結果に基づいて、納期が遅れている資材の所要を検索
し、検索した所要の情報を遅れ製品情報として出力し、
記憶された引当結果に基づいて、遅れの原因となった資
材の注文を検索し、遅れ原因注文情報として出力する。
このとき、記憶された注文情報には各資材の注文番号が
含まれ、記憶された所要情報には各資材の上位の資材の
注文番号が含まれ、注文番号と上位の注文番号とによっ
て、注文情報の各資材に対応する下位の所要の有無が判
断され、記憶された資材情報、記憶された構成情報、記
憶されたカレンダ情報、記憶された資材の在庫数量を読
み込み、記憶された構成情報に基づいて、資材を構成す
る下位の資材から順に、資材に対応する所要情報を読み
込み、資材に対応する注文情報を読み込み、資材の下位
の資材から上位の資材の順で、資材の所要に対して資材
の注文を引き当て、所要に引き当てられた注文の納期日
が、所要の所要日より所定の遅れ日数だけ遅れていると
き、遅れ日数を記憶し、記憶された遅れ日数に基づい
て、所要に対応する上位の資材の納期日を算出し、上位
の資材の注文の納期日が、算出された納期日より前のと
き、算出された納期日を上位の資材の注文の納期日に設
定し、算出された遅れ日数を記憶し、記憶された遅れ日
数に基づいて、納期が遅れている資材の所要を検索し、
検索した所要に関する情報を遅れ製品情報として出力
し、記憶された遅れ日数から、遅れの原因となった資材
の注文を検索し、検索した資材の注文に関する情報を遅
れ原因注文情報として出力するようにしたので、ある製
品に使用される資材について、資材メーカからの納期に
変更が発生した場合でも、製品の完成納期を素早く、か
つ精度良く計算し、回答することができる。また、完成
納期の遅れの原因となる資材を割り出すことが可能とな
る。
As described above, according to the delivery date management system, delivery date management method, and recording medium of the present invention, material information relating to a material procurement lead time is stored, and configuration information defining the parent-child relationship of the material is stored. Stores calendar information that defines holidays, which is used for schedule calculations, stores information on material stock quantities, stores material requirement information on material requirements, and stores material order information on material orders. And material procurement lead time, configuration information,
Based on the calendar information, the stock quantity, the material requirement information, and the material order information, generate and generate the required information indicating the required date and the required amount of the material and the order information indicating the delivery date and the number of the ordered materials. The stored required information is stored, the generated order information is stored, the stored material information, the stored configuration information, the stored calendar information, the stored quantity of the stored material, and the stored Based on the required information and the stored order information, the delivery date of the multi-stage material is calculated in order from the delivery date of the lower material to the delivery date of the upper material, and the calculated delivery date of the material is calculated. Based on the delivery date, based on the requirement of each material, material inventory and material order are allocated in order, the allocated allocation result is stored, and the material whose delivery date is delayed based on the stored allocation result Search for the required The delay and output as product information,
Based on the stored allocation results, an order for the material that caused the delay is retrieved and output as delay cause order information.
At this time, the stored order information includes the order number of each material, and the stored required information includes the order number of the upper material of each material. The presence or absence of lower-order requirements corresponding to each material of the information is determined, and the stored material information, the stored configuration information, the stored calendar information, and the stored material inventory quantity are read. Based on the material, read the necessary information corresponding to the material in order from the lower material constituting the material, read the order information corresponding to the material, and from the lower material of the material to the higher material, If the order of the material is allocated and the delivery date of the order allocated to the requirement is later than the required date by a predetermined number of days, the number of days delayed is stored, and the requirement is responded based on the stored number of days delayed. Do Calculate the delivery date of the top material, and if the delivery date of the order of the higher-order material is earlier than the calculated delivery date, set the calculated delivery date to the delivery date of the order of the higher-order material, and calculate Based on the stored number of days, searching for the requirement of the material whose delivery date is delayed,
Output the information about the required requirement as delayed product information, search for the order of the material that caused the delay from the stored number of delay days, and output the information about the searched order for the material as the delay cause order information. Therefore, even when the delivery date from the material maker is changed for the material used for a certain product, the completion delivery date of the product can be quickly and accurately calculated and answered. In addition, it is possible to determine a material that causes a delay in the completion delivery date.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の納期管理システムの一実施の形態の構
成例を示すブロック図である。
FIG. 1 is a block diagram illustrating a configuration example of an embodiment of a delivery date management system according to the present invention.

【図2】図1の引当兼納期算出処理22の処理手順を説
明するフローチャートである。
FIG. 2 is a flowchart illustrating a processing procedure of an allocation and delivery date calculation process 22 in FIG.

【図3】資材構成を示す図である。FIG. 3 is a diagram showing a material configuration.

【図4】所要情報を示す図である。FIG. 4 is a diagram showing required information.

【図5】注文情報を示す図である。FIG. 5 is a diagram showing order information.

【図6】在庫数量情報を示す図である。FIG. 6 is a diagram showing stock quantity information.

【図7】引当結果情報(所要日順)を示す図である。FIG. 7 is a diagram showing allocation result information (in order of required date).

【図8】遅れ製品情報を示す図である。FIG. 8 is a diagram showing delayed product information.

【図9】遅れ原因注文情報を示す図である。FIG. 9 is a diagram showing delay cause order information.

【図10】引当結果情報(優先度順)を示す図である。FIG. 10 is a diagram showing allocation result information (in order of priority).

【符号の説明】[Explanation of symbols]

11 資材情報 12 構成情報 13 カレンダ情報 14 在庫数量情報 15 製品所要情報 16 資材注文情報 21 MRP計算処理 22 引当兼納期算出処理 23 遅れ製品検索処理 24 遅れ原因注文検索処理 31 所要情報 32 注文情報 33 引当結果情報 34 遅れ製品情報 35 遅れ原因注文情報 11 Material Information 12 Configuration Information 13 Calendar Information 14 Stock Quantity Information 15 Product Required Information 16 Material Order Information 21 MRP Calculation Process 22 Reserve and Delivery Date Calculation Process 23 Delayed Product Search Process 24 Delay Cause Order Search Process 31 Required Information 32 Order Information 33 Reserve Result information 34 Delayed product information 35 Delay cause order information

Claims (8)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 多段階の資材構成を有する装置の組み立
てにおいて、前記装置の完成納期を管理する納期管理シ
ステムであって、 前記資材の調達リードタイムに関する資材情報を記憶す
る資材情報記憶手段と、 前記資材の親子関係を定義した構成情報を記憶する構成
情報記憶手段と、 日程計算に利用される、休日を定義したカレンダ情報を
記憶するカレンダ情報記憶手段と、 前記資材の在庫数量に関する情報を記憶する在庫数量情
報記憶手段と、 前記資材の所要に関する資材所要情報を記憶する資材所
要情報記憶手段と、 前記資材の注文に関する資材注文情報を記憶する資材注
文情報記憶手段と、 前記資材情報記憶手段によって記憶された前記資材の調
達リードタイムと、前記構成情報記憶手段によって記憶
された前記構成情報と、前記カレンダ情報記憶手段によ
って記憶された前記カレンダ情報と、前記在庫数量記憶
手段によって記憶された前記在庫数量と、前記資材所要
情報記憶手段によって記憶された前記資材所要情報と、
前記資材注文情報記憶手段によって記憶された前記資材
注文情報とに基づいて、前記資材の所要日および所要量
を示す所要情報と、前記資材の納期日および注文数を示
す注文情報を生成するMRP計算処理手段と、 前記MRP計算処理手段によって生成された前記所要情
報を記憶する所要情報記憶手段と、 前記MRP計算処理手段によって生成された前記注文情
報を記憶する注文情報記憶手段と、 前記資材情報記憶手段によって記憶された前記資材情報
と、前記構成情報記憶手段によって記憶された前記構成
情報と、前記カレンダ情報記憶手段によって記憶された
前記カレンダ情報と、前記在庫数量情報記憶手段によっ
て記憶された前記資材の在庫数量と、前記所要情報記憶
手段によって記憶された前記所要情報と、前記注文情報
記憶手段によって記憶された前記注文情報とに基づい
て、多段階の前記資材の納期日を、下位の資材の納期日
から上位の資材の納期日の順で算出し、算出された前記
資材の納期日に基づいて、前記納期日の順に各資材の所
要に対して、前記資材の在庫、前記資材の注文を順に引
き当てる引当兼納期日算出手段と、 前記引当兼納期日算出手段によって引き当てられた引当
結果を記憶する引当結果記憶手段と、 前記引当結果記憶手段によって記憶された前記引当結果
に基づいて、納期が遅れている前記資材の所要を検索
し、検索した所要の情報を遅れ製品情報として出力する
遅れ資材検索手段と、 前記引当結果記憶手段によって記憶された前記引当結果
に基づいて、遅れの原因となった資材の注文を検索し、
遅れ原因注文情報として出力する遅れ原因注文検索手段
とを備え、 前記注文情報記憶手段によって記憶された前記注文情報
には各資材の注文番号が含まれ、前記所要情報記憶手段
によって記憶された前記所要情報には各資材の上位の資
材の注文番号が含まれ、前記注文番号と前記上位の注文
番号とによって、前記注文情報の各資材に対応する下位
の所要の有無が判断され、 前記引当兼納期日算出手段は、前記資材情報記憶手段に
よって記憶された前記資材情報、前記構成情報記憶手段
によって記憶された前記構成情報、前記カレンダ情報記
憶手段によって記憶された前記カレンダ情報、前記在庫
数量情報記憶手段によって記憶された前記資材の在庫数
量を読み込み、前記構成情報記憶手段によって記憶され
た前記構成情報に基づいて、前記資材を構成する下位の
資材から順に、前記資材に対応する前記所要情報を読み
込み、前記資材に対応する前記注文情報を読み込み、前
記資材の下位の資材から上位の資材の順で、前記資材の
所要に対して前記資材の注文を引き当て、前記所要に引
き当てられた前記注文の納期日が、前記所要の所要日よ
り所定の遅れ日数だけ遅れているとき、前記遅れ日数を
記憶し、記憶された前記遅れ日数に基づいて、前記所要
に対応する上位の資材の納期日を算出し、前記上位の資
材の注文の納期日が、算出された前記納期日より前のと
き、算出された納期日を前記上位の資材の注文の納期日
に設定し、 前記引当結果記憶手段は、前記引当兼納期日算出手段に
よって算出された遅れ日数を記憶し、前記遅れ資材検索
手段は、前記引当結果記憶手段によって記憶された前記
遅れ日数に基づいて、納期が遅れている前記資材の所要
を検索し、検索した所要に関する情報を遅れ製品情報と
して出力し、前記遅れ原因注文検索手段は、前記引当結
果記憶手段によって記憶された前記遅れ日数から、遅れ
の原因となった資材の注文を検索し、検索した資材の注
文に関する情報を遅れ原因注文情報として出力すること
を特徴とする納期管理システム。
1. An assembling method for a device having a multi-stage material configuration, comprising: a delivery date management system for managing a completion delivery date of the device, wherein material information storage means for storing material information regarding a procurement lead time of the material; Configuration information storage means for storing configuration information defining the parent-child relationship of the material, calendar information storage means for storing calendar information defining holidays used for schedule calculation, and storing information on the stock quantity of the material Inventory quantity information storage means, material requirement information storage means for storing material requirement information relating to the requirement of the material, material order information storage means for storing material order information relating to the order of the material, and material information storage means. The stored procurement lead time of the material, the configuration information stored by the configuration information storage means, Said calendar information stored by the rendering information storing means, wherein the inventory quantity stored by the inventory quantity storing means, the material requirements information stored by the material requirements information storage means,
MRP calculation for generating, based on the material order information stored by the material order information storage means, required information indicating a required date and required amount of the material and order information indicating a delivery date and the number of orders of the material. Processing means; required information storage means for storing the required information generated by the MRP calculation processing means; order information storage means for storing the order information generated by the MRP calculation processing means; and the material information storage The material information stored by the means, the configuration information stored by the configuration information storage means, the calendar information stored by the calendar information storage means, and the material stored by the inventory quantity information storage means Inventory quantity, the required information stored by the required information storage means, and the order information storage means Therefore, based on the stored order information, the delivery date of the material in multiple stages is calculated in order from the delivery date of the lower material to the delivery date of the upper material, and the calculated delivery date of the material is calculated. Based on the requirement of each material in the order of the delivery date, the inventory of the material, the allocation and delivery date calculation means for sequentially assigning the order of the material, and the allocation result allocated by the allocation and delivery date calculation means. Based on the allocation result stored by the allocation result storing means, searching for the requirement of the material whose delivery date is delayed, and outputting the searched required information as delayed product information A material search unit, based on the allocation result stored by the allocation result storage unit, to search for an order for the material that caused the delay,
A delay cause order search means for outputting as delay cause order information, wherein the order information stored by the order information storage means includes an order number of each material, and the required information stored by the required information storage means is provided. The information includes the order number of the higher-order material of each material, and the order number and the higher-order number determine whether or not there is a lower requirement corresponding to each material in the order information. The date calculation means includes: the material information stored by the material information storage means; the configuration information stored by the configuration information storage means; the calendar information stored by the calendar information storage means; Reads the stock quantity of the material stored by the, based on the configuration information stored by the configuration information storage means, The required information corresponding to the material is read in order from the lower material constituting the material, the order information corresponding to the material is read, and the required information of the material is read in order from the lower material to the higher material of the material. When the delivery date of the order allocated to the requirement is later than the required date by a predetermined number of delay days, the delay days are stored, and the stored delay days are stored. Based on the number of delay days, calculate the delivery date of the higher-order material corresponding to the requirement, and when the delivery date of the order of the higher-order material is earlier than the calculated delivery date, calculate the delivery date. The delivery date of the order of the higher-order material is set, the allocation result storage means stores the number of delay days calculated by the allocation and delivery date calculation means, and the delay material search means stores the allocation result storage means. Based on the memorized delay days, the requirement of the material whose delivery date is delayed is searched, information on the searched requirement is output as delayed product information, and the delay cause order searching means is arranged by the allocation result storage means. A delivery date management system, wherein an order for a material causing a delay is retrieved from the stored number of days of delay, and information on the retrieved order of the material is output as delay cause order information.
【請求項2】 前記資材は、2以上の段階の資材構成を
なしており、下位の資材から上位の資材に順次処理が行
われることを特徴とする請求項1に記載の納期管理シス
テム。
2. The delivery date management system according to claim 1, wherein the material has a material configuration in two or more stages, and processing is sequentially performed from a lower material to a higher material.
【請求項3】 前記引当兼納期日計算手段は、各所要を
所要日の昇順でソートし、所要日順に前記所要に対して
注文を引き当てることを特徴とする請求項1に記載の納
期管理システム。
3. The delivery date management system according to claim 1, wherein said allocation and delivery date calculation means sorts each requirement in ascending order of required date and allocates an order to said requirement in order of required date. .
【請求項4】 前記引当兼納期日算出手段は、各所要を
前記所要に設定された優先度の順にソートし、優先度の
順に前記所要に対して注文を引き当てることを特徴とす
る請求項1に記載の納期管理システム。
4. The allocation / delivery date calculation means sorts each requirement in the order of the priority set to the requirement, and allocates an order to the requirement in the order of the priority. Delivery management system described in.
【請求項5】 前記遅れ資材検索手段は、前記引当結果
記憶手段に記憶された前記遅れ日数が1以上の資材を検
索し、検索された遅れの発生している資材に関する情報
を出力することを特徴とする請求項1に記載の納期管理
システム。
5. The delayed material search means searches for the material whose delay days stored in the allocation result storage means is one or more, and outputs information on the found delayed material. The delivery date management system according to claim 1, wherein:
【請求項6】 前記遅れ資材検索手段は、前記引当結果
記憶手段に記憶された前記遅れ日数が1以上の資材を検
索し、検索された遅れ日数が1以上の所定の資材につい
て、前記資材の下位の資材に関する情報を出力すること
を特徴とする請求項1に記載の納期管理システム。
6. The delayed material search means searches for the material whose delay days stored in the allocation result storage means is one or more, and, for a predetermined material whose searched delay days are one or more, searches for the material. The delivery date management system according to claim 1, wherein information on lower-order materials is output.
【請求項7】 多段階の資材構成を有する装置の組み立
てにおいて、前記装置の完成納期を管理する納期管理シ
ステムにおける納期管理方法であって、 前記資材の調達リードタイムに関する資材情報を記憶す
る資材情報記憶ステップと、 前記資材の親子関係を定義した構成情報を記憶する構成
情報記憶ステップと、日程計算に利用される、休日を定
義したカレンダ情報を記憶するカレンダ情報記憶ステッ
プと、 前記資材の在庫数量に関する情報を記憶する在庫数量情
報記憶ステップと、 前記資材の所要に関する資材所要情報を記憶する資材所
要情報記憶ステップと、 前記資材の注文に関する資材注文情報を記憶する資材注
文情報記憶ステップと、 前記資材情報記憶ステップによって記憶された前記資材
の調達リードタイムと、前記構成情報記憶ステップによ
って記憶された前記構成情報と、前記カレンダ情報記憶
ステップによって記憶された前記カレンダ情報と、前記
在庫数量記憶ステップによって記憶された前記在庫数量
と、前記資材所要情報記憶ステップによって記憶された
前記資材所要情報と、前記資材注文情報記憶ステップに
よって記憶された前記資材注文情報とに基づいて、前記
資材の所要日および所要量を示す所要情報と、前記資材
の納期日および注文数を示す注文情報を生成するMRP
計算処理ステップと、 前記MRP計算処理ステップによって生成された前記所
要情報を記憶する所要情報記憶ステップと、 前記MRP計算処理ステップによって生成された前記注
文情報を記憶する注文情報記憶ステップと、 前記資材情報記憶ステップによって記憶された前記資材
情報と、前記構成情報記憶ステップによって記憶された
前記構成情報と、前記カレンダ情報記憶ステップによっ
て記憶された前記カレンダ情報と、前記在庫数量情報記
憶ステップによって記憶された前記資材の在庫数量と、
前記所要情報記憶ステップによって記憶された前記所要
情報と、前記注文情報記憶ステップによって記憶された
前記注文情報とに基づいて、多段階の前記資材の納期日
を、下位の資材の納期日から上位の資材の納期日の順で
算出し、算出された前記資材の納期日に基づいて、前記
納期日の順に各資材の所要に対して、前記資材の在庫、
前記資材の注文を順に引き当てる引当兼納期日算出ステ
ップと、 前記引当兼納期日算出ステップによって引き当てられた
引当結果を記憶する引当結果記憶ステップと、 前記引当結果記憶ステップによって記憶された前記引当
結果に基づいて、納期が遅れている前記資材の所要を検
索し、検索した所要の情報を遅れ製品情報として出力す
る遅れ資材検索ステップと、 前記引当結果記憶ステップによって記憶された前記引当
結果に基づいて、遅れの原因となった資材の注文を検索
し、遅れ原因注文情報として出力する遅れ原因注文検索
ステップとを備え、 前記注文情報記憶ステップによって記憶された前記注文
情報には各資材の注文番号が含まれ、前記所要情報記憶
ステップによって記憶された前記所要情報には各資材の
上位の資材の注文番号が含まれ、前記注文番号と前記上
位の注文番号とによって、前記注文情報の各資材に対応
する下位の所要の有無が判断され、 前記引当兼納期日算出ステップにおいては、前記資材情
報記憶ステップによって記憶された前記資材情報、前記
構成情報記憶ステップによって記憶された前記構成情
報、前記カレンダ情報記憶ステップによって記憶された
前記カレンダ情報、前記在庫数量情報記憶ステップによ
って記憶された前記資材の在庫数量を読み込み、前記構
成情報記憶ステップによって記憶された前記構成情報に
基づいて、前記資材を構成する下位の資材から順に、前
記資材に対応する前記所要情報を読み込み、前記資材に
対応する前記注文情報を読み込み、前記資材の下位の資
材から上位の資材の順で、前記資材の所要に対して前記
資材の注文を引き当て、前記所要に引き当てられた前記
注文の納期日が、前記所要の所要日より所定の遅れ日数
だけ遅れているとき、前記遅れ日数を記憶し、記憶され
た前記遅れ日数に基づいて、前記所要に対応する上位の
資材の納期日を算出し、前記上位の資材の注文の納期日
が、算出された前記納期日より前のとき、算出された納
期日を前記上位の資材の注文の納期日に設定し、 前記引当結果記憶ステップにおいては、前記引当兼納期
日算出ステップによって算出された遅れ日数を記憶し、
前記遅れ資材検索ステップにおいては、前記引当結果記
憶ステップによって記憶された前記遅れ日数に基づい
て、納期が遅れている前記資材の所要を検索し、検索し
た所要に関する情報を遅れ製品情報として出力し、前記
遅れ原因注文検索ステップにおいては、前記引当結果記
憶ステップによって記憶された前記遅れ日数から、遅れ
の原因となった資材の注文を検索し、検索した資材の注
文に関する情報を遅れ原因注文情報として出力すること
を特徴とする納期管理方法。
7. A delivery date management method in a delivery date management system that manages a completion delivery date of the device in assembling the device having a multi-stage material configuration, wherein the material information stores material information relating to a lead time of procurement of the material. A storage step; a configuration information storage step of storing configuration information defining a parent-child relationship of the material; a calendar information storage step of storing calendar information defining a holiday used for schedule calculation; and a stock quantity of the material. A stock quantity information storing step of storing information about the material requirement; a material requirement information storing step of storing material requirement information relating to the requirement of the material; a material order information storing step of storing material order information relating to the order of the material; The procurement lead time of the material stored in the information storage step and the configuration information The configuration information stored by the storage step, the calendar information stored by the calendar information storage step, the inventory quantity stored by the inventory quantity storage step, and the inventory stored by the material requirement information storage step Based on the material requirement information and the material order information stored in the material order information storage step, required information indicating a required date and required amount of the material, and order information indicating a delivery date and the number of orders of the material. MRP that generates
A calculation processing step; a required information storage step for storing the required information generated by the MRP calculation processing step; an order information storage step for storing the order information generated by the MRP calculation processing step; The material information stored by the storage step, the configuration information stored by the configuration information storage step, the calendar information stored by the calendar information storage step, and the inventory information stored by the inventory quantity information storage step Material inventory quantity,
Based on the required information stored in the required information storage step and the order information stored in the order information storage step, the delivery date of the material in multiple stages is changed from the delivery date of the lower material to the higher date. Calculated in the order of the delivery date of the material, based on the calculated delivery date of the material, for the requirement of each material in the order of the delivery date, inventory of the material,
An allocation and delivery date calculation step of sequentially allocating the material order; an allocation result storage step of storing the allocation result allocated by the allocation and delivery date calculation step; and the allocation result stored by the allocation result storage step. Based on, based on the allocation result stored by the allocation result storage step, searching for the requirement of the material whose delivery date is delayed, and outputting the searched required information as delayed product information. A delay cause order search step of searching for the order of the material causing the delay and outputting the order as delay cause order information, wherein the order information stored by the order information storing step includes an order number of each material. The requirement information stored in the requirement information storage step includes an order number of a higher-order material of each material. It is determined by the order number and the higher order number whether or not there is a lower requirement corresponding to each material in the order information.In the allocation and delivery date calculation step, the material information storage step Reading the stored material information, the configuration information stored in the configuration information storage step, the calendar information stored in the calendar information storage step, and the inventory quantity of the material stored in the inventory quantity information storage step Based on the configuration information stored by the configuration information storage step, in order from the lower material constituting the material, read the required information corresponding to the material, read the order information corresponding to the material, In order from the lower material to the upper material of the material, the requirement of the material When the order is allocated and the delivery date of the order allocated to the requirement is later than the required date by a predetermined number of days, storing the number of days delayed, based on the stored number of days delayed, Calculate the delivery date of the higher-order material corresponding to the requirement, and when the delivery date of the order of the higher-order material is earlier than the calculated delivery date, the calculated delivery date is changed to the order of the higher-order material. Setting a delivery date, in the allocation result storage step, storing the number of delay days calculated in the allocation and delivery date calculation step,
In the delayed material search step, based on the number of delay days stored by the allocation result storage step, to search for the requirement of the material whose delivery date is late, and output information on the searched requirement as delayed product information, In the delay cause order searching step, the order of the material causing the delay is searched from the number of delay days stored in the allocation result storing step, and information on the searched order of the material is output as delay cause order information. Delivery management method characterized by performing.
【請求項8】 請求項7に記載の納期管理方法を実行可
能なプログラムが記録されている記録媒体。
8. A recording medium on which a program capable of executing the delivery date management method according to claim 7 is recorded.
JP12392698A 1998-04-20 1998-04-20 Delivery date management system, delivery date management method, and recording medium Expired - Lifetime JP3114694B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12392698A JP3114694B2 (en) 1998-04-20 1998-04-20 Delivery date management system, delivery date management method, and recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12392698A JP3114694B2 (en) 1998-04-20 1998-04-20 Delivery date management system, delivery date management method, and recording medium

Publications (2)

Publication Number Publication Date
JPH11306245A JPH11306245A (en) 1999-11-05
JP3114694B2 true JP3114694B2 (en) 2000-12-04

Family

ID=14872770

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12392698A Expired - Lifetime JP3114694B2 (en) 1998-04-20 1998-04-20 Delivery date management system, delivery date management method, and recording medium

Country Status (1)

Country Link
JP (1) JP3114694B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586092U (en) * 1992-04-24 1993-11-19 克紀 棚田 Swivel joint that can be connected

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001154722A (en) * 1999-11-29 2001-06-08 Hitachi Ltd Production planning system
JP3985996B2 (en) * 2001-08-21 2007-10-03 株式会社日立製作所 Automatic delivery date inquiry system, method, and program
JP2006244001A (en) * 2005-03-02 2006-09-14 Kumamoto Technology & Industry Foundation Material transaction management device, material transaction management program, and material transaction management method
JP7280805B2 (en) * 2019-11-05 2023-05-24 株式会社オービック Order optimization device, order optimization method and order optimization program

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05298325A (en) * 1992-04-17 1993-11-12 Dainippon Printing Co Ltd Operation schedule planning device for production machine
JPH08315018A (en) * 1995-05-16 1996-11-29 Hitachi Ltd Method for calculating parts preparation date by using retrospective date

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586092U (en) * 1992-04-24 1993-11-19 克紀 棚田 Swivel joint that can be connected

Also Published As

Publication number Publication date
JPH11306245A (en) 1999-11-05

Similar Documents

Publication Publication Date Title
US5233533A (en) Scheduling method and apparatus
US5630123A (en) Software system utilizing a filtered priority queue and method of operation
US7532945B2 (en) Data model for supply chain planning
MXPA97002050A (en) Filter system of priority row and metodode operac
US8121885B2 (en) Plan solver
US6119102A (en) MRP system with viewable master production schedule
US7945466B2 (en) Scheduling system
US7801640B1 (en) Continuous item picking in a distribution center using coordinated item picking periods
US20070094098A1 (en) Systems and methods for automated parallelization of back-order processing
WO2003094107A2 (en) Constraint-based production planning and scheduling
JP2008176662A (en) Sales prediction system, method, and computer program
JP3114694B2 (en) Delivery date management system, delivery date management method, and recording medium
WO1994016397A2 (en) Method of enterprise-wide to do list scheduling
JP4648013B2 (en) Production scheduling system
EP1785920A1 (en) A system for automatically selecting a plurality of specific order items from a plurality of order items, a computer implemented method, a user terminal and a computer readable storage medium
Hall et al. Online production planning to maximize the number of on-time orders
AU2007203220A1 (en) Work allocation model
JPH1131182A (en) Product drawing device, product drawing method and record medium
Chang et al. A very fast production scheduler
JP2847276B2 (en) Delivery management system for coiled products
JP2001100829A (en) Method and device for processing product delivery answer and information recording medium
JP3225762B2 (en) Multi-company delivery instruction management method and multi-company delivery instruction management system
Klein et al. Intelligent Location Design for SKU Storage in a Warehouse
JPH11245142A (en) Method and device for making production plan
JP2847275B2 (en) Delivery management system for coiled products

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080929

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080929

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090929

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090929

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100929

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110929

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120929

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130929

Year of fee payment: 13

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term