delivery date
component
product
production
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP27738899A
Other languages
Japanese (ja)
Inventor
Masayuki Kanesaka
真之 金坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP27738899A priority Critical patent/JP2001100829A/en
Publication of JP2001100829A publication Critical patent/JP2001100829A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a more exact delivery date answer without complicating production process grasping processing (operating processing) when giving delivery date answer to the ordered article of market production, to easily prepare planning of a production schedule and a component order schedule to a component vender and to attain reduction in stock at stocktaking. SOLUTION: This device is provided with an input device 1, a delivery date answer processing part 2, a data storage part 3 and an output device 4 and the delivery date answer to the ordered article of scheduled product production in a plant is processed. Also when a delivery date answer request to a product is received, a component constitution in production processes is expanded. Concerning the component of this expanded constitution, corresponding to respective component characteristics, the date of component delivery is found from a predetermined processing form of the delivery date answer. Furthermore, the date of answer delivery corresponding to the inputted delivery date answer request product is calculated from these respective found delivery date answers of respective components.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、製品計画生産(適
宜、見込生産方式と記載する)における受注品に対する
納期回答を行うための生産品納期回答処理方法及びその
装置並びに情報記録媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for responding to a delivery date of a production product for performing a delivery date response to an ordered product in planned product production (hereinafter referred to as an expected production system as appropriate), and an information recording medium.

【0002】[0002]

【従来の技術】従来、この種の工場における見込生産方
式での受注品に対する納期回答は、この製品計画生産の
ための製品在庫、仕掛かり製品、生産計画上の製品に対
する受注出荷を勘案して行っている。すなわち、注文に
対する製品在庫、仕掛かり製品、生産計画上の製品の状
況を連続的に把握(適宜、「ひもづける」と記載する)
して、その納期回答を行っている。
2. Description of the Related Art Conventionally, a delivery date response for an order product in a make-to-stock production system in a plant of this kind is made in consideration of a product inventory for this product planned production, a work-in-progress product, and an order shipment for a product on a production plan. Is going. That is, the product inventory for the order, the work-in-progress product, and the status of the product on the production plan are continuously grasped (denoted as “link” as appropriate).
Then, the delivery date is answered.

【0003】このような製品計画生産の受注品に対する
納期回答を行う場合、この納期回答によって全製造工程
の生産計画データの変更が必要となる。これは、出荷さ
れる最終製品(いわゆる、一つ又は複数からなる完成品
又は半完成品であり、最終製造工程で得られる出荷対象
の製品)の生産計画データに対して実需要の最終製品を
ひもづけることによって納期回答を実施しているため、
需要予測に基づいて作成されている生産計画と実需要の
変動に対応するためには、全製造工程にかかる生産計画
自体を変更する必要が生じるためである。したがって、
納期回答に対する製造工程把握処理(適宜、運用処理と
記載する)が複雑化してしまう。
[0003] When a delivery date is answered for an ordered product of such a product planned production, it is necessary to change the production plan data of all the manufacturing processes according to the delivery date response. This is based on the production plan data of the final product to be shipped (the so-called finished product or semi-finished product consisting of one or more products, which is the product to be shipped obtained in the final manufacturing process). Because the delivery date is implemented by linking,
This is because it is necessary to change the production plan itself for all the manufacturing processes in order to cope with the fluctuation of the production plan created based on the demand forecast and the actual demand. Therefore,
The manufacturing process grasping process (denoted as operation process as appropriate) for the delivery date reply becomes complicated.

【0004】また、このような製品計画生産における受
注品生産では、需要予測に基づく生産計画と実需要がほ
とんど一致しないため、実需要に対して製品数が多少多
くなるように製造している。このため製品、仕掛かり製
品及び部品の棚卸し在庫が増加してしまう。
In order product production in such product planned production, since the production plan based on demand forecast and actual demand hardly match, the product is manufactured so that the number of products is slightly larger than the actual demand. Therefore, the inventory of products, in-process products and parts increases.

【0005】このような問題を伴う製品計画生産におけ
る納期回答処理方法について多数の提案が行われてい
る。例えば、複数の製品新種を効率的に生産するために
コンピュータ演算装置を利用して生産計画を立案すると
ともに、材料の供給予定及び消費予定に合わせて生産計
画を立案しているものがある(例えば、特開平5−10
8662号公報「生産計画立案装置」)。また、見込生
産方式における受注品生産の顧客別の生産進捗情報を即
座に入手して把握することも行われている(例えば、特
開平8−25191号公報「見込生産品の生産進捗状況
の管理方法及び生産管理装置」)。
[0005] A number of proposals have been made for a delivery date response processing method in product planning production involving such a problem. For example, in order to efficiently produce a plurality of new kinds of products, a production plan is made using a computer arithmetic unit, and a production plan is made in accordance with a supply schedule and a consumption schedule of materials (for example, JP-A-5-10
No. 8662, “Production planning device”. In addition, production progress information for each customer in order production in the make-to-stock production method is immediately obtained and grasped (for example, Japanese Patent Application Laid-Open No. 8-25191, "Management of Production Progress of Make-to-Stock Products"). Method and production control device ”).

【0006】また、見込生産方式による受注品生産に対
する改善提案として、生産指示の変更時に、その変更打
合せ及び後製造工程の生産調整のため、部品の受注、出
荷指示、生産指示及び協力工場への連絡などで生じる混
乱を短時間で収束させるものもある(例えば、特開平9
−64510号公報「プリント回路板の生産装置とその
生産計画立案方法」)。
Further, as a proposal for improvement to the production of an ordered product by the make-to-stock production system, when a production instruction is changed, the order of the parts, a shipping instruction, a production instruction, and a request to a subcontract factory are made for a meeting for the change and a production adjustment in a later manufacturing process. In some cases, confusion caused by communication or the like is converged in a short time (for example,
-64510, "Printed Circuit Board Production Apparatus and Production Planning Method").

【0007】さらに、見込生産方式による受注品生産に
対する提案として、問題を含む生産計画を解析して、問
題点の抽出や計画を改善するための調整内容の絞り込み
など行い、計画調整における意思決定支援を行っている
ものがある(例えば、特開平9−128440号公報
「プリント回路板の生産装置とその生産計画立案方
法」)。さらに、注文からの正確な納期を短時間で把握
し、完成品及び材料の在庫低減を図っているものもある
(例えば、特開平10−214293号公報「負荷割り
付け方法、納期決定方法、負荷割り付けシステム、納期
決定システム、生産システム、記録媒体」)。
[0007] Further, as a proposal for order production by the make-to-stock production system, a production plan including a problem is analyzed, problems are extracted, adjustment contents for improving the plan are narrowed down, etc., and decision-making support in plan adjustment is performed. (For example, Japanese Patent Application Laid-Open No. 9-128440, entitled "Printed Circuit Board Production Apparatus and Production Planning Method"). Further, there is a method in which an accurate delivery date from an order is grasped in a short time to reduce inventory of finished products and materials (for example, Japanese Patent Application Laid-Open No. H10-214293, "Load Assignment Method, Delivery Date Determination Method, Load Assignment"). System, delivery date determination system, production system, recording medium ”).

【0008】[0008]

【発明が解決しようとする課題】このように、上記従来
例では、見込生産方式の受注品に対する納期回答を行う
際に、製造工程把握処理が複雑化してしまい、結果的
に、納期回答要求に対する、より的確な納期回答が得ら
れ難いという欠点がある。
As described above, in the above-described conventional example, the process of ascertaining the manufacturing process becomes complicated when replying to a delivery date for an ordered product of the make-to-stock production system. However, there is a disadvantage that it is difficult to obtain a more accurate delivery date response.

【0009】また、見込生産方式による受注品生産で
は、需要予測に基づく生産計画と実需要が一致しにくい
ため、多めに製品在庫、仕掛かり製品、部品の棚卸し在
庫を保有すにることによって需要変動に対応する必要が
ある。このため製品在庫、仕掛かり製品及び部品の棚卸
し在庫が増加するという欠点がある。
In order-to-order production by the make-to-stock production method, since a production plan based on demand forecast and actual demand are hardly coincident with each other, a large inventory of product inventory, work-in-progress products, and parts is required to maintain inventory. We need to respond to fluctuations. For this reason, there is a drawback that the inventory of products, in-process products, and parts increases.

【0010】公報の従来例も、このような見込生産方式
の受注品に対する納期回答を行う場合の製造工程把握処
理の複雑化や、製品計画生産における受注品生産での在
庫増加に対する改善の余地がある。
In the conventional example of the publication, there is room for improvement in the process of grasping the manufacturing process when giving a delivery date response to an order product of such a make-to-stock production system, and for an increase in stock in order product production in product planning production. is there.

【0011】本発明は、このような従来の技術における
課題を解決するものであり、製品計画生産(見込生産方
式)の受注品に対する納期回答を行う場合の製造工程把
握処理(運用処理)が複雑化せずに、より的確な納期回
答が得られ、かつ、生産計画の立案及び部品供給源への
部品発注計画が容易に作成可能になると共に、棚卸し在
庫の削減が可能になる生産品納期回答処理方法及びその
装置並びに情報記録媒体の提供を目的とする。
The present invention solves such problems in the conventional technology, and the process of grasping the production process (operation process) when replying to the delivery date for the ordered product of the product planned production (prospective production system) is complicated. A more accurate delivery date response can be obtained without the need for conversion, and it is also possible to easily create a production plan and order a part order to the parts supply source, and to reduce the inventory inventory. It is an object of the present invention to provide a processing method and an apparatus therefor and an information recording medium.

【0012】[0012]

【課題を解決するための手段】上記課題を達成するため
に、本発明の生産品納期回答処理方法は、製品に対する
納期回答要求を受け取った際に製造工程における部品構
成を展開する段階と、次に、この展開した構成の部品に
対し、それぞれの部品特性に応じて、予め定めた納期回
答の処理形態から部品納期を求める段階と、さらに、こ
の求めによるそれぞれの構成部品の納期回答から納期回
答要求の製品に対する回答納期を算出する段階とを有し
ている。
In order to achieve the above object, a method for processing a delivery date response of a product according to the present invention comprises the steps of: developing a component configuration in a manufacturing process when a delivery date response request for a product is received; Then, for the components of the developed configuration, a stage of obtaining a component delivery date from a predetermined delivery date response processing mode according to each component characteristic, and further, a delivery date response is obtained from the delivery date answer of each component component obtained by this determination. Calculating the response delivery date for the requested product.

【0013】また、前記算出された納期回答と共に、こ
の納期回答に関連した製品コードに対する結果を保存し
て、実需要に基づいた製造工程の生産計画及び部品供給
源への部品発注計画を作成している。
In addition, the result of the product code associated with the calculated delivery date answer is stored together with the calculated delivery date answer, and a production plan of a manufacturing process and a component ordering plan to a component supply source are created based on actual demand. ing.

【0014】本発明の生産品納期回答処理装置は、製品
計画生産の受注品に対する納期回答処理を行うものであ
り、納期問合せ要求を行う入力手段と、製品に関するデ
ータを予め記憶して保有するデータ記憶手段と、入力手
段からの納期問合せ要求に対する納期回答を、データ記
憶手段が保有する製品に関するデータを参照して、出荷
される最終製品単位を含まない部品段階のみから得るた
めの納期回答処理手段と、納期回答処理手段が算出した
納期回答の情報を出力する出力手段とを備える構成とし
てある。
A production product delivery date reply processing device of the present invention performs delivery date reply processing for an ordered product of a product planned production, and includes input means for requesting a delivery date inquiry, and data for storing and holding data relating to products in advance. A delivery means for obtaining a delivery time response to a delivery time inquiry request from the input means by referring to data on the product held in the data storage means only from a part stage which does not include a final product unit to be shipped; And output means for outputting information on the delivery time answer calculated by the delivery time answer processing means.

【0015】また、前記納期回答処理手段が、製品に対
する納期回答要求を受け取った際に製造工程における部
品構成を展開し、かつ、この展開した構成の部品に対
し、それぞれの部品特性に応じて、予め定めた納期回答
の処理形態から部品納期を求めると共に、この求めによ
るそれぞれの構成部品の納期回答から、入力された納期
回答要求製品に対する回答納期を算出する構成としてあ
る。
Further, the delivery date reply processing means develops the component configuration in the manufacturing process when receiving the delivery date reply request for the product, and, based on the respective component characteristics, A part delivery date is obtained from a predetermined delivery date response processing form, and a response delivery date for the input delivery date response request product is calculated from the delivery date response of each component based on the request.

【0016】さらに、前記算出された納期回答と共に、
この納期回答に関連した製品コードに対する結果をデー
タ記憶手段に保存して、実需要に基づいた製造工程の生
産計画及び部品供給源への部品発注計画を作成する構成
としてある。
Further, together with the calculated delivery date answer,
The result of the product code associated with the delivery date response is stored in the data storage means, and a production plan of a manufacturing process and a parts ordering plan to a parts supply source are created based on actual demand.

【0017】また、前記納期回答の算出後におけるデー
タ記憶部の処理の最後に、この記憶処理前の記憶状態に
戻る処理を納期回答処理手段が実行し、納期引当処理の
結果のみを参照したデータ記憶部の書き替えを行わない
構成としてある。
Further, at the end of the processing of the data storage unit after the calculation of the delivery date answer, the delivery date answer processing means executes a process of returning to the storage state before the storage process, and refers to only the result of the delivery date allocation process. The configuration does not rewrite the storage unit.

【0018】さらに、前記納期回答処理手段として、デ
ータ記憶部を参照して部品展開を行う部品展開部と、部
品展開部の部品展開後にデータ記憶部における製品に関
連した複数のテーブルを参照して部品特性に応じた納期
回答処理形態を決定する納期引当処理形態判別部と、デ
ータ記憶部のテーブルを参照して生産枠及び部品在庫の
制約を考慮した引当処理を行い、この引当処理を、テー
ブルにおける生産能力及び部品在庫に反映させて全構成
部品の納期回答処理を行う納期回答部と、納期回答部の
結果を集計して、要求製品に対する納期回答を算出し、
この納期回答を出力する部品まとめ部とを備える構成と
してある。
Further, as the delivery date reply processing means, a part expanding section for expanding the parts by referring to the data storage section and a plurality of tables related to the products in the data storage section after the parts expanding of the parts expanding section. A delivery date allocation processing mode determining unit that determines a delivery date response processing mode according to the component characteristics, and a allocation process that considers constraints on production frames and component inventory with reference to a table in a data storage unit. The delivery date answering section that performs the delivery time answering process for all the component parts by reflecting it on the production capacity and the parts inventory in, and the results of the delivery time answering section are totaled, and the delivery time answer for the requested product is calculated,
A component grouping unit that outputs the delivery date response is provided.

【0019】また、前記データ記憶部に納期回答処理手
段が参照する製品に関連した複数のテーブルを有し、こ
の複数テーブルのそれぞれデータを、出荷される最終製
品と、この最終製品の構成部品の関係に関する部品展開
データ、各部品のコード、名称及び値段を含む部品の基
本データと共に納期回答処理形態を決定するための部品
基本データ、各製品、部品に対する日々の生産能力の上
限と回答済みの確定受注を格納した生産能力データ、各
部品に対する初期在庫を格納した部品在庫データ、各部
品の在庫供給の日付と供給数量を格納した部品供給デー
タ、確定受注による各部品の消費予定を格納した部品確
定データとする構成としてある。
Further, the data storage unit has a plurality of tables related to the products referred to by the delivery date response processing means, and stores the data of each of the plurality of tables into the final product to be shipped and the components of the final product. Component development data related to the relationship, basic component data including the code, name and price of each component, basic component data for determining the delivery date response processing form, upper limit of daily production capacity for each product and component and determination of completed responses Production capacity data that stores orders, parts inventory data that stores initial stock for each part, parts supply data that stores the stock supply date and supply quantity of each part, and parts confirmation that stores the planned consumption of each part in a confirmed order It is configured as data.

【0020】さらに、入力手段、データ記憶手段、納期
回答処理手段及び出力手段の構成が、汎用小型コンピュ
ータ単体であり、又は、複数の汎用小型コンピュータを
通信ネットワークで接続したシステムとする構成として
ある。
Further, the configuration of the input means, the data storage means, the delivery date reply processing means and the output means is a single general-purpose small computer, or a system in which a plurality of general-purpose small computers are connected by a communication network.

【0021】本発明の情報記録媒体は、製品に対する納
期回答要求を受け取った際に製造工程における部品構成
を展開し、かつ、この展開した構成の部品に対し、それ
ぞれの部品特性に応じて、予め定めた納期回答の処理形
態から部品納期を求めると共に、この求めによるそれぞ
れの構成部品の納期回答から、入力された納期回答要求
製品に対する回答納期を算出する納期回答シミュレーシ
ョンプログラムを格納している。
The information recording medium of the present invention develops a component configuration in a manufacturing process when a delivery date response request for a product is received, and preliminarily assigns a component having the developed configuration according to each component characteristic. A delivery date answer simulation program for calculating the delivery date of the input delivery request product based on the determined delivery date of the component from the determined delivery date response processing form and storing the delivery date answer of each component based on the request is stored.

【0022】また、前記算出された納期回答と共に、こ
の納期回答に関連した製品コードに対する結果を保存し
て、実需要に基づいた製造工程の生産計画及び部品供給
源への部品発注計画を作成する納期回答シミュレーショ
ンプログラムを更に格納している。
Further, the result of the product code associated with the calculated delivery date answer is stored together with the calculated delivery date answer, and a production plan of a manufacturing process and a component ordering plan to a component supply source are created based on actual demand. A delivery date answer simulation program is further stored.

【0023】さらに、前記納期回答の算出後における記
憶処理の最後に、この記憶処理前の記憶状態に戻る処理
を実行し、納期引当処理の結果のみを参照した記憶の書
き替えを行わないようにするための納期回答シミュレー
ションプログラムを更に格納している。
Further, at the end of the storage process after calculating the delivery date answer, a process for returning to the storage state before the storage process is executed so that the storage is not rewritten only by referring to the result of the delivery date allocation process. Further, a delivery date answer simulation program for executing the delivery date is stored.

【0024】このような本発明の生産品納期回答処理方
法及びその装置は、製品に対する納期回答要求を受け取
った際に製造工程における部品構成を展開し、この展開
した構成の部品に対し、それぞれの部品特性に応じて、
予め定めた納期回答の処理形態から部品納期を求めて、
さらに、この求めによるそれぞれの構成部品の納期回答
から納期回答要求の製品に対する回答納期を算出してい
る。
According to the method and the apparatus for responding to a delivery date of a product according to the present invention, when a delivery date response request for a product is received, a component configuration in a manufacturing process is developed, and each component having the developed configuration is applied to each component having the developed configuration. Depending on the component characteristics,
Finding the part delivery date from the processing form of the predetermined delivery date answer,
Further, the response delivery date for the product requested for the delivery date response is calculated from the delivery date response of each component part based on the request.

【0025】換言すれば、工場における製品計画生産
(見込生産)において、顧客の確定受注に基づく生産指
示が投入される製造工程で必要となる部品及び、この製
造工程におけるの製造上の制約条件のデータのみを管理
して、その納期回答を行っている。すなわち、出荷され
る最終製品単位を含まない部品段階を考慮して、その納
期回答(換言すれば、最終製品単位ではなく、部品レベ
ルを考慮した納期回答)を行っている。
In other words, in product planned production (estimated production) in a factory, parts required in a production process in which a production instruction based on a confirmed order from a customer is input, and constraints on production in this production process. Only data is managed and the delivery date is answered. In other words, the delivery date is answered in consideration of the component stage that does not include the final product unit to be shipped (in other words, the delivery date is determined in consideration of the component level, not the final product unit).

【0026】この結果、出荷される最終製品を構成する
部品の共通度が高ければ要求納期に対する正確な対応が
可能になり、その要求納期を満足する納期的確度が向上
する。また、部品管理処理形態にあった納期引当を行っ
ているため、より生産の実態に即した正確な納期回答が
出来るようになる。
As a result, if the degree of commonality of parts constituting the final product to be shipped is high, it is possible to accurately respond to the required delivery date, and the delivery accuracy that satisfies the required delivery date is improved. In addition, since the delivery date allocation suitable for the component management processing mode is performed, it is possible to provide an accurate delivery date answer that is more suited to the actual situation of production.

【0027】また、本発明では、算出された納期回答と
共に、納期回答に関連した製品コードに対する結果を保
存して、実需要に基づいた製造工程の生産計画及び部品
供給源への部品発注計画を作成している。換言すれば、
生産指示が投入される製造工程の部品データを管理して
いる。
Further, in the present invention, the result of the product code related to the delivery date answer is stored together with the calculated delivery date answer, and the production plan of the manufacturing process based on the actual demand and the component ordering plan to the component supply source are prepared. Creating. In other words,
It manages the component data of the manufacturing process to which the production instruction is input.

【0028】したがって、前記した顧客の確定受注に基
づく生産指示が投入される製造工程のみならず、この製
造工程の前製造工程の生産計画及び、この製造工程への
納入部品の供給源への発注計画作成が可能になる。すな
わち、より的確な納期回答と共に、生産計画の立案及び
部品供給源への部品発注計画が容易に作成可能になる。
Therefore, not only the production process in which the production instruction based on the confirmed order received by the customer is input, but also the production plan of the production process before the production process and the ordering of the parts to be supplied to the production process to the supply source A plan can be created. That is, it is possible to easily create a production plan and a parts ordering plan to a parts supply source, together with a more accurate delivery date response.

【0029】また、本発明は、納期回答に基づいて実需
要による製造及び生産計画の立案の連鎖が前製造工程へ
連動する。すなわち、実需要に基づいて納期回答対象の
製造工程から前製造工程に対して連動し、その生産計画
の作成及び更新が実施される。この結果、製品在庫、仕
掛かり製品、部品の棚卸し在庫を必要最小限に抑えるこ
とが出来るようになる。
Further, according to the present invention, the chain of production and production planning based on actual demand is linked to the previous production process based on the delivery date response. In other words, the production process is created and updated in conjunction with the production process for which the delivery date is to be answered, based on the actual demand, with respect to the previous production process. As a result, it is possible to minimize the inventory of product inventory, in-process products, and parts.

【0030】本発明の情報記録媒体は、前記した工場に
おける製品計画生産の受注品に対する納期回答処理形
態、及び、納期回答に関連する結果を保存して実需要に
基づいた製造工程の生産計画及び部品供給源への部品発
注計画作成の処理を実行するための納期回答シミュレー
ションプログラム提供する。この結果、特に、小型汎用
コンピュータやクライアント/サーバシステムなどにお
いて、本発明の実施が容易に出来るようになる。
The information recording medium of the present invention provides a delivery date response processing form for an ordered product of a product planned production at the factory, and stores a result relating to the delivery date response to produce a production plan of a manufacturing process based on actual demand. Provided is a delivery date response simulation program for executing a process of creating a part order plan for a parts supply source. As a result, the present invention can be easily implemented especially in a small general-purpose computer or a client / server system.

【0031】[0031]

【発明の実施の形態】次に、本発明の生産品納期回答処
理方法及びその装置並びに情報記録媒体の実施の形態を
図面を参照して詳細に説明する。図1は本発明の生産品
納期回答処理方法及びその装置並びに情報記録媒体の概
念を示すブロック図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing an embodiment of the present invention; FIG. 1 is a block diagram showing the concept of a method and apparatus for responding to a delivery date of a product according to the present invention and an information recording medium.

【0032】図1においては、納期問合せ要求を行う入
力装置1と、この入力装置1からの納期問合せ要求に対
する納期回答の処理を行う納期回答処理部2と、製品に
関するデータを予め記憶して保有するデータ記憶部3
と、要求製品に対する納期回答を画面表示や印字出力に
よって行う出力装置4とを示している。
In FIG. 1, an input device 1 for requesting a delivery date inquiry, a delivery date response processing unit 2 for processing a delivery date response to the request for delivery date inquiry from the input device 1, and data relating to products are stored and held in advance. Data storage unit 3
And an output device 4 for providing a delivery date response to the requested product by screen display or printout.

【0033】図2は図1に示す納期回答処理部2の詳細
な構成及びデータ記憶部3の記憶内容を示すブロック図
である。納期回答処理部2は、データ記憶部3を参照し
て部品の展開を行う部品展開部21と、ここでの部品展
開後にデータ記憶部3の部品基本データ32を参照して
部品の特性に応じた納期回答処理形態(納期回答方式)
を決定する納期引当処理形態判別部22とを有してい
る。
FIG. 2 is a block diagram showing a detailed configuration of the delivery date reply processing unit 2 shown in FIG. The delivery date response processing unit 2 refers to the data storage unit 3 to expand the component and refers to the component basic data 32 of the data storage unit 3 after the component expansion, according to the characteristic of the component. Delivery date response processing form (delivery date answer method)
And a delivery date allocation processing mode determining unit 22 that determines the delivery date.

【0034】納期回答処理部2は、さらに、データ記憶
部3のテーブル(生産能力データ33から部品確定デー
タ36まで)を参照して生産枠及び部品在庫の制約を考
慮した引当処理を行い、この引当処理を生産能力データ
33及び部品在庫データ34に反映させて、全構成部品
の納期回答処理を行う納期回答部23を有し、また、こ
こでの結果を集計して、要求製品に対する納期回答を算
出し、この納期回答を出力装置4に送出する部品まとめ
部24を有している。
The delivery date response processing unit 2 further refers to a table (from the production capacity data 33 to the part determination data 36) in the data storage unit 3 to perform a reservation processing in consideration of the restrictions on the production frame and the parts inventory. It has a delivery date answering unit 23 that reflects the allocation process in the production capacity data 33 and the parts inventory data 34, and performs a delivery date answering process for all the components. , And sends the delivery date answer to the output device 4.

【0035】なお、本発明において展開する対象の部品
は、材料を含む部材(例えば、接着剤や充填材)や材料
を加工して製品を構成する部分品などを総称したものと
して取り扱う。
The components to be developed in the present invention are generally referred to as members including materials (for example, adhesives and fillers), and parts forming products by processing the materials.

【0036】データ記憶部3は、製品に関連するテーブ
ル(部品展開データ31、部品基本データ32、生産能
力(枠)データ33、部品在庫(確定)データ34、部
品供給データ35及び部品確定データ36)を有してい
る。
The data storage unit 3 stores tables (component development data 31, component basic data 32, production capacity (frame) data 33, component stock (fixed) data 34, component supply data 35, and component fixed data 36 related to products. )have.

【0037】部品展開データ31は出荷される最終製品
と、その構成部品の関係に関するデータである。部品基
本データ32は、各部品のコードや名称及び値段などの
部品の基本的なデータと共に納期回答処理形態(納期回
答方式)を決定するためのデータである。また、生産能
力データ33は、各製品、部品に対する日々の生産能力
の上限と回答済みの確定受注を示すデータである。部品
在庫データ34は、各部品に対する初期在庫を示すデー
タである。部品供給データ35は、各部品の在庫供給の
日付と供給数量を示すデータである。さらに、部品確定
データ36は、確定受注による各部品の消費予定を示す
データである。
The part development data 31 is data on the relationship between the final product to be shipped and its constituent parts. The component basic data 32 is data for determining a delivery date response processing form (delivery date answer method) together with basic component data such as a code, a name, and a price of each component. The production capacity data 33 is data indicating the upper limit of the daily production capacity for each product and component and the confirmed confirmed orders received. The parts inventory data 34 is data indicating the initial inventory for each part. The component supply data 35 is data indicating the date of the stock supply of each component and the supply quantity. Further, the part confirmation data 36 is data indicating a scheduled consumption of each part due to a confirmed order.

【0038】なお、この図1及び図2に示す生産品納期
回答処理装置は、汎用小型コンピュータや、FAにおけ
る工場生産ネットワークシステム(例えば、UNIXワ
ークステーションやイーサネットLAN構成のクライア
ント/サーバシステム)で実現可能である。
1 and 2 are realized by a general-purpose small computer or a factory production network system (for example, a UNIX workstation or an Ethernet LAN client / server system) in an FA. It is possible.

【0039】汎用小型コンピュータに本発明を実施する
ための納期回答シミュレーションプログラムを実装した
情報記録媒体としても実現可能である。このような情報
記録媒体は、汎用小型コンピュータ単体による実施が可
能である。また、本発明を実施するための納期回答シミ
ュレーションプログラムをサーバに実装することによっ
てクライアント/サーバシステムによる本発明の実施が
容易に可能である。
The present invention can also be realized as an information recording medium in which a delivery date answer simulation program for implementing the present invention is mounted on a general-purpose small computer. Such an information recording medium can be implemented by a general-purpose small computer alone. Further, by mounting a delivery date answer simulation program for implementing the present invention on a server, the present invention can be easily implemented by a client / server system.

【0040】次に、この実施形態の動作について説明す
る。まず、図1及び図2を参照して概略動作について説
明する。入力装置1からの納期問合せ要求が納期回答処
理部2に行われる。納期回答処理部2がデータ記憶部3
の部品展開データ31を参照して部品展開部21におけ
る部品展開を行う。この部品が展開が処理された後に、
納期引当処理形態判別部22がデータ記憶部3の部品基
本データ32を参照して、部品の特性に応じた納期回答
処理形態(納期回答方式)を決定する。納期回答部23
はデータ記憶部3のテーブル(生産能力データ33から
部品確定データ36まで)を参照して、生産枠、部品在
庫の制約を加味した引当処理を行う。この引当結果が、
生産能力データ33や部品在庫データ34に反映され
る。
Next, the operation of this embodiment will be described. First, the schematic operation will be described with reference to FIGS. A delivery date inquiry request from the input device 1 is made to the delivery date reply processing unit 2. Delivery date response processing unit 2 is data storage unit 3
The component development in the component development unit 21 is performed with reference to the component development data 31 of FIG. After this part has been processed for deployment,
The delivery date allocation processing mode determination unit 22 refers to the component basic data 32 in the data storage unit 3 and determines a delivery date answer processing mode (delivery date answer method) according to the component characteristics. Delivery date answer part 23
Refers to the table in the data storage unit 3 (from the production capacity data 33 to the parts determination data 36) and performs the allocation processing in consideration of the restrictions on the production frame and the parts inventory. The result of this allocation is
This is reflected in the production capacity data 33 and the parts inventory data.

【0041】納期回答部23での引当処理による引当結
果が、生産能力データ33及び部品在庫データ34に反
映されて、全構成部品の納期回答処理が行われる。この
後に、部品まとめ部24で結果を集計して、要求製品に
対する納期回答を算出し、この納期回答を出力装置4に
送出する。
The allocation result obtained by the allocation process in the delivery date reply unit 23 is reflected in the production capacity data 33 and the parts inventory data 34, and the delivery date response process for all the components is performed. After that, the result is totaled by the component grouping unit 24, the delivery date answer for the requested product is calculated, and this delivery date answer is sent to the output device 4.

【0042】以下、この概略動作を、更に詳細に説明す
る。図3は製造工程の中で納期引当が占める部分を説明
するための図である。図3において、確定受注生産指示
が投入される工程2の生産枠及び在庫部品の状況(図3
中の点線枠内A)に基づいて納期回答を行うと共に、製
造工程2の生産計画の立案と、この製造工程の前製造工
程である製造工程1の生産計画及び部品供給源(適宜、
部品ベンダと記載する)B,Cへの部品納入計画を立案
する。
Hereinafter, the general operation will be described in more detail. FIG. 3 is a diagram for explaining the portion occupied by the delivery date allocation in the manufacturing process. In FIG. 3, the status of the production quota and the stock parts in process 2 in which the fixed-order production instruction is input (FIG.
The delivery date is answered based on the dotted line frame A), the production plan of the manufacturing process 2 is prepared, and the production plan and the parts supply source of the manufacturing process 1 which is a manufacturing process before this manufacturing process (as appropriate)
Plan the parts delivery to B and C).

【0043】図1及び図2において、入力装置1で製
品、要求納期と台数を指定し、その納期問合せ要求デー
タが納期回答処理部2に入力される。納期回答処理部2
がデータ記憶部3に問い合わせを実行する。これに対す
る納期回答データを出力装置4に送出する。納期回答処
理部2は、納期回答を実施する製品を図3中の製造工程
2で利用する部品に展開したデータを有する図2に示す
データ記憶部3の部品展開データ31を参照して展開処
理を行い、その展開結果を図2に示す引当処理形態判別
部22)に送出する。
1 and 2, the input device 1 designates a product, a required delivery date and the number of units, and the delivery date inquiry request data is input to the delivery date reply processing unit 2. Delivery date response processing unit 2
Executes an inquiry to the data storage unit 3. The delivery date response data for this is sent to the output device 4. The delivery date response processing unit 2 refers to the component development data 31 in the data storage unit 3 shown in FIG. 2 which has data obtained by developing the product for which the delivery date response is performed into components used in the manufacturing process 2 in FIG. Is performed, and the result of the development is sent to the allocation processing mode determining unit 22) shown in FIG.

【0044】引当処理形態判別部22は、各部品の引当
処理形態データを有する図2中の部品基本データ32を
参照して各部品の引当処理形態コードを返送する。各部
品は引当処理形態コードと共に、図2に示す納期回答部
23に送出する。納期回答部23は引当処理形態コード
に基づいて、納期引当に必要な生産能力データ33、部
品在庫データ34、部品供給データ35及び部品確定デ
ータ36を参照して納期引当を行う。このようにして、
展開された全ての部品に対する処理が終了したら図2に
示す部品まとめ部24で展開部品の納期回答の結果に基
づいて展開前製品の納期を作成(決定)する。
The allocation processing mode determining section 22 returns the allocation processing mode code of each component with reference to the component basic data 32 in FIG. 2 having the allocation processing mode data of each component. Each part is sent to the delivery date reply unit 23 shown in FIG. 2 together with the allocation processing form code. The delivery date responding unit 23 performs the delivery date allocation with reference to the production capacity data 33, the component stock data 34, the component supply data 35, and the component determination data 36 necessary for the delivery date allocation based on the allocation processing form code. In this way,
When the processing for all of the developed parts is completed, the parts grouping unit 24 shown in FIG. 2 creates (determines) the delivery date of the product before deployment based on the result of the delivery date response of the developed parts.

【0045】[0045]

【実施例】以下、具体的な実施例に基づいて説明する。
以下、出荷される最終製品S8500−123が5月1
3日に3個要求された場合を例として説明する。なお、
最終装置S8500−123は、図3に示すようにマザ
ーボードS8550−12、筐体S8560−23、電
源S8570−34がそれぞれ1個ずつから構成される
ものとし、マザーボードは、図3中の製造工程1で製造
され、筐体は部品ベンダB、電源は部品ベンダCからの
購入品とする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, description will be made based on specific embodiments.
The final product S8500-123 to be shipped is May 1
The case where three requests are made every three days will be described as an example. In addition,
The final device S8500-123, as shown in FIG. 3, includes a motherboard S8550-12, a housing S8560-23, and a power supply S8570-34, each of which is a single unit. And the power supply is purchased from the component vendor B and the power supply is purchased from the component vendor C.

【0046】まず、図2に示すデータ記憶部3のテーブ
ル(部品展開データ31から部品確定データ36まで)
について詳細に説明する。図4は図2中の部品展開デー
タ31の具体例を説明するための図である。図4におい
て、部品展開データ31には、出荷される最終製品を図
3に示す製造工程2で製造する際に必要な部品への展開
データが格納されている。この展開データには、親製品
コードに対して子製品コードとその子製品が親製品にい
くつ含まれているかの数量データがあり、要求製品がど
の部品で構成されるかを図4に示す内容として格納して
いる。
First, the table of the data storage unit 3 shown in FIG. 2 (from the part development data 31 to the part determination data 36)
Will be described in detail. FIG. 4 is a diagram for explaining a specific example of the component development data 31 in FIG. In FIG. 4, component development data 31 stores development data for components required when the final product to be shipped is manufactured in the manufacturing process 2 shown in FIG. The expanded data includes child product code and quantity data indicating how many child products are included in the parent product with respect to the parent product code. As shown in FIG. Stored.

【0047】図5は図2中の部品基本データ32の具体
例を説明するための図である。この部品基本データ32
には、部品に対する納期回答処理形態(納期回答方式)
を決定するためのデータが保存されている。この部品基
本データ32を参照して各製品が製品特性に応じた引当
処理形態を実行する。
FIG. 5 is a diagram for explaining a specific example of the component basic data 32 in FIG. This part basic data 32
In the delivery date response processing form for parts (delivery date response method)
The data for determining is stored. With reference to the component basic data 32, each product executes an allocation processing mode according to the product characteristics.

【0048】図6は図2中の生産能力データ33の具体
例を説明するための図である。この生産能力データ33
には、図3中の製造工程2の日単位の生産可能数と既に
顧客を確定した、その確定数が格納されている。これは
図2中の納期回答部23における納期回答処理部23a
(適宜、納期回答方式1と記載する)の処理に使用す
る。
FIG. 6 is a diagram for explaining a specific example of the production capacity data 33 in FIG. This production capacity data 33
Stores the number of daily productions that can be performed in the manufacturing process 2 in FIG. 3 and the number of customers already determined. This is a delivery date answer processing unit 23a in the delivery date answer unit 23 in FIG.
(Appropriately described as delivery date response method 1).

【0049】図7は図2中の部品在庫データ34、部品
供給データ35、部品確定データ36の具体例を説明す
るための図である。図7(a)は部品在庫データ34を
示し、図7(b)は、部品供給データ35を示し、図7
(c)は、部品確定データ36を示している。これらの
部品在庫データ34、部品供給データ35、部品確定デ
ータ36は、製品の初期在庫と、この製品の初期在庫に
対する既に顧客が確定したオーダで必要な数である消費
量と今後の部品ベンダ及び前製造工程からの供給可能台
数である供給量を示すデータが格納されている。この部
品在庫データ34から部品確定データ36が、図2中の
納期回答処理部23b(適宜、納期回答方式2と記載す
る)の処理で使用される。
FIG. 7 is a diagram for explaining a specific example of the parts inventory data 34, the parts supply data 35, and the parts determination data 36 in FIG. 7A shows the parts inventory data 34, FIG. 7B shows the parts supply data 35, and FIG.
(C) shows the part determination data 36. The parts inventory data 34, the parts supply data 35, and the parts determination data 36 include the initial inventory of the product, the consumption amount, which is the number required in the order already determined by the customer for the initial inventory of the product, and the future parts vendor and Data indicating a supply amount, which is a supplyable number from the previous manufacturing process, is stored. The component determination data 36 from the component stock data 34 is used in the processing of the delivery date answer processing unit 23b (denoted as delivery date answer method 2 as appropriate) in FIG.

【0050】次に、動作における処理を具体的に説明す
る。まず、図1中の入力装置1から製品コード、要求納
期、要求数量が入力されると、部品展開部21において
処理が実施される。
Next, the processing in the operation will be specifically described. First, when a product code, a required delivery date, and a required quantity are input from the input device 1 in FIG.

【0051】部品展開部21は、図2及び図4に示すデ
ータ記憶部2における部品展開データ31の親製品コー
ドから要求製品の製品コードS8500−123を検索
する。親製品コードに要求製品コードが見つかると、こ
の要求製品コードに対応する子製品コードと数量を参照
して、親製品コードを子製品コードに展開する。図4の
例では、製品コードS8500−123はS8550−
12,S8560−23,S8570−34のそれぞれ
1個ごとに展開される。
The part expanding section 21 searches for the product code S8500-123 of the requested product from the parent product code of the part expanding data 31 in the data storage section 2 shown in FIGS. When the required product code is found in the parent product code, the parent product code is expanded into the child product code by referring to the child product code and the quantity corresponding to the required product code. In the example of FIG. 4, the product code S8500-123 is S8550-
12, S8560-23 and S8570-34, respectively.

【0052】次に、図2中の納期引当処理形態判別部2
2は、部品展開部21から送られてきた子製品コードに
対応する引当判別コードを返す処理を実行する。部品基
本データ32の製品コードから要求製品コードを検索し
て引当判別コードを返送する。なお、検索によって引当
判別コードが見つからない場合はデフォルトの判別コー
ドを返送する。
Next, the delivery date allocation processing form discriminating section 2 in FIG.
2 executes a process of returning an allocation determination code corresponding to the child product code sent from the component development unit 21. The requested product code is searched from the product code of the component basic data 32, and the allocation determination code is returned. If no search determination code is found, a default determination code is returned.

【0053】図5の例では展開された製品コードS85
50−12,S8560−23,S8570−34に対
してそれぞれ「1,2,2」の値が返送される。製品コ
ードについて引当判別コードが判明すると、次に引当判
別コードに対応した図2に示す納期回答部23による処
理が実行される。判別コードが「1」の製品のデータ
は、図2に示す納期回答処理部23aに送られ、また、
判別コードが「2」の製品のデータは納期回答処理部2
3bに送られる。
In the example of FIG. 5, the developed product code S85
The values of “1, 2, 2” are returned to 50-12, S8560-23, and S8570-34, respectively. When the allocation discrimination code is found for the product code, a process corresponding to the allocation discrimination code by the delivery date answering unit 23 shown in FIG. 2 is executed. The data of the product whose discrimination code is “1” is sent to the delivery date response processing unit 23a shown in FIG.
The data of the product whose discrimination code is "2" is the delivery date answer processing unit 2.
3b.

【0054】次に、実際に生産枠や在庫から引当可能数
を算出し、その結果を納期回答として返送する引当処理
について説明する。図2中の納期回答処理部23aは、
データ記憶部3内に保存された生産能力データ33を参
照して部品に対する引当(納期回答方式1)を行う。生
産能力データ33としては、各部品に対して日付、生産
可能数、確定数が保存されており、引当の際には生産可
能数から確定数を減算した結果を引当可能数として引当
を行う。
Next, a description will be given of a reserving process for actually calculating the reservable number from the production frame and the stock and returning the result as a delivery date response. The delivery date response processing unit 23a in FIG.
With reference to the production capacity data 33 stored in the data storage unit 3, allocation for parts (delivery date answering method 1) is performed. As the production capacity data 33, a date, a producible number, and a confirmed number are stored for each component, and at the time of allocation, the result obtained by subtracting the confirmed number from the producible number is allocated as an allocatable number.

【0055】ここで、要求日に対して引当不可能な場合
は、まず、顧客の納期に合わせて出荷することを優先と
し、要求日から前の日に溯って引当処理を実行するもの
とする。ただし、あまりにも先行して引き当てること
は、棚卸しの増加につながると共に、生産の平準化を乱
すことから製造環境に併せて予め溯る日数を決定してお
く必要がある。今回の例では、逆上る日数を4日とす
る。所定の日数まで溯っても引当が完了しない場合は、
要求納期日以降で引当を行う。
If it is not possible to allocate the requested date, first, priority is given to shipping in accordance with the customer's delivery date, and the allocation process is executed retroactively from the requested date. . However, if the allocation is made too early, it leads to an increase in the inventory and the leveling of the production is disturbed. Therefore, it is necessary to determine the number of days to go back in advance according to the manufacturing environment. In this example, the number of days that go up is four days. If the allocation is not completed even after the specified number of days,
Allocate after the requested delivery date.

【0056】現在の例ではS8550−12のコード製
品について、5月13日に3個の納期回答要求が送られ
てくる(図6中の)。納期回答要求が送られてくる
と、まず要求納期の4日前から要求納期までの要求部品
に対する生産可能数と確定数のデータセットを図2中の
生産能力データ33から読み出す(図6中の)。そし
て要求日の引当可能数を計算し、引当可能数が要求数を
越える場合は回答を返送する。ここでは要求数3個に対
して0個なので不足している。この不足の場合は、一日
前(5月12日)に遡って同様の処理を行う。
In the present example, three delivery date response requests are sent on May 13 for the code product of S8550-12 (in FIG. 6). When the delivery date reply request is sent, first, a data set of the number of products that can be produced and the determined number of required components from four days before the required delivery date to the required delivery date is read from the production capacity data 33 in FIG. 2 (in FIG. 6). . Then, the available number on the request date is calculated, and if the available number exceeds the requested number, a reply is returned. In this case, the number of requests is 0 for 3 requests, and thus is insufficient. In the case of this shortage, the same processing is performed one day before (May 12).

【0057】4日前まで溯っても要求数に満たない場合
は、要求日より後の日のデータセットを図2に示す生産
能力データ33から獲得して同様の処理を行う(図6中
の)。ここでは、最初にもってきたデータでは1個し
か引き当てが出来ないため5月14日以降のデータを生
産能力データ33から引き出して、その引当を行う。現
在のデータ例では、5月18日に4個の引当可能数があ
るので、5月18日に残りの2個を引き当てる。引き当
てた結果が確定数に反映される。
If the number of requests is less than four days before, the data set on the day after the requested date is obtained from the production capacity data 33 shown in FIG. 2 and the same processing is performed (in FIG. 6). . Here, since only one piece of data can be allocated at the beginning, the data after May 14 is extracted from the production capacity data 33 and the allocation is performed. In the current data example, since there are four available numbers on May 18, the remaining two are allocated on May 18. The assigned result is reflected in the final number.

【0058】次に、製品在庫に基づいて引当を行う図2
中の納期回答処理部23bにおける納期回答方式2につ
いて説明する。この納期回答処理部23bによる納期回
答方式2は、図1及び図2中のデータ記憶部3に格納さ
れている部品在庫データ34、部品供給データ35及び
部品確定データ36に基づいて引当を行う。
Next, FIG. 2 in which allocation is performed based on product stocks
The delivery date answering method 2 in the middle delivery date answer processing unit 23b will be described. In the delivery date response method 2 by the delivery date response processing unit 23b, allocation is performed based on the component stock data 34, the component supply data 35, and the component determination data 36 stored in the data storage unit 3 in FIGS.

【0059】この引当(納期回答方式2)を詳細に説明
する。図8は引当(納期回答処理部23bにおける納期
回答方式2)を説明するための図である。現在の例では
納期回答処理部23a(納期回答方式1)の結果より5
月10日に1個、さらに5月18日に2個の需要があ
る。要求納期の在庫情報だけを作成して納期回答してし
まうと、その後の需要に対して欠品となる可能性がある
ため、要求納期以前の在庫の計算だけではなく、要求納
期以後の需要及び供給データを参照する必要がある。
This allocation (delivery date answering method 2) will be described in detail. FIG. 8 is a diagram for explaining the allocation (delivery date answering method 2 in the delivery date answer processing unit 23b). In the present example, 5 is obtained from the result of the delivery date answer processing unit 23a (delivery date answering method 1)
There is one demand on May 10 and two on May 18. If only the inventory information of the requested delivery date is created and the delivery date is answered, there is a possibility that the product will be out of stock for the subsequent demand. Need to refer to supply data.

【0060】そのため、この納期回答処理部23bは、
引当要求がくると、その開始として時間の流れを供給情
報に合わせて区切る。図7(b)に示す部品供給データ
35を参照して、時間の流れを供給日を境にして分割す
る。図8では、〜5月10日(期間I)、5月11日〜
5月17日(期間II)、5月18日〜5月23日(期間
III)、5月24日〜(期間IV)の四つに分割される。
この分割を行った最後の期間から評価を行う。まず、期
間IVについて行う。需要は5+9=14に対して供給は
20個なので期間IVの需要は5月18日の供給のみで十
分である。
Therefore, the delivery date response processing unit 23b
When an allocation request is received, the flow of time is demarcated according to supply information as a start. With reference to the component supply data 35 shown in FIG. 7B, the flow of time is divided at the supply date. In FIG. 8, ~ May 10 (period I), May 11 ~
May 17 (period II), May 18-May 23 (period)
III) It is divided into four from May 24th (period IV).
Evaluation is performed from the last period in which the division was performed. First, the period IV is performed. Since the demand is 5 + 9 = 14 and the supply is 20 pieces, the demand in the period IV only needs to be supplied on May 18.

【0061】図9は納期回答処理を説明するための図で
ある。期間IIIでは需要合計が12個に対して供給は1
0である。したがって、5月18日の供給だけでは期間
IIIの需要に対応できない。よって、前の期間IIで少な
くとも2個供給に余裕がなければならない。この情報を
保存しておいて期間IIの評価を行う。期間IIでは供給1
0に対して需要が12と期間IIIからの需要2個でトー
タルで14個の需要が発生する。前記と同様に期間Iに
対して4個の需要情報を保存しておいて、期間Iの計算
を行う。期間Iでは、需要が10と期間IIからの需要が
4個で計14個に対して初期在庫20で20個。最終的
に期間Iには6個の余裕がある。
FIG. 9 is a diagram for explaining the delivery date reply process. In period III, supply is 1 for total 12 demand
0. Therefore, the supply on May 18 alone
Cannot meet demand for III. Thus, there must be room for at least two supplies in the previous period II. This information is saved and the evaluation for Period II is performed. Supply 1 during period II
There are a total of 14 demands with a demand of 0 and a demand of 12 and two demands from period III. As described above, four pieces of demand information are stored for the period I, and the period I is calculated. In period I, the demand is 10 and the demand from period II is 4 pieces, and the initial stock 20 is 20 pieces for a total of 14 pieces. Eventually, period I has six headrooms.

【0062】この結果を表にして、在庫と引当可能在
庫、出荷数、需要数を示したのが図9(b)に示す表で
ある。製品S8570−34も同様の処理を行い、図9
(c)に示す表のような結果が得られたとする。次に、
全ての納期回答の結果をまとめる処理を行う。
FIG. 9B is a table showing the results, the stock, the available stock, the number of shipments, and the number of demands. Product S8570-34 performs the same processing, and FIG.
It is assumed that the result shown in the table shown in FIG. next,
A process for summarizing the results of all the delivery date responses is performed.

【0063】現在の例ではS8550−12に関しては
5月10日に1個、5月18日に2個の結果が返送され
ている。そこで、S8560−23とS8570−34
について、5月10日に1個、5月18日に2個の引当
可能在庫があるかを、図9(b)(c)のそれぞれの表
を調べる。ここでは、どちらも引当可能でありS856
0−23,S8570−34の納期は5月10日に1
個、5月18日に2個である。したがって、出荷される
最終製品の納期は、図9(d)の表の最下段となる。こ
の結果が、納期回答処理部2から要求製品に対する納期
回答として、図1に示す入出力装置4に送られる。
In the present example, one result is returned on May 10 and two results are returned on May 18 for S8550-12. Then, S8560-23 and S8570-34
9 (b) and 9 (c), it is checked whether there is one available stock on May 10 and two available stocks on May 18. Here, both can be allocated and S856
Delivery date of 0-23, S8570-34 is 1 on May 10
There are two on May 18th. Therefore, the delivery date of the final product to be shipped is at the bottom of the table in FIG. The result is sent from the delivery date response processing unit 2 to the input / output device 4 shown in FIG. 1 as a delivery date response for the requested product.

【0064】また、各部品に対する納期回答部の処理結
果(図9(d)の表) の値は、データ記憶部3の生産能
力データ33、部品確定データ36の確定数の値に反映
される。
Further, the value of the processing result (table in FIG. 9D) of the delivery date answering part for each part is reflected in the value of the production capacity data 33 of the data storage part 3 and the number of confirmed parts of the part confirmed data 36. .

【0065】図10は生産計画及び部品ベンダへの発注
計画を説明するための図である。図10(a)(b)
(c)(d)は、生産能力データ33(図6)、部品在
庫データ34(図7(a))、部品供給データ35(図
7(b))、部品確定データ36(図7(c))を各部
品ごとに再集計した表である。図10(a)の表は、図
3中の製造工程1の生産計画であり、図10(b)
(c)のそれぞれの表は、図3中の部品ベンダB,Cへ
の発注計画のためのものである。
FIG. 10 is a diagram for describing a production plan and an order plan to a parts vendor. FIGS. 10A and 10B
(C) and (d) show the production capacity data 33 (FIG. 6), the parts inventory data 34 (FIG. 7A), the parts supply data 35 (FIG. 7B), and the parts confirmation data 36 (FIG. 7C). )) Is a table recounted for each part. The table of FIG. 10A is a production plan of the manufacturing process 1 in FIG.
Each table in (c) is for order planning to the parts vendors B and C in FIG.

【0066】実際に納期回答を実施する場合において
は、納期回答結果が、客先要求納期よりも遅延した場合
は、生産枠の増強又は部品供給計画の見直しを実施し、
図3中の製造工程1の生産計画(図6)、部品ベンダへ
の発注計画(図7(b))を修正する必要がある。ま
た、図10(b)(c)の表の可能在庫数が著しく増加
しつつある場合は、部品ベンダとの供給計画を見直し、
不要な仕掛かりが増加しないようにする必要がある。
In the case where the delivery date response is actually implemented, if the delivery date response result is later than the customer requested delivery date, the production quota is increased or the parts supply plan is reviewed,
It is necessary to modify the production plan (FIG. 6) of the manufacturing process 1 in FIG. 3 and the order plan to the parts vendor (FIG. 7B). If the number of available stocks in the tables of FIGS. 10B and 10C is increasing remarkably, the supply plan with the parts vendor is reviewed.
It is necessary to prevent unnecessary work in progress.

【0067】次に、他の実施形態について説明する。デ
ータ記憶部3の処理の最後に、この記憶処理前の記憶状
態に戻る処理(ロールバック)を行うことによって、納
期引当処理の結果のみを参照してデータ記憶部3の内容
を書き替えないようにすることが可能である。これによ
り、常に現状のデータを用いて要求納期に対する問合せ
処理を行うことが可能となり、現在のデータに対して、
さまざまな組み合わせの納期引当要求を何度も行えるよ
うな、納期回答シミュレーションプログラムを容易に作
成できるようになる。
Next, another embodiment will be described. At the end of the processing of the data storage unit 3, by performing processing (rollback) to return to the storage state before the storage processing, the contents of the data storage unit 3 are not rewritten by referring only to the result of the delivery date allocation processing. It is possible to As a result, it is possible to always perform the inquiry process for the requested delivery date using the current data, and for the current data,
It is possible to easily create a delivery date answer simulation program that can repeatedly request various combinations of delivery date.

【0068】[0068]

【発明の効果】以上の説明から明らかなように、本発明
の生産品納期回答処理方法及びその装置によれば、出荷
される最終製品単位を含まない部品段階を考慮して、そ
の納期回答を行っている。
As is clear from the above description, according to the method and apparatus for processing the delivery date of a product according to the present invention, the response of the delivery date is considered in consideration of the parts stage that does not include the final product unit to be shipped. Is going.

【0069】この結果、出荷される最終製品を構成する
部品の共通度が高ければ要求納期に対する正確な対応が
可能になり、その要求納期を満足する納期的確度が向上
する。また、部品管理処理形態にあった納期引当を行っ
ているため、より生産の実態に合った正確な納期回答が
出来るようになるという効果がある。
As a result, if the degree of commonality of the components constituting the final product to be shipped is high, it is possible to accurately respond to the required delivery date, and the delivery accuracy that satisfies the required delivery date is improved. In addition, since the delivery date allocation suitable for the component management processing mode is performed, there is an effect that an accurate delivery date answer that matches the actual situation of production can be made.

【0070】また、本発明の生産品納期回答処理方法及
びその装置によれば、算出された納期回答と共に、納期
回答に関連した製品コードに対する結果を保存して、実
需要に基づいた製造工程の生産計画及び部品供給源への
部品発注計画を作成している。したがって、より的確な
納期回答と共に、生産計画の立案及び部品供給源への部
品発注計画が容易に作成可能になるという効果がある。
Further, according to the method and the apparatus for processing the delivery date response of the present invention, the result for the product code related to the delivery date response is stored together with the calculated delivery date response, and the production process based on the actual demand is stored. A production plan and a parts ordering plan for the parts supply source are created. Therefore, there is an effect that it is possible to easily create a production plan and a parts ordering plan for a parts supply source together with a more accurate delivery date response.

【0071】さらに、本発明の生産品納期回答処理方法
及びその装置によれば、実需要に基づいて納期回答対象
の製造工程から前製造工程に対して連動し、その生産計
画の作成及び更新が実施される。この結果、製品在庫、
仕掛かり製品、部品の棚卸し在庫を必要最小限に抑える
ことが出来るようになるという効果がある。
Further, according to the method and apparatus for responding to the delivery date of a product according to the present invention, the production process for which the delivery date is to be answered is linked to the previous manufacturing process based on the actual demand, and the production plan is updated and created. Will be implemented. As a result, product inventory,
This has the effect that inventory of in-process products and parts can be kept to a minimum.

【0072】また、本発明の情報記録媒体は、前記の出
荷される最終製品単位を含まない部品段階を考慮した納
期回答、及び、算出された納期回答と共に、納期回答に
関連した製品コードに対する結果を保存して、実需要に
基づいた製造工程の生産計画及び部品供給源への部品発
注計画を作成する処理を実行するための納期回答シミュ
レーションプログラム提供する。この結果、特に、小型
汎用コンピュータやクライアント/サーバシステムなど
において、本発明の実施が容易に出来るようになるとい
う効果がある。
Further, the information recording medium of the present invention provides a delivery date response in consideration of a part stage not including the final product unit to be shipped, a calculated delivery date response, and a result for a product code related to the delivery date response. And a delivery date answer simulation program for executing a process of creating a production plan of a manufacturing process based on actual demand and a parts ordering plan to a parts supply source. As a result, there is an effect that the present invention can be easily implemented particularly in a small general-purpose computer or a client / server system.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の生産品納期回答処理方法及びその装置
並びに情報記録媒体の概念を示すブロック図である。
FIG. 1 is a block diagram showing the concept of a method and apparatus for responding to a delivery date of a product according to the present invention and an information recording medium.

【図2】図1に示す納期回答処理部の詳細な構成及びデ
ータ記憶部の記憶内容を示すブロック図である。
FIG. 2 is a block diagram showing a detailed configuration of a delivery date reply processing unit shown in FIG. 1 and contents stored in a data storage unit.

【図3】実施形態にあって製造工程中における納期引当
を説明するための図である。
FIG. 3 is a diagram for explaining delivery date allocation during a manufacturing process in the embodiment.

【図4】図2中の部品展開データの具体例を説明するた
めの図である。
FIG. 4 is a diagram for describing a specific example of component development data in FIG. 2;

【図5】図2中の部品基本データの具体例を説明するた
めの図である。
FIG. 5 is a diagram for describing a specific example of component basic data in FIG. 2;

【図6】図2中の生産能力データの具体例を説明するた
めの図である。
FIG. 6 is a diagram illustrating a specific example of production capacity data in FIG. 2;

【図7】図2中の在庫データの具体例を説明するための
図である。
FIG. 7 is a diagram for explaining a specific example of inventory data in FIG. 2;

【図8】実施形態にあって引当を説明するための図であ
る。
FIG. 8 is a diagram for explaining allocation in the embodiment.

【図9】実施形態にあって納期回答処理を説明するため
の図である。
FIG. 9 is a diagram for explaining a delivery date reply process in the embodiment.

【図10】実施形態にあって生産計画及び部品ベンダへ
の発注計画を説明するための図である。
FIG. 10 is a diagram for describing a production plan and an order plan to a parts vendor in the embodiment.

【符号の説明】[Explanation of symbols]

1 入力装置 2 納期回答処理部 3 データ記憶部 4 出力装置 21 部品展開部 22 納期引当処理形態判別部 23 納期回答部 23a,23b 納期回答処理部 24 部品まとめ部 31 部品展開データ 32 部品基本データ 33 生産能力データ 34 部品在庫データ 35 部品供給データ 36 部品確定データ DESCRIPTION OF SYMBOLS 1 Input device 2 Delivery time reply processing part 3 Data storage part 4 Output device 21 Parts development part 22 Delivery time reservation processing form discrimination part 23 Delivery time reply parts 23a, 23b Delivery time reply processing part 24 Parts grouping part 31 Parts development data 32 Parts basic data 33 Production capacity data 34 Parts inventory data 35 Parts supply data 36 Parts confirmation data

Claims (12)

【特許請求の範囲】[Claims] 【請求項1】 製品に対する納期回答要求を受け取った
際に製造工程における部品構成を展開する段階と、 次に、この展開した構成の部品に対し、それぞれの部品
特性に応じて、予め定めた納期回答の処理形態から部品
納期を求める段階と、 さらに、この求めによるそれぞれの構成部品の納期回答
から納期回答要求の製品に対する回答納期を算出する段
階と、 を有することを特徴とする生産品納期回答処理方法。
1. A step of developing a component configuration in a manufacturing process when a delivery date response request for a product is received. Next, a predetermined delivery date is determined for the component having the expanded configuration in accordance with each component characteristic. A step of obtaining a part delivery date from the response processing form; and a step of calculating an answer delivery date for the product of the delivery date answer request from the delivery time answer of each component based on the request. Processing method.
【請求項2】 前記算出された納期回答と共に、 この納期回答に関連した製品コードに対する結果を保存
して、実需要に基づいた製造工程の生産計画及び部品供
給源への部品発注計画を作成することを特徴とする請求
項1記載の生産品納期回答処理方法。
2. A result for the product code associated with the calculated delivery date response is stored together with the calculated delivery date response, and a production plan of a manufacturing process and a component ordering plan to a component supply source are created based on actual demand. 2. The method according to claim 1, further comprising the steps of:
【請求項3】 製品計画生産の受注品に対する納期回答
処理を行う生産品納期回答処理装置において、 納期問合せ要求を行う入力手段と、 製品に関するデータを予め記憶して保有するデータ記憶
手段と、 前記入力手段からの納期問合せ要求に対する納期回答
を、前記データ記憶手段が保有する製品に関するデータ
を参照して、出荷される最終製品単位を含まない部品段
階のみから得るための納期回答処理手段と、 前記納期回答処理手段が算出した納期回答の情報を出力
する出力手段と、 を備えることを特徴とする生産品納期回答処理装置。
3. A production product delivery date reply processing device for performing a delivery date reply process for an ordered product of product planned production, an input means for requesting a delivery date inquiry, a data storage means for storing data relating to products in advance and holding the data, A delivery time reply processing means for obtaining a delivery time reply to the delivery time inquiry request from the input means by referring to data on the product held by the data storage means, and only from a component stage which does not include a final product unit to be shipped; Output means for outputting information on a delivery date answer calculated by the delivery date answer processing means.
【請求項4】 前記納期回答処理手段が、 製品に対する納期回答要求を受け取った際に製造工程に
おける部品構成を展開し、かつ、この展開した構成の部
品に対し、それぞれの部品特性に応じて、予め定めた納
期回答の処理形態から部品納期を求めると共に、この求
めによるそれぞれの構成部品の納期回答から、入力され
た納期回答要求製品に対する回答納期を算出することを
特徴とする請求項3記載の生産品納期回答処理装置。
4. The delivery time response processing means, when receiving a delivery time response request for a product, develops a component configuration in a manufacturing process, and, for the component having the developed configuration, according to each component characteristic, 4. The delivery date for a product for which the requested delivery date is requested is calculated from the delivery date of each component based on the determined delivery date of the component from the predetermined delivery date response processing form. Production product delivery date response processing device.
【請求項5】 前記算出された納期回答と共に、この納
期回答に関連した製品コードに対する結果をデータ記憶
手段に保存して、実需要に基づいた製造工程の生産計画
及び部品供給源への部品発注計画を作成することを特徴
とする請求項3記載の生産品納期回答処理装置。
5. The result of the product code associated with the calculated delivery date response is stored in a data storage unit together with the calculated delivery date response, and a production plan of a manufacturing process based on actual demand and a component order to a component supply source are stored. 4. The production product delivery date reply processing device according to claim 3, wherein a plan is created.
【請求項6】 前記納期回答の算出後におけるデータ記
憶部の処理の最後に、この記憶処理前の記憶状態に戻る
処理を納期回答処理手段が実行し、納期引当処理の結果
のみを参照した前記データ記憶部の書き替えを行わない
ことを特徴とする請求項4記載の生産品納期回答処理装
置。
6. At the end of the processing of the data storage unit after the calculation of the delivery date answer, the delivery date answer processing means executes a process of returning to the storage state before the storage process, and refers to only the result of the delivery date allocation process. 5. The apparatus according to claim 4, wherein the data storage unit is not rewritten.
【請求項7】 前記納期回答処理手段として、データ記
憶部を参照して部品展開を行う部品展開部と、 前記部品展開部の部品展開後に前記データ記憶部におけ
る製品に関連した複数のテーブルを参照して部品特性に
応じた納期回答処理形態を決定する納期引当処理形態判
別部と、 前記データ記憶部のテーブルを参照して生産枠及び部品
在庫の制約を考慮した引当処理を行い、この引当処理
を、前記テーブルにおける生産能力及び部品在庫に反映
させて全構成部品の納期回答処理を行う納期回答部と、 前記納期回答部の結果を集計して、要求製品に対する納
期回答を算出し、この納期回答を出力する部品まとめ部
と、 を備えることを特徴とする請求項3記載の生産品納期回
答処理装置。
7. As a delivery date reply processing means, a part expanding section for expanding parts by referring to a data storage section, and referring to a plurality of tables related to products in the data storage section after the parts expanding section of the parts expanding section. And a delivery date allocation processing form determining unit for determining a delivery date answer processing mode according to the component characteristics, and performing a allocation process in consideration of a production frame and a component inventory restriction by referring to a table in the data storage unit. Is reflected in the production capacity and parts inventory in the table, and performs a delivery date response process for all the component parts. 4. The production product delivery date response processing device according to claim 3, further comprising: a component grouping unit that outputs a response.
【請求項8】 前記データ記憶部に納期回答処理手段が
参照する製品に関連した複数のテーブルを有し、この複
数テーブルのそれぞれのデータが、(a)出荷される最
終製品と、この最終製品の構成部品の関係に関する部品
展開データ、(b)各部品のコード、名称及び値段を含
む部品の基本データと共に納期回答処理形態を決定する
ための部品基本データ、(c)各製品、部品に対する日
々の生産能力の上限と回答済みの確定受注を格納した生
産能力データ、(d)各部品に対する初期在庫を格納し
た部品在庫データ、(e)各部品の在庫供給の日付と供
給数量を格納した部品供給データ、(f)確定受注によ
る各部品の消費予定を格納した部品確定データ、である
ことを特徴とする請求項3記載の生産品納期回答処理装
置。
8. The data storage unit has a plurality of tables related to a product referred to by the delivery date reply processing means, and the data of each of the plurality of tables is: (a) a final product to be shipped; (B) Basic part data for determining the delivery date response processing form together with basic part data including the code, name and price of each part, (c) Daily for each product and part Production capacity data storing the upper limit of the production capacity and the confirmed confirmed orders received, (d) parts inventory data storing the initial stock of each part, and (e) parts storing the stock supply date and supply quantity of each part. 4. The production product delivery date reply processing device according to claim 3, wherein the supply data is (f) component determination data storing a scheduled consumption of each component according to the determined order.
【請求項9】 前記請求項3記載の入力手段、データ記
憶手段、納期回答処理手段及び出力手段の構成が、 汎用小型コンピュータ単体であり、又は、複数の汎用小
型コンピュータを通信ネットワークで接続したシステム
であることを特徴とする生産品納期回答処理装置。
9. The system according to claim 3, wherein the input means, the data storage means, the delivery date response processing means and the output means comprise a single general-purpose computer or a system in which a plurality of general-purpose small computers are connected by a communication network. A production product delivery date response processing device, characterized in that:
【請求項10】 製品に対する納期回答要求を受け取っ
た際に製造工程における部品構成を展開し、かつ、この
展開した構成の部品に対し、それぞれの部品特性に応じ
て、予め定めた納期回答の処理形態から部品納期を求め
ると共に、この求めによるそれぞれの構成部品の納期回
答から、入力された納期回答要求製品に対する回答納期
を算出する納期回答シミュレーションプログラムを格納
したことを特徴とする情報記録媒体。
10. Upon receipt of a delivery date response request for a product, a component configuration in the manufacturing process is developed, and a predetermined delivery date response process is performed on the component of the developed configuration in accordance with each component characteristic. An information recording medium characterized by storing a delivery date answer simulation program for calculating a delivery date for a product with a requested delivery date answer from a delivery date answer of each component based on the determined delivery date of each component.
【請求項11】 前記算出された納期回答と共に、この
納期回答に関連した製品コードに対する結果を保存し
て、実需要に基づいた製造工程の生産計画及び部品供給
源への部品発注計画を作成する納期回答シミュレーショ
ンプログラムを更に格納したことを特徴とする請求項1
0記載の情報記録媒体。
11. A result for the product code associated with the calculated delivery date response is stored together with the calculated delivery date response, and a production plan of a manufacturing process and a component ordering plan for a component supply source are created based on actual demand. 2. A delivery time answer simulation program is further stored.
0 information recording medium.
【請求項12】 前記納期回答の算出後における記憶処
理の最後に、この記憶処理前の記憶状態に戻る処理を実
行し、納期引当処理の結果のみを参照した記憶の書き替
えを行わないようにするための納期回答シミュレーショ
ンプログラムを更に格納したことを特徴とする請求項1
0記載の情報記録媒体。
12. At the end of the storage process after calculating the delivery date answer, a process of returning to the storage state before the storage process is executed so that the storage is not rewritten only by referring to the result of the delivery date allocation process. 2. A delivery time answer simulation program for performing a delivery time answering simulation program.
0 information recording medium.
JP27738899A 1999-09-29 1999-09-29 Method and device for processing product delivery answer and information recording medium Pending JP2001100829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27738899A JP2001100829A (en) 1999-09-29 1999-09-29 Method and device for processing product delivery answer and information recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27738899A JP2001100829A (en) 1999-09-29 1999-09-29 Method and device for processing product delivery answer and information recording medium

Publications (1)

Publication Number Publication Date
JP2001100829A true JP2001100829A (en) 2001-04-13

Family

ID=17582848

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27738899A Pending JP2001100829A (en) 1999-09-29 1999-09-29 Method and device for processing product delivery answer and information recording medium

Country Status (1)

Country Link
JP (1) JP2001100829A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002351523A (en) * 2001-05-23 2002-12-06 Dainippon Printing Co Ltd Delivery date answering system
JP2006244470A (en) * 2005-02-01 2006-09-14 Hitachi Ltd Delivery date reply system, delivery date reply method, and delivery date reply program
US7610212B2 (en) 2002-05-17 2009-10-27 Kinaxis Holdings Inc. System and method for determining a demand promise date based on a supply available date
US7945466B2 (en) 2004-06-17 2011-05-17 Kinaxis Holdings Inc. Scheduling system
WO2011121703A1 (en) * 2010-03-29 2011-10-06 富士通フロンテック株式会社 Production management device, production management program, and production management method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002351523A (en) * 2001-05-23 2002-12-06 Dainippon Printing Co Ltd Delivery date answering system
US7610212B2 (en) 2002-05-17 2009-10-27 Kinaxis Holdings Inc. System and method for determining a demand promise date based on a supply available date
US8015044B2 (en) 2002-05-17 2011-09-06 Kinaxis Holdings Inc. System and method for determining a promise date for a demand in a business environment
US7945466B2 (en) 2004-06-17 2011-05-17 Kinaxis Holdings Inc. Scheduling system
JP2006244470A (en) * 2005-02-01 2006-09-14 Hitachi Ltd Delivery date reply system, delivery date reply method, and delivery date reply program
WO2011121703A1 (en) * 2010-03-29 2011-10-06 富士通フロンテック株式会社 Production management device, production management program, and production management method
JPWO2011121703A1 (en) * 2010-03-29 2013-07-04 富士通フロンテック株式会社 Production management apparatus, production management program, and production management method

Similar Documents

Publication Publication Date Title
US6889106B2 (en) Master production scheduling management system and method
US7668761B2 (en) System and method for ensuring order fulfillment
Gupta et al. Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis
Ball et al. Available to promise
US7058587B1 (en) System and method for allocating the supply of critical material components and manufacturing capacity
US6885902B2 (en) System and method for replenishment by purchase with attribute based planning
US20030033180A1 (en) System and method for optimizing resource plans
US20030208392A1 (en) Optimizing resource plans
US20030229550A1 (en) System and method for planning and ordering components for a configure-to-order manufacturing process
JP2004537772A (en) System and method for allocating supply of critical material components and manufacturing capacity
US7493184B2 (en) Available to promise allocation optimization tool
US20040117227A1 (en) Production capability simulating system and method
JP2002007822A (en) Commodity transaction system, commodity shipping side terminal equipment, commodity transaction method and storage medium
JP2001100829A (en) Method and device for processing product delivery answer and information recording medium
Álvarez et al. A web-based approach for exceptions management in the supply chain
US20190303815A1 (en) Distributed manufacturing system
JP2002328984A (en) Information presentation method and information presentation system
JPH1080842A (en) Production plan preparing device
JP2003099507A (en) Method and system for controlling inventory reserve
JP2008015873A (en) Producible limit planning system and method
US20040128213A1 (en) Material requirement planning system and method for re-scheduling purchase orders of materials
US20040122724A1 (en) System and method for generating priorities of manufacturing orders
JP2006244470A (en) Delivery date reply system, delivery date reply method, and delivery date reply program
JP2000322119A (en) Substitutive lot determination system
JP2004029874A (en) Production management system