JP3068803B2 - Mounting structure and mounting method of elastic pad for concrete sleepers - Google Patents

Mounting structure and mounting method of elastic pad for concrete sleepers

Info

Publication number
JP3068803B2
JP3068803B2 JP9235484A JP23548497A JP3068803B2 JP 3068803 B2 JP3068803 B2 JP 3068803B2 JP 9235484 A JP9235484 A JP 9235484A JP 23548497 A JP23548497 A JP 23548497A JP 3068803 B2 JP3068803 B2 JP 3068803B2
Authority
JP
Japan
Prior art keywords
elastic pad
concrete sleeper
rubber layer
mounting
sleeper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9235484A
Other languages
Japanese (ja)
Other versions
JPH1161701A (en
Inventor
惣一郎 清水
Original Assignee
東京フアブリック工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京フアブリック工業株式会社 filed Critical 東京フアブリック工業株式会社
Priority to JP9235484A priority Critical patent/JP3068803B2/en
Publication of JPH1161701A publication Critical patent/JPH1161701A/en
Application granted granted Critical
Publication of JP3068803B2 publication Critical patent/JP3068803B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Railway Tracks (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鉄道の砂利道床に
敷設されるコンクリートまくらぎ用弾性パッドの取付構
造及び、取付方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mounting structure and a mounting method for an elastic pad for a concrete sleeper laid on a gravel roadbed of a railway.

【0002】[0002]

【従来の技術】砂利道床に敷設される鉄道用のコンクリ
ートまくらぎは、前記砂利道床が持つ弾性によって当該
まくらぎが受ける振動がある程度吸収されるので、この
コンクリートまくらぎには弾性支承パッドを取付けない
で、まくらぎだけで使用される場合が多かったが、近
来、まくらぎを新設する場合には、振動吸収効率をさら
に向上させ、かつ砂利道床に伝わる衝撃を一層少なくし
て砂利の細石化や粉塵発生、道床崩れによるまくぎの沈
下を防ぎ、かつ保守周期を伸ばすために、多くの場合ま
くらぎの両端部を弾性支承パッドを収容した弾性支承箱
によって支持している。
2. Description of the Related Art A railroad concrete sleeper laid on a gravel roadbed absorbs vibrations to which the sleeper is applied to some extent due to the elasticity of the gravel roadbed. Therefore, elastic bearing pads are attached to the concrete sleeper. In many cases, a new sleeper was recently used.However, in the case of a new sleeper, the efficiency of vibration absorption has been further improved, and the impact transmitted to the gravel roadbed has been further reduced. In order to prevent the settlement of the nail due to the generation of dust and dust and the collapse of the roadbed, and to extend the maintenance cycle, both ends of the sleeper are often supported by elastic bearing boxes containing elastic bearing pads.

【0003】さらに、近時の傾向として、弾性支承パッ
ドを具備しない既設のコンクリートまくらぎについて
も、新たに弾性パッドを取付けてその振動をより緩衝し
てまくらぎの耐久性を伸ばすと共に、走行車両の振動を
低減して乗車快適性の向上を図ることが全国規模で順次
展開されつつある。
Further, as a recent trend, even for existing concrete sleepers having no elastic bearing pad, a new elastic pad is newly attached to cushion the vibration to extend the durability of the sleeper and to improve the durability of the traveling vehicle. Reduction of vibration to improve riding comfort is being gradually rolled out nationwide.

【0004】弾性パッドを具備しないコンクリートまく
らぎに弾性パッドを取付ける場合における従来の一般的
な取付け構造は、図18〜図21に示すとおりである。
各図において、レール(図示せず)に取付けたコンクリ
ートまくらぎ1の裏面2に割り溝3のあるアンカーナッ
ト4を埋設したうえ、このアンカーナット4を、その内
奥にクサビ5を打設することで割り溝3のあるアンカー
先端部を拡大してコンクリートまくらぎ1内に緊結固定
する。
[0004] A conventional general mounting structure for mounting an elastic pad on a concrete sleeper having no elastic pad is as shown in FIGS.
In each of the drawings, an anchor nut 4 having a split groove 3 is buried in a back surface 2 of a concrete sleeper 1 attached to a rail (not shown), and a wedge 5 is cast inside the anchor nut 4. As a result, the tip of the anchor having the split groove 3 is enlarged and tightly fixed in the concrete sleeper 1.

【0005】つぎに、コンクリートまくらぎ1の裏面2
に、下面にまくらぎ幅方向に複数の緩衝用溝6を有し、
それぞれまくらぎ中間部と両端部に配設する3枚の長方
形の弾性パッド7が配設され、各弾性パッド7に開設し
た複数のボルト孔8に固定ボルト9を挿入したうえ、ア
ンカーナット4にねじ込むことで弾性パッド7がまくら
ぎの裏面2に固着される。
Next, the back surface 2 of the concrete sleeper 1
Has a plurality of buffer grooves 6 in the sleeper width direction on the lower surface,
Three rectangular elastic pads 7 are respectively provided at the middle and both ends of the sleeper. Fixing bolts 9 are inserted into a plurality of bolt holes 8 formed in each elastic pad 7, and the anchor nut 4 is inserted into the bolts 8. By screwing, the elastic pad 7 is fixed to the back surface 2 of the sleeper.

【0006】[0006]

【発明が解決しようとする課題】前記取付け構造の弾性
パッド7を、弾性パッドを有しない既設のコンクリート
まくらぎ1に取付ける場合は、コンクリートまくらぎ1
の設置部周辺の砂利を除去してまくらぎの周囲に十分な
空間を形成したうえ、レールの固定金具を緩めて、まく
らぎ1をレールから取外して適宜の作業場所でこのまく
らぎ1を反転したうえ、その裏面2に弾性パッド7を配
設して固定ボルト9をアンカーナット4に螺合すること
で固定し、その後再びまくらぎ1を反転して元の砂利道
床の設置場所に戻し、固定金具を締結してレールを取
付、砂利を埋戻して作業が終了する。
When the elastic pad 7 of the above-mentioned mounting structure is mounted on an existing concrete sleeper 1 having no elastic pad, the concrete sleeper 1
After removing the gravel around the installation area to create a sufficient space around the sleeper, loosen the rail fixing bracket, remove the sleeper 1 from the rail, and invert the sleeper 1 at an appropriate work place Further, an elastic pad 7 is arranged on the back surface 2 and the fixing bolt 9 is fixed by screwing the fixing bolt 9 to the anchor nut 4, and then the sleeper 1 is again turned over and returned to the original setting site of the gravel roadbed, and fixed. Fasten the brackets, attach the rails, backfill the gravel and finish the work.

【0007】しかし、前記従来の弾性パッド取付構造で
は、既設のコンクリートまくらぎに弾性パッドを取付け
るために、多大の作業時間と手間がかかるという欠点が
ある。
[0007] However, the conventional elastic pad mounting structure has a disadvantage that it takes a lot of work time and labor to mount the elastic pad on an existing concrete sleeper.

【0008】本発明は前記の課題を解決したコンクリー
トまくらぎ用弾性パッドの取付構造及び、取付方法を提
供することを目的とする。
An object of the present invention is to provide a mounting structure and a mounting method for an elastic pad for a concrete sleeper which have solved the above-mentioned problems.

【0009】[0009]

【課題を解決するための手段】前記の目的を達成するた
め本発明に係るコンクリートまくらぎ用弾性パッドの取
付構造は、硬質ゴム層と、その上下両面またはそのいず
れか片面に装着した軟質ゴム層とからなる弾性パッドを
コンクリートまくらぎの裏面に当てがい、硬質材からな
る取付けハンガーをの水平係止部で前記弾性パッドの側
部を係止し、取付けハンガーの起立部側面と前記コンク
リートまくらぎの側面とを両面接着テープで固着するこ
とを特徴とする。
According to the present invention, there is provided a structure for mounting an elastic pad for a concrete sleeper according to the present invention, comprising a hard rubber layer, a soft rubber layer mounted on both upper and lower surfaces or one of the two surfaces. An elastic pad made of a material is applied to the back surface of the concrete sleeper, and a side portion of the elastic pad is locked by a horizontal locking portion of a mounting hanger made of a hard material. Are fixed with a double-sided adhesive tape.

【0010】また本発明は、前記両面接着テープでコン
クリートまくらぎに取付けハンガーを取付ける取付け手
段に加えて、前記取付けハンガーの起立部を貫通して固
定用アンカーをコンクリートまくらぎに貫入することを
特徴とする。
Further, the present invention is characterized in that, in addition to the mounting means for mounting the hanger to the concrete sleeper with the double-sided adhesive tape, a fixing anchor penetrates the upright portion of the mounting hanger and penetrates the concrete sleeper. And

【0011】また本発明は、前記両面接着テープでコン
クリートまくらぎに取付けハンガーを取付ける取付け手
段に代えて、前記取付けハンガーの起立部に開設したボ
ルト孔に固定ボルトを挿入し、この固定ボルトを、コン
クリートまくらぎに埋設のインサートのネジ部に螺合す
ることを特徴とする。
According to the present invention, instead of the mounting means for mounting the hanger to the concrete sleeper with the double-sided adhesive tape, a fixing bolt is inserted into a bolt hole formed in an upright portion of the mounting hanger. It is characterized in that it is screwed into the thread of the insert buried in the concrete sleeper.

【0012】また本発明は、前記弾性パッドにおいて、
硬質ゴム層とその上下部の軟質ゴム層の両側縁は、コン
クリートまくらぎの両側下縁よりも内寄りに設けられる
と共に、前記硬質ゴム層と上部軟質ゴム層の両側縁に
は、前記取付けハンガーの水平係止部と起立部とを結ぶ
段部連接部が嵌合する凹部を有した翼部が設けられてい
ることを特徴とする。
Further, the present invention provides the elastic pad,
Both side edges of the hard rubber layer and the upper and lower soft rubber layers are provided more inward than both lower edges of the concrete sleeper, and both sides of the hard rubber layer and the upper soft rubber layer are provided with the mounting hanger. A wing having a concave portion into which a step connecting portion connecting the horizontal locking portion and the upright portion is fitted is provided.

【0013】本発明に係るコンクリートまくらぎ用弾性
パッドの取付方法は、レールを支持し、砂利道床に埋設
されている既設のコンクリートまくらぎの周辺の砂利を
除去したうえ、前記コンクリートまくらぎの裏面に、硬
質ゴム層と、その上下両面またはそのいずれか片面に装
着した軟質ゴム層とからなる弾性パッドを当てがったう
え、硬質材からなる取付けハンガーの水平係止部で前記
弾性パッドの側部を係止し、取付けハンガーの起立部側
面と前記コンクリートまくらぎの側面とを両面接着テー
プで固着することを特徴とする。
The method for mounting an elastic pad for a concrete sleeper according to the present invention is characterized in that a rail is supported, a gravel around an existing concrete sleeper buried in a gravel roadbed is removed, and a back surface of the concrete sleeper is provided. A hard rubber layer and an elastic pad made of a soft rubber layer mounted on both upper and lower surfaces or any one of the surfaces are applied, and the horizontal locking portion of a mounting hanger made of a hard material is used to attach a side portion of the elastic pad. The side surface of the upright portion of the mounting hanger is fixed to the side surface of the concrete sleeper with a double-sided adhesive tape.

【0014】前記の弾性パッドの取付方法において、両
面接着テープでコンクリートまくらぎに取付けハンガー
を取付けたうえ、さらに取付けハンガーの起立部をコン
クリートまくらぎに貫入することを特徴とする。
[0014] In the above-mentioned method of mounting the elastic pad, the mounting hanger is mounted on the concrete sleeper with a double-sided adhesive tape, and further, the upright portion of the mounting hanger penetrates the concrete sleeper.

【0015】また本発明は、コンクリートまくらぎに取
付ハンガーを取付けるための前記両面接着テープによる
取付け手段に代えて、前記取付けハンガーの起立部に開
設したボルトに固定ボルトを挿入し、この固定ボルト
を、コンクリートまくらぎに埋設のインサートのネジ部
に螺合することを特徴とする。
Further, according to the present invention, a fixing bolt is inserted into a bolt formed in an upright portion of the mounting hanger in place of the mounting means using the double-sided adhesive tape for mounting the mounting hanger on a concrete sleeper. It is screwed into the thread of the insert buried in the concrete sleeper.

【0016】本発明によると、砂利道床に埋設された既
設のコンクリートまくらぎに弾性パッドを取付ける場合
は、まくらぎ周辺の砂利を取除いて空隙を設け、この空
隙を利用してまくらぎ裏面に弾性パッドを装着し、この
弾性パッドを係止する取付けハンガーを両面接着テープ
を介して又は、両面接着テープと固定用アンカーを介し
てコンクリートまくらぎに固着することにより、弾性パ
ッドのコンクリートまくらぎへ取付け作業は終了するの
で、従来のようにコンクリートまくらぎをレールから取
外して反転させて、弾性パッドをまくらぎ裏面にボルト
が固着したのち、まくらぎを再び砂利道床に戻してレー
ルに取付けるという面倒で手間のかかる作業が不要であ
る。
According to the present invention, when attaching an elastic pad to an existing concrete sleeper buried in a gravel roadbed, the gravel around the sleeper is removed to provide a gap, and this gap is used to provide a back surface for the sleeper. By attaching the elastic pad and attaching the mounting hanger that locks the elastic pad to the concrete sleeper via the double-sided adhesive tape or the double-sided adhesive tape and the fixing anchor, to the concrete sleeper of the elastic pad Since the installation work is completed, the concrete sleeper is removed from the rail and turned over as before, and the elastic pad is fixed to the bolt on the back of the sleeper, and then the sleeper is returned to the gravel roadbed and attached to the rail again. No complicated work is required.

【0017】また、新設のコンクリートまくらぎに弾性
パッドを取付る場合は、このまくらぎを砂利道床に埋設
する前に任意の作業場所で、まくらぎ裏面に弾性パッド
を装着し、この弾性パッドを係止する取付けハンガーを
まくらぎの側面に螺合する固定ボルトを介してまくらぎ
に固着することができる。この取付け構造であると、前
記弾性パッド付きまくらぎを砂利道床に埋設して数年
後、弾性パッドを交換するときは、まくらぎ周辺の砂利
を取除いて空隙を設けたうえ、まくらぎ側面のインサー
トに螺合する固定ボルトを脱着して簡単な交換作業で迅
速に行なうことができ、コンクリートまくらぎをレール
から取外し、さらに反転させて弾性パッドを取付けると
いう面倒で時間のかかる作業は不要である。
When an elastic pad is attached to a newly installed concrete sleeper, an elastic pad is attached to the back surface of the sleeper at an arbitrary work place before the sleeper is buried on a gravel roadbed. The locking mounting hanger can be fixed to the sleeper via fixing bolts screwed into the side of the sleeper. With this mounting structure, when replacing the elastic pad a few years after embedding the sleeper with the elastic pad on the gravel roadbed, remove the gravel around the sleeper and provide a gap, and Detach the fixing bolts to be screwed into the inserts and quickly replace them with a simple replacement work.The troublesome and time-consuming work of removing the concrete sleepers from the rails, turning them over and mounting the elastic pads is unnecessary. is there.

【0018】[0018]

【発明の実施の形態】以下本発明の実施形態を図を参照
して説明する。図1〜図6は第1実施形態として、既設
のコンクリートまくらぎに弾性パッド14を取付ける取
付け構造例を示す。各図において、まくらぎは、砂利道
床12に敷設されており、コンクリート製のまくらぎ1
3の両端部(図2では一端のみ示す)の裏面15には弾
性パッド14が装着されており、この両端部が砂利道床
12に埋設されている。弾性パッド14は例えば硬度8
0〜95の範囲の材料からなる硬質ゴム層14aと、こ
の上面に装着した上部軟質ゴム層14b及び、その下面
に装着した下部軟質ゴム層(いずれも硬度の低い55〜
70の通常のゴム)14cから構成される。上部軟質ゴ
ム層14bは、粗面であるコンクリートまくらぎ13の
裏面15とのなじみ層として作用させるもので、このな
じみ層としての上部軟質ゴム層14bを存在させること
により、硬質ゴム層14aをコンクリートまくらぎ13
の裏面15に直に接触させるよりも円滑に接触できる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. 1 to 6 show an example of a mounting structure for mounting an elastic pad 14 on an existing concrete sleeper as a first embodiment. In each figure, the sleepers are laid on a gravel roadbed 12 and are made of concrete sleepers 1.
Elastic pads 14 are attached to the back surface 15 of both ends (only one end is shown in FIG. 2) of the 3, and both ends are buried in the gravel roadbed 12. The elastic pad 14 has a hardness of, for example, 8
A hard rubber layer 14a made of a material in the range of 0 to 95, an upper soft rubber layer 14b mounted on the upper surface thereof, and a lower soft rubber layer mounted on the lower surface thereof (each having a low hardness of 55 to 55)
70 normal rubbers) 14c. The upper soft rubber layer 14b functions as a conforming layer with the back surface 15 of the concrete sleeper 13 which is a rough surface, and the presence of the upper soft rubber layer 14b as the conforming layer allows the hard rubber layer 14a to be converted into concrete. Sleeper 13
Can be more smoothly contacted than directly contacting the back surface 15.

【0019】上部軟質ゴム層14bの上面はフラット
(図4に示す)であり、他方下部軟質ゴム層14cの下
面には、砂利との咬み合いをより確実に行なわせるため
に、格子状枠16及び、この格子状枠16で形成される
複数の凹部17とが形成されている。
The upper surface of the upper soft rubber layer 14b is flat (shown in FIG. 4), while the lower surface of the lower soft rubber layer 14c is provided on the lower surface of the lattice-like frame 16 to more reliably engage with the gravel. Further, a plurality of recesses 17 formed by the lattice frame 16 are formed.

【0020】弾性パッド14は、コンクリートまくらぎ
13の端部の所定の範囲における裏面15の形状と相似
となるよう長方形状に設けられており、かつ硬質ゴム層
14aと上部軟質ゴム層14bとの両側縁18には、そ
れぞれ2個所ずつの凹部19を有する翼部20が設けら
れている。
The elastic pad 14 is provided in a rectangular shape so as to be similar to the shape of the back surface 15 in a predetermined range of the end of the concrete sleeper 13, and is formed of a hard rubber layer 14a and an upper soft rubber layer 14b. On both side edges 18, wing portions 20 each having two concave portions 19 are provided.

【0021】図3に示すように、前記硬質ゴム層14a
と上部軟質ゴム層14bの両側縁18は、砂利道床12
の補修時にタンピング装置のタンピングバーが弾性パッ
ド14を傷つけないよう、コンクリートまくらぎ13の
両側下縁21よりも内寄りの位置に設けられており、図
4に示す翼部20の先端縁22がコンクリートまくらぎ
13の両側下縁21とほぼ揃う寸法に設けられている。
また、下部軟質ゴム層14cの両側縁23は、硬質ゴム
層14a及び、上部軟質ゴム層14bの両側縁18より
も内寄りに設けられている。
As shown in FIG. 3, the hard rubber layer 14a
The both side edges 18 of the upper soft rubber layer 14b are
In order to prevent the tamping bar of the tamping device from damaging the elastic pad 14 at the time of repairing, the tip edge 22 of the wing portion 20 shown in FIG. The concrete sleepers 13 are provided with dimensions substantially aligned with the lower edges 21 on both sides.
Further, both side edges 23 of the lower soft rubber layer 14c are provided more inward than both side edges 18 of the hard rubber layer 14a and the upper soft rubber layer 14b.

【0022】前記の弾性パッド14は、コンクリートま
くらぎ13の裏面15に当てがわれ、取付けハンガー2
4によりまくらぎ裏面15に密着保持される。取付けハ
ンガー24は、硬質材で形成され、かつ垂直の起立部2
5と水平係止部26とが段状連接部27を介して接続さ
れて全体で側面略L形に構成される。
The elastic pad 14 is applied to the back surface 15 of the concrete sleeper 13 and is attached to the mounting hanger 2.
4 keeps the sleeper back surface 15 in close contact therewith. The mounting hanger 24 is formed of a hard material and has a vertical upright 2.
5 and the horizontal locking portion 26 are connected via a step-shaped connecting portion 27 to form a substantially L-shaped side surface as a whole.

【0023】取付けハンガー24は、弾性パッド14の
4つの翼部20に配設されるもので、この翼部20の凹
部19に嵌る幅に設けられる。つまり、各図に示される
ように、4つの取付けハンガー24のそれぞれ段状連接
部27が、弾性パッド14における4つの翼部20のそ
れぞれの凹部19に嵌合され、かつ水平係止部26が硬
質ゴム層14aの側縁部18の下面に係止しており、さ
らに、起立部25とコンクリートまくらぎ13の垂直側
面28との間は両面接着テープ29を介して一体的かつ
強固に固着しており、結果として、弾性パッド14は取
付けハンガー24を介して簡易な取付け構造で、コンク
リートまくらぎ13の裏面15に確実に支持される。
The mounting hanger 24 is disposed on the four wings 20 of the elastic pad 14 and is provided with a width that fits into the recess 19 of the wing 20. That is, as shown in each figure, the step-like connecting portions 27 of the four mounting hangers 24 are fitted into the respective concave portions 19 of the four wing portions 20 of the elastic pad 14, and the horizontal locking portions 26 are It is engaged with the lower surface of the side edge portion 18 of the hard rubber layer 14a, and furthermore, the upright portion 25 and the vertical side surface 28 of the concrete sleeper 13 are integrally and firmly fixed via a double-sided adhesive tape 29. As a result, the elastic pad 14 is securely supported on the back surface 15 of the concrete sleeper 13 with a simple mounting structure via the mounting hanger 24.

【0024】第1実施形態における弾性パッドの取付け
構造は、前記の構成からなるので、既設のコンクリート
まくらぎ13に弾性パッド14を取付ける場合は、まく
らぎ周辺の砂利を取除いて空隙を設け、この空隙を利用
してまくらぎ裏面15に弾性パッド14を装着し、この
弾性パッド14を係止する取付けハンガー24を両面接
着テープ29を介してコンクリートまくらぎ13の垂直
側面28に固着し、その後に前記空隙に砂利を埋戻すこ
とにより、レール10にまくらぎを取付けたまま弾性パ
ッド14のコンクリートまくらぎ13への取付け作業は
終了する。なお、コンクリートまくらぎ13の内部に
は、その長手方向に複数本のPCケーブル34が緊張し
て挿入されていて、コンクリートまくらぎの強度が補強
されている。
The mounting structure of the elastic pad according to the first embodiment has the above-mentioned structure. Therefore, when the elastic pad 14 is mounted on the existing concrete sleeper 13, the gravel around the sleeper is removed to provide a gap, The elastic pad 14 is mounted on the back surface 15 of the sleeper using this gap, and the mounting hanger 24 for locking the elastic pad 14 is fixed to the vertical side surface 28 of the concrete sleeper 13 via the double-sided adhesive tape 29. Then, the work for attaching the elastic pad 14 to the concrete sleeper 13 is completed with the sleeper still attached to the rail 10 by backfilling the gravel in the gap. Note that a plurality of PC cables 34 are inserted into the concrete sleeper 13 in the longitudinal direction thereof in a tensioned manner, and the strength of the concrete sleeper is reinforced.

【0025】図7〜図12は第2実施形態として、既設
のコンクリートまくらぎに弾性パッド14を取付ける取
付け構造例を示す。この第2実施形態では、第1実施形
態における両面接着テープ29でコンクリートまくらぎ
13に取付けハンガー24を取付ける取付け手段に加え
て、固定用アンカー35を前記取付けハンガー24の起
立部25に開設の孔34aを貫通してコンクリートまく
らぎ13の側面に穿孔したアンカー嵌入穴37に貫入し
固定している。前記固定用アンカー35は、例えば図1
1、図12に示すように、先端に割り溝36のあるアン
カー筒体35aに拡開用釘35bが打込み代を残して嵌
入された構造のものを使用するとよい。そして、コンク
リートまくらぎ13の側面にドリルでアンカー用の穴3
7を穿孔し、その穴に図11の状態で固定用アンカー3
5を挿入したうえ、拡開用釘35bを打込むことで図1
2に示すように、アンカー筒体35aの拡開先端部35
cが強制的に押拡げられ、固定用アンカー35をその貫
入用の穴37内に緊締できる。前記固定用アンカー35
は、取付けハンガー24の起立部25を挿入してコンク
リートまくらぎ13に1本又は複数本打込む。第2実施
形態におけるその他の構成は第1実施形態と同じである
ので、同等要素には同一符号を付して説明する。第2実
施形態によると、両面接着テープ29に加えて固定用ア
ンカー35を併用するので、取付けハンガー24のコン
クリートまくらぎ13への固着性がより強固となる。
FIGS. 7 to 12 show, as a second embodiment, an example of a mounting structure for mounting the elastic pad 14 on an existing concrete sleeper. In the second embodiment, in addition to the attachment means for attaching the hanger 24 to the concrete sleeper 13 with the double-sided adhesive tape 29 of the first embodiment, a fixing anchor 35 is provided in the upright portion 25 of the attachment hanger 24. It penetrates 34a and penetrates and is fixed in the anchor fitting hole 37 drilled in the side surface of the concrete sleeper 13. The fixing anchor 35 is, for example, as shown in FIG.
1. As shown in FIG. 12, it is preferable to use a structure in which an expanding nail 35b is fitted into an anchor cylindrical body 35a having a split groove 36 at the tip, leaving a driving allowance. Then, drill holes 3 for anchors on the side of the concrete sleeper 13 with a drill.
7 and the fixing anchor 3 is inserted into the hole as shown in FIG.
5 is inserted, and the expanding nail 35b is driven in, as shown in FIG.
As shown in FIG. 2, the expanded distal end portion 35 of the anchor cylinder 35a
c is forcibly expanded so that the anchor 35 can be tightened into its penetrating hole 37. The fixing anchor 35
Is inserted into the concrete sleeper 13 by inserting one or more standing portions 25 of the mounting hanger 24. Other configurations in the second embodiment are the same as those in the first embodiment, and therefore, the same elements will be described with the same reference numerals. According to the second embodiment, since the fixing anchor 35 is used in addition to the double-sided adhesive tape 29, the fixing property of the mounting hanger 24 to the concrete sleeper 13 is further enhanced.

【0026】図13〜図17には第3実施形態として、
新設のコンクリートまくらぎに弾性パッドを取付ける取
付け構造例を示す。この第3実施形態では、第1,第2
実施形態と異なり、コンクリートまくらぎ13をレール
10に取付けて砂利道床12に埋設する以前のまくらぎ
作成段階で、弾性パッド14をコンクリートまくらぎ1
3の裏面15に配設する場合における、取付けハンガー
24のコンクリートまくらぎ13への固定構造に特徴が
あり、この固定構造が第1,第2実施形態と相違してい
る。
FIGS. 13 to 17 show a third embodiment.
An example of an attachment structure for attaching an elastic pad to a newly installed concrete sleeper is shown. In the third embodiment, the first and second
Unlike the embodiment, the elastic pad 14 is attached to the concrete sleeper 1 in a sleeper making stage before the concrete sleeper 13 is attached to the rail 10 and buried in the gravel roadbed 12.
The third embodiment is characterized in a structure for fixing the mounting hanger 24 to the concrete sleeper 13 in the case of disposing the mounting hanger 24 on the back surface 15, and this fixing structure is different from the first and second embodiments.

【0027】第1実施例形態では、既設のコンクリート
まくらぎ13に、弾性パッド14支持用の取付けハンガ
ー24を固定するためのボルト螺合用のインサートを埋
設する作業は容易でないことに鑑みて、ボルトを使用し
ないで、両面接着テープ29を使用した。これに対し、
第3実施形態では、弾性パッド14を、砂利道床12に
埋設する以前のコンクリートまくらぎ13を作成する段
階で、このまくらぎに固着するので、弾性パッド14を
固定するためのボルト螺合用のインサート30をコンク
リートまくらぎ13の成型時に一緒に行なえば前述のよ
うな問題がない。
In the first embodiment, in view of the fact that it is not easy to embed a bolt screwing insert for fixing the mounting hanger 24 for supporting the elastic pad 14 to the existing concrete sleeper 13, it is not easy. Was used, and the double-sided adhesive tape 29 was used. In contrast,
In the third embodiment, the elastic pad 14 is fixed to the sleeper at the stage of forming the concrete sleeper 13 before it is buried in the gravel roadbed 12, so the bolt screwing insert for fixing the elastic pad 14 is fixed. If the steps 30 are carried out together with the molding of the concrete sleeper 13, there is no problem as described above.

【0028】そこで、第3実施形態では、第1実施形態
で示された両面接着テープ29によるコンクリートまく
らぎ13への取付けハンガー24の取付け手段に代え
て、コンクリートまくらぎ13の成型時に、まくらぎの
垂直側面28の4個所にインサート30を埋設し、一
方、取付けハンガー24の起立部25にボルト孔31を
開設する。そして、前記起立部25のボルト孔31に固
定ボルト32を挿入し、この固定ボルト32を、コンク
リートまくらぎ13に埋設のインサート30のネジ部に
螺合することで、取付けハンガー24はコンクリートま
くらぎ13に固定され、弾性パッド14は取付けハンガ
ー24を介してコンクリートまくらぎ13の裏面15に
保持される。
Therefore, in the third embodiment, instead of the means for attaching the hanger 24 to the concrete sleeper 13 by the double-sided adhesive tape 29 shown in the first embodiment, when the concrete sleeper 13 is molded, Inserts 30 are buried in four places on the vertical side surface 28, while bolt holes 31 are formed in the upright portions 25 of the mounting hanger 24. Then, the fixing hanger 32 is inserted into the bolt hole 31 of the upright portion 25, and the fixing hanger 32 is screwed into a screw portion of the insert 30 embedded in the concrete sleeper 13, so that the mounting hanger 24 is connected to the concrete sleeper. The elastic pad 14 is fixed to the rear surface 15 of the concrete sleeper 13 via a mounting hanger 24.

【0029】また、第3実施形態では、インサート30
の埋設部を取囲んでコンクリートまくらぎ13の垂直側
面28に凹部33が形成されており、取付けハンガー2
4をまくらぎに固定するボルト32は、まくらぎの垂直
側面28から出張らず、さらに、弾性パッド14の両側
縁18も、まくらぎの両側下縁21よりも内側に寄って
いるので、コンクリートまくらぎの側面から外方に出張
るものはない。それ故、タンピング装置を用いて、砂利
道床12の隙間が詰まったバラストを突き戻すと共に、
まくらぎの側方に逃げたこのバラストをまくらぎの下方
に戻す作業を行なうとき、タンピングバーが前記固定ボ
ルト32や弾性パッド14を傷つけないで円滑に作業で
きる。なお、第2実施形態では図10に示すように、弾
性パッド14の側縁部18に翼部は有しておらず、この
側縁部18に直に凹部19aが図示の配置で設けられて
おり、この凹部19aに取付けハンガー24の段状連接
部27が嵌合するように設けられている。
In the third embodiment, the insert 30
A recess 33 is formed in the vertical side surface 28 of the concrete sleeper 13 surrounding the buried portion of the mounting hanger 2.
The bolts 32 for fixing the sleepers 4 to the sleepers do not travel from the vertical side surfaces 28 of the sleepers, and the side edges 18 of the elastic pad 14 are also closer to the inside than the lower edges 21 of the sleepers. Nothing goes outside from the side. Therefore, using a tamping device, the ballast in which the gap in the gravel roadbed 12 is clogged back is pushed back,
When the ballast that has escaped to the side of the sleeper is returned to the lower side of the sleeper, the tamping bar can work smoothly without damaging the fixing bolt 32 or the elastic pad 14. In the second embodiment, as shown in FIG. 10, the elastic pad 14 does not have a wing portion at the side edge portion 18, and a concave portion 19a is provided directly on the side edge portion 18 in the arrangement shown. The stepped connecting portion 27 of the mounting hanger 24 is provided so as to fit into the concave portion 19a.

【0030】第3実施形態に係るコンクリートまくらぎ
用弾性パッドの取付構造は、前記の構成からなるので、
所定の作業場所においてコンクリートまくらぎ13の裏
面15に弾性パッド14を配設し、固定ボルト32をイ
ンサート30に螺合して、取付けハンガー24をコンク
リートまくらぎ13に固定したうえ、コンクリートまく
らぎ13を砂利道床12に埋設して作業が終了し、この
ようにまくらぎに弾性パッド14を簡易な構造で迅速に
取付けることができる。
The structure for mounting the elastic pad for concrete sleepers according to the third embodiment has the above-described structure.
At a predetermined work place, an elastic pad 14 is provided on the back surface 15 of the concrete sleeper 13, a fixing bolt 32 is screwed into the insert 30, and the mounting hanger 24 is fixed to the concrete sleeper 13. The work is completed by burying the elastic pad 14 in the gravel roadbed 12, and the elastic pad 14 can be quickly attached to the sleeper with a simple structure.

【0031】また、第3実施形態に係る弾性パッド付き
まくらぎを砂利道床に埋設して数年が経過した後、弾性
パッド14を交換するときは、まくらぎ周辺の砂利を取
除いて空隙を設けたうえ、まくらぎ側面に螺合する固定
ボルト32を脱着して簡単な交換作業で迅速に行なうこ
とができ、従来のようにコンクリートまくらぎをレール
から取外し、さらに反転させて弾性パッドを取付けると
いう面倒で時間のかかる作業は不要である。
Further, when the sleeper with the elastic pad according to the third embodiment is buried in the gravel roadbed and several years have passed, when the elastic pad 14 is replaced, the gravel around the sleeper is removed and the gap is removed. In addition, the fixing bolt 32 to be screwed to the side of the sleeper can be attached and detached, and it can be quickly performed by a simple exchange work. The concrete sleeper is removed from the rail as in the conventional case, and the elastic sleeper is turned over and the elastic pad is attached. The troublesome and time-consuming work that is required is unnecessary.

【0032】[0032]

【発明の効果】以上説明したように、本発明によると、
既設のコンクリートまくらぎに弾性パッドを取付ける場
合は、まくらぎ周辺の砂利を取除いて空隙を設け、この
空隙を介してレールが取付けてあるコンクリートまくら
ぎの裏面に弾性パッドを配設して、取付けハンガーによ
って弾性パッドを係止し、かつ両面接着テープを介して
または、この両面接着テープ固定用アンカーとを介して
この取付けハンガーをコンクリートまくらぎに固着する
ことで、前記弾性パッドをコンクリートまくらぎの裏面
に確実に保持できるので、従来のようにコンクリートま
くらぎをレールから脱着して弾性パッドを取付けるとい
う面倒で手間のかかる取付け作業が不要であり、少ない
作業者で短時間で迅速に取付け作業を行なうことがで
き、弾性パッドの取付けに要するコストを低減できると
いう効果がある。
As described above, according to the present invention,
When attaching an elastic pad to an existing concrete sleeper, remove the gravel around the sleeper and provide a gap, and place an elastic pad on the back of the concrete sleeper on which the rail is attached through this gap, and attach it. The elastic pad is fixed to the concrete sleeper by locking the elastic pad with a hanger and through a double-sided adhesive tape or through an anchor for fixing the double-sided adhesive tape, thereby connecting the elastic pad to the back of the concrete sleeper. , Which eliminates the need for the laborious and troublesome installation work of attaching and detaching the elastic sleeper by attaching and detaching the concrete sleepers from the rails as in the past, and quickly and quickly by a small number of workers. Therefore, there is an effect that the cost required for attaching the elastic pad can be reduced.

【0033】また、新設のコンクリートまくらぎに本発
明の弾性パッドを取付ける構造にあっては、この弾性パ
ッドをコンクリートまくらぎの裏面に配設し、取付けハ
ンガーで係止したうえ、この取付けハンガーをコンクリ
ートまくらぎに埋設のインサートに固定ボルトを螺合す
ることによってコンクリートまくらぎに弾性パッドを保
持できるので、その取付け構造が従来のこの種の弾性パ
ッド取付け構造に比べて簡潔であり、かつ、後年弾性パ
ッドを取替える際には、コンクリートまくらぎ周辺の砂
利を取除いて空隙を作り、固定ボルトをまくらぎ側面の
インサートから離脱し、取付けハンガーをまくらぎから
取外すことで簡単に弾性パッドを取替えることができ、
この場合も、コンクリートまくらぎをレールに取付けた
ままで、パッド交換作業を行なうことができるので、そ
の交換作業を従来に比べ迅速かつ容易に行なうことがで
き、その交換作業に要するコストを低減できるという効
果がある。
In the structure for attaching the elastic pad of the present invention to a newly installed concrete sleeper, the elastic pad is disposed on the back surface of the concrete sleeper, and is locked by a mounting hanger. Since the elastic pad can be held on the concrete sleeper by screwing the fixing bolt to the insert embedded in the sleeper, the mounting structure is simpler than the conventional elastic pad mounting structure of this kind, and When replacing the elastic pad, remove the gravel around the concrete sleeper to create a gap, remove the fixing bolt from the insert on the side of the sleeper, and easily replace the elastic pad by removing the mounting hanger from the sleeper Can be
Also in this case, pad replacement can be performed while the concrete sleeper is attached to the rail, so that the replacement can be performed more quickly and easily than before, and the cost required for the replacement can be reduced. effective.

【図面の簡単な説明】[Brief description of the drawings]

【図1】第1実施形態に係るコンクリートまくらぎ用弾
性パッドの取付け構造を示す図2のA−A断面図であ
る。
FIG. 1 is a cross-sectional view taken along the line AA of FIG. 2, showing a mounting structure of a concrete sleeper elastic pad according to a first embodiment.

【図2】図1の側面図である。FIG. 2 is a side view of FIG.

【図3】図1の要部拡大図である。FIG. 3 is an enlarged view of a main part of FIG. 1;

【図4】(A)は図1に示す弾性パッドの平面図、
(B)は弾性パッドの正面図である。
FIG. 4A is a plan view of the elastic pad shown in FIG. 1,
(B) is a front view of the elastic pad.

【図5】(A)は図1に示す弾性パッドの底面図、
(B)は図4のB−B断面図、(C)は図5(A)のC
−C断面詳細図である。
FIG. 5A is a bottom view of the elastic pad shown in FIG. 1,
FIG. 5B is a cross-sectional view taken along the line BB of FIG. 4, and FIG.
FIG. 4 is a detailed cross-sectional view of FIG.

【図6】(A)、(B)、(C)は、取付けハンガーの
平面図と正面図と側面図である。
FIGS. 6A, 6B, and 6C are a plan view, a front view, and a side view of a mounting hanger.

【図7】第2実施形態に係るコンクリートまくらぎ用弾
性パッドの取付け構造を示す図8のD−D断面図であ
る。
FIG. 7 is a sectional view taken along the line DD in FIG. 8 showing a mounting structure of the elastic pad for concrete sleepers according to the second embodiment.

【図8】図7の側面図である。FIG. 8 is a side view of FIG. 7;

【図9】図7の要部拡大図である。FIG. 9 is an enlarged view of a main part of FIG. 7;

【図10】(A)は取付けハンガーの平面図、(B)は
取付けハンガーの正面図、(C)は側面図である。
10A is a plan view of a mounting hanger, FIG. 10B is a front view of the mounting hanger, and FIG. 10C is a side view.

【図11】固定用アンカーの非拡開時の正面図である。FIG. 11 is a front view of the fixing anchor when it is not expanded.

【図12】固定用アンカーの拡開時の正面図である。FIG. 12 is a front view when the fixing anchor is expanded.

【図13】第3実施形態に係るコンクリートまくらぎ用
弾性パッドの取付け構造を示す図14のE−E断面図で
ある。
FIG. 13 is a cross-sectional view taken along the line EE of FIG. 14 showing a mounting structure of the elastic pad for concrete sleepers according to the third embodiment.

【図14】図13の側面図である。FIG. 14 is a side view of FIG.

【図15】図13の要部拡大図である。FIG. 15 is an enlarged view of a main part of FIG.

【図16】(A)は図13に示す弾性パッドの平面図、
(B)は弾性パッドの正面図である。
FIG. 16A is a plan view of the elastic pad shown in FIG. 13;
(B) is a front view of the elastic pad.

【図17】(A)は前記弾性パッドの底面図、(B)は
図16のF−F断面図、(C)は図17(A)のG−G
断面詳細図である。
17A is a bottom view of the elastic pad, FIG. 17B is a sectional view taken along line FF of FIG. 16, and FIG. 17C is a line GG of FIG. 17A.
It is a detailed sectional view.

【図18】(A)は従来例に係るコンクリートまくらぎ
用弾性パッドの取付け構造を示す正面説明図、同図
(B)は同図(A)の側面図、同図(C)は同図(A)
の底面図である。
18A is an explanatory front view showing a mounting structure of an elastic pad for a concrete sleeper according to a conventional example, FIG. 18B is a side view of FIG. 18A, and FIG. (A)
FIG.

【図19】図18(H)部におけるインサート部の拡大
断面図である。
FIG. 19 is an enlarged cross-sectional view of the insert section in FIG.

【図20】(A)、(B)は端部用弾性パッドの底面図
と側面図である。
FIGS. 20A and 20B are a bottom view and a side view of an end elastic pad.

【図21】(A)、(B)は中間部用弾性パッドの底面
図と側面図である。
21 (A) and (B) are a bottom view and a side view of an intermediate portion elastic pad.

【符号の説明】[Explanation of symbols]

1 コンクリートまくらぎ 2 裏面 3 割り溝 4 アンカーナット 5 クサビ 6 緩衝用溝 7 弾性パッド 8 ボルト孔 9 固定ボルト 10 レール 11 固定金具 12 砂利道床 13 コンクリートまくらぎ 14 弾性パッド 14a 硬質ゴム層 14b 上部軟質ゴム層 14c 下部軟質ゴム層 15 裏面 16 格子状枠 17 凹部 18 両側縁 19 凹部 20 翼部 21 まくらぎ両側下縁 22 先端縁 23 両側縁 24 取付けハンガー 25 起立部 26 水平係止部 27 段状連設部 28 垂直側面 29 両面接着テープ 30 インサート 31 ボルト孔 32 固定ボルト 33 まくらぎ凹部 34 孔 35 固定用アンカー 36 割り溝 37 アンカー嵌入孔 DESCRIPTION OF SYMBOLS 1 Concrete sleeper 2 Back surface 3 Split groove 4 Anchor nut 5 Wedge 6 Buffer groove 7 Elastic pad 8 Bolt hole 9 Fixing bolt 10 Rail 11 Fixing bracket 12 Gravel roadbed 13 Concrete sleeper 14 Elastic pad 14a Hard rubber layer 14b Upper soft rubber Layer 14c Lower soft rubber layer 15 Back surface 16 Lattice frame 17 Depression 18 Side edges 19 Depression 20 Wings 21 Sleeper lower edges 22 Front edge 23 Side edges 24 Mounting hanger 25 Upright portion 26 Horizontal locking portion 27 Step-like connection 27 Part 28 Vertical side surface 29 Double-sided adhesive tape 30 Insert 31 Bolt hole 32 Fixing bolt 33 Sleeper recess 34 Hole 35 Fixing anchor 36 Split groove 37 Anchor insertion hole

Claims (7)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 硬質ゴム層と、その上下両面またはその
いずれか片面に装着した軟質ゴム層とからなる弾性パッ
ドをコンクリートまくらぎの裏面に当てがい、硬質材か
らなる取付けハンガーを前記弾性パッドの翼部に係合さ
せると共に、この取付けハンガーの水平係止部で前記弾
性パッドの側部を係止し、取付けハンガーの起立部側面
と前記コンクリートまくらぎの側面とを両面接着テープ
で固着することを特徴とするコンクリートまくらぎ用弾
性パッドの取付構造。
1. An elastic pad comprising a hard rubber layer and a soft rubber layer attached to both upper and lower surfaces or one of the two surfaces is applied to the back surface of a concrete sleeper, and a mounting hanger made of a hard material is attached to a wing of the elastic pad. And a side portion of the elastic pad is locked by a horizontal locking portion of the mounting hanger, and a side surface of the upright portion of the mounting hanger and a side surface of the concrete sleeper are fixed with double-sided adhesive tape. Mounting structure of elastic pad for concrete sleepers.
【請求項2】 硬質ゴム層と、その上下両面またはその
いずれか片面に装着した軟質ゴム層とからなる弾性パッ
ドをコンクリートまくらぎの裏面に当てがい、硬質材か
らなる取付けハンガーを前記弾性パッドの翼部に係合さ
せると共に、この取付けハンガーの水平係止部で前記弾
性パッドの側部を係止し、取付けハンガーの起立部側面
と前記コンクリートまくらぎの側面とを両面接着テープ
で固着し、前記取付けハンガーの起立部を貫通して固定
用アンカーを前記コンクリートまくらぎに貫入すること
を特徴とするコンクリートまくらぎ用弾性パッドの取付
構造。
2. An elastic pad comprising a hard rubber layer and a soft rubber layer mounted on both upper and lower surfaces or one of the two surfaces is applied to the back surface of a concrete sleeper, and a mounting hanger made of a hard material is attached to a wing of the elastic pad. And the horizontal portion of the mounting hanger locks the side portion of the elastic pad, and the upright side of the mounting hanger and the side of the concrete sleeper are fixed with double-sided adhesive tape. A mounting structure for an elastic pad for a concrete sleeper, wherein a fixing anchor penetrates the concrete sleeper by penetrating an upright portion of a hanger.
【請求項3】 硬質ゴム層と、その上下両面またはその
いずれか片面に装着した軟質ゴム層とからなる弾性パッ
ドをコンクリートまくらぎの裏面に当てがい、硬質材か
らなる取付けハンガーの水平係止部で前記弾性パッドの
側部を係止し、取付けハンガーの起立部に開設したボル
ト孔に固定ボルトを挿入し、この固定ボルトを、コンク
リートまくらぎに埋設のインサートのネジ部に螺合する
ことを特徴とするコンクリートまくらぎ用弾性パッドの
取付構造。
3. An elastic pad comprising a hard rubber layer and a soft rubber layer attached to both upper and lower surfaces or one of the upper surface and the lower surface is applied to the back surface of the concrete sleeper. The side portion of the elastic pad is locked, a fixing bolt is inserted into a bolt hole formed in an upright portion of the mounting hanger, and the fixing bolt is screwed into a screw portion of an insert embedded in a concrete sleeper. Mounting structure of elastic pad for concrete sleepers.
【請求項4】 前記弾性パッドにおいて、硬質ゴム層と
その上下部の軟質ゴム層の両側縁は、コンクリートまく
らぎの両側下縁よりも内寄りに設けられると共に、前記
硬質ゴム層と上部軟質ゴム層の両側縁には、前記取付け
ハンガーの水平係止部と起立部とを結ぶ段部連接部が嵌
合する凹部を有した翼部が設けられていることを特徴と
する請求項1ないし3のいずれかに記載のコンクリート
まくらぎ用弾性パッドの取付構造。
4. In the elastic pad, both side edges of the hard rubber layer and the soft rubber layers above and below the hard rubber layer are provided more inward than both lower edges of the concrete sleeper, and the hard rubber layer and the upper soft rubber layer are provided. 4. A wing portion having a concave portion in which a step connecting portion connecting a horizontal locking portion and an upright portion of the mounting hanger is fitted on both side edges of the mounting hanger. A mounting structure for the elastic pad for concrete sleepers according to any one of the above.
【請求項5】 レールを支持し、砂利道床に埋設されて
いる既設のコンクリートまくらぎの周辺の砂利を除去し
たうえ、前記コンクリートまくらぎの裏面に、硬質ゴム
層と、その上下両面またはそのいずれか片面に装着した
軟質ゴム層とからなる弾性パッドを当てがったうえ、硬
質材からなる取付けハンガーの水平係止部で前記弾性パ
ッドの側部を係止し、取付けハンガーの起立部側面と前
記コンクリートまくらぎの側面とを両面接着テープで固
着することを特徴とするコンクリートまくらぎ用弾性パ
ッドの取付方法。
5. A method for supporting a rail, removing gravel around an existing concrete sleeper buried in a gravel roadbed, and forming a hard rubber layer on the back surface of the concrete sleeper and both upper and lower surfaces or one of the surfaces. An elastic pad made of a soft rubber layer mounted on the elastic pad is applied thereto, and a side portion of the elastic pad is locked by a horizontal locking portion of a mounting hanger made of a hard material. A method of mounting an elastic pad for a concrete sleeper, wherein the side of the sleeper is fixed to the side with an adhesive tape.
【請求項6】 レールを支持し、砂利道床に埋設されて
いる既設のコンクリートまくらぎの周辺の砂利を除去し
たうえ、前記コンクリートまくらぎの裏面に、硬質ゴム
層と、その上下両面またはそのいずれか片面に装着した
軟質ゴム層とからなる弾性パッドを当てがったうえ、硬
質材からなる取付けハンガーの水平係止部で前記弾性パ
ッドの側部を係止し、取付けハンガーの起立部側面と前
記コンクリートまくらぎの側面とを両面接着テープで固
着し、前記取付けハンガーの起立部を貫通して固定用ア
ンカーを前記コンクリートまくらぎに貫入することを特
徴とするコンクリートまくらぎ用弾性パッドの取付方
法。
6. A rail is supported to remove gravel around an existing concrete sleeper buried in a gravel roadbed, and a hard rubber layer is formed on the back surface of the concrete sleeper and both upper and lower surfaces or one of the two surfaces An elastic pad made of a soft rubber layer mounted on the elastic pad is applied thereto, and a side portion of the elastic pad is locked by a horizontal locking portion of a mounting hanger made of a hard material. A method for attaching an elastic pad for a concrete sleeper, comprising fixing a side surface of the sleeper with a double-sided adhesive tape, and penetrating a standing anchor of the mounting hanger and penetrating a fixing anchor into the concrete sleeper.
【請求項7】 レールを支持し、砂利道床に埋設されて
いる既設のコンクリートまくらぎの周辺の砂利を除去し
たうえ、前記コンクリートまくらぎの裏面に、硬質ゴム
層と、その上下両面またはそのいずれか片面に装着した
軟質ゴム層とからなる弾性パッドを当てがったうえ、硬
質材からなる取付けハンガーの水平係止部で前記弾性パ
ッドの側部を係止し、取付けハンガーの起立部に開設し
たボルト孔に固定ボルトを挿入し、この固定ボルトを、
コンクリートまくらぎに埋設のインサートのネジ部に螺
合することを特徴とするコンクリートまくらぎ用弾性パ
ッドの取付方法。
7. A rail is supported to remove gravel around an existing concrete sleeper buried in a gravel roadbed, and a hard rubber layer and upper and lower surfaces or one or both surfaces are provided on the back surface of the concrete sleeper. An elastic pad made of a soft rubber layer attached to the mounting pad is applied, and the side part of the elastic pad is locked by a horizontal locking part of a mounting hanger made of a hard material. Insert the fixing bolt into the hole,
A method of mounting an elastic pad for a concrete sleeper, wherein the elastic pad is screwed into a thread portion of an insert embedded in the concrete sleeper.
JP9235484A 1997-08-18 1997-08-18 Mounting structure and mounting method of elastic pad for concrete sleepers Expired - Lifetime JP3068803B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9235484A JP3068803B2 (en) 1997-08-18 1997-08-18 Mounting structure and mounting method of elastic pad for concrete sleepers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9235484A JP3068803B2 (en) 1997-08-18 1997-08-18 Mounting structure and mounting method of elastic pad for concrete sleepers

Publications (2)

Publication Number Publication Date
JPH1161701A JPH1161701A (en) 1999-03-05
JP3068803B2 true JP3068803B2 (en) 2000-07-24

Family

ID=16986751

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9235484A Expired - Lifetime JP3068803B2 (en) 1997-08-18 1997-08-18 Mounting structure and mounting method of elastic pad for concrete sleepers

Country Status (1)

Country Link
JP (1) JP3068803B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037349A (en) * 2004-07-22 2006-02-09 Getzner Werkstoffe Holding Gmbh Sleeper
DE102006015950A1 (en) * 2006-04-05 2007-10-11 Robel Bahnbaumaschinen Gmbh Device and method for renewing intermediate layers of a track
CN101967778A (en) * 2010-10-19 2011-02-09 北京交通大学 Rubber elastic shoes for sleeper
CN107269021A (en) * 2017-07-19 2017-10-20 深圳大学 The power consumption auxiliary cushion block and reinforcement means of Shear Strengthening are carried out to concrete component

Also Published As

Publication number Publication date
JPH1161701A (en) 1999-03-05

Similar Documents

Publication Publication Date Title
US5538182A (en) Railroad crossing system
JP3068803B2 (en) Mounting structure and mounting method of elastic pad for concrete sleepers
US6431462B1 (en) Railroad crossing spacers
KR20110020526A (en) Expansion joint for railroad bridges and this construction technique
JP2008143265A (en) Insulation cover for power supply rail of railroad vehicle using third track system, and its fixing method
JP2928745B2 (en) Installation structure of directly connected pillows and installation method of directly connected pillows
JP3615678B2 (en) Sleeper anti-vibration device
CN1149316C (en) Support for supporting rail of railway
KR20030065897A (en) Structure of concrete ballast track and construction method thereof
JPH0538086Y2 (en)
JP4723282B2 (en) Derailment prevention guard
JP6944892B2 (en) Track structure and track construction method
JP2618710B2 (en) Anti-vibration device for sleepers in tracked track
JP2859188B2 (en) Sleeper elastic bearing
KR200410824Y1 (en) Railway installation structure for tenderness ground
JP3926026B2 (en) Anchor fixed track structure and anchor fixed sleeper
JP6530439B2 (en) Orbital structure
KR200322061Y1 (en) section steel for fixing a railroad tie
KR200342625Y1 (en) Improved bolt be bearable impact
CN214798754U (en) Track plate cable clamp
JPH09316809A (en) Crossing subgrade plate and rail spliced member
JP3349912B2 (en) Rail buckling prevention device
KR100599523B1 (en) Joint coupling device and it's installation method for railroad rail cutting part emergency restoration
KR200348056Y1 (en) Joint coupling device for railroad rail cutting part emergency restoration
JP2978764B2 (en) Sleeper anti-vibration box and its installation method