JP3059601U - Jig for connecting pipes - Google Patents

Jig for connecting pipes

Info

Publication number
JP3059601U
JP3059601U JP1998009591U JP959198U JP3059601U JP 3059601 U JP3059601 U JP 3059601U JP 1998009591 U JP1998009591 U JP 1998009591U JP 959198 U JP959198 U JP 959198U JP 3059601 U JP3059601 U JP 3059601U
Authority
JP
Japan
Prior art keywords
arm
pipe
discharging pipe
rear end
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1998009591U
Other languages
Japanese (ja)
Inventor
義貞 田中
武男 桜木
Original Assignee
近畿通信建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 近畿通信建設株式会社 filed Critical 近畿通信建設株式会社
Priority to JP1998009591U priority Critical patent/JP3059601U/en
Application granted granted Critical
Publication of JP3059601U publication Critical patent/JP3059601U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(57)【要約】 【課題】 推進工法において、作業坑に臨む既設の第1
排土管の後端に新設の第2排土管の前端が手軽に差し込
み接続できるようにする。 【解決手段】 前後に対向する第1腕21と第2腕22
とを有する。第1腕21は既設の第1排土管5aの後端
部を把持する。第2腕22は新設の第2排土管5bの前
端部を把持する。第1腕21と第2腕22とは倍力リン
ク機構26で連結されている。操作ハンドル25を揺動
操作すると、第2腕22が第1腕21側に接近移動す
る。これで第1排土管5aの後端内部の差し込み口9に
第2排土管5bの前端が差し込み接続できる。
(57) [Summary] [Problem] In the propulsion method, the first existing one facing the work pit
The front end of the newly installed second discharge pipe is easily inserted and connected to the rear end of the discharge pipe. A first arm and a second arm facing each other are provided.
And The first arm 21 grips the rear end of the existing first discharging pipe 5a. The second arm 22 grips the front end of the newly provided second discharging pipe 5b. The first arm 21 and the second arm 22 are connected by a boost link mechanism 26. When the operation handle 25 is swung, the second arm 22 moves closer to the first arm 21 side. Thus, the front end of the second discharge pipe 5b can be inserted and connected to the insertion port 9 inside the rear end of the first discharge pipe 5a.

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

本考案は、二つの管の端どうしを接続する際に用いる接続用治具に関する。と くに、光ケーブルなどを通す通線管を地中に埋設する分野において、地中に推進 管を継ぎ足しながら推進する際に、推進管内に通して掘削土を外に排出する排土 管も順次継ぎ足して行くが、この排土管どうしの接続時に用いて好適なものであ る。 The present invention relates to a connecting jig used for connecting two pipe ends. Especially in the field of burying conduits for passing optical cables etc. underground, when propulsion is performed while extending propulsion pipes underground, excavation pipes that discharge excavated soil through the propulsion pipes are added sequentially. However, it is suitable for use when connecting the discharge pipes.

【0002】[0002]

【従来の技術】[Prior art]

地中に通線管を通すには、図2に示すごとく、先端の掘削機3に推進管4を順 に継ぎ足しながら掘り進める。その際に、作業坑1内で推進管4と排土管5とを 継ぎ足す作業が行われる。排土管5は既設の推進管4に通して、泥化させた先端 の掘削土を地上に排出するためのものである。なお、通線管は継ぎ足し連結した 推進管4内に通して敷設される。 この排土管5の接続に際し、従来方式では、図9に示すごとく一人の作業者が 作業坑1に臨む既設の第1排土管5aの後端に新設の第2排土管5bの前端を対 向状に位置合わせし、他の作業者がバール55の類で第2排土管5bの後端を前 方に押して第1排土管5aの後端内部に第2排土管5bの前端を差し込む。その 後に、両排土管5a・5bどうしを継手10で接続していた。 As shown in FIG. 2, the excavator 3 is excavated while sequentially adding the propulsion pipe 4 to the excavator 3 at the tip, in order to pass the conduit through the ground. At that time, the work of adding the propulsion pipe 4 and the discharge pipe 5 in the work pit 1 is performed. The discharge pipe 5 is for discharging the excavated soil at the tip of the mud to the ground through the existing propulsion pipe 4. The conduit will be laid through the propulsion pipe 4 which is connected and extended. In the conventional method, one worker faces the rear end of the existing first discharge pipe 5a facing the work pit 1 with the front end of the newly-installed second discharge pipe 5b as shown in FIG. Then, another worker pushes the rear end of the second discharging pipe 5b forward with a burl 55 and inserts the front end of the second discharging pipe 5b into the rear end of the first discharging pipe 5a. After that, the two discharge pipes 5a and 5b were connected with the joint 10.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the invention]

しかし、両排土管5a・5bの差し込み接続作業は、作業坑1内における作業 空間が狭くて作業が困難であり、何よりも作業者が少なくとも二名同時に作業を しなければならず、人手を要するところに問題があった。 そこで本考案の目的は、比較的重量のある管どうし、とくに前述の排土管どう しが人手を要さずに、しかも手軽に突き合わせ接続できる接続用治具を得るにあ る。 However, the work of inserting and connecting the two discharge pipes 5a and 5b is difficult because the work space in the work pit 1 is narrow, and at least two workers must work at the same time, which requires labor. Had a problem. Therefore, an object of the present invention is to obtain a connection jig which allows relatively heavy pipes, especially the above-mentioned discharge pipes, to be easily and butt-connected without requiring any manpower.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

請求項1記載の本考案は、第1管5aと第2管5bとを接続するために、両管 5a・5bの端どうしを突き合わせる接続用治具であって、第1管5aの端部を 把持する第1腕21と、第2管5bの端部を把持する第2腕22とを有する。こ れら第1腕21と第2腕22とは、対向状に配置されて遠近移動自在に連結され ており、第1腕21と第2腕22との間に、第1腕21に対して第2腕22を接 近移動させるための倍力リンク機構26を備えており、倍力リンク機構26を作 動させるために、揺動操作される操作ハンドル25を有する。ここでの第1管5 aは図示例の第1排土管5aに代表されるものであり、第2管5bは図示例の第 2排土管5bに代表されるものであるが、適用対象はこれら排土管に限定されな い。第1管5aと第2管5bを単に突き合わせて溶接する際などにも用いること ができる。 The present invention according to claim 1 is a connecting jig for joining the ends of both pipes 5a and 5b to connect the first pipe 5a and the second pipe 5b, and the end of the first pipe 5a. It has a first arm 21 for gripping the part and a second arm 22 for gripping the end of the second tube 5b. The first arm 21 and the second arm 22 are arranged to face each other and are connected to each other so as to be movable in a distance direction, and are disposed between the first arm 21 and the second arm 22 with respect to the first arm 21. The power steering apparatus further includes a boost link mechanism 26 for moving the second arm 22 closer to and from the front, and has an operating handle 25 that is swingably operated to operate the boost link mechanism 26. Here, the first pipe 5a is represented by the first discharging pipe 5a in the illustrated example, and the second pipe 5b is represented by the second discharging pipe 5b in the illustrated example. It is not limited to these drain pipes. It can also be used when the first pipe 5a and the second pipe 5b are simply butted and welded.

【0005】 請求項2記載の本考案は、図2に示すごとく作業坑1内において、地中の推進 管4に通した既設の第1排土管5aの後端に、新設の第2排土管5bの前端を差 し込み接続するための接続用治具であって、第1排土管5aの後端部を把持する 第1腕21と、第2排土管5bの前端部を把持する第2腕22とを有する。これ ら第1腕21と第2腕22とは、図1に示すごとく前後に対向状に配置されて、 前後方向にのみ遠近移動自在に連結されており、第1腕21と第2腕22との間 に、第1腕21に対して第2腕22を接近移動させるための倍力リンク機構26 を備えており、倍力リンク機構26を作動させるために、前後方向に揺動操作さ れる操作ハンドル25を有する。この場合、第1排土管5aの後端内部に、第2 排土管5bの前端が内嵌する差し込み接続でもよいし、第1排土管5aの後端に 第2排土管5bの前端が外嵌する差し込み接続方式でもよい。According to the present invention, as shown in FIG. 2, a new second discharging pipe is provided at the rear end of an existing first discharging pipe 5 a passing through an underground propulsion pipe 4 in a working pit 1. A connection jig for inserting and connecting the front end of the first discharge pipe 5b, a first arm 21 for holding the rear end of the first discharge pipe 5a, and a second arm for holding the front end of the second discharge pipe 5b. And an arm 22. As shown in FIG. 1, the first arm 21 and the second arm 22 are disposed so as to be opposed to each other in the front-rear direction, and are connected so as to be movable only in the front-rear direction. And a booster link mechanism 26 for moving the second arm 22 closer to the first arm 21. In order to operate the booster link mechanism 26, a swing operation is performed in the front-rear direction. Operation handle 25 to be operated. In this case, a plug-in connection in which the front end of the second discharge pipe 5b is fitted inside the rear end of the first discharge pipe 5a, or the front end of the second discharge pipe 5b is fitted externally to the rear end of the first discharge pipe 5a. Plug-in connection method.

【0006】 請求項3記載の本考案は、図2に示すごとく地中の推進管4に通されて後端が 作業坑1内に臨む既設の第1排土管5aと、作業坑1内において前端が第1排土 管5aの後端に接続される新設の第2排土管5bとを有する。 このうち第1排土管5aは、図3に示すごとく後端部の外周に鍔7が突設され 、鍔7よりも後方の外周面に外ねじ8が形成され、後端内周面に差込口9が形成 されている。また、第2排土管5bは、図3に示すごとく前端外周にリングパッ キン12を嵌装するパッキン受け11が突設され、前端部の外周に継手10が前 後移動自在に装着されており、その継手10が、前記外ねじ8に螺合する内ねじ 13を有する継手本体15の後端に、パッキン受け11の後ろ向き係合面11a に係合する係合鍔16を内向きに突設したものとなっている。 そのうえで本考案は第1排土管5aの後端内部の差込口9に、リングパッキン 12付きのパッキン受け11を含む第2排土管5bの前端部を差し込み接続する ための接続用治具20であって、その接続用治具20は、図1に示すごとく第1 排土管5aの後端部を把持する第1腕21と、第2排土管5bの前端部を把持す る第2腕22とを有する。 第1腕21は、図1および図4に示すごとく下面が開口していて、第1排土管 5aの外周に上方から嵌合し、前記鍔7の前向き係合面7aに係合して後方への 抜け止めを図る後ろ向き規制面45を有する。第2腕22は、図1および図5に 示すごとく下面が開口していて、第2排土管5bの外周に上方から嵌合し、前記 パッキン受け11の後ろ向き係合面11aに係合して前方への抜け止めを図る前 向き規制面46を有する。第1腕21と第2腕22とは、相対的に遠近移動自在 に連結されている。 第1腕21と第2腕22との間には、図1に示すごとく第1腕21に対して第 2腕22を接近移動させるための倍力リンク機構26を備えている。この倍力リ ンク機構26は、これを作動させるために、前後方向に揺動操作される操作ハン ドル25を備えている。According to the third aspect of the present invention, as shown in FIG. 2, an existing first discharging pipe 5 a that is passed through the underground propulsion pipe 4 and whose rear end faces the working pit 1, The front end has a newly provided second discharging pipe 5b connected to the rear end of the first discharging pipe 5a. As shown in FIG. 3, the first discharge pipe 5a has a flange 7 projecting from the outer periphery of the rear end thereof, an outer thread 8 formed on the outer peripheral surface behind the flange 7, and a difference between the inner peripheral surface of the rear end. An entrance 9 is formed. As shown in FIG. 3, a packing receiver 11 for fitting a ring packing 12 is provided on the outer periphery of the front end of the second discharge pipe 5b, and a joint 10 is mounted on the outer periphery of the front end so as to be movable back and forth. At the rear end of a joint body 15 of the joint 10 having an internal thread 13 screwed to the external thread 8, an engagement flange 16 engaging with a rearward engagement surface 11 a of the packing receiver 11 is provided inwardly. It has become something. In addition, the present invention provides a connection jig 20 for inserting and connecting the front end of the second discharging pipe 5b including the packing receiver 11 with the ring packing 12 to the insertion port 9 inside the rear end of the first discharging pipe 5a. As shown in FIG. 1, the connection jig 20 includes a first arm 21 for gripping a rear end of the first discharging pipe 5a and a second arm 22 for gripping a front end of the second discharging pipe 5b. And The lower surface of the first arm 21 is open as shown in FIGS. 1 and 4, and is fitted to the outer periphery of the first discharge pipe 5a from above, and is engaged with the forward engagement surface 7a of the flange 7 to be rearward. It has a rearward-facing regulating surface 45 for preventing the device from falling off. The lower surface of the second arm 22 is open as shown in FIGS. 1 and 5, and the second arm 22 is fitted to the outer periphery of the second discharge pipe 5 b from above, and is engaged with the rearwardly engaging surface 11 a of the packing receiver 11. It has a forward regulating surface 46 for preventing forward dropping. The first arm 21 and the second arm 22 are relatively movably connected to each other. A boost link mechanism 26 for moving the second arm 22 closer to the first arm 21 as shown in FIG. 1 is provided between the first arm 21 and the second arm 22. The boost link mechanism 26 includes an operation handle 25 that is swingably operated in the front-rear direction in order to operate the mechanism.

【0007】 更に詳しくは、第2腕22の前向き規制面46に、第2排土管5bの後ろ向き 係合面11aに係合する突起50が設けられている。 倍力リンク機構26としては、図5に示すごとく第1・第2腕のうち一方の腕 22の外側に位置するハンドルベース27を有し、ハンドルベース27の左右中 央部位に操作ハンドル25を有し、図1に示すごとくハンドルベース27の左右 の下端に支点部29と作用部30とを上下に設け、下方の各作用部30は一方の 腕22の左右の各側腕部22bの外側に第1軸31を介して連結する。そして上 方の各支点部29と、他方の腕21の左右の各側腕部21bの外側とが、リンク 32で第2軸33および第3軸34を介してそれぞれ連結されたものとする。More specifically, a protrusion 50 is provided on the forward regulating surface 46 of the second arm 22 to engage with the rearward engaging surface 11a of the second discharge pipe 5b. As shown in FIG. 5, the boost link mechanism 26 has a handle base 27 located outside one of the first and second arms 22, and the operation handle 25 is provided at the left and right center of the handle base 27. As shown in FIG. 1, a fulcrum portion 29 and an operating portion 30 are provided vertically at lower left and right ends of the handle base 27, and each lower operating portion 30 is located outside of each of the left and right side arm portions 22b of one arm 22. Via a first shaft 31. It is assumed that each of the upper fulcrum portions 29 and the outside of each of the left and right side arm portions 21b of the other arm 21 are connected by a link 32 via a second shaft 33 and a third shaft 34, respectively.

【0008】 また、第1腕21の左右の一方の側腕部21bと、第2腕22の左右の一方の 側腕部22bとには、図8に示すごとく止め軸40をこれが内向きに突出する姿 勢と外側に退入する姿勢とに切り換え自在とした止め手段36をそれぞれ備えて おり、各止め手段36は、止め軸40の先端が排土管5a・5bの外周面に直接 または間接的に接当する突出姿勢に保持する機構を含んだものとすることができ る。As shown in FIG. 8, a stop shaft 40 is provided on one of the left and right side arm portions 21 b of the first arm 21 and one of the left and right side arm portions 22 b of the second arm 22 so as to face inward. Each of the stopping means 36 is provided with a stopping means 36 capable of switching between a protruding attitude and an outward retreating attitude, and the tip of the stopping shaft 40 is directly or indirectly attached to the outer peripheral surface of the discharge pipes 5a and 5b. It may include a mechanism for holding the protruding posture in which the protruding posture comes into direct contact.

【0009】[0009]

【作用】[Action]

接続用治具20の使用要領を図示例の排土管を接続する場合について説明する と、作業坑1内において既設の第1排土管5aの後端と新設の第2排土管5bの 前端とを対向状に位置決めセットする。そして、図6に示すごとく操作ハンドル 25を前方に倒して両腕21・22が最大限に離間した状態にし、第1排土管5 aの後端部に第1腕21を、第2排土管5bの前端部に第2腕22をそれぞれ上 方から嵌め込む。その際に、第1排土管5aの鍔7の前向き係合面7aに第1腕 21の後ろ向き規制面45を当て、第1腕21が後方に移動するのを規制すると ともに、第2排土管5bのパッキン受け11の後ろ向き係合面11aに第2腕2 2の前向き規制面46を当て、第2腕22が前方に移動するのを規制する。 次に、図7に示すごとく操作ハンドル25を後ろ向きに起こすと、倍力リンク 機構26を介して第2腕22が前方の第1腕21側に接近移動する。これで第2 腕22に把持された第2排土管5bの前端が、第1排土管5aの後端内部の差込 口9に差し込み接続される。 後は、第2排土管5b側の継手10の内ねじ13を第1排土管5aの外ねじ8 に螺合して行き、継手本体15の係合鍔16をパッキン受け11の後ろ向き係合 面11aに係合させることにより、両排土管5a・5bどうしの接続が完了する 。 A description will be given of the use of the connection jig 20 in the case where the illustrated discharge pipe is connected. The rear end of the existing first discharge pipe 5a and the front end of the newly installed second discharge pipe 5b in the work well 1 are described. Positioning and setting are performed in the opposite shape. Then, as shown in FIG. 6, the operation handle 25 is tilted forward so that the arms 21 and 22 are maximally separated from each other, and the first arm 21 is attached to the rear end of the first discharge pipe 5a, and the second discharge pipe Each of the second arms 22 is fitted into the front end of 5b from above. At that time, the rearward regulating surface 45 of the first arm 21 is brought into contact with the forward engaging surface 7a of the flange 7 of the first discharging pipe 5a, thereby restricting the first arm 21 from moving backward and the second discharging pipe. The forward restricting surface 46 of the second arm 22 is applied to the rearward engaging surface 11a of the packing receiver 11 of 5b to restrict the second arm 22 from moving forward. Next, when the operation handle 25 is raised backward as shown in FIG. 7, the second arm 22 moves closer to the front first arm 21 via the boosting link mechanism 26. Thus, the front end of the second discharging pipe 5b gripped by the second arm 22 is inserted and connected to the insertion port 9 inside the rear end of the first discharging pipe 5a. Thereafter, the inner screw 13 of the joint 10 on the second discharging pipe 5b side is screwed into the outer screw 8 of the first discharging pipe 5a, and the engaging flange 16 of the joint main body 15 is engaged with the rearward engaging surface of the packing receiver 11. The engagement between the two discharge pipes 5a and 5b is completed by engaging with the discharge pipe 11a.

【0010】[0010]

【考案の効果】[Effect of the invention]

請求項1記載の本考案に係る接続用治具によれば、接続すべき対象管が何であ れ、第1管5aを第1腕21で、第2管5bを第2腕22でそれぞれ把持して位 置決めするので、後は操作ハンドル25を揺動操作するだけで倍力リンク機構2 6を介して両管5a・5bの端どうしを比較的重量のある場合にも手軽に接続位 置にセットできる。 According to the connecting jig according to the present invention, the first pipe 5a is gripped by the first arm 21 and the second pipe 5b is gripped by the second arm 22 irrespective of the target pipe to be connected. Then, by simply swinging the operation handle 25, the ends of the two tubes 5a and 5b can be easily connected to each other via the boosting link mechanism 26 even when the ends are relatively heavy. Can be set in place.

【0011】 請求項2記載の本考案に係る接続用治具によれば、狭い作業坑1内においても 、既設の第1排土管5aの後端に対し、新設の第2排土管5bの前端を前後対向 状態に位置決めセットしさえすれば、第1腕21と第2腕22とでこれらが両排 土管5a・5bの各端部を跨ぐようにそれぞれ把持するだけでよく、後は操作ハ ンドル25で倍力リンク機構26を介して第1排土管5aの後端に第2排土管5 bの前端を一人の作業者で手軽に、かつ手際良く差し込み接続できる。According to the connecting jig according to the second aspect of the present invention, even in the narrow work pit 1, the front end of the newly installed second discharging pipe 5 b is located at the rear end of the existing first discharging pipe 5 a. As long as they are positioned and set so as to face each other, the first arm 21 and the second arm 22 need only grip each of the two drain pipes 5a and 5b so as to straddle each end thereof. With the handle 25, the front end of the second discharging pipe 5b can be easily and easily inserted and connected to the rear end of the first discharging pipe 5a via the boosting link mechanism 26 by one worker.

【0012】 請求項3記載の本考案に係る接続用治具によれば、第1排土管5aの後端の差 込口9に第2排土管5bの前端を内嵌するよう差し込んだのち、袋ナット状の継 手10でねじ結合するユニオン継手仕様で両管5a・5bどうしの接続を図るも のとなっいる。その際に、第1腕21は第1排土管5aに、第2腕22は第2排 土管5bにそれぞれ上方から落とし込み装着しさえすれば、第1腕21の後ろ向 き規制面45が第1排土管5a側の鍔7の前向き係合面7aに接当係合し、第2 腕22の前向き規制面46が第2排土管5bのパッキン受け11の後ろ向き係合 面11aに接当係合するようにしたので、操作ハンドル25で倍力リンク機構2 6を介して第1排土管5a側に第2排土管5bを引き寄せ操作する作業が、一人 の作業者でも前記鍔7とパッキン受け11とを利用して合理的にかつ確実に行え る利点を有する。According to the connecting jig according to the third aspect of the present invention, after inserting the front end of the second discharging pipe 5b into the insertion port 9 at the rear end of the first discharging pipe 5a, The two pipes 5a and 5b are connected with each other by a union joint specification in which a cap nut-shaped joint 10 is used for screw connection. At this time, as long as the first arm 21 is dropped into the first discharging pipe 5a and the second arm 22 is dropped into the second discharging pipe 5b from above, the rearward regulating surface 45 of the first arm 21 is in the second position. (1) The front engagement surface 7a of the flange 7 on the side of the discharge pipe 5a contacts and engages, and the front restriction surface 46 of the second arm 22 contacts the rear engagement surface 11a of the packing receiver 11 of the second discharge pipe 5b. The operation of pulling the second discharging pipe 5b toward the first discharging pipe 5a through the boosting link mechanism 26 with the operating handle 25 requires the operation of the collar 7 and the packing receiver by one worker. There is an advantage that it can be carried out rationally and reliably by using the method of No. 11.

【0013】 請求項4記載の本考案に係る接続用治具によれば、先の第2腕22の前向き規 制面46に突起50を設け、この突起50がパッキン受け11の後ろ向き係合面 11aに接当係合するようにしたので、突起50の突出量分だけ、第2排土管5 bの前端のパッキン受け11をリングパッキン12が嵌装された状態で第1排土 管5aの差込口9の内奥所定位置まで確実に差し込むことができる。According to the connecting jig according to the present invention, the projection 50 is provided on the front regulation surface 46 of the second arm 22, and the projection 50 is the rear engagement surface of the packing receiver 11. 11a, the packing receiver 11 at the front end of the second discharging pipe 5b is fitted to the first discharging pipe 5a in a state where the ring packing 12 is fitted thereto by the amount of protrusion of the projection 50. It can be securely inserted to a predetermined position inside the insertion port 9.

【0014】 請求項5記載の本考案に係る接続用治具によれば、倍力リンク機構26は、第 1・第2腕21・22の一方の外側にこれらと接当干渉しないようにハンドルベ ース27を装着し、ハンドルベース27上に操作ハンドル25を操作しやすいよ うに設け、両腕21・22の左右外側にリンク32をそれぞれ配し、全体として コンパクトな形態にしてあるので、ハンドルベース27ないし操作ハンドル25 を手にして作業現場への持ち運び、および使用が手軽に行える利点を有する。According to the connecting jig according to the fifth aspect of the present invention, the booster link mechanism 26 has a handlebar on the outside of one of the first and second arms 21 and 22 so as not to interfere with the first and second arms 21 and 22. The handle 27 is mounted on the handle base 27 so that the operation handle 25 can be easily operated, and the links 32 are arranged on the left and right outer sides of the arms 21 and 22, respectively. It has the advantage that it can be easily carried to the work site with the base 27 or the operation handle 25 as a hand and used.

【0015】 請求項6記載の本考案に係る接続用治具によれば、第1腕21と第2腕22と に止め軸40を含む止め手段36がそれぞれ設けられているので、第1腕21を 第1排土管5aに、第2腕22を第2排土管5bにそれぞれ上方から余裕を以て 装着できるようにしながらも、止め軸40の先端を第1・第2排土管5a・5b にそれぞれ突き当てることにより、第1排土管5aの後端に対して第2排土管5 bの前端を正しく前後対向状態に位置決め調整することができ、両管5a・5b どうしの差し込み作業が容易かつ確実に行える。According to the connecting jig according to the present invention, the first arm 21 and the second arm 22 are provided with the stopping means 36 including the stopping shaft 40, respectively, so that the first arm is provided. 21 can be attached to the first discharge pipe 5a and the second arm 22 can be attached to the second discharge pipe 5b with a margin from above, while the tip of the stop shaft 40 is attached to the first and second discharge pipes 5a and 5b, respectively. By abutting, the front end of the second discharging pipe 5b can be positioned and adjusted correctly in the front-rear direction with respect to the rear end of the first discharging pipe 5a, and the insertion work between the two pipes 5a and 5b is easy and reliable. Can be done.

【0016】[0016]

【実施例】【Example】

図2において、1は地面2より掘り下げた作業坑であり、この作業坑1から光 ケーブル用の通線管を通すために、先端の掘削機3で略水平状に目的地点の作業 坑に向かって掘り進む公知の推進工法である。掘削機3がこれの先端から作泥剤 を吐出しながら掘り進むに伴い、推進管4が順に継ぎ足されて行き、推進管4内 に排土管5も順に継ぎ足し挿通されて行き、排土管5で先端の掘削土を地上の排 泥タンク6に排出している。これら推進管4および排土管5の継ぎ足し作業は、 作業坑1内で人手により行われる。 In FIG. 2, reference numeral 1 denotes a work pit dug below the ground 2, and from this work pit 1, a drilling machine 3 at an end of the work pit is directed substantially horizontally to a work pit at a destination in order to pass a conduit for an optical cable. It is a well-known propulsion method of digging. As the excavator 3 digs while discharging mud from the tip of the excavator, the propulsion pipes 4 are sequentially added, and the discharge pipes 5 are also sequentially added and inserted into the propulsion pipes 4. Excavated soil is discharged into the mud tank 6 above the ground. The work of adding the propulsion pipe 4 and the discharge pipe 5 is performed manually in the work pit 1.

【0017】 作業坑1に臨む既設の第1排土管5aの後端部は、図3に示すごとく管外周面 に鍔7が形成され、鍔7の後方側の外周面に外ねじ8が形成されており、後端開 口の内周面に径大の差込口9が段付き状に形成されている。新設の第2排土管5 bの前端部には、継手10が挿嵌されており、管端外周面にパッキン受け11が 周回状に突設されていて、このパッキン受け11にリングパッキン12が嵌装さ れている。例えば、排土管5a・5bの内径寸法は100mm、鍔7の突出高さは 15mm、パッキン受け11は前後幅が0.8mmで突出高さが5mmである。As shown in FIG. 3, a flange 7 is formed on the outer peripheral surface of the existing first discharging pipe 5 a facing the work pit 1, and an external thread 8 is formed on an outer peripheral surface on the rear side of the flange 7. A large-diameter insertion port 9 is formed in a stepped shape on the inner peripheral surface of the rear end opening. A joint 10 is inserted into the front end of the newly constructed second discharging pipe 5b, and a packing receiver 11 is provided on the outer peripheral surface of the pipe so as to protrude in a circular shape. Fitted. For example, the inner diameter of the discharge pipes 5a and 5b is 100 mm, the protrusion height of the flange 7 is 15 mm, and the packing receiver 11 has a front-rear width of 0.8 mm and a protrusion height of 5 mm.

【0018】 継手10は内ねじ13を有する袋ナット状の継手本体15の後端内周に係合鍔 16が周回状に形成されたユニオン継手仕様になっている。The joint 10 has a union joint specification in which an engagement flange 16 is formed in a circular shape on the inner periphery of the rear end of a cap nut-shaped joint body 15 having an internal thread 13.

【0019】 第1排土管5aに第2排土管5bを接続するに際しては、第1排土管5aの後 端の差込口9内に第2排土管5bのリングパッキン12付きパッキン受け11を 含む前端部を差し込む。次いで継手10の内ねじ13を第1排土管5aの外ねじ 8に螺合し、継手10の係合鍔16がパッキン受け11に係合するまでねじ込む ことになる。When connecting the second discharging pipe 5b to the first discharging pipe 5a, a packing receiver 11 with a ring packing 12 of the second discharging pipe 5b is included in the insertion port 9 at the rear end of the first discharging pipe 5a. Insert the front end. Next, the inner screw 13 of the joint 10 is screwed into the outer screw 8 of the first discharging pipe 5a, and screwed until the engagement flange 16 of the joint 10 engages with the packing receiver 11.

【0020】 しかるに本考案は、第1排土管5aの後端に第2排土管5bの前端を位置合わ せして差し込み接続するための接続用治具20に特徴を有する。その接続用治具 20は、図7に示すように、第1排土管5aの後端部を把持する第1腕21と、 第2排土管5bの前端部を把持する第2腕22とを有する。However, the present invention is characterized by a connecting jig 20 for inserting and connecting the front end of the second discharging pipe 5b to the rear end of the first discharging pipe 5a. As shown in FIG. 7, the connection jig 20 includes a first arm 21 that grips the rear end of the first discharging pipe 5a and a second arm 22 that grips the front end of the second discharging pipe 5b. Have.

【0021】 第1腕21と第2腕22とは、図4および図5に示すごとく、正面視で概ね逆 U字形ないし門形状を呈しており、それぞれ上腕部21a・22aと左右の側腕 部21b・22bとを有し、下面が開口している。つまり、第1腕21と第2腕 22とは、開口下面を介して各排土管5a・5bの外周にそれぞれ上方から嵌合 して装着できる。As shown in FIG. 4 and FIG. 5, the first arm 21 and the second arm 22 have a generally inverted U-shape or a gate shape when viewed from the front, and the upper arms 21a and 22a and the left and right side arms, respectively. Parts 21b and 22b, and the lower surface is open. That is, the first arm 21 and the second arm 22 can be fitted to the outer circumference of each of the discharge pipes 5a and 5b from above through the lower surfaces of the openings.

【0022】 第1腕21と第2腕22とは、前後に対向するよう配置されていて、第1腕2 1に対して第2腕22が平行に遠近移動できるよう上腕部21a・22aの左右 中央部位と、左右の側腕部21b・22bの下端部位との三点で連結されている 。具体的には、図4〜図7に示すように、前述の各連結点部位において第1腕2 1側から水平の支持杆23を後ろ向きにそれぞれ突出し、第2腕22側に設けた 各カラー24の通孔24aに各支持杆23が挿通されている。The first arm 21 and the second arm 22 are disposed so as to face front and rear, and the upper arms 21 a and 22 a of the upper arms 21 a and 22 a are movable in parallel with the first arm 21. They are connected at three points: the left and right central portions and the lower end portions of the left and right side arm portions 21b and 22b. Specifically, as shown in FIGS. 4 to 7, the horizontal support rods 23 project rearward from the first arm 21 side at the respective connection point sites, and the collars provided on the second arm 22 side. Each support rod 23 is inserted through 24 through holes 24a.

【0023】 第1腕21に対する第2腕22の遠近移動は、操作ハンドル25を含む倍力リ ンク機構26を用いて手動で行われる。 その倍力リンク機構26としては、図5および図6に示すごとく、第2腕22 の外側に位置するよう正面視で半円形状に形成されたハンドルベース27を有し 、このハンドルベース27の左右中央部位に操作ハンドル25を上向きに突設し てあり、ハンドルベース27の左右の下端に支点部29と作用部30とを上下に それぞれ設ける。そして下方の各作用部30が第2腕22の左右の各側腕部22 bの外側に第1軸31を介して連結され、上方の各支点部29と第1腕21の左 右の各側腕部21bの外側とが、リンク32で第2軸33および第3軸34を介 してそれぞれ連結されている。ここでのハンドルベース27の下端は、く字形状 に屈曲形成して、操作ハンドル25が第2腕22の後方へ大きく食み出ないよう にしてあり、屈曲部が浮動の支点部29に設定されている。The distance movement of the second arm 22 with respect to the first arm 21 is manually performed using a boost link mechanism 26 including an operation handle 25. As shown in FIGS. 5 and 6, the boost link mechanism 26 has a handle base 27 formed in a semicircular shape in a front view so as to be located outside the second arm 22. An operation handle 25 projects upward from the left and right central portions, and a fulcrum portion 29 and an action portion 30 are provided vertically at lower left and right ends of a handle base 27, respectively. The lower working portions 30 are connected to the outer sides of the left and right side arms 22 b of the second arm 22 via the first shaft 31, and the upper fulcrums 29 and the left and right sides of the first arm 21 are connected. The outside of the side arm portion 21b is connected by a link 32 via a second shaft 33 and a third shaft 34, respectively. Here, the lower end of the handle base 27 is bent and formed in a U-shape so that the operating handle 25 does not protrude greatly to the rear of the second arm 22, and the bent portion is set to a floating fulcrum portion 29. Have been.

【0024】 第1腕21と第2腕22とには、図4および図5に示すように、左右の側腕部 21b・22bの一方の下端寄りにそれぞれ止め手段36を有する。その各止め 手段36として、図8に示すごとく各側腕部21b・22bの下端には左右の対 向壁37・37間にこれに設けた通孔39・39を介して止め軸40が左右の内 外方向へ摺動自在に架設されており、両対向壁37・37間において止め軸40 の外周に圧縮コイルばね41を嵌装し、該ばね41で止め軸40を外側へ退入付 勢している。各止め軸40の外端には、アイボルト状の操作部42を有する。止 め軸40上には、ロック部43を有し、図1に示すごとく外側の通孔39はロッ ク部43の出入りを許す鍵孔状に形成してある。As shown in FIGS. 4 and 5, each of the first arm 21 and the second arm 22 has a stopping means 36 near one lower end of the left and right side arm portions 21b and 22b. As shown in FIG. 8, each stop means 36 has a stop shaft 40 at the lower end of each side arm 21b, 22b through through holes 39, 39 provided between the left and right opposite walls 37, 37. The compression coil spring 41 is fitted around the outer periphery of the stop shaft 40 between the opposing walls 37, 37, and the stop shaft 40 is retracted outward by the spring 41. I'm going. The outer end of each retaining shaft 40 has an eyebolt-shaped operating portion 42. A lock portion 43 is provided on the stop shaft 40, and the outer through hole 39 is formed in a keyhole shape that allows the lock portion 43 to enter and exit as shown in FIG. 1.

【0025】 操作部42を介して止め軸40を前記ばね41に抗して内方に押し込むと、止 め軸40の内側先端が各側腕部21b・22bの内側に突入する。この状態で止 め軸40を一方向に回し、ロック部43の外端を通孔39の内壁面に回り込み係 合させることにより、止め軸40をこれの先端が突出する止め姿勢に維持するこ とができる。因みに、止め軸40は内向きに突出するようばね41で押し出し付 勢してあってもよい。When the stop shaft 40 is pushed inward against the spring 41 via the operation portion 42, the inner end of the stop shaft 40 protrudes into the inside of each of the side arms 21b and 22b. In this state, the stop shaft 40 is rotated in one direction, and the outer end of the lock portion 43 is wrapped around and engaged with the inner wall surface of the hole 39, thereby maintaining the stop shaft 40 in the stop position where the tip of the stop shaft 40 projects. Can be. Incidentally, the stop shaft 40 may be pushed and urged by a spring 41 so as to protrude inward.

【0026】 次に本案接続用治具20の使用要領を説明すると、順に継ぎ足された既設の第 1排土管5aの後端は、図2に示すごとく作業坑1内に臨んでいる。この第1排 土管5aの後端に新設の第2排土管5bの前端が、作業坑1内において前後に近 接対向する状態で図外の装置により位置決めセットされている。この状態下にお いて、図1および図6に示すごとく接続用治具20の操作ハンドル25を上方の 支持杆23に当たるまで左側方に倒して、第1腕21と第2腕22とを最大限に 離し、第1腕21を第1排土管5aの後端部に、第2腕22を第2排土管5bの 前端部に上方からそれぞれ嵌合する。なお、第2排土管5b上の継手10は予め 後方に退避させてある。Next, the procedure of using the connecting jig 20 of the present invention will be described. The rear end of the existing first discharging pipe 5a which is successively extended faces the inside of the work pit 1 as shown in FIG. The rear end of the first discharging pipe 5a is positioned and set by a device (not shown) such that the front end of the newly-installed second discharging pipe 5b faces the front and rear in the working pit 1. In this state, as shown in FIGS. 1 and 6, the operation handle 25 of the connection jig 20 is tilted leftward until it hits the upper support rod 23, and the first arm 21 and the second arm 22 are moved to the maximum. Then, the first arm 21 is fitted to the rear end of the first discharge pipe 5a, and the second arm 22 is fitted to the front end of the second discharge pipe 5b from above. The joint 10 on the second discharge pipe 5b has been retracted backward in advance.

【0027】 このとき、第1腕21の後ろ向き規制面45を第1排土管5aの鍔7の前向き 係合面7aに当てることにより、第1腕21が後方に抜け出るのを規制する。同 時に、第2腕22の前向き規制面46を第2排土管5bのパッキン受け11の後 ろ向き係合面11aに当てることにより、第2腕22が前方に抜け出るのを規制 する。At this time, the rearward restricting surface 45 of the first arm 21 is brought into contact with the front engaging surface 7a of the flange 7 of the first discharging pipe 5a, thereby restricting the first arm 21 from slipping backward. At the same time, the forward regulation surface 46 of the second arm 22 is brought into contact with the rearward engagement surface 11a of the packing receiver 11 of the second discharging pipe 5b, thereby restricting the second arm 22 from slipping forward.

【0028】 第1腕21の後ろ向き規制面45には、図4および図6に示すごとく上腕部2 1aの左右と、左右の側腕部21b・21bの上下中央部位とに合計で4本の突 起47を後ろ向きに突設してある。これら突起47が鍔7の外周面で受け止めら れることにより、とくに第1排土管5aに対する第1腕21の上下高さ位置、延 いては第2排土管5bに対する第2腕22の上下高さ位置が規定される。As shown in FIGS. 4 and 6, the rearward regulating surface 45 of the first arm 21 has a total of four on the left and right sides of the upper arm portion 21a and the upper and lower central portions of the left and right side arm portions 21b. The protrusion 47 protrudes backward. When these protrusions 47 are received on the outer peripheral surface of the flange 7, the vertical height of the first arm 21 with respect to the first discharge pipe 5a, and in particular, the vertical height of the second arm 22 with respect to the second discharge pipe 5b. The position is defined.

【0029】 第1腕21の左右の側腕部21b・21bと第1排土管5aとの間、および第 2腕22の左右の側腕部22b・22bと第2排土管5bとの間には、嵌合装着 の容易性を図るために余裕隙間を有するので、この間に必要に応じて第1排土管 5aの外周面に添う円弧形状の当て板49・49をそれぞれ入れ、第1腕21お よび第2腕22における各止め手段36の止め軸40を突出姿勢にし、各止め軸 40の内側先端を第1・第2排土管5a・5bの外周面に突き当てることにより 、各排土管5a・5bに対して第1・第2腕21・22を正しく位置決めする。Between the left and right side arms 21 b and 21 b of the first arm 21 and the first discharging pipe 5 a, and between the left and right side arms 22 b and 22 b of the second arm 22 and the second discharging pipe 5 b Since there is a margin for ease of fitting and mounting, arcuate backing plates 49 and 49 along the outer peripheral surface of the first discharge pipe 5a are inserted between the first and second arms 21 and 21 as needed. By setting the stop shafts 40 of the stop means 36 of the second arm 22 to the protruding posture and abutting the inner ends of the stop shafts 40 to the outer peripheral surfaces of the first and second discharge pipes 5a and 5b, The first and second arms 21 and 22 are correctly positioned with respect to 5a and 5b.

【0030】 この状態からハンドルベース27上の操作ハンドル25を第1軸31まわりに 右側へ起立するよう揺動操作すると、図7に示すごとくリンク32を介して第2 腕22が第1腕21側に接近移動する。その移動限界は、支持杵23の段付面に 前記カラー24を当てるなどして規定する。第2腕22が第1腕21側に接近移 動することに伴い、第2腕22で把持した第2排土管5bの前端部(リングパッ キン12付きのパッキン受け11を含む)が第1排土管5aの後端の差込口9の 内奥に差し込まれ、リングパッキン12が差込口9の内周面に接した状態になる 。In this state, when the operation handle 25 on the handle base 27 is swung so as to stand rightward about the first shaft 31, the second arm 22 is connected to the first arm 21 via the link 32 as shown in FIG. Move closer to the side. The movement limit is defined by, for example, applying the collar 24 to the stepped surface of the support punch 23. As the second arm 22 moves closer to the first arm 21, the front end (including the packing receiver 11 with the ring packing 12) of the second discharging pipe 5 b gripped by the second arm 22 is moved to the first discharging position. The rear end of the clay pipe 5a is inserted into the inside of the insertion port 9 so that the ring packing 12 comes into contact with the inner peripheral surface of the insertion port 9.

【0031】 このとき、第1排土管5aに対する第2排土管5bの差し込み深さを稼ぐため に、第2腕22の前向き規制面46には、図5および図7に示すごとく上腕部2 2aの左右中央部位と左右の側腕部22b・22bの上下中間高さ位置に合計3 本の突起50を設けてあり、これら各突起50の先端が第2排土管5bのパッキ ン受け11の後ろ向き係合面11bに突き当たるようにしてある。At this time, in order to increase the insertion depth of the second discharging pipe 5b with respect to the first discharging pipe 5a, the forward regulating surface 46 of the second arm 22 has an upper arm portion 22a as shown in FIGS. A total of three protrusions 50 are provided at the upper and lower middle positions of the left and right central portions and the left and right side arm portions 22b, 22b. It is configured to abut the engaging surface 11b.

【0032】 かくして第1排土管5aの後端に第2排土管5bの前端を差し込んだのち、両 排土管5a・5bを継手10で接続する。すなわち、第2排土管5b側の継手本 体15の内ねじ13を第1排土管5aの外ねじ8に対して、係合鍔16がパッキ ン受け11の後ろ向き係合面11aに係合するまでねじ込むことになる。After inserting the front end of the second discharging pipe 5b into the rear end of the first discharging pipe 5a, the two discharging pipes 5a and 5b are connected by the joint 10. That is, the inner thread 13 of the joint body 15 on the second discharging pipe 5b side engages with the outer screw 8 of the first discharging pipe 5a, and the engaging flange 16 engages with the rearward engaging surface 11a of the packing receiver 11. Screw up.

【0033】 なお、倍力リンク機構26に関しては、図示例のハンドルベース27の上部が 操作ハンドル25になるよう変形してもよいし、ハンドルベース27の左右に操 作ハンドル25を突出させて両手で操作できるようにしてもよい。更に、ハンド ルベース27はこれの左右下端の作用部30・30を第1腕21の左右側腕部2 1b・21bに第1軸31を介して支持する形態に変更してもよい。As for the boost link mechanism 26, the upper part of the handle base 27 in the illustrated example may be deformed so as to become the operation handle 25, or the operation handle 25 may be protruded to the left and right of the handle base 27 so that both hands can be used. It may be possible to operate with. Further, the handle base 27 may be changed to a form in which the action portions 30 at the lower left and right ends are supported by the left and right arm portions 21b and 21b of the first arm 21 via the first shaft 31.

【図面の簡単な説明】[Brief description of the drawings]

【図1】接続用治具の側面図である。FIG. 1 is a side view of a connection jig.

【図2】推進工法を説明する概略側面図である。FIG. 2 is a schematic side view illustrating a propulsion method.

【図3】第1排土管の後端部と第2排土管の前端部とを
示す縦断側面図である。
FIG. 3 is a longitudinal sectional side view showing a rear end of a first discharging pipe and a front end of a second discharging pipe.

【図4】図7のA−A線断面図である。FIG. 4 is a sectional view taken along line AA of FIG. 7;

【図5】図7のB−B線断面図である。FIG. 5 is a sectional view taken along line BB of FIG. 7;

【図6】接続用治具の使用要領を説明する排土管どうし
の差し込み前の状態での一部縦断側面図である。
FIG. 6 is a partially longitudinal side view in a state before insertion of the discharge pipes for explaining a usage procedure of the connection jig.

【図7】接続用治具の使用要領を説明する排土管どうし
の差し込み後の状態での一部縦断側面図である。
FIG. 7 is a partially longitudinal side view in a state after insertion of earth discharging pipes for explaining how to use the connection jig.

【図8】止め手段を示す拡大縦断正面図である。FIG. 8 is an enlarged vertical sectional front view showing a stopping means.

【図9】従来例を説明する概略側面図である。FIG. 9 is a schematic side view illustrating a conventional example.

【符号の説明】[Explanation of symbols]

1 作業坑 4 推進管 5a 第1排土管 5b 第2排土管 7 鍔 7a 鍔の前向き係合面 8 外ねじ 9 差込口 10 継手 11 パッキン受け 12 リングパッキン 13 内ねじ 15 継手本体 16 係合鍔 20 接続用治具 21 第1腕 22 第2腕 23 支持杵 25 操作ハンドル 26 倍力リンク機構 27 ハンドルベース 29 支点部 30 作用部 31 第1軸 32 リンク 33 第2軸 34 第3軸 36 止め手段 40 止め軸 45 第1腕の後ろ向き規制面 46 第2腕の前向き規制面 50 突起 DESCRIPTION OF SYMBOLS 1 Working pit 4 Propulsion pipe 5a 1st discharge pipe 5b 2nd discharge pipe 7 Flange 7a Front engagement surface of flange 8 Outer screw 9 Insertion port 10 Joint 11 Packing receiver 12 Ring packing 13 Inner screw 15 Joint body 16 Engagement flange Reference Signs List 20 connection jig 21 first arm 22 second arm 23 support punch 25 operating handle 26 boost link mechanism 27 handle base 29 fulcrum 30 working part 31 first shaft 32 link 33 second shaft 34 third shaft 36 stopping means 40 stop shaft 45 rearward regulating surface of first arm 46 forward regulating surface of second arm 50 projection

Claims (6)

【実用新案登録請求の範囲】[Utility model registration claims] 【請求項1】 第1管5aと第2管5bとを接続するた
めに、両管5a・5bの端どうしを突き合わせる接続用
治具であって、 第1管5aの端部を把持する第1腕21と、第2管5b
の端部を把持する第2腕22とを有し、 第1腕21と第2腕22とは、対向状に配置されて遠近
移動自在に連結されており、 第1腕21と第2腕22との間に、第1腕21に対して
第2腕22を接近移動させるための倍力リンク機構26
を備えており、 倍力リンク機構26を作動させるために、揺動操作され
る操作ハンドル25を有する管の接続用治具。
1. A connecting jig for abutting ends of two pipes (5a, 5b) to connect the first pipe (5a) and the second pipe (5b), and grips an end of the first pipe (5a). The first arm 21 and the second tube 5b
The first arm 21 and the second arm 22 are arranged to face each other and are connected to each other so as to be movable in a distance. Between the first arm 21 and the second arm 22.
A jig for connecting a pipe having an operation handle 25 that is swingably operated to operate the boost link mechanism 26.
【請求項2】 作業坑1内において、地中の推進管4に
通した既設の第1排土管5aの後端に、新設の第2排土
管5bの前端を差し込み接続するための接続用治具であ
って、 第1排土管5aの後端部を把持する第1腕21と、第2
排土管5bの前端部を把持する第2腕22とを有し、 第1腕21と第2腕22とが、前後に対向状に配置され
て、前後方向にのみ遠近移動自在に連結されており、 第1腕21と第2腕22との間に、第1腕21に対して
第2腕22を接近移動させるための倍力リンク機構26
を備えており、 倍力リンク機構26を作動させるために、前後方向に揺
動操作される操作ハンドル25を有する管の接続用治
具。
2. A connecting jig for inserting and connecting a front end of a newly-constructed second discharging pipe 5b to a rear end of an existing first discharging pipe 5a passed through an underground propulsion pipe 4 in the working pit 1. A first arm 21 for gripping a rear end of the first discharging pipe 5a;
A second arm 22 for gripping a front end of the discharging pipe 5b, wherein the first arm 21 and the second arm 22 are arranged in a front-rear opposed manner, and are connected so as to be movable only in the front-rear direction. A boost link mechanism 26 for moving the second arm 22 closer to the first arm 21 between the first arm 21 and the second arm 22.
A pipe connection jig having an operation handle 25 that is swingably operated in the front-rear direction to operate the boost link mechanism 26.
【請求項3】 地中の推進管4に通されて後端が作業坑
1内に臨む既設の第1排土管5aと、作業坑1内におい
て前端が第1排土管5aの後端に接続される新設の第2
排土管5bとを有し、 第1排土管5aは、後端部の外周に鍔7が突設され、鍔
7よりも後方の外周面に外ねじ8が形成され、後端内周
面に差込口9が形成されており、 第2排土管5bは、前端外周にリングパッキン12を嵌
装するパッキン受け11が突設され、前端部の外周に、
前記外ねじ8に螺合する内ねじ13を有する継手本体1
5の後端にパッキン受け11の後ろ向き係合面11aに
係合する係合鍔16を内向きに突設した継手10が前後
移動自在に装着されており、 第1排土管5aの後端内部の差込口9に、リングパッキ
ン12付きのパッキン受け11を含む第2排土管5bの
前端部を差し込み接続するための接続用治具20であっ
て、 接続用治具20は、第1排土管5aの後端部を把持する
第1腕21と、第2排土管5bの前端部を把持する第2
腕22とを有し、 第1腕21は、下面が開口していて、第1排土管5aの
外周に上方から嵌合し、前記鍔7の前向き係合面7aに
係合して後方への抜け止めを図る後ろ向き規制面45を
有し、 第2腕22は、下面が開口していて、第2排土管5bの
外周に上方から嵌合し、前記パッキン受け11の後ろ向
き係合面11aに係合して前方への抜け止めを図る前向
き規制面46を有し、 第1腕21と第2腕22とは、相対的に遠近移動自在に
連結されており、 第1腕21と第2腕22との間に、第1腕21に対して
第2腕22を接近移動させるための倍力リンク機構26
を備えており、 倍力リンク機構26は、これを作動させるために、前後
方向に揺動操作される操作ハンドル25を備えている管
の接続用治具。
3. An existing first discharging pipe 5a, which is passed through an underground propulsion pipe 4 and has a rear end facing the working pit 1, and a front end connected to the rear end of the first discharging pipe 5a in the working pit 1. New second
The first discharging pipe 5a has a flange 7 protruding from the outer periphery of the rear end, an external thread 8 is formed on the outer peripheral surface behind the flange 7, and the first discharging pipe 5a has an inner peripheral surface on the rear end. An insertion port 9 is formed, and a packing receiver 11 for fitting a ring packing 12 on the outer periphery of the front end of the second discharging pipe 5b is provided in a protruding manner.
Joint body 1 having an internal thread 13 screwed to the external thread 8
A joint 10 is provided at the rear end of the first discharge pipe 5a at the rear end of the joint 10 in which an engagement flange 16 that engages with the rear engagement surface 11a of the packing receiver 11 projects inward and backward. A connection jig 20 for inserting and connecting the front end of the second discharge pipe 5b including the packing receiver 11 with the ring packing 12 to the insertion port 9 of the first jig. A first arm 21 for gripping a rear end of the earth pipe 5a and a second arm 21 for gripping a front end of the second earth pipe 5b.
The first arm 21 has an open lower surface, is fitted to the outer periphery of the first discharging pipe 5a from above, and engages with the forward engaging surface 7a of the flange 7 to move backward. The second arm 22 has an open lower surface, is fitted to the outer periphery of the second discharge pipe 5b from above, and has a rearward engagement surface 11a of the packing receiver 11. The first arm 21 and the second arm 22 are relatively movably connected to each other, and the first arm 21 and the second arm 22 are connected to each other. A boost link mechanism 26 for moving the second arm 22 closer to the first arm 21 between the two arms 22
The boost link mechanism 26 is a pipe connecting jig provided with an operation handle 25 that is operated to swing back and forth in order to operate the link.
【請求項4】 第2腕22の前向き規制面46に、第2
排土管5bの後ろ向き係合面11aに係合する突起50
が突設されている請求項3記載の管の接続用治具。
4. The second arm 22 has a front-facing regulating surface 46 with a second
Projection 50 that engages with rearward engaging surface 11a of discharge pipe 5b
4. The jig for connecting a pipe according to claim 3, wherein the jig is projected.
【請求項5】 倍力リンク機構26は、 第1・第2腕のうち一方の腕22の外側に位置するハン
ドルベース27を有しており、 ハンドルベース27の左右中央部位に操作ハンドル25
を有し、 ハンドルベース27の左右の下端に支点部29と作用部
30とを上下に設けてあり、 下方の各作用部30が、一方の腕22の左右の各側腕部
22bの外側に第1軸31を介して連結されており、 上方の各支点部29と、他方の腕21の左右の各側腕部
21bの外側とが、リンク32で第2軸33および第3
軸34を介してそれぞれ連結されている請求項3又は4
記載の管の接続用治具。
5. The boost link mechanism 26 has a handle base 27 located outside one of the first and second arms 22. The operating handle 25 is provided at the left and right central portions of the handle base 27.
A fulcrum portion 29 and an operating portion 30 are provided vertically on the left and right lower ends of the handle base 27, and each lower operating portion 30 is provided outside the left and right side arm portions 22 b of the one arm 22. Each of the upper fulcrum portions 29 and the outer sides of the left and right side arm portions 21b of the other arm 21 are linked by a link 32 to the second shaft 33 and the third shaft 31.
5. The connection according to claim 3, wherein the connection is made via a shaft.
A jig for connecting the pipe described.
【請求項6】 第1腕21の左右の一方の側腕部21b
と、第2腕22の左右の一方の側腕部22bとに、止め
軸40をこれが内向きに突出する姿勢と外側に退入する
姿勢とに切り換え自在とした止め手段36をそれぞれ備
えており、 各止め手段36は、止め軸40の先端が排土管5a・5
bの外周面に直接または間接的に接当する突出姿勢に保
持する機構を含んでいる請求項5記載の管の接続用治
具。
6. One of left and right side arm portions 21b of the first arm 21
And one of the left and right side arm portions 22b of the second arm 22 is provided with a stopping means 36 which enables the stopping shaft 40 to be freely switched between a posture in which the stopping shaft 40 protrudes inward and a posture in which it is retracted outside. Each of the stopping means 36 is configured such that the tip of the stopping shaft 40 is connected to the discharge pipes 5a and 5a.
6. The pipe connecting jig according to claim 5, further comprising a mechanism for holding the protruding posture of directly or indirectly contacting the outer peripheral surface of the pipe b.
JP1998009591U 1998-12-03 1998-12-03 Jig for connecting pipes Expired - Lifetime JP3059601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1998009591U JP3059601U (en) 1998-12-03 1998-12-03 Jig for connecting pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1998009591U JP3059601U (en) 1998-12-03 1998-12-03 Jig for connecting pipes

Publications (1)

Publication Number Publication Date
JP3059601U true JP3059601U (en) 1999-07-13

Family

ID=43193452

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1998009591U Expired - Lifetime JP3059601U (en) 1998-12-03 1998-12-03 Jig for connecting pipes

Country Status (1)

Country Link
JP (1) JP3059601U (en)

Similar Documents

Publication Publication Date Title
US4480942A (en) Apparatus and method for laying pipe
JPH05248160A (en) Grapple assembly
US7607863B2 (en) Automated pipe-laying method and apparatus
JP3059601U (en) Jig for connecting pipes
US20140360059A1 (en) Horizontal drilling attachment for excavators
JP2004534167A (en) How to make a circular hole in the ground
JP2004324256A (en) Shield machine
KR100805948B1 (en) Sewer pipe propeling unit
JP3402437B2 (en) Burial method of pipe
KR100983114B1 (en) Apparatus for pressing fore-end in steel pipe's loop structure
JP3489804B2 (en) New and old pipe replacement laying method and its equipment by non-cutting of gas supply pipe
JP2510832B2 (en) Soil retaining device for trench excavation
JPS621348Y2 (en)
KR101669329B1 (en) Concrete gravity dam its application daemche drilling rigs method
JPS644948Y2 (en)
JPH09235729A (en) Pulling-out device for rotary excavator
JP2003261952A (en) Pipe connecting apparatus operable in excavated groove
JP3393545B2 (en) Method of connecting buried pipe in excavation propulsion device and propulsion device
JP3037200U (en) Steel pipe connection device
JP2009012128A (en) Tool box and tool storing device
JPS6357673B2 (en)
JP2006193983A (en) Steel pipe drilling machine and underground propulsion method
JP3145345B2 (en) Method of laying vacuum sewer pipe and composite pipe for vacuum sewer pipe
JPH08246459A (en) Excavated ditch earth retaining shoring device
JPH09317383A (en) Method for burying main pipe and branch pipe in buried pipe

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term