JP3055080B2 - Equipment for transporting long materials - Google Patents

Equipment for transporting long materials

Info

Publication number
JP3055080B2
JP3055080B2 JP4220492A JP22049292A JP3055080B2 JP 3055080 B2 JP3055080 B2 JP 3055080B2 JP 4220492 A JP4220492 A JP 4220492A JP 22049292 A JP22049292 A JP 22049292A JP 3055080 B2 JP3055080 B2 JP 3055080B2
Authority
JP
Japan
Prior art keywords
guide rail
long material
bucket
tunnel
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4220492A
Other languages
Japanese (ja)
Other versions
JPH0666100A (en
Inventor
健治 渡辺
嘉彦 須々田
和雄 井手
種臣 出口
雄一 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP4220492A priority Critical patent/JP3055080B2/en
Publication of JPH0666100A publication Critical patent/JPH0666100A/en
Application granted granted Critical
Publication of JP3055080B2 publication Critical patent/JP3055080B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、土木建築現場等におい
て地上から地下の作業現場に長尺の資材を搬送するため
の長尺資材の搬送装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for transporting long material from the ground to an underground work site in a civil engineering construction site or the like.

【0002】[0002]

【従来の技術】一般に、土木建築現場において地上から
トンネルの作業現場に資材を搬送する場合には、地上に
設置されたクレーンに資材を取り付けて吊り下げる。こ
うして、吊持された資材を立坑の開口部より吊り降ろし
て作業現場に投入している。その後、立坑に接続された
トンネルに、トロリーホイストで資材を水平移動させ、
この資材を搬送する。
2. Description of the Related Art Generally, when materials are transported from the ground to a tunnel work site in a civil engineering construction site, the materials are attached to a crane installed on the ground and suspended. In this way, the suspended material is suspended from the opening of the shaft and thrown into the work site. After that, move the material horizontally with a trolley hoist to the tunnel connected to the shaft,
This material is transported.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、搬送さ
れる資材が長尺の鉄骨材や板材の場合には、吊持される
資材の安定を図るために、かかる長尺資材を水平にして
クレーンに吊り下げ、投入する。このため、資材が投入
される立坑等の穴の開口部も、水平に吊持される長尺資
材の大きさに合わせて大きく形成する必要があった。ま
た、クレーンを用いて資材の投入を行なう場合には、地
上にクレーンオペレーターが、また地下の作業現場には
合図や玉掛けを行なう作業者が必要になり、すなわち最
低二名の作業者が必要になる。さらに、地下の作業者
は、クレーンから資材を降ろし、この資材を玉掛け、玉
外しする必要があり、これら作業は煩雑である。
However, when the material to be conveyed is a long steel frame or plate, the long material is horizontally moved to the crane in order to stabilize the suspended material. Hang and throw. For this reason, the opening of a hole in a shaft or the like into which the material is to be charged also needs to be formed to be large according to the size of the long material suspended horizontally. In addition, when using a crane to input materials, a crane operator is required on the ground, and a crew or slinger is required on the underground work site, that is, at least two workers are required. . Further, an underground worker needs to unload the material from the crane, sling the material and removing the ball, and these operations are complicated.

【0004】本発明は前記課題を有効に解決するもの
で、長尺資材を地上から立坑を通してトンネル内に連続
・搬送でき、これら搬送作業を自動化可能な長尺資材の
搬送装置を提供することを目的とする。
[0004] The present invention effectively solves the above-mentioned problems, and an object of the present invention is to provide a long material transfer apparatus which can continuously and transfer long materials from the ground through a shaft and into a tunnel, and which can automate these transfer operations. Aim.

【0005】[0005]

【課題を解決するための手段】請求項1記載の長尺資材
の搬送装置は、長尺資材を立坑からトンネル内に連続・
搬送させる長尺資材の搬送装置であって、長尺資材を地
上からトンネル内に案内するガイドレールと、該ガイド
レールに沿って移動され、長尺資材を保持するバケット
台車とから構成され、前記ガイドレールは、給電ライン
を固定して複数分割されてなり、立坑の延在方向に沿っ
て配設されるとともに、トンネルの延在方向に沿って配
設され、前記バケット台車は、該バケット台車をガイド
レールに支持させるローラー部と、前記バケット台車を
ガイドレールに沿って移動させる駆動部と、該駆動部に
前記給電ラインから電力を供給する集電装置とを有する
構成にされ、これら集電装置と前記ローラー部とは、バ
ケット台車の前後の端部に設けられ、前記集電装置は、
前記ローラー部の中心軸の延長線上に配設されているこ
とを特徴とするものである。
According to a first aspect of the present invention, there is provided an apparatus for transporting long material, wherein the long material is continuously transferred from a shaft into a tunnel.
A device for transporting long material to be transported, comprising: a guide rail for guiding the long material from the ground into the tunnel; and a bucket cart that is moved along the guide rail and holds the long material; The guide rail is divided into a plurality of parts by fixing the power supply line, and is arranged along the extending direction of the shaft, and is arranged along the extending direction of the tunnel, and the bucket cart is the bucket cart. And a current collector that supplies power from the power supply line to the driving unit. The device and the roller unit are provided at front and rear ends of a bucket cart, and the current collector is
It is characterized by being arranged on an extension of the central axis of the roller section.

【0006】請求項2記載の長尺資材の搬送装置は、請
求項1記載の長尺資材の搬送装置であって、前記ガイド
レールには、前記バケット台車を別のガイドレールに切
り替える切り替え部が設けられていることを特徴とする
ものである。
According to a second aspect of the present invention, there is provided an apparatus for transporting long material, wherein the guide rail includes a switching unit for switching the bucket truck to another guide rail. It is characterized by being provided.

【0007】請求項3記載の長尺資材の搬送装置は、請
求項2記載の長尺資材の搬送装置であって、前記バケッ
ト台車の駆動部と、前記切り替え部との作動を制御する
制御部が設けられていることを特徴とするものである。
According to a third aspect of the present invention, there is provided a long material transport apparatus according to the second aspect, wherein the control section controls the operation of the driving section of the bucket truck and the switching section. Is provided.

【0008】[0008]

【作用】請求項1記載の長尺資材の搬送装置では、長尺
資材がバケット台車に保持され、このバケット台車をガ
イドレールに沿って移動させることにより、長尺資材が
立坑からトンネル内に連続・搬送される。前記バケット
台車のローラー部がガイドレールに支持され、このガイ
ドレールに沿って駆動部でバケット台車を移動させるか
ら、バケット台車は立坑の延在方向に沿って移動すると
ともに、トンネルの延在方向に沿って移動する。ここ
で、ガイドレールの給電ラインから集電装置で駆動部に
電力が供給される。さらに、集電装置と前記ローラー部
とは、共にバケット台車の前後の端部に設けられ、前記
集電装置は、前記ローラー部の中心軸上に配設されてい
るから、集電装置は、ローラー部の軸心の延長線上の位
置を保ちつつ、ガイドレールに沿って常時平行に移動さ
れる。したがって、ガイドレールが折曲されている場合
にあっても、複数分割された給電ラインに集電装置がそ
れぞれ接続され、長尺資材が立坑からトンネル内に連続
・搬送される。
According to the first aspect of the present invention, the long material is held by the bucket truck, and by moving the bucket truck along the guide rail, the long material is continuously transferred from the shaft into the tunnel.・ Transported. Since the roller unit of the bucket cart is supported by a guide rail, and the bucket cart is moved by the driving unit along the guide rail, the bucket cart moves along the extending direction of the shaft and in the extending direction of the tunnel. Move along. Here, power is supplied from the power supply line of the guide rail to the drive unit by the current collector. Furthermore, the current collector and the roller unit are both provided at the front and rear ends of the bucket cart, and the current collector is disposed on the center axis of the roller unit. The roller is always moved in parallel along the guide rail while maintaining the position on the extension of the axis of the roller. Therefore, even when the guide rail is bent, the current collector is connected to each of the plurality of divided power supply lines, and the long material is continuously and conveyed from the shaft into the tunnel.

【0009】請求項2記載の長尺資材の搬送装置では、
請求項1記載の作用を有するとともに、前記ガイドレー
ルには、前記バケット台車を別のガイドレールに切り替
える切り替え部が設けられているから、この切り替え部
でバケット台車が進行方向を転換される。
According to a second aspect of the present invention, there is provided an apparatus for transporting long material.
In addition to having the function of claim 1, the guide rail is provided with a switching unit that switches the bucket truck to another guide rail, and the traveling direction of the bucket truck is changed by this switching unit.

【0010】請求項3記載の長尺資材の搬送装置では、
請求項2記載の作用を有するとともに、制御部では、駆
動部の作動が制御され、切り替え部の作動が制御され
る。このため、長尺資材は無人で立坑からトンネル内に
連続・搬送される。
According to a third aspect of the present invention, there is provided a device for transporting long material.
In the control unit, the operation of the driving unit is controlled, and the operation of the switching unit is controlled. For this reason, long materials are continuously and conveyed unmanned from the shaft into the tunnel.

【0011】[0011]

【実施例】以下、本発明の長尺資材の搬送装置の一実施
例について、図1ないし図2を参照しながら説明する。
図1に示すように、符号1は長尺資材の搬送装置であ
り、この長尺資材の搬送装置1は、長尺資材を地上から
トンネル内に案内するガイドレール10と、このガイド
レール10に沿って移動され、長尺資材を保持するバケ
ット台車20とから基本構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention for transporting long materials will be described below with reference to FIGS.
As shown in FIG. 1, reference numeral 1 denotes an apparatus for transporting a long material. The apparatus 1 for transporting a long material includes a guide rail 10 for guiding the long material from the ground into a tunnel, and a guide rail 10. And a bucket truck 20 that is moved along and holds a long material.

【0012】前記ガイドレール10は、前記バケット台
車20を支持・案内するレール本体11と、このレール
本体11に固定された給電ライン12とから構成されて
いる。レール本体11は、図ではH型鋼を二本並設さ
れ、その延びる方向に複数分割されてなり、立坑の延在
方向に沿って配設されるとともに、この立坑から大きな
曲率の円弧を描いてトンネルの延在方向に沿って配設さ
れている。給電ライン12は、レール本体11に沿って
並設され、銅等を三本並設した導体線と、これら導体線
を覆う保護カバーとから構成されている。
The guide rail 10 is composed of a rail body 11 for supporting and guiding the bucket cart 20 and a power supply line 12 fixed to the rail body 11. In the figure, the rail main body 11 is formed by arranging two H-section steels in a row and dividing the H-shaped steel into a plurality of pieces in the direction in which the H-shaped steel extends. It is arranged along the extending direction of the tunnel. The power supply line 12 is arranged along the rail main body 11, and is composed of three conductor wires, such as copper, arranged side by side, and a protective cover covering these conductor wires.

【0013】前記バケット台車20は、長尺資材を載せ
る貨物台車21と、この貨物台車21をガイドレール1
0に沿って移動させる駆動部25と、この駆動部25
前記給電ライン12の導体線から電力を供給する集電装
置30とを有する構成にされている。ここで、駆動部2
5と貨物台車21とは、折曲自在な接続部40を介して
接続されている。貨物台車21には、この貨物台車21
をガイドレール10のレール本体11に支持させるロー
ラー部22が貨物台車21の前後の端部の下部にそれぞ
れ設けられている。
The bucket truck 20 includes a cargo truck 21 on which a long material is placed, and the cargo truck 21 is connected to the guide rail 1.
The drive unit 25 is configured to move along zero and a current collector 30 that supplies power to the drive unit 25 from the conductor line of the power supply line 12. Here, the driving unit 2
5 and the freight truck 21 are connected via a bendable connection portion 40. The cargo trolley 21 includes
Roller portion 22 for supporting the rail body 11 of the guide rail 10 are respectively provided in the lower portion of the front and rear ends of the cargo truck 21.

【0014】駆動部25は、貨物台車21の一方のロー
ラー部22に回動自在に接続され、前記レール本体11
上に設けられたチェーン等のラック26と、このラック
26に噛み合わされるピニオン27と、このピニオン2
7を回動させる電動モーター28と、この電動モーター
28の作動を制御する制御部(図示略)と、駆動部25
をレール本体11に支持させる二つの支持ローラー29
とから構成されている。これら支持ローラー29の側面
とレール本体11の側面との間には間隙が設けられ、ラ
ック26に噛み合わされたピニオン27がバケット台車
20をレール本体11に位置決めするから、支持ローラ
29の側面とレール本体11の側面との接触が防止さ
れる構成になる。ここで、支持ローラー29と前記ピニ
オン27は、側面視三角形状に配設されている。さら
に、ラック26にチェーンを用いたため、レール本体1
1上にチェーンを取り付けることにより、ラック26が
配設されるから、ラック26が容易に配設される。
The driving section 25 is rotatably connected to one roller section 22 of the freight truck 21, and is connected to the rail body 11.
A rack 26 such as a chain provided above, a pinion 27 meshed with the rack 26, and a pinion 2
Motor 7 for rotating the motor 7, a control unit (not shown) for controlling the operation of the electric motor 28, and a driving unit 25
Support rollers 29 that support the rail body 11
It is composed of Since a gap is provided between the side surface of the support roller 29 and the side surface of the rail body 11, the pinion 27 meshed with the rack 26 positions the bucket cart 20 on the rail body 11, so that the support roller
-29 and the rail body 11 are prevented from contacting with each other. Here, the support roller 29 and the pinion 27 are disposed in a triangular shape in a side view. Furthermore, since a chain is used for the rack 26, the rail body 1
Since the rack 26 is provided by mounting the chain on the rack 1, the rack 26 is easily provided.

【0015】集電装置30は、給電ライン12の各導体
線を押圧する三個の集電ブロック31と、この集電ブロ
ック31を前記電動モーター28に接続する配線とを有
する構成にされている。これら集電装置30と前記ロー
ラー部22とは、貨物台車21の幅方向に並設されてい
る。すなわち、ローラー部22の中心軸上に集電装置3
0が配設され、この集電装置30は二本のレール本体1
1の一方に隣接されている。したがって、集電装置30
と給電ライン12との接触部がローラー部22の中心軸
の延長線上に配設される。このため、ガイドレール10
が折曲されている場合にあっても、ローラー部22の中
心軸に対して常時集電装置30が所定位置に配設される
ことにより、集電装置30と給電ライン12との接触状
態は安定になる。
The current collecting device 30 has three current collecting blocks 31 for pressing the respective conductor lines of the power supply line 12 and wiring for connecting the current collecting block 31 to the electric motor 28 . . The current collector 30 and the roller unit 22 are juxtaposed in the width direction of the freight truck 21. That is, the current collecting device 3 is placed on the central axis of the roller portion 22.
0, and the current collecting device 30 includes two rail bodies 1
1 adjacent to one another. Therefore, the current collector 30
A contact portion between the roller unit 22 and the power supply line 12 is provided on an extension of the central axis of the roller unit 22 . For this reason, the guide rail 10
Even if is bent, the current collecting device 30 is always disposed at a predetermined position with respect to the central axis of the roller portion 22 , so that the contact state between the current collecting device 30 and the power supply line 12 is maintained. Become stable.

【0016】前記ガイドレール10には、図2に示すよ
うに、バケット台車20を別のガイドレール10に切り
替える切り替え部14が設けられている。この切り替え
部14は、駆動部25の制御部に接続されている。切り
替え部14には、例えば、バケット台車20を保持した
状態で、電動チェーンブロック、トロリーホイスト等の
揚重設備16で吊り上げることにより、鉛直面内に回動
させて別のガイドレール10に接続するガイドチャンネ
ル15と、バケット台車20を水平面内に回動させて別
のガイドレール10に接続するターンテーブル17と、
バケット台車20を平行移動させるトラバーサー(図示
略)とがある。
[0016] The guide rail 10, as shown in FIG. 2, the switching unit 14 for switching the bucket truck 20 with another guide rail 10 is provided. The switching unit 14 is connected to a control unit of the driving unit 25. The switching unit 14 is, for example, lifted by a lifting device 16 such as an electric chain block, a trolley hoist or the like while holding the bucket cart 20, and is turned in a vertical plane to be connected to another guide rail 10 . A guide channel 15, a turntable 17 for rotating the bucket trolley 20 in a horizontal plane and connecting to another guide rail 10 ,
There is a traverser (not shown) that translates the bucket cart 20 in parallel.

【0017】前記長尺資材の搬送装置1で長尺資材を立
坑からトンネル内に連続・搬送する方法について、図2
を参照しながら説明する。図2に示すように、立坑50
の開口部付近のガイドチャンネル15にバケット台車2
0を載せ、このバケット台車20を保持しつつ、ガイド
チャンネル15を倒立させ、バケット台車20を立坑5
0の延在方向からトンネルの延在方向に搬送する。この
トンネル内のガイドチャンネル15にバケット台車20
を載せ、このバケット台車20を保持しつつ、前記トン
ネルに形成された段部51で鉛直面内を回動させる。
FIG. 2 shows a method of continuously and transporting long materials from a shaft into a tunnel by the long material transport apparatus 1.
This will be described with reference to FIG. As shown in FIG.
Bucket truck 2 in guide channel 15 near the opening of
0, and while holding the bucket truck 20, the guide channel 15 is inverted so that the bucket truck 20 is
It is conveyed from the extending direction of 0 to the extending direction of the tunnel. A bucket truck 20 is provided in the guide channel 15 in this tunnel.
While holding the bucket cart 20, the stepped portion 51 formed in the tunnel rotates in the vertical plane.

【0018】この段部51に斜めに配設されたガイドレ
ール10に接続し、この斜めのガイドレール10上にバ
ケット台車20を走行させ、このバケット台車20を保
持しつつ、斜めのガイドレール10をターンテーブル1
7で水平面内を回動させ、別のトンネル内のガイドレー
ル10に接続する。こうして、長尺資材が立坑からトン
ネル内に連続・搬送される。
The stepped portion 51 is connected to a guide rail 10 which is disposed diagonally, and the bucket truck 20 is run on the diagonal guide rail 10. Turntable 1
At 7, the robot is rotated in a horizontal plane and connected to a guide rail 10 in another tunnel. Thus, the long material is continuously and transported from the shaft into the tunnel.

【0019】このような長尺資材の搬送装置1によれ
ば、長尺資材を地上からトンネル内に案内するガイドレ
ール10と、このガイドレール10に沿って移動され、
長尺資材を保持するバケット台車20とを有するから、
長尺資材がバケット台車20に保持され、このバケット
台車20ガイドレール10に沿って移動させることに
より、長尺資材が立坑からトンネル内に搬送される。こ
のため、長尺資材を水平状態で立坑に投入する場合に比
べ、立坑の開口部をバケット台車20が通れる大きさに
形成すればよく、開口部の開口面積を小さくできるか
ら、長尺資材の搬送作業の安全性を向上させることがで
きる。
According to such a long material transport apparatus 1, the guide rail for guiding the long material from the ground into the tunnel is provided.
And Lumpur 10 is moved along the guide rail 10,
Because it has a bucket truck 20 for holding long materials,
The long material is held on a bucket cart 20 , and the bucket
By moving the carriage 20 along the guide rail 10 , long materials are transported from the shaft into the tunnel. For this reason, compared with the case where the long material is put into the shaft in a horizontal state, the opening of the shaft may be formed to have a size through which the bucket truck 20 can pass, and the opening area of the opening can be reduced. The safety of the transfer operation can be improved.

【0020】前記ガイドレール10は、給電ライン12
を固定して複数分割されてなり、立坑の延在方向に沿っ
て配設されるとともに、トンネルの延在方向に沿って配
設され、前記バケット台車20は、貨物台車21をレー
ル本体11に支持させるローラー部22と、前記貨物台
車21をレール本体11に沿って移動させる駆動部25
と、該駆動部25に前記給電ライン12から電力を供給
する集電装置30とを有するから、バケット台車20は
立坑の延在方向に沿って移動するとともに、トンネルの
延在方向に沿って移動する。ここで、ガイドレール10
の給電ライン12から集電装置30で駆動部25の電動
モーター28に電力が供給される。このため、自動的に
バケット台車20を走行させることができるとともに、
立坑からトンネルにガイドレール10に沿って長尺資材
を搬送できるから、長尺資材を降ろし作業と、玉掛け、
玉外し作業を不要にでき、長尺資材の搬送作業性を向上
させることができる。
The guide rail 10 includes a power supply line 12
Are fixed and are arranged along the extending direction of the shaft, and are arranged along the extending direction of the tunnel. A roller unit 22 to be supported, and a drive unit 25 to move the cargo truck 21 along the rail body 11
And the current collector 30 for supplying power from the power supply line 12 to the drive unit 25, so that the bucket cart 20 moves along the extending direction of the shaft and also moves along the extending direction of the tunnel. I do. Here, the guide rail 10
Power is supplied from the power supply line 12 to the electric motor 28 of the drive unit 25 by the power collection device 30. For this reason, while being able to run the bucket truck 20 automatically,
Since long materials can be transported along the guide rails 10 from the shaft to the tunnel, unloading the long materials, slinging,
The operation of removing the ball can be eliminated, and the workability of transporting the long material can be improved.

【0021】さらに、集電装置30と前記ローラー部2
2とは、貨物台車21の前後の端部の下部にそれぞれ設
けられ、集電装置30と給電ライン12の接触部がロー
ラー部22の中心軸の延長線上に配設されているから、
ガイドレール10が大きな曲率を有して折曲されている
場合にあっても、集電装置30とローラー部22とはガ
イドレール10に沿って平行に移動され、給電ライン1
2と集電装置30とが一定間隔に維持され、複数分割さ
れた給電ライン12を集電装置30が押圧し、長尺資材
が立坑からトンネル内に搬送される。このため、集電装
置30は給電ライン12から確実に電力を得ることがで
き、長尺資材の搬送作業を連続的に行なうことができ、
地下の作業現場に合図や玉掛けを行なう作業者を不要に
でき、長尺資材の搬送作業の安全性を向上させることが
できる。
Further, the current collector 30 and the roller unit 2
2 is provided at the lower part of the front and rear ends of the cargo truck 21, respectively, and the contact portion between the current collector 30 and the power supply line 12 is disposed on an extension of the center axis of the roller portion 22.
Even when the guide rail 10 is bent with a large curvature, the current collector 30 and the roller unit 22 are moved in parallel along the guide rail 10 and the power supply line 1
2 and the power collecting device 30 are maintained at a constant interval, the power collecting device 30 presses the divided power supply line 12, and the long material is transported from the shaft into the tunnel. For this reason, the power collection device 30 can reliably obtain electric power from the power supply line 12, and can continuously perform the operation of transporting the long material,
This eliminates the need for an operator to signal or sling on the underground work site, thereby improving the safety of the operation of transporting long materials.

【0022】また、前記ガイドレール10には、バケッ
ト台車20を別のガイドレールに切り替える切り替え部
14が設けられている構成にしたから、この切り替え部
14でバケット台車20が進行方向を転換される。この
ため、ガイドレール10を大きな曲率をもって曲折させ
る必要性をなくすことができ、狭い地下トンネル内にあ
っても、バケット台車20の方向転換を確実に行なうこ
とができ、長尺資材をバケット台車20で直接地下の作
業現場に搬送できるから、長尺資材の搬送作業性を向上
させることができる。
Further, since the guide rail 10 is provided with a switching unit 14 for switching the bucket truck 20 to another guide rail, the traveling direction of the bucket truck 20 is changed by the switching unit 14. . For this reason, the necessity of bending the guide rail 10 with a large curvature can be eliminated, and the direction of the bucket truck 20 can be surely changed even in a narrow underground tunnel, and the long material can be transferred to the bucket truck 20. Thus, the workability of transferring long materials can be improved.

【0023】さらに、前記バケット台車20の駆動部2
5と、前記切り替え部14との作動を制御する制御部が
設けられている構成にしたから、制御部で駆動部25、
切り替え部14を制御することにより、長尺資材は無人
で立坑からトンネル内に連続・搬送される。このため、
長尺資材を全自動で、かつ連続的に立坑から地下の作業
現場に搬送できるから、長尺資材の搬送に作業員を不要
にでき、長尺資材の搬送作業の安全性を向上させること
ができるとともに、長尺資材の搬送作業性を向上させる
ことができる。
Further, the driving unit 2 of the bucket truck 20
5 and a control unit for controlling the operation of the switching unit 14 are provided.
By controlling the switching unit 14, the long material is continuously and conveyed from the shaft to the tunnel without any person. For this reason,
Since long materials can be transported from a shaft to an underground work site fully automatically and continuously, it is possible to eliminate the need for workers to transport long materials and improve the safety of long material transport operations. It is possible to improve the workability of transporting long materials.

【0024】[0024]

【発明の効果】以上説明したように、本発明の長尺資材
の搬送装置によれば、以下の効果を奏することができ
る。請求項1記載の長尺資材の搬送装置によれば、長尺
資材を地上からトンネル内に案内するガイドレールと、
該ガイドレールに沿って移動され、長尺資材を保持する
バケット台車とから構成されているから、長尺資材がバ
ケット台車に保持され、このバケット台車をガイドレー
ルに沿って移動させることにより、長尺資材が立坑から
トンネル内に連続・搬送される。このため、長尺資材を
水平状態で立坑に投入する場合に比べ、立坑の開口部を
バケット台車が通れる大きさに形成すればよく、開口部
の開口面積を小さくできるから、長尺資材の搬送作業の
安全性を向上させることができる。
As described above, according to the apparatus for transporting long material of the present invention, the following effects can be obtained. According to the device for transporting long material according to claim 1, a guide rail for guiding the long material from the ground into the tunnel,
The long material is held by the bucket truck, and the bucket truck is moved along the guide rail. The shaku materials are continuously and transported from the shaft into the tunnel. For this reason, compared with the case where the long material is put into the shaft in a horizontal state, the opening of the shaft may be formed to have a size through which the bucket truck can pass, and the opening area of the opening can be reduced. Work safety can be improved.

【0025】前記ガイドレールは、給電ラインを固定し
て複数分割されてなり、立坑の延在方向に沿って配設さ
れるとともに、トンネルの延在方向に沿って配設され、
前記バケット台車は、該バケット台車をガイドレールに
支持させるローラー部と、前記バケット台車をガイドレ
ールに沿って移動させる駆動部と、該駆動部に前記給電
ラインから電力を供給する集電装置とを有する構成にさ
れているから、バケット台車は立坑の延在方向に沿って
移動するとともに、トンネルの延在方向に沿って移動す
る。ここで、ガイドレールの給電ラインから集電装置で
駆動部に電力が供給される。このため、自動的にバケッ
ト台車を走行させることができるとともに、立坑からト
ンネルにガイドレールに沿って長尺資材を搬送できるか
ら、長尺資材を降ろし作業と、玉掛け、玉外し作業を不
要にでき、長尺資材の搬送作業性を向上させることがで
きる。
[0025] The guide rail is divided into a plurality of parts while fixing a power supply line, and is arranged along the extending direction of the shaft, and is arranged along the extending direction of the tunnel.
The bucket trolley includes a roller unit that supports the bucket trolley on a guide rail, a driving unit that moves the bucket trolley along the guide rail, and a current collector that supplies power to the drive unit from the power supply line. With this configuration, the bucket truck moves along the direction in which the shaft extends, and also moves along the direction in which the tunnel extends. Here, power is supplied from the power supply line of the guide rail to the drive unit by the current collector. For this reason, the bucket truck can be run automatically, and long materials can be transported along the guide rails from the shaft to the tunnel, eliminating the need for unloading the long materials, slinging, and removing the balls. In addition, the workability of transporting long materials can be improved.

【0026】さらに、集電装置と前記ローラー部とは、
バケット台車の前後の端部に設けられ、集電装置は、前
記ローラー部の中心軸の延長線上に配設されている構成
にしたから、ガイドレールが折曲されている場合にあっ
ても、集電装置はローラー部の軸心の延長線上の位置を
保ちつつ、ガイドレールに沿って平行に移動され、給電
ラインと集電装置との接触状態が維持され、複数分割さ
れた給電ラインに集電装置がそれぞれ接続され、長尺資
材が立坑からトンネル内に搬送される。このため、集電
装置は給電ラインから確実に電力を得ることができ、長
尺資材の搬送作業を連続的に行なうことができ、地下の
作業現場に合図や玉掛けを行なう作業者を不要にでき、
長尺資材の搬送作業の安全性を向上させることができ
る。
Further, the current collector and the roller portion
Provided at the front and rear ends of the bucket cart, the current collector is configured to be disposed on an extension of the center axis of the roller unit, so even when the guide rail is bent, The current collector is moved in parallel along the guide rails while maintaining the position on the extension of the axis of the roller section, the contact state between the power supply line and the current collector is maintained, and the current collector is collected into a plurality of divided power supply lines. The electrical equipment is connected to each other, and long materials are transported from the shaft into the tunnel. For this reason, the power collection device can reliably obtain power from the power supply line, can continuously transport long materials, and can eliminate the need for operators who signal or sling on underground work sites. ,
It is possible to improve the safety of the operation of transporting the long material.

【0027】請求項2記載の長尺資材の搬送装置は、請
求項1記載の効果を奏することができるとともに、前記
ガイドレールには、前記バケット台車を別のガイドレー
ルに切り替える切り替え部が設けられている構成にした
から、この切り替え部でバケット台車が進行方向を転換
される。このため、ガイドレールを曲折させる必要性を
なくすことができ、狭い地下トンネル内にあっても、バ
ケット台車の方向転換を確実に行なうことができ、長尺
資材をバケット台車で直接地下の作業現場に搬送できる
から、長尺資材の搬送作業性を向上させることができ
る。
According to a second aspect of the present invention, there is provided an apparatus for transporting long material having the same effects as the first aspect, and the guide rail is provided with a switching unit for switching the bucket truck to another guide rail. With this configuration, the traveling direction of the bucket truck is changed by this switching unit. This eliminates the need to bend the guide rails, ensures that the direction of the bucket truck can be changed even in a narrow underground tunnel, and allows long materials to be directly transferred to the underground work site by the bucket truck. Therefore, it is possible to improve the workability of transporting the long material.

【0028】請求項3記載の長尺資材の搬送装置は、請
求項2記載の効果を奏することができるとともに、前記
バケット台車の駆動部と、前記切り替え部との作動を制
御する制御部が設けられている構成にしたから、制御部
で駆動部、切り替え部を制御することにより、長尺資材
は無人で立坑からトンネル内に連続・搬送される。この
ため、長尺資材を全自動で、かつ連続的に立坑から地下
の作業現場に搬送できるから、長尺資材の搬送に作業員
を不要にでき、長尺資材の搬送作業の安全性を向上させ
ることができるとともに、長尺資材の搬送作業性を向上
させることができる。
According to a third aspect of the present invention, there is provided an apparatus for transporting long material, which has the effects of the second aspect, and further includes a control unit for controlling the operation of the driving unit of the bucket truck and the switching unit. Since the driving unit and the switching unit are controlled by the control unit, the long material is continuously and conveyed from the shaft to the tunnel without any person. As a result, long materials can be transported from a shaft to an underground work site fully automatically and continuously, eliminating the need for workers to transport long materials and improving the safety of long material transport operations. And the workability of transporting the long material can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の長尺資材の搬送装置を示す斜視図であ
る。
FIG. 1 is a perspective view showing a long material conveying apparatus of the present invention.

【図2】図1の長尺資材の搬送装置で搬送作業を示す断
面図である。
FIG. 2 is a cross-sectional view showing a transfer operation of the long material transfer device in FIG. 1;

【符号の説明】[Explanation of symbols]

1 長尺資材の搬送装置 10 ガイドレール 20 バケット台車 22 ローラー部 25 駆動部 30 集電装置 DESCRIPTION OF SYMBOLS 1 Conveyor of long material 10 Guide rail 20 Bucket truck 22 Roller part 25 Drive part 30 Current collector

フロントページの続き (72)発明者 出口 種臣 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 菊地 雄一 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (58)調査した分野(Int.Cl.7,DB名) E21F 13/00 Continued on the front page (72) Inventor Exit Taneomi 1-3-2 Shibaura, Minato-ku, Tokyo Within Shimizu Corporation (72) Inventor Yuichi Kikuchi 1-2-3 Shibaura, Minato-ku, Tokyo Shimizu Corporation In-company (58) Field surveyed (Int.Cl. 7 , DB name) E21F 13/00

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 長尺資材を立坑からトンネル内に連続・
搬送させる長尺資材の搬送装置であって、長尺資材を地
上からトンネル内に案内するガイドレールと、該ガイド
レールに沿って移動され、長尺資材を保持するバケット
台車とから構成され、前記ガイドレールは、給電ライン
を固定して複数分割されてなり、立坑の延在方向に沿っ
て配設されるとともに、トンネルの延在方向に沿って配
設され、前記バケット台車は、該バケット台車をガイド
レールに支持させるローラー部と、前記バケット台車を
ガイドレールに沿って移動させる駆動部と、該駆動部に
前記給電ラインから電力を供給する集電装置とを有する
構成にされ、これら集電装置と前記ローラー部とは、バ
ケット台車の前後の端部に設けられ、前記集電装置は、
前記ローラー部の中心軸の延長線上に配設されているこ
とを特徴とする長尺資材の搬送装置。
Claims: 1. Continuously transfer long materials from a shaft into a tunnel.
A device for transporting long material to be transported, comprising: a guide rail for guiding the long material from the ground into the tunnel; and a bucket cart that is moved along the guide rail and holds the long material; The guide rail is divided into a plurality of parts by fixing the power supply line, and is arranged along the extending direction of the shaft, and is arranged along the extending direction of the tunnel, and the bucket cart is the bucket cart. And a current collector that supplies power from the power supply line to the driving unit. The device and the roller unit are provided at front and rear ends of a bucket cart, and the current collector is
An apparatus for transporting a long material, which is provided on an extension of a center axis of the roller portion.
【請求項2】 請求項1記載の長尺資材の搬送装置であ
って、前記ガイドレールには、前記バケット台車を別の
ガイドレールに切り替える切り替え部が設けられている
ことを特徴とする長尺資材の搬送装置。
2. The long material conveying apparatus according to claim 1, wherein the guide rail is provided with a switching unit for switching the bucket truck to another guide rail. Material transfer device.
【請求項3】 請求項2記載の長尺資材の搬送装置であ
って、前記バケット台車の駆動部と、前記切り替え部と
の作動を制御する制御部が設けられていることを特徴と
する長尺資材の搬送装置。
3. The long material conveying device according to claim 2, further comprising a control unit for controlling the operation of the driving unit of the bucket truck and the switching unit. A transport device for shaku materials.
JP4220492A 1992-08-19 1992-08-19 Equipment for transporting long materials Expired - Fee Related JP3055080B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4220492A JP3055080B2 (en) 1992-08-19 1992-08-19 Equipment for transporting long materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4220492A JP3055080B2 (en) 1992-08-19 1992-08-19 Equipment for transporting long materials

Publications (2)

Publication Number Publication Date
JPH0666100A JPH0666100A (en) 1994-03-08
JP3055080B2 true JP3055080B2 (en) 2000-06-19

Family

ID=16751913

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4220492A Expired - Fee Related JP3055080B2 (en) 1992-08-19 1992-08-19 Equipment for transporting long materials

Country Status (1)

Country Link
JP (1) JP3055080B2 (en)

Also Published As

Publication number Publication date
JPH0666100A (en) 1994-03-08

Similar Documents

Publication Publication Date Title
US5657888A (en) Track-bound mobile crane
JP2001200700A (en) Segment conveying method and device for small-diameter shield
JP3055080B2 (en) Equipment for transporting long materials
JP2662581B2 (en) Automatic material transfer method in shield method
JPH0819838B2 (en) Automatic shield material transfer method and shield material automatic transfer device
JPH10277742A (en) Automatic welding line for box shape structure made of metal
JP4091686B2 (en) Material transport mechanism for tunnels
JPH10115192A (en) Device for mounting floor panel for tunnel
JPH10316365A (en) Installation structure for heavy object conveying crane in pit
JP3689165B2 (en) Material and material transport structure for uplift excavation
JP3138762B2 (en) Transport cart and transport method
KR100404903B1 (en) The system transportation a body
JPH07328961A (en) Transfer machine, conveying device, rolling facility for metal band coil
JPH0416769Y2 (en)
JP2545270B2 (en) Hawk-type storage cart drive
JP3108751B2 (en) Carrier
JP2505582Y2 (en) Waste coil discharge device
JPH0741157A (en) Method of transferring steel material and its facility
JPH10331599A (en) Carrying system of lining segment for tunnel construction
JPS6332924B2 (en)
JPH10176420A (en) Conveying method and device for material in underground work
JP2002331393A (en) Welding facility carrying device
JPH07119311A (en) Revolution type hoisting conveying equipment utilizing side of structure
JPH1136797A (en) Relay device for work and transportation system employing the same
JPS6357435A (en) Container crane

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000307

LAPS Cancellation because of no payment of annual fees