JP3049584B2 - All-weather construction method - Google Patents

All-weather construction method

Info

Publication number
JP3049584B2
JP3049584B2 JP5228384A JP22838493A JP3049584B2 JP 3049584 B2 JP3049584 B2 JP 3049584B2 JP 5228384 A JP5228384 A JP 5228384A JP 22838493 A JP22838493 A JP 22838493A JP 3049584 B2 JP3049584 B2 JP 3049584B2
Authority
JP
Japan
Prior art keywords
floor
ground
driving
jack device
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5228384A
Other languages
Japanese (ja)
Other versions
JPH0782893A (en
Inventor
四郎 谷口
幹太 宮口
健 三井
卓美 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP5228384A priority Critical patent/JP3049584B2/en
Publication of JPH0782893A publication Critical patent/JPH0782893A/en
Application granted granted Critical
Publication of JP3049584B2 publication Critical patent/JP3049584B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、建物の最上階(駆動
階)及び次下階を初めに地上レベルにおいて構築し、こ
れらを順次本設柱に沿って上昇させると共に各階床の構
築を地組みとして行ない前記駆動階と共に上昇させてハ
ーフアップと本固定をくり返し、下層から上層へと建築
を進めることにより、全天候型の作業環境を保持して建
物を構築する建築工法(駆動階先行上昇式建築工法とも
云う。)に係り、更にいえば、先願の特願平4−484
52号及び特願平5−144750号明細書及び図面に
記載した建築工法の改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention constructs the top floor (drive floor) and the next lower floor of a building at the ground level first, sequentially raises them along the main pillars, and constructs each floor. Building construction method to build a building while maintaining an all-weather working environment by raising the driving floor together with the driving floor, repeating half-up and permanent fixing, and proceeding with construction from the lower floor to the upper floor. In other words, Japanese Patent Application No. 4-484 of the earlier application.
The present invention relates to an improvement in the construction method described in Japanese Patent Application No. 52 and Japanese Patent Application No. 5-144750 and drawings.

【0002】[0002]

【従来の技術】最近、天候条件の影響を受けることの少
ない全天候型建築工法の開発が多面的に進められてい
る。先願の特願平4−48452号明細書及び図面に記
載した全天候型建築工法の発明もその一つである。同工
法の手順を簡単に説明すると、先ず、本設柱に沿って上
昇する駆動階を構築し、その下面に天井走行型のサーク
ルクレーンを設置し、前記駆動階を先行上昇させる。次
に、前記駆動階の下で前記サークルクレーンを使用して
地上1階床を地組みとして構築する。つづいて、この地
上1階床は作業員の背丈相当の高さハーフアップさせ、
そのハーフアップ位置で前記地上1階床を完成させると
共に耐火被覆やダクト布設などの仕上げ工事、設備工事
を行なう。その後、この地上1階床は更に地上1階位置
まで上昇させ、その位置において本設柱へ本固定する。
次には前記地上1階床の上で次上階床を地組みとして構
築する。以後、本設柱の継ぎ足しと駆動階の上昇、そし
て、各階床を順次に次下階床の上において地組み作業と
して構築し、そのハーフアップと施工位置までの上昇及
び本固定の工程を繰り返し、最終的に前記駆動階は建物
の最上階に使用する。
2. Description of the Related Art Recently, the development of all-weather construction methods that are less affected by weather conditions is being promoted in many aspects. The invention of the all-weather construction method described in Japanese Patent Application No. 4-48452 and drawings of the prior application is one of them. The procedure of this method will be briefly described. First, a driving floor that rises along a main pillar is constructed, and an overhead traveling circle crane is installed on the lower surface thereof, and the driving floor is raised first. Next, using the circle crane under the driving floor, the first floor above the ground is constructed as a ground structure. Then, the first floor above the ground is raised half the height equivalent to the height of the worker,
At the half-up position, the first floor above the ground is completed and finishing works such as fireproof coating and duct laying, and equipment work are performed. After that, the first floor above the ground is further raised to the first floor position, and is permanently fixed to the main pillar at that position.
Next, the next upper floor is constructed on the first floor above the ground. After that, rebuilding the main pillars, raising the driving floor, and building each floor in sequence on the next lower floor as a terrain work, repeating the half-up, raising to the construction position, and permanent fixing process Finally, the driving floor is used for the top floor of the building.

【0003】特願平5−144750号明細書及び図面
に記載した全天候型建築工法も、基本的には同様の建築
工法であるが、特には建物平面を数分割した工区毎の単
位で前記全天候型建築工法を実施する内容である。
The all-weather construction method described in Japanese Patent Application No. 5-144750 and the drawings are basically the same construction method. In particular, the all-weather construction method is divided into several sections of a building plane and divided into sections. It is the contents to carry out the type construction method.

【0004】[0004]

【本発明が解決しようとする課題】上述した先願の全天
候型建築工法は、駆動階の上昇工程と施工階床の上昇工
程を行なうために、ジャッキ装置は2種類を必要とす
る。一つは駆動階を上昇させ施工階床を上昇させる主た
るジャッキ装置であり、二つ目は駆動階を仮固定してお
く従たるジャッキである。このために設備機器が多くな
り、その操作手順も2回となってしまい、工程数も多く
なっている。
In the above-mentioned all-weather construction method of the prior application, two types of jack devices are required to perform the ascending step of the driving floor and the ascending step of the construction floor. One is a main jack device that raises the driving floor and the construction floor is raised, and the other is a secondary jack that temporarily fixes the driving floor. For this reason, the number of equipment is increased, the operation procedure is also performed twice, and the number of steps is also increased.

【0005】従って、本発明の目的は、唯1種のジャッ
キ装置によって施工でき、設備機器の削減及び工程の削
減を図れる全天候型建築工法を提供することである。
Accordingly, an object of the present invention is to provide an all-weather construction method which can be constructed by only one type of jack device and can reduce the number of equipment and the number of steps.

【0006】[0006]

【課題を解決するための手段】上記した従来技術の課題
を解決するための手段として、本発明に係る全天候型建
築工法は、地上レベルにおいて駆動階1を地組みにより
構築し、前記駆動階1はジャッキ装置5により本設柱3
に沿って施工階よりも上方の位置まで上昇させる段階
と、地上レベルにおいて地上1階床4を地組みにより構
築し、前記駆動階1に前記地上1階床4を吊設し、前記
ジャッキ装置5により前記駆動階1と共に地上1階床4
をその天井内の設備工事を地上レベルで行なうのに適し
た高さまでハーフアップさせる段階と、前記設備工事の
終了後に、前記地上1階床4は再び前記ジャッキ装置5
により駆動階1と共に地上1階位置まで上昇させ、本設
床として本設柱3へ本固定を行なう段階と、本設柱3を
継ぎ足し、ジャッキ装置5により駆動階1を更に上昇さ
せた後に、前記地上1階の本設床4′の上で次上階床4
を地組みにより構築し、その次上階床4は前記ジャッキ
装置5により前記駆動階1と共にハーフアップして天井
内の設備工事を行い、その後に施工位置まで上昇させ本
設柱3へ本固定する工程を繰り返す段階とから成ること
をそれぞれ特徴とする。
As means for solving the above-mentioned problems of the prior art, the all-weather construction method according to the present invention is to construct a driving floor 1 on the ground level by a ground structure, Is the main pillar 3 by the jack device 5.
Raising the ground floor to a position above the construction floor, constructing a ground floor at the ground level with a ground structure, suspending the ground floor on the driving floor 1, 5 and the driving floor 1 and the ground floor 4
To a height suitable for performing the construction work on the ceiling at the ground level, and after the completion of the construction work, the first floor 4 above the ground is again connected to the jack device 5.
Then, the driving floor 1 is raised to the first floor position together with the driving floor 1, and the main floor is fixed to the main pillar 3 as a permanent floor, and after the main pillar 3 is added and the driving floor 1 is further raised by the jack device 5, On the main floor 4 'of the first floor above, the next upper floor 4
Then, the next upper floor 4 is half-upped with the driving floor 1 by the jack device 5 to perform equipment work in the ceiling, and then raised to the work position and permanently fixed to the main pillar 3 And a step of repeating the steps of

【0007】また、第2の発明に係る全天候型建築工法
は、主要部の構成は上記第1の発明と共通するが、地上
レベルで駆動階1のみならず次下階2を順次地組みによ
り構築し、本設柱3に沿って昇降するジャッキ装置5の
ストローク柱6で前記駆動階1と次下階2とを一体的に
連結し、前記駆動階1及び次下階2はジャッキ装置5に
より本設柱3に沿って施工階よりも上方の位置まで上昇
させること、地上レベルにおいて地上1階床4を地組み
により構築し、前記次下階2の下に前記地上1階床4を
吊設し、前記ジャッキ装置5により前記駆動階1及び次
下階2と共に地上1階床4をその天井内の設備工事を地
上レベルで行なうのに適した高さまでハーフアップさ
せ、前記設備工事の終了後に、前記地上1階床4は再び
前記ジャッキ装置5により駆動階1、次下階2と共に地
上1階位置まで上昇させ、本設床として本設柱3へ本固
定を行なうことをそれぞれ特徴とする。
In the all-weather construction method according to the second invention, the construction of the main part is the same as that of the first invention, but not only the driving floor 1 but also the next lower floor 2 are sequentially laid on the ground level. The driving floor 1 and the next lower floor 2 are integrally connected by a stroke column 6 of a jack device 5 constructed and moved up and down along the main pillar 3, and the driving floor 1 and the next lower floor 2 are connected by a jack device 5 To rise to a position above the construction floor along the main pillar 3, construct a first floor 4 above the ground at the ground level, and place the first floor 4 below the next lower floor 2. Hanging, the jack device 5 halves the driving floor 1 and the next lower floor 2 together with the driving floor 1 and the next lower floor 2 to a height suitable for carrying out facility work in the ceiling at the ground level, and After the end, the first floor 4 is again returned to the jack device 5. More driving floor 1, with the following under floor 2 raised to first floor position, respectively and performing the fixed as the 設床 to this 設柱 3.

【0008】[0008]

【作用】駆動階1は常に先行してジャッキ装置5によっ
て上昇され、建築作業場の屋根代用となるから、全天候
型の作業場環境を確保できる。地上1階床4及び各施工
階は、駆動階1(及び次下階2)と共にジャッキ装置5
によって上昇され、先ずハーフアップして天井内の設備
工事等が無足場の高所作業なしで施工される。従って、
ジャッキ装置5は唯1種で足り、設備の削減と工程の削
減を実現できる。
The driving floor 1 is always raised by the jack device 5 in advance, and can be used as a roof for a construction workplace, so that an all-weather workplace environment can be secured. The first floor 4 above the ground and each construction floor are connected to the jacking device 5 together with the driving floor 1 (and the next lower floor 2).
First, it is half-up, and the equipment work in the ceiling etc. is carried out without work on high places without scaffolding. Therefore,
Only one type of jack device 5 is required, and the reduction of equipment and the number of processes can be realized.

【0009】[0009]

【実施例】以下に、本発明の実施例を図面に基づいて説
明する。図1と図2は、建物のN階まで本設床4′の建
築を完成した段階であり、更にN階の本設床4′の上に
おいて次上階(N+1階)4の鉄骨を地組み作業として
構築する状態を示している。図1中の符号7は駆動階1
の上で本設柱3の建て方、あるいは鉄骨等の資材搬入な
どに使用されるクレーンである。スライドクレーン8は
駆動階1の直下に設けた次下階2の天井部分に設置さ
れ、前記N階の本設床4′の上で構築する施工階床の鉄
骨その他の水平運搬又は鉄骨の組立作業に利用される。
駆動階1と次下階2は、本設柱3を伝って昇降するジャ
ッキ装置5のストローク柱6の上下に結合されている。
Embodiments of the present invention will be described below with reference to the drawings. FIGS. 1 and 2 show a stage where the construction of the main floor 4 'is completed up to the Nth floor of the building, and the steel frame of the next upper floor (N + 1 floor) 4 is further grounded on the main floor 4' of the Nth floor. This shows a state where it is constructed as an assembly work. Reference numeral 7 in FIG.
This is a crane used to build the main pillar 3 or carry in materials such as steel frames. The slide crane 8 is installed on the ceiling portion of the next lower floor 2 provided immediately below the driving floor 1, and transports steel or other horizontal members or assembles steel frames on the construction floor constructed on the main floor 4 ′ of the N floor. Used for work.
The driving floor 1 and the next lower floor 2 are connected above and below a stroke column 6 of a jack device 5 that moves up and down along a main column 3.

【0010】ところで、図1の施工段階に至るまでに
は、まず地上レベルで駆動階1を地組みとして構築し、
この駆動階1を上昇させた後に、つづいて次下階2をや
はり地上レベルで地組みとして構築し、本設柱3に沿っ
て昇降するジャッキ装置5のストローク柱6を仲介とし
て駆動階1と次下階2とを上下一体的に連結する。その
後、前記駆動階1及び次下階2はジャッキ装置5によっ
て本設柱3に沿って施工階4の施工位置(地上1階位
置)よりも上方の位置まで上昇させる。ちなみに、図示
したジャッキ装置5は、ジャッキ本体5aを本設柱3の
反力受け(凸部又は孔)12へ固定して反力をとった状
態でストローク柱6を上昇(又は下降)させ、ストロー
ク柱6をその有効長さ上昇させた後には、今度は駆動階
1に予め設置してある反力手段13で本設柱3に駆動階
1をあずけて反力をとった上で、ジャッキ装置5自体を
本設柱3に沿って駆動階1のすぐ下の位置まで上昇させ
る(図2と図3Aを参照)働き及び構成とされている。
By the way, before the construction stage shown in FIG. 1, first, a driving floor 1 is constructed as a ground structure at the ground level.
After the driving floor 1 is raised, the next lower floor 2 is also constructed as a ground structure at the ground level, and the driving floor 1 is connected to the driving floor 1 through the stroke columns 6 of the jack device 5 that moves up and down along the main columns 3. The next lower floor 2 is connected integrally vertically. Thereafter, the driving floor 1 and the next lower floor 2 are raised by the jack device 5 along the main pillar 3 to a position above the construction position of the construction floor 4 (the first floor position on the ground). Incidentally, the illustrated jack device 5 raises (or descends) the stroke column 6 in a state where the jack main body 5a is fixed to the reaction force receiver (convex portion or hole) 12 of the main column 3 and the reaction force is taken. After the stroke column 6 has been raised in its effective length, the driving floor 1 is applied to the main pillar 3 by the reaction force means 13 previously installed on the driving floor 1 to take a reaction force. The device 5 itself is raised and moved along the main pillar 3 to a position immediately below the driving floor 1 (see FIGS. 2 and 3A).

【0011】一方、再び地上レベルでは地上1階床の鉄
骨を地組み作業として構築し、これを鋼材等による吊具
10によって前記の次下階2の下に吊り下げる。そし
て、前記地上1階床は、前記駆動階1及び次下階2と共
にジャッキ装置5で地上レベルの作業員の背丈相当の高
さまでハーフアップし、天井部分の設備工事を行なう。
しかる後に、地上1階床は再び駆動階1、次下階2と共
に上昇させ、地上1階の位置において本設柱3へ本固定
する。次には、前記地上1階床の上で次上階床の構築を
地組み作業として行ない、これを前記次下階2の下に吊
具10で吊り、ジャッキ装置5の働きでハーフアップと
本固定をくり返す。こうして、図1と図2はN階の本設
床4′の上に架台11を設置し、その上でN+1階床
(施工階)4の構築を地組み作業として行なっている。
具体的には床鉄骨に一例として設備機器打込PC版ある
いはデッキプレートを取り付けることが行なわれる。各
階床の組立て作業は、全て床上レベルにおいて無足場で
行なわれ、高所作業は生じない。
On the ground level, on the other hand, a steel frame on the first floor above the ground is constructed as a ground work, and this is hung below the next lower floor 2 by a hanging tool 10 made of steel or the like. The first floor above the ground together with the driving floor 1 and the next lower floor 2 is half-up by the jack device 5 to a height equivalent to the height of the worker at the ground level, and the ceiling part is constructed.
Thereafter, the first floor above the ground is raised again together with the driving floor 1 and the next lower floor 2, and is permanently fixed to the main pillar 3 at the position of the first floor above the ground. Next, on the first floor above the ground, the construction of the next upper floor is performed as a laying work, and this is suspended below the next lower floor 2 by the hanging tool 10, and half-up is performed by the jack device 5. Repeat this fixation. 1 and 2, the gantry 11 is installed on the N floor of the permanent floor 4 ′, and the construction of the (N + 1) th floor (construction floor) 4 is performed as a ground work.
Specifically, a PC plate or a deck plate for driving equipment is attached to a floor steel frame as an example. All the assembling work of each floor is performed on the floor level without any scaffolding, and no work at height occurs.

【0012】次に、図3Aは前記のようにN階の本設柱
4′の上で構築したN+1階床4を次上階2の下に吊具
10で吊り下げ、ジャッキ装置5によって駆動階1、次
下階2と共にN+1階床4を天井設備工事をN階の床上
レベルで行なうのに適した高さまでハーフアップさせ、
N+1階床4についてN階の本設床4′の上に立つ設備
作業員が無足場で高所作業なしの床上作業としてN+1
階床の天井設備配管工事等を行なう段階を示している。
Next, FIG. 3A shows that the (N + 1) th floor 4 constructed on the main pillar 4 ′ of the Nth floor is suspended below the next upper floor 2 by the hanging tool 10 and driven by the jack device 5. Floor N + 1 floor 4 together with floor 1 and next lower floor 2 are halved to a height suitable for performing ceiling installation work on the floor above the N floor,
Regarding the N + 1 floor 4, the facility worker standing on the N floor main floor 4 ′ is N + 1 as a floor-based work without scaffolding and no altitude work.
It shows the stage of performing ceiling facility plumbing work and the like on the floor.

【0013】図3Bは、前記の天井設備工事の終了後
に、N+1階床4は、再びジャッキ装置5により駆動階
1、次下階2と共にN+1階位置まで上昇させ、本設柱
3へ本固定した段階と、その後吊具10による次下階2
との連結が解放され、駆動階1及び次下階2はジャッキ
装置5によって適度に上昇され、前記N+1階床の上で
次上階(N+2階)の構築が地組みとして開始された段
階を示している。
FIG. 3B shows that the N + 1 floor 4 is raised again to the N + 1 floor position together with the driving floor 1 and the next lower floor 2 by the jack device 5 after the completion of the above-mentioned ceiling installation work, and is permanently fixed to the main pole 3. And the next lower floor 2
The driving floor 1 and the next lower floor 2 are appropriately raised by the jack device 5, and the construction of the next upper floor (N + 2 floor) on the N + 1 floor is started as a terrain. Is shown.

【0014】以後も、本設柱3の継ぎ足し、次上階床
(N+2階)のハーフアップと天井設備工事、再上昇と
本固定の工程を順次に繰り返して各階の建築を進める。
いずれにしても、ジャッキ装置5は駆動階1及び次下階
2を段階的に上昇させるだけの働きであり、駆動階1及
び次下階2の上昇工程と共に施工階のハーフアップと施
工位置までの再上昇を併合して行なうので、ジャッキ装
置5は唯1種で用が足り、工程的にも省略が行なわれる
のである。
Thereafter, the steps of adding the main pillars 3, half-up of the next upper floor (N + 2 floor), construction of the ceiling equipment, re-elevation and permanent fixing are sequentially repeated to proceed with the construction of each floor.
In any case, the jack device 5 only works to raise the driving floor 1 and the next lower floor 2 step by step. Is carried out in combination, so that only one kind of jack device 5 is sufficient and the process is omitted in the process.

【0015】尚、図示した実施例のジャッキ装置5は、
ストローク柱6を併用した形式のものであり、よってス
トローク柱6の上下を固定して安定化させるため、駆動
階1の直下に次下階2を設けて各々をストローク柱6の
上下に結合した2層構造としているが、この例の限りで
はない。例えば駆動階1に直接、又はストローク柱6の
下部に施工階を吊具で吊り下げた単層構造の構成で実施
すること、又は特願平5−5255号明細書及び図面に
記載しているような押し上げ引き上げ用複合ジャッキ装
置を使用して駆動階1を上昇させる構成で実施すること
もでき、即ち、駆動階を1層でのみ構成し、駆動階の下
に直接吊具によって施工階を吊り下げる方式で全く同様
に実施することができる。また、ストローク柱6は本設
柱3の左右に2本設ける構成に限らず、1本だけの構
成、又は3本以上の構成で実施することも可能である。
The jack device 5 of the embodiment shown in FIG.
In order to fix and stabilize the upper and lower portions of the stroke column 6, the next lower floor 2 is provided immediately below the driving floor 1 and each is connected to the upper and lower portions of the stroke column 6. Although it has a two-layer structure, it is not limited to this example. For example, the construction is carried out in a single-layer structure in which the construction floor is hung directly below the driving floor 1 or below the stroke column 6 by a hanging tool, or described in Japanese Patent Application No. 5-5255 and the drawings. The driving floor 1 can be lifted by using such a composite jack device for lifting and lifting, that is, the driving floor is composed of only one layer, and the construction floor is directly hung below the driving floor by a hanging tool. It can be carried out in exactly the same manner in a hanging manner. Further, the number of the stroke columns 6 is not limited to two provided on the left and right sides of the main pillar 3, and it is also possible to implement the configuration with only one, or three or more.

【0016】[0016]

【本発明が奏する効果】本発明に係る全天候型建築工法
には、唯1種のジャッキ装置5によって駆動階1の上昇
工程と共に施工階4のハーフアップと施工位置への再上
昇工程を行なうので、設備機器の削減及び工程の削減を
達成でき、ひいてはコストの低減と工期の短縮に寄与す
る。
[Effects of the present invention] In the all-weather construction method according to the present invention, a half-up of the construction floor 4 and a re-elevation step to the construction position are performed together with the ascending step of the driving floor 1 by only one kind of jack device 5. In addition, it is possible to achieve a reduction in the number of equipments and processes, thereby contributing to a reduction in cost and a shortened construction period.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の全天候型建築工法の施工概要図であ
る。
FIG. 1 is a schematic diagram showing the construction of an all-weather construction method according to the present invention.

【図2】施工階床の地組み状態を示した正面図である。FIG. 2 is a front view showing a laid state of a construction floor.

【図3】Aは施工階床のハーフアップ状態を示した正面
図であり、Bは施工階床を本固定し、駆動階及び次下階
を上昇させた状態を示した正面図である。
FIG. 3A is a front view showing a half-up state of a construction floor, and FIG. 3B is a front view showing a state where a construction floor is permanently fixed and a driving floor and a next lower floor are raised.

【符号の説明】[Explanation of symbols]

1 駆動階 2 次下階 3 本設柱 4 施工階 5 ジャッキ装置 6 ストローク柱 DESCRIPTION OF SYMBOLS 1 Drive floor 2 Lower floor 3 Main pillar 4 Construction floor 5 Jack device 6 Stroke pillar

───────────────────────────────────────────────────── フロントページの続き (72)発明者 藤井 卓美 東京都江東区南砂二丁目5番14号 株式 会社竹中工務店技術研究所内 (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 E04B 1/35 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Takumi Fujii 2-5-1-14 Minamisuna, Koto-ku, Tokyo Inside Takenaka Corporation Technical Research Institute (58) Field surveyed (Int. Cl. 7 , DB name) E04G 21/14 E04B 1/35

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地上レベルにおいて駆動階を地組みにより
構築し、前記駆動階はジャッキ装置により本設柱に沿っ
て施工階よりも上方の位置まで上昇させる段階と、 地上レベルにおいて地上1階床を地組みにより構築し、
前記駆動階に前記地上1階床を吊設し、前記ジャッキ装
置により前記駆動階と共に地上1階床をその天井内の設
備工事を地上レベルで行なうのに適した高さまでハーフ
アップさせる段階と、 前記設備工事の終了後に、前記地上1階床は再び前記ジ
ャッキ装置により駆動階と共に地上1階位置まで上昇さ
せ、本設床として本設柱へ本固定を行なう段階と、 本設柱を継ぎ足し、ジャッキ装置により駆動階を更に上
昇させた後、前記地上1階の本設床の上で次上階床を地
組みにより構築し、その次上階床は前記ジャッキ装置に
より駆動階と共にハーフアップして天井内の設備工事を
行い、その後に施工位置まで上昇させ本設柱へ本固定す
る工程を繰り返す段階とから成ることをそれぞれ特徴と
する、全天候型建築工法。
At the ground level, a driving floor is constructed by a terrain structure, and the driving floor is raised by a jack device along a main pillar to a position above a construction floor. Is built on the ground,
Suspending the ground floor on the driving floor, and half-up the floor on the ground together with the driving floor by the jack device to a height suitable for performing facility work in the ceiling at the ground level; After the completion of the installation work, the ground floor is raised again to the ground floor position together with the driving floor by the jack device, and the main floor is fixed to the main pillar as a permanent floor, and the permanent pillar is added, After the driving floor is further raised by the jack device, the next upper floor is constructed by the ground construction on the main floor of the ground floor, and the next upper floor is half-up with the driving floor by the jack device. All-weather construction method, which comprises the steps of repeating the process of performing equipment work inside the ceiling, and then repeating the process of ascending to the construction position and permanently fixing it to the main pillar.
【請求項2】地上レベルにおいて駆動階及び次下階を順
次地組みにより構築し、本設柱に沿って昇降するジャッ
キ装置のストローク柱で前記駆動階と次下階とを一体的
に連結し、前記駆動階及び次下階は前記ジャッキ装置に
より本設柱に沿って施工階よりも上方の位置まで上昇さ
せる段階と、 地上レベルにおいて地上1階床を地組みにより構築し、
前記次下階の下に前記地上1階床を吊設し、前記ジャッ
キ装置により前記駆動階及び次下階と共に地上1階床を
その天井内の設備工事を地上レベルで行なうのに適した
高さまでハーフアップさせる段階と、 前記設備工事の終了後に、前記地上1階床は再び前記ジ
ャッキ装置により駆動階、次下階と共に地上1階位置ま
で上昇させ、本設床として本設柱へ本固定を行なう段階
と、 本設柱を継ぎ足し、ジャッキ装置により駆動階を更に上
昇させた後、前記地上1階の本設床の上で次上階床を地
組みにより構築し、その次上階床は前記ジャッキ装置に
より駆動階、次下階と共にハーフアップして天井内の設
備工事を行い、その後に施工位置まで上昇させ本設柱へ
本固定する工程を繰り返す段階とから成ることをそれぞ
れ特徴とする、全天候型建築工法。
2. A driving floor and a next lower floor are sequentially constructed on a ground level at a ground level, and the driving floor and the next lower floor are integrally connected by a stroke column of a jack device which moves up and down along a main pillar. The driving floor and the next lower floor are raised by the jack device along the main pillar to a position above the construction floor, and the first floor above the ground at the ground level is constructed by groundwork,
The first floor above the ground is suspended below the next lower floor, and the jack device is used to move the first floor above the ground together with the driving floor and the next lower floor to a height suitable for performing equipment work in the ceiling at the ground level. And after the completion of the facility construction, the ground floor is raised again to the ground floor position together with the driving floor and the next lower floor by the jack device, and is permanently fixed to the main pillar as a permanent floor. And after adding the main pillars and further raising the driving floor by means of the jack device, constructing the next upper floor on the main floor of the first floor above the ground, and forming the next upper floor The driving floor by the jack device, half up with the next lower floor, perform the equipment work in the ceiling, then repeat the process of ascending to the work position and permanently fixing to the main pillar All-weather architecture Law.
JP5228384A 1993-09-14 1993-09-14 All-weather construction method Expired - Fee Related JP3049584B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5228384A JP3049584B2 (en) 1993-09-14 1993-09-14 All-weather construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5228384A JP3049584B2 (en) 1993-09-14 1993-09-14 All-weather construction method

Publications (2)

Publication Number Publication Date
JPH0782893A JPH0782893A (en) 1995-03-28
JP3049584B2 true JP3049584B2 (en) 2000-06-05

Family

ID=16875629

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5228384A Expired - Fee Related JP3049584B2 (en) 1993-09-14 1993-09-14 All-weather construction method

Country Status (1)

Country Link
JP (1) JP3049584B2 (en)

Also Published As

Publication number Publication date
JPH0782893A (en) 1995-03-28

Similar Documents

Publication Publication Date Title
AU626320B2 (en) Construction apparatus and construction method
JP3049584B2 (en) All-weather construction method
JPH0483060A (en) Building construction
JP3516056B2 (en) Rotary lift-up construction method for dome roof
JP3185122B2 (en) All-weather construction method
JP3079324B2 (en) Construction method of high-rise building
JP3066460B2 (en) How to build a tower
JPH05340001A (en) Constructing method and device for building
JPH0759831B2 (en) Construction equipment
JPH0791904B2 (en) Push-up device
JPH05187068A (en) Construction method of building
JP3355374B2 (en) Driving-floor ascending construction method
JP3119982B2 (en) Self-elevating construction equipment
KR200200363Y1 (en) Building construction apparatus
JP2876991B2 (en) Steel frame method for high-rise buildings
JPH0781323B2 (en) Building construction method
JPH0518132A (en) Jack-up type construction method for steel structure such as tower type stereoscopic parking lot
JPH08284418A (en) Method for installing elevator for construction
JPH0317356A (en) Construction of multi-story building
JP3279290B2 (en) Rebar prefab vertical composition device
JPH0387439A (en) Construction method
JPH084273A (en) Constructing method of building
JPH04363471A (en) Building construction method
JPH04221173A (en) Execution of reconstruction of building in transfer
JPH07116845B2 (en) Construction equipment

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080331

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090331

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100331

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100331

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110331

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees