JP3028469U - Guide wall for continuous underground wall construction - Google Patents

Guide wall for continuous underground wall construction

Info

Publication number
JP3028469U
JP3028469U JP1996002007U JP200796U JP3028469U JP 3028469 U JP3028469 U JP 3028469U JP 1996002007 U JP1996002007 U JP 1996002007U JP 200796 U JP200796 U JP 200796U JP 3028469 U JP3028469 U JP 3028469U
Authority
JP
Japan
Prior art keywords
wall
construction
continuous underground
guide wall
underground wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1996002007U
Other languages
Japanese (ja)
Inventor
武良 吉田
康雄 坪根
広 村田
潔 片岡
篤 岩下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1996002007U priority Critical patent/JP3028469U/en
Application granted granted Critical
Publication of JP3028469U publication Critical patent/JP3028469U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

(57)【要約】 【課題】 工事で使用する電力ケ−ブルや、工事で
発生する排水処理のための排水管などの、設置、移動、
撤去が簡単に行える、連続地中壁構築用ガイドウオ−ル
を提供すること。 【解決手段】 連続地中壁構築用ガイドウオ−ル1
の頂部に、上面を開放し、ケ−ブル6や排水管を収納出
来る深さと幅を有する、上面開放路3を、地中壁4の溝
側から地山方向に向けて貫通する状態で設ける。
(57) [Abstract] [Problem] Installation, movement, etc. of electric power cables used in construction, drainage pipes for wastewater treatment generated in construction, etc.
To provide a guide wall for continuous underground wall construction that can be easily removed. SOLUTION: A guide wall 1 for constructing a continuous underground wall
An upper surface open path 3 having a depth and a width capable of accommodating the cable 6 and the drainage pipe is provided at the top of the so as to penetrate from the groove side of the underground wall 4 toward the natural direction. .

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the device belongs]

本考案は、連続地中壁構築用ガイドウオ−ルに関し、より詳細には連続地中壁 構築に際し、地中壁施工のためのガイドの役割を果たす壁体の構造に関する。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a guide wall for constructing a continuous underground wall, and more particularly, to a structure of a wall that serves as a guide for constructing an underground wall when constructing a continuous underground wall.

【0002】[0002]

【従来の技術】[Prior art]

連続地中壁用の溝を掘削する際に、溝の上端縁部の崩壊を防ぐために、溝の上 端に一定深さまでコンクリ−トの防護壁を設ける。これをガイドウオ−ルと称す る。 連続地中壁を施工する際、工事用機器の電力ケ−ブル、及び、工事に伴い発生 する排水処理のための排水管などは、現場内で複雑に配置されており、特に、連 続地中壁構築用ガイドウオ−ル付近においては、工事用機器が移動走行する際、 キャタピラなどでこれら電力用ケ−ブルなどを踏みつぶし、工事に支障を来す恐 れがある。 そのため従来は、電力ケ−ブルなどを挿入するための挿入用鋼管を、ガイドウ オ−ルの延長方向と直角方向に地中に複数箇所埋設し、この挿入用鋼管に上記電 力用ケ−ブルなどを挿入して対処していた。 従来技術を具体的に説明すると、 When excavating a trench for a continuous underground wall, a concrete protection wall is provided at a certain depth at the upper end of the trench to prevent collapse of the upper edge of the trench. This is called a guide wall. When constructing a continuous underground wall, the power cable of the equipment for construction and the drain pipe for the wastewater treatment generated during the construction are complicatedly arranged in the site, especially the continuous ground. In the vicinity of the guidewall for building the inner wall, when the construction equipment moves and travels, there is a danger that the power cables and the like will be squished by the caterpillar and the like, which will hinder the construction. For this reason, conventionally, steel pipes for inserting power cables and the like have been buried in a plurality of places in the ground in the direction perpendicular to the extension direction of the guide wall, and the above-mentioned power cables are inserted into the steel pipes for insertion. I was dealing with it by inserting. Specifically explaining the conventional technology,

【図3】FIG. 3

【図4】に示すように連続地中壁構 築用ガイドウオ−ル1のコンクリ−ト打設時に、ガイドウオ−ル1の地中部分で 、その延長方向と直角方向に挿入用鋼管2を、円周の複数箇所に埋設しておく。 この挿入用鋼管2は、連続地中壁を施工する際必要な電力用ケ−ブルや工事に伴 い発生する排水処理のための排水管などが、工事の際支障となるため、その保護 、整理の目的で挿入用綱管2内に収納するものである。 この方法によれば、上記電力ケ−ブルや排水管は工事の支障にもならず、かつ 、保護、整理の目的が達成出来る。[Fig. 4] As shown in Fig. 4, at the time of concrete driving of the guide wall 1 for constructing a continuous underground wall, the steel pipe 2 for insertion is inserted in the underground portion of the guide wall 1 in a direction perpendicular to the extension direction thereof. It is buried in multiple places on the circumference. This steel pipe 2 for insertion is protected by a cable for electric power required when constructing a continuous underground wall and a drain pipe for treating wastewater generated by the construction, which hinders the construction. It is stored in the insertion rope 2 for the purpose of organizing. According to this method, the electric power cable and the drainage pipe do not hinder the construction, and the purpose of protection and organization can be achieved.

【0003】 しかしこの方法では、電力ケ−ブルなどを挿入用鋼管2に挿入したり更には、 施工場所が次のブロックに移動の際には、電力ケ−ブルなどを挿入用鋼管2から 引き出し、次のブロックのガイドウオ−ル1の挿入用鋼管2に挿入し直さなけれ ばならず、段取り替えの手間がかかるばかりでなく、この間工事は中断となる。 これが何度も繰り返されると工期に大きな遅延を来す原因となり、更に、挿入用 鋼管2内に水が溜まりケ−ブルの漏電の原因となることもあった。However, in this method, when the power cable or the like is inserted into the steel pipe 2 for insertion, or when the construction site moves to the next block, the power cable or the like is pulled out from the steel pipe 2 for insertion. In addition, the guide wall 1 of the next block must be re-inserted into the steel pipe 2 for insertion, which not only takes time and labor for setup change, but also interrupts the construction during this time. If this is repeated many times, it may cause a great delay in the construction period, and further, water may be accumulated in the steel pipe 2 for insertion, which may cause electric leakage in the cable.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

本考案は以上の点に鑑みてなされたもので、その目的とするところは、電力ケ −ブルなどを簡単に設置し、移動でき、工事の中断もなく、現場内を整然とさせ 安全に工事遂行できる、連続地中壁構築用ガイドウオ−ルを提供することにある 。 The present invention has been made in view of the above points, and the purpose thereof is to easily install and move an electric power cable, etc., without interruption of construction, to keep the site tidy and to perform construction safely. It is possible to provide a guide wall for constructing a continuous underground wall.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

本考案は、連続地中壁構築用のガイドウオ−ルにおいて、前記ガイドウオ−ル 頂部に、上面を開放し、ケ−ブルなどを収納出来る深さと幅を有する複数本の上 面開放路を、地中壁の溝側から地山方向に向けて貫通する状態で設けたことを特 徴とする、連続地中壁構築用ガイドウオ−ルである。 The present invention relates to a guide wall for constructing a continuous underground wall, in which a plurality of upper surface open passages having a depth and a width capable of accommodating cables and the like are formed at the top of the guide wall and the ground is provided with a ground opening. A guide wall for constructing a continuous underground wall, which is characterized in that it is provided so as to penetrate from the groove side of the intermediate wall toward the natural ground direction.

【0006】[0006]

【考案の実施の形態】[Embodiment of device]

以下図面を参照しながら本考案の実施の形態について説明する。 尚、本考案の説明に際し、従来技術の項で説明した同一部分は同一の符号を付し て説明する。 An embodiment of the present invention will be described below with reference to the drawings. In the description of the present invention, the same parts described in the section of the prior art will be designated by the same reference numerals.

【0007】 <イ>連続地中壁構築用ガイドウオ−ルの全体構成 図5は連続地中壁構築用ガイドウオ−ル1により、連続地中壁構築時の施工状 況の縦断図を示し、図6はその全体平面図を示す。 ガイドウオ−ル1全体の配置は、図6に示す通り連続地中壁4の内外両側に、 向かい合って同心円状に設けられ、ガイドウオ−ル1頂部には上面開放路3が設 けられている。<a> Overall configuration of guide hole for constructing continuous underground wall FIG. 5 is a vertical sectional view showing a construction state when constructing a continuous underground wall by the guide wall 1 for constructing a continuous underground wall. 6 shows the whole top view. As shown in FIG. 6, the entire guide wall 1 is arranged in concentric circles on the inner and outer sides of the continuous underground wall 4 so as to face each other, and an open top passage 3 is provided at the top of the guide wall 1.

【0008】 <ロ>ガイドウオ−ルの詳細構造 図1はガイドウオ−ル1の縦断図を示すもので、ガイドウオ−ル1の頂部に、 上面開放路3が設けられている。 この上面開放路3の上面は、ケ−ブルなどを収納、撤去しやすくするため開放 にしてある。上面開放路3の幅、深さはケ−ブルや排水管を収納し、かつ、その 上に、保護材となる土砂、砕石などを埋め戻すことの出来るスペ−スを有する断 面であればよい。 図2はガイドウオ−ル1の外側のみを取り出した部分的な斜視図で、ガイドウ オ−ル1の延長方向と略直交方向に横断して、上面開放路3が設けられている。 この上面開放路3が連続地中壁の外側と内側のガイドウオ−ル1円周上の任意箇 所に対向して設けられている。 上面開放路3の断面形成にあたっては、ガイドウオ−ル1のコンクリ−ト打設 時に型枠で仕切っておいてもよく、または、U字型溝を設置しておくなど、任意 の方法でよい。<B> Detailed Structure of Guide Wall FIG. 1 is a vertical cross-sectional view of the guide wall 1. An upper surface open path 3 is provided at the top of the guide wall 1. The upper surface of the upper surface open path 3 is opened to facilitate the storage and removal of cables and the like. The width and depth of the open top passage 3 should be such that the cable or drainage pipe is accommodated and the space has a space on which earth or sand or crushed stones as a protective material can be backfilled. Good. FIG. 2 is a partial perspective view showing only the outside of the guide wall 1, and an upper surface open passage 3 is provided across the guide wall 1 in a direction substantially orthogonal to the extending direction. The upper surface open path 3 is provided so as to oppose an arbitrary position on the circumference of the guide wall 1 on the outer side and the inner side of the continuous underground wall. In forming the cross-section of the upper surface open passage 3, any method may be used, such as partitioning with a form at the time of concrete driving of the guide wall 1 or providing a U-shaped groove.

【0009】[0009]

【作用】[Action]

<イ>上面開放路への設置 図6に示すように本考案は、連続地中壁4を挟むように設けられた外側と内側 のガイドウオ−ル1の円周上の任意箇所に対向して設けられた上面開放路3の溝 に、工事用機器5の電力ケ−ブル6や、工事に伴い発生する排水処理のための排 水管など(図示せず)を、単に上から落とし込むだけでよい。 <A> Installation on open upper surface As shown in FIG. 6, the present invention is arranged so as to face any position on the circumference of the outer and inner guide walls 1 provided so as to sandwich the continuous underground wall 4. It is sufficient to simply drop the power cable 6 of the construction equipment 5 and the drain pipe (not shown) for the waste water treatment generated during the construction (not shown) into the groove of the upper open path 3 provided. .

【0010】 <ロ>上面開放路の埋め戻し 電力ケ−ブル6や排水管などを上面開放路3の溝へ落とし込んだあと、その上 に土砂、砕石などを、工事用機器5が走行し易いように埋め戻す。これにより、 電力ケ−ブル6や排水管は、工事用機器5の走行時の破損から保護される。<B> Backfilling of open top road After the electric power cable 6 and drainage pipe are dropped into the groove of the open top road 3, the construction equipment 5 is easy to run on the sand, crushed stone, etc. Backfill. As a result, the power cable 6 and the drain pipe are protected from damage when the construction equipment 5 is running.

【0011】 <ハ>上面開放路からの引き上げ 施工場所の移動、及び施工完了時の撤去の際は、埋め戻した土砂、砕石などを 取り除いたあと、電力ケ−ブル6や排水管などを上面開放路3の溝から単に引き 上げて、次の施工場所へ移動するか、またはそのまま撤去すればよい。<C> Pulling up from open upper surface When moving the construction site or removing it at the completion of construction, remove the backfilled earth and sand, crushed stones, etc., and then remove the power cable 6 and drain pipe etc. from above. Simply pull up from the groove of open path 3 and move to the next construction site, or just remove it.

【0012】[0012]

【考案の効果】[Effect of device]

本考案は以上説明したようになるから、次のような効果を得ることができる。 <イ> 電力ケ−ブルや排水管などの設置は、単に上面開放路へ落とし込むだけ でよい。 <ロ> 工事用機器が走行し易く、かつ、電力ケ−ブルや排水管などの破損を防 ぐためには、土砂、砕石などを上面開放路へ埋め戻すだけでよい。 <ハ> 電力ケ−ブルや排水管などの移動、撤去の際は、上面開放路の土砂、砕 石などを取り除き、電力ケ−ブルや排水管などを引き上げて移動、撤去すればよ い。 <ニ> 電力ケ−ブルや排水管などの移動手間が簡単で、かつ、移動の際に工事 を中断するなどの工期の無駄がなくせる。 Since the present invention is as described above, the following effects can be obtained. <B> To install the power cable and drainage pipe, simply drop it into the open road. <B> In order to make construction equipment easy to run and to prevent damage to power cables and drainage pipes, it is only necessary to backfill earth and sand, crushed stone, etc. into the open road. <C> When moving or removing electric power cables or drainage pipes, remove the soil and crushed stones from the open road, and lift and move the electric power cables and drainage pipes. <D> It is easy to move electricity cables and drain pipes, and it is possible to eliminate the waste of construction time such as interrupting construction work when moving.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本考案に係るガイドウオ−ル及びその上面開
放路の縦断面図
FIG. 1 is a vertical cross-sectional view of a guide wall according to the present invention and its upper open path.

【図2】 その部分拡大斜視図FIG. 2 is a partially enlarged perspective view of FIG.

【図3】 従来のガイドウオ−ル及びその挿入管の位置
を示す縦断面図
FIG. 3 is a longitudinal sectional view showing positions of a conventional guide wall and its insertion tube.

【図4】 その部分拡大斜視図FIG. 4 is a partially enlarged perspective view of FIG.

【図5】 連続地中壁施工状況を示す縦断面図[Figure 5] Vertical cross-sectional view showing the continuous underground wall construction status

【図6】 その全体平面図FIG. 6 is an overall plan view thereof

【符号の説明】[Explanation of symbols]

1……ガイドウオ−ル、 2……挿入用綱管、
3……上面開放路、4……連続地中壁、 5……
工事用機器、 6……電力ケ−ブル、61…盛替時
電力ケ−ブル、7……分電盤、 8……メイン
分電盤。
1 ... guide wall, 2 ... insertion rope,
3 ... Open road, 4 ... Continuous underground wall, 5 ...
Construction equipment, 6 ... Electric power cable, 61 ... Electrical power cable when reassembling, 7 ... Distribution board, 8 ... Main distribution board.

───────────────────────────────────────────────────── フロントページの続き (72)考案者 片岡 潔 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)考案者 岩下 篤 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kiyoshi Kataoka 1-25-1 Nishishinjuku, Shinjuku-ku, Tokyo Inside Taisei Corporation (72) Inventor Atsushi Iwashita 1-25-1 Nishishinjuku, Shinjuku-ku, Tokyo Within Taisei Construction Co., Ltd.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 連続地中壁構築用のガイドウオ−ルに
おいて、前記ガイドウオ−ル頂部に、上面を開放し、ケ
−ブルなどを収納出来る深さと幅を有する複数本の上面
開放路を、地中壁の溝側から地山方向に向けて貫通する
状態で設けたことを特徴とする、連続地中壁構築用ガイ
ドウオ−ル。
1. A guidewall for constructing a continuous underground wall, the top of the guidewall having an upper surface opened, and a plurality of upper surface open passages having a depth and a width capable of accommodating cables and the like, A guide wall for constructing a continuous underground wall, characterized in that it is provided so as to penetrate from the groove side of the intermediate wall toward the natural ground direction.
JP1996002007U 1996-02-27 1996-02-27 Guide wall for continuous underground wall construction Expired - Lifetime JP3028469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1996002007U JP3028469U (en) 1996-02-27 1996-02-27 Guide wall for continuous underground wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1996002007U JP3028469U (en) 1996-02-27 1996-02-27 Guide wall for continuous underground wall construction

Publications (1)

Publication Number Publication Date
JP3028469U true JP3028469U (en) 1996-09-03

Family

ID=43163539

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1996002007U Expired - Lifetime JP3028469U (en) 1996-02-27 1996-02-27 Guide wall for continuous underground wall construction

Country Status (1)

Country Link
JP (1) JP3028469U (en)

Similar Documents

Publication Publication Date Title
US6230468B1 (en) Foundation waterproofing system
KR101103782B1 (en) Temporary retaining wall structure for water works
JP3028469U (en) Guide wall for continuous underground wall construction
CN212462740U (en) Concrete cover plate for cable trench
KR100989984B1 (en) Bult-in timbering roof type tunnel method
JP3663541B2 (en) Impermeable mountain retaining wall with groundwater flow conservation function and its groundwater flow conservation method
JP3250709B2 (en) Open shield method
CN218510307U (en) Pipeline protection device
JP2019203261A (en) Common conduit embedded member and common side ditch unit
JP2625614B2 (en) Drain material placement method
KR100389533B1 (en) united ducts structure for things layed underground
CN212154779U (en) Plugging structure suitable for construction of railway tunnel, bridge and tunnel connected portal
JP2876265B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
KR200236601Y1 (en) united ducts structure for things layed underground
JP4349570B2 (en) Construction method of division box and underground level crossing
KR20050112893A (en) Method of drain construction for basement
JPS6058330B2 (en) Waterproof sheet installation method
KR200286242Y1 (en) Gabion having a perforated drain pipe for collecting water
SU1006617A1 (en) Device for burying section of drain collector in soil
JPS605732B2 (en) Trench excavation method and its earth retention shoring device
JP3176819B2 (en) Cable laying method and manhole used for it
JPS5845323Y2 (en) Tensioning device for earth retaining sheet piles for trench excavation
JPH0638915Y2 (en) Gate for water pipe
JPH04322114A (en) Laying structure of underground communication line
JP2024097648A (en) Steel sheet pile, and removal method of upper steel sheet pile